Fairmont and Cold Spring Creek Community Info Meeting - November 18, 2025

East Kootenay, BC (Canada) · · More East Kootenay, BC (Canada) meetings · More British Columbia meetings

Transcript

Download: Text · SRT ·
SOURCE TRANSCRIPT

This transcript is downloaded from the source you provided but we haven't reviewed it for accuracy. Treat it as a starting point, not a verbatim record. You can also request an AI-transcription of the audio file with the button to the left.

[0:07] All right, welcome everyone. Um, we'll
[0:09] be getting started here in just a
[0:11] moment. Right at 7 o'clock, we'll kick
[0:14] things off. So yeah, just about a minute
[0:17] from start time.
[0:35] Okay, so yeah, it's 7 o'clock. Um, good
[0:37] evening and thanks for joining us for
[0:39] the community information meeting. Uh my
[0:41] name is Nathan Seammens and I'm in the
[0:43] communications department at the RDUK.
[0:45] Um before I hand it over to Director
[0:47] Clochuk, I'd like to just give a quick
[0:49] rundown on what to expect this evening.
[0:51] Uh first off, the meeting is being
[0:54] recorded, so got that out of the way
[0:56] right away. And we will be posted on the
[0:58] engage page at engage.rdek.bc.ca/debris.
[1:04] And we'll get that up within the next
[1:06] day, maybe two. Um once the recording
[1:10] recorded meeting is posted, we will send
[1:12] out an email with the link. Um and so if
[1:14] you're not signed up for the community
[1:16] emails, uh you can do that by visiting
[1:18] rdk.bc.ca
[1:21] and clicking the stay informed link at
[1:23] the top of your page. Um so after
[1:26] director clochuk's introductions and the
[1:28] staff presentations, we will be
[1:30] answering the questions from all the
[1:32] attendees.
[1:34] So, um, in the interest of time and
[1:36] clarity, we'll be using Zoom's Q&A tool
[1:39] to collect the questions. You can find
[1:40] that at the bottom of your screen. It's
[1:42] a little question mark and says Q&A. Um,
[1:46] so yeah, we'll be using the Q&A tool and
[1:48] we will also be going through the
[1:50] questions that were submitted on the
[1:51] project engage page at that time. Uh,
[1:54] we'll attempt to address all of the
[1:55] questions in the order that they are
[1:57] received. And if your question pertains
[2:00] to a specific slide during the
[2:01] presentation, please try to reference
[2:04] that slide number. Slide numbers are in
[2:06] the upper right of each slide. The
[2:08] reason we're asking this is just
[2:11] um so that we can the answerer of the
[2:13] question can be certain as to what
[2:16] they're answering. If you missed the
[2:19] slide number, that's no problem. Please
[2:20] still answer or ask your question. Um
[2:23] yeah, and now I'll pass it on to
[2:24] Director Clchuk.
[2:26] » Great. Thank you, Nathan, and thanks for
[2:28] all your work uh on tonight's meeting.
[2:32] Um you kind of keeping us going from a
[2:34] technology perspective. Um if you have
[2:37] any kind of technical questions, you can
[2:40] also throw them Nathan's way. Um tonight
[2:43] we're we're joined uh we have a lot of
[2:46] information to share as you can well
[2:48] imagine if you looked at the engage page
[2:49] and saw the reports. Um, we're start
[2:53] we're going to start with uh Christina
[2:54] Carbury who is our protective services
[2:57] manager and then uh Carara Xanberen our
[3:01] uh flood and mitigation and water
[3:03] project supervisor in our engineering
[3:04] department and Karen Mloud our planning
[3:08] manager from our planning and
[3:09] development uh department. And then
[3:11] during the Q&A, we're going to be um
[3:14] also supported by consultants who worked
[3:16] on the reports. Uh Beatrice Kalipadia um
[3:20] geological engineer for BGC engineering
[3:23] and Tamson Mills, a senior planner for
[3:25] Pina sustainability. Um I encourage you
[3:28] to put your questions in to the Q&A as
[3:32] we uh as we go through the presentation
[3:35] and um as you can see there is the
[3:37] agenda. So without any further ado,
[3:40] we'll get started with understanding
[3:42] hazard risk and uh Christina.
[3:49] » Uh great. Thank you, Director Club. Uh
[3:52] so good evening everyone. Uh my name is
[3:54] Christina Carbury. I'm the protective
[3:56] services manager for the regional
[3:57] district and I'm responsible for
[3:59] emergency management and rural fire
[4:01] services within the regional district.
