[0:11]
Good evening.
[0:11]
I'd like to call the Village of
Croton-on-Hudson Planning Board meeting
[0:18]
Croton-on-Hudson Planning Board meeting
for Tuesday,
[0:19]
July 28th, 2026, to order.
[0:21]
We have A couple of items on our agenda,
first being a new business item.
[0:27]
Carmel Riverside LLC, 425 South Riverside
Avenue, applications for a special permit,
[0:35]
site plan approval, and a steep slope
permit for a new 49-unit multifamily
[0:41]
permit for a new 49-unit multifamily
building.
[0:42]
Um, I have a relationship with one of the
principals in this, uh, application, uh,
[0:49]
who I have ongoing business with, uh, Mr.
[0:53]
Leggio, and therefore am recusing myself
from the application and will turn over
[0:59]
the, uh, chairmanship of the meeting and
the review of this application to our
[1:06]
Deputy Chairman, uh, Geoff Haynes.
[1:09]
So I'll be stepping down now, and I'll
come back at the end of the meeting.
[1:16]
All right, so we respect Rob's decision.
[1:19]
Um, he is concerned about the integrity of
the Village Planning Board and wants to
[1:26]
make sure there's no perception at all of,
of any kind of favoritism.
[1:31]
So, um, we respect that.
[1:33]
Going to miss him greatly in this
application, his expertise. Thank you,
[1:39]
application, his expertise. Thank you,
John.
[1:39]
He's incredible. In fact,
[1:41]
he was named by Westchester Municipal
Planning Federation the Planner of the
[1:47]
Planning Federation the Planner of the
Year.
[1:48]
So his, his skills are great. We're going
to miss him for this application.
[1:54]
So we're beginning tonight a long, long
process.
[1:58]
Okay, the village residents are concerned
that we give this a thorough review.
[2:04]
We're going to do that.
[2:06]
We're going to give this a thorough
review, and that of course takes time.
[2:12]
There's a number of moving parts to this
application, and it's fairly sprawling,
[2:18]
and we're going to be tracking each and
every one of the loose ends to see that
[2:25]
every one of the loose ends to see that
they
[2:25]
are fully evaluated.
[2:27]
The way this will play out over the next
few weeks Tonight we're going to have a
[2:33]
period where we're— we have many questions
for the applicants.
[2:38]
Those of you that have read the backup
material that's provided on the website
[2:44]
material that's provided on the website
will
[2:45]
see a report from our planning consultant
that works for the village, NPV,
[2:51]
represented by Bo Brady over here,
[2:53]
that outlines 31 areas that Are pointed
out as needing some additional
[2:59]
out as needing some additional
clarification
[3:00]
or some additional information.
[3:03]
We also have some accompanying
documentation on traffic studies and
[3:08]
documentation on traffic studies and
school
[3:08]
enrollment impact and water and sewer
impact and community benefits.
[3:14]
So there's a lot of supporting
documentation that came with this.
[3:19]
This is you know a six-inch high.
[3:22]
Packet of information that the planning
board gets for this.
[3:27]
So we're going to be going through that
tonight,
[3:30]
asking questions about that supporting
information, the traffic study,
[3:36]
the water and sewer hookups, etc.
[3:39]
This meeting tonight, just so everybody's
aware,
[3:43]
is going to be a discussion with a
developer where we have a lot of gaps.
[3:49]
In this application that we need clarified
before we can go into a full presentation
[3:55]
of where everything's going to be laid out
on the property,
[4:00]
how tall it's going to be, what color it's
going to be,
[4:04]
where the car chargers are going to be.
We're not there yet.
[4:09]
Where we are right now is with an
application that that has a lot of gaps,
[4:15]
and until we have all that information in
hand.
[4:19]
We're not ready to get a presentation from
the developer.
[4:24]
With any luck, that information comes to
us by the next meeting,
[4:29]
and we might be able to entertain a
presentation at that point.
[4:34]
I know this might be news to you guys, but
just want to explain to you that the—
[4:40]
what we see is the process going forward,
be transparent about that.
[4:46]
This application includes a special
permit.
[4:49]
And a site plan review,
[4:51]
2 actions that the planning board has to
take and 2 approvals or denials that the
[4:58]
planning board will be responsible for.
[5:01]
There'll be public hearings on both of
those. Tonight is not a public hearing.
[5:07]
Tonight is going to be one-on-one with the
applicant.
[5:11]
Bill Brady, our NPV planning consultant,
will be going through point by point The,
[5:18]
uh, 31 areas that we need more information
on.
[5:22]
And then planning board members will have
a bunch of questions as well,
[5:27]
perhaps the village engineer, to flesh out
the application.
[5:32]
So we're not at the point yet where we can
get a presentation nor public comment
[5:39]
until we have a common set of facts that
everybody understands what this project
[5:45]
entails. It's premature to start making
points about it.
[5:50]
So let the process play out.
[5:52]
I know some of you came here wishing to
speak,
[5:55]
but give us some time to do our due
diligence.
[5:59]
Have some patience, and we will get a
better application,
[6:04]
a better group of information for you to
react to as a result of this.
[6:09]
Thank you.
[6:11]
Um, so that's kind of where— what I wanted
to lay out.
[6:14]
Um, this is going to be several meetings.
[6:17]
There's, there's going to be a lot of
loose ends to track down and follow
[6:22]
loose ends to track down and follow
throughout
[6:23]
the meeting. There may be some zoning
board variances that need to be pursued.
[6:28]
We'll find out about that tonight.
[6:30]
So there's a lot of things that are going
to transpire.
[6:34]
Obviously, no decisions are going to be
made tonight.
[6:37]
Nor anytime in the immediate future.
[6:40]
So just so everybody's aware,
[6:42]
this is something that the planning board
is really going to weigh carefully and dig
[6:47]
into like we have. And, you know, rest
assured, that's,
[6:51]
that's where we're going with this.
[6:53]
Anybody have anything else they'd like to
add to this?
[6:57]
No. Do you want to have the attorney tee
up some of what our protocols and
[7:03]
up some of what our protocols and
abilities
[7:04]
are? Yeah.
[7:06]
So That's a good point, Steve. So what
we'll do is we'll turn it over.
[7:11]
Introducing our team here: Bill Brady from
MPV, Lori Lee Dickinson— Dixon,
[7:16]
I'm sorry— the village attorney, and
Vincent Salanitro is our village engineer.
[7:21]
Karen Stapleton is our representative from
the engineering department,
[7:26]
and planning board members who you have
probably seen in previous meetings.
[7:31]
So we're going to be working with,
[7:34]
with the developer to To answer these
questions and flesh it out.
[7:38]
And during the course of this process, the
planning board cannot just say, no,
[7:44]
we don't like this, and vote no.
[7:46]
We've got certain criteria we have to
weigh and some criteria we can't weigh.
[7:51]
So to kind of flesh some of that out,
Lori,
[7:54]
if you don't mind giving people an
overview of some of the things that the
[8:00]
overview of some of the things that the
planning
[8:00]
board will be able to consider in this
application.
[8:04]
Sure. And I think the concerns are
specific to the special permit.
[8:09]
So of course, there's a site development
plan that goes along with that.
[8:15]
But since this is the first application to
be entirely within the purview of the
[8:21]
planning board, I thought maybe just to
explain the process for a special permit,
[8:27]
a special use permit. And the, the
criteria is clearly in the code.
[8:33]
I did an educational memorandum to you.
It's not privileged and confidential.
[8:39]
It will be uploaded along with the rest of
the documents.
[8:43]
It just explains what a special permit is,
what it entails,
[8:48]
and the decision by the Village Board of
Trustees to assign you with the primary
[8:54]
responsibility of the special use permit.
[8:57]
Thank you.
[8:59]
Was because of your unique qualifications
and expertise in, um, these,
[9:05]
these planning aspects.
[9:07]
The Village Board of Trustees has enacted
local legislation in your,
[9:13]
your village code which defines uses
permitted as of right and indicates that
[9:19]
permitted as of right and indicates that
in,
[9:19]
in your use tables, and also defines what
uses are permitted by special permit.
[9:26]
So they've already predetermined by
legislation that the use proposed is
[9:32]
legislation that the use proposed is
permitted
[9:33]
in this zone, at this location, in this
zone,
[9:37]
pursuant to additional conditions and
additional criteria.
[9:42]
So, so you're not allowed as a planning
board to legislate otherwise.
[9:48]
You can find by reviewing the criteria in
the code,
[9:52]
and it's Article 10 of the Village Code,
zoning code.
[9:57]
Article 10 in its complete current state
is also included in the memo that I
[10:04]
provided and will be uploaded.
[10:06]
So you can see in its entirety the areas
to be considered by the planning board.
[10:13]
And the applicant is aware of the
responsibilities to meet the minimum
[10:19]
responsibilities to meet the minimum
requirements.
[10:20]
And the project, once it's determined to
be the project and presented publicly,
[10:27]
will then have an opportunity—
[10:30]
you'll have an opportunity to look at the
project as proposed and to determine what
[10:37]
additional information you may require,
[10:40]
what other records or evidence that you
need.
[10:44]
And again, you'll need to find substantial
evidence in the record to either approve
[10:51]
it, approve it with conditions, or deny it
in its entirety.
[10:56]
But that substantial evidence must be
present. in your record.
[11:02]
Your record is the development starting
with this initial conversation and
[11:08]
continuing throughout the public hearing
process.
