[7:02]
I want to welcome each and every one of
you to the August 12th during Board
[7:05]
meeting. If you would please stand and
we'll pledge to the flag
[7:11]
to the flag United States of America to
the republic for it stands. One nation
[7:18]
under God, indivisible, with liberty and
justice for all.
[7:24]
» Thank you. Roll call, please.
>> Mr. Whitehead,
[7:27]
» here.
>> Mr. Hamilton,
[7:28]
» present.
>> Commissioner,
[7:30]
» present.
>> Mr. Christie,
[7:31]
» present.
>> Mr. Bustel,
[7:32]
» here.
>> Mr.
[7:33]
» Here.
>> Mr. Brooks.
[7:35]
» Orchers.
>> Oh, here.
[7:39]
» Approval of the July 8th minutes. Any
additions or corrections?
[7:45]
Motion to approve the minutes.
>> Second.
[7:47]
» Have a motion before us properly.
Second. Roll call, please.
[7:51]
» Mr. Whitehead.
>> Yes.
[7:52]
» Mr. Hamilton.
>> Yes.
[7:53]
» Mr. Rood.
>> Yes.
[7:54]
» Mr. Christie.
>> Yes.
[7:55]
» Mr. B.
>> Yes. Table of business. Pavement
[7:59]
McConnell. Reconstruction.
>> Yeah. I think where we left it last
[8:04]
month was Mr. Hamilton was going to to
talk to the prominent land owners and
[8:08]
see where they're wanting to go with the
three options that we came up. the
[8:14]
engineer came up with.
>> I did talk to two of the land owners on
[8:17]
the original petition. Dr. Hazlet is
here. Dr. Hazlet, is there anything that
[8:20]
you would like to say?
>> If you would please.
[8:26]
» No problem at all.
[8:30]
» Good morning. Gary Hazellet, 221 West
County Road, 400 South. Uh, yes, I'm not
[8:36]
in favor of this particular drain
project. I do have several reasons for
[8:41]
that.
uh one is that we have had this project
[8:46]
reconstructed in some manner several
what 15 years ago or thereabouts. It was
[8:50]
unsuccessful. We spent a fair amount of
money and I'm not convinced that that
[8:54]
will happen again properly. two is that
uh our end and major owners including u
[9:04]
Cirrus and Lon Wright who I thought
might be here this morning uh really
[9:10]
don't have a problem in terms of any
drainage in that area. The tenant for my
[9:16]
ground also brings up a point that when
we disturb the ground like we will would
[9:20]
need to do for this that puts the ground
in a much less productive state for a
[9:25]
number of years and that's not very
valuable in my mind if we do something
[9:30]
like that and of course thirdly of all
as a major land owner I'm going to have
[9:34]
to take a chunk of money on this and I
don't really want to do that either. So
[9:38]
I it appears to me that most of the
drainage issues appear to be south and
[9:44]
east of Waynewood, which is where some
of the major concerns seem to be. There
[9:49]
are a few people involved with that area
back in there. So I think
[9:54]
this is a a
[9:58]
project that not as beneficial down the
line as it would be for a group of
[10:04]
people near the eastern end of that
drain. Now, granted, after five and a
[10:08]
half inches of rain at my house this
morning, it does look a little
[10:11]
different, but uh it won't for very long
because it'll pass on down the to the
[10:16]
creek until the creek gets too full. So,
I I myself am not in favor of this of
[10:22]
any of those repairs. Uh it's too
expensive for the money and the benefit
[10:26]
and
uh just seems to be weighted toward one
[10:31]
end. So, I I uh guess that's all I can
say. Any questions for me? item.
[10:37]
» Any questions?
>> Thank you.
[10:40]
» Thank you, [clears throat] doctor. All
right.
[10:41]
» Appreciate you.
>> I spoke to Mr. Wright and his comments
[10:44]
were similar. Um, it I I estimated that
it would cost $122 per acre per year for
[10:49]
5 years to install alternative 1, which
is the upsizing of the 24-in tile from
[10:54]
Kalen Road to Noame Creek from 24 in to
30 and 36 in. Um I believe that this
[11:01]
would be beneficial or even required if
there is um pattern tiling done on any
[11:06]
of those fields from Kowan Road to No
Name Creek, but um until that is done um
[11:12]
the the benefit may not um may not be
outweighed by the cost. Um,
[11:19]
so my recommendation for this is to um
put the design for the 36 and 30inch
[11:26]
upsizing
um to put that on the shelf and save
[11:31]
that for a time when that there is
additional drainage planned for this
[11:34]
watershed.
The surface water solution that um
[11:39]
Banning proposed could be implemented at
a time that there is development in this
[11:43]
watershed but is probably not um not
worth the cost at this time to the
[11:49]
agricultural land owners. And then the
repair of the previous um regulated
[11:55]
drains from 1890 and 1973. That solution
that Banning proposed um could be
[12:01]
implemented at any time to reduce some
of the reoccurring claims in this
[12:06]
wershed to repairs to those still
functioning but um old regulated drains
[12:12]
are in poor condition.
[12:16]
Any other comments from the board?
>> I just let to let you guys know I went
[12:20]
back [clears throat]
and read everything from the 1973 or 78
[12:25]
I don't remember 76. There's two or
three of them where they tried it
[12:28]
earlier in the 70s and then again in the
later 70s which follows similar to the
[12:36]
uh it actually goes different than the
1890 because it kind of went right
[12:39]
through the middle but they did not
vacate any of that drain when they redid
[12:45]
it in 2009 and and rerouted it a little
different way. So we still do have a
[12:50]
ride of way along where the 197070s
reconstruction went. So, we do have the
[12:57]
option to go in there and uh repair that
if needed or bust up some of the
[13:04]
the old clay that we keep on repairing
that doesn't need to be there. You know,
[13:07]
it'd be something that we'd have to dig
this after the crops are off and kind of
[13:11]
assess where it's at. So, we do have the
ride ofway there to do necessary
[13:16]
changes. I was just hoping that they
didn't vacate it when they redid it in
[13:20]
2009 and they did. So,
>> would you look more into that proposed
[13:26]
um 15-inch repair solution that Banning
um designed? Yeah.
[13:31]
» And once once the crops are off of Mr.
Wright's field, um could you report back
[13:35]
to the board on on an implementation
plan for that solution?
[13:39]
» Yeah, we can I can do that. Um, and
another issue that we have when they
[13:44]
when they lay the tile next to the old
tile, which is something you guys know I
[13:48]
don't like. There's a lot of times we'll
lay the new tile with a a field plow and
[13:53]
it'll be a foot, sometimes two foot
taller than the old clay tile, and
[13:57]
sometimes it's hard to get that to line
up and drain right on
[14:04]
on a deal. So once we get out there,
punch some holes, kind of figure out how
[14:08]
we want to lay that out within our ride
of way, it'll be a pretty cost effective
[14:13]
uh addition or to the already 2009 uh
reconstruction. So I can get that
[14:21]
together once crops are off. You live
out there, some other people, if you see
[14:25]
the crops are off, give me a call and we
can get a contractor out there to punch
[14:29]
some holes and kind of lay out what
we've got and what's good and what's
[14:32]
not.
The other two issues that we had with
[14:35]
this previous reconstruction was
recording the actual path of the 2009
[14:39]
installation. Um could you make sure
that that was properly recorded in 2009
[14:46]
and if not take the steps to record the
location of the current installation?
[14:50]
» Absolutely. If it's if it's not and this
is the same thing I was going to bring
[14:54]
up with the
uh the ditch that we took in on 700
[14:59]
East. I was I'm going to contact a land
surveyor to go ahead and record the the
[15:04]
legal description of that so I can get
it in into the cards, get it on the
[15:08]
rules, and make sure all our rideways
are good for that. So now that we'll
[15:13]
have two, it'll be easier for them to
do.
[15:16]
» And the last issue was the um separating
the watershed accounts of the A
[15:21]
McConnell wershed from the rest of the
county. Um I believe that banning will
[15:26]
provide a um a GPS coordinates of the
outline of this watershed. Um Mr.
[15:32]
Surveyor, what what steps would be
required to separate this watershed
[15:36]
account from the rest of the county?
[15:41]
if if he gives the roles with each uh
property on there and their uh property
[15:49]
ID and what acreages are on there, then
we can separate that out.