[4:03] Uh so this evening we're going to spend
[4:05] some time talking about hazard and risk.
[4:07] And when we talk about hazard, what
[4:09] we're talking about is actually the
[4:10] natural processes themselves. So that
[4:13] would be things like steep creeks and
[4:15] heavy rainfall and the potential for
[4:16] debris to move downhill. When we're
[4:18] talking about risk, we're talking about
[4:20] who and what might possibly be in harm's
[4:22] way and how severe the impact could be.
[4:25] Um both are key in how we plan and how
[4:27] we respond. Next slide.
[4:34] So, uh, hazard is the event and risk is
[4:37] the impact. The hazard doesn't change.
[4:40] Fairmont Creek will always have the
[4:42] potential for debris flows, but our risk
[4:44] changes depending on where people live,
[4:46] how properties are designed, and what
[4:48] systems we have in place for warning and
[4:50] response.
[4:52] Risk impact to put it into perspective
[4:54] is the effect that a debris flow could
[4:56] have on you, your neighbors, your homes,
[4:59] properties, and businesses, which
[5:01] essentially means life safety,
[5:03] structural damages, and economic losses,
[5:05] uh, such as income.
[5:08] Risk can be a challenging thing to put
[5:09] into a relatable context. So, I'll give
[5:11] you a couple of examples here, but
[5:12] you're going to hear many examples
[5:14] throughout the evening. [sighs]
[5:16] So for a 1 in300
[5:18] uh debris flow would be similar to
[5:21] having a 0.3% chance of it happening
[5:23] each year. So what that means in an
[5:26] easier context would be over 25 years uh
[5:29] the time uh the time many people will
[5:31] come uh sorry the time many people live
[5:34] in a home that adds up to roughly an 8%
[5:36] chance. Uh that's roughly the same odds
[5:39] as your car needing a major repair at
[5:41] least once over 25 years. It's not a
[5:43] guarantee, but it is absolutely
[5:45] realistic.
[5:46] Now, looking at something like a 1 in
[5:49] 1,000-year debris flow, uh that would be
[5:52] similar to a 0.1% chance per year. So,
[5:55] over 25 years, that becomes roughly a
[5:57] 2.5% chance. And that would be
[5:59] comparable to the chance of your airline
[6:01] losing your luggage at least once in
[6:03] your lifetime. It's unlikely, but it
[6:05] does happen. Next slide.
[6:10] So when hazards become emergencies, uh
[6:13] when a known hazard turns into an active
[6:15] event, our job is to translate that risk
[6:17] information into action. Uh the
[6:19] protective services department leads
[6:21] evacuations, coordinates emergency
[6:23] response, manages debris removal in
[6:25] coordination with our flood response
[6:26] team, and navigates provincial funding
[6:28] programs to support recovery. When the
[6:31] hazard is known, the province expects
[6:33] local governments to plan for it through
[6:35] land use decisions, emergency plans, and
[6:37] risk reduction strategies. Understanding
[6:40] where the hazard exists and who is most
[6:42] at risk allows us to pre-plan routes,
[6:44] resources, and staging areas so we can
[6:46] respond quickly and safely when an event
[6:48] occurs. Next slide.
[6:54] So uh ensuring
[6:56] um ensuring we meet provincial
[6:58] expectations for managing known hazards
[7:00] includes implementing mitigation or risk
[7:02] reduction measures where feasible,
[7:05] maintaining emergency plans that address
[7:07] the identified hazard. So in this case,
[7:09] debris flows and demonstrating due
[7:11] diligence in land use decisions and
[7:13] public safety.
[7:14] Next slide.
[7:18] So building resilience in Fairmont. Our
[7:20] goal isn't to eliminate hazards. That is
[7:22] not possible, especially in a mountain
[7:24] environment. Uh but to reduce risk by
[7:27] understanding where those hazards are
[7:28] and planning accordingly. Uh every level
[7:32] of awareness and preparation makes a
[7:34] difference. And I will pass things over
[7:36] to Cara now.
[7:41] Thanks, Christina.
[7:43] So, as part of building resilience in
[7:46] the community of Fairmont, construction
[7:47] of the Cold Spring Creek debris flow
[7:51] mitigation structure was completed this
[7:52] year.