[11:12]
This project, once it's ready in answering
all of the necessary information that may
[11:20]
or may not be missing from the, the plans
that you have in front of you,
[11:26]
will need to go to the county planning
board for review and comment before you
[11:33]
board for review and comment before you
can
[11:33]
reach a decision. And also, under the code
provision as adopted recently,
[11:39]
will need to be transmitted to the Board
of Trustees for consideration as to
[11:46]
providing you with comments. So that's a
30-day process.
[11:51]
The, the project, having appeared this
evening on your agenda,
[11:56]
can now be placed on a Board of Trustees
agenda,
[12:00]
and the 30 days will run from the date of
that meeting.
[12:05]
So you do have time to obtain more
information from the developer,
[12:10]
a set of revised plans if appropriate,
under the planning—
[12:15]
your planning consultant's
recommendations.
[12:19]
And then you'll have time to consider
comments you may receive from the county.
[12:26]
Again, that's a 30-day requirement and
comments you may receive from the Board of
[12:33]
Trustees.
[12:34]
Mm-hmm.
[12:34]
Again, the criteria is clearly set forth
in the code, and you are limited.
[12:40]
If, if you can determine that those
factors and that criteria is met through
[12:47]
evidence provided by the developer, then
you can approve this,
[12:52]
approve it with conditions,
[12:54]
or if you feel that it hasn't met the
necessary criteria based upon substantial
[13:00]
evidence in the record, You can deny it in
its entirety. So that's the limitation.
[13:07]
You can't legislate it and say this use is
not appropriate because the Board of
[13:14]
Trustees has already determined this use
is permitted by special permit in this
[13:20]
zoning district.
[13:22]
Okay, thank you. So there's obviously some
time ahead of us for things to be
[13:27]
investigated. Tonight, as I mentioned,
[13:30]
we'll have the collaborative discussion
with the developer where Bill Brady is
[13:36]
with the developer where Bill Brady is
going
[13:36]
to walk through the memo that mentions the
gaps that we saw in the application so
[13:42]
that perhaps next meeting we can come back
and have an application that's closer to
[13:49]
being complete and we can move on from
there.
[13:52]
So perhaps, Andrew, if you want to come up
to the Microphone, bring your team up,
[13:58]
introduce everybody, and, um, we'll— I'll
turn it over to Bill to walk through, um,
[14:04]
his questions.
[14:05]
Thank you, thank you. Uh, good evening, my
name is Andrew Cortese.
[14:10]
Um, I'm the applicant of Carmel Riverside
LLC.
[14:14]
I have my managing partner here, Robert
Leggio.
[14:17]
Um, we're here to present our multi-
Family project. A little bit about myself.
[14:23]
I've been doing development,
[14:25]
real estate development and construction
for the last 30 years within Westchester
[14:31]
County, from typically, most likely
through the real estate,
[14:35]
through the river towns from Yonkers all
the way up to Peekskill.
[14:40]
We, within the 30 years, we acquired some
property and we hold it in our portfolio.
[14:46]
Thank you.
[14:47]
And we manage it as well. So typically we
build and manage our own projects.
[14:52]
So that's what we're looking to do here.
We take pride in our work.
[14:56]
And a little bit about this project, we
purchased it, myself and my partner,
[15:01]
probably 2 and a half years ago. There
were some violations on the property.
[15:06]
We cleaned those up. There were some
tenants there.
[15:09]
We kind of— they're still there as well
right now.
[15:12]
We were We were transparent with our goals
to redevelop the property, um,
[15:17]
so they were well aware that we are
looking to do that.
[15:22]
Um, and—
[15:24]
oh, sorry, sorry.
[15:26]
There you go. Thank you.
[15:30]
So yeah, we're well— you know, the,
[15:32]
the tenants are well aware that we're
looking to redevelop the property.
[15:36]
We've been transparent with them,
[15:38]
and we look forward to working with your
board board, uh,
[15:41]
in the future for this development here.
[15:45]
Thank you. Um, just a few words. Good
evening, Deputy Chair, board members,
[15:50]
evening, Deputy Chair, board members,
staff.
[15:50]
My name is Jacob Amir from Zarin and
Steinmetz.
[15:53]
Our firm is the attorney on the project,
and, um, I,
[15:57]
I just want to kind of supplement very
briefly—
[16:00]
I'm not going to take up too much time—
what you opened with, and,
[16:05]
and that this is a Serious, long— we hope
not too long, but, but a serious process.
[16:10]
And, and I'm, I'm happy that the members
of the community are here behind us,
[16:15]
this table, to hear this project from the,
from the outset,
[16:20]
because I think it's important from the
beginning to get a good perspective of
[16:25]
beginning to get a good perspective of
what
[16:25]
the project is. It's much easier to go
through it that way.
[16:29]
And, and we look forward to hearing Mr.
[16:32]
Brady's And your village consultant's
comments.
[16:35]
A few seconds just overall so everybody
hears what, what this is.
[16:39]
So the project proposes the development of
a building with 49 units,
[16:44]
a combination of 1 and 2-bedroom units,
[16:47]
I believe 79 parking spaces including 5
handicapped spaces, 5 affordable units,
[16:52]
e-bike, bike storage, various amenities
and improvements.
[16:56]
Your planning consultant has identified
this as a Type 2 action under SEQR.
[17:01]
There are variances that are required,
[17:04]
so we will be asking your board to refer
to the zoning board so that we can proceed
[17:09]
with that. But again,
[17:11]
what's important to especially note for
the people behind Andrew and me is that it
[17:16]
doesn't obviously end with the zoning
board.
[17:19]
That is just one small, relatively
Speaking component of this.
[17:24]
It will go back to this, to this board
for, for site plan and special use permit,
[17:29]
as you had mentioned before.
[17:31]
I want to just sort of introduce very
quickly,
[17:34]
and then we're going to turn it over to
the consulting team because there's a lot
[17:40]
the consulting team because there's a lot
of
[17:40]
info to get through, who's here.
[17:42]
And the reason why I want to introduce is
because you said there are components
[17:47]
here. There's stormwater and lighting and
landscaping. Yes.
[17:51]
And traffic flow and school impact.
[17:54]
So I think all of that needs to be
addressed at the outset,
[17:58]
not just because we want to show off that
we have a project that's really great for
[18:03]
the village, but that the team has gone
through great efforts to try to get us
[18:09]
through great efforts to try to get us
here.
[18:09]
There's a lot to put in, but that's— it's
important to lay out.
[18:13]
Lou Demasi of Demasi Architects is going
to go through architectural plans to the
[18:19]
extent We're able— Jim Annichiarico from
Cronin Engineering and Michael
[18:24]
Mastrogiacomo from Mastrogiacomo
Engineering are going to handle
[18:28]
Engineering are going to handle
engineering aspects
[18:29]
of the project. Robert Sherwood is going
to talk to you about some landscaping,
[18:35]
and Paul Vernon and Tars Schroff of Kimley
Horn are going to talk to you about some
[18:40]
fiscal issues, school impact or
non-impact, and traffic memo.
[18:45]
So Hopefully we get a wide scope on this
meeting, and then we intend to
[18:49]
meeting, and then we intend to
incorporate,
[18:50]
um, your planning consultant's comments
into a further submission.
[18:55]
So as we go through this process,
[18:57]
the issues and the open points become less
and less and less and less till we get to
[19:03]
a place where your board is comfortable
with the site plan and special use permit.
[19:08]
Okay, that's great. Thank you.
[19:10]
Just to add one more piece of detail, To
explain some of the process,
[19:14]
we do anticipate that we will use an
issues actions tracking sheet to keep
[19:19]
issues actions tracking sheet to keep
track of
[19:20]
all the loose ends that we have in this
project,
[19:23]
things that we may be asking you to come
back with.
[19:26]
And it would just be a central document,
you know,
[19:29]
a single source of truth that we would
share with you and— And the public.
[19:33]
And the public, yeah. It's going to be
part of the public meeting backup.
[19:38]
And it would show what the loose ends are,
who's responsible,
[19:42]
and the promised delivery date of those
things.
[19:45]
It's just common, you know, project
management tracking type mechanism.
[19:49]
So that'll be incorporated into, into this
process as well.
[19:53]
So I imagine the points that Bill's
bringing up tonight will fall into that
[19:58]
bringing up tonight will fall into that
sheet.
[19:58]
Some additional ones that the group here
comes up with tonight would fall into that
[20:03]
sheet.
[20:03]
That'll be great. It keeps us on our, on
our toes. With the checklist.
[20:07]
So that's, that's, that's great. Sure.
[20:10]
Do you want to take— want Lou to step in?
[20:12]
All right. So with that, I think—
[20:15]
Again, Mr., Mr. Acting Chair, just so
we're clear,
[20:19]
the board isn't necessarily interested in
taking a full-blown presentation
[20:26]
tonight. I think that they're interested
clearly in The elements that the
[20:32]
planning consultant has, has indicated.
[20:36]
So maybe instead of taking the experts'
presentations on the project,
[20:42]
you can start by just having that review
in public of the items that the
[20:49]
planning consultants have determined may
be missing from this.
[20:54]
And also the planning board seeking
clarifications on some of the questions
[21:01]
clarifications on some of the questions
and
[21:02]
comments Yeah, exactly.
[21:04]
I mean, that's, that's the intention for
tonight.
[21:07]
It would not be a full-blown presentation.
