Agenda
[0:04]
Call to Order
[0:35]
Non-Agenda Public Comment
[1:23]
Consent Calendar
[2:25]
Business Items
[2:26]
Consideration of a design review for the renovation of an existing building at 72700 Fred Waring, converting the former church building into a medical office building.
[1:14:37]
Cultural Arts Committee
[1:15:55]
ARC Subcommittee
[1:15:57]
City Staff
[1:16:15]
Requests for Action
[1:18:08]
ADJOURNMENT
Transcript
SOURCE TRANSCRIPT
This transcript is downloaded from the source you provided but we haven't reviewed it for accuracy. Treat it as a starting point, not a verbatim record. You can also request an AI-transcription of the audio file with the button to the left.
[0:00]
Commission meeting on August 25th, 2026. To order at 1232.
[0:10]
I'm gonna have a roll call, please. Commissioner Garcia. Here.
[0:15]
Commissioner McIntosh. Here. Commissioner Sanchez. Pierre. Commissioner Buchsik? Here. Vice
[0:22]
Chair Gregory. Here. Chair Blakely. Here. We have a quorum.
[0:26]
Thank you. At this time, it's been set aside for
[0:31]
the public to address the architecture review commission on issues
[0:34]
that are not on the agenda for up to three
[0:37]
minutes because the Brown Act does not allow the Commission
[0:39]
to act on items not listed on the agenda. Members
[0:43]
may briefly respond or refer the matter to staff. A
[0:47]
report and recommendation that a future meeting. For the recording,
[0:52]
Secretary, please instruct. For those joining by Zoom, if you'd
[0:57]
like to provide non - agenda public comment, please use
[0:59]
the raise hand function at the bottom of your screen.
[1:01]
If you're joining by a phone, you can press star
[1:04]
9 to add yourself to the queue. If there was
[1:08]
to speak on the agenda, but it's not on the
[1:09]
agenda, please raise your hand to speak. I see none.
[1:17]
Consent, excuse me, consent calendar all matters listed on the
[1:20]
consent calendar are considered routine and maybe approved by one
[1:23]
motion. The public may comment on any item on the
[1:26]
consent calendar within the three - minute time limit individual
[1:30]
items may be removed by the architecture review commission for
[1:33]
a separate meeting. Is there any commissioner who would like
[1:36]
to make a motion. Chair, if I may, that's for
[1:44]
item 4A, the approval of the minutes for July 28th.
[1:48]
And August 11. Mr. Itemprove for The Minutes of July
[1:54]
28th and August 27, okay. Business items. Consideration. We still
[2:00]
need a motion in a second. Oh, motion in a
[2:02]
second. I motion to approve. Second. Motion by Gregory, second
[2:06]
by Vhuksev, all in favor, please say aye. Aye. Any
[2:11]
opposed. Motion carry 60. Thank you guys. Can this is
[2:17]
a reaching of a design review for the innovation of
[2:19]
an existing building at 72, 700 Fred wearing. Converting the
[2:25]
former church building into a medical office building. Can I
[2:29]
have a staff report. Yes.
[2:48]
Good afternoon, sharing commissioners. My name is Peyton Thomas, an
[2:52]
associate planner in the development services department. And today I'll
[2:55]
be presenting on permit number DR - 26009. The DIG
[3:02]
LLC Medical Center off 72700 Fred wearing drive. The project
[3:12]
applicant is Reuben Coronado. The project location is 72700 Fredware
[3:18]
in Drive. And the request is the design review approval
[3:21]
for a proposed facade modification. To an existing building for
[3:25]
DIG LLC Medical Center. Their project includes modification to the
[3:29]
architecture, landscape, hardscape, and lighting, and increasing the square footage
[3:34]
from 7, 469 square feet to 9, 325 square feet.
[3:44]
Years of vicinity mapped show the area of the project
[3:47]
site. This is the north side of Fred Waring and
[3:51]
it's to the west of Fairhaven Drive. Across from Trader
[3:57]
Joe's. Now here we just have the east and west
[4:03]
elevations of the proposed project. This is to show the
[4:07]
sloping of the roof. As you can see, the highest
[4:09]
point is on the south elevation at 28 feet. The
[4:16]
northernmost point is at 15 feet height. And here we
[4:26]
have the, um, other elevations, the north and south ignore
[4:30]
the title, please. Um, here we could see the standing
[4:35]
seams as well as the, um, simplification of the North
[4:41]
elevation to just double doors. So here we have the
[4:48]
existing South elevation. This is the current condition. And then
[4:55]
here we have the proposed South elevation. As you can
[4:58]
see, um, the existing recession of the existing conditions have
[5:04]
been infilled. And that is partially of how the square
[5:08]
footage is being added. As well as, um, addition of
[5:12]
second story is added as well. So most of the
[5:14]
square footage edition is actually just infill of two pop
[5:19]
belts, one on the west side and one on the
[5:21]
east, as well as infillion entryways on the east elevation.
[5:27]
And then as we could see on the south elevation,
[5:29]
that infill would be the standing seam. Here we have
[5:36]
the existing east elevation. Again, you could see how it
[5:40]
is recessed currently with the pop out as well as
[5:44]
in the doorways. Then we have the proposed East elevation.
[5:57]
And then we have the existing West elevation. Here I
[6:00]
included multiple photos, um, to show the existing condition as
[6:05]
well as where the mechanical equipment exists currently and where
[6:09]
it's going to be proposed as well. It's going to
[6:11]
be on the side of the West elevation of the
[6:14]
building. And here we have the proposed West Elevation rendering.
[6:25]
And then here I included this rendering to show the
[6:29]
overall image and also include the roof plan. That just
[6:35]
a little bit more clear for presentation purposes just to
[6:38]
show that there is no mechanical equipment on the sloped
[6:40]
roof. For proposed landscaping, this shows
[6:51]
the scope limit as well as some of the plants
[6:54]
included in the landscaping, which includes the line of ficus
[6:58]
along the west elevation. Which is also included with, there
[7:02]
will be a wall as well for screening, but screening
[7:05]
the mechanical equipment. As well as inclusion of polo verdes,
[7:11]
brittle bush, slipper plants, and other various plants like aloe
[7:16]
vero, with, uh, decomposed granite DG. And we have decorative
[7:23]
pavers going into the building on the East elevation. Now
[7:31]
staff of determined that the findings have been met and
[7:33]
recommend the project for approval. If design comments arise during
[7:37]
the discussion, staff recommends the ARC outline the request of
[7:40]
changes and incorporate the commons as conditions of approval. That
[7:44]
concludes my presentation. Thank you. Are there any
[7:54]
questions from staff for the commission. There's the applicant have
[8:01]
any questions. Thought that was, um. Presentation. Is African.
[8:11]
Question. To make sure I understand. I didn't see any
[8:19]
demo plans. I want to make sure I understand exactly
[8:23]
what I'm looking at. Um. So I understand that the
[8:27]
pop - outs on the east and west that are
[8:29]
being filled in, I think. Yes. And then on, on
[8:32]
the south end, um, I'm looking at, right now I'm
[8:37]
looking at A sheet A201. I'm sorry, the north end,
[8:43]
the north end. So it's the low end. And the.
[8:50]
Um, the thing at the, at the north end that's
[8:54]
kind of popping up above the sloped groove. Is that
[8:58]
existing or is that, is that been altered by the
[9:02]
applicant. Are you describing the kind of column feature that's
[9:08]
on the southern elevation that's peeking out on the elevation?
[9:13]
No, I'm, I'm referring to the north end of the
[9:15]
building at the low, low end of the roof. There's
[9:19]
a piece that pops up above the sloped roof. Kind
[9:26]
of a boxy. Oh, yes, the paraffin. Yeah. What is
[9:30]
that added. Um, based off what I saw that parapet
[9:35]
was already existing. You're saying that three feet parapit on
[9:41]
the end. How slopes all the way down and then
[9:44]
it picks back up at that last. Well, it's flat
[9:49]
on the top. The thing I'm looking at, I'm looking
[9:51]
at the west exterior elevation on sheet eight, 201. And
[9:55]
I'm looking at the right end of it. Okay. Yes.
[10:05]
And what you're describing is that end the northernmost piece
[10:09]
that has the three foot parapit. I guess it's a
[10:13]
three foot pair pit. Okay. Yes. Kind of jogs up.
