Transcript
SOURCE TRANSCRIPT
This transcript is downloaded from the source you provided but we haven't reviewed it for accuracy. Treat it as a starting point, not a verbatim record. You can also request an AI-transcription of the audio file with the button to the left.
[0:48]
Um, it's 4 o'clock, so I'd like to ask
[0:51]
uh that we call the meeting to order.
[0:55]
» Can we have a roll call, please?
[0:57]
» Board member Dyer
[0:58]
» Here.
[0:59]
» Board member Guiieri
[1:00]
» Here.
[1:01]
» Board member Rinstein,
[1:03]
» Board member Boris,
[1:04]
» Here.
[1:05]
» And Chair Croman,
[1:06]
» Here. Will you rise and join me in the
[1:08]
pledge of allegiance?
[1:13]
» I pledge allegiance to the flag
[1:15]
» Of the United States of America and to
[1:18]
the republic for which it stands, one
[1:20]
nation under God, indivisible, with
[1:24]
liberty and justice for all.
[1:29]
» Thank you.
[1:34]
Do we have any public appearances? Any
[1:36]
um people from the public that wish to
[1:38]
speak on items not part of the agenda?
[1:44]
» Do we have anybody online? Shelby. Okay.
[1:46]
Hearing none, we'll go forward with the
[1:48]
board member announcements. Any board
[1:50]
member announcements?
[1:50]
» Yes, I have.
[1:51]
» Yes, ma'am.
[1:52]
» Do you have your thing on?
[1:56]
» Yes. The middle. I think
[1:57]
» The I think it's on.
[1:59]
» It's on. The um next year is the 52nd
[2:03]
anniversary of Joanne Matthew's book,
[2:06]
The Fairy Tale Houses of Carmemell, and
[2:08]
it's a seminal book about Hugh
[2:09]
Commtock's Fairy Tale Houses. I'd like
[2:12]
to propose honoring Joanne by a
[2:14]
proclamation being drafted, given to the
[2:16]
historic resources board for review, and
[2:18]
presented by the mayor and the city
[2:20]
council. I brought a copy of the
[2:22]
original book. If anyone would like to
[2:25]
take a look at it after the meeting,
[2:27]
you're welcome to do that. Joanne
[2:29]
Matthew is no longer with with us. I
[2:31]
believe she had a son. I could possibly
[2:33]
find him. She also had a good friend
[2:35]
that worked at a shop next to Piccadilly
[2:38]
Park. And so there would be at least
[2:40]
since she's not with us, there would be
[2:42]
at least a couple of people that knew
[2:43]
her if this were to come about. Um
[2:47]
that's pretty much my announcement.
[2:50]
» Thank you.
[2:51]
Any others?
[2:55]
Okay, hearing none, we'll move forward
[2:56]
with the consent agenda.
[2:59]
Um, we have the regular meeting minutes
[3:02]
for the August 17th uh meeting as well
[3:05]
as the special joint session meeting
[3:08]
minutes from September 9th.
[3:10]
Any comments on either one of those?
[3:16]
» I had a question about the September 9th
[3:18]
meeting.
[3:22]
Kathy, there was You mentioned this I
[3:24]
think earlier was the uh my impression
[3:27]
of the planning commission motion was
[3:29]
that the the condition of approval was
[3:34]
more of a not a condition of approval
[3:36]
but a something for the architects to
[3:39]
consider which was about the guardrail.
[3:43]
» If that did not make it into the minutes
[3:45]
uh Shelby and I will revise them and
[3:47]
bring it back to you because that is my
[3:49]
understanding as well
[3:50]
» That it was not a condition of approval.
[3:51]
I think it was noted as a one. So that's
[3:53]
» Okay.
[3:54]
» Okay. Thank you.
[3:55]
» We'll bring it back next month with an
[3:56]
edit because I also understood that
[3:59]
discussion of the railing wraparound to
[4:01]
be a suggestion, not a requirement.
[4:03]
» Great.
[4:03]
» Good.
[4:04]
» Thank you.
[4:06]
» Any other comments on the minutes?
[4:08]
» So we'll remove the September 9th from
[4:11]
that and
[4:12]
» Y. Okay. Do we have a
[4:14]
» Second?
[4:15]
» Yep. Okay. There we go. Um, so we have a
[4:19]
approve a request for approval and a
[4:20]
second. Can we have a vote, please?
[4:22]
» I'm so sorry. Who made the initial
[4:24]
motion? I couldn't.
[4:24]
» I can make it. I can make it. [laughter]
[4:26]
Sorry.
[4:27]
» Thank you. Okay. Roll call vote. Board
[4:30]
member Dyer.
[4:31]
» Yes.
[4:31]
» Board member Guiieri.
[4:32]
» Yes.
[4:33]
» Board member Rinstein.
[4:34]
» Yes.
[4:34]
» Board member Voris.
[4:35]
» Yes.
[4:36]
» And Chair Croman,
[4:37]
» Yes.
[4:37]
» Motion passes.
[4:38]
» Thank you. Okay. Now, we'll go on to
[4:40]
orders of business with the first order
[4:41]
of business being an information brief
[4:44]
on the forge in the forest. Um, I I want
[4:48]
to stipulate that this is an information
[4:50]
brief, not a decision brief. And
[4:51]
Katherine's going to walk us through the
[4:53]
process. I'm certainly happy to hear any
[4:55]
thoughts that uh our public has. Um, and
[4:58]
then the board will take up a discussion
[5:00]
if they feel they need to. So, can we
[5:02]
have the staff report, please?
[5:04]
» Thank you, Chair Croman. Um, I don't
[5:07]
have a presentation for this item, but
[5:08]
at the chair's request, I'll simply
[5:10]
review the project timeline uh from the
[5:13]
start to where we are now. So, bear with
[5:15]
me. It is a lengthy one. I'll go back to
[5:18]
uh January 31st, 2025, which is when the
[5:21]
project um the property owner submitted
[5:24]
a historic evaluation and uh paid their
[5:26]
fees. In February of 2025, staff
[5:29]
determined that a phase one initial
[5:31]
historic assessment was not necessary
[5:34]
due to assoc known associations with
[5:36]
builder Hugh Commtock and iron worker
[5:39]
Francis Whitaker. Therefore, rather than
[5:42]
do the initial historic assessment,
[5:44]
staff directed Margaret Clovis, a
[5:46]
qualified professional under contract to
[5:48]
the city, to go ahead and skip to the
[5:50]
next step, which is to prepare a phase
[5:51]
one intensive historic assessment uh in
[5:54]
the format of a California parks and
[5:56]
recreation DPR form.
[5:59]
So, just to clarify, um, with the
[6:01]
knowledge that there's a potentially a
[6:03]
significant builder and a significant
[6:05]
individual, we can just go straight to
[6:06]
the most intensive evaluation that the
[6:08]
city performs. In March of 2025, Miss
[6:12]
Clovis completes that uh intensive
[6:14]
assessment, the DPR form, which
[6:16]
concluded that the property is eligible
[6:18]
under California Register criterion 2
[6:22]
person because Francis Whitaker uh the
[6:24]
iron worker contributed to Carmel's
[6:26]
ongoing artistic community and is
[6:29]
considered a nationally renowned
[6:30]
blacksmith. However, because the
[6:32]
building does not retain substantial
[6:34]
integrity, it is not eligible for
[6:36]
listing on the Carmel Historic
[6:38]
Inventory.
[6:40]
Uh in in March, staff prepared a
[6:42]
preliminary determination of
[6:44]
ineligibility, emails that determination
[6:46]
to all historic resources board members
[6:49]
and the property owner and applicant and
[6:51]
post it online. And at the end of this
[6:53]
presentation, I'm going to just walk
[6:55]
everyone through where those online
[6:57]
postings can be found. In April 2025, um
[7:02]
the 10 calendar day appeal period closed
[7:04]
without any appeals being received from
[7:06]
the public and without any historic
[7:08]
resources board member calling up the
[7:10]
determination for further discussion uh
[7:13]
which the code does describe as an
[7:15]
option.
[7:17]
And then uh later that month, April
[7:20]
22nd, 2025, a design review application
[7:24]
for the corner market restaurant was
[7:26]
submitted with fees paid in May. There
[7:29]
were no proposed changes to the seat
[7:31]
count, either interior or exterior, nor
[7:34]
an increase in floor area, or change in
[7:36]
the use as a full-line restaurant. The
[7:39]
former planning and building director,
[7:41]
Anna Janette, categorizes the project as
[7:44]
a track 1 major design review.
[7:47]
And then in November 2025, Miss Janette
[7:50]
approves design the design review
[7:52]
application. Uh the approval is mailed
[7:55]
to all property owners within 100 ft of
[7:58]
the project site as the code requires
[8:00]
and the approved plans again were posted
[8:02]
online. No inquiries or appeals were
[8:05]
received during the 10 calendar day
[8:06]
appeal period.
[8:08]
That brings us to 2026. Uh in March,
[8:11]
board member Katherine Guieri inquires
[8:14]
via email as to the safeguarding of the
[8:16]
forge artifacts. Uh later that month,
[8:19]
planning staff contacted Thomas Hood,
[8:21]
architect and president of the Carmel
[8:23]
Heritage Society, regarding the possible
[8:25]
relocation of the forge and anvil. Mr.
[8:29]
Hood expressed interest in relocating
[8:31]
the artifacts to the first Murphy House
[8:32]
property. Uh planning staff provided
[8:35]
photos of the artifacts and contact
[8:37]
information for the corner market
[8:39]
project team so that uh Mr. Hood could
[8:41]
arrange a site visit.
[8:43]
In April, the historic resources board
[8:45]
briefly discusses the potential artifact
[8:48]
relocation plan. During the meeting
[8:51]
in August, uh the building permit was
[8:54]
issued in accordance with the design
[8:56]
review plans.
[8:58]
Uh, in late August, the city building
[9:00]
official and the building inspector go
[9:02]
out to conduct an inspection and they
[9:04]
identify a requirement to replace all
[9:06]
framing members on on a north wall uh a
[9:10]
part of the north wall. Due to severe
[9:13]
rot and termite infestation, the framing
[9:15]
was beyond repair and the building
[9:17]
official ordered ordered them to be
[9:19]
replaced.
[9:21]
Uh August 26th, Thomas Hood of the
[9:24]
Heritage Society calls um Justin Cogley
[9:27]
of the Corner Market Team and emails
[9:29]
planning staff to relay that the forge,
[9:31]
which the rough dimensions are uh 60 in
[9:34]
wide by 64 in deep, 87 in tall, should
[9:37]
be housed in a heated space, and Mr.
[9:40]
Hood offers that the two reasons we, the
[9:43]
Heritage Society, cannot put it in the
[9:44]
first Murphy house. Size, we have very
[9:47]
limited space for exhibits and
[9:49]
gatherings. weight. The floor would not
[9:51]
carry the weight of this large object.
[9:53]
We're guessing it could be 600 pounds or
[9:55]
more. Uh September 1st, planning staff
[9:58]
meets with the corner market team to
[10:00]
discuss a forthcoming submitt of a
[10:02]
building permit revision that would
[10:04]
reflect that required north wall
[10:06]
reframing as well as roof repair. The
[10:08]
corner market team additionally shares
[10:11]
that the whereabouts of the anvil are
[10:12]
unknown. The anvil was separate from the
[10:15]
forge unlike the other ironworking tools
[10:17]
which are welded onto the forge.
[10:20]
The wood bar from the former Forge in
[10:22]
the Forest restaurant is in the
[10:23]
possession of the former property owner
[10:25]
as agreed upon with the current owner.
[10:27]
Uh the former owner does not know the
[10:29]
whereabouts of the anvil.
