Good afternoon, everybody. Today's meeting we have a presentation from the folks at the
[0:37]
was made with some modifications and some revisions, and I would say at the end of that meeting the board said proceed with what you're going to do.
[0:47]
One of the elements of that was what it looked like.
[0:53]
And to that end, I believe the applicant has provided two versions, I guess, for lack of a better word of what it would look like.
[1:02]
And I was looking for some board input as to the architecturals.
[1:08]
In addition, he, the applicant, has submitted a stipulation,
[1:13]
which is intended to incorporate the various elements of this project
[1:19]
into a court order to settle the litigation.
[1:23]
I think I spoke to Mr. Murphy.
[1:27]
There are some concerns about the stipulation
[1:30]
from board members need some revisions, so the board is not going to be approving any stipulation
[1:35]
today.
[1:37]
And I have the various comments from board members that I will share with him, but I think
[1:41]
we should go over the architectures and if you have any other planners that, the same plan,
[1:47]
maybe you can bring it up in a quick public about what that is, what's all about.
[1:52]
And also, show the renderings and let's get a perspective from the renderings as to what
[1:56]
The Board and the public feels as appropriate make sense.
[2:02]
Sure.
[2:05]
Good afternoon.
[2:06]
We were last year, four months ago.
[2:07]
We were here on November 15th.
[2:09]
Four months ago?
[2:10]
Time flies.
[2:11]
November 15th.
[2:14]
And at that time, we did present an updated plan that further reduced the impervious to a 40% limit and reduced the overall square footage.
[2:27]
Additionally, down to plus or minus 52,000 square feet, it's that plan that is on the
[2:34]
easel to my right and which Scott prepared and we reviewed at length the last time.
[2:41]
We had gone through different considerations on impervious reducing the bike path eliminating
[2:47]
from calculation, the one way access in the access to the well, et cetera, but so that
[2:54]
hasn't changed, so we're happy to go over that again if you like. However, since then,
[2:59]
just right, we did exchange comments on a stipulation, Jeff provided me some specific comments
[3:06]
earlier today, all of which I'm going through with our client. We had no issue with the ones
[3:12]
that Jeff raised previously.
[3:14]
There's additional comments from board members though that I'll share with you tomorrow.
[3:17]
Okay. Well, that's fine. But at least as far as the ones you've shared with me so far, I think we're good.
[3:23]
Also with us today is David Pilotnik, who is the architect that has done some elevations.
[3:30]
We did some earlier, we got some feedback about those, and David in response has prepared
[3:37]
an alternate, which, again, we've circulated in small form, but David can review them in
[3:43]
the larger elevations that he also has here as well.
[3:46]
So, he'd like I'll introduce David, and he can go through that for you.
[3:49]
Welcome.
[3:52]
My name is David Pullout, and I come with PCS Architects on the Project Architects.
[4:00]
We need to find a way that the folks in the audience can take a look at these, because I...
[4:04]
Aren't they the same?
[4:05]
No, they're different.
[4:06]
Actually, they're different.
[4:07]
They're different.
[4:08]
They're different.
[4:08]
They're different.
[4:10]
They're different.
[4:10]
I don't know the public.
[4:15]
I thought you'd hold up and haven't picked a look at, and that's version one.
[4:18]
sort of do the like they do with boxing matches, you know the first round
[4:30]
I'll tell you a little bit about the building, the building is going to be constructed of wood frame
[4:36]
and for the exterior materials we'll have
[4:40]
are you going to be mites?
[5:07]
So, as I have saying, the buildings are constructed of wood frame, and they have wood
[5:14]
trusses, basically the exterior walls would be constructed of wood.
[5:19]
The exterior material would be on the end path you can see on the end.
[5:24]
and use these two renderers to pretty similar,
[5:27]
but that the ends and the base will have so in the air.
[5:33]
And the group would be an actual chain up,
[5:35]
and there would be some use of some metal groups
[5:37]
in some of the pages you can see
[5:39]
before we're here to have a metal group.
[5:41]
There also we'd be using some side up,
[5:44]
there's a sign-dance, and there'll be some wood trends
[5:47]
on vertical side, and you can see we made use
[5:50]
of the couple on the buildings.