[15:55]
Uh as of right now, it would be the same
uh ditch assessment unless that changes,
[16:03]
but we could separate it out. Yes. If he
gives if he gives me the all the partial
[16:08]
numbers and acreage
uh we can separate all that out if we
[16:14]
separate it out before anyways. But if
we're not going to do a reconstruction
[16:17]
then why is that?
>> What Banning had suggested was to
[16:22]
separate this out so in the event of a
future implementation of alternative one
[16:26]
or two the surface water or the 30 and
36 in we would be ready to um to
[16:31]
separate those from the rest of the
county. The other issue is is this
[16:35]
15-inch repair work that Banning had
proposed. I believe it is alternative
[16:38]
three. Um that would be advertised over
20 years and um that would be assessed
[16:44]
to only this watershed. Although the
cost is small um I believe that this
[16:49]
would be an opportunity for us to um to
figure out the necessary steps to
[16:54]
separate watersheds um to separate
watersheds account accounts.
[17:01]
» Do them all. No, we're not going to do
them all. Not right yet.
[17:05]
» Just one at a time.
>> One at a time, please.
[17:07]
» Now, what was the 20 year?
>> The the 15-year re the 15-inch tile
[17:13]
replacement can be advertised over 20
years because it's a repair of an
[17:18]
existing repair.
>> If it was a reconstruction, it would be
[17:21]
advertised over five years.
>> Yeah. Those years is what I I worry
[17:26]
about. [clears throat]
Reconstruction should be over 20 instead
[17:30]
of five. But anyhow, any other comments?
>> So, if it's just a repair, could we we
[17:37]
couldn't just pay for it out of our
maintenance account?
[17:40]
» We could
we could, but I think this is an
[17:44]
opportunity to separate the wershed to
the wersheds. So, that someone across
[17:48]
the county is not paying for repair in
Monroe Township.
[17:55]
» And Mr. Mayor,
>> yes, sir.
[17:57]
» In past history, there is those
split out somewhere along the line,
[18:03]
isn't it?
>> Yeah, I believe a McConnell was actually
[18:05]
the last time they split out. Last time
they reconstructed it. So, we just take
[18:10]
the parcels, split them up the way that
uh engineer says, and if there's a they
[18:16]
have to pay an extra assessment, then we
assess
[18:19]
» that watershed.
>> Yep.
[18:21]
» Thank you. Any other questions,
comments?
[18:25]
» Are we expecting I mean, are we done
with banning? Have they done all their
[18:29]
work? I I think other than the um the
roles with property ID and the acreage
[18:34]
that the surveyors ask for um I don't
believe there is anything else that is
[18:38]
outstanding from banning. I believe they
have completed everything that we've
[18:41]
asked them to do
[18:46]
a motion
>> since it is tabled business. Um
[18:54]
I think we should I motion to remove
this from the table and close the issue.
[19:00]
Second. I
>> have a motion before us properly.
[19:02]
Second. Roll call.
>> Mr. Redhead.
[19:05]
» Yes. Mr. Hamilton.
>> Yes. Commissioner.
[19:07]
» Yes.
>> Mr. Christie.
[19:08]
» Yes. Mr.
>> Yes.
[19:11]
» Bruce somebody Moravis jurisdiction open
ditch, please.
[19:17]
» Uh, yeah.
He he approached about us taking this
[19:22]
open ditch in as a regulated drain
because the town of Selma doesn't have
[19:26]
enough money to or funds. I don't know
really what he said to maintain this
[19:32]
ditch. Uh I I last month if you can
remember right I didn't know what the
[19:37]
proper procedure was because we haven't
received a
[19:41]
any any type of uh document that is
asking us to take this in as a regulated
[19:47]
drain. So, I asked uh Stribble to look
into that and do would we did we figure
[19:53]
anything out on that?
>> So, we've been working on this and I
[19:56]
have a couple of things I want to go
over with you on um some mapping so that
[20:01]
I can clarify
>> which I which of the two things I need
[20:05]
to do. Okay.
>> Um because when I what I thought I was
[20:08]
working on, Selma was questioning um
some of the area to the north of it.
[20:13]
Okay. So, I want to go over the exact
details of the mapping and then I've
[20:16]
already started working on letters for
the town to reach out to the land
[20:20]
owners. Um, so the town's working on
their side of it as well, so we can kind
[20:24]
of track this together and then they'll
get a formal proposal that we're putting
[20:29]
together to present to you guys. Um, we
just didn't have time to get it all done
[20:35]
within the last month. So, we are
actively working on it and then Bruce
[20:39]
will come up and present that to you
guys as soon as we're we've got our
[20:43]
heads around everything and got the
consents from all the land owners
[20:46]
because it seemed like that was
something that this board would want to
[20:50]
have in consideration when looking at
the requests. So,
[20:57]
so I believe we just leave that table.
[21:03]
Moving on. Recctor drain reconstruction.
>> If you guys remember last month, I
[21:09]
presented a report on the recctor drain
that we've had a couple people file
[21:13]
petition to reconstruct.
And uh my biggest issue was is 80% of
[21:20]
it's through wetlands. So, I wanted to
get with the DNR to make sure that the
[21:24]
mitigation costs wouldn't put us over
the threshold
[21:28]
for uh you know, profitable
reconstruction for the the farmers and
[21:32]
the other land owners involved. DNR did
get back to me. Uh they do not require
[21:38]
per permits for working on tiles, and
this is a the whole drain is a tile
[21:42]
drain. There's no open ditch to it.
Uh so they wouldn't require any
[21:47]
mitigation or any any permits for us to
go in there and reconstruct it. Uh they
[21:54]
have a special process for surveyors to
get permits to the DNR and that only
[21:59]
applies to open drains. He tagged uh the
the guy the gentleman from DNR
[22:06]
uh CCD the IDM and asked them if they
would have an issue with it. Please get
[22:12]
back with me. they have not got back
with me on it. So, uh, as of now, as far
[22:18]
as the DNR is concerned, and I assume
the IDM, they're not very good at
[22:21]
getting back sometimes,
uh, I don't see that they have a problem
[22:25]
with us exploring reconstruction on this
on the recctor drain tile.
[22:35]
» Any questions? Do we have a properly
signed petition for reconstruction on
[22:40]
this?
>> Yes.
[22:42]
Um, I I did talk to Mr. Cox about this
reconstruction. I believe he was on the
[22:47]
petition and he may not have understood
the uh what the reconstruction entails.
[22:53]
» Okay.
>> Um I I would like to go over this with
[22:55]
Mr. Cox. He was waiting to hear back
from the DNR. Um I I do not know that
[22:59]
he's continues to support this
reconstruction.
[23:02]
» Okay. Well, uh just let us know and
we'll go from there. I
[23:06]
» I believe this should remain on the
table for another month because I I
[23:09]
believe if Mr. Cox removes himself from
the petition. I don't know if we have
[23:12]
the proper amount of land. I agree. So,
>> okay. It'll stay t This is a time we
[23:20]
have set [clears throat] forth for
public comment. Anyone wishing to speak,
[23:25]
please come forth. State your name,
address, and your concerns.
[23:32]
» Yeah. Skyler Southern, 613 Northwood. Uh
you guys been working on a regulated
[23:37]
drain out there and I've got part of
that drain that runs right through my
[23:40]
property. It is not shedding water
enough and I've got three properties
[23:44]
that are flooded. Um we're trying to
renovate them. We renovated them, put
[23:48]
about 50 grand in each one of them and
uh this morning I've got about 6 in of
[23:53]
water through all three of them. I'm
just looking for direction on if I can
[23:58]
handle this personally or did the county
do it, the surveyor. I'm just not quite
[24:02]
sure.
>> Mr. surveyor.
[24:05]
» Yeah. What we have it's what' you say
616
[24:08]
» 613
>> 613
[24:10]
» north north.
>> We have a tile that runs north of all of
[24:14]
the properties. The tiles in flowing
condition. I walked out there. I believe
[24:22]
I had a lady call about a month ago.
[24:38]
And you can see these are all the
properties talking about you're
[24:41]
renovating. It look like it looked like
most of them were all
[24:45]
» and if you look
just just north of where the last one
[24:49]
is, we have a tile that runs through
there. It's a small 8 in tile that
[24:55]
drains that. But the the issue is is it
doesn't drain any of this stuff.