[21:10]
Glad you guys have your subject matter
experts on hand.
[21:13]
They may be able to help fill in some gaps
that Bill raises.
[21:17]
So we could use them for, for that part of
it.
[21:20]
So with that, Bill, if you want to run
down the list.
[21:24]
Thank you very much, Chairman.
[21:25]
Again, as you noted, our memo was in the
materials that are online,
[21:29]
and if you want to review those, you'll
kind of can play along.
[21:33]
Um, we put together this memo to kind of
also give the board and the public
[21:38]
background on what can appear complicated.
[21:40]
There's a lot of different pieces to the
things that need—
[21:44]
this board's going to be approving. So get
nice and closer.
[21:47]
Thank you.
[21:49]
And reviewing. And it's a good opportunity
for the applicant to understand kind of
[21:54]
going and all be on the same page as we've
discussed on the various pieces.
[21:59]
And again, this is our initial review of—
again,
[22:02]
we'll get into some of the general and
procedural comments that we've pulled
[22:07]
together. As has already been said,
[22:09]
the board is going to be looking at this
for a site plan approval by the planning
[22:14]
board, and a public hearing will be
conducted by the planning board for site
[22:19]
conducted by the planning board for site
plan
[22:19]
approval. The planning board will also be
reviewing this,
[22:23]
as the attorney also mentioned, for
special permit approval.
[22:27]
It requires a special permit by— from the
planning board,
[22:30]
and a public hearing will also be
conducted by the planning board for the
[22:35]
conducted by the planning board for the
special
[22:36]
permit. As already mentioned too,
[22:38]
this application is categorized as
qualifying exemption under the New York
[22:42]
qualifying exemption under the New York
State
[22:43]
Environmental Conservation Law.
[22:45]
No further SEQR action is required for
this application.
[22:48]
Thank you.
[22:49]
That doesn't mean that this board will not
be looking at the many,
[22:53]
many environmental impacts of this
project, though.
[22:57]
As already mentioned, this project will
be—
[23:00]
the application referred to Westchester
County Department of Planning,
[23:04]
Westchester County, due to its— due to the
special use permit.
[23:08]
There are also additional local land use
permits.
[23:12]
We list them in here, everything from A
deep slope permit, a tree removal permit,
[23:17]
and an excavation and filling permit.
[23:19]
We've requested that the application—
[23:22]
that the applicants submit those
application materials to the village as we
[23:27]
application materials to the village as we
go
[23:27]
further along. I think it's also mentioned
that this application not only is in the
[23:33]
C-2 commercial district— C-2 general
commercial district— it's also located in
[23:38]
commercial district— it's also located in
the—
[23:38]
Sorry, the Harmon South Riverside Gateway
Overlay Zoning District.
[23:42]
So it's got, it's got its underlying
zoning, the C-2, and also the, uh,
[23:47]
HSRG Overlay Zoning District.
[23:49]
So we'll get into some of those details on
those 2 districts.
[23:53]
Um, we note that the, um,
[23:55]
we've outlined what we believe are
potential zoning variances that the
[24:00]
potential zoning variances that the
application
[24:00]
would be would require based on the
current submission,
[24:04]
and we request some additional information
as we go through some of these specific
[24:09]
variances that would, again, as mentioned,
[24:12]
would have to go through the Zoning Board
of Appeals.
[24:16]
We note that the— per the zoning code,
[24:18]
the maximum floor area ratio shall be 0.8
And the applicant needs to provide an
[24:24]
exact calculation so that we all
understand what floor area ratio is
[24:28]
understand what floor area ratio is
proposed for
[24:29]
this project. The next one is regarding
the height of the project.
[24:33]
The maximum height is 35 feet.
[24:35]
In addition, the— for buildings located in
their entirety more than 5 feet from the
[24:41]
street line, the height in feet and in
stories shall be established by the
[24:46]
stories shall be established by the
village
[24:46]
engineer in such a way that no building
shall be prevented from attaining at least
[24:52]
at one point the maximum height permitted
in the district in which such building is
[24:57]
proposed to be erected,
[24:59]
such height to be measured above the
elevation of the pre-construction grade
[25:04]
abutting such building at this point.
[25:06]
We noted that in the site plan drawings,
we need to see—
[25:10]
they need to provide that the calculations
regarding the height of the building
[25:15]
relation to the site is And those will be
provided to the village engineer for his
[25:21]
review. Also, another variance is that we
note that the front yard setback does not
[25:26]
comply with for the C2 zoning district and
for lots within 25 feet of a residential
[25:32]
district boundary. So a variance will be
required related to that setback,
[25:37]
and the front yard setback does not comply
with the HSRG overlay zoning district.
[25:42]
A variance from the Zoning Board of
Appeals will be required.
[25:46]
So regarding parking, um, in the code
specifically says,
[25:50]
notwithstanding any other provisions of
the code,
[25:53]
for mixed-use and multi-family residential
buildings in that HSRG gateway overlay
[25:59]
area, there shall be provided at least the
following amount of parking for each
[26:04]
residential dwelling unit:
[26:06]
1 parking space plus 1 additional parking
space for each bedroom in the unit in
[26:11]
excess of 1 bedroom.
[26:12]
And we say, for example, studio apartment,
1 space; 1-bedroom apartment, 1 space;
[26:18]
2-bedroom apartment, 2 spaces.
[26:20]
So the proposed project will, will meet
the minimum parking requirements,
[26:24]
but the zoning table has the wrong
calculation for the required parking.
[26:29]
Again, the applicant will give the correct
information and provide that to the
[26:34]
board. So then we get into the area and
bulk Regulations relating to the maximum
[26:40]
building square footage.
[26:41]
The code says, with the exception of lots
within the C-2 zoning district and the
[26:47]
Municipal Place gateway area fronting on
Municipal Place,
[26:51]
the maximum permissible square footage for
any single building should not exceed
[26:56]
20,000 square feet. It appears that the
building will be larger than 20,000 square
[27:01]
feet, so a variance from the ZBA will be
required.
[27:05]
And we are asking that the applicant
confirm the building's total square
[27:09]
confirm the building's total square
footage.
[27:10]
So now we're going to get into some of the
design regulations,
[27:14]
and this has to do with off-street parking
placement and design.
[27:18]
The code states that all the parking shall
be located along the side and in the rear
[27:24]
of buildings unless the applicant
demonstrates to the planning board that
[27:29]
demonstrates to the planning board that
site or
[27:29]
business constraints prevent conformance
with this requirement.
[27:34]
The proposed project does not meet this
requirement.
[27:37]
And we are requesting that the applicant
provide more information whether or not
[27:42]
they're going to be seeking a waiver from
the planning board for that requirement.
[27:48]
Another requirement is related to curb
cuts and sidewalks.
[27:52]
Quote, properties within the gateway area
shall be permitted a maximum of one
[27:57]
vehicular curb cut per lot per street
frontage unless the property owner can
[28:02]
demonstrate the planning board that this
standard cannot be achieved or is not
[28:07]
appropriate to the specific site.
[28:09]
And the project does not meet this
requirement,
[28:12]
and we're asking the applicant to seek a
waiver from the Planning Board related to
[28:18]
that curb cut and sidewalk requirement.
[28:20]
Another requirement related to open space,
quote,
[28:24]
to enhance the appearance of the gateway
areas and contribute to Croton's open
[28:29]
areas and contribute to Croton's open
space
[28:29]
character, a minimum, a minimum of 15% of
the lot shall be set aside as open space.
[28:35]
Applicants will be required to submit a
landscape plan as part of the site plan
[28:40]
application.
[28:41]
Thank you.
[28:42]
The applicant has submitted a landscape
plan,
[28:45]
but additional information is needed to
determine if the project complies with
[28:50]
determine if the project complies with
this
[28:50]
section. If any of the components do not
comply,
[28:53]
the applicant will need to either seek a
variance from the ZBA or a waiver from the
[28:58]
planning board. So then, related to
signage,
[29:00]
all signs in the Gateway District must
conform to the village's signage
[29:05]
conform to the village's signage
regulations.
[29:05]
In addition, no sign in the Gateway
District shall exceed 48 square feet in
[29:10]
District shall exceed 48 square feet in
area.
[29:10]
And the application— the applicant will
be—
[29:13]
would—
[29:14]
is required to provide more information if
they're going to be having any signs at
[29:19]
the proposed site, and again, the sizes of
those signs.
[29:23]
Regarding lighting, a lighting and
photometric plan is required at the time
[29:27]
photometric plan is required at the time
of site
[29:28]
plan application. That has not been
submitted, and the application—
[29:32]
the applicant should provide this to
confirm that the lighting plans will meet
[29:37]
confirm that the lighting plans will meet
the
[29:37]
requirements of the lighting section of
the code. So more about parking.
[29:41]
Regarding the size of the parking spaces,
[29:44]
300 square feet shall be considered one
parking space,
[29:47]
and it's to provide room for standing area
and aisles for maneuvering.
[29:52]
The applicant should provide parking
dimensions on the site plan to confirm the
[29:56]
proposed project meets the zoning
regulations for that requirement.
[30:01]
Related to access, Unobstructed access to
and from a street shall be provided.
[30:05]
Such access shall consist of at least one
10-foot lane for parking areas with less
[30:10]
than 20 spaces and at least two 10-foot
lanes for parking areas with 20 or more
[30:15]
spaces. So the applicant is requested to
provide the parking aisle and access
[30:20]
dimensions on the site plan to confirm
that the project meets those zoning
[30:25]
requirements. We get into another list of
Regulations, more regulations.
