Drainage Board August 12, 2026

Delaware County, IN · · More Delaware County, IN meetings · More Indiana meetings

Transcript

Download: Text · SRT
SOURCE TRANSCRIPT

This transcript is downloaded from the source you provided but we haven't reviewed it for accuracy. Treat it as a starting point, not a verbatim record. You can also request an AI-transcription of the audio file with the button to the left.

These are YouTube's auto-generated captions, not a human transcript — expect occasional errors, especially with names and technical terms.
[7:02] I want to welcome each and every one of you to the August 12th during Board
[7:05] meeting. If you would please stand and we'll pledge to the flag
[7:11] to the flag United States of America to the republic for it stands. One nation
[7:18] under God, indivisible, with liberty and justice for all.
[7:24] » Thank you. Roll call, please. >> Mr. Whitehead,
[7:27] » here. >> Mr. Hamilton,
[7:28] » present. >> Commissioner,
[7:30] » present. >> Mr. Christie,
[7:31] » present. >> Mr. Bustel,
[7:32] » here. >> Mr.
[7:33] » Here. >> Mr. Brooks.
[7:35] » Orchers. >> Oh, here.
[7:39] » Approval of the July 8th minutes. Any additions or corrections?
[7:45] Motion to approve the minutes. >> Second.
[7:47] » Have a motion before us properly. Second. Roll call, please.
[7:51] » Mr. Whitehead. >> Yes.
[7:52] » Mr. Hamilton. >> Yes.
[7:53] » Mr. Rood. >> Yes.
[7:54] » Mr. Christie. >> Yes.
[7:55] » Mr. B. >> Yes. Table of business. Pavement
[7:59] McConnell. Reconstruction. >> Yeah. I think where we left it last
[8:04] month was Mr. Hamilton was going to to talk to the prominent land owners and
[8:08] see where they're wanting to go with the three options that we came up. the
[8:14] engineer came up with. >> I did talk to two of the land owners on
[8:17] the original petition. Dr. Hazlet is here. Dr. Hazlet, is there anything that
[8:20] you would like to say? >> If you would please.
[8:26] » No problem at all.
[8:30] » Good morning. Gary Hazellet, 221 West County Road, 400 South. Uh, yes, I'm not
[8:36] in favor of this particular drain project. I do have several reasons for
[8:41] that. uh one is that we have had this project
[8:46] reconstructed in some manner several what 15 years ago or thereabouts. It was
[8:50] unsuccessful. We spent a fair amount of money and I'm not convinced that that
[8:54] will happen again properly. two is that uh our end and major owners including u
[9:04] Cirrus and Lon Wright who I thought might be here this morning uh really
[9:10] don't have a problem in terms of any drainage in that area. The tenant for my
[9:16] ground also brings up a point that when we disturb the ground like we will would
[9:20] need to do for this that puts the ground in a much less productive state for a
[9:25] number of years and that's not very valuable in my mind if we do something
[9:30] like that and of course thirdly of all as a major land owner I'm going to have
[9:34] to take a chunk of money on this and I don't really want to do that either. So
[9:38] I it appears to me that most of the drainage issues appear to be south and
[9:44] east of Waynewood, which is where some of the major concerns seem to be. There
[9:49] are a few people involved with that area back in there. So I think
[9:54] this is a a
[9:58] project that not as beneficial down the line as it would be for a group of
[10:04] people near the eastern end of that drain. Now, granted, after five and a
[10:08] half inches of rain at my house this morning, it does look a little
[10:11] different, but uh it won't for very long because it'll pass on down the to the
[10:16] creek until the creek gets too full. So, I I myself am not in favor of this of
[10:22] any of those repairs. Uh it's too expensive for the money and the benefit
[10:26] and uh just seems to be weighted toward one
[10:31] end. So, I I uh guess that's all I can say. Any questions for me? item.
[10:37] » Any questions? >> Thank you.
[10:40] » Thank you, [clears throat] doctor. All right.
[10:41] » Appreciate you. >> I spoke to Mr. Wright and his comments
[10:44] were similar. Um, it I I estimated that it would cost $122 per acre per year for
[10:49] 5 years to install alternative 1, which is the upsizing of the 24-in tile from
[10:54] Kalen Road to Noame Creek from 24 in to 30 and 36 in. Um I believe that this
[11:01] would be beneficial or even required if there is um pattern tiling done on any
[11:06] of those fields from Kowan Road to No Name Creek, but um until that is done um
[11:12] the the benefit may not um may not be outweighed by the cost. Um,
[11:19] so my recommendation for this is to um put the design for the 36 and 30inch
[11:26] upsizing um to put that on the shelf and save
[11:31] that for a time when that there is additional drainage planned for this
[11:34] watershed. The surface water solution that um
[11:39] Banning proposed could be implemented at a time that there is development in this
[11:43] watershed but is probably not um not worth the cost at this time to the
[11:49] agricultural land owners. And then the repair of the previous um regulated
[11:55] drains from 1890 and 1973. That solution that Banning proposed um could be
[12:01] implemented at any time to reduce some of the reoccurring claims in this
[12:06] wershed to repairs to those still functioning but um old regulated drains
[12:12] are in poor condition.
[12:16] Any other comments from the board? >> I just let to let you guys know I went
[12:20] back [clears throat] and read everything from the 1973 or 78
[12:25] I don't remember 76. There's two or three of them where they tried it
[12:28] earlier in the 70s and then again in the later 70s which follows similar to the
[12:36] uh it actually goes different than the 1890 because it kind of went right
[12:39] through the middle but they did not vacate any of that drain when they redid
[12:45] it in 2009 and and rerouted it a little different way. So we still do have a
[12:50] ride of way along where the 197070s reconstruction went. So, we do have the
[12:57] option to go in there and uh repair that if needed or bust up some of the
[13:04] the old clay that we keep on repairing that doesn't need to be there. You know,
[13:07] it'd be something that we'd have to dig this after the crops are off and kind of
[13:11] assess where it's at. So, we do have the ride ofway there to do necessary
[13:16] changes. I was just hoping that they didn't vacate it when they redid it in
[13:20] 2009 and they did. So, >> would you look more into that proposed
[13:26] um 15-inch repair solution that Banning um designed? Yeah.
[13:31] » And once once the crops are off of Mr. Wright's field, um could you report back
[13:35] to the board on on an implementation plan for that solution?
[13:39] » Yeah, we can I can do that. Um, and another issue that we have when they
[13:44] when they lay the tile next to the old tile, which is something you guys know I
[13:48] don't like. There's a lot of times we'll lay the new tile with a a field plow and
[13:53] it'll be a foot, sometimes two foot taller than the old clay tile, and
[13:57] sometimes it's hard to get that to line up and drain right on
[14:04] on a deal. So once we get out there, punch some holes, kind of figure out how
[14:08] we want to lay that out within our ride of way, it'll be a pretty cost effective
[14:13] uh addition or to the already 2009 uh reconstruction. So I can get that
[14:21] together once crops are off. You live out there, some other people, if you see
[14:25] the crops are off, give me a call and we can get a contractor out there to punch
[14:29] some holes and kind of lay out what we've got and what's good and what's
[14:32] not. The other two issues that we had with
[14:35] this previous reconstruction was recording the actual path of the 2009
[14:39] installation. Um could you make sure that that was properly recorded in 2009
[14:46] and if not take the steps to record the location of the current installation?
[14:50] » Absolutely. If it's if it's not and this is the same thing I was going to bring
[14:54] up with the uh the ditch that we took in on 700
[14:59] East. I was I'm going to contact a land surveyor to go ahead and record the the
[15:04] legal description of that so I can get it in into the cards, get it on the
[15:08] rules, and make sure all our rideways are good for that. So now that we'll
[15:13] have two, it'll be easier for them to do.