[25:03]
That water run straight down right down
the road.
[25:09]
Thank you. Thank you. Now, there is
there is a
[25:15]
say like a a bridge that crosses
Northwood.
[25:21]
» South of his location right here.
>> So, what county road? Where where we at?
[25:26]
» Oh, my fault. Let me let me zap out.
You're just north of 32,
[25:30]
» east of Selma.
>> Yes.
[25:31]
» East of the 700 East project you're
working on. That's part of the same
[25:35]
brown ditch. This is uh
>> 32.
[25:38]
» This is 32. This is Selma. And then this
is Northwood right here. It's a It's a
[25:42]
little T- road to the north.
[25:48]
And as you can see right here, we have a
tile that runs north of his north
[25:52]
property.
And that's that's flowing. Where I think
[25:57]
the issue is, and I've talked to the
county highway,
[26:00]
is there's a bridge right here or a
large culvert, excuse me, where it's 34
[26:06]
of the way full. I think I've asked them
to remove
[26:12]
the
the dirt underneath that. I don't know
[26:16]
if they've done it yet. I don't think
they have. Have you know stand? Okay.
[26:22]
But I guess the the issue that I have is
yes, we have a tile that runs north of
[26:27]
all that, but I don't have, you know,
the tiles flowing. I don't really have a
[26:32]
a way to tie in tie them in.
[26:41]
Yeah. Just to try to try to relieve some
of the water that actually got to the
[26:46]
tile. with it. The issue is a lot of
it's
[26:50]
a lot of it's coming down the road and
and from the back side of the property,
[26:55]
not really
from our area.
[26:58]
» I think I got about seven, eight acres
right there that go behind those. I was
[27:02]
going to parcel those off and try to
sell them to a farmer farmer, but you
[27:05]
know, at this point, I can dig a
retention pond or something to to just
[27:10]
shed that water away from that low spot.
>> Now, if you dug a retention pond, I
[27:14]
think the board would be okay with you
tying the outfall of that retention pond
[27:20]
into that tile, and that'd give you
someplace to go, at least with the the
[27:24]
outfall.
But it's just a low it's a low area, and
[27:28]
there's really no good good place to
take the water. That's that's the issue.
[27:31]
Yeah, it all pools right on a pump
station. Um,
[27:36]
» perceptic,
[27:39]
» but they're I mean, all three properties
are pretty much worthless. Can't do
[27:42]
anything with them. Can't occupy them.
Can't do anything until until I fix this
[27:47]
problem.
[27:50]
» Tom, what kind of shape's that 8 in in?
Is it pretty good?
[27:53]
» I like I said, we sunk another breather
in there about three or four years ago.
[27:57]
It was in the plastic and it was flowing
fine. And I went out there a month like
[28:02]
a month ago, but it was empty. So I, you
know, I assume it's flowing. It wasn't
[28:07]
backed up. Now I haven't really been to
where daylights and maybe through this
[28:14]
woods when it comes where it comes
through this woods. Maybe that's
[28:17]
something we can clear out of there on
top of it and make sure that it's
[28:20]
flowing at at its proper,
you know, volume. But like I said, the
[28:27]
the biggest issue is the
I can bring on the it's kind of hard to
[28:32]
see up here, but the biggest issue is
this water pools the pools back here and
[28:38]
there's really no way to get it to there
that I can do. You know, I can make sure
[28:43]
that that tiles in and you can point it
out
[28:45]
» and it's like an L shape right now. So
all that water is sitting right here and
[28:50]
right through here. But uh I mean I'm
I'm going to go strip all this out. Try
[28:55]
to
any sort of water movement, but it all
[28:59]
right right there.
[29:09]
» Oh, Mr. Mayor, you will look at that 8
in on down the line.
[29:14]
» Yeah, like I said, it was last time I
was out there, it was flowing.
[29:17]
I think there needs to be some work on
his part on the on the private ground
[29:23]
for a way to get water to it, whether
it's a retention pond to hold that water
[29:27]
for a while. I mean, obviously the last
couple days it's extreme situation, but
[29:32]
we still don't want water on the houses,
>> right?
[29:34]
» So, I I can meet you out there at some
point or
[29:38]
however you want to do it, but we need
to get a way to get hold that water for
[29:42]
a little bit. Like I said, a retention
pond would be a ve a very nice addition
[29:46]
to that, but I know they're also
expensive and uh
[29:51]
you know, I don't know if that 8 in will
handle all that water at once. There's a
[29:56]
lot of area that drains right right down
there where he's talking about. And it's
[30:00]
it's it's bad on both sides of the road
out there. It's just not it's just not
[30:04]
this uh west side. The east side gets a
lot of water, too. Especially down here
[30:09]
south [snorts]
down in this area.
[30:14]
It's a it's just a low area.
>> Where's that 8 inch out outlet at?
[30:21]
» Uh it ties into here and then it it ties
into the brown ditch right here. 700. It
[30:27]
ties into that tile that here's a here's
that ditch that we took in and where we
[30:34]
had the one reconstruction. All this
ties into that. That's why when we had
[30:39]
the
engineers put together the list of
[30:44]
affected properties, as you can see, all
these properties, all these properties
[30:49]
are involved in that reconstruction.
[31:02]
All right.
if you'll get with this gentleman and
[31:07]
see if we can come to some conclusion,
Mr. Syer.
[31:12]
» Yes, absolutely.
>> Hopefully, we can work something out.
[31:17]
» Sounds good. I appreciate
>> Thank you.
[31:19]
» Yep. Thanks.
>> Anyone else wishing to speak? Come
[31:23]
forth.
[31:27]
New business, Mr. Surveyor.
>> Yes. Uh, let me put this in real quick.
[31:54]
So, this is the new bond permit
application that we will be seeing now
[32:00]
on. Yeah, like I said, I've signed off
on a couple that didn't have a regulated
[32:04]
drain near it. Just kind of there's been
two other ones that have came through
[32:08]
since we've done it, and I've signed off
on two of them. There wasn't a regulated
[32:13]
drain near it. It wasn't really a
drainage issue, and so I went ahead and
[32:17]
signed off on that. Now, this one, uh,
[32:23]
I've got the right here's a copy of
what, uh, Mr. Snider
[32:33]
gave me and I was out there. This is a
very wet area. So, he's going to try to
[32:37]
put that pond right in here. And so,
he's seeking a reduction of ride of way
[32:41]
to 20 ft next to this ditch. It's this
isn't the ditch here. It's right in the
[32:47]
middle if you can see it. So, the pond
will go right around in here. [snorts]
[32:51]
And he 20 feet where we can get down
obviously both sides of that ditch. And
[32:56]
then he would like to tie the outfall
into the ditch. So he needs a reduction
[33:00]
of rideway to 20 feet just in a couple
sections right here. And then also an
[33:07]
approval to tie into the Stewart ditch.
If you look
[33:13]
at his neighbors,
[33:17]
there's a bunch of them that have ponds
right just like that all along here. Uh,
[33:22]
I don't really see an issue with it.
Like I said, this is a very wet area.
[33:28]
Even Beacon lays the
lays it in like it's around that area.
[33:33]
So, I don't I don't see an issue with
it. I think it'll slow some of the water
[33:37]
movement into the ditch, which is always
nice. Uh, the only issue I'd have is
[33:42]
reducing that down to 20 ft.
the ditch bank would be our
[33:47]
responsibility, but if something happens
to the pond bank, if it collapses or if
[33:52]
it fails at some point and we can't get
equipment down there, which granted we
[33:58]
can get on the other side, but I would
like to have some kind of stipulation
[34:01]
that we can go in there and fix it at
the cost of the landowner. We've done
[34:06]
that before in the past.
[34:11]
» Any questions? How much how much
distance is sufficient of right away to
[34:16]
maintain that ditch on the same side?
>> 20 feet is as low as I'll go. Usually
[34:20]
it's 35
uh 20 ft in some kind of in a very uh
[34:27]
urban setting where they've built the
house basically on the ditch already and
[34:32]
they're looking to remodel the house.
We've went down to 20 ft. you know,
[34:36]
that's typically big enough to get a
excavator, a pickup truck, or any kind
[34:41]
of equipment through there.