[5:52]
like what I do is like going to love a work here just to show you some materials that we
[5:58]
used that we would be thinking about, the representative materials that we would be using.
[6:05]
And these are the colors or not. That's certainly the colors that we would be using
[6:09]
but we would try to stay within Earth and then the colors I get.
[6:13]
Well, if you could, so the residents, if you could just use their water.
[6:19]
they're they're they're oriented you're going to have to get to a mic to go to a
[6:27]
mic or saw them please because most of the people you know kind of know where
[6:35]
some of these buildings are but I believe this is coming from 263 this is the
[6:40]
building that's going to be next to where the lamp factory is and that is going to
[6:46]
the CVS, if that's how I take it. I'm going to be talking to you right here. It would be
[6:52]
yeah it would be helpful for people to kind of know where those buildings are going to be situated
[6:56]
on the property. I'm going to go to use a lot of the better behind or something here.
[7:10]
Well that's what I'm just talking to you for here. You see that building, you see that building
[7:14]
on the background. The difference between the two random things is that one shows
[7:27]
I have to admit that I said to Mr. Murphy, when I first saw that rendering, it seemed like a awful
[7:35]
expanse of roof line, straight after each other, and I said, maybe you can do something that
[7:41]
provide a little more colonial and break up with a roof.
[7:43]
So if it's ugly, then it's my fault, but that maybe what was produced as a result of those
[7:48]
comments.
[7:49]
It looks great, like the dormers, the dormers, yes, they look like they belong on a trackhouse and
[7:56]
Northeast Philly.
[8:00]
They don't look like real dormers to me.
[8:01]
They look like they're like something from the 70s.
[8:03]
No offense.
[8:05]
No offense.
[8:05]
You know what I'm saying?
[8:06]
They're not like real dormers.
[8:09]
Well, you know, they could be back when they could be made and look like, you know, they're
[8:13]
back that space up there and that's not a problem to do things like that.
[8:17]
I guess the first question is,
[8:20]
it's elevated.
[8:23]
It's not, it's not.
[8:26]
You know what I'm saying?
[8:27]
So the question I guess is, do you prefer some
[8:29]
break-up of the roof line or does the board
[8:32]
in the public prefer that straight roof line that goes
[8:34]
all the way back in the man's system?
[8:38]
Some direction would be appropriate.
[8:41]
I think the dormer is a nice idea.
[8:44]
I think they look like they belong there.
[8:45]
I don't know. I just just putting them on there to break the roof line doesn't make sense to me.
[8:50]
Yeah. I mean, I noticed the roof line originally, but after you say it, Jeff, now it does look like I think something to break it up, doesn't it?
[9:03]
No offense to you. They're very nice renderers. They're very nice renderers.
[9:11]
And maybe the dormers have to see more that for that to that window.
[9:17]
Maybe six over six or something else that gives a little more of a, as opposed just a piece of glass and sort of squatted down like you're in an old polka mill property or something.
[9:28]
You know, like the northeastern.
[9:30]
Same difference.
[9:39]
All right, so everyone's kind of okay with the rendering, just a question, so are you suggesting that all the buildings would have the same look and feel?
[9:50]
Yes, the CVS and everything was a CVS would be further over, right, so that will look the same.
[9:55]
every one of them will have that okay and I guess the board should have some input and
[10:05]
what the preferences of the stone work and the and the roof material. So if I think you
[10:11]
had a board somewhere with that in it. This is a board of some representatives in the material. It's
[10:15]
really doesn't really reflect the colors, but the stone patterns, you know, with the finish of the
[10:22]
that would be routine goals from the vertical in the horizontal side of the side that would be using.
[10:30]
The need for the materials that would be on the buildings.
[10:34]
Is the rendering to pick any of those that are in your board, or they just do not?
[10:38]
I'm doing that now.
[10:39]
It's quite me as well.
[10:40]
I mean, here's this would be the sum.
[10:43]
It would be the value of that grouping that we talked about.
[10:46]
This would be the actual chain goal.