[15:16] » And the last issue was the um separating the watershed accounts of the A
[15:21] McConnell wershed from the rest of the county. Um I believe that banning will
[15:26] provide a um a GPS coordinates of the outline of this watershed. Um Mr.
[15:32] Surveyor, what what steps would be required to separate this watershed
[15:36] account from the rest of the county?
[15:41] if if he gives the roles with each uh property on there and their uh property
[15:49] ID and what acreages are on there, then we can separate that out.
[15:55] Uh as of right now, it would be the same uh ditch assessment unless that changes,
[16:03] but we could separate it out. Yes. If he gives if he gives me the all the partial
[16:08] numbers and acreage uh we can separate all that out if we
[16:14] separate it out before anyways. But if we're not going to do a reconstruction
[16:17] then why is that? >> What Banning had suggested was to
[16:22] separate this out so in the event of a future implementation of alternative one
[16:26] or two the surface water or the 30 and 36 in we would be ready to um to
[16:31] separate those from the rest of the county. The other issue is is this
[16:35] 15-inch repair work that Banning had proposed. I believe it is alternative
[16:38] three. Um that would be advertised over 20 years and um that would be assessed
[16:44] to only this watershed. Although the cost is small um I believe that this
[16:49] would be an opportunity for us to um to figure out the necessary steps to
[16:54] separate watersheds um to separate watersheds account accounts.
[17:01] » Do them all. No, we're not going to do them all. Not right yet.
[17:05] » Just one at a time. >> One at a time, please.
[17:07] » Now, what was the 20 year? >> The the 15-year re the 15-inch tile
[17:13] replacement can be advertised over 20 years because it's a repair of an
[17:18] existing repair. >> If it was a reconstruction, it would be
[17:21] advertised over five years. >> Yeah. Those years is what I I worry
[17:26] about. [clears throat] Reconstruction should be over 20 instead
[17:30] of five. But anyhow, any other comments? >> So, if it's just a repair, could we we
[17:37] couldn't just pay for it out of our maintenance account?
[17:40] » We could we could, but I think this is an
[17:44] opportunity to separate the wershed to the wersheds. So, that someone across
[17:48] the county is not paying for repair in Monroe Township.
[17:55] » And Mr. Mayor, >> yes, sir.
[17:57] » In past history, there is those split out somewhere along the line,
[18:03] isn't it? >> Yeah, I believe a McConnell was actually
[18:05] the last time they split out. Last time they reconstructed it. So, we just take
[18:10] the parcels, split them up the way that uh engineer says, and if there's a they
[18:16] have to pay an extra assessment, then we assess
[18:19] » that watershed. >> Yep.
[18:21] » Thank you. Any other questions, comments?
[18:25] » Are we expecting I mean, are we done with banning? Have they done all their
[18:29] work? I I think other than the um the roles with property ID and the acreage
[18:34] that the surveyors ask for um I don't believe there is anything else that is
[18:38] outstanding from banning. I believe they have completed everything that we've
[18:41] asked them to do
[18:46] a motion >> since it is tabled business. Um
[18:54] I think we should I motion to remove this from the table and close the issue.
[19:00] Second. I >> have a motion before us properly.
[19:02] Second. Roll call. >> Mr. Redhead.
[19:05] » Yes. Mr. Hamilton. >> Yes. Commissioner.
[19:07] » Yes. >> Mr. Christie.
[19:08] » Yes. Mr. >> Yes.
[19:11] » Bruce somebody Moravis jurisdiction open ditch, please.
[19:17] » Uh, yeah. He he approached about us taking this
[19:22] open ditch in as a regulated drain because the town of Selma doesn't have
[19:26] enough money to or funds. I don't know really what he said to maintain this
[19:32] ditch. Uh I I last month if you can remember right I didn't know what the
[19:37] proper procedure was because we haven't received a
[19:41] any any type of uh document that is asking us to take this in as a regulated
[19:47] drain. So, I asked uh Stribble to look into that and do would we did we figure
[19:53] anything out on that? >> So, we've been working on this and I
[19:56] have a couple of things I want to go over with you on um some mapping so that
[20:01] I can clarify >> which I which of the two things I need
[20:05] to do. Okay. >> Um because when I what I thought I was
[20:08] working on, Selma was questioning um some of the area to the north of it.
[20:13] Okay. So, I want to go over the exact details of the mapping and then I've
[20:16] already started working on letters for the town to reach out to the land
[20:20] owners. Um, so the town's working on their side of it as well, so we can kind
[20:24] of track this together and then they'll get a formal proposal that we're putting
[20:29] together to present to you guys. Um, we just didn't have time to get it all done
[20:35] within the last month. So, we are actively working on it and then Bruce
[20:39] will come up and present that to you guys as soon as we're we've got our
[20:43] heads around everything and got the consents from all the land owners
[20:46] because it seemed like that was something that this board would want to
[20:50] have in consideration when looking at the requests. So,
[20:57] so I believe we just leave that table.
[21:03] Moving on. Recctor drain reconstruction. >> If you guys remember last month, I
[21:09] presented a report on the recctor drain that we've had a couple people file
[21:13] petition to reconstruct. And uh my biggest issue was is 80% of
[21:20] it's through wetlands. So, I wanted to get with the DNR to make sure that the
[21:24] mitigation costs wouldn't put us over the threshold
[21:28] for uh you know, profitable reconstruction for the the farmers and
[21:32] the other land owners involved. DNR did get back to me. Uh they do not require
[21:38] per permits for working on tiles, and this is a the whole drain is a tile
[21:42] drain. There's no open ditch to it. Uh so they wouldn't require any
[21:47] mitigation or any any permits for us to go in there and reconstruct it. Uh they
[21:54] have a special process for surveyors to get permits to the DNR and that only
[21:59] applies to open drains. He tagged uh the the guy the gentleman from DNR
[22:06] uh CCD the IDM and asked them if they would have an issue with it. Please get
[22:12] back with me. they have not got back with me on it. So, uh, as of now, as far
[22:18] as the DNR is concerned, and I assume the IDM, they're not very good at
[22:21] getting back sometimes, uh, I don't see that they have a problem
[22:25] with us exploring reconstruction on this on the recctor drain tile.
[22:35] » Any questions? Do we have a properly signed petition for reconstruction on
[22:40] this? >> Yes.
[22:42] Um, I I did talk to Mr. Cox about this reconstruction. I believe he was on the
[22:47] petition and he may not have understood the uh what the reconstruction entails.
[22:53] » Okay. >> Um I I would like to go over this with
[22:55] Mr. Cox. He was waiting to hear back from the DNR. Um I I do not know that
[22:59] he's continues to support this reconstruction.
[23:02] » Okay. Well, uh just let us know and we'll go from there. I
[23:06] » I believe this should remain on the table for another month because I I
[23:09] believe if Mr. Cox removes himself from the petition. I don't know if we have
[23:12] the proper amount of land. I agree. So, >> okay. It'll stay t This is a time we
[23:20] have set [clears throat] forth for public comment. Anyone wishing to speak,
[23:25] please come forth. State your name, address, and your concerns.
[23:32] » Yeah. Skyler Southern, 613 Northwood. Uh you guys been working on a regulated
[23:37] drain out there and I've got part of that drain that runs right through my
[23:40] property. It is not shedding water enough and I've got three properties
[23:44] that are flooded. Um we're trying to renovate them. We renovated them, put
[23:48] about 50 grand in each one of them and uh this morning I've got about 6 in of
[23:53] water through all three of them. I'm just looking for direction on if I can
[23:58] handle this personally or did the county do it, the surveyor. I'm just not quite
[24:02] sure. >> Mr. surveyor.
[24:05] » Yeah. What we have it's what' you say 616
[24:08] » 613 >> 613
[24:10] » north north. >> We have a tile that runs north of all of
[24:14] the properties. The tiles in flowing condition. I walked out there. I believe
[24:22] I had a lady call about a month ago.
