Transcript
SOURCE TRANSCRIPT
This transcript is downloaded from the source you provided but we haven't reviewed it for accuracy. Treat it as a starting point, not a verbatim record. You can also request an AI-transcription of the audio file with the button to the left.
These are YouTube's auto-generated captions, not a human transcript — expect occasional errors, especially with names and technical terms.
[0:00]
uh microphones everybody just be aware
I'm going to uh call to order the
[0:04]
Planning Commission meeting in City Hall
here 501 Laurel Street council chambers
[0:08]
for Wednesday July 19th 2023. Mr kravic
would you please call the roll Maron
[0:15]
here Gorham here Duvall here Norwood
here Grunwald here staying line here
[0:22]
Jaeger yes item number three Pledge of
Allegiance
[0:30]
I pledge allegiance to
[0:36]
two
indivisible
[0:46]
okay first thing on our agenda here is
an approval of the uh the agenda for
[0:52]
this evening this is item number four do
we have any additions changes
[0:55]
substitutions for the agenda
all right hearing none I'll be looking
[0:59]
for a motion to approved our motion by
staying line and a second by second
[1:04]
Norwood by Norwood very good uh any
discussion hearing none all those in
[1:08]
favor signify by saying aye aye opposed
same sign very good we have an agenda
[1:12]
first item in our agenda is uh number
five this is an approval of the minutes
[1:16]
this is for our regular meeting that was
held on June 21st special meeting held
[1:19]
on June July uh July 12th I think yes uh
do we have a motion to approve those
[1:25]
minutes
so I moved Norwood got a motion to
[1:28]
second group and a second any discussion
hearing none all those in favor signify
[1:32]
by saying aye aye opposed same sign we
have an approval uh motion carries
[1:36]
approval of the uh minutes
okay uh item number six this is uh we're
[1:41]
gonna jump into our unfinished business
here the first is item 6A this is a
[1:45]
letter for the DW Jones requesting
public art for the uh 805 uh Laurel
[1:49]
Street we've got just a sample letter
here uh pretty easy to read but James uh
[1:54]
please uh give us just the brief
overview on this if you would please
[1:57]
there's this is not an action item
unless we want to make any adjustments
[2:00]
or amendments to the letter uh as it
will be submitted and uh I appreciate
[2:05]
all of you looking out on my behalf
since it's my name on it
[2:08]
go ahead James thank you Mr chair so
Planning Commission directed staff to
[2:12]
write a letter to DW Jones on behalf of
the Planning Commission to request a
[2:16]
public art piece as part of the 805
Laurel Street project staff has included
[2:20]
a draft of that letter and like would
like Planning Commission to discuss and
[2:23]
recommend any changes to the letter
all right very good the letter was uh
[2:29]
not particularly lengthy if you all had
a chance to read it that's great if not
[2:34]
no big deal but this would be the letter
that we'd be sending out just requesting
[2:38]
uh some information as I believe it was
Mr Duvall who brought this originally to
[2:43]
the attention of the commission great
great idea here and uh unless anybody
[2:46]
has any objections we'll approve this
letter and I'll sign it and we'll send
[2:50]
it out and see what happens
Mr chair yes please I would encourage an
[2:55]
additional sentence in here probably
following the uh next to the last
[3:00]
sentence in the last paragraph to the
effective I encourage you to reach out
[3:05]
to the crossing Arts Alliance or other
art organizations and institutions in
[3:09]
our community and region just basically
that they don't have to necessarily own
[3:14]
the search or the but the gamut if we
can think of them providing the canvas
[3:19]
and working with the Arts Community to
be able to to fulfill what's on that on
[3:24]
that canvas so very good awesome yeah it
seems yes please well I was wondering
[3:28]
because I had the same
[3:32]
don't
rack card or something or that we can
[3:37]
throw in with the letter
if not I could run and get one there's
[3:42]
some type of what card like a rack card
or uh like we're the from The Crossing
[3:47]
We're The Crossing here's how to get a
hold of them yeah we could probably
[3:50]
include something like that in there
yeah yep some information on that so
[3:53]
that they because like if I got this out
of the blue and I Skip's not getting out
[3:57]
of the blue but I wouldn't know
[4:02]
and I think pointing them in that
direction is the right way to go
[4:07]
yep I think that certainly adds some
some value to the letter
[4:10]
yeah
uh to your point and I'll just jump in
[4:13]
also to your point Mr Duvall I know that
the five Wings Arts Council is a uh an
[4:18]
initiative that works with artists and
they have in many cases uh money
[4:24]
available to uh to partner with people
who want to put art in their locations
[4:29]
we did this for the library over here
with their art and so it might be good
[4:32]
just to put them on there also so that's
you know Skip's not 100 working on his
[4:36]
own on this but there may be actually
somebody else out there who might pay
[4:39]
for it so and just put it on his
property so those seem to make that
[4:43]
seems to make good sense to me any other
thoughts or additions to this
[4:48]
got what you need James and we got what
we need very good thank you very much
[4:51]
and uh Wilkin yes thank you thank you
we're good we're going to continue on uh
[4:56]
to our uh new business and our first
item is item 7A this is a consideration
[5:01]
of an iup an interim use permit for a
short-term rental at 515 9th Street
[5:06]
South
um Dylan would you please uh just kind
[5:09]
of give us the rundown on this and then
James follow up with Dylan if you have
[5:11]
anything please
[5:16]
thank you and good evening
um we are here to discuss an interim use
[5:22]
permit for short-term rental
um applied for by stangler Properties
[5:27]
LLC at uh 515 9th Street South Brainerd
um this is a parcel that lies in a
[5:37]
traditional neighborhood two zoning
District
[5:40]
adjacent uses are duplex rentals uh
single-family residential rental and
[5:47]
non-rental as well as the sharing Bread
soup kitchen all of the other adjacent
[5:52]
properties are also traditional
neighborhood too
[5:58]
included in the packet you can see an
aerial map of where we're looking at
[6:04]
findings of fact we note that this is
located in a traditional neighborhood 2
[6:11]
zoning district and that according to
our table of uses appendix a
[6:17]
um
short-term rentals are an interim use in
[6:22]
that zoning District
in order
[6:26]
for an interim use to be granted in this
zoning District
[6:33]
short-term rentals must comply with the
following minimum standards as required
[6:37]
by the section of code
the maximum rental period shall not be
[6:43]
more than 28 consecutive nights the
applicant proposes the unit as a
[6:49]
short-term rental that will not exceed
28 consecutive nights for a rental
[6:53]
period
the permit holder slash owner
[6:58]
of a short-term rental must apply for
and receive an interim use permit this
[7:03]
application and process that we are
currently going through constitutes the
[7:07]
applicant's attempt to apply for an
interim use permit for the operation of
[7:12]
a short-term rental
the application for an interim use
[7:17]
permit shall include the number of
bedrooms with dimensions and all other
[7:21]
sleeping accommodations I will read
through these parts and then go through
[7:27]
them a little more holistically because
this um
[7:30]
application includes a lot of
redundancies so we have the number of
[7:35]
bedrooms with dimensions and all other
sleeping accommodations
[7:40]
the number of off street parking spaces
available to guests all accessory
[7:44]
structures outdoor recreational features
available for guest use
[7:50]
a pet garbage and noise policy and the
permit holder shall post emergency
[7:55]
contact information police fire hospital
and show renters the location of fire
[8:01]
extinguishers in the short-term rental
unit
[8:05]
um
[8:08]
included in
each of these we have that the proposed
[8:14]
short-term rental is a 900 square foot
unit with two bedrooms those bedrooms
[8:21]
are 13 feet by 12 feet 6 inches and 10
feet by 12 feet 3 inches that will
[8:32]
become important later as according to
occupancy for short-term rentals
[8:38]
there's a limit of not more than three
people per bedroom according to section
[8:44]
404.4.1
[8:48]
of the property maintenance code each
bedroom shall contain not less than 70
[8:52]
square feet and every bedroom occupied