[10:19]
Yeah. Bottom left corner. Okay. Okay. You can look at
[10:23]
the bottom left or the upper right. Yeah. It's the
[10:26]
same form. And is that existing. The parapet now. Yeah.
[10:32]
Okay. We'll leave that one for the apple. Yeah. Okay.
[10:36]
Based off of existing conditions from the aerial you could
[10:39]
see a little bit of change, but he'll describe more
[10:42]
about the paradigm. We'll leave that for the applicant. Another
[10:50]
questions. Okay. I have a question. This being check against
[10:55]
historical preservation ordinance.
[11:06]
Let me get back to you on that one. I
[11:12]
have a question. Uh, so this whole package is all
[11:16]
proposed changes. There is nothing in here indicating existing conditions.
[11:22]
Is that correct? Let's. See. You're saying showing. Well, so
[11:29]
the point of us even talking about this project is
[11:33]
that they're proposing significantly altering an existing building. And all
[11:40]
that we see in this package front of us and
[11:45]
from the presentation. That evokes anything existing or at the
[11:49]
photographs, but we can't see like an existing demo and
[11:54]
proposed plan compare that to a floor plan or a
[11:58]
site plan. So it's hard for us unless we hear
[12:02]
it from you as far as infilling to get that
[12:04]
square footage. We can't really see it. I understand what
[12:09]
you're saying. We have included the, uh, yeah, the floor
[12:14]
plan is included, but the demo plan is not included.
[12:22]
Sheriff, I may. I know, um, as far as what's
[12:26]
typically shown, what we have as far as our design
[12:29]
review checklist, it doesn't include, um, what's existing. It just
[12:34]
includes what's being proposed. I know it's typical that we
[12:36]
do receive it. Um, but however, it's not, it's something
[12:41]
that we can make a modification to if that's something
[12:44]
that the architecture, review commission is concerned about. But as
[12:48]
far as our checklist, the way that it's set up,
[12:50]
it doesn't have what the existing designs are. As part
[12:54]
of the required checklist. Can we make a motion on
[13:01]
that that we'd like to see that? Or how does
[13:02]
that work. It would be a separate item. On the
[13:09]
motion you mean? Not for this motion, but for, um,
[13:13]
follow - up discussion. Okay. Thank you. From the pictures,
[13:19]
the existing building, the north end of the building has
[13:26]
Commissioner Buksey pointed. It seems to be following the slope
[13:30]
of the build. But we'll need clarification. Off if that's
[13:37]
a new. Parpet flat roof on the back. Or you're
[13:42]
just in closing the opening. So it's not clear. And
[13:51]
that's something we'll have the applicant clarify. Any more questions.
[14:01]
At this time I'll open the public period. I invite
[14:05]
the applicant providing additional information. That they can.
[14:20]
State your name. Cornado. Nice to see everyone. So, uh,
[14:26]
to talk about the back area there on the south
[14:30]
side. So what we had to do is we had
[14:33]
to raise the ceiling. Because we had to create the
[14:36]
MR shielding for the, for the, uh, MRI machine. So
[14:41]
that there was an existing parapet, but we did have
[14:44]
to raise the parapet because I had to raise the
[14:46]
roof structure. To accommodate for the MR shielding. So yes,
[14:52]
there already was an existing parapet, but we had to
[14:54]
increase it a little bit because I had to increase
[14:56]
the, uh, the roof height in that area. So it
[15:03]
was raised a little bit here to accommodate that. Thank
[15:08]
you. Anything else you want to explain that she did
[15:12]
a good job? Yeah. So in regards to the floor
[15:16]
plan essentially, I hadn't changed the footprint of the building.
[15:20]
The footprint of the building literally remains the same. It's
[15:24]
just the open patios that are in the building have
[15:27]
just literally been enclosed in that area. So if you
[15:30]
take a look at A dash 100. 1. Uh, on
[15:38]
the bottom side there where you see the elevation, we
[15:42]
pretty much just enclosed that area. Cause right now that
[15:44]
interior area is just a open area. That transients pretty
[15:48]
much hang out in that area right now. So we
[15:50]
closed that out. On the west side, Office 101, that
[15:57]
structure remains the same. We're essentially just infilling the exterior
[16:01]
wall. On the west side. And that area pretty much
[16:06]
stayed exactly the same. And we're adding a standing seam
[16:09]
one inch batten seam roof to that area. On the
[16:12]
east side, I will be removing that, that arched opening.
[16:18]
And this will be a new, uh, extrusion build out
[16:21]
here. But the footprint remain the same. And I just
[16:24]
squared it off so that I can have more room
[16:26]
inside for the lobby area. Uh, everything else that you
[16:30]
see on here is existing exterior structure. If you go
[16:36]
to sheet A dash 100. 2. And the hallway 133.
[16:44]
Essentially that area back to those walls that you see
[16:47]
to the, to the left is all open patio. You
[16:50]
can see I essentially closed off that exterior wall. And
[16:54]
that's, and that's how we pretty much were able to
[16:56]
gain the additional square footage to create a hallway for
[16:59]
all of the new imaging and office areas. So that's
[17:05]
essentially what we did to close off the area. There
[17:07]
was no square footage edition other than the footprint that
[17:10]
was already remaining. Also the architectural features of the building
[17:15]
all remain the same. I'm not changing any of the
[17:17]
exterior structure of the building at all. Other than that
[17:21]
back South area where we're raising the ceiling to create
[17:24]
that parapet to raise it for the CT scan. If
[17:29]
you go to sheet A dash 100. 3. Uh, we've
[17:33]
created a mezzanine, a storage mezzanine on the second floor
[17:40]
for their, uh, secured, uh, expensive medical, you know, whatever
[17:45]
they have up there. Uh, so that's what we've did
[17:48]
on the second floor. But all encapsulated within the existing
[17:51]
structure of the building. Because this was a church that
[17:54]
area was raised and we had substantial space to add
[17:56]
that square footage. A 110, that's just the window. Windows,
[18:06]
I mean, the door schedule. A101 is the exterior window
[18:10]
schedule. Uh, A130 is the roof plan. And you can
[18:14]
see the modifications that we made to the roof on
[18:17]
the, on the south side here. We've, you know, included
[18:21]
that, you know, included the raised pair of pits here.
[18:25]
We're going to have a fiber type roof and the
[18:28]
sloping is going to go to an existing drainage that
[18:31]
was already in place in those locations. Uh, on the
[18:35]
west side here, or the east side, we have the
[18:39]
build out that I was talking about with the roof.
[18:41]
That's also going to be a fiber type roof system.
[18:44]
And I've added a drain system there as well for
[18:46]
it to drain off of that roof. And essentially the
[18:49]
roof will drain as it originally drained from the previous,
[18:54]
uh, build out. Um. These are the exterior elevations. Um,
[19:01]
I do have existing elevations that I can present if
[19:05]
you guys need to see them. That's not a problem.
[19:08]
They've already been created. But essentially you're essentially going to
[19:12]
see the same exact view because there's really no architectural
[19:16]
portions that I'm actually modifying other than accentuating the removing
[19:20]
the cross and putting the stone veneer at the front
[19:24]
entrance on the north side. And then raising the parapet
[19:28]
there for the MRI room. Other than that, and on
[19:33]
A10, you'll see on A201. That's the new, uh, pop
[19:39]
out here that we did for the front entranceway. And
[19:44]
you can see these in the color renderings where the
[19:47]
openings there. I've enclosed it. Remove the cross. We're going
[19:51]
to be putting the stone. On the existing on A202.
[19:57]
That will be removed. And then new facade will be
[20:00]
put on the new entrance way. On the. East side
[20:08]
here. You can see this all essentially remains the same
[20:11]
other than in closing. You can't see it because the
[20:14]
tree's in the way. But essentially it's the same thing.
[20:16]
This, the area on, uh, A203 on the upper right
[20:20]
- hand corner. Looks exactly the same as A202 on
[20:25]
the lower right - hand corner. Those two openings are
[20:30]
essentially exactly the same. We're just in closing it here
[20:34]
on the other one because we're able to make those
[20:36]
offices work within the existing space. A - 204 is
[20:42]
just the color. Pretty much the exterior colors. We're going
[20:47]
to match the adjacent buildings because the doctors own. That
[20:50]
was Jason buildings there. So it's just going to be
[20:53]
a smooth plaster. A smooth white plaster. Um, we have
[20:57]
reglets. Those one inch reglets that we're going to incorporate
[21:00]
here to try to give it a little bit more
[21:02]
pop. And we have the stone. On the north side.