[10:48]
Well, it's hard to get it signed in with the stock out and, you know, we had a little
[10:54]
donor back up here, which would have some size in there.
[11:00]
So yeah.
[11:01]
The buzz of the board, whether you want to weigh in on the materials or not, I mean, it's really
[11:04]
up to you folks.
[11:08]
You know, tonight, as we go forward, I think we should have something like that.
[11:13]
I think you do.
[11:14]
You're the architects and you're the designer.
[11:16]
You pick your best thing, what you think is most appropriate and we'll look at the
[11:20]
We have an injection more than you know, but it seems like you have pretty good taste
[11:24]
Yeah, maybe you can just do what you do the final mix of options on the same
[11:50]
The way it looks is going to be fine, and we'll be tweaking as we go, but I think the general look is good.
[11:58]
Anybody out there want to weigh in on this now?
[12:00]
Seeing nobody's here.
[12:03]
Mr. Murphy, I just wanted to prime the get out.
[12:06]
I'm not going to be wanting to approach any stipulation until most of the development work is done.
[12:12]
I think there are just too many open-ended issues in here,
[12:16]
If this and that, and then we shall do this sort of thing, we shall do that thing.
[12:22]
I think that there's no off-site impact fees.
[12:24]
I think it's a little too early, and I still don't know what happened to all the trees.
[12:29]
One of the comments I said to Mr. Murphy was, we have an old agreement that we have to
[12:37]
deal with.
[12:39]
But there was some evidence to restore some trees and whatever.
[12:43]
I think we need that.
[12:44]
I look forward looking for more than just that to be attached to this part.
[12:48]
Well, as I said, Jeff and I reviewed a handful of things, including this thing, for
[12:52]
of you mentioned, and we're happy to include those in a revised draft of the stipulation.
[12:57]
And we spoke about the outside impact fee, needing to include the terms and additions
[13:02]
of the prior settlement with which we were not in Bob, but that involves the tree replacement
[13:06]
issue.
[13:06]
Who happy to do that?
[13:07]
No, okay.
[13:08]
Well, fine.
[13:10]
We know that this isn't going to be executed, well, some of the British members.
[13:15]
Correct.
[13:15]
And soon as Jeff, if there's other issues of which I'm on a wear, I'll do it with those things.
[13:19]
Board says fine and we air it publicly will make the boards, I think it's expressed their opinion into plan and was satisfactory.
[13:28]
Right.
[13:28]
Matter of funding up the loose ends and getting some things taken there of and incorporating architectures and all the things that are part of that process.
[13:37]
But if you indicate, for example, number two, minor shifting of a location, I don't know what that is.
[13:45]
We have, we've got the word, Shaolin here within 30 business days, and that always makes me nervous.
[13:52]
That's the challenge of Shaolin doing something within a time term.
[13:57]
We Shaolin through the final land development, if it's substantially complies with all aspects of this distillation, that also makes me nervous.
[14:04]
I think there's a little too much on us to be doing here.
[14:07]
We should use our best efforts to improve the pollining modules.
[14:11]
And then that we don't have any way of looking at off-site impact fees.
[14:16]
It's necessary.
[14:17]
I think that's something I'm not willing to give up at this point.
[14:20]
And we're not asking you to.
[14:22]
Well, I know it's in here.
[14:24]
No.
[14:24]
Well, Jeff and I spoke today.
[14:26]
Okay.
[14:27]
Yesterday.
[14:28]
I didn't get a chance to tell on my.
[14:30]
And then 15 is a third party time state.
[14:35]
And in litigation, I don't know at this point whether I hopefully know what it would do
[14:39]
that.
[14:40]
But we really don't have any control of the third party in your interventions.
[14:46]
And whether we would have to help you defend those I'm not sure I'm willing to go into that.
[14:51]
I'm always stipulation discipline.
[14:53]
So those are the general and my things.
[14:55]
And I have Mr. Sniders that I'll share with you in Mr. Collellis and other more members so
[15:00]
Question for the file I can retrieve the issue we should get, flush it out.