[7:54] A residual hazard map was completed
[7:56] after the construction, which
[7:57] incorporates the basin and barrier. This
[8:00] residual mapping shows how the
[8:01] structures mitigated risk in the
[8:02] community and where the risk is still
[8:04] slightly elevated. So, the structure
[8:06] will hold up to an estimated 84,000
[8:09] cubic meters of debris flow material.
[8:12] These frequency magnitude values on the
[8:14] slide
[8:15] um are the return periods and est these
[8:17] are the return periods and associated
[8:19] volumes. These were determinate
[8:21] determined in the 2020 hazard assessment
[8:23] and this was what we were these are the
[8:25] values and numbers that we were using
[8:27] when we were designing the structure.
[8:30] So at 84,000 cubes this will hold up to
[8:33] the 300 to 1,000 year event.
[8:37] Once we go past that, so in the thousand
[8:38] to 3,000 year event, there's still
[8:40] 12,000 cubic meters of material more
[8:42] than the structure can contain. So this
[8:45] excess volume at the estimated discharge
[8:47] rate
[8:49] would be this is the hazard that creates
[8:51] a residual risk. Next slide, please.
[9:01] Can we move to the next slide, please?
[9:03] Thanks.
[9:06] So for comparison purposes, this is a
[9:08] premitigation debris flow risk map. The
[9:10] very high and high-risisk zones are
[9:12] indicated by brown and red. And a large
[9:14] number of res residences were included
[9:17] in these zones when we started. Next
[9:19] slide, please.
[9:23] And this is our post mitigation risk
[9:25] map. The only very high zone remaining
[9:27] is upstream of the barrier. And there's
[9:30] a small strip of high and moderate risk
[9:32] zones immediately downstream of the
[9:33] barrier.
[9:34] There are no longer any residences or
[9:36] businesses located in the moderate high
[9:38] or very high risk zones.
[9:43] Next slide, please. And that is all we
[9:45] have for the Cold Spring Creek. Moving
[9:48] on, I'm sure everyone here is aware the
[9:50] other creek in the community with debris
[9:52] flow concerns is Fairmont Creek.
[9:54] Fairmont Creek experienced a significant
[9:56] debris flow event in 2012. As part of
[9:58] the reaction to this event, the RDK had
[10:01] a hazard and risk assessment completed
[10:02] for the creek. And this assess this
[10:04] assessment which was completed in 2013
[10:06] is what was used for the planning and
[10:08] design of the mitigation works that have
[10:09] been completed on the creek to date.
[10:13] This report is now 12 years old and
[10:15] since the creek has been very active and
[10:17] some mitigation has been constructed, it
[10:19] was prudent to update the report. So
[10:21] this updated report incorporates the
[10:23] mitigation on the creek. It includes
[10:25] data from the multiple debris flow
[10:26] events that have occurred since the last
[10:28] report and it uses updated modeling
[10:30] techniques and changes to how climate
[10:32] change and wildfire impacts are
[10:34] considered. This report was funded by
[10:37] the UBCM community preparedness fund and
[10:39] it was completed by BGC Engineering.
[10:42] Next slide please.
[10:47] So before we talk about the up outcomes
[10:49] of the updated mapping, I wanted to
[10:51] review some of the terminology that
[10:52] you'll see and one big one is the
[10:55] distinction between debris floods and
[10:56] debris flows. So we see both of these
[10:58] processes on both of the creeks in
[11:00] Fairmont and they are related but there
[11:02] are some important differences.
[11:05] So a debris flood occurs when we have
[11:07] large volumes of flow in the creek or
[11:09] river and gravel, cobbles and boulders
[11:12] are picked up and entrained in the flow.
[11:15] It behaves more like water and it can
[11:17] still move really large volumes of
[11:18] debris, but there's generally lower peak
[11:21] discharges than debris flows. So we're
[11:22] getting um so the impacts are not quite
[11:25] as quite as um powerful.
[11:29] With debris flows, we have higher
[11:31] sediment concentrations than in debris
[11:33] floods. It behaves more like a wet
[11:35] concrete and it's typically faster.
[11:37] They're typically faster than debris
[11:39] floods and they have higher peak
[11:40] discharges and impact forces. Typically,
[11:42] they are more dangerous.
[11:45] Next slide, please.