by more than one person shall contain
[8:57]
not less than 50 square feet of floor
area for each occupant thereof or
[9:02]
whichever is less
thus the one bedroom is 162 square feet
[9:08]
the other is 122 square feet both of
those exceed the
[9:13]
100 square foot
requirement on those guest rooms
[9:19]
thus
the number of bedrooms and the
[9:23]
dimensions that are not only included
are included but they are also valid
[9:30]
considerations for bedrooms
in a short-term rental
[9:36]
the number of off street parking places
as noted in the rules for the particular
[9:44]
rental
we have two off street parking spaces
[9:49]
available one allocated in the driveway
and one in an alley loaded garage
[9:56]
the only accessory structure available
for use is the garage and the
[10:02]
rules policy for the
short-term rental clearly states that
[10:08]
there are no pets allowed in the rent
short-term rental property garbage and
[10:13]
recycling bins for use are located at
the rear of the property and collected
[10:17]
every seven days by waste partners and
that there is a quiet hours imposed
[10:23]
between 10 pm and 8 pm
the housing inspector upon inspection of
[10:31]
the rental unit will also confirm that
any emergency information is
[10:37]
posted at the unit
permit holder must disclose in writing
[10:42]
to their renters the following
information
[10:45]
contact information managing agent or
contacts name address and phone number
[10:51]
and the agent shall be available 24
hours a day seven days a week whenever
[10:55]
the property is being rented and
property contact will always be
[11:00]
accessible to the public on the city
Brainerd website our applicant Mr
[11:05]
stangler is the responsible party
and resides within 50 miles of the
[11:11]
premises which is required for an agent
occupancy in the maximum allowed guests
[11:19]
is listed within the rules as has been
previously discussed
[11:25]
vehicles
maximum number of vehicles recreational
[11:30]
vehicles and trailers allowed on the
property which needs to be noted and the
[11:35]
rules clearly state that renters are not
allowed to park more than two vehicles
[11:39]
at the premises at any one time in
designated off-street areas this would
[11:44]
also include Vehicles such as trailers
as referenced
[11:56]
barring any further questions
it is at this point no written
[12:03]
communication has been
put forward to the community development
[12:07]
director or our department with concerns
on this interim use permit
[12:15]
um
yes I will hand over to James for our
[12:19]
discussion of Staff recommendations very
good thank you Mr Edwards James please
[12:23]
yeah so
um Dylan it's kind of summarized the
[12:26]
findings of fact there what I'll be
discussing is just kind of a refresher
[12:30]
on interim use permits and and kind of
the difference between a conditional use
[12:33]
perm and interim use so interim uses are
similar to conditional uses in which
[12:37]
they are allowed provided they meet the
conditions the city May attach whatever
[12:41]
reasonable conditions are deemed
necessary to mitigate anticipated
[12:45]
adverse impacts associated with the
proposed use so really the primary
[12:49]
difference between an iup versus a cup
is that an iup can impose a date or
[12:55]
event that will terminate the use also a
change in the city's zoning regulations
[13:00]
can render the use non-conforming and it
terminates the interim use so those are
[13:06]
a couple of the big differences
staff did forward an email from council
[13:12]
member Johnson with concerns about the
short-term rental in opposition to the
[13:16]
iup
um kind of a summary of that email from
[13:22]
councilman Johnson is the Eda believing
stangler was building long-term housing
[13:26]
awarded stangler property sixty thousand
dollars of government funds to create
[13:30]
the housing stangler properties proposed
uh singular properties accepted the
[13:34]
money to build housing I oppose the
interim use permit because I believe
[13:37]
both units of this government Finance
duplex should be long-term housing
[13:40]
options for people in our community
staff certainly understands the concerns
[13:47]
from councilman Johnson housing is
something that Brainerd certainly a
[13:51]
short on right now and as a major issue
facing the city and it is also an
[13:56]
important goal of the comprehensive plan
however based on a review of the land
[14:01]
use applications and the findings of
fact 515 South 9th Street has met all
[14:06]
the conditions for a short-term rental
and staff recommends approval of the
[14:09]
interim use permit with the following
conditions first one is an approved
[14:14]
inspection by the fire marshal I'm
believe Dave Cox was going to be
[14:18]
reaching out to Mr stangler for that
final review the fire marshal is
[14:23]
required to do a yearly inspection on
short-term rentals
[14:26]
second condition is the middle of the
local option sales tax form to the
[14:30]
finance department which is a
requirement to the interim use and
[14:33]
number three upon sale of the property
by Mr stangler property or by stangler
[14:38]
Properties LLC the interim use permit
for a short-term rental at 515 9th
[14:42]
Street South Brainerd Minnesota is no
longer valid
[14:46]
so with that certainly can answer any
questions from the commission and Mr
[14:51]
stangler is here if you have any
questions for the applicant very good
[14:54]
thank you Mr cram Vic commission members
do we have any questions for staff
[14:58]
either uh Mr Edwards or Mr kranvik at
this time
[15:02]
yes please Mr Gorham is this the third
time we've we've gone through this in
[15:06]
the last two years or is the second time
because I know we've we've taught we
[15:10]
discussed the property before so this
property has gone through two variance
[15:13]
requests the first one expired came in
for a variance request because that
[15:18]
first one expired for essentially the
same thing they were approved both times
[15:21]
and then this one is for the short-term
rental okay
[15:25]
did you mean short-term rentals or just
this property well just this property
[15:28]
because I think it's three on short-term
rentals also if I'm not mistaken right
[15:31]
and then we've gone through or at least
since I've been here a short-term rental
[15:36]
on First Street and then two of them on
South 6th Street in the same unit as the
[15:40]
triplex okay
pretty good any other questions for
[15:43]
staff
Mr chair please I've got one and it's on
[15:47]
the the third condition
um I I understand and I've seen cities
[15:54]
do this where they say on sale the
property or transfer of the property
[15:59]
this is owned by LLC though right
that's correct so someone could buy the
[16:04]
LLC and
you could transfer that
[16:07]
essentially yeah you could transfer it
from a company okay
[16:12]
so this is really
not a condition
[16:15]
if that were to be the case that they'd
actually buy the LLC okay I just I I'm
[16:21]
it it
[16:24]
yeah did our attorney like look at that
third condition and all like is that is
[16:29]
that something you would run by him or
not because it
[16:33]
I'm just it seems like a uh a thing that
we couldn't do but I've seen cities do
[16:39]
it I'm just wondering if I didn't run it
by the City attorney certainly there
[16:42]
could be a triggering effect or an end
date for an interim use permit um so
[16:45]
that's my rationale behind it but uh
General
[16:50]
can't attach conditions to to
individuals
[16:53]
so you know like I can say like I
wouldn't allow you to do it but I'd
[16:57]
allow you to do it it becomes
problematic yeah I could certainly run
[17:01]
it by the City attorney before I really
even want to do it because
[17:07]
like I said you if you're gonna transfer
it you would just sell the LLC and keep
[17:11]
the name
okay I'm with you I don't care either
[17:15]
way I just was interested in the thought
process yep I think that's definitely a
[17:20]
um a good comment there okay
very good any other questions for staff
[17:27]
okay uh this time I'm going to go ahead
and open the public hearing it does uh
[17:32]
617 and we'll invite anyone who might
like to come forward including the
[17:35]
applicant you don't have to but if you
would like to you can come forward uh
[17:39]
I'm assuming we don't have anyone online
no one online so that leaves only you if
[17:43]
you'd like to come forward again you
don't have to
[17:46]
um but at this time the public hearing
is now open and I invite you for it if
[17:51]
you'd like
thank you thank you very much just state
[17:54]
your name and address please for the
record here my name is Eric stangler my