[21:07]
And then we're going to be having the staggered. We're
[21:11]
going to be having the, you know, standing seam on
[21:13]
the pop out on the roof. And for the vertical
[21:17]
features, it's going to be a vertical panel staggered seam.
[21:21]
It's more of like an inverted standing seam system. And
[21:24]
you can see a little bit more of that. If
[21:26]
you take a look on A205 on the upper right
[21:30]
- hand corner, it kind of gave you a picture
[21:33]
of kind of what that will look like. The lower
[21:36]
area on H - 205, that's the standing seam. That
[21:41]
will be sitting on the adjacent roof on the east
[21:44]
side. I'm proposing at this point that it's a matte
[21:48]
black. And then for a little bit more detail on
[21:55]
the sections on A300, you can essentially see kind of
[21:59]
here what I'm doing. Especially on the south side that
[22:01]
you guys talked about raising this area. This is essentially
[22:05]
the, you know, a section cut through that area to
[22:08]
kind of show what's going on. Also you can see
[22:11]
on F10, on A300. The section cut here through the
[22:17]
new entryway. And what the difference correlation would be on
[22:22]
the east side versus the west side there for the
[22:25]
leaving the existing area filled in with the standing seam
[22:28]
and the new entrance build out. Uh, A301 provides a
[22:36]
little bit more detailed information in regards. I have a
[22:41]
question. I don't know if I'm going too much on
[22:43]
this, but no question. Yeah. Keep continue. Okay. Yeah. A301,
[22:48]
that's just a little, uh, better cross section of that
[22:50]
existing condition and how we're infilling that new wall area.
[23:00]
And that's essentially it for the architectural. If you guys
[23:03]
have any more questions, I'd be happy to answer them.
[23:05]
Okay. Thank you. Um, is there any member of the
[23:09]
public who would like to comment on this item? Please
[23:11]
raise your hand to speak. If you are joining the
[23:13]
meeting by telephone, please press star nine to raise your
[23:17]
hand to speak. None. Okay. Now we can ask questions
[23:23]
at the applicant. Okay for she 300, A300 on your
[23:31]
sections. Why is some of the lines are dashed and
[23:35]
some are. Solid doesn't mean. Oh. Those are just gas.
[23:47]
Sorry. Uh, yeah, those are areas are just dashed because
[23:51]
I caught a cross section through them and it just
[23:52]
kind of indicating of cutting through the wall in that
[23:55]
area. It's not demolition. No, this is everything that you
[24:01]
see on these plans is all new construction. Essentially for
[24:05]
the demolition, the interior, we've already gutted the entire inside
[24:10]
of the existing building here now. So, and we already
[24:13]
got demolition permit and all that's already been completed. And
[24:17]
all abatements all been done already as well. But we've
[24:20]
essentially gutted the entire inside of this. The new construction
[24:23]
would just be infilling the patio portions. And going on
[24:28]
the inside from there. Uh, I got a question for
[24:36]
you. On your sheet A204. It says
[24:45]
East elevation. I think it's supposed to be west, right?
[24:53]
Is this the only place where you're calling out the
[24:55]
MS2, which is the standing seam metal roof. Correct. Microphone.
[25:05]
Should I just leave it on? Still breathe heavy. So
[25:11]
yeah, the MS2 is only going to be on that
[25:14]
on the, uh, west side, correct? So is it more
[25:18]
of a fascia detail than an actual roof? I mean,
[25:21]
are we seeing the, just a standing sea metal roof
[25:23]
that I'm going to add to that right now. It
[25:25]
just has a plaster finish on top of it. I'm
[25:28]
going to, I'm going to add the standing seam to
[25:30]
help bring in more of the standing seam elements around
[25:34]
the building to help tie it together. But do you
[25:37]
really, you don't really see it, right? I mean, if
[25:39]
you go up to A203, you've got a nice perspective.
[25:44]
Kind of coming from the southwest that looks at it,
[25:47]
right? Yes. So yeah, that's pretty much what you'll see.
[25:51]
Obviously we'll be cleaning up some of the landscaping there
[25:53]
so you can hopefully see the building a little bit
[25:54]
better. But yes, that tree is to remain in that
[25:57]
area. The tree. You're the palm? Well, the tree there
[26:01]
and there's palms in front of it. Okay. Well, I
[26:04]
was just thinking that, you know, you're not really seeing
[26:06]
too much of your standing sea metal roof, right? It's
[26:09]
more of a fascia detail. Facial. It's just the roof
[26:15]
system that we're going to be putting on there to
[26:16]
help alleviating type of leaks that would also be going
[26:19]
on top of that roof as well. I think it'll
[26:21]
help. Cause right now it's just an open, it's just
[26:24]
an open area. What's probably leaks like crazy. So I
[26:27]
introduce a standing scene to help mitigate any leakage in
[26:30]
that area and kind of make sure that we're sealing
[26:32]
it off correctly. Right. But was that an Architectural decision?
[26:37]
I mean, I'm just wondering, cause you don't really see
[26:38]
it. Right. I mean, it's kind of a flat slope.
[26:41]
Yes. It was an architectural decision. Like I said to
[26:45]
make sure that we handle any water leaks or water
[26:49]
mitigation into that new area. So are you rolling those
[26:52]
ribs down on that fascia detail? Is that what really
[26:55]
makes it look? If you take a look at A301.
[27:06]
If you go to A301, it's pretty much a detailed
[27:10]
description here of what we're looking to do. So if
[27:12]
you look at A7, A301, that's how we're going to
[27:16]
be finishing up regarding the slanted area to help make
[27:19]
sure that they're on getting any waters through that, through
[27:21]
that cracked area there. We also have the Eve and
[27:24]
then we also have the general wheat screen detail at
[27:27]
the bottom. A11. So, so it really doesn't wrap down
[27:36]
into a fascia detail at all, right? Correct. It's just
[27:39]
the standing seam on top of the roof. The face
[27:41]
of that would be plastered to match the rest of
[27:43]
the exterior of the building. Right. Yeah. It's just so
[27:47]
flat. It's too bad we're going to miss out on
[27:49]
a good visual on it. Maybe we cut down the
[27:52]
tree there. Yeah. By the way, before I, I don't
[27:56]
want to sound just critical all the time. Nice set
[27:58]
of drawings by the way. I appreciate that. Thank you.
[28:01]
Um, I noticed on your roof plan. So it looks
[28:05]
like we're going to keep all the mechanical equipment on
[28:08]
the weth side of the building. Yes, sir. Nothing's going
[28:11]
on the roof. Yes, exactly correct. Yes, sir. Okay. Is
[28:14]
that Ruf Hatch existing up there? That's a new roof
[28:17]
hatch that I do need to create to make sure
[28:19]
that we can get on because the knot currently one
[28:21]
there now. Why do you need one? If the guy
[28:25]
put a roof hatch on it and get on the
[28:26]
roof versus somebody stacking a ladder up on the side,
[28:29]
it's a little more little safer. But if we need
[28:31]
to remove it, I have no, you don't need to
[28:33]
remove it. I'm just hoping you're not going to put
[28:35]
any equipment up there. Zero equipment's going on there. As
[28:38]
you can see, if you take a look at the
[28:39]
site plan G010, pretty much the second sheet. Okay. Pretty
[28:47]
much all of the equipment is going out there. We
[28:50]
have nothing on the roof. Just when we see roof
[28:52]
hatches typically, we see equipment. It's just pretty much to
[28:56]
get access in case anything gets up on the roof
[28:58]
where roof trains need to be re cleaned or anything
[29:01]
like that. And some are safe for somebody to get
[29:03]
up onto the roof and do whatever they need to
[29:05]
do. Good. Okay. Um, one, I think important architectural question
[29:11]
I have. You've got that nice vertical. Mass. That currently
[29:18]
has the crucifix on it. And you're going to collat
[29:20]
it in this. Eldorado stone. Correct. You got really two
[29:26]
really nice outside edges outside corners. Right. Have you been
[29:32]
successful in bringing those veneers together in an outside corner?