[10:31]
September 9th, uh the corner market team
[10:34]
emails the city to say, "We would like
[10:36]
to gift the original forge to the city
[10:38]
of Carmel by the Sea. As agreed, the
[10:40]
city would coordinate its removal and
[10:42]
relocation over the next couple of
[10:44]
weeks, no later than September 25th, as
[10:47]
construction continues to move forward.
[10:49]
Uh September 19th, planning staff
[10:51]
engages with public works to initiate
[10:53]
collection of bids to relocate the
[10:54]
forge. September 14, uh HRB Chair Jordan
[10:59]
Croman requests staff add this as a
[11:01]
discussion uh as an order of business to
[11:04]
this evening's meeting. September 15th,
[11:08]
uh, acting city administrator Brandon
[11:09]
Swanson directs public works to collect
[11:13]
those quotes, which will involve
[11:15]
disconnecting the forge gas line. The
[11:17]
forge had been retrofitted as a
[11:19]
fireplace, likely during the 1970s
[11:21]
conversion to a restaurant, and move the
[11:24]
forge to a temporary storage location
[11:26]
yet to be determined. On the 17th, uh,
[11:29]
the corner market team confirms via
[11:32]
email, "We are very pleased to provide a
[11:34]
plaque inside or outside TBD honoring
[11:37]
the building's history. We will
[11:38]
thoughtfully determine the plaque's
[11:40]
wording, size, and design to ensure it
[11:42]
is a tasteful tribute to Carmel by the
[11:44]
Seas heritage.
[11:46]
September 18th, city contracts with a
[11:49]
professional mover at a cost of
[11:50]
approximately $5,000 to safely relocate
[11:54]
the forge to temporary city storage. And
[11:56]
the city will continue to look for
[11:58]
opportunities to safely display the
[11:59]
forge for public education in the
[12:01]
future.
[12:03]
Uh that concludes my timeline and I'm
[12:07]
happy to answer any questions about the
[12:09]
timeline from the board um or the
[12:11]
public.
[12:12]
» Great. Thank you. Um, does the board
[12:14]
have any [clears throat] questions for
[12:16]
staff?
[12:20]
» I guess I I have one just to start with.
[12:23]
The location of the anvil, I mean,
[12:25]
that's a 600lb anvil or whatever it is.
[12:27]
Um, have we have we narrowed down where
[12:29]
we think it is?
[12:31]
» So, uh, the forge and the anvil are two
[12:33]
separate items. It's the forge that is
[12:35]
the approximately 600 lb item. the
[12:39]
anvil. Um if if you look in the the
[12:41]
photos, it was sitting next to the forge
[12:44]
in photos I could find from um Yelp,
[12:48]
Google, the restaurant reviews, those
[12:50]
photos do show an anvil. The current
[12:52]
property owner has relayed that they
[12:54]
never they've never seen it. When they
[12:56]
took ownership, they haven't seen it.
[12:59]
» And I did reach out to the former
[13:01]
property owner who confirms they do not
[13:03]
have it.
[13:04]
» Okay. Thank you. Other questions for the
[13:08]
staff?
[13:11]
Um I I have one other question then just
[13:14]
um so in the in our reading material um
[13:17]
it mentioned that Francis Whitaker was
[13:19]
not on the Carmel historic statement um
[13:24]
why is that?
[13:28]
» Where where in the reading material the
[13:30]
cont historic cont historic context
[13:33]
statement. Yeah. Um
[13:35]
» It was it is it was somewhere.
[13:38]
» Yeah.
[13:39]
» Um
[13:39]
» I read that too.
[13:40]
» Yeah. I don't have it exactly.
[13:44]
» Um
[13:46]
but I I was just curious just that you
[13:47]
know he's obviously a a very renowned
[13:50]
blacksmith um you know contribute a lot
[13:52]
to Carmel um in his own right. And I was
[13:55]
just wondering why he wasn't on there.
[13:59]
Shoot.
[14:00]
» I will certainly do a search to see if
[14:03]
Francis would occur. is in the context
[14:05]
statement or not and we have a you know
[14:06]
a running list of edits when the
[14:08]
document will next be updated and if he
[14:11]
is not in there he will be added.
[14:12]
» Mhm.
[14:16]
» Uh yeah it's on page five of 11. Um it
[14:20]
says
[14:22]
uh Francis Whitaker is Whitaker Whitaker
[14:26]
is not included in Carmel's historic
[14:27]
context statement. However, the context
[14:29]
statement explains that exclusion from
[14:30]
the historic context statement does not
[14:32]
preclude importance to car Carmel's
[14:35]
history referencing page 186.
[14:38]
» That's correct.
[14:39]
» Okay.
[14:40]
» And so the consultant did, you know,
[14:41]
even though he is not listed in the
[14:43]
context statement, she did identify him
[14:45]
as a very significant individual.
[14:47]
» Yeah. I think that would be a person
[14:49]
though that we would want to nominate
[14:50]
onto that statement, right? Yeah. Okay.
[14:54]
Any other thoughts?
[14:57]
Okay. Um, we will go ahead and open up
[15:00]
for public discussion. Uh, any members
[15:02]
of the public wish to comment on this
[15:06]
situation, please come forward, state
[15:08]
your name.
[15:15]
» Nancy Tumi, resident. Thank you for what
[15:17]
you're doing. Um, I did send a letter in
[15:20]
to you, which you've all seen, so I
[15:22]
won't repeat what was in there. I guess
[15:24]
my um you know personal concern is that
[15:29]
the the exterior elements of this
[15:33]
property be as uh maintained as best as
[15:38]
possible as this continues to go through
[15:40]
whatever its logical life cycle is to
[15:44]
get it to current and functioning mode.
[15:47]
Um you know as I had mentioned we've
[15:49]
been you know dined there [snorts]
[15:51]
times over the years and um that very
[15:54]
rustic nature of that venue is critical
[15:59]
to maintain from just a general public
[16:02]
uh perspective and again respecting the
[16:05]
fact that um where deterioration has
[16:08]
occurred you've got to do some
[16:09]
refreshment of of [clears throat] uh to
[16:12]
make things stable and safe and uh
[16:14]
following all the appropriate uh
[16:16]
regulations. along those lines. But um I
[16:19]
I'm just concerned that the path that
[16:21]
this is on right now will have a very
[16:23]
bright and sparkling uh clean and crisp
[16:26]
and new feel when rustic and high
[16:30]
character is more in tune to what a lot
[16:34]
of uh us as pure patrons of that
[16:37]
location would look forward to seeing
[16:40]
maintained. So, a casual observation,
[16:43]
not historically relevant, maybe not
[16:45]
process relevant, but uh nonetheless
[16:48]
just reflects an opinion that many
[16:49]
people have. Thank [snorts] you very
[16:51]
much for your consideration.
[16:53]
» Thank you, ma'am.
[16:55]
Other members of the public wish to
[16:57]
comment.
[16:59]
[clears throat]
[17:02]
[snorts]
[17:06]
[clears throat]
[17:07]
Excuse me. I'm Neil Cruz. I want to uh
[17:11]
thank the chairman Jordan for realizing
[17:14]
what was going on and trying to bring
[17:16]
attention to it. I really appreciate
[17:18]
that. Julie went did a amazing amount of
[17:21]
work on this. So many people actually
[17:23]
have helped. Katherine Wallace and
[17:26]
Carol Hall did a lot of work on this. So
[17:28]
I just want to thank everybody that has
[17:30]
participated this and I know I've left
[17:32]
out some names. Um I want to thinking
[17:35]
about what to contribute. Well, I was
[17:36]
the designer of Forging the Forest
[17:38]
Gumble Store for 10 years, and I worked
[17:40]
directly with Dan Glosser. We turned it
[17:42]
into what it finally became. We married
[17:45]
the two parcels together. It was a 5,000
[17:48]
uh square foot parcel that is now a
[17:50]
10,000t parcel. We married it with the
[17:53]
property below. I believe in one of
[17:54]
those offices uh we may have had u the
[17:59]
Coast Weekly, you know, is had a small
[18:01]
office down there. But anyway, he
[18:03]
married those two sites together. Uh, it
[18:06]
started when I got a call from a guy by
[18:08]
the name of Dan Glosser and he says, 'I
[18:10]
was told I should talk to you about
[18:11]
doing some design work at the forge and
[18:13]
he says, 'I'm bringing five designers
[18:15]
in. I'm going to give you each an area
[18:17]
to do a design and then I'm going to
[18:19]
pick one of you to be the designer for
[18:20]
the project. He picked me and that began
[18:24]
I don't know if it was 10 or 12 years.
[18:27]
But to give you some idea, at one point
[18:28]
Brian Rose said to Dan and I, because we
[18:30]
were going into the planning commission,
[18:32]
it was every, you know, almost every
[18:34]
meeting, Dan had something else he
[18:36]
wanted to do. As soon as we finished a
[18:38]
commission meeting, he was with me, "No,
[18:39]
no, we're going to do this, this, and
[18:40]
that. Write that up for me by tomorrow.
[18:42]
I want to see that tomorrow." And uh,
[18:46]
Brian Rose said to us one day, he said,
[18:47]
"Neil, do you realize that your file is
[18:49]
now bigger than the entire Carmel
[18:51]
Plaza?" He said, "That's how much work
[18:53]
you guys have done on this thing." This
[18:55]
was Dan's love. Dan was called Dan the
[18:57]
Ride Man. His father was best friends
[18:59]
with Walt Disney. And Dan knew all of
[19:02]
the designers in the world of theme
[19:05]
centers. Okay? And his friends were
[19:08]
people that designed theme centers
[19:09]
around the world. And so he started
[19:12]
inviting them to his house which was in
[19:14]
in Caramel Woods area. And he would say,
[19:16]
"Neil, I want you to take these guys,
[19:18]
show them where we want to work, and and
[19:20]
and put them to work." And so, uh, I
[19:24]
did. Only the interesting thing about it
[19:26]
was they they just had pads of paper and
[19:28]
pencil and they just went to work like
[19:31]
this. And in in seconds, they had
[19:34]
complete designs. They had pictures.
[19:36]
They had So, the uh the designer uh the
[19:38]
the number one designer, the Frontier
[19:40]
Village did the interior of the General
[19:43]
Store uh which was the two-story
[19:46]
building behind the forge, which also
[19:48]
had a kitchen and a dining room in it at
[19:50]
the time.
[19:52]
Uh Dan had made very good friends with
[19:55]
many designers in Germany and so he
[19:57]
asked them to do special woodwork for
[19:59]
this was mostly for the lower property.
[20:02]
A lot of the woodwork that you see on
[20:03]
that actually came from Germany. The
[20:05]
plans came in German. I had learned some
[20:07]
German. So Dan asked me to translate the
[20:09]
plans and then it was my job to turn
[20:11]
this over to the contractor and build
[20:13]
it. Uh Dan, this was Dan's love. He
[20:18]
absolutely this meant everything to him.
[20:21]
uh he was not happy with what happened
[20:24]
in in the years that followed, but I
[20:25]
said, you know, that's that's the way it
[20:27]
goes. But uh you guys, there are so many
[20:30]
stories. I there were so many famous
[20:31]
people that had to come here. So many
[20:33]
people that got married here or they,
[20:36]
you know, they pitched their proposal to
[20:39]
their mate at the forge. They had to do
[20:41]
it because this was the most magical
[20:43]
place in the city. Uh, so now all of
[20:47]
that and I I'm sorry I was out of the
[20:49]
loop so long and thank you to Julie Went
[20:51]
for bringing it to our awareness and uh
[20:54]
when I first saw a friend of mine took
[20:56]
photographs of it after it had been
[20:58]
changed and I went into a pretty bad
[21:01]
funk. I was depressed for a while. Dan
[21:04]
and I both got depressed when the
[21:05]
general store was removed. But uh this
[21:08]
really hit me hard and I just I just
[21:11]
wanted to say something about what a
[21:14]
glorious and incredible and magical
[21:16]
place this was. Perhaps one of the most
[21:18]
magical places in all of Carmel history.