[11:50] So now we'll move into one of the key
[11:52] outputs of the report which is the
[11:54] frequency magnitude values. So frequency
[11:57] of course is how often the event is
[12:00] likely to occur and the uh the volume is
[12:04] obviously the estimated size. So on cold
[12:09] on Fairmont Creek
[12:12] similar to Cold Spring Creek up until
[12:13] about the 100year return period event
[12:16] the event is likely to be a debris
[12:17] flood.
[12:19] So in the 10 to 20 year return period we
[12:21] can expect a volume of about 9,000 cubes
[12:23] and 30 to 100 year about 28,000.
[12:27] So [cough and clears throat]
[12:29] from about the 100year period onwards
[12:31] the events likely to be debris flow with
[12:34] significantly higher volumes.
[12:38] And you can see with the some of the
[12:40] numbers here the peak discharges for the
[12:41] debris flood are significant
[12:43] significantly lower [clears throat] than
[12:44] they are for debris flows. same as they
[12:47] are with the volumes. So to show how
[12:50] some of um our like more recent events
[12:53] fit into this table in 2020 the volume
[12:56] of debris that was mobilized from above
[12:57] the weers in Fairmont Creek was about
[13:00] 20,000 cubic meters.
[13:03] So at that time the return period
[13:05] estimated by NHC who was our consultant
[13:07] that looked at looked at the creek right
[13:09] after the event they estimated the
[13:11] period was about 35 years. So, this
[13:13] doesn't fit exactly into the table, but
[13:15] pretty closely fits into our 30 to
[13:18] 100year return period for debris floods.
[13:22] The 2012 event had an estimated volume
[13:24] of about 65,000 cubic meters. So, this
[13:28] was estimated by Clark in 2013.
[13:32] Um, at the time they felt that that was
[13:35] a period of maybe roughly 475
[13:38] year return period. But after the 2020
[13:42] event occurred, NHC updated this return
[13:44] period to be an estimated 165 years. So
[13:48] this again it doesn't fit exactly into
[13:50] what we have here, but relatively
[13:52] closely into the 100 to to 300year
[13:55] return period event. And this change in
[13:57] the estimated return period is due to
[13:59] the additional information from the more
[14:01] recent event.
[14:03] Next slide, please.
[14:11] So the mapping that we're going to look
[14:13] at next shows hazard zones that are
[14:15] based on the hazard which is determined
[14:17] from topography data interpretation
[14:19] modeling and then the risk index which
[14:22] is calculated using um a risk equation.
[14:25] So risk again is the probability of the
[14:28] hazard occurring and then the
[14:29] consequences of it occurring.
[14:33] So just to give a bit of background on
[14:37] risk, the risk equation considers the
[14:40] hazard probability which is of course
[14:42] the annual probability that the event
[14:44] will occur and then it considers spatial
[14:46] probability which means so in if an
[14:49] event of a certain magnitude occurs
[14:51] what's the likelihood of a certain
[14:53] location being impacted by it. It
[14:57] considers the temporal probability. So
[15:01] that means what's the likelihood of a
[15:03] person being in that location when the
[15:05] event occurs.
[15:08] It considers exposure. So exposure is
[15:10] the number of people or the value of the
[15:12] elements at risk in that location. And
[15:15] then the vulnerability. So that is the
[15:17] likelihood of a fatality
[15:20] should that person be impacted at that
[15:22] location. So this equation gives us our
[15:25] individual risk and that is that that is
[15:28] the PDI that you see on the table and
[15:30] that stands for the probability of death
[15:32] of an individual.
[15:34] We also considered in the report the
[15:36] group risk. So that's the estimated
[15:38] number of fatalities should a certain
[15:40] hazard occur and we looked at economic
[15:42] risk.
[15:46] So the hazard zones shown in this table
[15:49] align with risk tolerance criteria that
[15:51] other municipalities are using um such
[15:53] as Canmore, North Vancouver, Squamish
[15:55] and this risk is generally considered to
[15:57] be unacceptable
[16:00] um in a community if the risk of death
[16:02] of an individual is greater than 1 to
[16:03] 10,000. So this corresponds to the high
[16:06] and very high zones.
[16:09] Next next page please.
[16:14] So,
[16:16] this is one of the uh one of the key
[16:18] outputs of the assessment and it's it's
[16:21] a really great visual. So, I'll just I
[16:24] thought I would have this one up while I
[16:26] talked about some of the hazard zones.
[16:29] So, when you're looking at this map, the
[16:31] yellow zone is the is a low hazard zone.
[16:36] So, in the yellow zone, we're look the
[16:38] risk index is less than 1 to 100,000.