[29:38]
Thousand percent we have. Yes. We're going to, I'm going
[29:40]
to miter those. I want to, I like to miter
[29:42]
those corners. Okay. Plus they also plus if we can't
[29:50]
miter it. They also have corner pieces that you can
[29:52]
install in the corner of those areas as well. Yeah.
[29:55]
Yeah. Okay. I just think that would be really important
[29:58]
to pay attention to that detail. I mean, that's going
[30:01]
to be really sticking out. Stone's going to get your
[30:03]
attention. I've seen unfortunate applications where people didn't pay attention
[30:08]
to that detail. And it just kind of kills the
[30:10]
whole thing. Whereas with yours, um, I'm glad to hear
[30:15]
you guys are thinking about that and making sure, cause
[30:19]
I didn't quite, I didn't see a detail in the
[30:21]
set about mydering or anything like that. Yep. I don't
[30:25]
have that on here, mydering, but I'm here with the
[30:28]
contractor here as well. And, you know, we work together
[30:31]
on these things. So it's a, it's a kind of
[30:34]
a design build type thing. So we make sure that
[30:36]
we look at those type of things and make sure
[30:38]
it looks nice. I want that to look nice. So
[30:42]
for sure I'm going to make sure that that's going
[30:43]
to look good at the end of the day. Yeah.
[30:45]
No, like I said, you did a great job here.
[30:47]
Great set of drawings. And I think you did great
[30:50]
with the building form. Kind of keeping true to form
[30:53]
what was there and sort of modernizing it. But, um,
[30:58]
yeah, if we could just make sure that those details,
[31:02]
you know, are included in the approval. That'd be really
[31:06]
important. Sure. That was it for my comments. I got
[31:11]
one second. Are we still at questions to the applicant?
[31:18]
Yes. Okay. That should have been questions, not comment. Um,
[31:26]
looking at your roof plan A130, you're identifying a scupper
[31:32]
at the north end of the, called the major slope
[31:36]
right when it hits the new parapet of your, um.
[31:40]
Your scanner room. What shooting? A130, your roof plan.
[31:51]
So. I'm just curious. The main existing roof has a
[31:56]
pretty significant slope, right? Correct. And but there is still
[31:59]
a ridge going down the middle of it. Correct. So
[32:02]
water is probably going to be shedding off the roof
[32:04]
on each side before it even gets down to the
[32:07]
bottom where you have this new parapet. North end of
[32:10]
the building. Um. Even with the scupper there, um, do
[32:18]
you have a section that goes right through the middle
[32:19]
of that. I'm just, I'm wondering. Even if it's necessary,
[32:28]
um, to have a scupper there. And that if you
[32:33]
did run. Oh, you mean in the middle where it
[32:35]
transitions to the other side? Yeah. Straddling your ridge line
[32:38]
going through the parapet. Yeah. I've also talked to Al
[32:41]
Miller about this as well. I've talked to the roofers
[32:44]
here as well. We're probably going to open that up
[32:47]
even more because he's saying it's just better for it
[32:49]
to sheet flow into that area. Essentially, that's what it's
[32:51]
doing now. So yes, there won't, there won't be a
[32:55]
scupper there. We're going to just open that up. And
[32:57]
it's just going to sheet flow into that area. But
[33:01]
then those two little scuppers on the northwest corner and
[33:04]
the northeast corner would be sufficient for any of that
[33:07]
runoff. That's exactly what is doing now. That's exactly how
[33:13]
the runoff is happening at this current stage now. Do
[33:17]
you know what the existing slope is on that main
[33:19]
roof. I do not, I'd have to go back to
[33:24]
my plans and get that actual existing slow. There wasn't
[33:28]
a lot of as build information to go off for
[33:32]
this project since it was back in the 50s or
[33:34]
something, I think when this thing was. Yeah. And if
[33:37]
it's just going to follow that kind of gentle ever
[33:41]
increasing slope from the south end and the north end,
[33:44]
it then has a cross slope, which would take any
[33:46]
of that runoff over the edges. Okay. Thank you. Question.
[33:55]
Oh, so. Your elevations are labeled. Wrong, right? The east
[34:03]
means the west, the north, missed out. And so forth.
[34:07]
Uh, no, the north means the north. The south means
[34:10]
the south. East in the west. I thought I had
[34:18]
that correctly there, but I guess what's your question on
[34:21]
in regards to that other one? Um, the new roof
[34:25]
over by the, uh, what it's going to be the
[34:27]
lobby, the entry. Yes. Right now is this loping roof
[34:32]
and you are putting a standing same fascia flat roof.
[34:43]
Because without the existing conditions of demolition planner or existing
[34:48]
section. Can't tell if the proposed rule for your on
[34:53]
the east. It's neo - war existent. So if you
[34:56]
go to A300, right. And go to F10, the middle
[35:04]
one and the. Left - hand side, that is the
[35:08]
existing roof slope as it stands now. All I've done
[35:13]
is enclose the exterior wall and add it standing seam
[35:17]
to that portion. When you go to the right -
[35:20]
hand side, I have demolished that existing entranceway. And now
[35:24]
I'm creating this new, the new pop - out entranceway
[35:29]
here. You can see with parapets and as drains, where
[35:33]
everything to drain properly as well. Um, so that's essentially,
[35:39]
did I answer your question? Right. It's the existing entries
[35:44]
being demolished. And you put in a new roof for
[35:48]
the answer. Correct. But on this section cut, essentially the
[35:54]
existing section cut would just essentially look exactly like the
[35:59]
left - hand side. On the right - hand side
[36:02]
being removed.
[36:14]
I have one more question. And looking at L. Preliminary
[36:19]
Landscape Plan. Is the main entrance to the building going
[36:24]
to be the bottom right kind of cross. Which kind
[36:29]
of has an E dot T just below it. Is
[36:32]
that the main entrance to the building. Yeah. E. T.,
[36:37]
yes. That door right there is the new, is the
[36:38]
main entrance to the building, correct? Golding into the lobby.
[36:43]
And then above that where there is additional paver. To
[36:48]
the left of Mediterranean fan palm, um, that basically looks
[36:52]
like patio right off of a long hallway. Correct. Okay.
[36:57]
And that hallway is not for, uh, patients to go
[37:01]
through. That's more of an exit. It's, it's for both.
[37:05]
Right. So they'll come into the lobby. And either they'll
[37:08]
meet in the exam rooms adjacent to the lobby. And
[37:13]
you meet with the doctor. Or they'll be pre -
[37:16]
scheduled to already have, uh, imaging session where they go
[37:20]
into the area, going to the dress and rooms. And
[37:24]
then from there, they would be going through those corridors
[37:26]
to get to the MRI or the CT scan. Or
[37:29]
whatever treatment that they would be going to do. So
[37:32]
yes, it's an exit corridor as well. Plus it's plus
[37:36]
the doctors also like to have an entrance other than
[37:39]
the front entrance as well. They usually like to enter
[37:41]
the building. Uh, but essentially none of the clients that
[37:46]
would be going there would be using these doors. They
[37:49]
would be coming in and out to front entrance. Uh,
[37:51]
the other doors are primarily for employees, but the hallway
[37:54]
will be used by both clients and the employees and
[37:59]
doctors. I have a question. On L2
[38:09]
landscape imagery. You have three types of, um, ground material,
[38:14]
rock material. Decouples granite, fresh rock, three quarter cross rock.
[38:19]
And a boulders. But on the planting plan, I don't
[38:22]
really see how that's late being laid out is that
[38:27]
just missing from the plan or do I have outdated
[38:29]
plans. What's. So I do have my landscape architect on
[38:36]
the call here. Maybe it's better that he responds to
[38:38]
those. Okay. Um.
[38:51]
My name is Alex Kazukis. I'm the landscape architect. And
[38:56]
actually, thanks for pointing that out. We're, we're not going
[39:00]
to have the crushed rock proposed on the project anymore.
[39:07]
So we'll remove, we would remove that. So it's just
[39:10]
going to be DG and the boulders, right? I'm sorry.
[39:19]
Um, yes, it's just going to be DG. Okay. Thank
[39:24]
you. Another question I had was, um, the rest of
[39:28]
the parking lot is part of this property. Right? We
[39:31]
just, uh, updating planting as needed, uh, specify on your
[39:35]
plans. Sorry. What was the question.