[15:07]
If I understand everything that maybe is stretched but can we delay the stipulated agreement
[15:17]
like barbers saying, so you get a little finer detail relying on the good faith of the board
[15:23]
that we're, you know, amenable to going along and then it will flush out some of these
[15:29]
if and then's that is that doable well and billbanners here representing Mr. Grasso as
[15:38]
well as he was last time what I would say to that is that the prospect of now re-engineering
[15:43]
another plan without having the comfort level of a document that we're all going to abide by
[15:51]
unsure will make Mr. Grasso uncomfortable use important work if we're all operating in good faith
[15:58]
that we can move ahead on this or whatever additional comments that I hear from Jeff tomorrow
[16:03]
of the next day.
[16:04]
And maybe we can talk about that.
[16:05]
But the whole point of doing this was to try to give everyone the comfort that you're going
[16:09]
to get what we all intend to provide to you, which is that plan plus whatever details and
[16:14]
everything else we have to spell out.
[16:17]
So I guess that is a question, Rick, that we probably-
[16:19]
What are things where we all have to-
[16:21]
They don't want to spend a whole lot of money on engineering, which would be significant if they
[16:24]
don't feel that there's a-
[16:26]
I like it. He has a tunnel and that somebody comes back and says, no, I want something else.
[16:31]
So it's one of those things that most of our comments are not about architectural engineering things.
[16:36]
It is about, you know, fundamental.
[16:39]
Yeah. I mean, it's not about the dude with anything that's stormwater, but they've got to apply with the ordinance.
[16:43]
We're going to think. We know that. Yeah.
[16:45]
So if they are the same character of the comments that I've already heard from Jeff.
[16:50]
I don't think that's going to be a stomach block.
[16:53]
We just want you to know that there's some uncertainty because and what I make sure that
[16:57]
this is precise is can be that your commitments are reduced to writing and that the plan
[17:03]
is consistent with what's been presented.
[17:05]
And we support all those.
[17:07]
I'm good with all those.
[17:08]
So I feel pretty confident that that's the case that we're going to be able to come up with something
[17:11]
that gives everybody enough comfort to move ahead because we want to move ahead.
[17:16]
We're anxious to move ahead.
[17:17]
Can we now send any questions or comments from the board? Any questions or comments from the folks here?
[17:23]
Neighbors.
[17:24]
Okay. Do you have enough direction? Sort of?
[17:29]
I guess.
[17:30]
Hopefully.
[17:31]
I hope I'm actually here to talk to Jeff and see if there's any other issues of which we are unaware of.
[17:48]
Okay, any other visitors or public comments.
[17:56]
Next meeting of us board is Tuesday, March 15th at 7pm.
[18:01]
Daylight savings times everybody is March 13th.
[18:04]
You have to set your clocks ahead.
[18:06]
You lose an hour.
[18:07]
That's Sunday morning.
[18:09]
Washington D.C. Cherry Blossom Trip is April 2nd, it's $50,000 a person. You can sign up at
[18:16]
dosairect.com. Red Cross Spring Blood Drive is Monday, April 11th, 227, the activity center.
[18:23]
You can sign up at RedCrossBlood.org.
[18:28]
The dosairect community garden survey is available on our website. We're thinking about doing
[18:33]
a community garden and we want to make sure everyone has an opportunity to wait in on it.
[18:37]
It would be down in the neighborhood of the Lower Stigland Parkway.
[18:42]
There's an area of tank or parcel that we acquired in open space.
[18:46]
We're looking at, perhaps, in any garden, but we want to do unless there's an interesting, you know, folks participating.
[18:53]
And then, movie and ski tickets are available, contact the admin offices for the prices and what is in the available.
[18:59]
Next slide, when the agenda is approval of the minutes from December 16, 2016, regular meeting of the board.
[19:09]
Okay. Any questions, comments, corrections? All in favour?
[19:13]
Aye. Aye. One abstent? One abstent? You were on our zone.
[19:18]
So, they did watch the meeting. I like the record to show.
[19:21]
I did watch the meeting.
[19:23]
And the minutes? The minutes were.
[19:25]
Reflected, what I saw on television.