[21:21]
Dan would send me out. He'd say, "Neil,
[21:23]
I Francis Whitaker is going to he's
[21:25]
going to give a talk in Carmel. You get
[21:26]
over there and here's what I want from
[21:28]
him. I want this story and that story
[21:30]
and I want some paperwork." So Francis
[21:32]
was giving us stuff to put up at the
[21:34]
forge. Uh, one morning Dan calls me up
[21:37]
early and says, "We're going to San Juan
[21:39]
Batista." And I said, "What the hell
[21:40]
for?" And he said, "You'll know. Just
[21:42]
get ready. Get dressed." And we drove to
[21:44]
San Juan Batista. We went to all the
[21:45]
flea markets and we were picking out old
[21:47]
horseshoes and old metal and old uh
[21:50]
rusty pliers and everything that we
[21:53]
could get. And I finally said, "What is
[21:55]
this for, Dan?" And he says, "We're
[21:57]
going to weld it against the anvil in in
[22:00]
the store and we're going to make a
[22:01]
frame around." So all of that metal work
[22:03]
that you see that was welded onto the
[22:06]
hearth uh we did because Dan that was
[22:09]
Dan's idea to do it. So I'm
[22:15]
I don't I don't know where to go from
[22:16]
here. Is it is it too late? I I I want
[22:18]
to say I understand the problems with
[22:20]
code when you have ADA. You know you're
[22:23]
not going to get around that. But I will
[22:24]
tell you this. Tim did Tim
[22:27]
loved Carmel. He loved the old buildings
[22:29]
in here. And we had many a negotiation,
[22:32]
you know, uh, well, Neil, if we put a
[22:35]
5-ft circle in this bathroom, the
[22:36]
bathroom's toast, right? And I don't
[22:38]
want to see the bathrooms go. So, let's
[22:40]
let's work this out. How can you make
[22:42]
this door wider? Can you make this
[22:43]
opening bigger? And so Tim worked with
[22:46]
us on everything to get as close to ADA
[22:48]
as we could, but he had the power at
[22:50]
that time to say, "I'm not going to
[22:51]
force the whole thing on you."
[22:53]
Inspectors today do not. So, I don't
[22:55]
want that laid on on the current
[22:56]
inspection group. they would never get
[22:58]
away with what Tim did. But Tim saved
[23:00]
Carmel to a great extent. So the only
[23:04]
thing that um
[23:06]
I find really kind of Oh, by the way, we
[23:08]
have new information that was just given
[23:10]
to us 5 minutes before the meeting uh in
[23:14]
a phone call. And uh I don't know if the
[23:17]
information is solid enough for me to
[23:18]
say in this meeting, but we have not
[23:21]
been informed of everything. And this
[23:23]
information comes from the Propheta
[23:25]
family. We did not have time to get it
[23:27]
together for this meeting, but I def it
[23:29]
it is going to make a difference in the
[23:31]
way people see what happened over this
[23:32]
project. So I would like to get that
[23:35]
together and submit this to the HRB
[23:37]
perhaps in written form if that's the
[23:39]
way to do it because we just don't have
[23:42]
it right now. But just to give you an
[23:44]
idea and this may or may not be true.
[23:47]
What we have heard is that Espironza
[23:49]
retained the ownership of the name forge
[23:52]
in the forest and it has always been
[23:55]
under the ownership of Espironza. We did
[23:58]
not know this or hear this. There's
[24:00]
several other things uh that are
[24:01]
connected to that. So I don't want to
[24:03]
get into those without knowing exactly
[24:05]
what they are, but we'll we'll get this
[24:06]
to you guys in a letter. Okay. Thank you
[24:09]
very much for your time. And if there is
[24:11]
any way for any of the the parts, the
[24:13]
pieces, you know, we can't find the
[24:15]
anvil.
[24:18]
Boy, somebody really did care about our
[24:19]
history, didn't they? We've heard that
[24:21]
it may be worth a lot of money. Maybe
[24:23]
they just saw it as a good way to get
[24:24]
rich quick. Wow. Really hurts you guys.
[24:28]
It I think more and more the oldtime
[24:32]
residents of Caramel are just feeling
[24:34]
they don't matter. You know, they're not
[24:36]
heard. But I did feel that you you did,
[24:38]
sir. And I want to thank you for that
[24:40]
and everybody else who helped with this.
[24:42]
Thank you very much.
[24:44]
» Thank you very much.
[24:46]
[clears throat]
[24:52]
» Hello all. Um
[24:56]
well I feel like a Johnny come lately in
[24:58]
all of this and and really became aware
[25:00]
of what was going on when uh several
[25:04]
residents started calling me to say have
[25:06]
you seen what's happened at the forge?
[25:08]
And you know, you see the bulldozer in
[25:10]
there and everything's gone. Um, and and
[25:13]
the the restaurant part is in studs and
[25:17]
everyone was so alarmed. Um, so then I
[25:21]
started looking at at what was going on
[25:23]
and was uh met with Janet Alarmo, the
[25:27]
manager um wife of uh Justin Codley and
[25:32]
uh
[25:34]
and she, you know, we went back and
[25:36]
found that um Meg Clovis had said uh it
[25:39]
was not salvageable, that too much had
[25:41]
been done to it, etc.
[25:43]
And um and I get that the building
[25:45]
itself was in terrible shape and um that
[25:48]
was a problem, but I didn't feel like uh
[25:51]
enough weight had been given to Francis
[25:53]
Whitaker and the name that he is. And I
[25:56]
guess Katherine, you were uh interested
[25:58]
in that as well. Um and the fact that
[26:02]
this was the forge in the forest and
[26:03]
what Janet told me was that that the
[26:06]
former owners asked that they not call
[26:08]
it forge in the forest. Uh but now
[26:11]
that's in question. I'm not sure what
[26:13]
happened there, but it is the forge in
[26:15]
the forest. And um and when I met with
[26:19]
Chris Mitchell several months before
[26:22]
uh and knew that they Esparonza had
[26:25]
bought the property, I said, you know,
[26:27]
he said it's not historic. And I said,
[26:29]
well, you may not call the building
[26:31]
historic, but I said this is a historic
[26:34]
site. This is where Francis Whitaker, a
[26:36]
historic figure, did his work. And this
[26:39]
is where he created a lot of the work
[26:42]
that goes on that that's on buildings in
[26:45]
Carmeill by the Sea. So, uh I said that
[26:48]
that's something that really has to be
[26:50]
protected. In my meeting with uh Janet,
[26:54]
I found out that they had no plans to
[26:56]
keep the forge at the unit at the place
[26:59]
there. I asked about the back of the uh
[27:03]
bar as well, which was a lovely wooden
[27:06]
piece. I don't know if you remember. Uh
[27:08]
that was taken by the former owners. Uh
[27:10]
because
[27:12]
they the new owners said, "You can take
[27:14]
whatever you want, basically." So, they
[27:17]
took it. Uh and I said, "Well, what's
[27:19]
happened with the tools and the anvil?"
[27:21]
I didn't realize the anvil was missing
[27:23]
at that point. I'm not sure Janet knew
[27:25]
that the anvil was missing. And she
[27:27]
said, "Well, we don't want it." She
[27:29]
said, 'It doesn't go with our decor.
[27:33]
It's going to be light, she said. So,
[27:36]
uh, at that point, I became somewhat
[27:39]
alarmed what would happen to the forge.
[27:42]
And so, I talked to Thomas Hood and, uh,
[27:46]
uh, Katherine and a number of people.
[27:49]
Uh, I even asked Dale if he would build
[27:52]
something to put the forge in like at
[27:55]
the back patio of of the Heritage
[27:57]
Society or something like that or in in
[27:59]
the park, you know, there. Um, and I
[28:02]
guess Dale had actually asked if the
[28:04]
Carmel Heritage uh no Carmel uh what is
[28:09]
it the uh Hienda Carmel in Carmel Valley
[28:12]
would take it. And that made me upset
[28:14]
because I thought that's out of Carmel,
[28:16]
you know, that I'd rather have it there
[28:17]
than no no place. But it's it's out of
[28:20]
Caramel. I think it should be in Carmel.
[28:22]
So, uh, and I had suggested maybe
[28:24]
Flanders Mansion, you know, could we
[28:26]
make that into a Carmel museum? Um, as a
[28:30]
as another idea that I mean, there must
[28:33]
be some place we can put it in Carmel.
[28:34]
So, the city is storing it on a
[28:38]
temporary basis, I think, right across
[28:40]
the street in those steel, you know,
[28:43]
those parts in the Vista Lobos area. Um
[28:47]
but but I sure hope we can find some
[28:50]
place for it if so if we can't have it
[28:53]
at the forge. And so there were three
[28:55]
things I asked Janet for. One was uh
[28:59]
when you call it corner market or
[29:00]
whatever you want to call it. I mean we
[29:02]
already have two corner markets and it's
[29:04]
not really a market. It's a restaurant
[29:06]
but anyway uh whatever they want to call
[29:08]
it to put it underneath in smaller print
[29:12]
at the Village Forge because that's
[29:14]
where it is. It's at the Village Forge.
[29:17]
Um, she did not commit to that. Uh, I
[29:21]
asked them to at least put a plaque up
[29:23]
within view of the public [laughter]
[29:27]
that explains that this was the village
[29:29]
forge and the Francis Whitaker and the
[29:32]
dates. And I thought HRB could probably
[29:34]
help them with that. The wording on that
[29:37]
plaque. She agreed to that. Um, I asked
[29:41]
that they keep the forge at the site and
[29:45]
she did not agree with that and that was
[29:48]
a stronger no. I suggested that possibly
[29:51]
right inside, you know, where the u
[29:55]
uh onipro street where the um
[29:59]
garage is, the garage uh doors that they
[30:03]
make that folding out like barn doors
[30:06]
and put it right in there. Thomas Hood
[30:08]
thought it would take about a 3x5 foot
[30:10]
space, which isn't much um for the
[30:13]
forge, and that could be kind of
[30:15]
separate from the from the restaurant
[30:17]
essentially. I guess there's some
[30:19]
electrical equipment in there, so I
[30:21]
don't know. But she said, "Well, we've
[30:22]
already made our plans and we have our
[30:25]
where we're putting our walls and so
[30:26]
forth." Um, and anyway, that would be
[30:30]
perfect because then it could be closed
[30:32]
up when the restaurant was closed,
[30:33]
opened up when the restaurant was open,
[30:35]
and people even right on the street
[30:37]
could see it. And if there was a plaque
[30:38]
there to explain what it was and it was
[30:40]
Francis Whitaker, I think that would be
[30:41]
ideal. But I haven't gotten too far with
[30:44]
that idea, but I'll keep pushing.
[30:46]
Um,
[30:48]
so I I think it's uh I think there were
[30:52]
a number of circumstances that happened
[30:55]
to fall together one after another after
[30:57]
another that created this problem. And I
[31:01]
think it's really a shame that we didn't
[31:03]
uh address this initially and find out
[31:06]
what we really needed to do to save this
[31:08]
in one form or another. Um the new
[31:11]
owners, yes, they got permission to do
[31:14]
whatever they wanted, so we can't fault
[31:16]
them. Uh they can do whatever they want.
[31:18]
But um but this was this was a really
[31:21]
important place in Carmel and it had the
[31:24]
feel of Carmel and it was wonderful. And
[31:27]
uh there are a lot of people who are not
[31:29]
here today that were very upset about
[31:31]
it. They hate coming to meetings. You
[31:33]
know how that goes. So uh anyway, I
[31:37]
guess I hope that you can carry forward
[31:39]
with helping this process be the best
[31:42]
one it can be given where we stand at
[31:44]
this point. Thank you.