[16:42] So that is roughly equivalent to your
[16:45] risk of drowning in a bathtub.
[16:47] The moderate zone, and this is the
[16:49] orange zone, is in the 1 to 10,000
[16:53] to 1 to 100,000 range. And that's
[16:57] comparable to your risk of um dying
[17:00] [clears throat] from gun violence in the
[17:01] US or from general anesthesia in an
[17:06] operation.
[17:08] Now the high zone, this is the red zone.
[17:12] Um that is the 1 to 10,000 to 1 to 1,000
[17:20] risk of risk of death and that is
[17:24] comparable to CO 19 in 2020 or a car
[17:27] accident.
[17:29] and then the very high zone and that is
[17:31] greater than 1 to 1,000
[17:34] that is comparable to dying the 40th
[17:38] year of life in the USA from any cause.
[17:43] So the shape this map is much more
[17:45] detailed than we've seen in the past
[17:47] from from our last our last assessment
[17:50] but the shape of it is not remarkably
[17:52] different.
[17:53] There are however a number of properties
[17:56] uh remaining that are still in the high
[17:57] and very high hazard zones.
[18:01] Next slide please.
[18:07] So the final part of this report was to
[18:09] identify some potential options to be
[18:11] considered for future debris flow
[18:12] mitigation and to estimate the costs. So
[18:16] several factors were considered in the
[18:18] development of the options and some of
[18:20] these included the degree of risk
[18:22] reduction that could be achieved um risk
[18:25] transfer. So that would be um
[18:30] you know assuming we can mitigate the
[18:32] risk at one location but the cost of
[18:34] that was that a downstream location
[18:38] would see higher risk. Um the location
[18:41] of a potential
[18:44] potential mitigation uh the land
[18:46] ownership at that location future
[18:48] maintenance costs capital costs public
[18:51] impacts and the possibility of phasing.
[18:55] So at this point we have five options
[18:58] identified. They're not all standalone
[19:01] options. They mitigate in different
[19:02] ways. So it may make sense to combine
[19:04] two or more of these options as we look
[19:06] further into it. So very briefly, option
[19:10] number one would be a large debris
[19:13] barrier and basin, not unlike what we
[19:15] have on Cold Spring. Um and I know my
[19:18] map is is a little small up here, but
[19:20] that would be the number one option and
[19:23] it's right at the very top of the map.
[19:26] So that could potentially contain on the
[19:30] order of 60,000 cubic meters. So it does
[19:33] come close to mitigating um a good
[19:36] portion of the risk.
[19:38] It does come at a very high cost. And
[19:40] these costs are order of magnitude. They
[19:42] are very very rough, but they do give us
[19:45] an idea of what we could um be looking
[19:48] at when we're just thinking of what way
[19:50] we might want to go when we're thinking
[19:52] about options.
[19:54] Option number two is down, excuse me, is
[19:58] down on the golf course and that is a
[20:01] parallel parallel Burman basin. Um, that
[20:05] would contain less. It also costs a lot
[20:08] less. Um,
[20:10] there are different challenges with it.
[20:13] Um,
[20:15] it's all in private land. Um, it's right
[20:17] in the middle of community. It's
[20:18] definitely none of these options are
[20:19] ideal, but that it it does remain a
[20:22] viable option that we'd like to, you
[20:24] know, look at a little bit more.
[20:27] Um,
[20:28] the third option is downstream. So, that
[20:32] is
[20:33] on the lower part of the map. That's the
[20:35] number three and that's where the creek
[20:37] flows through the community downstream
[20:39] of the golf course pond.
[20:42] Um
[20:44] we're cons we're at in this location
[20:48] channel improvements are being
[20:49] considered. Uh it is a very small creek
[20:52] channel at the time. Um this would
[20:54] include looking at the culverts and the
[20:58] various ways it flows through the
[21:00] community. Um could include BMS, it
[21:03] could include armoring. The cost
[21:05] estimate is very broad um because
[21:08] [clears throat] there are so many
[21:09] different ways we could go with this
[21:10] option.
[21:13] Option number four, this is a smaller,
[21:15] more localized
[21:17] um
[21:19] potential mitigation. So [clears throat]
[21:20] that is towards the upper part of the
[21:23] map or and that is the the road crossing
[21:28] just downstream of where our wheels are
[21:30] located um where the road goes into the
[21:32] campground.