[30:29]
The project will need to meet— we
discussed this before—
[30:32]
the project will need to meet the
regulations related to the village's
[30:37]
regulations related to the village's
affordable
[30:37]
housing requirements.
[30:39]
This project, the planning board will need
to make a determination regarding the
[30:44]
reservation of parkland.
[30:45]
So the planning board will determine
whether a proper case exists for requiring
[30:50]
whether a proper case exists for requiring
such
[30:50]
land reservation in accordance with the
code.
[30:53]
Related to the village's local waterfront
revitalization consistency,
[30:57]
the board will need to make it its
consistency determine—
[31:01]
determination with the village's LWRP as
part of its final site plan approval,
[31:06]
and the applicant has provided a coastal
consistency form.
[31:09]
The project will need to conform to the
village's requirements for stormwater
[31:14]
pollution prevention.
[31:15]
They'll need to provide a plan for that,
[31:18]
but because the site is greater than 1
acre,
[31:20]
a stormwater pollution plan will be
required.
[31:23]
Thank you.
[31:24]
The site— excuse me—
[31:26]
falls within the Indian Brook Croton Gorge
overlay and must meet the performance
[31:31]
criteria of those— of that part of the
code.
[31:34]
The applicant should provide a narrative
on how the project will meet the criteria
[31:39]
of that overlay. So we also—
[31:41]
that's just the background on all the
different approvals and requirements of
[31:46]
different approvals and requirements of
this
[31:46]
project. We then took a look at the site
plan and we had the following comments
[31:51]
regarding the landscaping plan.
[31:53]
We recommended that the applicant provide
an irrigation plan for all the new
[31:58]
plantings, plantings,
[32:00]
and can please confirm that the rear
plantings will not be in constant shade,
[32:05]
and if so, select another species,
[32:07]
and also provide information on how the
rear area of the project will be
[32:12]
rear area of the project will be
maintained.
[32:13]
We had a comment on the retaining walls.
[32:15]
We note that 3 tiers of retaining walls
are proposed for with the site plan.
[32:20]
Additional details on the construction of
the walls should be provided.
[32:25]
We're requesting whether or not
geotechnical studies have been conducted
[32:30]
geotechnical studies have been conducted
on the
[32:30]
stability of the slopes.
[32:32]
The planning board may want to consider
having a structural engineer review those
[32:37]
structural plans related to water and
sewer and the capacity of those utilities
[32:42]
sewer and the capacity of those utilities
in
[32:42]
the area. So in accordance to the— with
the code,
[32:46]
the location of all proposed water lines,
valves,
[32:49]
and hydrants And of all sewer lines with
profiles should be provided indicating
[32:54]
connections with existing lines or
alternative means of water supply or
[32:59]
alternative means of water supply or
sewage
[32:59]
disposal and treatment.
[33:01]
Again, related to stormwater, related—
[33:03]
the code requires that a stormwater
pollution prevention plan—
[33:07]
we discussed this already— shall be
required for any site development plan,
[33:12]
and that it will need to be submitted.
Still needs to be submitted.
[33:16]
Tree removal— related to tree removal,
[33:19]
the code requires that a tree removal plan
be provided.
[33:23]
Related to blasting or rock removal,
[33:25]
we are requesting information on whether
blasting or rock removal will be happening
[33:30]
at the site, and if so, what mechanism is
proposed to remove the rock.
[33:35]
Related to emergency access,
[33:37]
we noted that one of the plans do include
include a fire truck access plan,
[33:42]
but it still needs to show the ability for
a fire truck to access the garage or show
[33:47]
adequate maneuvering space.
[33:49]
And we were requesting that they discuss
whether or not the project meets the New
[33:54]
York State Building Code fire access
requirements,
[33:58]
and a turning diagram on the proposed site
should be provided.
[34:02]
We also recommend that the planning board
refer this application to the village fire
[34:07]
department for their review and Related to
visual impacts and elevations,
[34:12]
architectural elevations have been
provided,
[34:15]
but no context montage is included as
required by code.
[34:19]
A context montage, a streetscape montage
that shows adjacent buildings within 200
[34:24]
feet of the proposed building, is
required,
[34:27]
and the applicant should provide photo
simulations of the project in the context
[34:32]
simulations of the project in the context
of
[34:32]
the surrounding properties.
[34:34]
In addition, we ask that they provide rear
elevations of the proposed building and
[34:39]
its retaining walls.
[34:41]
Regarding lighting, a lighting diagram is
required that shows the areas of
[34:45]
illumination. The code requires that the
proposed location, direction, power,
[34:51]
and time— the timing of the proposed
outdoor lighting is provided by means of
[34:56]
outdoor lighting is provided by means of
data
[34:56]
details and an illumination contour plan.
[34:59]
Which shows that lighting equal to or
greater than 1/2 footcandle will not splay
[35:04]
greater than 1/2 footcandle will not splay
off
[35:04]
the site as required. We get into— we
discussed trash collection.
[35:08]
So we note that the trash storage and
removal appear to be located at the garage
[35:14]
door or refuge area shown on the plans,
[35:16]
but the garbage truck can only back into
the site,
[35:19]
blocking the driveway and the sidewalk.
[35:22]
Additionally, in the preliminary set of
The first floor plan,
[35:26]
a trash room is shown adjacent to the
refuge area without an internal
[35:30]
refuge area without an internal
connection.
[35:31]
So we're asking that the applicant clarify
the proposed trash collection process.
[35:37]
Also, the garbage truck turning diagram
shows that the truck must back into the
[35:42]
shows that the truck must back into the
site
[35:42]
from South Riverside Avenue, blocking the
driveway and the proposed sidewalk.
[35:47]
And we're requesting that they discuss how
often the trash will be picked up.
[35:52]
And also, all dumpsters and refuge storage
areas shall be fully screened from the
[35:57]
street and adjacent properties as per the
code.
[36:01]
We discussed the proposed walkway that was
shown on the, on the drawings.
[36:05]
The applicant will discuss a little bit
more of that and whether or not there will
[36:11]
be an entrance to the building through the
walkway on site.
[36:15]
Delivery and loading area, we are asking
for more information on delivery vehicles,
[36:20]
uh, where, where they will be, what area
that will be located, uh,
[36:24]
whether or not there's a loading or
delivery vehicle zone.
[36:28]
And if so, we're requesting that they mark
that on the site plan.
[36:32]
Um, the code also requires a construction,
a construction management plan.
[36:37]
And in those, in that management plan,
[36:40]
the applicant will be also providing
information on phasing and staging during
[36:45]
construction, duration of construction
Truck traffic during construction,
[36:50]
construction noise, and construction dust.
[36:53]
So in that construction management plan,
they're required to provide that.
[36:57]
So it's a long list, and again, we're at
the beginning,
[37:01]
but they have a lot to get back to us.
Thank you very much, Chairman.
[37:06]
Thanks, Bill. It's really complete. I
really appreciate all your hard work on
[37:10]
really appreciate all your hard work on
that.
[37:11]
So I'm assuming you guys will come back
with something in the next meeting,
[37:15]
something in writing, give you time to
digest this.
[37:18]
Meanwhile, while we're here together, do
you have any initial questions, feedback,
[37:23]
comments on what you heard so far?
[37:26]
So, no, we don't have any comments per se.
[37:29]
We want to second that we appreciate the
thorough memo.
[37:33]
This is a great roadmap for us, so it's
very, very helpful.
[37:38]
I don't know if— look, we have our team
here.
[37:41]
It may be helpful for them to just give a
little bit of their thoughts on the
[37:47]
project, at least aspects of the project.
[37:50]
We don't want to be long-winded, but at
least since everyone's here,
[37:56]
have them come up and just give some sort
of facets of it to put into context what
[38:02]
we just heard from Mr. Brady.
[38:04]
Yeah, no, I mean, we don't have a complete
application at this point,
[38:09]
and I think it might be premature to Bring
people up and start talking about the
[38:13]
project. Unfortunately, you assembled your
team for this, and you know,
[38:18]
sorry that they're here and not able to
speak.
[38:20]
But really want to keep the focus on these
outstanding issues.
[38:24]
Get a complete application together.
[38:26]
I think that'll facilitate the project
more than anything else.
[38:30]
We come back; we all got a common set of
facts to deal with.
[38:33]
We all know what needs to be done.
[38:35]
So that's kind of how I was hoping we
would we would proceed tonight.
[38:40]
And also because there are so many
questions on here,
[38:44]
adding or subtracting from the list of
variances, that's, you know,
[38:50]
a very essential question that should be
answered.
[38:54]
Some of the missing items and details and
information may impact your ability to
[39:00]
refer this at some point because you're
not really sure what variances they're
[39:07]
seeking and what needs to be sought and
whether, you know,
[39:11]
they're aware of the extent that the
project didn't meet the code.
[39:17]
And if, you know, they have members of
their team that can speak to one or more
[39:23]
their team that can speak to one or more
of
[39:23]
the comments, the architectural comments
or the site plan comments or the— you
[39:29]
or the site plan comments or the— you
know,
[39:30]
it's, it's important for you to— And the
public.