[17:58]
address is 7384 Lone Oak Road in
Brainerd
[18:03]
um
and so we just built this property last
[18:07]
fall and
um well I guess I'll address one thing
[18:11]
stangler properties is like I started
that with one little house and we owned
[18:17]
many properties it's gonna get passed on
to my kids it's never going to be sold
[18:21]
it's not like we're a huge corporation
but
[18:25]
um as far as this uh property goes our
intent was always the same and that was
[18:33]
to rent
for Extended Stay to traveling nurses
[18:37]
and doctors or techs or whoever may be
coming to the hospital
[18:42]
my wife worked in the ER or several
different locations from Essentia to
[18:49]
Cayenne Regional Medical Center and the
Brainerd Lake Surgery Center and we saw
[18:55]
that there was a huge need for like
those people that were traveling to stay
[19:01]
um
so that was why we initially came up
[19:05]
with the plan to build this property now
when we found out that there was a grant
[19:09]
that was available that did not have any
strings attached to it and we could you
[19:15]
know get that money I looked I think
there's over 20 HUD programs but they
[19:19]
all have specific requirements
for what you can use that property for
[19:24]
and this grant didn't have that so I
understand the council member's concern
[19:29]
but as far as
us meeting the requirements I I guess I
[19:35]
don't really see the the logic
um
[19:39]
so the other thing is
the traveling nurses they go on a
[19:44]
13-week rotation so we filled the one
unit right away the second unit didn't
[19:50]
fill so all we're trying to do really is
bridge the gap so our intent is not to
[19:56]
keep this as an Airbnb for
ever for as long as we own the property
[20:01]
it's to get us to where we can keep
turning over
[20:05]
Extended Stay traveling nurses doctors
or techs and so that's the intent I know
[20:13]
it's kind of you know we furnish the
units and
[20:17]
um you know we got a lot of extra money
stuck into them if we're going to do a
[20:21]
long-term rental
we wouldn't have done that so we kind of
[20:25]
and we can't go 13 weeks without renting
out an entire unit so that's why we're
[20:30]
applying for the interim use to get us
to the point where we hopefully can find
[20:36]
a
traveling nurses doctors whoever it may
[20:40]
be to occupy the unit
very good thank you uh do we have any
[20:46]
questions for our applicant just hang
out just one sec just in case
[20:50]
yes please sure
can I restate what you said and just
[20:54]
make sure that I understand sure
um you you're doing 13-week rentals to
[20:59]
nurses but if you've got one that
doesn't fill you'd like the option to be
[21:03]
able to do short-term rental until you
get the next 13 week one in
[21:07]
well our so this is a two unit building
so the one you filled right away yeah
[21:12]
yeah yeah and the other this one did not
so right we're applying for the permit
[21:16]
to get us to the point where we can find
somebody that will fill that so our
[21:22]
turnover with the the nurses we had a
doctor that was doing clinicals here
[21:27]
first then we had a nurse and then that
nurse actually found another traveling
[21:31]
nurse so we didn't really have any Gap
well
[21:34]
the other unit hasn't filled so we're
applying for the permit so that we can
[21:40]
at least generate some sort of income
out of that until we get to that point
[21:45]
which hopefully we do until you get to
having a a trialing nurse or someone in
[21:50]
there correct okay
okay and a little bit of background I
[21:54]
mean we we bought the first rental the
first long short-term rental ever in uh
[22:01]
Ironton cuyuna bike house and operated
that for a few years and then we sold
[22:07]
that and turned a couple of smaller
units like these in Crosby in the
[22:12]
short-term units and it's not all that
it's cracked up to be yes it makes a
[22:17]
little bit more money we're trying to
transition even the ones in Crosby into
[22:21]
these Extended Stays because there's so
many Travelers coming into our
[22:25]
communities and they're staying at
hotels and this is better for them and
[22:29]
it's better for the community in my
opinion
[22:35]
good any other questions for the
applicant yes please Mr Duvall thank you
[22:39]
Mr stangler um so you're describing that
you've had difficulty attracting
[22:45]
qualifying long-term applicants is that
what you're implying for for the one
[22:52]
unit that remains vacant
or
[22:56]
yes so the intent is to do basically the
nurses doctors techs work when they're
[23:03]
traveling they're on a 13-week schedule
so and those come in waves so we've
[23:08]
filled the one unit we haven't been able
to fill this unit and that's why we're
[23:12]
applying for the interim use
could you describe
[23:17]
you know what what your efforts have
been to try and attract
[23:22]
qualified applicants for for the housing
unit
[23:26]
um well like I said my wife worked in
the medical field here all over the
[23:31]
um City at Baxter Crosby and so she's
put out a lot of feelers with people
[23:36]
that are still friends that she has that
still work in those areas we've also
[23:42]
contacted the uh
um
[23:46]
I forget the title now but basically who
who manages The Travelers at the
[23:52]
hospital and you know if you have
somebody that's interested Point them
[23:56]
our way and we just not have not been
able to fill this unit we haven't filled
[24:02]
the other two we had one traveler over
in Crosby and then that fizzled out so
[24:07]
it's been an uphill battle but I think
we're still optimistic that we can get
[24:15]
all four units filled with Travelers and
do that in a way that uh is beneficial
[24:21]
for the community and the hospital and
The Travelers so they're not staying in
[24:26]
hotels while they're here
sure yes please
[24:30]
um you know it it seems like you're
you're targeting a fairly narrow segment
[24:36]
of potential renters for
for a couple bedroom
[24:41]
bath units which are very desirable
rental units in the city of Brainerd I'm
[24:48]
I'm I'm
wondering to what degree you're open to
[24:53]
broadening
your potential
[24:58]
list of candidates to to go beyond the
medical professionals to other families
[25:06]
within the city or coming to the city
for long term and looking for long-term
[25:12]
rental what are your what are your
thoughts on on broadening that
[25:16]
that application that that
pool of people that you'd be trying to
[25:21]
attract to fill your unit
we're 100 open to that and we have
[25:25]
filled it with our units in Crosby when
they were working on the power line up
[25:29]
there we had people that stayed at the
cuyuna bike house all winter long so
[25:34]
we're willing to rent out to anyone
that's going to be staying long term
[25:42]
the issue that we have is you know
construction is not cheap and the fact
[25:48]
that we just built this building our
rents have to be a little bit higher
[25:52]
than what a normal two-bedroom one-bath
rental property long-term rental would
[25:58]
be in the city of Brainerd not to
mention we keep them furnished so you
[26:04]
know if if we have a family that's going
to move in there for six years then we
[26:08]
have to take the furniture out because
you know one thing about having
[26:12]
short-term rentals is they get cleaned
every week or every other day or every
[26:16]
couple weeks or whatever it is every 13
weeks and there's always issues you know
[26:22]
even with these brand new ones I had to
fix a light like we're always in there
[26:26]
keeping them in Tip-Top shape and so you
know our field of of what we're you know
[26:35]
targeting is small but in order to even
more make the mortgage payments on a new
[26:40]
construction in the city of anywhere
that's
[26:45]
you know that was our intent that's how
we set up our financials for it and it
[26:50]
was really the only way that we could
have done it
[26:55]
you know and I and I understand
um and I I don't have uh you know any
[27:02]
any qualms about the business model
you're using to try and get at
[27:07]
you know managing the finances the books
to make this this build work out I I
[27:13]
kind of get that
um I I think a couple things that strike
[27:18]
me uh you know one is by by narrowing
down your
[27:24]
narrowing down your focus whether you
may
[27:27]
be running into the federal fair housing
act by by excluding people it's almost
[27:33]
like choosing families over over
um
[27:37]
individual tenants blending you know you
might be running crosswise there with
[27:43]
federal fair housing act if you've not
looked into that already but the other
[27:47]