[24:38] And you can see these are all the properties talking about you're
[24:41] renovating. It look like it looked like most of them were all
[24:45] » and if you look just just north of where the last one
[24:49] is, we have a tile that runs through there. It's a small 8 in tile that
[24:55] drains that. But the the issue is is it doesn't drain any of this stuff.
[25:03] That water run straight down right down the road.
[25:09] Thank you. Thank you. Now, there is there is a
[25:15] say like a a bridge that crosses Northwood.
[25:21] » South of his location right here. >> So, what county road? Where where we at?
[25:26] » Oh, my fault. Let me let me zap out. You're just north of 32,
[25:30] » east of Selma. >> Yes.
[25:31] » East of the 700 East project you're working on. That's part of the same
[25:35] brown ditch. This is uh >> 32.
[25:38] » This is 32. This is Selma. And then this is Northwood right here. It's a It's a
[25:42] little T- road to the north.
[25:48] And as you can see right here, we have a tile that runs north of his north
[25:52] property. And that's that's flowing. Where I think
[25:57] the issue is, and I've talked to the county highway,
[26:00] is there's a bridge right here or a large culvert, excuse me, where it's 34
[26:06] of the way full. I think I've asked them to remove
[26:12] the the dirt underneath that. I don't know
[26:16] if they've done it yet. I don't think they have. Have you know stand? Okay.
[26:22] But I guess the the issue that I have is yes, we have a tile that runs north of
[26:27] all that, but I don't have, you know, the tiles flowing. I don't really have a
[26:32] a way to tie in tie them in.
[26:41] Yeah. Just to try to try to relieve some of the water that actually got to the
[26:46] tile. with it. The issue is a lot of it's
[26:50] a lot of it's coming down the road and and from the back side of the property,
[26:55] not really from our area.
[26:58] » I think I got about seven, eight acres right there that go behind those. I was
[27:02] going to parcel those off and try to sell them to a farmer farmer, but you
[27:05] know, at this point, I can dig a retention pond or something to to just
[27:10] shed that water away from that low spot. >> Now, if you dug a retention pond, I
[27:14] think the board would be okay with you tying the outfall of that retention pond
[27:20] into that tile, and that'd give you someplace to go, at least with the the
[27:24] outfall. But it's just a low it's a low area, and
[27:28] there's really no good good place to take the water. That's that's the issue.
[27:31] Yeah, it all pools right on a pump station. Um,
[27:36] » perceptic,
[27:39] » but they're I mean, all three properties are pretty much worthless. Can't do
[27:42] anything with them. Can't occupy them. Can't do anything until until I fix this
[27:47] problem.
[27:50] » Tom, what kind of shape's that 8 in in? Is it pretty good?
[27:53] » I like I said, we sunk another breather in there about three or four years ago.
[27:57] It was in the plastic and it was flowing fine. And I went out there a month like
[28:02] a month ago, but it was empty. So I, you know, I assume it's flowing. It wasn't
[28:07] backed up. Now I haven't really been to where daylights and maybe through this
[28:14] woods when it comes where it comes through this woods. Maybe that's
[28:17] something we can clear out of there on top of it and make sure that it's
[28:20] flowing at at its proper, you know, volume. But like I said, the
[28:27] the biggest issue is the I can bring on the it's kind of hard to
[28:32] see up here, but the biggest issue is this water pools the pools back here and
[28:38] there's really no way to get it to there that I can do. You know, I can make sure
[28:43] that that tiles in and you can point it out
[28:45] » and it's like an L shape right now. So all that water is sitting right here and
[28:50] right through here. But uh I mean I'm I'm going to go strip all this out. Try
[28:55] to any sort of water movement, but it all
[28:59] right right there.
[29:09] » Oh, Mr. Mayor, you will look at that 8 in on down the line.
[29:14] » Yeah, like I said, it was last time I was out there, it was flowing.
[29:17] I think there needs to be some work on his part on the on the private ground
[29:23] for a way to get water to it, whether it's a retention pond to hold that water
[29:27] for a while. I mean, obviously the last couple days it's extreme situation, but
[29:32] we still don't want water on the houses, >> right?
[29:34] » So, I I can meet you out there at some point or
[29:38] however you want to do it, but we need to get a way to get hold that water for
[29:42] a little bit. Like I said, a retention pond would be a ve a very nice addition
[29:46] to that, but I know they're also expensive and uh
[29:51] you know, I don't know if that 8 in will handle all that water at once. There's a
[29:56] lot of area that drains right right down there where he's talking about. And it's
[30:00] it's it's bad on both sides of the road out there. It's just not it's just not
[30:04] this uh west side. The east side gets a lot of water, too. Especially down here
[30:09] south [snorts] down in this area.
[30:14] It's a it's just a low area. >> Where's that 8 inch out outlet at?
[30:21] » Uh it ties into here and then it it ties into the brown ditch right here. 700. It
[30:27] ties into that tile that here's a here's that ditch that we took in and where we
[30:34] had the one reconstruction. All this ties into that. That's why when we had
[30:39] the engineers put together the list of
[30:44] affected properties, as you can see, all these properties, all these properties
[30:49] are involved in that reconstruction.
[31:02] All right. if you'll get with this gentleman and
[31:07] see if we can come to some conclusion, Mr. Syer.
[31:12] » Yes, absolutely. >> Hopefully, we can work something out.
[31:17] » Sounds good. I appreciate >> Thank you.
[31:19] » Yep. Thanks. >> Anyone else wishing to speak? Come
[31:23] forth.
[31:27] New business, Mr. Surveyor. >> Yes. Uh, let me put this in real quick.
[31:54] So, this is the new bond permit application that we will be seeing now
[32:00] on. Yeah, like I said, I've signed off on a couple that didn't have a regulated
[32:04] drain near it. Just kind of there's been two other ones that have came through
[32:08] since we've done it, and I've signed off on two of them. There wasn't a regulated
[32:13] drain near it. It wasn't really a drainage issue, and so I went ahead and
[32:17] signed off on that. Now, this one, uh,
[32:23] I've got the right here's a copy of what, uh, Mr. Snider
[32:33] gave me and I was out there. This is a very wet area. So, he's going to try to
[32:37] put that pond right in here. And so, he's seeking a reduction of ride of way
[32:41] to 20 ft next to this ditch. It's this isn't the ditch here. It's right in the
[32:47] middle if you can see it. So, the pond will go right around in here. [snorts]
[32:51] And he 20 feet where we can get down obviously both sides of that ditch. And
[32:56] then he would like to tie the outfall into the ditch. So he needs a reduction
[33:00] of rideway to 20 feet just in a couple sections right here. And then also an
[33:07] approval to tie into the Stewart ditch. If you look
[33:13] at his neighbors,
[33:17] there's a bunch of them that have ponds right just like that all along here. Uh,
[33:22] I don't really see an issue with it. Like I said, this is a very wet area.
[33:28] Even Beacon lays the lays it in like it's around that area.
[33:33] So, I don't I don't see an issue with it. I think it'll slow some of the water
[33:37] movement into the ditch, which is always nice. Uh, the only issue I'd have is
[33:42] reducing that down to 20 ft. the ditch bank would be our
[33:47] responsibility, but if something happens to the pond bank, if it collapses or if
[33:52] it fails at some point and we can't get equipment down there, which granted we
[33:58] can get on the other side, but I would like to have some kind of stipulation
[34:01] that we can go in there and fix it at the cost of the landowner. We've done
[34:06] that before in the past.