[39:34]
To have a project that is as complete as
possible and ready for public comment,
[39:40]
ready for referrals, ready for, you know,
[39:43]
the necessary distributions under the
general municipal law, et cetera. So I
[39:49]
general municipal law, et cetera. So I
don't—
[39:50]
Thanks.
[39:50]
I don't know if there's any clarification
that your team members
[39:56]
might have available.
[39:57]
I, you know, I realize that, yeah, it's
very short notice, but, um,
[40:03]
you can see from 7 pages it's, it's pretty
thorough.
[40:08]
So let me just, let me just comment.
[40:10]
So there are— we would like, if it's
possible, to,
[40:13]
to get the referral to the zoning board.
[40:15]
And the reason why I'm going back to that
is there are,
[40:19]
there are a couple of variances that we're
clearly going to need that are not going
[40:24]
change as we go through this, you know,
setback, for instance.
[40:27]
I think, I think Robert Sherwood, if he
can,
[40:30]
can probably talk about the open space
because that I know is one item that may
[40:35]
because that I know is one item that may
be
[40:35]
up in the air as to whether we need a
variance, whether we're asking for a
[40:39]
variance, whether we're asking for a
waiver.
[40:40]
So if it's possible, if, you know, if we
could just touch on that, on that one,
[40:45]
because if that is somewhat satisfying to
you this evening.
[40:48]
I'm hopeful that we can get the referral
to the zoning board.
[40:52]
And look, just to be open, it's on the
applicant to get a full variance request,
[40:57]
right? If we go to the zoning board with a
request for 2 or 3 variances and we
[41:01]
needed 4, let's say it's hypothetical,
we're just wasting our own— I mean,
[41:06]
wasting your time, but we're wasting our
own time.
[41:09]
We're going to go through this process.
[41:11]
So the onus is on us to make as complete a
variance request as possible.
[41:15]
Otherwise, we're going to have to go back
there, which is why I, I would—
[41:20]
I'm hopeful we can get that process
started now.
[41:23]
But if, if it's okay, if we can speak to
the open space item.
[41:26]
Yeah, I mean, if, if we stick our comments
strictly to the
[41:30]
questions that were raised, uh, your
responses, um,
[41:34]
we can entertain that.
[41:35]
Okay.
[41:42]
Okay, but Jeff, just point of reference,
um,
[41:47]
my own opinion is that I don't— is this
on?
[41:52]
Yeah.
[41:53]
I don't want to be sending stuff, just as,
um, the attorney just said,
[41:57]
I don't want to be sending stuff to the
zoning board piecemeal.
[42:00]
And I don't want to—
[42:01]
I don't want to submit anything to the
zoning board until the application's
[42:05]
zoning board until the application's
complete
[42:06]
to our Yeah, that's all.
[42:08]
Yeah, we just, we just conversed. I think
that, that makes sense.
[42:11]
We— let's supplement what we have. And at
the next meeting, okay.
[42:15]
I think that's the most efficient way to
handle it.
[42:19]
If per chance the project will be amended
or in some way changed as a result of the
[42:26]
need for this significant number of
variances or whether other variances are
[42:33]
necessary. It would be important to get
the actual project as proposed.
[42:39]
And certainly, the inability to get
variances would foreclose the opportunity
[42:46]
variances would foreclose the opportunity
to
[42:46]
come back here to proceed.
[42:48]
So you do want to make sure that there's
coordination and that the project is ready
[42:55]
for a public presentation, as you know, is
routinely intended for the first meeting.
[43:02]
But in speaking with the acting chair and
the board members earlier this evening,
[43:09]
in light of the significance and this
list, both site plan and special permit,
[43:16]
we thought it best to provide you the
opportunity to supplement to the point
[43:23]
opportunity to supplement to the point
where
[43:23]
you can make that presentation and the
public can be satisfied that this is what
[43:30]
you're proposing, right?
[43:32]
Yeah. So just a couple of housekeeping
items then, since, since we'll go that
[43:38]
items then, since, since we'll go that
way.
[43:38]
One is, are the notices to the related
agencies and county,
[43:42]
is that going to be held in abeyance till
the next meeting? Or is that the time?
[43:48]
Is that going out now?
[43:49]
So there's a notice that goes to
Westchester County Planning Board.
[43:53]
But I don't think that goes to them until
we declare, uh, declare a public hearing.
[43:58]
So I think that, that wouldn't start— we—
[44:01]
that we wouldn't send it to the West
Chester Department of Planning until we
[44:05]
Chester Department of Planning until we
declare
[44:06]
when the public hearing is going to be on
this matter.
[44:09]
Okay.
[44:10]
Um, I, I'm not aware of what the procedure
process is, so it does— it,
[44:16]
it really is incumbent for this to be
ready for public Before it's
[44:21]
distributed. I know that the code also
requires the transmittal,
[44:27]
and the Board of Trustees, once they add
it to their agenda—
[44:32]
and they have an agenda upcoming, Len?
[44:35]
August 19th.
[44:36]
August 19th. Thank you. What day is it?
August 19th.
[44:40]
It will appear on their agenda and give
them the opportunity,
[44:44]
and the 30 days will run from the date
that it appears on their agenda as well.
[44:50]
So I guess I'm, you know, I've known you a
long time, Jacob. I'm just—
[44:55]
Yep.
[44:55]
I want to encourage— and Mr.
[44:58]
Cortese, I've advised on other projects at
other communities that you were
[45:04]
developing. I just want to make sure that
this is the project.
[45:09]
And with so many things missing and being
suggested to be added.
[45:14]
I think it would be helpful for the public
to know what the project is.
[45:20]
So that makes sense.
[45:21]
So just, just in, in terms of chronology
based upon that,
[45:25]
so if we're coming back to this board's
next meeting, obviously assuming we,
[45:30]
we have all our ducks in order, um, I know
the, the memo from the, uh,
[45:34]
planning consultant was— came out, I
think, on the 24th.
[45:38]
So we had to go through that right after
that.
[45:41]
I don't know if there's a timing on—
[45:43]
assuming we get everything that we're
going to get, I mean,
[45:47]
it's on us to do that as quickly as
possible.
[45:50]
Is there a timing on when the consultant
can return a memo?
[45:54]
And also, will the next meeting be a
public meeting?
[45:57]
Will it be open to the public, a public
hearing?
[46:00]
Likely not a public hearing, but Vince,
[46:02]
if you want to talk about the submission
of documents and the deadline to submit
[46:06]
documents before the next meeting.
[46:09]
It's usually 15 days before the meeting.
[46:11]
We have 2 meetings per month.
[46:13]
We have a schedule, we can provide that to
you. Okay. Like that.
[46:17]
Okay.
[46:18]
So we would envision—
[46:19]
The code says a public presentation is
usually the first,
[46:23]
which isn't a public hearing.
[46:25]
But generally, the, the chair has
established public comments are available.
[46:31]
But We were reluctant to go with a
presentation this evening because the
[46:37]
presentation this evening because the
comments
[46:37]
would be based upon sort of incomplete
data.
[46:41]
And we want to make sure that public is—
we're being transparent.
[46:46]
You're being transparent and that the
public knows the project that you're
[46:51]
proposing. And there wasn't really enough
information for that to happen.
[46:57]
But I don't think you're necessarily—
[47:00]
No, I'm not.
[47:00]
and I'm not speaking for you, ready to
call for a public hearing.
[47:03]
Nope.
[47:04]
You want to—
[47:05]
Yeah. So the document deadline, according
to what Vincent said, 15 days.
[47:10]
I believe that would be Friday of this
week in order to get it submitted for our
[47:17]
next regularly scheduled meeting. That's
aggressive, understand.
[47:22]
But, you know, if we can have some, some
solid responses at that point,
[47:28]
And can put this on the agenda.
[47:30]
Potentially we can have the presentation,
presentation at that point,
[47:36]
and then potentially the public hearing
thereafter. Okay, great.
[47:41]
All right, I think that's it.
[47:43]
That's it.
[47:44]
Thank you, guys.
[47:45]
All right, so anything else that you guys
want to add based on what you heard here
[47:48]
so far?
[47:49]
Last call for the consultants. Any
questions?
[47:52]
There's a whole group behind me that are
itching to speak.
[47:55]
There are a lot of questions in here, but
we understand the timing is—
[47:59]
I have one very basic question. Is the
plan for these to be for sale or for rent?
[48:06]
We're still undecided on that, but—
[48:09]
Okay, fair enough.
[48:11]
Probably for rent, but we'll—
[48:13]
A little louder, please.
[48:14]
Probably for rent, but we're still not
100% certain.
[48:16]
Thank you.
[48:17]
Okay.
[48:18]
So I do have several questions having gone
through the documentation,
[48:23]
the supporting documentation for water
supply and sewer and parking, etc.,
[48:30]
supply and sewer and parking, etc.,
traffic,
[48:30]
etc., if you'll bear with me.
[48:33]
So referring to the supporting
documentation about the preliminary water
[48:39]
documentation about the preliminary water
engineering
[48:40]
report, page 3.0, On that document, on the
very bottom of the page.
[48:46]
Based on the testing of the existing
6-inch water main on South Riverside,
[48:52]
can supply domestic needs to the projects.
[48:55]
In other words, we got a 6-inch water main
on South Riverside.
[49:01]
Mm-hmm.
[49:02]
However, fire flow, fire flow at the
6-inch water main provides less than
[49:07]
specification required for fire
protection. Water flow demand.
[49:12]
So then I mentioned we got 2— we got a
couple options.