[31:46]
» Thank you.
[31:50]
[clears throat]
[32:00]
Good afternoon, Chair Croman, members of
[32:01]
the HRB. My name is Cindy Lloyd. In
[32:04]
preface, I will say Francis Whitaker was
[32:06]
a family friend. I knew him. I used to
[32:08]
go to the forge and watch him fashion
[32:10]
things and out of metal with his hammer.
[32:13]
And the thing I remember most about him
[32:15]
was his hat. It was a little very short
[32:19]
little black hat with a little brim. And
[32:21]
when I saw photos of him recently, I
[32:22]
said, "Yeah, that's that." Well, anyway,
[32:24]
[clears throat]
[32:25]
um I have a request. May I indulge in
[32:28]
your generosity by granting me a bit
[32:30]
more time to share my comments and read
[32:33]
excerpts from Julie Went's letter as she
[32:35]
is out of the country? If so, I shall
[32:38]
start with the front page story from the
[32:41]
October 29, 1999 issue of the Pine Cone.
[32:45]
Thank you.
[32:48]
And it is this
[33:01]
if you can see it.
[33:05]
» I'm not sure what you're showing us.
[33:07]
It's a little bit hard to see from here.
[33:08]
» It's probably hard to see from there,
[33:09]
but anyway over the forage, right?
[33:12]
» Yeah. this picture of Francis at his
[33:13]
anvil and the um
[33:18]
now I'll go back to my written statement
[33:21]
[laughter]
[33:23]
[clears throat]
[33:25]
below a photo of Francis Whitaker is the
[33:27]
headline iron yielded to powerful man's
[33:30]
touch.
[33:34]
He had died just days before, reportedly
[33:36]
[clears throat]
[33:37]
with his hammer beside him. In 1922, at
[33:41]
the age of 15, Francis Whitaker told his
[33:43]
father that he wanted to end his formal
[33:45]
education and start working. Quote, "I
[33:49]
had always been big for my age and had
[33:52]
always enjoyed working with my hands,
[33:54]
and even though I was young, I could fix
[33:56]
things, make things, and enjoyed drawing
[33:58]
and mechanics." End quote. Francis spent
[34:01]
a year working with Samuel Yelen in his
[34:03]
Philadelphia blacksmith shop before
[34:06]
traveling to Germany to work with Julius
[34:09]
Shramm in Berlin. Both eminent
[34:12]
decorative blacksmiths influence
[34:15]
Francis's professional life. In 1926, at
[34:19]
age 18, his father gave him $35 and a
[34:23]
one-way train ticket to California to
[34:26]
find his fortune. Visiting a friend in
[34:28]
Carmel, he knew he'd arrived in a
[34:30]
special place. Looking for a job, he was
[34:33]
advised to see Carmel's master builder,
[34:36]
MJ Murphy. Hired, he soon oversaw work
[34:39]
in Murphy's iron shop for the next seven
[34:41]
years. His decorative iron work can be
[34:44]
found throughout Carmel. While he
[34:46]
undertook a variety of backs blacksmith
[34:49]
jobs, he never shot a horse.
[34:52]
Following the end of World War II,
[34:55]
quote, "Caramel began to suffer from
[34:57]
what I called growing pains. Carmemell,
[34:59]
one of those incredibly beautiful
[35:01]
places, was about to be invaded by the
[35:04]
outside world." End quote. He and many
[35:07]
other residents were becoming worried
[35:09]
about the future of the community. Thus,
[35:11]
Francis became involved in politics.
[35:15]
Quote, "Blacksmiths by their very nature
[35:17]
are stubborn, independent, fearless,
[35:20]
thick-skinned, bullheaded, determined,
[35:23]
and they don't like to be crowded, so
[35:25]
they make perfect politicians." End
[35:28]
quote. Francis served on the city
[35:30]
council for 11 years, helping to develop
[35:33]
the first master plan. involved in
[35:36]
conservation activities. He was
[35:38]
president of the league preserving Point
[35:40]
Lobos for a state park as well as
[35:43]
preserving the Carmel River mouth beach.
[35:46]
Quote, I just couldn't stand by and see
[35:49]
development of these beautiful areas to
[35:52]
face the beauty of nature. They should
[35:54]
be available to be enjoyed by all, not
[35:57]
just by those who could afford to buy
[35:59]
them." End quote.
[36:01]
Following Francis's love for skiing and
[36:04]
the beauty of unspoiled aspen, Francis
[36:07]
loaded all his blacksmith equipment and
[36:09]
moved. Thus ended Francis Whitaker's
[36:13]
37 years
[36:15]
in his forge in the forest, gone, but
[36:18]
now forgotten.
[36:20]
One of the things I I question
[36:24]
is if Francis took all of his equipment
[36:27]
to Aspen,
[36:29]
what is left behind, was it really
[36:31]
Francis's? And um in in this book from
[36:36]
which I quoted, this is a book that
[36:38]
Francis wrote
[36:40]
and it's really wonderful reading. It's
[36:43]
very easy reading. Um he he said that he
[36:47]
hired a man with a truck to take
[36:49]
everything in his blacksmith shop and
[36:51]
then he loaded up his own truck and
[36:52]
left. So I I really question whether
[36:56]
those things are indeed Francis's, but I
[36:58]
don't know. So that ends my my little
[37:02]
story. But from Julie went who was in
[37:05]
Paris and she sent me a text and said,
[37:08]
"Cindy, if you're going to the meeting,
[37:09]
would you mind reading some of my
[37:11]
comments in the record?" And I'm sure
[37:13]
you've all read them. So, I just picked
[37:14]
out a few. The Forge in the Forest
[37:17]
blacksmith shop began 100 years ago in
[37:19]
Carmel by the Sea, but the city is in
[37:22]
danger of losing this history. My
[37:25]
objective is to bring awareness to the
[37:26]
Carmel community and future generations
[37:29]
of residents and visitors of Francis
[37:32]
Whitaker's Forge in the Forest and their
[37:34]
contributions to Carmel's early
[37:36]
beginnings.
[37:38]
The forge building itself may not be
[37:40]
historic because of alterations,
[37:43]
but there should be an alternate way to
[37:45]
recognize this one-of-a-kind historic
[37:47]
contribution to Carmel. Francis Whitaker
[37:51]
is eligible for the California Register
[37:53]
under criterion 2 for person.
[37:57]
The original forge building has lost
[37:59]
integrity and cannot be dee deemed
[38:01]
historic. The city should now be
[38:04]
considering other means of commemorating
[38:06]
the contribution and historic
[38:08]
significance of Francis Whitaker's forge
[38:10]
in the forest. A commemorative plaque is
[38:14]
an option with the permission of the new
[38:16]
restaurant operators of the corner
[38:18]
market and Mr. Pastor who is the owner
[38:21]
of the property. A commemorative plaque
[38:23]
could be displayed on the site. the HRB,
[38:27]
the city, the owners of the corner
[38:29]
market, and interested Carmel residents
[38:32]
could develop what the plaque might look
[38:34]
like, as well as the language on the
[38:36]
plaque and possibly a photo of Francis
[38:39]
at work.
[38:41]
And this is my last little thing. Now is
[38:43]
the time to honor Francis Whitaker, for
[38:46]
without him, the forge would not have
[38:48]
become significant. Thank you.
[38:52]
» Thank you very much.
[38:53]
» You're very welcome.
[38:59]
Seeing no one else in the room. Shelby,
[39:00]
do we have anyone online?
[39:02]
» We do. Yes. Um Ian Martin.
[39:04]
[clears throat]
[39:06]
» Good evening everybody. Um I am Ian
[39:10]
Martin. I'm a former planning
[39:11]
commissioner and a resident and u and a
[39:14]
student of Carmel by the seas history.
[39:16]
Uh, I want to give Neil Cruz a great
[39:18]
deal of credit for the work that he did
[39:21]
to maintain the historical feel of the
[39:25]
Forge in the Forest after it became a
[39:27]
restaurant. You know, when you're
[39:29]
sitting there having a drink or a meal,
[39:32]
you had a sense that you were in a place
[39:34]
that had a had a a deep history to it.
[39:37]
And I think there's some good news here
[39:39]
in that I don't see
[39:43]
why it's too late, why you could not
[39:45]
return to something in line with what
[39:48]
Neil originally did. In fact, Neil's
[39:50]
right there in the room. Neil could
[39:52]
participate in the restoration uh to
[39:55]
bring it back to give the place
[39:59]
uh that to return to that place a sense
[40:02]
of the deep history that that property
[40:05]
embodies. And you [clears throat] know,
[40:07]
and I can't think of any reason why they
[40:09]
couldn't also call it the forge in the
[40:11]
forest if um you know, everything's a
[40:14]
negotiation. I mean, I you know, why not
[40:16]
try and acquire the name back and call
[40:18]
it the Forge in the Forest again? So,
[40:21]
you could retain that sense of history
[40:25]
um as as the place, you know, as as the
[40:28]
place once was under Neil's creativity
[40:31]
and sensitivity to our village's
[40:33]
history. So hopefully that could
[40:36]
actually happen. Um, beyond just having
[40:38]
a plaque, which you know, a lot of
[40:40]
people don't read plaques, right? But
[40:42]
when you went to the original Forge of
[40:43]
the Forest restaurant, you had a sense
[40:45]
you were sitting there at a historical
[40:47]
place, you understood that there was a
[40:48]
backstory there that you were aware of
[40:51]
because they had the forge there in the
[40:54]
room. Um, and then also the ambiance of
[40:57]
the place, the rusticity of the place,
[40:59]
all lent a strong reinforcement of the
[41:03]
sense of of that history. So, it's not
[41:06]
too late. All those things could come to
[41:09]
pass and Neil could even take the reigns
[41:11]
and and make it a reality as he once
[41:13]
did. Um, that would be amazing and a and
[41:16]
a a demonstration of the love for the
[41:19]
village. Um,
[41:21]
this also speaks to, you know, I
[41:23]
appreciate that all the all the the
[41:26]
mechanical factors of notification in
[41:29]
the municipal code were met, I suppose,
[41:32]
but when you're dealing with something
[41:34]
like this, it really should have come
[41:36]
before the historic resources board um
[41:39]
as a matter of default, right? when
[41:42]
you're dealing with something that is so
[41:44]
important um you know as as Francis
[41:48]
Whitaker and his legacy in the village I
[41:50]
mean here's a guy who had an obituary in
[41:52]
the New York Times when he died so you
[41:56]
know we should be defaulting to the
[41:58]
historic resources board to make sure
[42:00]
that everybody is aware of what's
[42:02]
happening when we are dealing with
[42:04]
historic properties or or or history or
[42:07]
or properties that may not technically
[42:10]
meet the letter of the offer histo but
[42:13]
there should be [gasps]
[42:15]
uh a plain in view discussion in front
[42:17]
of the public about how the city's
[42:19]
arriving at these discussions um just
[42:21]
beyond the perform steps. So anyway in
[42:25]
closing um thank you all for giving this
[42:28]
thing a a proper uh airing and again
[42:32]
it's not too late. Thank you. Thank you
[42:38]
Charles.
[43:02]
I'm mute.
[43:05]
unmute.
[43:11]
» Charles, if you're muted, uh we cannot
[43:13]
hear you. Please unmute.
[43:17]
» Good afternoon. Um
[43:20]
uh this is uh Chuck Nagarian. I'm a
[43:22]
resident of of Carmel. I really uh
[43:26]
appreciate the hearing today.