But, as I said in the past, I've seen
[34:46]
where they've built a pond next to a
ditch like that. The ditch moves or the
[34:51]
pond breaks down and sometimes that 20
ft becomes 10 ft real fast.
[35:02]
Mr. Bosel, you're out there. any
observation?
[35:07]
» I think it'll be okay. Um, it's back
where the old Cunningham Park was, isn't
[35:12]
it?
>> Or Cummins Park. And there was a pond
[35:16]
back in there at one time.
>> That entire
[35:18]
» Sir, would you please, we need to get it
recorded. Thank you.
[35:22]
» It helps my secretary.
>> I'm sorry. That entire valley you see
[35:27]
there used to be a reservoir dam lake.
It was 4 and a half to 5 acres. And the
[35:33]
Cumins family when the old man was put
in a nursing home got worried about
[35:38]
liability, somebody going in there and
drowning. So they had the dam removed.
[35:43]
So our our choice was to not replace the
dam, but rather just dig down from the
[35:50]
existing level so that we don't change
water level on anyone else's property.
[35:55]
The cabin that you see in the picture is
at an elevation of 935 ft above sea
[36:02]
level and the valley floor where we want
to put the pond is right at 900 above
[36:09]
sea level. So there's a 35 ft drop. It's
difficult to appreciate that in this
[36:14]
picture, but the topographical me there
you go. That's quite a steep hillside
[36:19]
that goes down to that valley.
The entire north shoreline of Steuart
[36:25]
Ditch in the east will always be
accessible to work from. And I'm not
[36:30]
concerned about the county if they come
in and dredge it and and tear up the
[36:35]
dirt in my dam along the pond. I'm not
concerned about that. I've got a
[36:39]
backhoe. I'll fix it. I got 70 acres
worth of dirt to fix it.
[36:45]
» Thank you.
>> Thank you, sir.
[36:48]
» Thank you. Any other
questions or concerns here?
[36:52]
» So, Mr. Surveyor, what what is your
recommendation for the ultra right
[36:56]
ofway? Should it be 20 ft, 25 ft, 35 ft
or unchanged?
[37:01]
» Well, I I think where this
where this pond's going to sit and
[37:06]
looking at other ponds that have been
constructed years ago, the same 20 ft. I
[37:10]
I I think 20 ft would just be fine with
me, you know. Uh, I think that'll give
[37:16]
us proper to get in there, but we also
can always get in there on the north
[37:20]
side, too. So,
[37:24]
» and what legal agreement will we put in
place? Um, if we reduce this right away,
[37:29]
» we'll have a I think Jennifer's got one
to sign. It's a reduction of rideway and
[37:33]
then he'll take that to the recorder's
offices and get it signed. So if you try
[37:38]
to build something or someone builds
something on there that they know that
[37:42]
the ride ofways reduced down from 75 ft
to 20 ft. And then also
[37:48]
because you're going to outfall into
that you're going to outfall into the
[37:51]
ditch. Correct. So then we just need a
to put in the minutes a motion that he
[37:57]
can tie into the Steuart ditch from the
outfall to the newly built pond.
[38:02]
» I had one more comment.
>> Yes. where I concerned
[38:06]
» that area is half private land and the
other half is classified forest
[38:12]
wildlands property. Nothing can be built
there. So, it's going to remain a a
[38:19]
natural wildlife area for all future
generations for as long as I'm alive.
[38:26]
Whoever buys the property after me has
to continue that classified program or
[38:32]
pay the back taxes to the tune of 14 to
$20,000 just to get started.
[38:40]
» Thank you.
>> What's the pleasure?
[38:46]
» I motion to reduce the right of way to
20 ft in this area
[38:51]
as requested.
>> I'll second it.
[38:55]
Have a motion before us and properly
second. Roll call, please.
[38:58]
» Mr.
>> Yes.
[39:00]
» Yes.
>> Mr. Rick,
[39:01]
» yes.
>> Mr. Christie,
[39:02]
» yes. Mr.
>> Yes.
[39:04]
» Thank you, Mr. Snder.
>> Thank you.
[39:08]
» Are you also going to do a motion to tie
into the ditch?
[39:13]
» Yeah. I I motion to to approve the
requested overflow into the regulated
[39:18]
drain.
[39:21]
» Second.
>> I have a motion before properly second.
[39:24]
Roll call.
>> Mr. Whitehead?
[39:26]
» Yes.
>> Mr. Hamilton?
[39:27]
» Yes.
>> Mr. Reagan?
[39:28]
» Yes.
>> Mr. Christie?
[39:29]
» Yes.
>> Mr. B?
[39:30]
» Yes. Old business. Mr. Ser.
>> Yeah. Mr. Snder. We'll have a a paper in
[39:36]
our office probably tomorrow at some
point, but we'll have it in there. You
[39:40]
just You'll need to take it down to the
recorder's office and get that recorded.
[39:43]
» Mr. Swear.
>> Mr. Swear.
[39:46]
» Yeah.
>> Your able's assistant has I think.
[39:49]
» I mean, at some point we'll have it,
right?
[39:51]
» I have it right here. Okay.
>> They just have to sign it. Do we need to
[39:54]
get a copy of it for our office or not?
>> Um,
[39:57]
» yeah. So, probably tomorrow at the
earliest, but uh
[40:01]
it's ready.
>> Sure, 100%.
[40:05]
» Yes, I do. [clears throat]
>> Thank you. Thank you.
[40:09]
» Yes, you can leave. [laughter]
>> Old business.
[40:13]
» Uh yeah, the first thing is is the the
our journey's maintenance interest. Uh
[40:19]
do you want to speak on this? I think we
may have folks that will speak on us.
[40:24]
» Okay.
>> In the back.
[40:27]
» In the back perhaps.
>> Name. Tanya. Brad.
[40:32]
» Sorry.
[40:36]
» Hi. Tanya Dunmore, Chief Deputy Auditor.
>> I'm Brad P, County Treasurer.
[40:43]
Um, I talked to John on the phone and I
just kind of went over with him on some
[40:48]
details of what we did with DCCC and he
understood all of it, but he said, you
[40:54]
know, he's just one of the board
members, so he just wanted it to be
[40:57]
presented to the rest of the board
members so that everybody understood. I
[41:01]
don't know if he spoke to any of you
about what we talked about on the phone.
[41:07]
Um, but basically you guys just need to
come up with the amount that you are
[41:13]
willing to invest. Um, and then Brad, he
takes care of the actual investment. He
[41:21]
his office takes care of all the banking
where we're the funds. So we would um we
[41:29]
can show the amount that you choose to
invest from your um such fund whatever
[41:36]
fund number it is and we can show that
on a separate line so that you can see
[41:41]
oh yeah that's our invested amount. This
is what we're still working with kind of
[41:45]
thing as far as like cash flow. Um and
then we would also create a revenue fund
[41:52]
number in order for the interest to go
into. However, his office, they do the
[42:00]
interest. They would take care of
receiving that interest. They would take
[42:03]
care of quite in that interest on a
monthly basis. Um and they track
[42:09]
everything. They can supply you with
statement of course in order to show um
[42:16]
your earnings and such, but they would
take care of everything on a monthly
[42:20]
basis. As far as um lucrative, I guess
you'd say, as far as getting your hands
[42:25]
on the money um at all times, you can
within a day because it's like a EFT
[42:34]
transfer. But what I also explained that
wouldn't be something that the treasur's
[42:39]
office would want to have to do
constantly for you. So, you would want
[42:44]
to pick an investment amount that you
can kind of invest and not really have
[42:50]
to use um on a constant basis, I guess,
just for convenience-wise for his office
[42:56]
cuz that would be a lot on them to
constantly have to move that back and
[43:00]
forth between where he takes it from in
order to where he puts it to. So the
[43:05]
place that he was going to invest into
is called Trust Indiana and that is a
[43:11]
pool um within Indiana. It was created
at the state level um by the treasur
[43:19]
few years back quite a few years back. I
forget what year it was and it's a pool
[43:24]
investment of all the counties in
Indiana. Whoever wants to invest into
[43:29]
that they can and therefore it pays at a
higher interest. Um and he has that
[43:35]
interest rate as far as what it's paying
right now. [clears throat]
[43:38]
» So right now currently um we just got
our statement. They're paying 3.6193%.