point is that that you know the housing
study that was done a few years ago for
[27:54]
Crow Wing County including brainer
really highlights the need for long-term
[27:58]
Workforce housing and you're describing
members a section of the workforce of
[28:04]
Brainerd you know the the Medical
Professional is a is a part of our
[28:10]
Workforce in in here and and and the
need for providing long-term housing is
[28:16]
pretty highlight highly identified as a
high priority in our in our housing
[28:21]
study it's identified as a high priority
in our comprehensive plan and and what I
[28:26]
what I see here is a proposal that's
actually taking
[28:32]
long-term
Workforce housing out of the pool in
[28:38]
returning it in a short term use that
doesn't really help us with the long
[28:44]
Ledger sheet of Need for for Workforce
housing here in the in the city so
[28:50]
that's a that's pretty much very much a
concern I guess that's a comment more
[28:54]
than a question so thank you Mr Spangler
for your answers
[28:57]
um I guess just to that I
you know our we're not I'm very well
[29:04]
aware of the discriminating against
um and we're not saying that we're not
[29:09]
turning people away the issue is the
price point that we need to be at in
[29:14]
order to support the build that we did
um people that are doing long-term
[29:21]
housing just aren't able to spend that
much on a rental unit so you know down
[29:28]
the line you know this this building is
not going to be probably extended stay
[29:32]
short term forever eventually it will
turn to long-term rental and it's a
[29:38]
beautiful building it's built well and
it's going to be there for a long long
[29:41]
time so you know I think this is just a
like a section of its life that we need
[29:49]
to get it to where it needs to be and
then it'll be part of the housing pool
[29:53]
in the city of Brainerd you know we're
not going to own this building for 30
[29:56]
years it's
so yeah in the efforts that you describe
[30:01]
to try and attract applicants really
came down to sort of word of mouth and
[30:06]
and and and I didn't I didn't hear that
that you had advertised with a with a
[30:12]
price point there my my guess is as a
landlord myself in the city that you you
[30:18]
would find
qualified tenants that would meet your
[30:23]
background criteria or your screening
criteria that that would be able to pay
[30:28]
a higher end and look for something
that's nice like that you know because I
[30:32]
agree with you it's a nice looking
building I've not been inside I've seen
[30:36]
it in planned views during the 10 months
ago when you had that before so
[30:41]
anyway I'll
if I could comment sure
[30:45]
um so yes the we I guess I kind of lost
my train of thought but
[30:51]
um
sorry I guess one thing I was going to
[30:55]
say before that the fire marshal
actually was out yesterday too and did
[30:59]
his inspection as well so I guess that
portion has already been done
[31:06]
it's pretty good thank you any other
questions for the applicant
[31:11]
okay thank you very much I'm going to go
ahead and close the public hearing at uh
[31:18]
6 31 here and I'm going to bring it back
to us for a discussion so further
[31:28]
requirement is granted and that it is
not used
[31:31]
for that use for a period of time is
that an issue going back to using it for
[31:37]
that does that make sense what I'm
asking James yeah so I I really looked
[31:41]
at this uh
and considered you know how that would
[31:45]
work you know the use is still a duplex
um so whether it's a rental or
[31:50]
interviews obviously there's more
stringent conditions set upon the
[31:54]
interim use permit with the public
hearing conditions that can be can be
[31:57]
put upon it
um so unless there was a triggering
[32:00]
event in staff's interpretation where uh
you know say say it's a short-term
[32:07]
rental and then you know the Planning
Commission wanted to put a trigger in
[32:10]
advance saying that once it's a long
term or Extended Stay then the interim
[32:14]
use is void
um really I think what we did what we
[32:17]
work well with the applicant is that
he'd have to notify staff when it's when
[32:21]
it's being used as a as a long-term
rental versus a short-term rental
[32:25]
okay so there's nothing like inherent
unless we decide to put something there
[32:29]
that that's all staff's interpreting it
okay
[32:33]
hmm
you know quick questions for staff
[32:36]
otherwise we can discuss amongst
ourselves here yes please Mr Duvall Mr
[32:41]
chair I'd like to make a motion please
to deny the interim use permit for
[32:48]
um 15 or 515 9th Street South in
Brainerd
[32:52]
or short-term rental application all
right we have a motion
[32:58]
their second
[33:02]
second we have a motion in this in a
second
[33:06]
um
is there any discussion on this Mr chair
[33:09]
yes please I would just ask what what
would be the findings
[33:15]
that would support the motion
[33:20]
Mr chair if I may yes please
um the findings of fact that I would
[33:24]
offer are that the variance
application that was approved 10 months
[33:29]
previous
findings of fact there were
[33:34]
supporting the application for a
variance at that time that was findings
[33:39]
of fact three B which stated when
variances are consistent with the comp
[33:44]
plan staff believes this variance
requests are supported by goal one of
[33:48]
chapter three of the comprehensive plan
which states provide a diverse mix of
[33:51]
housing choices for all stages of Life
income ranges and ownership rental
[33:55]
preferences and they highlighted
specifically policy five which says
[33:59]
ensure an adequate supply of quality in
affordable housing units for current and
[34:03]
future residents and and what's proposed
here tonight does not support the
[34:09]
findings of fact that we offered in
support of the variants in
[34:14]
um
September 21st 2022.
[34:20]
Mr chair please yeah go ahead guys I
actually have a
[34:25]
different take than you
and and when I look at
[34:29]
people trying to provide housing that
would be Workforce housing that would be
[34:34]
housing that
um you know could could fill this kind
[34:38]
of need that we're talking about with
the the traveling nurses but also fill
[34:41]
needs for people who are kind of at a
startup position in life
[34:45]
there's a there's there's time in that
market when you're going to have
[34:50]
vacancies there's time when you're going
to have extended vacancies and the idea
[34:54]
that
you would not be allowed to do a
[34:58]
short-term rental on that or an interim
an interim type rental what it does is
[35:02]
it makes a higher burden for people
wanting to provide that particular
[35:06]
product and for me I think if we want
more of that product we should give the
[35:11]
people who are providing that product a
lot more options to fill those gaps it's
[35:15]
going to bring more people into the
market it's going to make uh you know it
[35:19]
easier for people to do that and
actually think that the outcome you're
[35:23]
worried about which is we're going to
have less
[35:25]
Workforce housing if we allow this type
of use I actually think we're going to
[35:30]
have more Workforce housing if we allow
this type of use as a supplemental
[35:35]
for people in the gaps to fill in those
gaps when they have short-term Revenue
[35:40]
problems
Mr chair if I may respond to that and I
[35:45]
and I agree very much with the the
[35:49]
idea you're expressing Mr Marone and I I
think what we have no control over is
[35:56]
whether that short-term rental
goes towards
[36:00]
um
medical professionals who are transitory
[36:05]
in our in our community or
VRBO or
[36:11]
um
Airbnb I think was the phrase that that
[36:15]
the applicant had used here is sort of
the platforms that it turns into
[36:19]
vacation rental space and the vacation
rental space is what
[36:23]
detracts from meeting our Workforce
housing needs and we have no control
[36:28]
over saying you can only rent to
Workforce people in our community right
[36:34]
and if we say short-term rentals are
okay and that's and that's the part that
[36:39]
I'm getting and I fully agree with you
in the the other aspects of the
[36:44]
workforce Community out there and the
way to fill in these slots in our in our
[36:49]
rentals
Mr chair and I I I I get where you're
[36:54]
coming from
I I don't know as I would
[36:57]
if we were talking about like a lake
home or something
[37:01]
maybe we could find some common ground
on that one but you know this is not
[37:05]
this is not going to be a high end
vacation rental
[37:09]
so I I you know just PR in practicality