[34:11] » Any questions? How much how much distance is sufficient of right away to
[34:16] maintain that ditch on the same side? >> 20 feet is as low as I'll go. Usually
[34:20] it's 35 uh 20 ft in some kind of in a very uh
[34:27] urban setting where they've built the house basically on the ditch already and
[34:32] they're looking to remodel the house. We've went down to 20 ft. you know,
[34:36] that's typically big enough to get a excavator, a pickup truck, or any kind
[34:41] of equipment through there. But, as I said in the past, I've seen
[34:46] where they've built a pond next to a ditch like that. The ditch moves or the
[34:51] pond breaks down and sometimes that 20 ft becomes 10 ft real fast.
[35:02] Mr. Bosel, you're out there. any observation?
[35:07] » I think it'll be okay. Um, it's back where the old Cunningham Park was, isn't
[35:12] it? >> Or Cummins Park. And there was a pond
[35:16] back in there at one time. >> That entire
[35:18] » Sir, would you please, we need to get it recorded. Thank you.
[35:22] » It helps my secretary. >> I'm sorry. That entire valley you see
[35:27] there used to be a reservoir dam lake. It was 4 and a half to 5 acres. And the
[35:33] Cumins family when the old man was put in a nursing home got worried about
[35:38] liability, somebody going in there and drowning. So they had the dam removed.
[35:43] So our our choice was to not replace the dam, but rather just dig down from the
[35:50] existing level so that we don't change water level on anyone else's property.
[35:55] The cabin that you see in the picture is at an elevation of 935 ft above sea
[36:02] level and the valley floor where we want to put the pond is right at 900 above
[36:09] sea level. So there's a 35 ft drop. It's difficult to appreciate that in this
[36:14] picture, but the topographical me there you go. That's quite a steep hillside
[36:19] that goes down to that valley. The entire north shoreline of Steuart
[36:25] Ditch in the east will always be accessible to work from. And I'm not
[36:30] concerned about the county if they come in and dredge it and and tear up the
[36:35] dirt in my dam along the pond. I'm not concerned about that. I've got a
[36:39] backhoe. I'll fix it. I got 70 acres worth of dirt to fix it.
[36:45] » Thank you. >> Thank you, sir.
[36:48] » Thank you. Any other questions or concerns here?
[36:52] » So, Mr. Surveyor, what what is your recommendation for the ultra right
[36:56] ofway? Should it be 20 ft, 25 ft, 35 ft or unchanged?
[37:01] » Well, I I think where this where this pond's going to sit and
[37:06] looking at other ponds that have been constructed years ago, the same 20 ft. I
[37:10] I I think 20 ft would just be fine with me, you know. Uh, I think that'll give
[37:16] us proper to get in there, but we also can always get in there on the north
[37:20] side, too. So,
[37:24] » and what legal agreement will we put in place? Um, if we reduce this right away,
[37:29] » we'll have a I think Jennifer's got one to sign. It's a reduction of rideway and
[37:33] then he'll take that to the recorder's offices and get it signed. So if you try
[37:38] to build something or someone builds something on there that they know that
[37:42] the ride ofways reduced down from 75 ft to 20 ft. And then also
[37:48] because you're going to outfall into that you're going to outfall into the
[37:51] ditch. Correct. So then we just need a to put in the minutes a motion that he
[37:57] can tie into the Steuart ditch from the outfall to the newly built pond.
[38:02] » I had one more comment. >> Yes. where I concerned
[38:06] » that area is half private land and the other half is classified forest
[38:12] wildlands property. Nothing can be built there. So, it's going to remain a a
[38:19] natural wildlife area for all future generations for as long as I'm alive.
[38:26] Whoever buys the property after me has to continue that classified program or
[38:32] pay the back taxes to the tune of 14 to $20,000 just to get started.
[38:40] » Thank you. >> What's the pleasure?
[38:46] » I motion to reduce the right of way to 20 ft in this area
[38:51] as requested. >> I'll second it.
[38:55] Have a motion before us and properly second. Roll call, please.
[38:58] » Mr. >> Yes.
[39:00] » Yes. >> Mr. Rick,
[39:01] » yes. >> Mr. Christie,
[39:02] » yes. Mr. >> Yes.
[39:04] » Thank you, Mr. Snder. >> Thank you.
[39:08] » Are you also going to do a motion to tie into the ditch?
[39:13] » Yeah. I I motion to to approve the requested overflow into the regulated
[39:18] drain.
[39:21] » Second. >> I have a motion before properly second.
[39:24] Roll call. >> Mr. Whitehead?
[39:26] » Yes. >> Mr. Hamilton?
[39:27] » Yes. >> Mr. Reagan?
[39:28] » Yes. >> Mr. Christie?
[39:29] » Yes. >> Mr. B?
[39:30] » Yes. Old business. Mr. Ser. >> Yeah. Mr. Snder. We'll have a a paper in
[39:36] our office probably tomorrow at some point, but we'll have it in there. You
[39:40] just You'll need to take it down to the recorder's office and get that recorded.
[39:43] » Mr. Swear. >> Mr. Swear.
[39:46] » Yeah. >> Your able's assistant has I think.
[39:49] » I mean, at some point we'll have it, right?
[39:51] » I have it right here. Okay. >> They just have to sign it. Do we need to
[39:54] get a copy of it for our office or not? >> Um,
[39:57] » yeah. So, probably tomorrow at the earliest, but uh
[40:01] it's ready. >> Sure, 100%.
[40:05] » Yes, I do. [clears throat] >> Thank you. Thank you.
[40:09] » Yes, you can leave. [laughter] >> Old business.
[40:13] » Uh yeah, the first thing is is the the our journey's maintenance interest. Uh
[40:19] do you want to speak on this? I think we may have folks that will speak on us.
[40:24] » Okay. >> In the back.
[40:27] » In the back perhaps. >> Name. Tanya. Brad.
[40:32] » Sorry.
[40:36] » Hi. Tanya Dunmore, Chief Deputy Auditor. >> I'm Brad P, County Treasurer.
[40:43] Um, I talked to John on the phone and I just kind of went over with him on some
[40:48] details of what we did with DCCC and he understood all of it, but he said, you
[40:54] know, he's just one of the board members, so he just wanted it to be
[40:57] presented to the rest of the board members so that everybody understood. I
[41:01] don't know if he spoke to any of you about what we talked about on the phone.
[41:07] Um, but basically you guys just need to come up with the amount that you are
[41:13] willing to invest. Um, and then Brad, he takes care of the actual investment. He
[41:21] his office takes care of all the banking where we're the funds. So we would um we
[41:29] can show the amount that you choose to invest from your um such fund whatever
[41:36] fund number it is and we can show that on a separate line so that you can see
[41:41] oh yeah that's our invested amount. This is what we're still working with kind of
[41:45] thing as far as like cash flow. Um and then we would also create a revenue fund
[41:52] number in order for the interest to go into. However, his office, they do the
[42:00] interest. They would take care of receiving that interest. They would take
[42:03] care of quite in that interest on a monthly basis. Um and they track
[42:09] everything. They can supply you with statement of course in order to show um
[42:16] your earnings and such, but they would take care of everything on a monthly
[42:20] basis. As far as um lucrative, I guess you'd say, as far as getting your hands
[42:25] on the money um at all times, you can within a day because it's like a EFT
[42:34] transfer. But what I also explained that wouldn't be something that the treasur's
[42:39] office would want to have to do constantly for you. So, you would want
[42:44] to pick an investment amount that you can kind of invest and not really have
[42:50] to use um on a constant basis, I guess, just for convenience-wise for his office
[42:56] cuz that would be a lot on them to constantly have to move that back and
[43:00] forth between where he takes it from in order to where he puts it to. So the
[43:05] place that he was going to invest into is called Trust Indiana and that is a
[43:11] pool um within Indiana. It was created at the state level um by the treasur
[43:19] few years back quite a few years back. I forget what year it was and it's a pool
[43:24] investment of all the counties in Indiana. Whoever wants to invest into
[43:29] that they can and therefore it pays at a higher interest. Um and he has that
[43:35] interest rate as far as what it's paying right now. [clears throat]
[43:38] » So right now currently um we just got our statement. They're paying 3.6193%.