[43:45]
Compare that to what some of our other
accounts we have here locally. Um
[43:51]
they're in the 1.75 to 2 and a half
range. So it's quite a bit over. So more
[43:56]
than a percent over what is the going
rate I guess.
[44:00]
because there's power with, you know,
with there's the the investment power
[44:04]
with a lot of money uh throughout the
state so they can get better rates.
[44:11]
» Thank you. Any questions?
>> Mr. Surveyor, in this account, we have
[44:16]
[snorts] two deposits a year for the
collected ditch assessments.
[44:19]
» Yeah, we have two draws a year on it.
Correct.
[44:21]
» And then we have 12 um withdrawals for
the claims that we approve every month.
[44:25]
Is that correct?
>> Correct. Are there any other withdrawals
[44:28]
that we would expect from this account?
>> I don't I don't believe so. It's just
[44:34]
the our maintenance. Yeah. So, it would
just be 12 or 12 We take Yep. 12 a year.
[44:41]
» Is that acceptable to the treasur's
office if we have two deposits and 12
[44:46]
withdrawals a year in this account?
>> Um,
[44:51]
yeah. Because I mean with the deposits I
mean we could you know basically to get
[44:56]
initially set up we'd won a number um I
think when we met with the board of
[45:03]
finance and they approved um this um I
think there was about a million dollars
[45:10]
total. Now, if you don't want to invest
all that, I mean, with I don't invest
[45:15]
all the county count's money in trust
Indiana because they want to have the
[45:19]
commissioner's council, they want to
have access to it like very quickly. Um,
[45:24]
which we can get it if it's on a a
weekday, we can get it the next day. I
[45:30]
mean, that's the thing. That's the nice
thing with Trust Indiana. It it is very
[45:34]
liquid, so we can get our hands on it.
Um but yeah, it shouldn't be any problem
[45:39]
of getting that the two deposits and
then um just a monthly withdrawal
[45:46]
on that.
>> Did the did the board of finance give
[45:51]
you an estimate of what they would
suggest?
[45:54]
» They did not. I don't think they they
you know it would be up to whatever they
[45:58]
whatever this board is comfortable with
asking.
[46:03]
Um, just to kind of give you an idea, if
you look at say 500,000 at the current
[46:09]
rate, it's about $18,000 a year. Um, if
you invested a million dollars is you're
[46:16]
doubling that 36 about 36,000
per year.
[46:21]
» So, countywide, how do you break it up
as far as what you invest and what you
[46:27]
keep?
So locally we have to keep at least 50%
[46:31]
um in our in in local banks and so
that's kind of where we're at. We have
[46:37]
some in Trust Indiana. We have some in
United Fidelity which is out of
[46:42]
Evansville. They're paying four over 4%.
So they're at like 4.34. So
[46:49]
we've got a large sum in there. So we
just kind of look at honestly what what
[46:55]
we're getting the best rates on.
with with keeping in within that 50%
[47:02]
uh local 50% outside of outside of local
you know what we look at
[47:10]
in trust Indiana it's about right now
I've got about 10% of
[47:15]
the county's money in trust Indiana and
it's probably look at with the rates
[47:21]
look at maybe moving that to maybe 15%
so I I mean it's all liquid. I mean
[47:28]
that's that's the nice thing with trust
Indiana is we get the next day.
[47:35]
» Right now in the in the maintenance fund
we have almost $1.2 million. But my
[47:42]
suggestion would be to at least leave
out let's say like $200,000
[47:47]
and that way we always have enough in
there to pay the next month's claims.
[47:51]
things happen, computers go down, and
I'd hate to hold up payment to
[47:54]
contractors and distributors if we don't
get the money transferred over in time
[47:59]
or something happens. I mean, that's
what my suggestion would be, at least to
[48:02]
leave a month's worth of uh money in
there to to pay out our uh account
[48:09]
payables.
>> And Danielle, we wouldn't have to have a
[48:13]
board meeting to
change it or how we
[48:20]
what do you mean? Well, if he's just
suggesting in case we would need more
[48:27]
to use.
>> The commissioners had to approve this
[48:31]
entire process.
>> Yeah, the commissioners have already
[48:35]
approved the interest account. Do you
are you asking like if you wanted to
[48:40]
change the amount you invested as this
board?
[48:43]
» Right.
[48:47]
» Yes. I Yeah. So my recommendation is
make sure you leave out enough that you
[48:52]
don't have right.
>> If I may add to that as well um since I
[48:58]
am in the auditor's office and we do
deal with the claims and such and I know
[49:03]
um what the his um deputy has to do in
order to process those. I would have to
[49:10]
agree with him that that is a wise idea
because you have to put in for your PO
[49:16]
process that has to be approved before
that person can even do a claim. Well,
[49:21]
they can't get their PO approved unless
there's money there um for the auditors
[49:27]
to say yes, that fund has availability.
So, if we're waiting on uh the treasurer
[49:33]
in order to get the money, in order to
get a quota to stand in, I mean, it kind
[49:37]
of jams you up in the pay process. I
mean, you know, I I don't know how much
[49:43]
he he can suggest the amount. I'm just
saying the process of it. There is a
[49:48]
kind of like a timely process of it to
get it all [clears throat] finalized. So
[49:53]
then the next time we got a draw, we
would have to have maybe a little
[49:57]
discussion as to how much of that draw
went into which to which account,
[50:03]
whether we wanted to invest it or not
invest it.
[50:07]
» Yeah. Would it automatically come into
the 2700 account? And then once that's
[50:10]
in there, I would let the board know
because it's not always it's always not
[50:15]
always the same date every year. Um, and
then once once it's the fall taxes is
[50:19]
the next one coming up. And when that
gets in there, I say, "Hey, listen. We
[50:23]
got and it's usually,
you know, a fifth of what the spring
[50:27]
taxes are for our board. It's not 50/50
like a lot of other ones." I would let
[50:32]
you guys know, hey, this is what we got
in there. It's $10,000. Do you want to
[50:36]
leave that in the maintenance of fund to
pay out or do you want to invest it and
[50:40]
we can go from there? Uh, how would
probably be the easiest way.
[50:46]
» [snorts]
>> The auditor's office by law have to have
[50:49]
the settlement distri distributed to all
the units by the 31st of June andor
[50:57]
December.
>> Right.
[51:01]
» His most chunk of his money comes in the
spring.
[51:04]
» Yeah. Because like I said, it's a $10
for most people's $10 and they just pay
[51:08]
that in the spring instead of splitting
it up five and five.
[51:11]
So Tom, if we put 700,000 in the Trust
Indiana account and then the rest
[51:18]
outside of it,
>> I mean, that's what I would do. You
[51:20]
know, I always feel better with money in
the bank that we can pay something comes
[51:24]
up, you know.
>> Does that seem reasonable to you folks?
[51:29]
» Um, I I would think so. I don't do your
do your budget but [laughter]
[51:34]
» well I mean it push
>> but you got over a million dollars. So
[51:37]
yeah I think that leaves what you say
that leaves you $500,000 basically if
[51:41]
you got 1.2. So I mean I I I don't know
your um expenses I guess. Um, but
[51:48]
» typically once or twice a year we'll
have like this month we'll have one over
[51:52]
100,000 but for the most part they're
usually 40 to 60,000 every month
[51:57]
[snorts]
>> with with our this month's claims being
[52:00]
$100,000. Um, I'm inclined to to make a
motion would be to put a million in
[52:06]
Trust Indiana. That would leave us with
$200,000 in our account. That would pay
[52:11]
for this month's claims and give us
cushion for the next month. and then
[52:15]
every subsequent month as we approve
claims pull those out of the trust
[52:20]
Indiana account. Does that seem
feasible?
[52:25]
» Now on that I mean with I mean we're you
know we we have a lot of different
[52:31]
accounts that we really would rather not
every month be pulling money out of
[52:36]
there and having to maintain it. um you
know quarterly maybe doing something
[52:40]
like that because that otherwise it puts
a lot of burden on my back office the
[52:45]
bookkeepers uh in my office too you know
because there's now another uh
[52:50]
department that also we're we're having
trust Indiana funds on and so with you
[52:57]
know doing the regular job this is kind
of in it in addition to and so um I
[53:04]
would recommend maybe having enough for
three months
[53:08]
um and doing maybe a quarterly
withdrawal on the, you know, on that if
[53:13]
we if you needed to. Obviously, if
you're looking at a million dollar,
[53:18]
you're looking at probably about $3,000,
you know, $3,500 a year a month in
[53:24]
interest, that would be going back into
that account. So, that kind of offsets
[53:28]
the 40. But um yeah, I would say
probably doing having enough in there
[53:33]
for to cover at least three months and
maybe even a fourth month just in case.