[49:16]
One is to build an on-site water storage
and pump system.
[49:21]
And the other is if we're able to bring
down a water connection from Wayne Street
[49:27]
that would supply— potentially supply
this.
[49:31]
That—
[49:32]
Vince, you might be able to speak to the
status of that,
[49:35]
but I think that easement is—
[49:37]
Yes.
[49:38]
been under discussion for quite a while.
[49:41]
And I think we may continue to be under
discussion for a while.
[49:46]
We may want to consider the water storage
and pump system on site to be a pretty
[49:52]
good likelihood that how we might have to
support this.
[49:56]
Yes, currently our design does have the
pump and tank system.
[50:01]
Yeah. Anything you want to add to that,
Vince?
[50:05]
No, still in the works, that easement
language for Waterman.
[50:09]
So that's— and any other members,
[50:13]
you guys have any questions,
[50:16]
feel free to jump in while I'm doing this.
[50:21]
I had one— I'm sorry, one quick question
for Bill, actually,
[50:25]
going back to your memo on item 7 under
design design regulations.
[50:30]
Um, why wouldn't that trigger an
additional zoning variance as opposed to a
[50:36]
waiver from the planning board?
[50:38]
If these are in the— um,
[50:41]
it depends on if it's in the code for, um,
[50:45]
or if it's a special permit requirement,
right?
[50:50]
Number 7, this is regarding the, the
sizes, right?
[50:56]
Off-street parking placement design, that
one under design regulations.
[51:00]
Oh, under design. I'm sorry, I thought you
said 7, right? Under design.
[51:04]
So number 8 then, right?
[51:06]
I'm asking about number 7, Bill.
[51:09]
On page 3.
[51:10]
On page 3.
[51:11]
3 of 7. Design regulations has a 7 right
there.
[51:17]
All right. Oh, got it.
[51:20]
Oh my goodness.
[51:21]
Sorry about that.
[51:21]
I don't know why that happened. So, okay,
so, uh, number 7.
[51:25]
Um, so the proposed spot does not meet
this requirement,
[51:28]
is seeking a waiver from the planning
board per— so I'm assuming that this is,
[51:32]
board per— so I'm assuming that this is,
uh,
[51:32]
when we talk about waivers from the
planning board,
[51:35]
that is a special permit requirement.
[51:37]
Um, but again, we can get clarification on
that. So it's a good question, Steve.
[51:42]
I, again, I can look it up in the code and
we'd talk with the applicant on on
[51:46]
seeking a waiver from that parking
off-street parking requirement.
[51:50]
So yeah, if I may, I can chime in also to
that.
[51:54]
You'll notice in the code provisions, and
again,
[51:58]
I put Article 10 in its entirety in the
memo that we'll be uploading for special
[52:06]
permits, you're permitted to waive from
that list of criteria.
[52:11]
But Anything that needs a variance from an
actual dimensional requirement in the
[52:18]
code, in the zoning code itself, would
need to go to the Zoning Board of Appeals.
[52:25]
So you can waive certain items in, in the
special permit criteria,
[52:31]
but you cannot waive requirements that are
actually part of the zoning code.
[52:38]
code itself. So a dimensional requirement,
minimum number requirement,
[52:44]
those need to go to the Zoning Board of
Appeals.
[52:48]
So those are not available to be waived,
only available as a variance process.
[52:55]
So it is under our purview and not the
zoning board?
[53:01]
Is that correct? Okay, a waiver is
Specifically yours.
[53:06]
Okay. Thank you.
[53:08]
It's more of a, you know, every site's
different.
[53:11]
You know, where is this going to be
located?
[53:14]
The code, the special permit requirements
talk about having them in the side and the
[53:19]
rear.
[53:20]
But because the site is different,
[53:21]
then just don't want to send the applicant
to the wrong board for an approval.
[53:24]
Right?
[53:25]
Thank you.
[53:26]
That's a waiver.
[53:27]
One last question. Go ahead, John. Is the
building going to be steel or wood?
[53:33]
It's going to be steel on the first floor
[53:37]
deck, concrete floor,
[53:39]
and then wood frame above.
[53:41]
Okay, so I'm going to move on to the
school analysis and
[53:48]
schools impact report.
[53:50]
So page 2 has an inconsistency in the
table.
[53:55]
When we talk about the, uh, low point of
enrollment at, uh,
[54:02]
Groton-Harmon schools being 2021—
2020-2021— of 1,394,
[54:09]
table below it has a different number for
that year.
[54:15]
So there's just an inconsistency.
[54:18]
I'm not sure which number is correct
there.
[54:23]
Typo.
[54:28]
Yeah. A lot of work went into this report
describing the cost to educate a student
[54:34]
and how many students are expected and how
much revenue would be generated, um,
[54:41]
how much, how much tax revenue would be
generated to the school district and
[54:46]
generated to the school district and
whether
[54:47]
that would essentially cover the cost of
adding new students.
[54:52]
So That's, you know, really valuable
information.
[54:55]
It's based on what we expect will be the
assessed value of the apartment complex,
[55:02]
and it would be nice to get a more
accurate number of these potential
[55:07]
accurate number of these potential
assessed
[55:08]
values so we can determine how accurate or
not these figures might be.
[55:13]
In other words, whether the additional
students will be covered by the additional
[55:19]
tax revenue, uh, generated to the school
district.
[55:23]
I don't know how we can— if we can get any
sort of, uh,
[55:27]
preliminary estimate on what the assessed
value might be.
[55:32]
Um, if we don't have an assessor—
[55:38]
yeah, the town handles that. So you're—
[55:42]
Bill, how have you guys handled that in
other applications?
[55:45]
you've been involved with?
[55:46]
Yeah, I guess we could work with the town
again.
[55:49]
Again, work— it's often we have them— if
the town does the assessment assessments,
[55:54]
right? It's, uh, trying to get a
preliminary number from them.
[55:57]
So that would be helpful. Yeah, maybe you
guys could pursue that. Yeah, thank you.
[56:02]
Yeah, I mean, based on the preliminary
estimate,
[56:04]
the tax revenue that we generated for the
school district would more than cover the
[56:09]
additional students who will be coming
into the District,
[56:12]
or expected number of students. Yep, which
is a good thing.
[56:15]
Um, good point, Jeff.
[56:17]
So wherever we can show math in, in these
tables is, is really helpful.
[56:24]
So that's the school report. Uh, let's
move on to the traffic study.
[56:31]
Um, this is going to be a— just so you
know,
[56:35]
it's going to be a point of focus for us.
There's It's a busy part of our town.
[56:43]
What's unaddressed in this traffic study
is Blaze, the Blaze,
[56:49]
the Historic Hudson Valley's event that
takes place for about 45 days in the fall.
[56:57]
And it runs for 10 weeks.
[57:00]
Yeah, if you've been down there, it is It
is a crowded scene.
[57:05]
We'd need some sort of at least
acknowledgement that that's there and is
[57:11]
acknowledgement that that's there and is
an issue,
[57:12]
and then a sense about how it you can
potentially mitigate it.
[57:17]
You're going to have residents that are
trying to get home after a workday and
[57:23]
trying to get home after a workday and
stuck
[57:24]
in a line with people who are going into
historic Hudson Valley.
[57:29]
Van Cortlandt Manor.
[57:31]
So it would be good to have some thought
put into that and,
[57:36]
and how that could be mitigated.
[57:39]
Um, right across— and there was a really
thoughtful letter to the Gazette that
[57:45]
someone wrote about—
[57:47]
right across from the building that you're
proposing is a driveway that goes down to
[57:54]
ShopRite that is not for pedestrian use.
[57:58]
Um, when the ShopRite— when the plaza was
modified,
[58:02]
they put the ADA access on the far side of
that parking lot.
[58:07]
In other words, closest to Van Cortlandt
Manor.
[58:11]
So that is the preferred way that people
are supposed to enter—
[58:16]
pedestrians are supposed to enter
ShopRite, to walk all the way down. Nobody
[58:23]
ShopRite, to walk all the way down. Nobody
does.
[58:23]
Instead, everybody walks down this ramp.
It's two-way traffic and it's very tight.
[58:30]
Especially if people are lugging groceries
up that hill.
[58:35]
And your— that pedestrian walkway from the
apartment complex leads directly across
[58:42]
the street to that ramp that is not
pedestrian-friendly and not meant for
[58:48]
pedestrians. So presumably it would add
some pedestrian traffic of people that
[58:55]
some pedestrian traffic of people that
want
[58:55]
to pick up some quick groceries.
[58:58]
Want to run down, walk down there, grab
some things.
[59:02]
Um, it's something that needs— I'd love to
give it some thought and,
[59:08]
and how that could potentially be
addressed.
[59:12]
Obviously, this is not on your property.
This is ShopRite owner's, uh, property.
[59:18]
But if there's a way to address that as
part of this, you know,
[59:24]
that would be wonderful. We could put
some, some thought into that. Okay.
[59:30]
Yeah, the number of trips that are
expected to be generated is a result of
[59:36]
expected to be generated is a result of
the is a
[59:37]
result of the apartment complex.
[59:40]
We've got the numbers are generated, I
think, based on.
[59:44]
A table that comes from, I believe,
Rutgers University,
[59:49]
which provides data to all planning
entities.
[59:53]
That is a table that says if it's an
apartment complex with 30 to 50 units,
[59:59]
the number of average trips is X. So
that's where these numbers are derived
[1:00:05]
that's where these numbers are derived
from.