[19:29]
So, is it anything?
[19:30]
I'd let report at this moment.
[19:36]
And then the touch of editor, I have a few things. First, I have a memo on training for the APM conference for my self-enotum to attend and then for myself to attend the P-Sats conference with the board.
[19:49]
I see that you're going to try and learn something about drones with special, you know, potential ordinances, drafts.
[19:55]
It's going to probably come on this kind of conference for us, okay, is there a motion to approve the request for training?
[20:02]
So move, second.
[20:04]
All in favor.
[20:05]
All right.
[20:05]
All right.
[20:06]
All right.
[20:07]
Thank you.
[20:09]
Setting the work budget session.
[20:11]
Thank you.
[20:12]
Yes.
[20:13]
The way the means to meeting that and I want to do that spring budget work session like we did last year.
[20:20]
And pretty sure we have a little discussion before the meeting that the date starts is April
[20:24]
12, which believes that Tuesday, not Thursday, and then Tuesday June 14th, and it probably
[20:33]
will.
[20:34]
Well, this is Tuesday.
[20:35]
And Thursday, June 14th or four, is everyone okay with those two days waiting to make
[20:39]
them or not?
[20:40]
I'm okay.
[20:41]
I just want to comment about the 12th, because Sean, I mean, he's going to become into the
[20:44]
ways of means, parking, wreck, and EAC, which is like six, seven straight hours.
[20:50]
So?
[20:51]
I'm just bringing it up.
[20:53]
Have a problem with that, Sean?
[20:54]
I appreciate it. If there's any compassion on the board, you could pack me like a lunch or meal.
[21:02]
That's four o'clock. Yeah, I don't be a person and I'll be a long time.
[21:06]
Yeah, well, not getting into this.
[21:10]
Okay, but that's seriously. It's a long day for you.
[21:13]
It's a long day for you.
[21:16]
Both states are good? Yes.
[21:19]
We'll let the ways we need to meet you now.
[21:21]
We'll get that every kind of.
[21:23]
June 14th at 4.
[21:24]
June 14th.
[21:25]
All right.
[21:25]
Next item is this snow.
[21:30]
Show no.
[21:31]
Fair.
[21:31]
Show no.
[21:32]
Yes.
[21:33]
The board will recall that we had advertised through the piece
[21:36]
That's magazine twice for the sale of the show will be all.
[21:40]
We actually had the burrow of Sair, which is on the New York border.
[21:45]
Come down.
[21:45]
Look at it.
[21:46]
Mr. Snyder had to be here the day that they were here, so he got to meet them.
[21:53]
They absolutely loved the show reveal and their board is their council, excuse me, their borough council.
[21:58]
There's a February 25th approved the purchase of the show reveal for $10,000, which was our minimum fit on that.
[22:07]
And our recommendation would be for us to go ahead and sell it to the borough of Sayer.
[22:13]
have Mr. Garton prepared the appropriate documentation.
[22:16]
This is blind to execute it and when it's prepared and then they'll come down and pick it up
[22:22]
and we will make sure when they come will transfer the tags and everything like that while they're here.
[22:28]
I did draft it and I will be sending it out to all the board members tomorrow for your
[22:43]
I'm sorry you've heard the sound right you'll prove offering it for sale, but not to sale to say or
[22:48]
I make a motion we approve the sale to say a second then. Okay, all in favor. All right. All right, I'm sorry. Thank you
[22:54]
I'm coming to the supervisor Sean
[22:57]
No, I've had no
[22:58]
Meetings except for the Decado Conference and Saturday. So I'll defer thank you. No comment. Okay. Okay. I get the accumulator time. I
[23:09]
That's just that three things.
[23:11]
At the pension meeting, it was brought up about with our two experts, Deborah and Jim Kennedy,
[23:23]
that our MMO is not going to basically change much.
[23:26]
It's going to be much more than $300,000, that's an example.
[23:29]
So the recommendation was if our cash flow permitted it to put in $50,000 now because they can do, in most cases, better with the $50,000, then we can do in a 1% CD where it is now.
[23:51]
So their recommendation was to see if the cash flow could advance or not advance but pay in advance $50,000.