[43:29]
Um, I I'm I'm I guess my my
[43:34]
guess my my main concern here is I'm
[43:36]
baffled
[43:38]
by the over- the-counter process that
[43:41]
occurred here. I think that is the
[43:43]
genesis of the problems we have here
[43:46]
today. And um I I was really encouraged
[43:50]
by what uh what Neil presented and uh
[43:55]
and also what Ian Martin's um
[43:58]
recommendations for for restoration. I
[44:01]
think that's that's the key here. Um
[44:05]
this is this is too important of a site.
[44:08]
And um I'm not sure why the HRB was left
[44:12]
out of this, but I I'm I'm noting that
[44:15]
the HRB seems to be left out of a lot of
[44:18]
key things,
[44:20]
including other other permitting
[44:21]
processes, and I'm I'm encouraging you
[44:24]
to be involved as much as you can and
[44:26]
express
[44:28]
express your your expertise.
[44:31]
Um, unfortunately, I don't think the
[44:32]
city uh or or concerned residents know
[44:37]
all the facts. I know I know I don't,
[44:39]
but I know a lot of questions have been
[44:41]
raised that are a little disconcerting.
[44:44]
Uh, and I urge you, the city, uh, to to
[44:48]
to sink answers to them. Um, I think
[44:52]
it's really important understand
[44:53]
everything that's been going on. Um, and
[44:57]
and I think the over-the-c counter
[44:59]
process itself,
[45:01]
uh, you know, facilitated facilitated
[45:03]
where we are today, uh, which isn't a
[45:06]
very good place. I think it's somewhat
[45:07]
embarrassing, frankly. And, um, I'm
[45:11]
sorry that I'm sorry that it happened.
[45:13]
Um, I I think anybody with half a brain
[45:16]
knows and feels the the historicity of
[45:20]
the of the forge in the forest. and um
[45:24]
and and I hope you take uh uh Ian's
[45:28]
recommendation at heart in terms of
[45:30]
moving in a restoration
[45:32]
manner. I don't think anything but the
[45:36]
name forging the forest will work at
[45:39]
that property. I think everything else
[45:41]
is nonsense. Anyway, thank you for your
[45:45]
time and thank you for for your interest
[45:47]
in looking into this. [clears throat]
[45:50]
» Thank you very much. Anyone
[45:56]
else?
[45:57]
» That's everyone.
[45:58]
» Okay. Any other comments from the
[46:01]
public? [clears throat] Hearing? None.
[46:02]
We'll close it back up and um ask the
[46:07]
board if they have any comments or
[46:08]
issues that they'd like to discuss. I
[46:10]
have a question.
[46:11]
» Yes, ma'am.
[46:12]
» My question is for Neil. You had
[46:14]
indicated that at some point you and the
[46:17]
owner had gone shopping for items that
[46:19]
were welded to the forge. So those
[46:21]
things were not Francis Whitickers. They
[46:24]
were things that you purchased.
[46:25]
» You mean the the implements?
[46:27]
» Can you come to the Yes. microphone,
[46:28]
please?
[46:29]
» Sorry.
[46:32]
» Yes. All All there was really
[46:34]
[clears throat] was the the hearth which
[46:37]
the anvil sat on and then the anvil
[46:40]
itself and the railing around it.
[46:43]
» Okay. Thank you.
[46:44]
» And so uh Dan wanted to it was partly
[46:49]
for safety reasons. He wanted there to
[46:51]
be a fire in that, but didn't want kids
[46:53]
or something. So, he thought he would
[46:55]
get all these rusty old metal elements.
[46:59]
And then he brought in our favorite
[47:01]
welder and we just spent the day holding
[47:04]
them and welding them in place.
[47:05]
» Made making it look like it was still in
[47:07]
use.
[47:08]
» Yeah.
[47:08]
» But it wasn't Francis Luc.
[47:10]
» No, most of that stuff we got at flea at
[47:12]
flea markets at Sanon Batista.
[47:14]
» Great. Thank you, Neil. Thank you very
[47:16]
much.
[47:17]
» Thank you,
[47:17]
» Neil. Do you mind if I ask a question as
[47:19]
well? Do you know about the forge being
[47:21]
relocated within the room?
[47:24]
» Uh, excuse me. Could you say it one more
[47:25]
time, Kath?
[47:26]
» Do you know about the forge's relocation
[47:28]
within the room
[47:30]
from
[47:31]
» One more time? I'm sorry because my
[47:33]
[laughter] hearing is not good.
[47:34]
» Uh, do you have knowledge of the forge
[47:37]
being relocated from one corner of the
[47:39]
room to another, like the back of the
[47:41]
building to the front?
[47:43]
» Uh, no. the the the hearth and the anvil
[47:46]
was always in that location throughout
[47:48]
the our experience with the project to
[47:50]
my knowledge. It was always right in
[47:53]
that. I I believe I remember as a young
[47:56]
child my father would always take me to
[47:59]
watch Francis Whitaker do his metal work
[48:02]
and uh my memory of that is that the uh
[48:05]
hearth and the anvil were in the place
[48:08]
where it is now or where it just
[48:10]
recently was all that time there was an
[48:15]
earlier forge in the forest. Okay. Which
[48:17]
is down near uh
[48:21]
uh you know the supermarket and sand um
[48:25]
and uh
[48:29]
just a second here. So uh right next to
[48:32]
Bruno's market you have the Sandpiper
[48:35]
and you used to be able to look up and
[48:37]
see the ceiling of the Sandpiper and it
[48:40]
was dark wood and all this old wood and
[48:42]
old framing. That was this the the
[48:45]
ceiling of the first forge in the
[48:47]
forest. And I was informed by a
[48:49]
historian one day. He sat down with Dan
[48:51]
and I and he said, "Yeah." He said, "Uh,
[48:54]
so there's the story from Francis that
[48:56]
he was out there and John Steinbeck was
[48:59]
sitting down getting drunk and Lincoln
[49:01]
Stefins comes by and he says, "Is that
[49:03]
John?" He says, "Yeah." So he says, "I
[49:06]
got a book he needs to write." Lincoln
[49:08]
Stephins went over there and sat with
[49:10]
Steinbeck for about an hour. That's how
[49:13]
you got the grapes of wrath in that
[49:16]
conversation.
[49:22]
» Thanks very much for that.
[49:23]
» Is there anything else?
[49:26]
» Any other comments from the board or any
[49:28]
thoughts?
[49:30]
» Well, this is a this is a tough one
[49:32]
really. Um, I also have the feeling like
[49:34]
we're dealing with something similar to
[49:37]
the horses out of the barn, which makes
[49:40]
it very difficult uh to know what the
[49:44]
right the right approach should be.
[49:48]
Um, I'm reminded of a of a situation uh
[49:52]
in my former city, Capola,
[49:56]
where um a small cabin that had been
[49:59]
part of the original
[50:02]
um development by the founder of Capola,
[50:05]
a small cabin was found uh at some
[50:09]
distance from city hall and um the
[50:13]
owners wanted to remove it from the
[50:15]
property and do something house. And so
[50:18]
that cabin was brought uh down to the
[50:23]
city so that when people walk from the
[50:26]
parking lot behind city hall, you're
[50:29]
forced to go right in front of the
[50:31]
cabin. And inside it was opened uh with
[50:36]
larger windows. You can't go inside, but
[50:40]
a a historic display was set up to
[50:44]
resemble the interior of a small
[50:48]
one room house. And in back um they had
[50:52]
a washroom place where you changed your
[50:54]
clothes or used the bathroom. It was
[50:56]
just a outouse but a long narrow one. So
[51:00]
people were not only forced to, but they
[51:03]
loved looking in the windows and seeing
[51:06]
what life was like in the 1920s.
[51:10]
And uh you know, we miss that here in
[51:12]
Carmel. We're [clears throat] so busy uh
[51:14]
looking at the architectural integrity
[51:17]
and the style, but the history. Uh I I
[51:22]
up the street from the Whitaker Forge
[51:25]
uh just a block half a block away is um
[51:29]
James Weaver Kitchens plumbing shop and
[51:33]
it's part now of a real estate office.
[51:37]
But if you just walk past it and look
[51:40]
inside, you can see the original um form
[51:44]
of the of the u plumbing business. And
[51:49]
all of these men, the Whitakers, the uh
[51:52]
K kitchens, the the men that Catelyn who
[51:55]
was mentioned earlier, they all have a
[51:58]
place in the story. And I took special
[52:00]
note of what I I think I don't know
[52:04]
which one of you said that Whitaker I
[52:06]
think maybe you did. Uh
[52:09]
I it Whitaker was on the council for 11
[52:11]
years. So that counts for a lot. I mean,
[52:14]
he put something of himself into that
[52:17]
position. So all of this makes me think
[52:20]
we you know we should have thought of
[52:22]
this. I I have the date of a almost a
[52:25]
year ago when the um planning director
[52:30]
um asked you know uh the council not
[52:33]
council the HRB to look at this issue
[52:37]
and u
[52:40]
it kind of passed through based on the
[52:43]
fact that its integrity had been
[52:45]
changed. But what about the site? You
[52:48]
know, uh that's one of the parts of the
[52:50]
National Register and the California
[52:52]
Register and our own inventory that we
[52:55]
tend to forget that a site is just as
[52:58]
significant. It may not have the all the
[53:01]
uh accutra months or however you say it
[53:04]
of the original, but something important
[53:07]
happened there. And these places like
[53:10]
the forge are very few and far between.
[53:13]
And if we only look at the architecture
[53:15]
and say, well, you know, it's been all
[53:17]
changed. That that to me I think we're
[53:21]
leaving something out. So, I I think we
[53:24]
need to do something to show off uh a
[53:27]
man with Whitaker's talents and that we
[53:29]
don't uh we don't we're sending uh the
[53:33]
wrong signal if we don't do something uh
[53:36]
to honor his memory and uh what he
[53:39]
contributed to all the ornamental
[53:42]
railings and uh iron work that we see
[53:45]
throughout the city. So, I'm glad that a
[53:48]
plaque is being suggested. I was very
[53:50]
intrigued by Carol's comment about
[53:53]
opening those doors on the street
[53:56]
because I could see the little cabin in
[53:58]
Capola right there as you walked by. You
[54:02]
could have the forge in the tools and a
[54:05]
photograph of Mr. Whitaker and I think
[54:08]
it would draw people to the corner
[54:10]
market or it wouldn't be an uh anything
[54:14]
wrong with that. So that that's that's
[54:16]
what my where my thinking is going right
[54:18]
now. Any
[54:22]
thoughts?
[54:25]
» Yeah, I
[54:27]
probably it's a cautionary tale a little
[54:29]
bit. And it's not just this last um
[54:34]
proposal and building permit that went
[54:36]
through, but there was a lot of changes
[54:37]
over time that made it lose its
[54:39]
integrity. I do remember being in town
[54:42]
um when I first came to Carmela and
[54:45]
enjoying the general stores, the
[54:47]
restaurant, and the beautiful little
[54:50]
courtyard and the the the old bar and
[54:52]
the in in the with the forge and the
[54:55]
anvil all in that that space which was
[54:59]
and having that indooroutdoor connection
[55:01]
which was really I thought a beautiful
[55:03]
part of that um
[55:05]
scheme and restaurant. It made it really
[55:07]
special. Um,
[55:09]
and I think there were changes even
[55:11]
subsequent to that. Like I think you
[55:12]
know one of the things people may not
[55:14]
understand that is that the historic
[55:16]
resources board doesn't really have
[55:18]
jurisdiction about the inside of
[55:20]
buildings and I know the bar was removed
[55:22]
for example that was quite an impressive
[55:25]
piece of it. Um, you know, at this
[55:28]
point, as as you mentioned, that the the
[55:31]
horses have left the barn and and
[55:34]
these folks have a have a building
[55:36]
permit and we're lucky. You know,
[55:39]
[snorts] Mr. Cogley is a wonderful chef
[55:42]
and I'm sure it's going to be an amazing
[55:44]
restaurant, which we'll all enjoy. Um
[55:47]
but there is this certain lack of
[55:49]
[clears throat] um consideration to the
[55:51]
history of the place that
[55:54]
probably should have been caught before.