[39:45]
So on L1, I have callouts for existing plan mature
[39:50]
to remain dead or dying plants to be replaced as
[39:53]
needed. I'm assuming that the rest of the parking lot
[39:56]
is still part of this, um, project. Right. Um, it's
[40:03]
not part of the landscape project, but, um, I guess
[40:09]
it's, it might be a part of, uh, the Reuben's
[40:12]
parking and all that. I guess I can feel this.
[40:17]
Yeah. So, um, yeah, the existing parking area that's there
[40:21]
is to remain as, however, it was other than trying
[40:24]
to clean it up here at this point. But it
[40:26]
is part of the property? It is part of their
[40:28]
property, correct? Okay. Thank you. Off you off that. If
[40:34]
the existing planting is to remain is the new planting,
[40:40]
uh, reflecting or kind of caring consistent specimens and ground
[40:46]
cover. For example, if we're calling out for new California
[40:50]
Gold DG, um, is that existing already, uh, in these
[40:54]
medians, uh, do we have existing. Chilean mesquites or blue
[41:03]
Palo Verde. In these medians? Like, are we being consistent.
[41:10]
If we're leaving the existing as it is. Yeah. That
[41:13]
was the intent to stay consistent. It's currently, um, drought
[41:20]
tolerant, um, sparse planting. And we're going to be sticking
[41:24]
with that theme. And we're, we're, um, sharing a lot
[41:27]
of the same, uh, trees that are existing. We're, we're,
[41:32]
uh, implementing them in the new plans as well.
[41:54]
Any more comments, questions. Questions. Um, I have, uh, I
[42:01]
have a question. I'm going to go back to the,
[42:03]
to the roof, the long existing roof. Um. Just cause
[42:10]
I'm a little, little confused about what's happening there. I've
[42:14]
never, I've never seen anything like that. Where you have
[42:17]
a roof, you know, that's a hundred feet long or
[42:19]
something. It's all sloping from the high point to the
[42:23]
low point. Looking for the roof plan now. Except there's
[42:27]
a ridge in the middle of it that doesn't seem
[42:29]
to have. A purpose. I'm looking at the big arrows
[42:33]
that are pointing north. They're going to the low point
[42:37]
of the roof. And is that, is there really a
[42:42]
ridge there? There is. Okay. So is it causing the
[42:45]
water to actually like shed off and go down the
[42:49]
sides of the building instead of just run down to
[42:52]
the bottom? The roof is actually kind of like a
[42:54]
V. So this roof is in caving like this. Oh,
[43:00]
so, so it's a low in the, it's not a
[43:02]
ridge. It's a valid. It's a valley. It's low in
[43:06]
the middle. That's better. So the water is coming and
[43:09]
that's why it's shooting right down the middle of this
[43:11]
thing. And you can tell when you go inside the
[43:13]
building, you can see the trusses are inverted. In creating
[43:18]
that valley. So yeah, the ridgeline. It is, it is
[43:21]
depressed. Okay. So that's what's creating that valley for the
[43:26]
water to sheet flow into the lower area. That's much,
[43:28]
much better. Now that scupper makes sense. Yes. Much, much
[43:31]
better. Okay. Sorry for that. I mislabeled that. No, no
[43:36]
worries. Um, and did you say that that roof is
[43:41]
covered with fiber type. The existing roof right now that
[43:45]
sits there right now as a built up roof system.
[43:48]
Right. And, and the main component of it, it's relatively
[43:50]
in good shape. And to save costs for the owner,
[43:54]
we tried to keep it in place. It was just
[43:56]
the areas that were remodifying that I am putting a
[44:00]
fiber type roof on the back end here to make
[44:02]
sure everything drains properly. Also on the new area and
[44:06]
then standing seam on the, on the, uh, other pop
[44:10]
out there on the right left hand side. Okay. So
[44:14]
that, that big roof, existing roof in the middle, that's
[44:17]
going to remain a built up root. Okay. Okay. I
[44:24]
don't have any other questions. Right. Anybody else any questions
[44:29]
or we. Ve got it. Chair, if I may, um,
[44:33]
I know the question was asked as far as the
[44:36]
historic, if they had it been evaluated. So this site
[44:40]
previously went through a change of zones. So it was
[44:43]
previously designated differently. And then the zone was changed. Um,
[44:48]
as far as the date and the age of the
[44:50]
building, it does fall within the criteria of possibly being
[44:54]
historic. But as far as any type of designations, it's
[44:58]
not a part of any designation. So, um, for the
[45:01]
certificate of appropriateness would be the vehicle for us to
[45:05]
evaluate that. If it was designated as a historic resource,
[45:10]
since it's not designated, then we don't have, um, the
[45:14]
direction that we've been given from counsel is to, um,
[45:18]
give the property owners the ability to make modifications to
[45:22]
their buildings. So that's the direction that we've been given.
[45:26]
It is listed on the recent survey for Circle potentially
[45:31]
historical. So our survey is, we do have a survey
[45:35]
and it is on that list. However, that list is
[45:38]
not a certified list. So if it was certified, then
[45:42]
if they would be required to go through that certificate
[45:45]
of appropriateness process for the historic preservation aspect of it.
[45:50]
But since it's not, it's not designated and it's not
[45:54]
recognized certified lists by the city. Then it does not
[45:58]
have to go through that process. We're good to go,
[46:01]
as they say. Correct. Okay. That was the question. All
[46:06]
right. No other questions than, uh, should we, uh, make
[46:12]
a motion or see what we can do with this
[46:14]
project. Or do you have discussion. I've discussed. Okay. Let's
[46:18]
do discussion. All right. Um, yeah, I guess I'll go
[46:25]
ahead and start it off. Um, so. Yeah, I, I,
[46:30]
uh, first of all, I agree. It's really nice set
[46:33]
of plans. Um, you guys do good work. Um, but
[46:37]
I have to, I have to critique some of the
[46:40]
design that I'm looking at here. Um, you know, and,
[46:45]
and regardless of the building being historic or not, I
[46:49]
didn't even cross my mind. It's a, it's a very
[46:54]
elegant design. It's, it's a really interesting unique striking design
[47:01]
because it's such a simple form. Um, and the, the
[47:07]
pieces that are coming off to the east and west
[47:10]
that we've been talking about, um, you know, they're also
[47:14]
simple and have an elegance to them. Um, I think
[47:19]
the one on the west that's being filled in with
[47:22]
the standing seam roof on top. I think that's fine.
[47:25]
It's very simple. Um, I think you will, you will
[47:28]
see the standing seam. I think, you know, it's surprising
[47:32]
when something has an angle to it how you might
[47:34]
think you're not going to see it, but yeah, you
[47:36]
end up seeing it. Um, the, the appendage on the
[47:41]
east side, that's your new entrance. Um, I was having
[47:46]
a hard time kind of figuring that out because in
[47:49]
the, in the 3D images, it keeps getting covered up
[47:52]
with trees. I can't see it in the 3D images.
[47:56]
Um, so I have to rely on the elevations. And
[48:00]
I can see the existing form. I'm looking at sheet
[48:04]
8202. And in the bottom right I see what's their
[48:08]
existing. And I'm sure it's, you know, it's in bad
[48:13]
shape and whatnot. Um, but from a design standpoint, I
[48:17]
see an elegance that I really like. I think that
[48:21]
new entrance that you're proposing looks like it belongs on
[48:25]
a different building, not this one. Um, I think you
[48:29]
could make an entrance that is at least inspired by
[48:34]
what's, what's their currently. And, you know, keep it simple.
[48:38]
It doesn't have to cost a lot or, or be
[48:41]
something crazy, but just something simple and elegant, like, like
[48:46]
the building. And that looks like a part of the
[48:49]
building. Um. And then in the back. That piece I
[48:58]
asked about, um, in the beginning, cause I wasn't sure
[49:01]
if that was an addition or not, um, sort of
[49:04]
the same thing. You know, the existing building just has
[49:07]
this roof that slopes from, it's high on the south
[49:11]
then and it slopes down to the north end really
[49:14]
strong, simple form. And what you're proposing there looks like
[49:22]
in addition. Um, that doesn't really. Compliment the building very
[49:30]
well. Um, I think that whatever you do on the,
[49:35]
on that north end needs to have a little more
[49:39]
elegance to it to tie into that strong form that
[49:42]
you're working with. You have a really. I think good
[49:45]
opportunity here. I liked when I, when I first looked
[49:47]
at this, before I really started studying the pieces and
[49:51]
I was looking at sheet 8202 and I looked at
[49:53]
proposed and I looked at the existing up at the
[49:56]
top of that sheet, I don't know if you can
[49:57]
put it up on the screen or not, Peyton.