[1:00:06]
It would be. Desirable if we could
instead, or in addition,
[1:00:11]
use numbers that refer to apartment
complexes we've just built here in Croton.
[1:00:18]
It might be a more like-for-like
comparison,
[1:00:21]
which would be Maple Commons and North
Riverside. Is it— is it 425 North
[1:00:27]
Riverside. Is it— is it 425 North
Riverside?
[1:00:28]
Yeah.
[1:00:28]
25 North Riverside, which is Still being
occupied.
[1:00:32]
However, for both of those projects,
[1:00:35]
and even for one Chrome Point Avenue for
that point, for that matter,
[1:00:41]
estimates were provided that said here's
what we expect to be our estimated number
[1:00:47]
of trips. And if we can incorporate those
three residential units into the study,
[1:00:54]
obviously some have more units, some have
less, or they all have more.
[1:00:59]
Well, Maple Commons has less, and we could
adjust accordingly.
[1:01:04]
But it's good to do a like-for-like
comparison.
[1:01:08]
I think, Steve, you're at the Westchester—
[1:01:11]
the Pace University Land Use Law Center
meeting where some of the planners said
[1:01:18]
meeting where some of the planners said
it's
[1:01:18]
best to use as a point of reference local
projects as opposed to some table The
[1:01:24]
addresses you just threw out, were one of
them, uh, the Baked by Susan apartments?
[1:01:32]
Because there's 8 or 10 units there that
could be studied.
[1:01:35]
People coming in and out of there,
[1:01:37]
that might be comparable in terms of
geography and the demographic.
[1:01:41]
Possibly, possibly. But something that
kind of fleshes out this data is kind of
[1:01:48]
kind of fleshes out this data is kind of
what
[1:01:48]
we're looking for, that uses some of our
local buildings.
[1:01:53]
Okay, uh, I think that's it for that.
[1:01:57]
And all right, so community benefits was,
uh, kind of a—
[1:02:01]
the summary of all these other documents,
um,
[1:02:05]
in terms of what the complex would bring
to the community, property taxes, etc.
[1:02:12]
And, um, again, it's based on projected
assessed value of the building.
[1:02:18]
If there's a way to,
[1:02:20]
to get a number that we feel is a little
bit more accurate or dialed in to drive
[1:02:27]
these numbers, that would be desirable.
[1:02:30]
And I don't know, Bill, if that's
something you can help with.
[1:02:36]
Definitely, yes.
[1:02:38]
Because, you know, we've got it generating
a fair amount of taxable
[1:02:44]
revenue for both The town, the village,
[1:02:47]
and the schools in Westchester County.
[1:02:50]
Just if I can chime in, please.
[1:02:53]
It, it isn't a use that you can regulate.
[1:02:58]
But if these were offered for sale in a
condominium format,
[1:03:05]
the assessment is based upon a different
formula or calculation.
[1:03:12]
So you might want to look at ownership
under a condominium formula.
[1:03:19]
Those assessments are much different than
a multifamily rental
[1:03:26]
property.
[1:03:27]
Yep, great point.
[1:03:29]
Also, we can— we, you know,
[1:03:30]
we have done a pro forma based on the rent
roll that would generate the value of the
[1:03:35]
building also. So maybe we can have a An
appraiser look at it just to get a value
[1:03:39]
appraiser look at it just to get a value
of
[1:03:40]
what they think its projection would be,
and then talk to the assessment—
[1:03:44]
the town assessor.
[1:03:45]
Yeah, as much coordination and cooperation
between
[1:03:50]
the applicant and the consultants is
appreciated.
[1:03:55]
Absolutely.
[1:03:57]
Okay, I think that's all I have for the
documents.
[1:04:02]
Anybody else from the planning board have
questions that they want to
[1:04:09]
add to the mix here?
[1:04:12]
They don't.
[1:04:13]
Just one comment regarding the traffic—
[1:04:17]
speak into the microphone.
[1:04:20]
Yeah, regarding traffic study,
[1:04:22]
I think should be more comprehensive to
traffic flow through the South Riverside
[1:04:28]
Avenue and Croton Point.
[1:04:30]
Where, you know, you're gonna have Lot A
gonna be developed.
[1:04:35]
Maybe that traffic study can be expanded,
show how much impact it's gonna have.
[1:04:41]
Okay, the cumulative—
[1:04:45]
yes, accumulate time into the other
projects, right?
[1:04:47]
Yeah.
[1:04:51]
Okay, Vincent, do you have anything?
[1:04:52]
Not at this time.
[1:04:56]
So I think that's where we are for
tonight, uh, for this agenda item, um,
[1:05:00]
unless there's anything else or questions
that you guys have.
[1:05:04]
Um, I have one question.
[1:05:05]
In the event we come back with all our,
you know, responses to your comments, uh,
[1:05:10]
will our professionals be heard at the
next meeting, or is—
[1:05:15]
will the presentation be heard at the next
meeting? Um, What's your sense, Laura?
[1:05:21]
I think it's highly likely that if,
[1:05:24]
if we can get clarifications and answers
to comments and questions,
[1:05:30]
that the board certainly would entertain a
project presentation.
[1:05:36]
Yeah.
[1:05:36]
Okay.
[1:05:37]
I think that's something once we get our
responses to you,
[1:05:40]
probably the planning consultant and the
village attorney in our office can sort of
[1:05:45]
have a conversation so we know, I mean,
that there's a comfort level for that,
[1:05:50]
right?
[1:05:51]
Like you said, the list of questions will
shrink, will shrink,
[1:05:54]
and we'll focus on certain ones, right?
[1:05:55]
Yeah.
[1:05:56]
And, you know, again,
[1:05:58]
the village engineer is really the intake
point.
[1:06:02]
So, you know, keeping the lines of
communication open is always—
[1:06:07]
everyone's gonna, everyone's gonna be on.
[1:06:08]
Thank you. I'm standing in for the
planning board attorney for this evening,
[1:06:15]
but we confer daily. So, you know, she
probably is even watching this evening.
[1:06:21]
But, you know, we'll do what we can to
move this to streamline it.
[1:06:27]
The opportunity exists in here.
[1:06:29]
As you know, the opportunity exists in
Article 10 for you to streamline the
[1:06:35]
Article 10 for you to streamline the
process
[1:06:36]
and look at the site development plan
simultaneously with the requirements for
[1:06:42]
Article 11. So we would like to see that
happen. And that would be to your benefit.
[1:06:49]
So that's why this memo covered both the
site development plan and also the special
[1:06:56]
permit.
[1:06:57]
So, great.
[1:06:59]
All right, gentlemen, thank you. Thank
you.
[1:07:02]
Thank you.
[1:07:02]
Appreciate it.
[1:07:06]
Okay, we're going to move on to our next
agenda item.
[1:07:10]
And Rob, if you'd like to rejoin us.
[1:07:12]
Good job,
[1:07:18]
Geoff.
[1:07:23]
Is that
[1:07:28]
weird
[1:07:31]
sitting back
[1:07:40]
there?
[1:07:44]
I've had the
[1:07:53]
experience
[1:08:00]
myself.
[1:08:07]
So I think they just went through and— I
can hear you guys pretty well.
[1:08:14]
Good.
[1:08:20]
Get the mic a little bit closer to Mr.
Cortese. He was hard to hear a little bit.
[1:08:25]
He's a little soft-spoken.
[1:08:27]
Right.
[1:08:27]
Yeah.
[1:08:28]
Which—
[1:08:29]
something like this from the early '70s.
[1:08:31]
I wish they gave the same big note here
saying, look, it's like—
[1:08:36]
what the heck's that?
[1:08:38]
Print out the memo and cross it out.
[1:08:42]
Mics are still on. I'm just saying.
[1:09:11]
We're in the middle of a meeting.
[1:09:27]
All right, so we're going to move on to
our next agenda item.
[1:09:34]
It's a referral from the Village Board of
Trustees to review Local
[1:09:41]
Law Introductory 10 of 2026, the CAF and
EAF,
[1:09:46]
to amend Chapter 230 zoning of the Village
Code that seeks to amend
[1:09:54]
the text of Chapter 230 zoning to provide
clarification as to the
[1:10:01]
harboring or keeping of animals in the
village.
[1:10:06]
You guys, anybody take a look at this one
yet?
[1:10:11]
Yeah, I have.
[1:10:12]
Okay.
[1:10:15]
So this does have a short environmental
assessment form.
[1:10:20]
It has a coastal assessment form, which
are largely blank, and appropriately so,
[1:10:26]
because there's just really no impact. So
there's really not much to review there.
[1:10:32]
The law itself, the changes themselves,
has to do with fowl— definition of fowl,
[1:10:38]
I think, is where it started from.
[1:10:41]
Right.
[1:10:42]
And along the way, we clarified a few
things.
[1:10:46]
Most prominently, the keeping of roosters
and pigeons shall be prohibited.
[1:10:52]
Where I don't believe that was spelled out
in a previous law.
[1:10:58]
So that might be one of the bigger changes
that's involved here.
[1:11:04]
Okay, seems to me like a prudent
[1:11:09]
thing. And we're referred to it to
[1:11:14]
refer it back, or are we taking action
[1:11:20]
on it?
[1:11:21]
Yeah, they're asking for comments if you
have any.