[43:45] Compare that to what some of our other accounts we have here locally. Um
[43:51] they're in the 1.75 to 2 and a half range. So it's quite a bit over. So more
[43:56] than a percent over what is the going rate I guess.
[44:00] because there's power with, you know, with there's the the investment power
[44:04] with a lot of money uh throughout the state so they can get better rates.
[44:11] » Thank you. Any questions? >> Mr. Surveyor, in this account, we have
[44:16] [snorts] two deposits a year for the collected ditch assessments.
[44:19] » Yeah, we have two draws a year on it. Correct.
[44:21] » And then we have 12 um withdrawals for the claims that we approve every month.
[44:25] Is that correct? >> Correct. Are there any other withdrawals
[44:28] that we would expect from this account? >> I don't I don't believe so. It's just
[44:34] the our maintenance. Yeah. So, it would just be 12 or 12 We take Yep. 12 a year.
[44:41] » Is that acceptable to the treasur's office if we have two deposits and 12
[44:46] withdrawals a year in this account? >> Um,
[44:51] yeah. Because I mean with the deposits I mean we could you know basically to get
[44:56] initially set up we'd won a number um I think when we met with the board of
[45:03] finance and they approved um this um I think there was about a million dollars
[45:10] total. Now, if you don't want to invest all that, I mean, with I don't invest
[45:15] all the county count's money in trust Indiana because they want to have the
[45:19] commissioner's council, they want to have access to it like very quickly. Um,
[45:24] which we can get it if it's on a a weekday, we can get it the next day. I
[45:30] mean, that's the thing. That's the nice thing with Trust Indiana. It it is very
[45:34] liquid, so we can get our hands on it. Um but yeah, it shouldn't be any problem
[45:39] of getting that the two deposits and then um just a monthly withdrawal
[45:46] on that. >> Did the did the board of finance give
[45:51] you an estimate of what they would suggest?
[45:54] » They did not. I don't think they they you know it would be up to whatever they
[45:58] whatever this board is comfortable with asking.
[46:03] Um, just to kind of give you an idea, if you look at say 500,000 at the current
[46:09] rate, it's about $18,000 a year. Um, if you invested a million dollars is you're
[46:16] doubling that 36 about 36,000 per year.
[46:21] » So, countywide, how do you break it up as far as what you invest and what you
[46:27] keep? So locally we have to keep at least 50%
[46:31] um in our in in local banks and so that's kind of where we're at. We have
[46:37] some in Trust Indiana. We have some in United Fidelity which is out of
[46:42] Evansville. They're paying four over 4%. So they're at like 4.34. So
[46:49] we've got a large sum in there. So we just kind of look at honestly what what
[46:55] we're getting the best rates on. with with keeping in within that 50%
[47:02] uh local 50% outside of outside of local you know what we look at
[47:10] in trust Indiana it's about right now I've got about 10% of
[47:15] the county's money in trust Indiana and it's probably look at with the rates
[47:21] look at maybe moving that to maybe 15% so I I mean it's all liquid. I mean
[47:28] that's that's the nice thing with trust Indiana is we get the next day.
[47:35] » Right now in the in the maintenance fund we have almost $1.2 million. But my
[47:42] suggestion would be to at least leave out let's say like $200,000
[47:47] and that way we always have enough in there to pay the next month's claims.
[47:51] things happen, computers go down, and I'd hate to hold up payment to
[47:54] contractors and distributors if we don't get the money transferred over in time
[47:59] or something happens. I mean, that's what my suggestion would be, at least to
[48:02] leave a month's worth of uh money in there to to pay out our uh account
[48:09] payables. >> And Danielle, we wouldn't have to have a
[48:13] board meeting to change it or how we
[48:20] what do you mean? Well, if he's just suggesting in case we would need more
[48:27] to use. >> The commissioners had to approve this
[48:31] entire process. >> Yeah, the commissioners have already
[48:35] approved the interest account. Do you are you asking like if you wanted to
[48:40] change the amount you invested as this board?
[48:43] » Right.
[48:47] » Yes. I Yeah. So my recommendation is make sure you leave out enough that you
[48:52] don't have right. >> If I may add to that as well um since I
[48:58] am in the auditor's office and we do deal with the claims and such and I know
[49:03] um what the his um deputy has to do in order to process those. I would have to
[49:10] agree with him that that is a wise idea because you have to put in for your PO
[49:16] process that has to be approved before that person can even do a claim. Well,
[49:21] they can't get their PO approved unless there's money there um for the auditors
[49:27] to say yes, that fund has availability. So, if we're waiting on uh the treasurer
[49:33] in order to get the money, in order to get a quota to stand in, I mean, it kind
[49:37] of jams you up in the pay process. I mean, you know, I I don't know how much
[49:43] he he can suggest the amount. I'm just saying the process of it. There is a
[49:48] kind of like a timely process of it to get it all [clears throat] finalized. So
[49:53] then the next time we got a draw, we would have to have maybe a little
[49:57] discussion as to how much of that draw went into which to which account,
[50:03] whether we wanted to invest it or not invest it.
[50:07] » Yeah. Would it automatically come into the 2700 account? And then once that's
[50:10] in there, I would let the board know because it's not always it's always not
[50:15] always the same date every year. Um, and then once once it's the fall taxes is
[50:19] the next one coming up. And when that gets in there, I say, "Hey, listen. We
[50:23] got and it's usually, you know, a fifth of what the spring
[50:27] taxes are for our board. It's not 50/50 like a lot of other ones." I would let
[50:32] you guys know, hey, this is what we got in there. It's $10,000. Do you want to
[50:36] leave that in the maintenance of fund to pay out or do you want to invest it and
[50:40] we can go from there? Uh, how would probably be the easiest way.
[50:46] » [snorts] >> The auditor's office by law have to have
[50:49] the settlement distri distributed to all the units by the 31st of June andor
[50:57] December. >> Right.
[51:01] » His most chunk of his money comes in the spring.
[51:04] » Yeah. Because like I said, it's a $10 for most people's $10 and they just pay
[51:08] that in the spring instead of splitting it up five and five.
[51:11] So Tom, if we put 700,000 in the Trust Indiana account and then the rest
[51:18] outside of it, >> I mean, that's what I would do. You
[51:20] know, I always feel better with money in the bank that we can pay something comes
[51:24] up, you know. >> Does that seem reasonable to you folks?
[51:29] » Um, I I would think so. I don't do your do your budget but [laughter]
[51:34] » well I mean it push >> but you got over a million dollars. So
[51:37] yeah I think that leaves what you say that leaves you $500,000 basically if
[51:41] you got 1.2. So I mean I I I don't know your um expenses I guess. Um, but
[51:48] » typically once or twice a year we'll have like this month we'll have one over
[51:52] 100,000 but for the most part they're usually 40 to 60,000 every month
[51:57] [snorts] >> with with our this month's claims being
[52:00] $100,000. Um, I'm inclined to to make a motion would be to put a million in
[52:06] Trust Indiana. That would leave us with $200,000 in our account. That would pay
[52:11] for this month's claims and give us cushion for the next month. and then
[52:15] every subsequent month as we approve claims pull those out of the trust
[52:20] Indiana account. Does that seem feasible?