[50:18]
Give me one moment. Okay.
[50:37]
Sheet A202. Oh, okay. Let's see. Oh. Let me, okay.
[50:48]
My apologies and share the wrong screen. You were saying
[50:53]
the proposed elevation screen? Yeah. If you just go to
[50:57]
8202. Right now I just, it would
[51:07]
take me a little bit longer to pull up the
[51:09]
project exhibits. I could pull up what I had on
[51:11]
that presentation. Okay. Do you have a sheet that shows
[51:16]
the existing and proposed.
[51:29]
All right. It looks like it's, it's broken up. Maybe.
[51:34]
I have it broken up here. All right. Let's give
[51:40]
me a moment. I could pull up the plans, but
[51:42]
for now I just have the, that's all right. Okay.
[51:45]
I don't want everyone to just have to sit here
[51:47]
too long. Um, but in, and everyone can see their
[51:51]
own sheet 8202. Um, I looked at it, I looked
[51:55]
at that and went, wow, this is really cool. You
[51:57]
know, I like, I like basically what you guys are
[52:00]
doing. I think it's great. Um, and, and, uh, you're
[52:04]
taking, uh, special building, um, you're refreshing it. Um, so
[52:10]
I'm really, really excited about that. Um, it's just when,
[52:14]
when you start looking at some of the pieces, it's
[52:16]
like, Oh man, you know, and this is like our,
[52:19]
our one chance at this, once this is built, it's
[52:22]
going to look like that for 50 years. So, um,
[52:26]
I want to make sure that, you know, everyone's happy
[52:29]
and excited about it in the end. So that's why
[52:33]
I made those comments I made about those different appendages.
[52:37]
Um. And there are some details. But those are, I
[52:43]
think I'm going to stick with the broad brush important
[52:45]
one. I think are important things. And I've mentioned them.
[52:54]
I'd like to jump in if we can keep that
[52:56]
pay job. Kind of, um, harking back to what Commission
[53:01]
of Bucks Aquish is mentioning now with this simple but
[53:04]
elegant roof line. And to, um, Commissioner McIntosh was asking
[53:09]
about earlier with this El Dorado Stone cladding on the
[53:12]
south end, which is, uh, arguably the most prominent end
[53:17]
of the building. Um. If you look at the proposed
[53:23]
in the existing part of the elegance of the existing
[53:26]
was that this southmost end of the cross, the holding
[53:30]
the crucifix maintained the slope of the building. And if
[53:34]
you look at the image here in the top right,
[53:36]
you can see that that slope continues his trajectory up
[53:38]
to the cross. Um, yet in the proposed, uh, where
[53:44]
kind of abandoning that relationship by raising what looks like
[53:48]
a chimney now, uh, a few feet above the, um,
[53:51]
southernmost call it perpendicular roof edge. And, um, I, I,
[53:59]
I want to say that, you know, what we're looking
[54:02]
at here is an improvement to what's existing. But I
[54:05]
am concerned about that one corner. And it could be,
[54:09]
um, corner meeting that call it chimney element. It could
[54:13]
be a combination of the changed roof line. Um, and
[54:17]
the material, uh, usage. But, um, you know, the very
[54:21]
strong. Material change on the southeast corner where we're infilling
[54:29]
what was kind of a covered outdoor area, um, standing
[54:35]
seam metal element. And it just feels a little, it
[54:40]
feels detached switching to the El Dorado Stone and raising,
[54:44]
um. Raising that roof height. Um, so it's not following
[54:49]
the existing slope of the building anymore. And it seems
[54:54]
like there's opportunity to kind of bring it back while
[54:58]
still improving it. Um, otherwise, uh,
[55:08]
understanding that the slope of the roof is actually not
[55:11]
a ridge, but a valley took some questions away about
[55:13]
the water overflow. Um. But, uh. That's all I got.
[55:22]
I have a comment. I agree with Commissioner Buksek. The
[55:29]
first thing I saw on the additions is that are
[55:34]
not following the architecture. This is a 1968 building by
[55:39]
Richard Harson. It's on the historical survey, but it might
[55:44]
not be destinated. But, uh, the least thing we can
[55:48]
do is just try to be compatible with the architecture.
[55:53]
So I'm not totally in agreement with the entry treatment.
[55:57]
And the north side addition that looks like an addition
[56:01]
with the flat roof higher. Than this elegant sloping roof
[56:05]
going down. And, um, on the west side, the patio
[56:12]
that sticks out, I think it's a good call to
[56:17]
just put the standing seam on top and leave the
[56:21]
roof sloping the way it is. But on the east,
[56:26]
um, that entries, it can be enhanced. And make it
[56:31]
work again to provide the entry for the new, for
[56:34]
the renovated building. Also, I'm happy to see that the
[56:41]
void on the soth side has been enclosed. Because if
[56:45]
you notice, it's been fenced out because I was a
[56:49]
room for homeless people to gather there their night. But
[56:54]
I don't agree on the angle of the standing seam
[56:58]
roof. That it doesn't really need to follow the taper
[57:04]
ends. And I think the proposal of evacia might not
[57:10]
be right because the left side of that void is
[57:14]
actually straight, not in an angle. So if you put
[57:19]
the standing seam panels vertical, it might look better. So
[57:27]
those are the. Three areas that are not comfortable with,
[57:32]
um, for this building. Any other comments?
[57:43]
I have a few comments. Okay. Um, pretending to the
[57:46]
landscape. It's a great plant palette you have here. A
[57:53]
great mixture of, um, a low water used plants. What
[57:57]
I do see missing is some type of ground cover.
[58:00]
That can help you, um, fill in a lot of,
[58:03]
a lot of the landscape as needed. But, um, more
[58:06]
importantly when it comes to the plant layout, I don't
[58:09]
see really a consistency with the new plant arrangement compared
[58:14]
to what's already their existing on the rest of the
[58:17]
parking lot. From the, um, planting design. It seems to
[58:22]
be more before more, um, structured plant layout, more on
[58:28]
center planting. And as you look on the street view
[58:31]
of the rest of the parking lot, it looks more
[58:34]
organic natural arrangement of plant material. So it's going to
[58:38]
be a stark difference between existing and new, uh, new,
[58:42]
uh, the new planting design as you get closer to
[58:46]
the building. And I feel like it would be a
[58:48]
disservice to have a brand new looking building with new
[58:53]
landscape plant material by the building. But as you approach
[58:57]
from the street side into the parking lot, you're going
[58:59]
to have a mixture of old and new plant material.