[53:39]
Um so it's roughly what about a4
million. So um you know, wherever that
[53:46]
leaves you with what your balance is,
you know, 1.2 and if you had four months
[53:50]
of it, um you know, you're looking
probably 200,000. So yeah, I I would
[53:56]
think with a million you should be okay.
Maybe 900,000,
[54:01]
but that's totally up to the board.
>> I think typically that one
[54:04]
» we'll invest whatever you guys tell us
to.
[54:06]
» That 1.2 is a little higher than normal
investment. [laughter] I mean it seemed
[54:10]
to me mean like a lot of months it's 800
to a million.
[54:13]
» Correct. We last last year we saved
saved about 300 400,000 back into the
[54:20]
debt maintenance account. So we're a
little bit higher than normal. But also
[54:24]
right now we've basically used the
majority of our spring money already. So
[54:30]
I you know I'm not sure what we're going
to get in the fall, but we're not going
[54:32]
to have
you know I we're going to be lower than
[54:36]
what we started the year with obviously
because we did a lot of we've done a lot
[54:40]
of work and a lot of good things. But
Mr. P suggested, I I'd rather have
[54:48]
I'd rather have more money in our
maintenance account to pay out than
[54:53]
having to worry about it every month
between
[54:57]
» uh Jennifer, Tanya, and everybody, you
know, and then when when she puts in the
[55:03]
the claims, there's not enough money
there. And then we have to wait a couple
[55:06]
days. And it's we don't get our invoices
usually until late Thursday, early
[55:11]
Friday. We have to have all those
entered then approved
[55:17]
uh by Wednesday morning. That only
leaves us a couple days to do all that
[55:21]
paperwork. And it's uh I would like to
have enough money in there that we don't
[55:25]
have to worry about pulling it pulling
money out of Trust Indiana to cover this
[55:31]
month's uh payables
uh in two days, three days basically
[55:37]
Friday to Wednesday. So, you know, you
guys do what you want, but I'd rather
[55:43]
have
extra money in there just to cover it in
[55:47]
case we have a big month, something
happens or,
[55:51]
you know, Trust Indiana goes down or
anything like that. There's nothing
[55:55]
worse than being a contractor or someone
expecting you only get paid once a month
[56:00]
and then you're going to have to wait an
extra month because of a clerical error
[56:04]
on our fault or someone else's fault.
What if we did 800,000 now and then
[56:10]
watch and see where we're at? Then if we
see we're carrying okay, we can always
[56:14]
add to it, can't we?
>> That that would give us $400,000,
[56:18]
» correct?
>> Of cash.
[56:20]
» We could even do if we did 900, that
gives us 300,000. I
[56:23]
» I think 300,000 would be sufficient. I
mean, this month is $100,000 worth of
[56:27]
claims, which is the highest that we've
ever had,
[56:29]
» right?
>> But Joe, we've been doing 800 to 1.2 two
[56:35]
million just sitting there and
>> most people didn't say word.
[56:39]
» You were right. You were right. But
yeah,
[56:42]
so Wayne did
>> 300,000 should get us through shipment.
[56:46]
That gives a pretty good buffer.
>> That would be three months worth at the
[56:49]
at the at the minimum.
>> Yeah.
[56:51]
» Okay. I I make a motion to move $900,000
trust.
[56:57]
» I'll second that.
I have a motion before properly. Second.
[57:03]
Roll call.
>> Mr. W.
[57:06]
» Yes.
>> Yes.
[57:07]
» Commissioner.
>> Yes.
[57:09]
» Mr. Christy.
>> No.
[57:10]
» Mr.
>> Yes.
[57:13]
» All right. Thank you.
>> Approval of maintenance claims. Any
[57:18]
questions, concerns here on maintenance?
[57:32]
A motion to approve the maintenance
claims.
[57:38]
» I'll second it. Have a motion before.
Proper second. Roll call.
[57:43]
» Yes.
>> Yes.
[57:44]
» Mr.
>> Yes.
[57:47]
» Mr. B.
>> Yes.
[57:50]
Board comments.
[57:54]
So, do we need to make a motion if we
want to split that
[58:00]
out for the m a McConnell
or what do we need to do there? If we
[58:06]
want to do that,
>> I I think the surveyor was investigating
[58:09]
what um what steps are required to split
that out and I will talk to Banning
[58:14]
about the few things that he asked for
and we will we will leave this on the
[58:19]
agenda for the next month. Okay. And as
far as splitting them out now, it,
[58:25]
you know, they won't know the difference
until
[58:28]
you send them out letters and say, "Hey,
we're going to raise the maintenance fee
[58:32]
for the a McConnell." So, right now,
it's going to be the same as the rest of
[58:36]
the county. We'll just know that instead
of break broken down into the four ones,
[58:42]
there's going to be a fifth one that
we'll have broke down. So, as far as
[58:45]
actual land owners out there right now,
they won't see a difference in it. it
[58:49]
would maybe show up on the bill as a
McConnell instead of Northwest, you
[58:55]
know, whatever they're in. But that uh
until you guys make action
[59:01]
raise the maintenance fee for that
particular one, it'll be normal for all
[59:05]
the land owners. So,
>> and once we get that information
[59:08]
together, we'll do that to update.
[59:14]
» Any other comments from the board? Yeah,
I got a couple three things. Um
[59:22]
Tom, we had a contractor that uh was low
bidder on a couple of projects and did
[59:29]
that fellow kind of indicated that he
was not going to do them. He told me
[59:36]
that all his employees are hurt and all
his equipment's broken and the earliest
[59:42]
he could get to any of it was the end of
this month. So, I sent an email out to
[59:48]
the board members because
one of the one of the projects he had,
[59:53]
the one through country village, needs
to be done. It needs to get done this
[59:56]
time of year. Uh I like to do that
between June and July 15th. So, that's
[1:00:01]
that job is for the most part done right
now. Everybody's happy out there. Uh
[1:00:07]
there's another one that I took away
from him because I, you know, there's no
[1:00:11]
sense of waiting on him now. I'm going
to add a section to it and we'll just re
[1:00:16]
quote that out for next year. It's on
the list. It's one over by Ball State.
[1:00:20]
There's another section I want to add on
it. So, yeah, he just basically said
[1:00:24]
that his equipment was broke and so was
his employees and he didn't know when he
[1:00:29]
could get to it.
>> So, so the country village job was
[1:00:33]
reassigned to
>> correct. And it's done.
[1:00:37]
» And the other job will be within the
next round of loops for debrushing.
[1:00:41]
» Right. There was a third one on there
too that I missed when I was
[1:00:45]
» and that will be within the next round
of votes for
[1:00:48]
» There's Yeah, there's a second one that
is on the other side of Country Village
[1:00:53]
that I awarded to Mr. What's I'm sorry,
what was his name? Jackson.
[1:00:58]
» Brian Jackson.
>> And he's going to start on that when the
[1:01:01]
corn is off. He was a second bidder on
that. So, as soon as corn comes off on
[1:01:06]
over there by uh LJ Stone, he'll start
on that ditch. the third one that's over
[1:01:10]
by Ball State.
We're going to rec quote that out on our
[1:01:15]
next package of quotes. Uh the reason I
did that, it's one that's be better to
[1:01:20]
do uh in the winter.
It's easier to see and it there's a lot
[1:01:25]
of traffic down those roads. Uh a lot of
people that like trees and it's easier
[1:01:30]
to do that sometimes in the winter when
it's not so obtrusive.
[1:01:36]
So then to kind of continue on that, um,
and I think we've touched on it in the
[1:01:42]
past a little bit, these contractors
that take these jobs on and then they
[1:01:48]
either don't do them or they don't do
them correctly,
[1:01:53]
do we have recourse?