applying that particular concern to this
[37:15]
property to me it would be a little bit
overstated like I don't think that I the
[37:20]
the likelihood of that is very strong
I'd be interested to know what
[37:26]
what the
um rental history is for the other
[37:32]
two vrbos that we have or excuse me
there's two other short-term rental
[37:37]
permitted properties we have here which
are not Waterfront beach front I think
[37:42]
once up on North End and one's on on the
south end of town and not exactly what
[37:47]
you'd think of as vacation property but
it's a place to
[37:51]
anyway
very good thank you further discussion
[37:56]
yes please Mr Corner yeah one question
when the um maybe uh staff could help me
[38:00]
on this when the study was done looking
at Workforce housing and how to address
[38:04]
it was um was short-term housing ever a
part of it in other words with the sixty
[38:08]
thousand dollars that was allocated here
65 whatever it was was was there uh a
[38:14]
need um recognized to provide for
short-term housing in other words was
[38:17]
that part of the equation
um that the funders had
[38:21]
from the initiative Foundation funding
so I don't believe I don't believe that
[38:26]
uh was part of it I'd have to go into
the the study to see if there's anything
[38:31]
related short-term rental in Crow Wing
County study I'm not I don't know that
[38:35]
offhand
because I think they're just to continue
[38:37]
I think I think there might be a valid I
think there is a valid market for it but
[38:41]
we don't understand it I don't
understand you know we don't understand
[38:43]
how big it is or maybe it's just so
small we shouldn't be concerned about it
[38:47]
I don't know
and uh but I I can see how it is
[38:51]
something can help fill a niche but also
can see how it's something that could
[38:56]
um say well let's take in these uh
short-term things at a higher rate than
[39:01]
as opposed to having to turn to Market
and provide the real long-term housing
[39:05]
we need which was probably the intention
behind the initiative Foundation
[39:08]
so that's my thinking
anyhow thank you
[39:13]
other comments questions
okay well I'm just going to jump in with
[39:18]
my thoughts here uh when I've when I
first saw this come through I will admit
[39:22]
that this landed on me all wrong mostly
because of my background with deed and
[39:26]
being part of the group that
gave the sixty thousand dollars or was
[39:30]
was a part of that in initially when I
when I first reacted to this it landed
[39:35]
on me all wrong also
um and to your point uh I know um Mr
[39:41]
stangler that you've said that there was
nothing on you know in that application
[39:45]
that prevented you from doing this but I
would also just like to ask staff to
[39:48]
just follow up with that and just verify
with the people of deed to make sure
[39:52]
that there isn't something that we're
missing here which disqualifies this
[39:55]
type of use
um
[39:58]
and then coming and that being said
that's not really a part of what's in
[40:01]
front of us tonight totally get that
um that being said I've also kind of
[40:06]
been on both sides of the fence of this
I've been a part of the long-term
[40:10]
long-term housing conversation been a
big proponent of that still am but I've
[40:14]
also noticed that myself in in sitting
in other city meetings with short-term
[40:20]
rentals and
um uh have been going through life
[40:23]
somewhat per blind with what these what
what these uh what these types of
[40:29]
dwellings really can do for a community
so uh while I would probably prefer to
[40:34]
have a long-term residence here I also
understand the need for people who are
[40:38]
moving in between residences people who
are only in town for short-term work
[40:42]
traveling service providers seasonal
visitors people who have lost their home
[40:46]
due to fire or to other construction
issues or kicked out of their house for
[40:51]
construction issues and there's also a
whole list of people who need short-term
[40:55]
Living For Life circumstances things
beyond their control that happen in
[40:59]
their life that force them to move out
of their house or their dwelling without
[41:03]
with very short notice so
um
[41:06]
I can I can also see that there's a need
for this also in a short term in our
[41:11]
community I will always come back to the
fact that what concerns me most is
[41:16]
behavior
and what I see visually with my eyes
[41:21]
when I look at a property this means
upkeep whether it be by an owner that's
[41:25]
a renter or a long-term owner and
behavior whether it is a rental or a
[41:29]
long-term owner because believe me we
have good and both in both good and bad
[41:33]
in both scenarios some of our most
problematic people that come before us
[41:38]
are long-term owner occupiers we we know
this right so I guess where I'm at on
[41:44]
this is is I'm struggling I find that
taking the path of saying that this
[41:51]
doesn't fit our our comprehensive plan
is a bit of a reach for me personally
[41:57]
I'm very close to neutral on this and
that's why I'm going to be asking for a
[42:01]
roll call vote on this but that's that's
kind of where I am and I I think that uh
[42:06]
just generally we need to to be a little
generally more open-minded that
[42:11]
short-term rental doesn't mean keggers
every weekend and trash in the street so
[42:15]
I think there's there are other
functions behind that so yeah
[42:19]
um if there's uh yes please
Mr Norwood
[42:23]
sorry I'm dying
um
[42:29]
currently I'm in the position of not
supporting the motion
[42:32]
um
[42:34]
under the premise of the
it's difficult there's other ways to
[42:40]
skin the cat so I agree
with the the motioner but
[42:47]
there's there's I agree but I can't
support it
[42:53]
if that makes sense
it doesn't make sense I've been there
[42:56]
many times
[43:00]
further discussion okay we have a motion
to deny I just want to be clear make
[43:04]
sure everyone's got this straight we
have a motion to deny in a second uh so
[43:08]
and we're going to be voting by roll
call if you vote if you vote Yes you're
[43:12]
voting for a denial of this iup if you
vote no you are voting uh to uh to allow
[43:18]
the iup to happen okay does that sound
right everyone all right very good I
[43:22]
feel like there should be a separate
motion very good
[43:26]
if this one doesn't pass
okay so would you how would you like to
[43:30]
play this would you like to vote first
and then make a motion after this motion
[43:33]
and then we can have a second one very
good
[43:36]
all right here we go drum roll everyone
and Mr cramp go ahead James is going to
[43:40]
uh call the roll
maroon a post
[43:44]
Gorham no
Duvall yes
[43:48]
Norwood no
onwald no staying line yes Jaeger and
[43:54]
that's no
so I would I would make a motion uh to
[43:59]
uh recommend the the interim use permit
be approved based on the findings
[44:05]
provided by staff
with the three conditions recommended by
[44:09]
staff
I would add to the third condition since
[44:13]
we're we're going down this road anyway
we might as well go all the way I would
[44:17]
say upon sale the property by stangler
Properties LLC comma or transfer of
[44:23]
ownership within stangler Properties LLC
comma the interim use permit for
[44:28]
short-term rental da da
Mr chair yes please would the motion or
[44:33]
be open to an amendment to that motion
to include a two-year term on the permit
[44:40]
to expired December 31st 2025.
point of order yes uh point of order
[44:47]
just for a second
and I'll second the motion
[44:50]
okay just so that way it got it yeah
I respect what you're asking but no I
[44:58]
don't really feel a need to do that
[45:02]
all right so we have a new and exciting
motion and a second on the table here is
[45:07]
there any uh further discussion
it
[45:11]
I know I seconded it but
where Mr Duvall was headed is the
[45:16]
general direction of where I was headed
for you just beat me to make an emotion
[45:21]
and so so you're saying head your bets
two years we'll look at it again if it's
[45:25]
not a problem I I the reason I wouldn't
do that is because I feel like we're
[45:29]
just adding
I mean the petitioner was suggesting
[45:36]
that there is a time delay as to fulfill
the proposed
[45:42]
business plan
so you're saying in two years that delay
[45:45]
should be resolved and then this is not
needed I
[45:50]
the the timing is as far as the timing
it
[45:55]
I'm indifferent to the timing I just
believe that it needed a close date
[45:59]
and so if
if Mr Duvall is asking for a did you say
[46:06]
two years two years expiring December
31st 2025.