[52:25] » Now on that I mean with I mean we're you know we we have a lot of different
[52:31] accounts that we really would rather not every month be pulling money out of
[52:36] there and having to maintain it. um you know quarterly maybe doing something
[52:40] like that because that otherwise it puts a lot of burden on my back office the
[52:45] bookkeepers uh in my office too you know because there's now another uh
[52:50] department that also we're we're having trust Indiana funds on and so with you
[52:57] know doing the regular job this is kind of in it in addition to and so um I
[53:04] would recommend maybe having enough for three months
[53:08] um and doing maybe a quarterly withdrawal on the, you know, on that if
[53:13] we if you needed to. Obviously, if you're looking at a million dollar,
[53:18] you're looking at probably about $3,000, you know, $3,500 a year a month in
[53:24] interest, that would be going back into that account. So, that kind of offsets
[53:28] the 40. But um yeah, I would say probably doing having enough in there
[53:33] for to cover at least three months and maybe even a fourth month just in case.
[53:39] Um so it's roughly what about a4 million. So um you know, wherever that
[53:46] leaves you with what your balance is, you know, 1.2 and if you had four months
[53:50] of it, um you know, you're looking probably 200,000. So yeah, I I would
[53:56] think with a million you should be okay. Maybe 900,000,
[54:01] but that's totally up to the board. >> I think typically that one
[54:04] » we'll invest whatever you guys tell us to.
[54:06] » That 1.2 is a little higher than normal investment. [laughter] I mean it seemed
[54:10] to me mean like a lot of months it's 800 to a million.
[54:13] » Correct. We last last year we saved saved about 300 400,000 back into the
[54:20] debt maintenance account. So we're a little bit higher than normal. But also
[54:24] right now we've basically used the majority of our spring money already. So
[54:30] I you know I'm not sure what we're going to get in the fall, but we're not going
[54:32] to have you know I we're going to be lower than
[54:36] what we started the year with obviously because we did a lot of we've done a lot
[54:40] of work and a lot of good things. But Mr. P suggested, I I'd rather have
[54:48] I'd rather have more money in our maintenance account to pay out than
[54:53] having to worry about it every month between
[54:57] » uh Jennifer, Tanya, and everybody, you know, and then when when she puts in the
[55:03] the claims, there's not enough money there. And then we have to wait a couple
[55:06] days. And it's we don't get our invoices usually until late Thursday, early
[55:11] Friday. We have to have all those entered then approved
[55:17] uh by Wednesday morning. That only leaves us a couple days to do all that
[55:21] paperwork. And it's uh I would like to have enough money in there that we don't
[55:25] have to worry about pulling it pulling money out of Trust Indiana to cover this
[55:31] month's uh payables uh in two days, three days basically
[55:37] Friday to Wednesday. So, you know, you guys do what you want, but I'd rather
[55:43] have extra money in there just to cover it in
[55:47] case we have a big month, something happens or,
[55:51] you know, Trust Indiana goes down or anything like that. There's nothing
[55:55] worse than being a contractor or someone expecting you only get paid once a month
[56:00] and then you're going to have to wait an extra month because of a clerical error
[56:04] on our fault or someone else's fault. What if we did 800,000 now and then
[56:10] watch and see where we're at? Then if we see we're carrying okay, we can always
[56:14] add to it, can't we? >> That that would give us $400,000,
[56:18] » correct? >> Of cash.
[56:20] » We could even do if we did 900, that gives us 300,000. I
[56:23] » I think 300,000 would be sufficient. I mean, this month is $100,000 worth of
[56:27] claims, which is the highest that we've ever had,
[56:29] » right? >> But Joe, we've been doing 800 to 1.2 two
[56:35] million just sitting there and >> most people didn't say word.
[56:39] » You were right. You were right. But yeah,
[56:42] so Wayne did >> 300,000 should get us through shipment.
[56:46] That gives a pretty good buffer. >> That would be three months worth at the
[56:49] at the at the minimum. >> Yeah.
[56:51] » Okay. I I make a motion to move $900,000 trust.
[56:57] » I'll second that. I have a motion before properly. Second.
[57:03] Roll call. >> Mr. W.
[57:06] » Yes. >> Yes.
[57:07] » Commissioner. >> Yes.
[57:09] » Mr. Christy. >> No.
[57:10] » Mr. >> Yes.
[57:13] » All right. Thank you. >> Approval of maintenance claims. Any
[57:18] questions, concerns here on maintenance?
[57:32] A motion to approve the maintenance claims.
[57:38] » I'll second it. Have a motion before. Proper second. Roll call.
[57:43] » Yes. >> Yes.
[57:44] » Mr. >> Yes.
[57:47] » Mr. B. >> Yes.
[57:50] Board comments.
[57:54] So, do we need to make a motion if we want to split that
[58:00] out for the m a McConnell or what do we need to do there? If we
[58:06] want to do that, >> I I think the surveyor was investigating
[58:09] what um what steps are required to split that out and I will talk to Banning
[58:14] about the few things that he asked for and we will we will leave this on the
[58:19] agenda for the next month. Okay. And as far as splitting them out now, it,
[58:25] you know, they won't know the difference until
[58:28] you send them out letters and say, "Hey, we're going to raise the maintenance fee
[58:32] for the a McConnell." So, right now, it's going to be the same as the rest of
[58:36] the county. We'll just know that instead of break broken down into the four ones,
[58:42] there's going to be a fifth one that we'll have broke down. So, as far as
[58:45] actual land owners out there right now, they won't see a difference in it. it
[58:49] would maybe show up on the bill as a McConnell instead of Northwest, you
[58:55] know, whatever they're in. But that uh until you guys make action
[59:01] raise the maintenance fee for that particular one, it'll be normal for all
[59:05] the land owners. So, >> and once we get that information
[59:08] together, we'll do that to update.
[59:14] » Any other comments from the board? Yeah, I got a couple three things. Um
[59:22] Tom, we had a contractor that uh was low bidder on a couple of projects and did
[59:29] that fellow kind of indicated that he was not going to do them. He told me
[59:36] that all his employees are hurt and all his equipment's broken and the earliest
[59:42] he could get to any of it was the end of this month. So, I sent an email out to
[59:48] the board members because one of the one of the projects he had,
[59:53] the one through country village, needs to be done. It needs to get done this
[59:56] time of year. Uh I like to do that between June and July 15th. So, that's
[1:00:01] that job is for the most part done right now. Everybody's happy out there. Uh
[1:00:07] there's another one that I took away from him because I, you know, there's no
[1:00:11] sense of waiting on him now. I'm going to add a section to it and we'll just re
[1:00:16] quote that out for next year. It's on the list. It's one over by Ball State.
[1:00:20] There's another section I want to add on it. So, yeah, he just basically said
[1:00:24] that his equipment was broke and so was his employees and he didn't know when he
[1:00:29] could get to it. >> So, so the country village job was
[1:00:33] reassigned to >> correct. And it's done.
[1:00:37] » And the other job will be within the next round of loops for debrushing.
[1:00:41] » Right. There was a third one on there too that I missed when I was
[1:00:45] » and that will be within the next round of votes for
[1:00:48] » There's Yeah, there's a second one that is on the other side of Country Village
[1:00:53] that I awarded to Mr. What's I'm sorry, what was his name? Jackson.
[1:00:58] » Brian Jackson. >> And he's going to start on that when the
[1:01:01] corn is off. He was a second bidder on that. So, as soon as corn comes off on
[1:01:06] over there by uh LJ Stone, he'll start on that ditch. the third one that's over
[1:01:10] by Ball State. We're going to rec quote that out on our
[1:01:15] next package of quotes. Uh the reason I did that, it's one that's be better to
[1:01:20] do uh in the winter. It's easier to see and it there's a lot
[1:01:25] of traffic down those roads. Uh a lot of people that like trees and it's easier
[1:01:30] to do that sometimes in the winter when it's not so obtrusive.
[1:01:36] So then to kind of continue on that, um, and I think we've touched on it in the
[1:01:42] past a little bit, these contractors that take these jobs on and then they
[1:01:48] either don't do them or they don't do them correctly,
[1:01:53] do we have recourse?