[59:03]
So it's going to look like two different projects, two
[59:05]
different properties where, where, uh, new plan materials starts at
[59:09]
one point and then ends at the existing, um, parking
[59:14]
lot. I feel like for consistency either new plans should
[59:19]
be installed throughout the parking lot. Not just near the
[59:22]
building. And or match the plant arrangement to either be
[59:27]
formal like you have on the new plant. Layout. Or
[59:32]
to match was existing, which would be more of a
[59:34]
natural organic arrangement of the plant material and not be
[59:38]
on center planting. Just as a comment,
[59:48]
uh, when it comes to the pettylamth as being used,
[59:51]
um, it's a great plant. Um, it will need some
[59:53]
shade. And it seems like in some of the locations
[59:56]
that it's being proposed, um, you would have a chance
[1:00:01]
of the plant material not making it, especially when it's
[1:00:05]
getting full sun exposure throughout the day. It would need
[1:00:08]
constant yearly, um, uh. Yeah, shading and providing replacing the
[1:00:18]
plan material way too often. Maybe come maintenance problem later
[1:00:21]
down the road. But, uh, overall, um, I think it's
[1:00:25]
a good plant palette. It's just might need some rework
[1:00:28]
to be done to be able to seamlessly work with
[1:00:31]
the existing landscape and or replace the existing landscape. Thank
[1:00:36]
you. Comments. I've seen. That. So do we want to
[1:00:46]
make a motion in some form. I'd like to take
[1:00:50]
a crack at it. Okay. Um, and yeah, the reason
[1:00:54]
I want to take a crack at it is, um,
[1:00:57]
I want to say, you know, I made some general
[1:00:59]
comments about, about a couple of the parts of the,
[1:01:03]
of the building, um, and I have ideas about what
[1:01:07]
you could do on the East End and what you
[1:01:09]
could do on the north end, but I didn't want
[1:01:11]
to say it because, you know, you guys are good
[1:01:14]
designers. And I think you need, you deserve to take
[1:01:18]
a crack at it and do what you think is,
[1:01:20]
is right based on the comments you hear. And, you
[1:01:23]
know, and bring it back. I don't want to have
[1:01:25]
you guys walk away with a list of, oh, well,
[1:01:29]
gee, let's lower this and let's, you know, at a
[1:01:31]
standing seam roof over here and, you know, um, I
[1:01:35]
don't know what some other comments, um, maybe would be,
[1:01:39]
Oh, let's, let's make this standing seam straight, not, not
[1:01:42]
sloped. You know, if you guys have reasons for what
[1:01:45]
you did, I'm going to say if you have aesthetic
[1:01:49]
reasons that you feel strongly about, you can push back
[1:01:54]
and say, you know, and give us design reasons for
[1:01:58]
why you want to do it this way or that
[1:02:01]
way. We can have, we can have a design discussion
[1:02:04]
about it. Um, so I think it'd be good to
[1:02:09]
give you guys that opportunity to come back based on
[1:02:12]
what you've heard. And with a modified proposal, um, and
[1:02:17]
then, and then, you know, defend your design. You might
[1:02:22]
lose. Um, but, but if you feel strongly about it,
[1:02:26]
I'll tell you in the past when, when an architect
[1:02:30]
has, has given me good reasons for why they did
[1:02:34]
what they did. And I might, I might disagree a
[1:02:37]
little bit philosophically, but I'm the first one to back
[1:02:39]
off if, if I think what they're saying has merit.
[1:02:50]
The public comic has ended. So, uh, as far as
[1:02:57]
making a motion, um, I'm going to ask staff, how
[1:03:01]
general can we keep it? I know typically you guys
[1:03:03]
like, you know, to have some kind of list of
[1:03:07]
comments that we can hand to an applicant, um, is
[1:03:12]
that really necessary. So it would be, it's beneficial for
[1:03:18]
the application to be able to have the information as
[1:03:22]
far as the, I know different commissioners weighed in. But
[1:03:27]
yeah, providing information on how giving them just general direction.
[1:03:33]
So then that way they know what they need to
[1:03:35]
correct or adjust. So that way they can bring the
[1:03:38]
item back. Okay. Um, so I would propose to condition
[1:03:43]
the project with the, with the following comments, um, number
[1:03:50]
one, um, revisit the East entrance to make it more
[1:04:00]
cohesive and complementary to the existing building design. To revisit
[1:04:09]
the North end of the building, um, and parapet design
[1:04:15]
that's being proposed. To revisit the fin at the south
[1:04:25]
end that's being proposed to be clad in stone. Um,
[1:04:30]
and to revisit the standing seam, um, curtain wall product
[1:04:40]
that's being proposed at the south end and how it
[1:04:44]
integrates with the, with the existing building. And to, um.
[1:04:53]
To restudy the landscape plan so that it's a more
[1:04:58]
cohesive landscape design throughout the entire site, not just around
[1:05:03]
the building. What did I miss. Anyone want to add
[1:05:10]
to that? Oh, and to reconsider the specification for the
[1:05:17]
pedal anthys. And whatever he said.
[1:05:28]
If you don't afford it's worth, um, cause we went
[1:05:30]
over. Does that have a common name. Slipper plant. Slipper
[1:05:34]
plant to revisit the use of the slipper plant. And
[1:05:43]
I agree with, with your breakdown, by the way, um,
[1:05:45]
but I just wanted to point out, because we've reviewed
[1:05:48]
another project before where an applicant was proposing to put
[1:05:52]
in some plantings, um, on call it the addition on
[1:05:55]
this building. But the opposite side that was existing to
[1:05:59]
remain wasn't really kind of following through. It was clearly
[1:06:03]
a different design. Um. There's clearly more work done in
[1:06:08]
the landscape plan around the new building that wants existing
[1:06:10]
around the rest of the parking lot. Um, I would
[1:06:13]
consider, um, if they wanted to, to, um, make the
[1:06:19]
rest of the property follow suit to the new design
[1:06:22]
as an option. Versus telling their landscape architect to change
[1:06:27]
the design to conform to someone else's design. Right? Exactly.
[1:06:32]
Okay. Okay. Any more. All right. For the record, Commissioner
[1:06:40]
Vuxic, was that a condition of approval or are you
[1:06:44]
motioning to continue? Forgive me. I'm motioning to continue. I
[1:06:47]
think there's enough here. We, we need to look at
[1:06:49]
it again. Okay. Yeah. Okay. Should we take a phone?
[1:06:53]
We need a second. I'll second. You got a second.
[1:06:57]
Uh, one second. All right. Motion by FUXIC second by
[1:07:01]
Sanchez Commissioner Voksick. Aye. Commissioner Sanchez. Aye. Commissioner McIntosh. Hi.
[1:07:09]
Commissioner Garcia. Aye. Vicer Gregory? I am. Chair Blakely. Aye.
[1:07:14]
Motion carry 60. Thank you. And I'm going to ask
[1:07:21]
the applicant to stick around for one more minute. I
[1:07:23]
just want to make sure that you guys don't leave
[1:07:25]
with some confusion about what to do on that landscape.
[1:07:28]
Cause I'm a little confused. On it. Um, so this
[1:07:32]
is kind of like after the fact, just, just quick,
[1:07:36]
quick discussion. Um. Are, are we going to, are we
[1:07:42]
expecting them to come back and, and, and propose a
[1:07:48]
new landscape plan for the entire parking lot. And, and
[1:07:53]
if we are, and you guys can't do that. Then
[1:07:57]
you need to come back and say, and say, Hey,
[1:07:59]
you know, Hey guys, we can't do that. Yeah. Yeah.
[1:08:07]
Hi. Can we get you on a microphone, please? Well,
[1:08:12]
I'm sorry. I guess it's not. Yeah. We're in a,
[1:08:14]
we're in a public meeting. So yeah, go ahead and
[1:08:17]
come over here and just turn it on. Here. All
[1:08:20]
right. So my name is Oscar Lua. I'm the managing
[1:08:24]
partner for DIG. And I'm also the general contractor and
[1:08:27]
Reuben is our designer, uh, but yeah, this property does
[1:08:31]
have a shared parking with, uh, the enabling properties. So,
[1:08:36]
um, to mandate to have other property owners who I'm
[1:08:39]
not familiar with. I know there are other owners that
[1:08:42]
own this parking lot as reciprocally use. Uh, what takes
[1:08:45]
some time, uh, to come in and have the landscape
[1:08:49]
architect, which I'm sure would have to go to just
[1:08:51]
like it is here. A commission, the voting, uh, what
[1:08:55]
landscape architect and then what that design would look like
[1:08:58]
or the entire property rather than the specific property that
[1:09:01]
is owned by this parcel. Does that pertain to existing
[1:09:08]
planetary? That's there that you're calling out to replace as
[1:09:10]
well? Are you going to those same people as you
[1:09:13]
replace? We would have to. Yes. Uh, again, the partnership
[1:09:16]
also owns, uh, part of the neighboring parcel. And both
[1:09:21]
conditions, uh, for the parcel that we own and the
[1:09:24]
neighboring have reciprocal use agreement. So therefore all costs must
[1:09:30]
be split, including improvements and maintenance. So the, the, the,
[1:09:40]
the motions been made and it's been approved. Um, but
[1:09:45]
you guys can certainly come back and explain, okay, this
[1:09:48]
is what we would propose. And this is why. I
[1:09:53]
think what, what brought this common up in the first
[1:09:56]
place was that you have, I'm just going to say
[1:09:59]
you have prominent frontage on Fred wearing. Right. And, uh,
[1:10:03]
your scope of work, your limit of work is at
[1:10:07]
pretty close to significant intersection. Townsend our way and Fred
[1:10:10]
Waring. And the proposed landscape design is covering about half
[1:10:15]
of that frontage. And then there, defined transition from what
[1:10:21]
is a more, um, call it like a systemic, uh,
[1:10:27]
aligned force design of rows and patterns that then all
[1:10:33]
of a sudden, uh, becomes more of a sparse, more
[1:10:36]
natural flow of plants. So, um, I think what I
[1:10:41]
was trying to, to at least put out as an
[1:10:43]
idea is that rather, you don't want to change this
[1:10:46]
landscape design. It's obvious, right? But you're suggesting also that
[1:10:49]
it's more complicated to revise the existing parking lot landscading
[1:10:55]
landscaping. Um, but perhaps there's a way to maybe, massage
[1:11:00]
the frontage along Fred wearing so that there is a
[1:11:04]
more of like a uniform look along the street that
[1:11:07]
then as it goes back towards your building, might change
[1:11:10]
into this new design that was presented to us. Does
[1:11:17]
that make sense? Yeah. I mean, that's something I understand.