[46:11]
that's I've go ahead I'm indifferent to
the the time I'm that's the debatable
[46:16]
part that we can
uh well I can tell you where I am on
[46:20]
that debate we've allowed to my
knowledge we have approved two of these
[46:23]
in the last 24 months into my knowledge
that condition wasn't attached to either
[46:26]
one of those two so my concern is is
that we are unfairly or or perhaps uh on
[46:34]
we are in we're doing this in a way that
is not
[46:38]
um in in alignment with the way that we
have approved the other so that's my
[46:42]
concern with attaching uh and forgive me
was that in a tn2
[46:48]
agreed yeah Mr chair if there's a Nexus
between what the applicant has said his
[46:54]
business plan is and what you know other
Commissioners would want that would help
[46:58]
us get to
a recommendation I'm I'm fine
[47:02]
considering it but I I guess
I'm kind of with you like I like let's
[47:06]
just
we're gonna do it let's do it
[47:10]
uh well it's on you you're being asked
to change your motion
[47:14]
yeah and I guess maybe I'm doing a straw
full like is this going to be like is
[47:18]
everyone going to vote against this
because like it'll be here all night
[47:21]
maybe let's call the question and if
people will not vote for this one then
[47:24]
uh I'll change it I'd like to also
remind this commission that we are
[47:28]
advisory so yeah whatever the outcome is
of this um city council ultimately will
[47:33]
be making the decision on this but uh I
would encourage us to just uh pull the
[47:38]
trigger on something here
[47:43]
so I'm not hearing a Amendment to the
motion so we're going to do this by roll
[47:47]
call also now one more time if you vote
uh yes in favor of this you are agreeing
[47:52]
to allow the interim use permit to be
permitted if you vote no you are voting
[47:57]
no and remember that there were three
conditions the third one was briefly
[48:00]
modified I'm not going to go into the
details of that any questions on this
[48:03]
before we roll call this
all right James here we go maroon yes
[48:08]
Gorham yes Duvall yes Norwood yes
gruenwald yes staying line yes Jaeger
[48:17]
yes wow oh there we go
very good thank you
[48:22]
um will you please Mr cranbic just kind
of let the applicant know what uh what's
[48:26]
going to happen next next steps yep so
this will go to the next city council
[48:30]
meeting which is on August 7th and they
will vote for an approval or denial of
[48:35]
the interim use permit very good thank
you Mr cram Victor thank you for coming
[48:40]
thank you okay we're going to move on to
uh item 7B this is the consideration of
[48:44]
allowing mixed-use buildings in the
commercial Corridor District Mr kramvick
[48:48]
please
yes thank you Mr chair uh so just a
[48:51]
brief summary at the June 28th Eda
Workshop staff proposed allowing
[48:55]
mixed-use development in the commercial
Corridor District to incentivize
[48:58]
Redevelopment in the district and to
maximize housing opportunities for
[49:02]
potential developers kind of along with
this as well staff is also proposing and
[49:08]
the Eda is uh
you had a kind of a general consensus at
[49:13]
the workshop that they're interested in
creating a a similar River to rails
[49:16]
District along the commercial Corridor
District part of the commercial Corridor
[49:20]
district is already in the river Trails
but extending it kind of all the way to
[49:23]
the Cub Food area
the river Trails District just is kind
[49:27]
of a reminder waves all building permit
fees up to 150 000 of construction value
[49:33]
as well as waving sack and whack and
park dedication fees so one of the
[49:39]
things that the Eda
[Music]
[49:42]
the workshop had directed staff to do
was to talk with Brainerd Public
[49:48]
Utilities as well as our public works
department to see if the utilities can
[49:51]
handle waving sack and whack fees but
so so staff will be doing that tomorrow
[49:58]
but tonight's consideration is whether
mixed use development could be done in
[50:03]
the commercial Corridor District as well
staff would look at that this is similar
[50:07]
to The Main Street District in which the
first floor residents units are
[50:11]
prohibited so right now our Main Street
District runs from Front Street down to
[50:16]
the mid block of maybe Norwood and Oak
Street and then from 5th Street to a
[50:22]
street so essentially no residential is
allowed on the first floor that's
[50:26]
essentially how staff sees as a
potential for the commercial Corridor
[50:30]
District I did include in the second
page here
[50:34]
an example so this is Moorhead this is a
city where I grew up so this is First
[50:39]
Avenue North it's a I think a pretty
good representation of what we kind of
[50:45]
see with Highway 210 this is kind of a
Gateway into Moorhead and in a similar
[50:49]
location in in and close around downtown
you see here is a 2008 picture pretty
[50:55]
sparse development there's a the
railroads actually on the left hand side
[50:59]
some industrial uses over there if you
go down to the 2002 picture here's a
[51:05]
picture the the appear to allow complete
residential on the left-hand side but
[51:10]
there is a mixed use development that
was was created on the right hand side
[51:14]
so besides allowing more residential
into this kind of Gateway into Moorhead
[51:18]
it also really spurred development from
some of the existing businesses that
[51:22]
aren't mixed mixed-use development
there's a brewery that kind of expanded
[51:26]
and doubled in size because of the
amount of residents that are in here and
[51:29]
then there's also a number of other
businesses that because the amount of
[51:33]
residents that are in this area it
really spurred development and and has
[51:37]
kind of revitalized this whole Gateway
into Moorhead so just kind of a quick
[51:41]
example and this is really just a
discussion topic tonight
[51:45]
um you know seeing if Planning
Commission does want a direct staff to
[51:48]
look further into potential potentially
allowing mixed-use development in the
[51:52]
commercial Corridor District right now
it's just essentially a business
[51:55]
district
um and there is no parking requirements
[52:00]
in the commercial Corridor District so
that would some you know maybe have to
[52:03]
be some type of consideration
um but with that I'll turn it over to
[52:08]
the Planning Commission you did see
there's a there are currently five
[52:11]
mixed-use development buildings within
the commercial Corridor District those
[52:15]
are considered legal non-conforming at
this at this time but I'll turn it over
[52:19]
to the Planning Commission for any
comments or Direction very good thank
[52:23]
you Mr cranvik
all right guys any uh
[52:27]
questions comments
considerations discussion
[52:32]
I think it's a great idea
[52:35]
they've been through that area in
Moorhead
[52:39]
properly went to that Brewery
[52:42]
probably I can admit to anything but
it's it's um it's pretty amazing the
[52:49]
amount of people are all walking around
[52:54]
are you envisioning this as a
conditional use
[52:57]
or as a so yeah mixed use development is
a conditional use kind of throughout all
[53:02]
of our districts so it ended up being a
conditional use yeah okay
[53:08]
I think that's the key for me also
hugely powerful tool but
[53:13]
it's allowed but we're you know then
allowed to attach conditions to better
[53:16]
control
any other questions for staff comments
[53:21]
Mr chair yes please Mr Gorham my
question a lot of it uh to you Mr
[53:26]
krampik sent us around what is
Washington Street going to look like
[53:30]
when the when the redo is done in other
words is it going to be the kind of
[53:33]
street that will actually support what
we're trying to do I like that you have
[53:36]
mixed use on there I think that's
tremendous I think it's something we've
[53:40]
kind of talked about before of trying to
turn Washington Street and slow it down
[53:44]
and get more out of it and create a more
hospitable place and the question is do
[53:50]
we think the highway plan as presented
so far I guess it's done at this point
[53:53]
is it going to support it
you know that's something I can bring up
[53:58]
with the public works department as well
our city engineer to get his thoughts on
[54:01]
that part and certainly provide a report
kind of on the the next part if we do
[54:04]
bring some type of draft ordinance
um I think you know to your point of
[54:08]
trying to slow traffic down you know
right now some of these places and you
[54:12]
see you see in the the 2008 picture it's
just these large expanses and you know
[54:17]
the more you have these large expanses
the you know it kind of feels almost
[54:20]
more like a super highway that's going
through here you know traffic speeds up
[54:24]
you know one of our con or one of our
conditions within the commercial
[54:29]
Corridor district is to bring buildings
closer also adding height is going to
[54:33]
kind of frame this and and I think you
know have the desired effect of
[54:37]
potentially you know helping slow
traffic or calm traffic slightly
[54:42]
thank you
yes sure yeah Brent can you freeze that
[54:47]
picture for just a second
um
[54:50]
wouldn't it be cool if you had like a
Skyway across and you know thinking
[54:56]
about the thinking about the Washington
example I mean being able to join these
[55:01]
kinds of buildings to to to provide
another way across a busy
[55:06]
State Highway in addition to all of the
the things that are in the design for