[55:56]
Um and I agreed more things should come
[55:58]
to the HRV especially if there's if
[56:00]
there's you know I think objectively you
[56:03]
can you know they're sensitive and you
[56:05]
know the town's sensitive about it. Um,
[56:10]
I think the at this point a plaque or
[56:13]
Carol's idea of a of having an exhibit
[56:16]
behind those doors sounds really lovely.
[56:18]
Um, I think having some marker of what
[56:21]
it what it was in France is a is a is a
[56:24]
great idea. Um, [clears throat]
[56:27]
but in general, I think that is a piece
[56:29]
of Carmel. I kind of understand the the
[56:32]
how people feel so strongly about it is
[56:34]
a piece of caramel that's kind of lost
[56:36]
and I think it was lost as a
[56:41]
you know sequentially it wasn't just one
[56:44]
thing.
[56:46]
» Yeah.
[56:47]
So I think um you know we've there's a
[56:51]
lot we can take away from this. Um I I
[56:53]
would hesitate to say that the historic
[56:56]
resources board was not made aware of
[56:57]
this because through due process um the
[57:01]
staff assessed the property and then um
[57:05]
open it up for public comment and open
[57:07]
up for HRB comment as they're supposed
[57:09]
to um during that 10day period. And
[57:11]
unfortunately or fortunately um you know
[57:14]
there weren't significant issues raised
[57:16]
at that point. I understand it's a very
[57:18]
emotional um space for a lot of people,
[57:20]
but I also understand that um Espironza,
[57:24]
you know, entered into this project with
[57:25]
a set of guidelines and rules that they
[57:27]
felt were appropriate. And I think um
[57:29]
you know, that's been pointed out a
[57:30]
couple times. Um and so they shouldn't
[57:32]
be penalized for that either. So I think
[57:35]
in the future um I think I would just
[57:39]
urge the public that if you see
[57:40]
something like this happening that you
[57:43]
really pay attention to the notification
[57:45]
by the city about um you know your cons
[57:49]
and and voice your concerns about it. I
[57:51]
also agree that I think there's certain
[57:52]
things that don't come to the HRB as a
[57:54]
formal agenda item that probably should
[57:56]
and so you know we as a group can talk
[57:59]
about that and and maybe provide some
[58:02]
additional guidance to the staff on what
[58:04]
that looks like. Um and I think you know
[58:06]
the the good news is the organizations
[58:08]
agreed to a plaque which is important
[58:10]
and certainly I I think the HRB and
[58:13]
other members of the uh community are
[58:16]
happy to help with writing that plaque.
[58:18]
Um, but I think, you know, we're at the
[58:21]
point where um this process is moving
[58:24]
and it it's got to keep moving. And I I
[58:26]
appreciate the staff um walking us
[58:28]
through the timeline once again. I think
[58:30]
that was very thorough and I do
[58:31]
certainly do appreciate um the members
[58:33]
of the public who spoke and um very
[58:35]
eloquently talked about the issues that
[58:37]
they felt were concerning. So, with
[58:40]
that, I'd ask if there's any Yes, ma'am.
[58:43]
» I don't know how many people have had
[58:45]
experience ordering plaques, but I have.
[58:47]
And Possibly
[58:49]
not all of you know that you can
[58:51]
actually have a photograph as part of
[58:53]
the plaque. So it wouldn't have be a
[58:55]
plaque for him with a just a picture of
[58:57]
him next to it. It could be all be
[58:59]
incorporated in that.
[59:02]
» Yeah, I think there's some good options.
[59:04]
Any other comments from the board?
[59:07]
Okay, hearing none, we will move on to
[59:09]
the next consent item
[59:15]
public hearing. Yeah, sorry. To the
[59:16]
public hearing um which is DR 25228 the
[59:19]
Cypress in consideration of a
[59:22]
determination of consistency with the
[59:24]
secretary of the interior standards for
[59:26]
a track one design review for exterior
[59:28]
alterations and site improvements at the
[59:30]
historic LA Riviera Hotel located in the
[59:33]
northeast section northeast corner of
[59:35]
Lincoln Street and 7th Avenue.
[59:45]
Thank you.
[59:52]
» Thank you, [snorts] chair. Uh, the
[59:54]
Cypress in originally called um La La
[59:58]
Libera was designed by Blaine and Olsen
[1:00:00]
and was constructed in 1929 at the
[1:00:03]
northeast corner of Lincoln and 7th.
[1:00:06]
to anymore.
[1:00:08]
» Blaine and Olsen had studied
[1:00:10]
Mediterranean architecture in Spain and
[1:00:12]
incorporated a clay tile roof, a
[1:00:15]
three-story Moorish tower with a zigurat
[1:00:17]
top and a courtyard into their hotel
[1:00:19]
design.
[1:00:24]
In 1949, the original 1929 building was
[1:00:27]
expanded with an addition by significant
[1:00:29]
architect Gardner Daly. The addition is
[1:00:32]
located at the southwest corner of the
[1:00:33]
property and is included in the period
[1:00:36]
of significance which is 1929 through
[1:00:38]
1949.
[1:00:40]
The property has been called the Cypress
[1:00:42]
in since circa 1980.
[1:00:46]
In 2002 2003 the hotel was again
[1:00:49]
expanded to the north on a separate lot.
[1:00:52]
The current project is limited to the
[1:00:54]
original property not the north annex
[1:00:56]
which you see circled in red there.
[1:01:01]
Long recognized as a historic property,
[1:01:03]
the Cypress Inn is listed on the city's
[1:01:06]
uh historic inventory and register and
[1:01:09]
has an active Mills Act contract.
[1:01:13]
The building has numerous identified
[1:01:15]
character-defining features, including
[1:01:17]
the mission tile roof, the 7th Avenue
[1:01:20]
courtyard with the hexagonal tiles and
[1:01:22]
arcade, and steel casement windows, all
[1:01:24]
of which are included in the current
[1:01:26]
project scope of work slated for either
[1:01:29]
repair or replacement.
[1:01:32]
So, the current project proposes roof
[1:01:34]
repairs, window replacements, the
[1:01:37]
installation of a courtyard ADA ramp,
[1:01:39]
courtyard tile replacements, and new
[1:01:41]
courtyard stair tiles.
[1:01:45]
The applicant proposes to replace 70
[1:01:48]
non-original steel windows, which
[1:01:50]
according to the window survey are
[1:01:52]
either rusted, difficult, or unsafe to
[1:01:54]
operate, and they permit water
[1:01:55]
intrusion. The proposed new windows
[1:01:58]
which will be installed within existing
[1:02:00]
openings with no change to opening
[1:02:01]
dimensions will be divided light
[1:02:04]
casement steel windows by Jensen
[1:02:06]
Janisole.
[1:02:10]
So the applicant proposes to remove the
[1:02:12]
existing mission tile roof and to wash,
[1:02:15]
repair and store the tiles during the
[1:02:17]
period of time in which any areas of dry
[1:02:19]
rot will be repaired and a new
[1:02:21]
waterproof underllayment installed. The
[1:02:23]
old tiles will then be reinstalled. If
[1:02:26]
any broken tiles need to be replaced on
[1:02:28]
a street facing elevation, old tiles
[1:02:30]
will be salvaged from a less visible
[1:02:32]
area of the roof and new Redland clay
[1:02:35]
tile will be used to fill in the salvage
[1:02:37]
tile spots.
[1:02:40]
The south courtyard features a
[1:02:42]
distinctive arcade with mission tiles
[1:02:44]
laid directly on tree branches. A
[1:02:47]
structural engineer completed an
[1:02:49]
evaluation and did not recommend a
[1:02:50]
waterproof underllayment for this
[1:02:52]
feature due to aesthetic impacts. The
[1:02:55]
structural engineer concluded that the
[1:02:56]
tree limbs are sound and recommends
[1:02:58]
reinspection every six years.
[1:03:03]
For the courtyard, the existing
[1:03:05]
hexagonal tiles, as described by the
[1:03:07]
applicant, are deteriorated beyond
[1:03:08]
repair, and they're mixed with areas of
[1:03:10]
non-original square tiles, resulting in
[1:03:13]
an inconsistent appearance throughout
[1:03:14]
the courtyard. The applicant proposes to
[1:03:17]
replace all existing tiles with new
[1:03:19]
hexagonal tiles to match the original
[1:03:21]
condition.
[1:03:24]
The project plans also reflect a new ADA
[1:03:27]
ramp to provide access from 7th Street,
[1:03:29]
7th Avenue, excuse me. The proposed ramp
[1:03:32]
will feature a square tile with a center
[1:03:34]
medallion pattern. A new planter will be
[1:03:37]
installed directly east of the ramp,
[1:03:39]
topped with a metal handrail.
[1:03:43]
Lastly, the project includes adding
[1:03:45]
satio tile to the concrete stairs that
[1:03:48]
lead from the east side of the courtyard
[1:03:49]
up to the second story of the east wing.
[1:03:54]
The city contracted with a professional
[1:03:57]
uh historian to evaluate the project for
[1:03:59]
consistency with the st the secretary of
[1:04:01]
the interior standards for
[1:04:02]
rehabilitation.
[1:04:04]
Miss Clovis found the project as
[1:04:06]
proposed to be consistent with the
[1:04:08]
relevant standards 1 2 4 5 6 and 9 which
[1:04:12]
I'll review individually.
[1:04:15]
Uh the board also has a little visual
[1:04:18]
handout on the standards which is
[1:04:20]
available at the front of the room and
[1:04:21]
will be posted online. It's simply a
[1:04:23]
little visual cheat sheet of our 10
[1:04:25]
standards. We'll be going through the
[1:04:27]
relevant ones here.
[1:04:30]
So the project is consistent with
[1:04:31]
standard one because the historic use as
[1:04:34]
a hotel is not changing and standard one
[1:04:37]
is all about use.
[1:04:41]
The project is consistent with standard
[1:04:42]
two um which is all about preserving
[1:04:45]
historic character because one the
[1:04:48]
existing roof [clears throat] tiles will
[1:04:49]
be cleaned and reinstalled rather than
[1:04:51]
replaced. two, the hodge podge of
[1:04:53]
courtyard tiles in the non-original um
[1:04:56]
lighter grout color no longer reflect
[1:04:58]
the original 1929 tile design and may
[1:05:02]
therefore be restored. And then three,
[1:05:05]
the steel casement windows are
[1:05:06]
deteriorated beyond repair and the
[1:05:08]
replacement windows will be
[1:05:10]
undistinguishable from the existing.
[1:05:14]
Uh moving to standard five um which
[1:05:17]
talks about how distinct features uh
[1:05:19]
should be kept. the project is
[1:05:21]
consistent um excuse me number four
[1:05:24]
which speaks to how previous changes can
[1:05:27]
become significant in their own right.
[1:05:29]
So in this case the hotel's 1949 edition
[1:05:33]
has acquired historic significance uh
[1:05:35]
was designed by gardener daily and
[1:05:38]
recorded in the DPR form as significant.
[1:05:41]
So the roof work occurring at that
[1:05:43]
portion of the building follows the
[1:05:44]
preservation standards um and is
[1:05:47]
appropriate. Standard five um retaining
[1:05:51]
distinct features um character-defining
[1:05:54]
roof tiles will be preserved. The
[1:05:56]
existing windows will be replaced in
[1:05:58]
kind and the original hexagonal
[1:06:01]
courtyard tiles will be replicated um
[1:06:03]
with the same dimensions. So the
[1:06:05]
courtyard will be brought back to its
[1:06:07]
historic appearance. Uh lastly, while
[1:06:10]
the removal of decorative tiles at the
[1:06:13]
base of one of the arcade support
[1:06:16]
columns will need to be removed to
[1:06:18]
accommodate the ADA ramp, those tiles
[1:06:20]
will be saved and used as needed in the
[1:06:22]
future for repairs elsewhere, such as
[1:06:24]
these Lincoln Street entry steps.