[1:11:20]
I understand that. But it's just difficult. I'd have to
[1:11:23]
understand what the architect means and what that means with
[1:11:25]
the neighboring owners. It's not one or two owners. There's,
[1:11:29]
uh, multiple property owners within the condo eyes project next
[1:11:32]
door. So, um, yeah, I'd have to explore what that
[1:11:36]
looks like and what that means because I'm sure today
[1:11:38]
they're not mandating to change it. But, uh, because of
[1:11:41]
a new building, they're just going to say that's, that's
[1:11:44]
your problem, right? So that's what I would tell them.
[1:11:47]
I'm not building a new building. You are. But to
[1:11:50]
redo the entire parking lot, that'd be, uh, that would
[1:11:53]
be the case. Yeah. Too much. But even if, if
[1:11:57]
your landscape architect, you're able to look at the, the
[1:12:00]
South elevation, Fred wearing drive landscape and was able to
[1:12:05]
maybe take a page out of the existing landscape's book
[1:12:09]
and feather that into as your landscape proceeds towards the
[1:12:12]
building, towards the north, the parking area. That remains as
[1:12:16]
designed. Am I making sense? It's making sense. I mean,
[1:12:21]
the easy solution to me to take it all the
[1:12:23]
way into the entrance all the way there, but that's,
[1:12:26]
you know, it's something we'd have to look at and
[1:12:32]
do a study on and see what it is. Because
[1:12:35]
ultimately we'd have to redesign that, submit that to CVWD
[1:12:39]
that we have and all that, right? So even if
[1:12:41]
it's the subtle part right here. Chair, if I may,
[1:12:46]
we should be cautious of continuing the discussion since the
[1:12:50]
item has already been a decision has already been made
[1:12:53]
to continue the item. Um, so this discussion can be
[1:12:56]
followed up as part of the next, um, design review.
[1:13:01]
My question, should we make an amendment to what we
[1:13:04]
just voted on changing what we just talked about. So
[1:13:08]
as far as the motion, the motion was to continue.
[1:13:11]
The item with the direction. So with the applicant having
[1:13:14]
that information that came following after is just the minutes
[1:13:19]
are just going to look a little different. But yeah,
[1:13:22]
I think the applicant understands what the commission is looking
[1:13:24]
for. Just want to make clarify that. Okay. Yeah. It
[1:13:30]
is John said earlier. You have the right to come
[1:13:33]
back and defend your position. Right. Yeah. Understand. And I'll
[1:13:37]
have to have a discussion with my consultants and my
[1:13:39]
landscape architect. And I know the back of the building,
[1:13:42]
which is the north end. There's a very specific piece
[1:13:45]
of equipment that we need to look at. But how
[1:13:47]
can we aesthetically make it better? Right. We need to
[1:13:49]
maintain the heights and the clearances, but can it look
[1:13:53]
better? Yeah. Sure. Let's, let's look at what aesthetically we
[1:13:56]
can do with para bits. But the height will need
[1:13:59]
to maintain in order for us to achieve what we're
[1:14:01]
looking forward, our medical facility. But absolutely more than happy,
[1:14:07]
uh, to look at any architectural elements that we can
[1:14:09]
do. Uh, you know, it isn't a parking lot. So
[1:14:12]
we want to make sure that we're conscious of that
[1:14:15]
and what, what kind of, uh, costs would go into
[1:14:17]
that. Right. Making the east entrance simpler. Thank you. It
[1:14:24]
would cost me less. So, uh, certainly we'll look at
[1:14:26]
all the elements. We'll certainly regroup with my architectural team
[1:14:30]
and design team and, uh, come back with something with,
[1:14:33]
uh, with the comments that we've got from today's meeting.
[1:14:36]
Great. Thank you. Okay. Thank you. You got it. Okay.
[1:14:42]
Now we move on. Um, Committee meeting updates. Cultural art
[1:14:47]
committee. We do have something, um, as I said before,
[1:14:52]
for some reason, uh, Palm Desert is becoming the art
[1:14:56]
section of the Coachella Valley. So there is an organization
[1:15:01]
called Planair. It's a outdoor painting situation, uh, got a
[1:15:08]
brochure here that got approved. They ask Palm Springs Acom
[1:15:14]
Springs Life. Where would they like to put this. And
[1:15:19]
they decided Palm Desert. So Palm Desert is going to
[1:15:22]
be the location and Palm Springs life is going to
[1:15:25]
sponsor it. And it's going to be an outdoor event
[1:15:27]
on El Paso. So we are moving forward as a
[1:15:32]
city to be the Art of the Valley. That's the
[1:15:36]
Architect. Before I turn the page. Um, so for staff,
[1:15:46]
um, we do have a new member of our planning
[1:15:49]
team, uh, Travis Heaps. He's joining us coming from the
[1:15:53]
private sector and also with Public Sector experience. Also fellow
[1:15:58]
Ca Poly Alumni. So we're excited to have him on
[1:16:01]
board. And so he'll be seeing more of him. Yes.
[1:16:09]
Okay. Um. Request fraction. Are there any commissioners who like
[1:16:14]
to propose a future agenda item to be considered by
[1:16:16]
the Commission. I'll make the one. What about making a
[1:16:22]
motion or considering, uh, would you do four plants. Yeah.
[1:16:31]
Um, what was presented to us today could be construed
[1:16:34]
as like a permit submittal. Um, minus the existing demo
[1:16:41]
plans and sections and all that stuff. But from an
[1:16:44]
aesthetic standpoint, it helps us, we have no understanding of
[1:16:47]
the project at all except for those few pictures of
[1:16:49]
existing to have a comparison of what's existing and what's
[1:16:53]
proposed. Yeah. And that's, that's something that we can look
[1:16:58]
at as far as our checklist. So the checklist is
[1:17:01]
what's provided online. So that's typically whenever, um, we're giving
[1:17:05]
guidance to applicants to make sure that they have a
[1:17:07]
complete application is that they're adhering to our checklist. Um,
[1:17:12]
for whatever reason, existing elevations and existing floor plans, it's
[1:17:17]
not, I know it's typically provided, but as far as,
[1:17:20]
um, it being a hard requirement, we can revisit that
[1:17:23]
and take a look at our checklist and see if
[1:17:25]
they need to be updated. Um, also too right now,
[1:17:27]
we're going through a lot of ADA changes on the
[1:17:30]
way that we have our handouts. Um, so this is
[1:17:33]
probably a good time to be able to look at
[1:17:35]
that and, um, make changes. We can request that. As
[1:17:40]
a commission. Uh, so it's something that SAF will take
[1:17:43]
into consideration. And we'll report back as far as if
[1:17:50]
we're able to make those changes. Yeah. I think it
[1:17:54]
doesn't have to be demolition because that's getting a construction
[1:17:56]
documents. It's really just understanding aesthetically what it looked like
[1:18:01]
before and what it's going to look like after heights,
[1:18:03]
all those things. Sure. Anybody else. Okay.
[1:18:14]
With no other questions. I moved to adjourn this meeting
[1:18:16]
hearing no objections. I declare the meeting adjourned at. 150.
[1:18:31]
Recording stopped.