[23:59]
And the pension board unanimously approved that.
[24:03]
So I'm bringing it here saying if the consensus is to have the Stephanie and Ken Snyder and Ken Wallace or whoever,
[24:11]
to take a look at that and see if the cash flow can support sending in extra amount of dollars.
[24:18]
Well, we have a ways of means meeting, I don't know the April 12th, is that should we have a
[24:24]
fall budget reported at that time, where's it too long to wait?
[24:28]
We could analyze it between now and then and have it reported then and you could
[24:32]
take an action or be an advertised meeting if we need to, because we don't have to
[24:36]
them a moment until such a journey.
[24:39]
Is that work?
[24:40]
Yeah, and I wouldn't think we'd take very long to.
[24:41]
I agree.
[24:42]
Okay, my second thing is I'm a reasonably intelligent person. I'll start with that and I've read this EMS letter from Chuck a few times and I honestly don't quite understand it
[24:57]
And then the next step is he's looking for a support. So I don't know what I don't know what
[25:04]
What you know the balancing
[25:07]
A billing by anybody
[25:09]
I thought it was a confusing request to Chuck Fussler as they had the CVM meal and he's looking for something, make up money.
[25:21]
The loss there, I'm not quite sure what it is, you know.
[25:24]
We can ask for more content, we can ask for content.
[25:26]
The board wants to help them, that's fine.
[25:29]
I just don't understand.
[25:31]
Yeah, I think he's looking for support.
[25:32]
There's legislation that's pending as well.
[25:34]
And then this balance billing thing, which is, I guess,
[25:37]
then the Pennsylvania insurance commission is saying
[25:41]
that they don't, they won't be able to balance bill
[25:43]
on an ambulance ride.
[25:45]
So typically, if they're not certain portion isn't covered
[25:49]
if it's 600 and they only get 300,
[25:52]
they want to balance bill the other 300 to the insured.
[25:56]
I think he's just asking for the work.
[25:58]
Not necessarily our financial skills work.
[26:01]
Yeah, that's how we do that.
[26:01]
No, that's how I read it.
[26:02]
Yeah, no no, no.
[26:03]
You don't have to share a ready to?
[26:04]
Does he want to suspend, what do you want us to do?
[26:07]
Right.
[26:07]
What kind of support?
[26:08]
Yeah, exactly.
[26:08]
What for?
[26:10]
Third thing is, as I mentioned, I watched him eat, and I think, Shawn mentioned that the
[26:15]
parking wreck is looking to do some additions and maybe I'll say, cosmetics, that's probably
[26:20]
not a fair thing.
[26:21]
For the amphitheatre, I would like to see before I get to that step, where were
[26:28]
at with the amphitheatre?
[26:31]
What's what's what's profit in loss? What's our sheet? What we have planned for this year?
[26:36]
I mean, I speak people give us donations and we still have a fiduciary responsibility to spend those donations properly and I can't
[26:45]
Vote for that unless you get some clarity on
[26:49]
How many events? How they're doing is it going to be you mean repitalized me, right?
[26:53]
I'm not voting on anything. I'm asking for Sean to ask to regard that you go ask me
[26:57]
Yeah, I think that was to mention that there was still a sponsorship opportunity that they
[27:04]
are available.
[27:05]
But going forward, I know Parkal Red currently is working on both of the list, a punch list,
[27:12]
prioritizing those, you know, what still, but they still want to accomplish, you know, improvements
[27:16]
and such on the community as well as a schedule for the concert series.
[27:22]
So they're looking at both sides, habits and credits, you know, what they still want to do
[27:25]
and other fundraising opportunities as well.
[27:30]
And the schedule, so I think we can get a report from the next park and wreck what they have planned for instance.
[27:37]
They've expanded that series such a concert.
[27:39]
All right, and they've added some additional events or shows and concerts.
[27:44]
And there's still some others that they're talking about now.
[27:47]
Although the window is closing for sponsors to get on like on the printed material and everything.