[1:06:28]
Uh standard six speaks to the importance
[1:06:31]
of repairing before moving to a
[1:06:34]
replacement plan.
[1:06:36]
» [clears throat]
[1:06:36]
» The project is consistent with this
[1:06:37]
standard because uh as previously
[1:06:39]
described, the roof work will follow the
[1:06:42]
guidance included in preservation brief
[1:06:44]
30, which speaks to how to deal with
[1:06:47]
clay tile roofs and the windows will be
[1:06:50]
replaced in kind and the new courtyard
[1:06:52]
tile will be matching the old.
[1:06:56]
Uh standard nine, um the the new ADA
[1:07:00]
ramp is a code compliant accessibility
[1:07:03]
feature. The standards recommend
[1:07:05]
minimizing the impact of accessibility
[1:07:07]
ramps by installing them on secondary
[1:07:10]
elevations or by screening them with
[1:07:12]
planting. And in this case, the proposed
[1:07:14]
ramp is both located on a secondary
[1:07:16]
elevation and is proposed to be screened
[1:07:19]
from the courtyard by a white concrete
[1:07:21]
landscaped planter. The new ramp will
[1:07:24]
feature square tiles with a central
[1:07:26]
medallion which is compatible yet
[1:07:28]
differentiated from the historic
[1:07:30]
hexagonal tile pattern. Um likewise the
[1:07:33]
square satio tiles proposed for the east
[1:07:36]
stairs are compatible yet
[1:07:38]
differentiated.
[1:07:42]
So, the Cypress Inn is located within
[1:07:44]
the downtown conservation district,
[1:07:46]
which has the highest concentration of
[1:07:48]
historic buildings in the city. And the
[1:07:51]
municipal code requires that the
[1:07:53]
historic resources board makes certain
[1:07:55]
findings for all projects um on historic
[1:07:58]
sites in the conservation district
[1:08:00]
district, which this is. Uh several of
[1:08:03]
the findings overlap with those
[1:08:04]
standards that we just reviewed. You can
[1:08:06]
see in green kind of how the standards
[1:08:09]
and these conservation district findings
[1:08:12]
overlap. And then additionally, the
[1:08:14]
board must find that the proposed
[1:08:16]
project is consistent with the
[1:08:18]
established design context of the
[1:08:20]
conservation district and will not
[1:08:22]
adversely affect any historic resource
[1:08:24]
on the project site or on adjacent
[1:08:26]
sites.
[1:08:29]
the historic uh Cocker building directly
[1:08:32]
east of the Cypress Inn, built in 1927
[1:08:35]
and designed by Blaine Olsen, the same
[1:08:37]
architectural team that designed the
[1:08:39]
Cypress Inn, features many similar
[1:08:41]
features such as the decorative tile
[1:08:43]
work, steel windows, and clay roof
[1:08:45]
tiles.
[1:08:47]
Historic buildings on uh Dolores that
[1:08:49]
back up to the Cypress in are also 1920s
[1:08:53]
Spanish style buildings. The proposed
[1:08:56]
project um as we've reviewed complies
[1:08:59]
with the standards but it also complies
[1:09:00]
with the relevant commercial design
[1:09:02]
guidelines including guideline 8.1 which
[1:09:06]
says basic elements of design integrity
[1:09:08]
and consistency throughout each building
[1:09:10]
should be preserved or restored.
[1:09:13]
Guideline C which says windows design
[1:09:16]
should be consistent with the original
[1:09:17]
building concept or with its
[1:09:19]
architecture. And lastly, guideline E,
[1:09:22]
building materials should respect the
[1:09:24]
traditions already established in the
[1:09:27]
commercial district.
[1:09:31]
Staff is recommending you adopt a
[1:09:33]
resolution um finding the proposed
[1:09:35]
project consistent with the established
[1:09:38]
design context of the downtown
[1:09:39]
conservation district and consistent
[1:09:41]
with the standards for for
[1:09:43]
rehabilitation.
[1:09:44]
That concludes my presentation. I
[1:09:47]
believe the architect is online for any
[1:09:49]
[clears throat] questions.
[1:09:50]
» Super. Thank you. Any questions for the
[1:09:52]
staff before we um open it up?
[1:09:59]
» I I do have one question about the
[1:10:01]
courtyard tiles. Well, actually two
[1:10:02]
questions. Is there currently an ADA
[1:10:04]
entrance ramp entrance?
[1:10:07]
» I will defer to the architect to
[1:10:09]
describe how the current
[1:10:12]
» Entrance is not ADA accessible.
[1:10:14]
» Okay. And then um under standard nine,
[1:10:17]
the courtyard tiles being replaced
[1:10:19]
rather than
[1:10:21]
salvaged and things like that. So we're
[1:10:24]
wholesalingly replacing
[1:10:26]
historic tiles with non-historic tiles
[1:10:29]
that look the same.
[1:10:31]
» That's right.
[1:10:33]
» But we don't normally do that.
[1:10:35]
We usually differentiate We usually
[1:10:37]
differentiate between old and new.
[1:10:40]
» If it Yes. If it is a new feature, a new
[1:10:43]
feature should be differentiated so that
[1:10:46]
it's not falsely
[1:10:48]
um giving the sense that it's historic.
[1:10:52]
Um the courtyard itself is is not a new
[1:10:55]
feature because it's a historic feature.
[1:10:58]
It's essentially being repaired
[1:11:03]
» Or replaced in kind.
[1:11:05]
» Yeah. Okay. Thanks for that. Any other
[1:11:08]
questions for the staff before we go to
[1:11:10]
the architect?
[1:11:12]
Okay. No. Uh, no questions. So, we'll go
[1:11:16]
forward to the hear from the architect,
[1:11:18]
please.
[1:11:23]
» Mr. Goodwin,
[1:11:24]
» Can you guys hear me?
[1:11:26]
» Yes, we can.
[1:11:27]
» All right. Wonderful. Thank you uh
[1:11:29]
everyone for allowing us to present this
[1:11:32]
and Katherine, thank you so much for
[1:11:34]
that. Um the accessibility uh for the
[1:11:37]
property right now um
[1:11:41]
currently the only accessible path of
[1:11:43]
travel is through the courtyard and
[1:11:46]
after review of it through um
[1:11:49]
topographic survey the slopes do not
[1:11:52]
meet the requirements. So there
[1:11:54]
technically is no accessible path
[1:11:57]
because the there's actually stairs from
[1:11:58]
the other entry to the lobby. Um so
[1:12:02]
currently even though the uh entry uh
[1:12:05]
and the bathrooms and certain other
[1:12:07]
features inside the building have an
[1:12:10]
accessible nature the path to the inside
[1:12:14]
is not currently accessible.
[1:12:19]
» Okay. Thanks for that.
[1:12:22]
» Any questions for the architect?
[1:12:27]
Um, I had some questions about the the
[1:12:29]
windows and
[1:12:32]
the profiles that are being proposed. I
[1:12:35]
know [clears throat] that that was part
[1:12:35]
of the I can't actually access it from
[1:12:38]
my tablet. Could we go over that again
[1:12:41]
or or see the
[1:12:43]
the steel windows that are being
[1:12:44]
proposed?
[1:12:48]
» Uh, yes. Do you have the um brochure uh
[1:12:54]
Katherine that you can show?
[1:12:59]
» Um
[1:13:01]
they do not
[1:13:03]
» The existing windows that are being um
[1:13:05]
replaced have a similar division that we
[1:13:09]
are proposing. The only difference is
[1:13:11]
that the mullions in the frame of the
[1:13:14]
new windows are thicker than the steel
[1:13:17]
um that was originally built.
[1:13:20]
uh the simulated steel or the steel uh
[1:13:22]
dividers that are inside of the proposed
[1:13:25]
replacements are very similar to the
[1:13:27]
thickness. It's just the outside frame
[1:13:30]
which has to be nailed in place um in
[1:13:33]
the existing openings
[1:13:35]
um is thicker. So that would be the only
[1:13:38]
uh major difference. Even though it it
[1:13:40]
simulates the idea of what the old
[1:13:42]
windows were, it is not an exact u
[1:13:45]
match.
[1:13:47]
» Okay. I was I think it would be nice to
[1:13:51]
have the the the muttons. I understand
[1:13:54]
it's a different um manufacturer,
[1:13:57]
different time, and you have the double
[1:13:58]
uh insulated windows and things, but I
[1:14:00]
think that you could simulate is is the
[1:14:03]
mutton simulating the the tea bar putty
[1:14:06]
look or is it square?
[1:14:09]
» The muttons are Yeah. And that will be
[1:14:12]
something that we can work with staff um
[1:14:14]
to show examples once we get one
[1:14:17]
ordered. But the muttons are
[1:14:21]
» Okay. So that's that I think that's
[1:14:22]
that'd be a nice important
[1:14:25]
part of it to be replacing in kind. And
[1:14:28]
then the other thing that was a little
[1:14:30]
bit confusing in the in the packet, I
[1:14:32]
was looking at a a detail that obviously
[1:14:34]
there there's a lot of different
[1:14:36]
conditions throughout the the building
[1:14:39]
on on the different openings and I just
[1:14:41]
wanted to make sure that the the
[1:14:44]
locations of the window frames within
[1:14:48]
the walls are maintained. So just
[1:14:50]
confirming that
[1:14:53]
» Distance from the base of the uh wall,
[1:14:56]
you mean? Yes, basically the the
[1:14:59]
position of the frame within the
[1:15:00]
thickness of the wall, the depth.
[1:15:03]
» Yeah, that would be maintained as well
[1:15:05]
and we can work with a mockup just to
[1:15:07]
make sure that that um is approved if
[1:15:09]
needed. But that's the general idea.
[1:15:13]
» Okay, those are my two
[1:15:16]
questions. Thank you. Otherwise, I think
[1:15:17]
everything looks good, man. Well, I
[1:15:19]
guess we'll wait for the public hearing
[1:15:21]
to close before
[1:15:22]
» Anybody else's questions for the
[1:15:23]
architect.
[1:15:25]
Okay, hearing none, we will open the
[1:15:28]
comments to the public. If you have a
[1:15:31]
comment, please come forward to the
[1:15:33]
podium.
[1:15:37]
Nobody in the room, anybody online,
[1:15:39]
Shelby?
[1:15:40]
» No, sir.
[1:15:40]
» Okay, so we'll close that back up. Um,
[1:15:44]
any further discussion by staff or are
[1:15:45]
we ready to
[1:15:47]
uh
[1:15:49]
make a recommendation?
[1:15:51]
» You want to say anything more, Eric? I
[1:15:54]
was just make the comments. I think all
[1:15:55]
the replacing the roofing and kind like
[1:15:57]
that and then use the redlinin tiles for
[1:15:59]
the one so they can replace or can't uh
[1:16:02]
they run out of the existing tiles to
[1:16:04]
reclaim. That's a good choice. I think
[1:16:07]
that I'm fine with the replacement and
[1:16:09]
kind of the courtyard. I think that is
[1:16:11]
obviously an important thing because you
[1:16:13]
can see how uneven it is as you walking
[1:16:15]
through that. I know
[1:16:16]
» Um people sensitive to accessibility
[1:16:18]
would probably have a problem with the
[1:16:20]
existing conditions. So improving that
[1:16:23]
with the nice tile that they found
[1:16:24]
sounds great. Um dealing with the cross
[1:16:27]
slopes of the the ramp that comes in off
[1:16:30]
um 7th Avenue makes a lot of sense as
[1:16:34]
well. So everything else looks great.