[1:11:24]
Okay. Um, I mean, I think that this has
been added to the use provisions.
[1:11:31]
So it's clear what's permitted in what
zones.
[1:11:35]
It's also clear the number of animals,
minimum lot size for certain animals.
[1:11:41]
So they, they did— I can speak from
experience.
[1:11:45]
And I can get a nod from our 2 trustees in
the, in the audience.
[1:11:50]
They, they looked at this many ways on how
to handle it.
[1:11:55]
And they thought it best that we drafted
it at their suggestion to include it in
[1:12:02]
it at their suggestion to include it in
the
[1:12:02]
use provisions. So it's going to be
included in this table.
[1:12:07]
So everyone's clear, it's clarified what's
permitted, what's not permitted.
[1:12:13]
Mm-hmm.
[1:12:18]
I would point out that in— if you look at
the setback that's required for, say,
[1:12:24]
somebody wants to have a chicken coop,
[1:12:28]
it says that shall be penned or housed
within 50 feet of any lot line.
[1:12:34]
And on my particular house, I'm in— not
sure if I'm in RA-5 or RA-9,
[1:12:39]
or the smaller one is.
[1:12:41]
RA-5.
[1:12:42]
5, I think.
[1:12:42]
5. I can't really have a chicken coop.
Because I have a fairly standard lot.
[1:12:48]
It's narrow. I can only have it exactly in
the middle, which really,
[1:12:53]
even with the 50 feet, probably doesn't
work because the chicken coop is wider.
[1:12:59]
I would just like to, on the record, note
that I can have an ADU on my property,
[1:13:05]
but I can't have a chicken coop. I think
there's some inconsistency to that rule.
[1:13:12]
I'm not opposing the chicken coop, not
suggesting we change it.
[1:13:16]
It's just an inconsistency with our
thinking. That's all.
[1:13:21]
Is there—
[1:13:24]
well, I think we can include that on as a
recommendation back to the Village Board
[1:13:29]
of Trustees.
[1:13:30]
I'd like to review that provision.
[1:13:33]
Thank you.
[1:13:34]
Public aware of this?
[1:13:36]
Yes, it's, it's part of our agenda, so
it's posted on the village website.
[1:13:41]
And the, and the Board of Trustees has
been discussing it, um, of course, uh,
[1:13:47]
at multiple, um, work sessions and then
also on the agenda for its referral to
[1:13:53]
also on the agenda for its referral to
you.
[1:13:54]
So yes, the public is—
[1:13:55]
Feedback, letters coming in saying that
the support chicken Like that,
[1:14:00]
or don't support chickens?
[1:14:03]
I'm not aware of— I'm not aware of that.
[1:14:06]
Um, hasn't been scheduled for public
hearing yet.
[1:14:08]
What's that?
[1:14:10]
Okay.
[1:14:11]
Yeah, yeah, they're, they,
[1:14:13]
they're collecting comments in advance of
scheduling it for a public hearing.
[1:14:19]
So at the public hearing,
[1:14:20]
it's possible that members of the public
would weigh in or send letters or Support
[1:14:26]
or otherwise.
[1:14:31]
I don't have chickens, just so you know. I
don't have chickens.
[1:14:35]
A friend of mine does, and I follow him
around that field.
[1:14:39]
He doesn't have a rooster. He gets eggs
from the chickens anyway.
[1:14:44]
So it's a matter of I have to feed my
family. Shouldn't be a problem.
[1:14:49]
Right.
[1:14:52]
Have to wait for answers to come in. Maybe
people have different thoughts.
[1:14:55]
Yeah.
[1:14:57]
Oh, my, my parents, when they lived in a
larger property,
[1:15:00]
had chickens on the property, and they
didn't have a rooster.
[1:15:04]
They got plenty of eggs, right?
[1:15:07]
That's great. Nothing like a farm-fresh
egg.
[1:15:10]
Really fun to follow you around. You can
pick out each one.
[1:15:15]
One's the boss, and the other follow him.
[1:15:18]
It's going to take off that way, but they
don't make any noise, right?
[1:15:24]
All right, so any, any other thoughts?
[1:15:27]
Okay, so I think what we can, um, include
a note about the, the, uh,
[1:15:34]
setbacks for chicken coops and
specifically in versus an ADU and
[1:15:40]
specifically in versus an ADU and
specifically
[1:15:41]
on, uh, You know, smaller properties
within RA-5.
[1:15:46]
RA-5, I think it'd be hard to achieve that
setback. Yeah, if not impossible.
[1:15:53]
RA-5 is the 25 feet.
[1:15:56]
It says 25 feet.
[1:15:57]
And then all other districts is 50
[1:16:01]
feet. RA-5 in the middle, right?
[1:16:05]
Because the 50-foot lot.
[1:16:06]
Yep.
[1:16:07]
It's almost precluding it from happening.
[1:16:10]
Yep, but I can have a second house.
[1:16:12]
All right, so I think we can include that
in, um,
[1:16:16]
a referral note back and you guys can work
on that,
[1:16:20]
then we'll take it from there.
[1:16:23]
Um, the only other item we had on our
agenda was— well, actually, Steve,
[1:16:28]
you had something about—
[1:16:30]
We were gonna ask an engineer report, um,
on the issue about Um, at our last— yeah,
[1:16:37]
at our last meeting we resolved that there
were going to be some landscaping
[1:16:44]
improvements for, uh, 425 South Riverside,
uh,
[1:16:48]
as it related to the signage and
landscaping application.
[1:16:53]
So, uh, just my question is, has, uh,
Andrew Cortese, uh, fulfilled his, uh,
[1:17:00]
requirements?
[1:17:01]
Oh, I have to check up on that one.
[1:17:03]
Okay.
[1:17:08]
425. He was here before the board last—
[1:17:11]
Yeah, I remember. But I think we misspoke
by saying 425, which is the report,
[1:17:16]
the project you just looked at. So it's
the 3.
[1:17:19]
Yeah, same address.
[1:17:20]
Same address.
[1:17:21]
Oh, it is?
[1:17:21]
Yeah.
[1:17:22]
So it was fulfilling a prior requirement
for site
[1:17:26]
plan modification that needed to be
buttoned up.
[1:17:30]
So I was just looking for an update, which
Vincent will get back to us on,
[1:17:34]
it sounds like.
[1:17:34]
No problem.
[1:17:35]
Yeah, great.
[1:17:36]
And the only other thing, just—
[1:17:38]
I don't know if we've followed up or where
we're at with this
[1:17:43]
garden center down the way.
[1:17:45]
It's a good question.
[1:17:46]
Um, as far as I know, they have been
reaching out to the DOT and Last I saw,
[1:17:51]
I think it was in DOT's court to give them
an answer.
[1:17:54]
I don't think that they have, and that was
like 2 months ago.
[1:17:58]
I could follow up on that though. That'd
be great.
[1:18:01]
It's been 2 months or so since I saw the
emails being exchanged,
[1:18:04]
so I'll look into that.
[1:18:06]
Thank you.
[1:18:07]
DOT takes some time.
[1:18:09]
Yeah, well, we know, several years.
[1:18:11]
We know.
[1:18:12]
I, I, uh, I, I said this to the Board of
Trustees recently.
[1:18:16]
There's another community that's been
trying to obtain surplus property along
[1:18:23]
trying to obtain surplus property along
the
[1:18:23]
Sawmill River Parkway for 6 years from the
DOT.
[1:18:27]
This goes back about as long, quite
frankly. No, I'm not exaggerating.
[1:18:30]
To be used as a public park. It's taken 6
years.
[1:18:34]
That's tough.
[1:18:36]
Vincent, do you know the status on that
clothing drop box that's opposite?
[1:18:42]
They're trying to get rid of it.
[1:18:44]
They tried to get rid of it, I think
Yesterday,
[1:18:46]
but it was too heavy for the truck that
they had.
[1:18:49]
So today they were using a forklift or
something.
[1:18:52]
So, um—
[1:18:52]
They being the people that put it there?
[1:18:53]
The management company. We don't know who
put it there, how it got there.
[1:18:56]
Really?
[1:18:57]
Yeah. So they're trying to get rid of
that.
[1:19:00]
That's nuts. Okay, thank you.
[1:19:01]
I think they might have done it by today,
but they're working on it for sure.
[1:19:04]
They don't want it there.
[1:19:04]
So the people that own the shopping center
are trying to get rid of it?
[1:19:07]
Yeah, they've got to get rid of it.
[1:19:08]
Great.
[1:19:09]
They don't want it there either.
[1:19:10]
That's good. Thank you.
[1:19:11]
That's good news.
[1:19:12]
All right, so I think the only other thing
we have on our agenda then would
[1:19:18]
be the minutes from our prior meeting. I
think they're in my— oh, here we go.
[1:19:25]
I did not have any comments
[1:19:29]
or changes. Great job, Karen.
[1:19:34]
Yep, looks good.
[1:19:38]
I have no comment.
[1:19:39]
Neither do I.
[1:19:40]
Okay, uh, John, you want to make a motion
on the minutes?
[1:19:45]
Uh, I'd like to make a motion
[1:19:50]
that the minutes from June
[1:19:54]
20th—
[1:19:55]
July—
[1:19:55]
July be accepted without any corrections.
[1:20:04]
Second.
[1:20:04]
All in favor?
[1:20:06]
Aye.
[1:20:06]
All right, thank you guys. So we're
adjourned for tonight.