[1:01:58] » I mean, potentially. I guess each situation is going to depend on what the
[1:02:02] circumstances are. I mean, do we need for them going into this to sign or some
[1:02:09] way to make sure that they understand that if they take these jobs on, they
[1:02:14] have to do them and they have to do them correctly?
[1:02:20] » John, are you suggesting that we add something like a 10% penalty for a
[1:02:24] contractor who's not performing on a uh on an awarded job?
[1:02:29] » I I don't know. I just think we need to I mean we've had a couple of these where
[1:02:35] you know they they got off the hook scotfree.
[1:02:38] Uh I think you as a board have to decide how serious you want to be about
[1:02:47] pursuing those options, right? I mean it's is it is the juice worth the
[1:02:51] squeeze? So what are your damages? Is it worth pursuing? That's and that's why I
[1:02:57] say it's going to be each situation you're going to have to look at
[1:03:00] individually on what did the lack of performance or the quality of the work
[1:03:08] what damages did it cause the drainage board is that worth something pursuing
[1:03:12] from the scope of work that they were engaged to do. So,
[1:03:16] I guess that's about as lawyers and answers you're going to get is
[1:03:20] potentially. But >> I I would just think if they stopped
[1:03:23] getting the telephone calls, Tom, that that would be enough warning that their
[1:03:28] work wasn't >> It doesn't It doesn't always help. The
[1:03:33] one on the racer ditch I called what three or four times a week would not
[1:03:38] answer, you know. >> You're not using him anymore, though.
[1:03:42] » Well, he No, no, I'm not. So initially when after we award these
[1:03:49] jobs to the con to the low bidder is it basically just a handshake deal?
[1:03:55] » He signs the specs and on the specs and I can change the language and we can
[1:03:59] clean up the language but the specs that I have them sign in return with their
[1:04:03] quote says you know the drainage board is
[1:04:07] uh you're not doing a good job. I can't remember how I ever worded now that
[1:04:10] you're there allowed to pull this job from you at any time. Uh if you know I
[1:04:16] can't remember how I put it off the top of my head and I can
[1:04:19] » we can look at >> Yeah, we can get maybe clean that up a
[1:04:22] little bit. >> Could we put in there like at our
[1:04:24] discretion we possibly could pursue legal?
[1:04:28] » I mean it should it should say that anyway. But yeah, we we'll clean up the
[1:04:32] language. He can get those to me. We can take a look.
[1:04:34] » Okay. I mean that's just my thoughts. I don't know what anyone else
[1:04:37] » I mean I would suggest not >> but finding them because our our office
[1:04:44] doesn't take any money in and that would be kind of a I mean you can you could
[1:04:49] find them by what you pay out. you can take a percentage off what you pay them
[1:04:53] out. But as far as like ahead for every day that you don't finish this job, you
[1:04:58] pay us $250, which I've seen in other contracts. I think that'd be hard for
[1:05:03] our office to do because we have no we're not set up to take any type of
[1:05:07] payment right now or h or have never been set up to take any payment. I don't
[1:05:11] know why that is. We just are.
[1:05:17] One more thing, at the last storm water meeting, there was some discussion about
[1:05:24] a rate cost of service study or something. Uh, but in watching the
[1:05:31] meetings, there was discussion about drainage board could be affected in some
[1:05:35] way. Recall that.
[1:05:40] Could anyone elaborate on that? >> You want elaboration? Steven Brandell or
[1:05:45] county commissioner's office. You want uh elaboration on which part? That
[1:05:49] there's a cost of service study being performed or how it could potentially
[1:05:53] impact the drainage board? >> Yes,
[1:05:55] » both. So, there is a cost of service study going to be performed so that we
[1:05:59] understand the affordability index which is uh basically a requirement
[1:06:04] [clears throat] and then it could impact the drainage board as Mr. Borcher
[1:06:07] brought up during the storm water board meeting because sometimes they're
[1:06:10] overlapping um responsibilities. I guess maybe is maybe that's not the right word
[1:06:15] to say. Mr. Borcher, would you say that's the right word?
[1:06:18] » That's correct. >> So the cost of service study could
[1:06:21] impact uh where there's a uh responsibility by the drainage board uh
[1:06:26] and there's overlapping responsibilities between storm water and drainage. It's
[1:06:31] it's very rare when it is because if it's a regulated drain, it's our
[1:06:35] responsibility. But there's situations where it's either
[1:06:39] vague or not drawn. You know, 1890 didn't say what was what. So, there will
[1:06:45] be some overlapping responsibility and I don't know if the cost of study will
[1:06:49] point that out, but it may be. So, when we get the study back, I can report back
[1:06:53] to the drainage board on anything that I feel is uh pertinent to the drainage
[1:06:57] board. >> Yeah. I think to Mr. Borcher's point, I
[1:07:00] don't believe the cost of service study will uh provide clarity on
[1:07:04] responsibility between the drainage board and the storm water board. What
[1:07:07] the cost of service study does is it goes out and it looks at your current
[1:07:10] rate uh versus your um historical expense expenditures plus any projects
[1:07:16] that you have planned. So that's where the drainage board would also come into
[1:07:20] play. So we'll have to put out from the storm water board's perspective, these
[1:07:24] are the projects we have planned. Drainage board, these are the projects
[1:07:26] we have planned. And then it looks at the affordability index. What what can
[1:07:30] the taxpayers afford? And then we'll have a recommendation back from uh the
[1:07:34] municipal advisor. Let's make that up. Say it's Baker Tilly. Uh they'll come
[1:07:38] back and say based on your projects, based on your historical expenditures
[1:07:42] and based on the affordability uh in your community, this is our recommended
[1:07:47] rate uh that that they would recommend a rate and then the storm water board
[1:07:51] would have to adopt new rates. >> Is there a fee for the study?
[1:07:54] » Of course there is. That is our expectation that we will help pay that
[1:07:58] fee. >> That hasn't been discussed, but I
[1:08:00] appreciate you bringing that up. I'll put it in my notes. [laughter]
[1:08:04] » No problem. >> Thanks, Mr. Christie.
[1:08:09] » I think that's all. >> Any other comments?
[1:08:14] » May I know there was a public comment section
[1:08:17] already and I wasn't able to be here, but
[1:08:19] » it's been marked off. >> Yeah,
[1:08:20] » go right ahead. Commissioner. So, just for everybody's awareness, the county
[1:08:24] has been put in a yellow status due to the flash flooding that we've had this
[1:08:28] morning. We've had to close a couple of roads, specifically Albany Pike from
[1:08:32] Rainer to 700 East. Uh, Black Mill Road from 67 to Old Granville and 300 South
[1:08:38] Priest Ford around the river over by Yorktown. I think those are pretty
[1:08:41] typical. Also, uh I think that we should take a look uh at the drain on the east
[1:08:48] side of Cowan Road in front of Progress Rail. Uh prog the front yard in Progress
[1:08:53] Rail is completely flooded this morning. I understand it's a flash flood event,
[1:08:56] but that legal drain drains north to Buck Creek. And when you get to 23rd
[1:09:01] Street there where Midwest Metal is, there's an inlet down in the ditch and
[1:09:05] it's dry. There's no water running into that, but Progress Rail is completely
[1:09:09] flooded. Having said that, Progress Rail just did some work out there. Uh they
[1:09:14] put uh catch basins in their parking lot and they cut up our trail and they came
[1:09:19] and they drained into that open ditch and they dipped the ditch out. Whether
[1:09:24] they had permission to do any of that or not, I don't know. I'm just letting you
[1:09:27] guys know they did do some work and we have the new housing project that's just
[1:09:31] to the south of it where they just paved their parking lot. So you have all that
[1:09:36] sheet drain. So they have all that roof, they have all that parking surface. So
[1:09:39] all that impervious surface is now also hitting that drain. Uh I believe Mr.