[1:16:36]
And then again, I would just stipulate
[1:16:38]
that the the window frames have the T-
[1:16:41]
bar putty mutton look and the uh the the
[1:16:46]
location of the frames within the wall
[1:16:48]
thickness is maintained per existing
[1:16:51]
condition.
[1:16:54]
» Okay.
[1:16:54]
» I will add those two as conditions of
[1:16:56]
approval.
[1:16:57]
» Perfect.
[1:16:59]
» All right. Would someone like to make a
[1:17:00]
recommendation?
[1:17:01]
» Well, I'd like to say a couple things.
[1:17:02]
Sorry. There's a I thought the phase 2
[1:17:05]
report that Miss Clovis did was
[1:17:07]
excellent. Uh I had the sense that she
[1:17:11]
uh really understood the project and
[1:17:13]
made the important salient points. And
[1:17:16]
if you'll just indulge me for a minute,
[1:17:19]
uh when uh we were uh I think in your
[1:17:22]
report, Katherine, you said that in 2002
[1:17:25]
2003, the property was enlarged to the
[1:17:29]
north to add new rooms on the on that
[1:17:33]
northern side. And I had to remember
[1:17:36]
that I think I served on the HRB back in
[1:17:40]
2002, which makes it very long time ago
[1:17:45]
because uh that's that's an example of
[1:17:49]
we had to discuss the removal of a
[1:17:52]
studio that was the um uh office of uh
[1:17:57]
one of the prominent women painters in
[1:18:01]
town who had started way back when it
[1:18:04]
was the arts and crafts club here, Mary
[1:18:06]
Denil Morgan, and that her studio was
[1:18:09]
kind of a mess really. It didn't look
[1:18:11]
really beautiful, but it was historic.
[1:18:13]
And I remember we struggled with that
[1:18:15]
idea at the time that here's another
[1:18:18]
historic site that is changing and
[1:18:22]
moving into a new addition to this
[1:18:24]
hotel. But it 20 years later, I mean, it
[1:18:28]
looks beautiful. So there you go. and
[1:18:31]
the gardener dy's edition. All all of
[1:18:34]
this is adding to the historic record
[1:18:37]
which I think is very significant. So I
[1:18:40]
enjoyed reading the structural engineers
[1:18:43]
report. It was very folksy more not as
[1:18:46]
uh you know serious as some some write
[1:18:49]
but I I thought it was great and I I I
[1:18:53]
agree with Eric's uh additions. I
[1:18:55]
thought those are appropriate.
[1:19:03]
Okay.
[1:19:06]
Uh, would someone like to make a
[1:19:09]
recommendation?
[1:19:13]
We have the two caveats already about
[1:19:14]
the windows that Eric mentioned.
[1:19:18]
» [clears throat]
[1:19:20]
» Um, I'll I'll make a motion that the
[1:19:22]
resolution uh for this project, the
[1:19:25]
Cypress in U found consistent with the
[1:19:29]
uh established design context of the
[1:19:31]
downtown conservation district and
[1:19:34]
consistent with the Secretary of the
[1:19:36]
Interior standards for the treatment of
[1:19:38]
historic properties.
[1:19:40]
uh including uh issuing a determination
[1:19:43]
of consistency with the standards for
[1:19:45]
the proposed exterior alterations and
[1:19:48]
site improvements at the La Rivera
[1:19:51]
Hotel.
[1:19:53]
» Do I have a second?
[1:19:54]
» I'll second.
[1:19:56]
» Can we have a vote, please?
[1:20:00]
» Board member Dyer,
[1:20:02]
» Yes.
[1:20:02]
» Board member Guiier,
[1:20:03]
» Yes.
[1:20:04]
» Board member Rinstein,
[1:20:05]
» Yes.
[1:20:05]
» Board member Boris,
[1:20:06]
» Yes.
[1:20:07]
» And chair Croman,
[1:20:08]
» Yes.
[1:20:08]
» Motion passes.
[1:20:09]
» Great. Thanks very much for that. Um, do
[1:20:11]
we have a director's report?
[1:20:13]
» I do have uh several announcements.
[1:20:19]
» Um, Shelby, do you mind can I can I
[1:20:21]
display this? Do I pull it over?
[1:20:25]
And I meant to do this while we had more
[1:20:28]
of an audience in the room, but if
[1:20:29]
anyone's watching later, just so the
[1:20:31]
public knows where to find any staff
[1:20:34]
level project approval or determination
[1:20:38]
of ineligibility, uh this is how you
[1:20:40]
will find it.
[1:20:48]
So from the city's homepage, you'll go
[1:20:51]
up to departments,
[1:20:53]
planning and building,
[1:20:58]
planning division,
[1:21:02]
and then this icon that says current
[1:21:05]
planning applications, determinations,
[1:21:07]
and approvals. [clears throat]
[1:21:10]
And there's several different categories
[1:21:12]
here where staff
[1:21:15]
leaves notice of of various actions. The
[1:21:18]
historic determinations dropdown is
[1:21:20]
where you'll be able to access um
[1:21:24]
determinations of ineligibility. These
[1:21:26]
are are a little bit old. We we add the
[1:21:30]
determinations of ineligibility on the
[1:21:33]
first day of the appeal period. Um
[1:21:36]
here's some some old ones, but I'll just
[1:21:37]
pull this one up.
[1:21:40]
So you'll see the cover sheet which the
[1:21:44]
board just recently approved this new
[1:21:45]
format which will say
[1:21:48]
why the property uh is ineligible and
[1:21:52]
then the the report itself is also
[1:21:54]
accessible. Um you can see maps
[1:21:58]
um photographs.
[1:22:00]
So that is where
[1:22:03]
the city posts posts things. And then I
[1:22:06]
have a few other um announcements.
[1:22:10]
Last [cough and clears throat] week uh
[1:22:11]
the city
[1:22:13]
hosted an objective design and
[1:22:15]
development standard for the downtown
[1:22:19]
workshop uh last Wednesday.
[1:22:22]
[clears throat] This was the fourth
[1:22:23]
workshop and it was co-hosted by the
[1:22:26]
principal planner Marne Waffle and our
[1:22:28]
consultant Optic Coast Design. So, the
[1:22:31]
city is soliciting feedback on preferred
[1:22:33]
architectural styles for multifamily and
[1:22:37]
mixeduse housing in the villages
[1:22:38]
downtown. Um, we're seeking feedback on
[1:22:42]
also which which architectural design
[1:22:45]
element should be regulated for each
[1:22:47]
architectural style. So, if you missed
[1:22:49]
the work workshop, you can view the
[1:22:51]
PowerPoint presentation and you can
[1:22:53]
watch the meeting on our YouTube channel
[1:22:56]
and last week's Friday letter also had a
[1:22:59]
blurb about the workshop with pertinent
[1:23:01]
links. So, there's there are surveys.
[1:23:03]
So, I highly encourage the board and
[1:23:06]
members of the public to get involved
[1:23:08]
because that's very project with a great
[1:23:11]
impact. My second announcement is that
[1:23:13]
the city has hired a new planning and
[1:23:15]
building director, Andy Mrick. And Andy
[1:23:19]
will be joining us on September 30th,
[1:23:21]
and we're very excited to welcome him.
[1:23:23]
So, you'll be meeting him in o in
[1:23:26]
October.
[1:23:28]
Third announcement is that, as you know,
[1:23:30]
the board is registered for a two-part
[1:23:32]
virtual training on the secretary of the
[1:23:33]
interior standards. Uh part one was last
[1:23:36]
week and part two is uh tomorrow. I
[1:23:38]
believe the webinars are recorded and I
[1:23:41]
will be sending out the recording links
[1:23:43]
as soon as I receive them.
[1:23:46]
Additionally, U Meg Clovis will present
[1:23:48]
an in-person refresher on the standards
[1:23:50]
as requested at a date yet to be
[1:23:52]
determined, but definitely haven't
[1:23:54]
forgotten about that. Thank you to the
[1:23:56]
board for attending that joint HRB
[1:23:58]
planning commission meeting on September
[1:24:00]
9th to consider the upcoming
[1:24:02]
rehabilitation of the Harrison Memorial
[1:24:04]
Library. Um the board issued a
[1:24:07]
determination of consistency with the
[1:24:08]
standards and then the planning
[1:24:10]
commission approved the design review
[1:24:11]
application and then a design for that
[1:24:14]
plaque recognizing MJ Murphy and Bernard
[1:24:17]
Maybeck will be brought back to the
[1:24:19]
board for final copy approval. And this
[1:24:21]
is a city property so we have a lot of
[1:24:24]
control over that plaque. And then um
[1:24:28]
the design guidelines 1.5 will be
[1:24:31]
brought back to the planning commission
[1:24:33]
in October and then sub subsequently uh
[1:24:36]
considered by the city council and
[1:24:39]
according to council members Baron and
[1:24:42]
Delves who are the city council sponsors
[1:24:44]
of that project. The inclusion of the
[1:24:46]
draft visual history section will be
[1:24:48]
postponed until after the main document
[1:24:50]
has been approved.
[1:24:52]
And then my last announcement is that we
[1:24:55]
are going to pull the board for
[1:24:57]
availability to adjust the meeting time
[1:24:59]
of the regularly scheduled October 19th
[1:25:02]
meeting because the chambers is going to
[1:25:04]
be in use uh for another meeting that
[1:25:08]
day. We're going to reach out to you
[1:25:09]
tomorrow via email to see if maybe a
[1:25:11]
morning meeting time could be feasible.
[1:25:15]
» Super. Thanks.
[1:25:16]
» So when do we get the visual history
[1:25:17]
then? Because we still need to approve
[1:25:19]
it, right?
[1:25:21]
The only update I have is that the
[1:25:24]
document is going to be considered
[1:25:26]
without it in the short term
[1:25:28]
[clears throat]
[1:25:30]
per council members Baron and Delves,
[1:25:34]
» But we asked it to have it back to
[1:25:37]
[clears throat] review. So,
[1:25:39]
» I understand that they're not going to
[1:25:40]
include it in the main document at this
[1:25:41]
point, but I think it it's kind of nice
[1:25:43]
that if we get our work done, they can
[1:25:46]
then have the option to include it or
[1:25:48]
not include it, I guess.
[1:25:51]
When I receive
[1:25:54]
the guidance from the council members,
[1:25:57]
uh, we'll bring it back to you.
[1:26:00]
» Is it decoupling the project though if
[1:26:02]
we do it? I mean, it's like we're doing
[1:26:04]
the same thing but not doing it.
[1:26:07]
» I'd recommend any member of the public
[1:26:09]
who has questions about it to contact
[1:26:11]
the council member project sponsors.
[1:26:15]
» Okay.
[1:26:17]
Okay. Well, thanks for the report. Um,
[1:26:20]
our next regular meeting is scheduled
[1:26:22]
for the 19th of October. As Katherine
[1:26:24]
said, I guess we're going to look at
[1:26:24]
some alternate timings for that. Um, any
[1:26:27]
other comments before we adjourn.
[1:26:30]
Okay. Thanks everybody on the board and
[1:26:32]
thanks for the public for joining us
[1:26:34]
today. Uh, the meeting's adjourned.
[1:26:36]
» Thank you.
[1:26:36]
» Thank you.
[1:26:44]
Um I think I think we can raise it as a
[1:26:48]
um a future agenda item and we can just
[1:26:50]
make a decision on it. Yeah.
[1:26:52]
» Yeah. [clears throat]
[1:26:53]
» Yeah. I will reach out to our clerk who
[1:26:56]
I think handles those proclamations and
[1:26:58]
I'll get more information for you.