[27:52]
You know, because they have to go to print soon. There's still that's still expanding the venues for the rest of the year
[27:58]
So we can try to get that from the night. I mean, I'm not if you could do if you want to bring a great if Karen wants to stop by for five minutes
[28:04]
That's great. I just bring it to the meeting on the in the ways of being unable for June
[28:09]
We have it already. I'm good whenever
[28:12]
Yeah, you know me here. There's time frames for some kind of report if they're ready. I mean, especially if they want to do some work during the summer
[28:23]
You're suggesting that at the April 12th meeting, that was a means committee meeting or the other was a means committee.
[28:31]
The April 12th or the June 14th.
[28:33]
Okay.
[28:33]
Whenever they're ready for it.
[28:35]
Yes, I'm ready for it.
[28:36]
It's fine.
[28:38]
Thank you.
[28:38]
That's all I have.
[28:39]
Thank you.
[28:41]
Nothing for this one.
[28:42]
Thank you.
[28:43]
All right.
[28:43]
Moving on to the long maintenance did for 2016.
[28:47]
You memo from Dick John.
[28:50]
Any questions?
[28:52]
The recommendation is to prove one-year-long maintenance extension.
[28:58]
Now, rating increase with green landscape contractors for $114,520.
[29:06]
I'll make that motion.
[29:07]
I'll second questions on favor.
[29:10]
I can tap grant.
[29:14]
Yes.
[29:15]
This is a form of policy that we need to approve resolution
[29:20]
that will designate three people from the township that will review the inspection and construction management from.
[29:29]
This is all part of the tap grant will be paid for by the 1 million point two tap grant.
[29:34]
But it is policy that has to be put into our electronic data management program with PENDA.
[29:41]
And this will be working with DVRPC, the Delaware Valley Regional Planning Commission,
[29:46]
and setting this up and selecting a construction management engineering company to oversee that project.
[29:53]
And so that is what the resolution sets for three of those people being the bidding system.
[30:00]
First of all, we'll be done through the RFP system. We'll be done through the PEN.com ECMS program, the electronic management,
[30:07]
and then they'll be selected in all of the paid forth through the tap grant.
[30:12]
Sir, may you stand there, request?
[30:15]
Sir, may you do for the resolution?
[30:17]
Why do you identify who are the three people just so that?
[30:19]
Definitely, may some would be serving as from the township manager,
[30:22]
does not need to take John, his director of operations, and then Tom Kalsos, the White and
[30:27]
High Community Voluntary.
[30:30]
I'll make that motion a second.
[30:32]
All in favour?
[30:33]
All in favour?
[30:33]
All in favour?
[30:36]
Egel's Capacamation for Caldha, David Roberts.
[30:39]
2nd number 71, is your motion to approve the Proclamation?
[30:43]
So moved.
[30:45]
All in favour?
[30:46]
Kiles Court of Honor is April 10, 2016.
[30:50]
He did the ADA accessible pedestrian bridge at Peace Valley Park.
[30:56]
So, when you walk over, I think I'll have an Eagle Scout project.
[31:01]
I wonder if I can.
[31:02]
All right.
[31:03]
Our next item on the agenda is our announcements.
[31:06]
We are done.
[31:08]
Next being of this board is February 15th at 7 p.m.
[31:11]
By 2 p.m. March 15th at 7 p.m.
[31:13]
Daylight savings time is March 13th.
[31:16]
Set your clock ahead of one hour.
[31:18]
Washington D.C. Cherry Blossom trip is April 2nd, $50 a person, you sign up at DawesTimeRect.com,
[31:27]
Red Cross Spring Blood Drive, April 11th, 2 to 7 at the Activities Center, and you sign up
[31:32]
for that at RedCrossBlood.org.
[31:35]
The Community Township and DawesTimeCommunity Garden Survey, please go to DawesTimePay.org, take
[31:42]
a moment to do the survey, would like to get your input.
[31:45]
And movie and ski tickets are available by contacting the administrative offices for prices and availability.
[31:52]
Is there any other business?
[31:54]
No.
[31:55]
Here you know, we are Jones.
[31:56]
Thank you very much.
[31:56]
There are things to sign.
[31:58]
To see you all.