[55:11]
2025 or 2026 reconstruction of
Washington Street so this this kind of
[55:17]
what you see there would lend itself to
being able to to give you that
[55:21]
alternative and you can imagine those
being a publicly accessible uh maybe
[55:26]
it's a stairwell elevator system on the
corner of those buildings that gets you
[55:31]
crossed as well so it's also going to be
able to serve our Ada folks as well so
[55:36]
just a comment about ways to that that
could help us
[55:40]
we do actually have a couple of examples
of kind of what this looks like when
[55:44]
both The Sawmill Sawmill which has main
floor commercial residential above as
[55:50]
well as the bicycle shop same similar
kind of concept sitting close to the
[55:54]
road commercial on the bottom storefront
on the bottom residential on top so it's
[55:59]
kind of a little bit the look
[56:02]
any other discussion
um Mr chair yes please I'm I'm
[56:08]
enthusiastically in support of the idea
of mixed use in this area I
[56:13]
I think this is rather hideous in a lot
of ways
[56:18]
um just from a design standpoint and I
mean if you
[56:22]
if the idea is we want to restrict the
first floor to Commercial and the rest
[56:28]
be residential I I've seen a lot of
success where instead of doing it that
[56:35]
way you actually have
what would be a very light architectural
[56:40]
standard
uh not the kind of architectural
[56:43]
standard where you're speccing the type
of siding and the color and all that but
[56:46]
you're expecting where the door opens up
onto uh how wide the ground floor units
[56:53]
can be so you don't get kind of a
monolithic you know thing if you look at
[56:57]
the building on the left it's actually
pushed back quite a bit from Where the
[57:01]
Sidewalk would be and the openings are
not on that side so if you're walking
[57:04]
through there it's kind of as almost as
desolate as it was in the pre-picture
[57:09]
there's really no interaction on the
other side you get a little bit of
[57:13]
interaction but the doors are on the
side of the building not on the street
[57:17]
side and so you lose that kind of
connectivity
[57:21]
I I tried one in Greenville South
Carolina not too long ago where they had
[57:27]
a similar concept but on the first floor
they were very flexible about
[57:31]
residential and Commercial and they were
they didn't have enough commercial to
[57:35]
fill the space initially and so they had
a couple that were residential on the
[57:39]
first floor but they from the street
wise they opened up the same way and
[57:43]
they looked the same way and I talked to
the developer and he's like yeah as soon
[57:47]
as we fill these we're going to make
these commercial too but again kind of
[57:52]
like with the last one it was a way to
cash flow it in the interim because
[57:56]
there was more residential demand than
there was commercial demand I also you
[58:00]
know step back and look at the second
and third stories and
[58:05]
yes you know having them as residences
is really great but when you allow them
[58:10]
the flexibility to also be office or
something else again you you just get a
[58:15]
building that functions more like the
Easy Rider store would have functioned
[58:20]
historically or the the the
Samoan with a function historically
[58:24]
where
you're kind of
[58:28]
you know whatever works as long as it's
at this scale
[58:32]
I think what we'd want to get away from
is the idea that like on the left you'd
[58:37]
have one big wall for a you know 500
feet with no uh no you know no breakup
[58:44]
in the continuity no human interaction
because that just kills your your
[58:48]
walkability
so I'm enthusiastic but I wouldn't I
[58:52]
wouldn't approach it the way that it's
being recommended I would tweak
[58:56]
the standard a little bit uh from what
is being recommended
[59:04]
all the comments so so basically
broadening the staff assignment to
[59:10]
to bring in some sort of architectural
considerations
[59:14]
um
in addition to just sort of that
[59:17]
residential use
as they're proposal yeah I I feel like
[59:20]
developers would be more open to
it kind of standard that allow them a
[59:25]
lot of flexibility and use in exchange
for a little bit of um
[59:29]
you know design requirements
and we talked about stepping back upper
[59:35]
floors a certain distance in some of our
previous conversations through the comp
[59:39]
plan and and the development of the
ordinance here
[59:42]
right that that storefront and maybe you
step back from the street on the next
[59:47]
level up or maybe two levels up and
gives you less of that that wall effect
[59:52]
and more texture if you would a visual
texture to the wall it would depend on
[59:57]
the the place
um you know if you have a wide Street
[1:00:02]
width you can go quite a bit up before
it starts to feel that way
[1:00:06]
on a narrower Street you you've got some
height
[1:00:10]
yeah the height would be different
but in this Zone I mean I you could go
[1:00:15]
three or four stories before you had
that effect
[1:00:18]
in any way
commercials Corridor correct is
[1:00:22]
Washington Street
yep that's correct so commercial
[1:00:26]
corridor from the river to about the Cub
Food area that's that's considered
[1:00:31]
commercial Corridor Cub Food then would
be General commercial any kind of kind
[1:00:35]
of the certain models around it and then
once you cross the river that's General
[1:00:38]
commercial as well so we have some
defined
[1:00:42]
parameters within the road in the the
width of what we're talking about yeah
[1:00:46]
you generally I mean it's a kind of a
three to one six to one ratio of width
[1:00:51]
to height
gives you a good proportions so you
[1:00:54]
wouldn't you wouldn't want to
step back until you exceeded that
[1:01:02]
and that's a pretty big building
[1:01:07]
yes please Mr cranbic yeah so I do think
Mr Marone made some some excellent
[1:01:11]
comments there on the building look
certainly when I look at the building on
[1:01:15]
the left-hand side you know there's
really no interest to that and and uh
[1:01:18]
you know it doesn't look like a
particularly pleasing building
[1:01:22]
um I know just getting the resonance
down here is what really has spurred
[1:01:25]
development to some of the other
buildings so kind of my recommendation
[1:01:29]
with this is uh we haven't really talked
about you know kind of next steps after
[1:01:34]
our parking ordinance so and I do have
that in my staff report where the
[1:01:38]
parking commission will be meeting
August 2nd to go over the parking
[1:01:42]
ordinance and then at the August meeting
we'll bring the draft of the parking
[1:01:46]
ordinance and then there's kind of next
steps on what we work on next
[1:01:50]
um so staff was going to recommend
actually looking at our design standards
[1:01:55]
um at our next one and and taking a look
in our in our general development and
[1:01:59]
design standards so I think this would
be a relatively easy one adding mixed
[1:02:04]
use to the commercial Corridor but if we
did those in conjunction function with
[1:02:07]
reviewing our design standards I I and
staff is going to recommend we look at
[1:02:11]
it for single family two to four as well
as as five plus and multi-family so kind
[1:02:16]
of looking a whole at a whole thing for
our design standards um I think these
[1:02:20]
could two could be you know kind of done
simultaneously
[1:02:24]
yes please and how much of a wrench does
the parking question
[1:02:30]
how much of a wrench do we throw into if
you start requiring parking design
[1:02:34]
elements into architectural design for
mixed use
[1:02:40]
so yeah so right now we're working on
the parking ordinance um parking parking
[1:02:44]
commission is going to review out one
thing that we did toss around with the
[1:02:46]
next one is in our Main Street downtown
district maybe there's a requirement to
[1:02:52]
um you know have half the amount of
required parking spaces
[1:02:55]
um for a place or you know maybe simply
that uh that there's gonna have to be
[1:02:59]
some type of parking plan
provided by the developer in order to to
[1:03:04]
construct a project like this as part of
a conditional use permit so there's a
[1:03:07]
couple things I think we still have to
work out with our parking commission as
[1:03:11]
plant and Planning Commission on you
know how this would really work because
[1:03:14]
obviously you know a large building like
this would need parking so whether it's
[1:03:18]
you know whether they're coming some
agreement to a property next to them
[1:03:23]
some joint you know joint agreement or
they're doing underground parking
[1:03:27]
um you know that's kind of how staff
envisions that but uh you know getting
[1:03:30]
some direction here would you know maybe
help provide us some direction then as
[1:03:35]
we're going to the Planning Commission
and kind of future
[1:03:38]
um future parking commission meetings on
on working on the parking ordinance
[1:03:42]
thank you James yeah Mr Norwood I'll
just jump in on that also I would say as
[1:03:46]
a I mean from a developer's perspective
parking can have a huge impact on how
[1:03:51]
you would attack a project or and even
possibly complete viability if we were
[1:03:55]
to say for instance
say you have to have underground parking
[1:03:59]
or something like that
you could be potentially imposing
[1:04:02]
Financial burdens
that would make render virtually all
[1:04:07]
projects you know not not viable that's
an extreme case but to answer your