[1:09:43] Bortra, isn't is that a legal drain? >> So here's the issue with that drain. And
[1:09:47] uh when they were
[1:09:51] building what whatever they're building out there now, I can't I think it's
[1:09:54] maybe apartments, I don't remember. >> So that legal drain kind of went into
[1:10:00] that area. And so I had a contractor because I couldn't find it by probing.
[1:10:04] So I had a contractor go out there and he was out there for a day digging every
[1:10:09] where we thought that that old tile was at. So what I think
[1:10:15] happened is when they went from one road cuz it ran right up the road to four
[1:10:19] lane and then my sanitary came in and ran a sanitary up there. I think at some
[1:10:24] point they vacated that drain because I could not find it anywhere and like I
[1:10:29] said he was out there for a day digging and probing and it it was not there
[1:10:33] anymore. So I I don't know if that's something we need to get my sanitary
[1:10:37] district because there's a sewer project that runs right there where that old
[1:10:42] tile was, but I think at some point when they went from one lane to four lane,
[1:10:47] that tile disappeared. >> Yeah, I I recall when that happened. And
[1:10:51] if if I recall properly, I think Gradea A Excavating was the contractor at that
[1:10:55] time that put that. And it's really deep.
[1:10:57] » Yeah. >> I mean, it's it's super deep. So, I
[1:11:01] don't remember if it was abandoned in service or not, but you bring up a very
[1:11:04] good point. So, I think that still needs anyway, Progress Trails flooded uh up to
[1:11:10] uh where they have that burn where they park their locomotives out front. I've
[1:11:13] never seen it flood like that. Now, it's a flash. Maybe it's down by now, but
[1:11:16] that was, you know, 6:00 this morning. Um earlier there was a question came up
[1:11:21] about who would make the decision on how you changed what you had invested uh in
[1:11:27] an account. uh the commissioners and the board of finance authorized this board
[1:11:31] to make those decisions. So if you guys want to change those allocations, my
[1:11:35] point is you don't have to come back to the commissioners or you don't have to
[1:11:38] come back to the finance the board of finance. I believe that's your purview.
[1:11:43] » Thank you. Thank you. >> Comments from the attorney.
[1:11:51] » Thank you. Uh Mr. Borcher, you want to make any
[1:11:55] comment on debrushing. Oh,
[1:12:00] » I just these are the next round of debrushing I gave you guys. It's just
[1:12:04] kind of a simple uh you know, just kind of shows you where we're at. There's
[1:12:09] some areas I'm going to add uh on onto this, but I I haven't been able to walk
[1:12:15] them all. We've had rain. We've had some other things getting on.
[1:12:19] » This is your fall work. >> Yeah. What I'd like to do is quote this
[1:12:22] out in October on our October meeting. Um,
[1:12:27] if there's something that the board would like to add or take away,
[1:12:31] hit me up in an email, call me, and I can work on that. I'm I'm not
[1:12:36] 100% on all these, but I I think this is the next round. We've got two or three
[1:12:40] of them on here that we did last year, and we only have a couple more sections
[1:12:44] to do, and they'll be completely cleared and free of debris, and we can uh
[1:12:49] maintain them with a spray program. That's where I'm at on that. Also, I
[1:12:55] forgot our next meeting. We're gonna either
[1:12:59] have to postpone or move the date to I had to wrote down. I lost it.
[1:13:04] » September. >> It's a Tuesday in the afternoon.
[1:13:09] » Afternoon.
[1:13:12] » That's the only date we're open because of budget hearings. This this room will
[1:13:17] be filled with >> county council.
[1:13:20] » Yes. >> And Monday's a holiday.
[1:13:23] So Tuesday they they have the commissioner's meeting and those
[1:13:26] meetings on Tuesday morning. So we could either have it Tuesday afternoon or we
[1:13:31] could postpone it and just go to October. Those are basically our two
[1:13:34] options with the streaming that we have to stream on
[1:13:38] online. This the Indiana code. I leave that up to the board. I don't know if
[1:13:43] that's something we have to decide right now later.
[1:13:46] » So September 9th is the Wednesday, >> right? It would be that it would be that
[1:13:51] Tuesday before that. >> It'll be the only time this room will be
[1:13:55] open because counsel will start that next Wednesday.
[1:14:03] » We don't know when they're going to resched.
[1:14:08] » Oh, >> so we would we have a lot of claims
[1:14:10] coming in in September that would need to be
[1:14:15] would it push till October? Well, what I think what I've done in the past is
[1:14:19] since the claims out, uh, you know, I don't know if this was the only COVID
[1:14:23] rules, but when we couldn't meet for a reason, I they made an ordinance and I
[1:14:28] can send the claims off to you guys. You guys can look them over and we can still
[1:14:31] approve claims with the the majority of the board over an email or a phone call,
[1:14:38] I believe, is what the ordinance said. And I don't know if that's still in
[1:14:41] effect, but that's how we did it during CO. I don't know if we've missed a
[1:14:44] meeting since that. Do you have a copy of that ordinance I could look at?
[1:14:47] » I do not off the top of my head. >> I could go back and look, but I I
[1:14:52] believe that we could they let us approve the claims with three of the
[1:14:56] board members. So, I would get the claims to three of the board members or
[1:15:01] more, you know, all of them. >> If you have an ordinance in effect for
[1:15:04] that and it doesn't specify it was just during a co time, then that's totally
[1:15:08] acceptable. If you know your claims are consistently
[1:15:13] the same type of thing and you want to give him even if you make a motion now
[1:15:17] to say he has authority to pay those claims next month and then you um come
[1:15:21] back in in October and ratify that decision. Um he could send out
[1:15:26] everything that was being paid and everyone can send kind of a verbal email
[1:15:30] saying you know thank you looks good and you can ratify those decisions in
[1:15:34] October if you wanted to also. Is everyone available? September 8th at
[1:15:39] 9:00 a.m.
[1:15:42] » after. >> It's got to be that. It's not the 9th.
[1:15:47] It's the what you what date? >> It's the 8th.
[1:15:49] » 8th. That's the Tuesday after Labor Day. >> Yes.
[1:15:53] » Okay. >> Is everyone available? September 8th at
[1:15:57] 2 p.m.
[1:16:05] » Okay, that's fine. Do we need a motion to reschedu?
[1:16:09] I make a motion to reschedule the September drainage board meeting to
[1:16:12] September 8th at 2 p.m. in this room. >> Jennifer, will you make sure to let
[1:16:16] » Yes. >> Second
[1:16:19] » motion to force properly second. Roll call.
[1:16:22] » Mr. Whitehead. >> Yes.
[1:16:23] » Mr. Hamilton. >> Yes.
[1:16:24] » Mr. Yes. >> Mr. Yes.
[1:16:26] » Mr. B. >> Yes.
[1:16:29] » Um, Mr. Do we have to publish that that we moved it?
[1:16:32] » Yes. Yeah. >> into the paper or just around the
[1:16:34] building to >> So you both and you don't have to
[1:16:38] publish it. You just have to send it the notice. You know what I mean? You just
[1:16:43] have to email the notice. It doesn't have to be republished.
[1:16:46] » Email to who? >> The paper the email for the the one you
[1:16:50] send the actual notice is to that email. You just email them, right?
[1:16:54] » Yes. >> Yeah. So you just have to there's a
[1:16:56] difference in publishing and sending the notice. Okay.
[1:16:59] » It sounds the same to me. They put it in the paper.
[1:17:01] you publish your yearly list for the beginning of the year. So then you only
[1:17:05] have to send notice of a change of meeting.
[1:17:08] » Okay. >> I wonder if he
[1:17:13] » Okay. [clears throat]
[1:17:17] » Any other further business? If not, motion to adjurnn, please. So moved.
[1:17:24] » All in favor say I. >> I
[1:17:27] thank you all.