[1:01:58]
» I mean, potentially. I guess each
situation is going to depend on what the
[1:02:02]
circumstances are. I mean, do we need
for them going into this to sign or some
[1:02:09]
way to make sure that they understand
that if they take these jobs on, they
[1:02:14]
have to do them and they have to do them
correctly?
[1:02:20]
» John, are you suggesting that we add
something like a 10% penalty for a
[1:02:24]
contractor who's not performing on a uh
on an awarded job?
[1:02:29]
» I I don't know. I just think we need to
I mean we've had a couple of these where
[1:02:35]
you know they they got off the hook
scotfree.
[1:02:38]
Uh I think you as a board have to decide
how serious you want to be about
[1:02:47]
pursuing those options, right? I mean
it's is it is the juice worth the
[1:02:51]
squeeze? So what are your damages? Is it
worth pursuing? That's and that's why I
[1:02:57]
say it's going to be each situation
you're going to have to look at
[1:03:00]
individually on what did the lack of
performance or the quality of the work
[1:03:08]
what damages did it cause the drainage
board is that worth something pursuing
[1:03:12]
from the scope of work that they were
engaged to do. So,
[1:03:16]
I guess that's about as lawyers and
answers you're going to get is
[1:03:20]
potentially. But
>> I I would just think if they stopped
[1:03:23]
getting the telephone calls, Tom, that
that would be enough warning that their
[1:03:28]
work wasn't
>> It doesn't It doesn't always help. The
[1:03:33]
one on the racer ditch I called what
three or four times a week would not
[1:03:38]
answer, you know.
>> You're not using him anymore, though.
[1:03:42]
» Well, he No, no, I'm not.
So initially when after we award these
[1:03:49]
jobs to the con to the low bidder is it
basically just a handshake deal?
[1:03:55]
» He signs the specs and on the specs and
I can change the language and we can
[1:03:59]
clean up the language but the specs that
I have them sign in return with their
[1:04:03]
quote says you know the drainage board
is
[1:04:07]
uh you're not doing a good job. I can't
remember how I ever worded now that
[1:04:10]
you're there allowed to pull this job
from you at any time. Uh if you know I
[1:04:16]
can't remember how I put it off the top
of my head and I can
[1:04:19]
» we can look at
>> Yeah, we can get maybe clean that up a
[1:04:22]
little bit.
>> Could we put in there like at our
[1:04:24]
discretion we possibly could pursue
legal?
[1:04:28]
» I mean it should it should say that
anyway. But yeah, we we'll clean up the
[1:04:32]
language. He can get those to me. We can
take a look.
[1:04:34]
» Okay. I mean that's just my thoughts. I
don't know what anyone else
[1:04:37]
» I mean I would suggest not
>> but finding them because our our office
[1:04:44]
doesn't take any money in and that would
be kind of a I mean you can you could
[1:04:49]
find them by what you pay out. you can
take a percentage off what you pay them
[1:04:53]
out. But as far as like ahead for every
day that you don't finish this job, you
[1:04:58]
pay us $250, which I've seen in other
contracts. I think that'd be hard for
[1:05:03]
our office to do because we have no
we're not set up to take any type of
[1:05:07]
payment right now or h or have never
been set up to take any payment. I don't
[1:05:11]
know why that is. We just are.
[1:05:17]
One more thing, at the last storm water
meeting, there was some discussion about
[1:05:24]
a rate cost of service study or
something. Uh, but in watching the
[1:05:31]
meetings, there was discussion about
drainage board could be affected in some
[1:05:35]
way.
Recall that.
[1:05:40]
Could anyone elaborate on that?
>> You want elaboration? Steven Brandell or
[1:05:45]
county commissioner's office. You want
uh elaboration on which part? That
[1:05:49]
there's a cost of service study being
performed or how it could potentially
[1:05:53]
impact the drainage board?
>> Yes,
[1:05:55]
» both. So, there is a cost of service
study going to be performed so that we
[1:05:59]
understand the affordability index which
is uh basically a requirement
[1:06:04]
[clears throat] and then it could impact
the drainage board as Mr. Borcher
[1:06:07]
brought up during the storm water board
meeting because sometimes they're
[1:06:10]
overlapping um responsibilities. I guess
maybe is maybe that's not the right word
[1:06:15]
to say. Mr. Borcher, would you say
that's the right word?
[1:06:18]
» That's correct.
>> So the cost of service study could
[1:06:21]
impact uh where there's a uh
responsibility by the drainage board uh
[1:06:26]
and there's overlapping responsibilities
between storm water and drainage. It's
[1:06:31]
it's very rare when it is because if
it's a regulated drain, it's our
[1:06:35]
responsibility.
But there's situations where it's either
[1:06:39]
vague or not drawn. You know, 1890
didn't say what was what. So, there will
[1:06:45]
be some overlapping responsibility and I
don't know if the cost of study will
[1:06:49]
point that out, but it may be. So, when
we get the study back, I can report back
[1:06:53]
to the drainage board on anything that I
feel is uh pertinent to the drainage
[1:06:57]
board.
>> Yeah. I think to Mr. Borcher's point, I
[1:07:00]
don't believe the cost of service study
will uh provide clarity on
[1:07:04]
responsibility between the drainage
board and the storm water board. What
[1:07:07]
the cost of service study does is it
goes out and it looks at your current
[1:07:10]
rate uh versus your um historical
expense expenditures plus any projects
[1:07:16]
that you have planned. So that's where
the drainage board would also come into
[1:07:20]
play. So we'll have to put out from the
storm water board's perspective, these
[1:07:24]
are the projects we have planned.
Drainage board, these are the projects
[1:07:26]
we have planned. And then it looks at
the affordability index. What what can
[1:07:30]
the taxpayers afford? And then we'll
have a recommendation back from uh the
[1:07:34]
municipal advisor. Let's make that up.
Say it's Baker Tilly. Uh they'll come
[1:07:38]
back and say based on your projects,
based on your historical expenditures
[1:07:42]
and based on the affordability uh in
your community, this is our recommended
[1:07:47]
rate uh that that they would recommend a
rate and then the storm water board
[1:07:51]
would have to adopt new rates.
>> Is there a fee for the study?
[1:07:54]
» Of course there is. That is our
expectation that we will help pay that
[1:07:58]
fee.
>> That hasn't been discussed, but I
[1:08:00]
appreciate you bringing that up. I'll
put it in my notes. [laughter]
[1:08:04]
» No problem.
>> Thanks, Mr. Christie.
[1:08:09]
» I think that's all.
>> Any other comments?
[1:08:14]
» May I
know there was a public comment section
[1:08:17]
already and I wasn't able to be here,
but
[1:08:19]
» it's been marked off.
>> Yeah,
[1:08:20]
» go right ahead. Commissioner. So, just
for everybody's awareness, the county
[1:08:24]
has been put in a yellow status due to
the flash flooding that we've had this
[1:08:28]
morning. We've had to close a couple of
roads, specifically Albany Pike from
[1:08:32]
Rainer to 700 East. Uh, Black Mill Road
from 67 to Old Granville and 300 South
[1:08:38]
Priest Ford around the river over by
Yorktown. I think those are pretty
[1:08:41]
typical. Also, uh I think that we should
take a look uh at the drain on the east
[1:08:48]
side of Cowan Road in front of Progress
Rail. Uh prog the front yard in Progress
[1:08:53]
Rail is completely flooded this morning.
I understand it's a flash flood event,
[1:08:56]
but that legal drain drains north to
Buck Creek. And when you get to 23rd
[1:09:01]
Street there where Midwest Metal is,
there's an inlet down in the ditch and
[1:09:05]
it's dry. There's no water running into
that, but Progress Rail is completely
[1:09:09]
flooded. Having said that, Progress Rail
just did some work out there. Uh they
[1:09:14]
put uh catch basins in their parking lot
and they cut up our trail and they came
[1:09:19]
and they drained into that open ditch
and they dipped the ditch out. Whether
[1:09:24]
they had permission to do any of that or
not, I don't know. I'm just letting you
[1:09:27]
guys know they did do some work and we
have the new housing project that's just
[1:09:31]
to the south of it where they just paved
their parking lot. So you have all that
[1:09:36]
sheet drain. So they have all that roof,
they have all that parking surface. So
[1:09:39]
all that impervious surface is now also
hitting that drain. Uh I believe Mr.
[1:09:43]
Bortra, isn't is that a legal drain?