[1:04:11]
question it could have an impact yes
especially if it's minimums
[1:04:15]
um
you know
[1:04:19]
all right uh just any other discussion
conversation here
[1:04:24]
so staff is looking for us uh you know
is is looking for us to direct them to
[1:04:30]
revise the zoning code to allow for
multi-use in the in the corridor
[1:04:34]
District it sounds like we still have
some heavy lifting to do as far as
[1:04:37]
potential design standards architectural
standards even maybe overlaid with
[1:04:42]
parking standards and that but I think
we're just kind of generally you're
[1:04:46]
looking for some head nodding to say
yeah we kind of like where this is going
[1:04:51]
so at this point I'm going to ask for
people who are head shakers not knotters
[1:04:55]
okay very good you got what you need
James you think we do have what we need
[1:04:59]
all right fantastic this may be just a
follow-up if we are
[1:05:02]
um you know just to build off of what uh
director pram said about the cue of
[1:05:08]
other things that you know as we as we
start wrapping up the parking if we
[1:05:13]
could look at the Grand list
and and we you know so as as we think
[1:05:18]
about
um
[1:05:20]
placing this or something else in that
queue just to be helpful just to refresh
[1:05:25]
ourselves or at this beyond the
six-month point be helpful to just
[1:05:28]
refresh yourself as we've gotten close
to knocking off one of those is the are
[1:05:33]
the priorities still the same and we can
bring that to the next meeting yep
[1:05:38]
we could start meeting weekly
[1:05:42]
I'm almost there very good uh okay
um I was going to move on
[1:05:49]
we're going to move on now just uh so
everyone knows as you read the packet
[1:05:53]
item 7c was technically canceled for
tonight but it was actually postponed to
[1:05:58]
the next meeting just so everyone knows
that we'll be uh re-emerging in our near
[1:06:01]
future I'm going to move on to item
number eight which is our public forum
[1:06:05]
um I'd like to make a motion relating
back to 7A
[1:06:09]
um to direct staff to investigate
approaches
[1:06:14]
precedence benefits consequences of
limiting short-term rentals in our city
[1:06:20]
and to just report back to us on what
examples are out there what's the I mean
[1:06:25]
we've had some discussion about the pro
and con here at this desk and and
[1:06:29]
whether we could have a look at that
um you know and I wouldn't put that I
[1:06:33]
guess I might put it on that list though
stuff but I would like to to see us
[1:06:39]
have a good careful eye at that and then
and then some information we can act on
[1:06:44]
so I'd like to offer that motion please
uh so yeah we have a motion uh there do
[1:06:49]
you have a grasp on the motion you okay
with what we get what he's asking to be
[1:06:52]
done here okay and we got a motion a
second uh any discussion I'm just going
[1:06:57]
to jump in real quick I think it's
probably a good good idea because I have
[1:06:59]
this feeling in the back of my head that
when the comprehensive plan was written
[1:07:02]
nobody was asking is there a need for
short-term rental this is to me
[1:07:06]
the conference plan perhaps doesn't
cover it or address it as a need because
[1:07:11]
it really didn't exist or was even if it
did exist it wasn't acknowledged as uh
[1:07:16]
as a performing status in our in our
community so I think it's a great
[1:07:20]
exercise and uh for you know good idea
for us to get our head wrapped around
[1:07:24]
how it's doing what other communities
are doing and how we can better apply it
[1:07:28]
so excellent point thank you uh so we
have a motion a second any other
[1:07:31]
discussion hearing none all those in
favor signify by saying aye aye opposed
[1:07:36]
same sign very good thank you
okay so I'm going to open the public
[1:07:39]
forum at 707. uh this is the time for
anyone to come forward who have might
[1:07:43]
have anything they would love to chat
about before this esteemed commission do
[1:07:47]
we have anyone in line I went online and
I see no one in the house so I'm going
[1:07:51]
to close the public forum at 707 and we
are going to move on to item number nine
[1:07:55]
which is Staff reports uh whoever raises
their hand first goes first
[1:07:59]
no one's there we go James kramdick
you're up so update on vcv uh so vcv has
[1:08:04]
not contacted the Community Development
Department this is the cryptocurrency
[1:08:07]
that purchased the industrial park lots
they've not contacted staffs and service
[1:08:11]
plans are approved by the Eda for
buildings instead of outdoor storage as
[1:08:15]
a principal use I do believe they're
still working with Brainerd Public
[1:08:19]
Utilities on kind of final utility plans
and getting the power that they need to
[1:08:23]
their site so
um but for the last couple of months
[1:08:26]
staff has not heard anything about a
building permit or or any I guess
[1:08:31]
anything from them on on that front
um I did mention the parking commission
[1:08:35]
will be meeting August 2nd to review the
draft of the ostrich parking ordinance
[1:08:39]
and a final draft will come back to the
Planning Commission on August 16th so
[1:08:42]
that'll be kind of the final review and
then the next Planning Commission would
[1:08:45]
be the actual public hearing so a few
more steps to that
[1:08:49]
for the draft of the parking ordinance
also at the last city council meeting
[1:08:54]
the council did hold the first reading
for the Country Manor planned unit
[1:08:58]
development District uh so that's the
ordinance amendment to create the new
[1:09:02]
zoning District they did also approve
the preliminary and final plat as well
[1:09:06]
as the concept plan and general
development plan for the Pud in order
[1:09:11]
for the final plat and the preliminary
plot to be approved there will have to
[1:09:15]
be a second reading of the ordinance as
well as as well as approval from city
[1:09:20]
council after that Country Manor will
have to work with the city of Brainerd
[1:09:25]
on a development agreement and then
bring a final plan for their planned
[1:09:29]
unit development so those are kind of
next steps I'd anticipate probably two
[1:09:32]
or three months to resolve some of some
of that stuff and kind of last one city
[1:09:37]
council approved the Redevelopment Tift
and Redevelopment Tiff plan for 805
[1:09:41]
Laurel Street at the last city council
as well and with that that's everything
[1:09:44]
I have very good thank you Mr Edwards
you have anything
[1:09:48]
um yes just briefly and it sort of came
up during the discussion of the interim
[1:09:53]
use permit that this property has had
things come along in the past and one of
[1:09:58]
the things that we were working on in
the department is building a running
[1:10:01]
two-year list
at least for the city council level of
[1:10:06]
the
Planning and Zoning processes that have
[1:10:10]
gone through Planning Commission and
city council and where they're at in the
[1:10:15]
process currently so that we can have a
clearer picture of once something comes
[1:10:21]
through this commission or the council
for instance if it's a conditional use
[1:10:25]
permit and that was supposed to prompt
some action and nothing has happened for
[1:10:30]
two years that might be something that's
good to note or in a rezoning or
[1:10:35]
something along that line so that is
something we're actively working on
[1:10:38]
creating which may be a helpful
reference that'll be in our community
[1:10:42]
development report for city council
awesome okay thank you Mr Edwards
[1:10:46]
anything Mr bomber nothing tonight okay
we're going to move to item number ten
[1:10:51]
this is our commission member reports
I'll start with my left anyone who would
[1:10:54]
like to go promote anything
Tiffany Mr Norwood nothing to add I got
[1:11:00]
in front of you anyways you know that
works see I started laughing okay I just
[1:11:04]
have one quick thing uh I was able to
attend I believe was Friday the 14th uh
[1:11:09]
this was the yeah this is the Italia
quartet that happened at our brand new
[1:11:13]
uh Park uh the Lyman P wide park and it
was uh phenomenal I just want to say uh
[1:11:19]
people there was about 120 130 people
there they were having a fantastic time
[1:11:24]
it sounded good it looked good off in
the uh on the Riverside there was about
[1:11:28]
a dozen kids who were playing on the uh
playground equipment which was highly
[1:11:33]
criticized as to whether or not it would
be played upon not a playground it's
[1:11:36]
play area that the play area and the
kids were there non-stop for an hour
[1:11:40]
over an hour and a half straight and
never left so and uh having fun also I
[1:11:45]
will say that a couple members from the
uh from the lake Sarah Music Festival
[1:11:49]
came forward and uh spoke very highly of
the development in our city and just
[1:11:56]
what a what treasure that was to have
something like that in support of the
[1:12:00]
Arts so uh just wanted to shout out that
uh good job to everyone that worked on
[1:12:05]
that and offer some positive feedback on
on our beautiful park down there that's
[1:12:10]
all I have
you anything I knew you're going to say
[1:12:14]
that anything else uh down the road up
yep Mr Duvall
[1:12:19]
um pass okay very good uh with that
we'll be looking for a motion to an
[1:12:24]
adjournment
make a motion to adjourn got a motion to
[1:12:27]
adjourn second and a second all those in
favor signify by saying aye aye opposed
[1:12:32]
same sign thank you everyone