>> So here's the issue with that drain. And
[1:09:47]
uh
when they were
[1:09:51]
building what whatever they're building
out there now, I can't I think it's
[1:09:54]
maybe apartments, I don't remember.
>> So that legal drain kind of went into
[1:10:00]
that area. And so I had a contractor
because I couldn't find it by probing.
[1:10:04]
So I had a contractor go out there and
he was out there for a day digging every
[1:10:09]
where we thought that that
old tile was at. So what I think
[1:10:15]
happened is when they went from one road
cuz it ran right up the road to four
[1:10:19]
lane and then my sanitary came in and
ran a sanitary up there. I think at some
[1:10:24]
point they vacated that drain because I
could not find it anywhere and like I
[1:10:29]
said he was out there for a day digging
and probing and it it was not there
[1:10:33]
anymore. So I I don't know if that's
something we need to get my sanitary
[1:10:37]
district because there's a sewer project
that runs right there where that old
[1:10:42]
tile was, but I think at some point when
they went from one lane to four lane,
[1:10:47]
that tile disappeared.
>> Yeah, I I recall when that happened. And
[1:10:51]
if if I recall properly, I think Gradea
A Excavating was the contractor at that
[1:10:55]
time that put that. And it's really
deep.
[1:10:57]
» Yeah.
>> I mean, it's it's super deep. So, I
[1:11:01]
don't remember if it was abandoned in
service or not, but you bring up a very
[1:11:04]
good point. So, I think that still needs
anyway, Progress Trails flooded uh up to
[1:11:10]
uh where they have that burn where they
park their locomotives out front. I've
[1:11:13]
never seen it flood like that. Now, it's
a flash. Maybe it's down by now, but
[1:11:16]
that was, you know, 6:00 this morning.
Um earlier there was a question came up
[1:11:21]
about who would make the decision on how
you changed what you had invested uh in
[1:11:27]
an account. uh the commissioners and the
board of finance authorized this board
[1:11:31]
to make those decisions. So if you guys
want to change those allocations, my
[1:11:35]
point is you don't have to come back to
the commissioners or you don't have to
[1:11:38]
come back to the finance the board of
finance. I believe that's your purview.
[1:11:43]
» Thank you. Thank you.
>> Comments from the attorney.
[1:11:51]
» Thank you.
Uh Mr. Borcher, you want to make any
[1:11:55]
comment on
debrushing. Oh,
[1:12:00]
» I just these are the next round of
debrushing I gave you guys. It's just
[1:12:04]
kind of a simple uh you know, just kind
of shows you where we're at. There's
[1:12:09]
some areas I'm going to add uh on onto
this, but I I haven't been able to walk
[1:12:15]
them all. We've had rain. We've had some
other things getting on.
[1:12:19]
» This is your fall work.
>> Yeah. What I'd like to do is quote this
[1:12:22]
out in October on our October meeting.
Um,
[1:12:27]
if there's something that the board
would like to add or take away,
[1:12:31]
hit me up in an email, call me, and I
can work on that. I'm I'm not
[1:12:36]
100% on all these, but I I think this is
the next round. We've got two or three
[1:12:40]
of them on here that we did last year,
and we only have a couple more sections
[1:12:44]
to do, and they'll be completely cleared
and free of debris, and we can uh
[1:12:49]
maintain them with a spray program.
That's where I'm at on that. Also, I
[1:12:55]
forgot
our next meeting. We're gonna either
[1:12:59]
have to postpone or move the date to I
had to wrote down. I lost it.
[1:13:04]
» September.
>> It's a Tuesday in the afternoon.
[1:13:09]
» Afternoon.
[1:13:12]
» That's the only date we're open because
of budget hearings. This this room will
[1:13:17]
be filled with
>> county council.
[1:13:20]
» Yes.
>> And Monday's a holiday.
[1:13:23]
So Tuesday they they have the
commissioner's meeting and those
[1:13:26]
meetings on Tuesday morning. So we could
either have it Tuesday afternoon or we
[1:13:31]
could postpone it and just go to
October. Those are basically our two
[1:13:34]
options with the streaming that we have
to stream on
[1:13:38]
online. This the Indiana code. I leave
that up to the board. I don't know if
[1:13:43]
that's something we have to decide right
now later.
[1:13:46]
» So September 9th is the Wednesday,
>> right? It would be that it would be that
[1:13:51]
Tuesday before that.
>> It'll be the only time this room will be
[1:13:55]
open because counsel will start that
next Wednesday.
[1:14:03]
» We don't know when they're going to
resched.
[1:14:08]
» Oh,
>> so we would we have a lot of claims
[1:14:10]
coming in in September that would need
to be
[1:14:15]
would it push till October? Well, what I
think what I've done in the past is
[1:14:19]
since the claims out, uh, you know, I
don't know if this was the only COVID
[1:14:23]
rules, but when we couldn't meet for a
reason, I they made an ordinance and I
[1:14:28]
can send the claims off to you guys. You
guys can look them over and we can still
[1:14:31]
approve claims with the the majority of
the board over an email or a phone call,
[1:14:38]
I believe, is what the ordinance said.
And I don't know if that's still in
[1:14:41]
effect, but that's how we did it during
CO. I don't know if we've missed a
[1:14:44]
meeting since that. Do you have a copy
of that ordinance I could look at?
[1:14:47]
» I do not off the top of my head.
>> I could go back and look, but I I
[1:14:52]
believe that we could they let us
approve the claims with three of the
[1:14:56]
board members. So, I would get the
claims to three of the board members or
[1:15:01]
more, you know, all of them.
>> If you have an ordinance in effect for
[1:15:04]
that and it doesn't specify it was just
during a co time, then that's totally
[1:15:08]
acceptable. If you know your claims are
consistently
[1:15:13]
the same type of thing and you want to
give him even if you make a motion now
[1:15:17]
to say he has authority to pay those
claims next month and then you um come
[1:15:21]
back in in October and ratify that
decision. Um he could send out
[1:15:26]
everything that was being paid and
everyone can send kind of a verbal email
[1:15:30]
saying you know thank you looks good and
you can ratify those decisions in
[1:15:34]
October if you wanted to also.
Is everyone available? September 8th at
[1:15:39]
9:00 a.m.
[1:15:42]
» after.
>> It's got to be that. It's not the 9th.
[1:15:47]
It's the what you what date?
>> It's the 8th.
[1:15:49]
» 8th. That's the Tuesday after Labor Day.
>> Yes.
[1:15:53]
» Okay.
>> Is everyone available? September 8th at
[1:15:57]
2 p.m.
[1:16:05]
» Okay, that's fine. Do we need a motion
to reschedu?
[1:16:09]
I make a motion to reschedule the
September drainage board meeting to
[1:16:12]
September 8th at 2 p.m. in this room.
>> Jennifer, will you make sure to let
[1:16:16]
» Yes.
>> Second
[1:16:19]
» motion to force properly second. Roll
call.
[1:16:22]
» Mr. Whitehead.
>> Yes.
[1:16:23]
» Mr. Hamilton.
>> Yes.
[1:16:24]
» Mr. Yes.
>> Mr. Yes.
[1:16:26]
» Mr. B.
>> Yes.
[1:16:29]
» Um, Mr. Do we have to publish that that
we moved it?
[1:16:32]
» Yes. Yeah.
>> into the paper or just around the
[1:16:34]
building to
>> So you both and you don't have to
[1:16:38]
publish it. You just have to send it the
notice. You know what I mean? You just
[1:16:43]
have to email the notice. It doesn't
have to be republished.
[1:16:46]
» Email to who?
>> The paper the email for the the one you
[1:16:50]
send the actual notice is to that email.
You just email them, right?
[1:16:54]
» Yes.
>> Yeah. So you just have to there's a
[1:16:56]
difference in publishing and sending the
notice. Okay.
[1:16:59]
» It sounds the same to me. They put it in
the paper.
[1:17:01]
you publish your yearly list for the
beginning of the year. So then you only
[1:17:05]
have to send notice of a change of
meeting.
[1:17:08]
» Okay.
>> I wonder if he
[1:17:13]
» Okay. [clears throat]
[1:17:17]
» Any other further business? If not,
motion to adjurnn, please. So moved.
[1:17:24]
» All in favor say I.