[21:34] And
[21:36] armoring this would um greatly
[21:41] greatly reduce the chance of that road
[21:42] being washed out in a large event. And
[21:46] that's important for emergency access,
[21:48] for ingress, egress, etc. The final
[21:51] option, number five, it's right in the
[21:54] middle of our map. So that would be an
[21:56] armored burm, and that's right in front
[21:58] of the Marble Canyon town homes. Um,
[22:02] they're extremely vulnerable. Be as
[22:05] close as they are to the creek. uh
[22:07] building up a larger BM would not only
[22:09] protect those homes, but it would keep
[22:10] um it would keep the flow in the channel
[22:14] at that location and uh easier to
[22:16] control downstream.
[22:20] Next slide, please.
[22:25] So, this report was just a first step in
[22:28] moving towards a potential future
[22:31] project on Fairmont Creek if that ends
[22:34] up happening. Um the next step will be
[22:36] to complete a detailed options analysis
[22:38] for all of these options that we've
[22:41] discussed and considered. And this
[22:43] options analysis would include more
[22:46] detailed analysis of the costs,
[22:47] feasibility, risks, and community needs
[22:50] and wants. And a really critical
[22:53] component of this next step will be
[22:54] engagement with all stakeholders
[22:56] including community members, businesses,
[22:58] first nations, and other levels of
[23:00] government.
[23:02] We'll be seeking funding opportunities
[23:03] for this next step and moving beyond
[23:07] that next step, should that be the
[23:09] decision that we go with, um we'll be
[23:11] looking at additional funding
[23:12] opportunities for potential future
[23:14] construction projects that come out of
[23:16] this options analysis.
[23:19] Thank you. And moving on to Karen.
[23:27] Thank you, Cara. So I'm going to speak
[23:29] to a bit about the planning side of
[23:31] things and about the guidance report
[23:33] that we had done by BGC Engineering and
[23:36] Pina Sustainability.
[23:39] So right now um we have an official
[23:42] community plan for Fairmont Hot Springs
[23:44] and Colombia Lake area and that OCP was
[23:48] done around the time of the 2013 event.
[23:52] Um and right now the policies and the
[23:55] direction with respect to hazards are
[23:58] quite generic and they're not very
[24:00] specific. Um how we've been dealing
[24:03] largely um with um the debris risk or an
[24:08] assessments have been on a sightspecific
[24:10] basis through the building permit
[24:12] process. So at this point um based on
[24:15] the the previous mapping for both the
[24:17] creeks uh the building inspector has
[24:20] been doing an independent assessment at
[24:22] each building permit stage to determine
[24:25] what level of reporting or what type of
[24:28] qualified professional report might be
[24:31] required in order to consider if there
[24:34] should be sightsp specific engineering
[24:37] considerations um to ensure that
[24:40] whatever is being built would be a safe
[24:42] built.
[24:43] So what the guidance report was intended
[24:46] to do is to provide information and to
[24:49] be proactively thinking ahead in terms
[24:52] of how we can move away from our current
[24:54] model which is reliant on a specific
[24:57] section section 56 of the community
[25:00] charter uh to ensure that property
[25:02] owners are informed about the risks um
[25:05] relative to building on their property
[25:08] and ensure that this uh building that is
[25:11] being built is safe for the intended use
[25:14] of occupancy. Uh to be moving forward to
[25:17] having an official community plan that
[25:20] includes relevant current policies with
[25:23] respect to land use policies. Uh so
[25:26] that's going to be land use conservation
[25:28] or change if people are looking to
[25:30] change the use of planning.
[25:33] whether or not there should be changes
[25:34] to our zoning bylaw, whether there
[25:36] should be changes that are reflective of
[25:38] the outcomes of these two reports to our
[25:41] flood plane management bylaw. And most
[25:44] importantly, that there would be
[25:46] opportunities to proactively have
[25:48] information for property owners and the
[25:51] regional district so that everyone has
[25:53] an understanding of how these reports
[25:55] that have been prepared relate to um
[25:59] individual properties and how they can
[26:01] safely be used and built. So what the
[26:04] intent of the guidance report were were
[26:07] three-fold. It was to have a chance to
[26:09] review the hazard mapping for both
[26:11] creeks. um with that reporting that was
[26:14] just completed this fall and has just
[26:16] been presented by Carara. Um it has a
[26:20] framework analysis and this is options
[26:22] on how to consider the updated hazard
[26:24] mapping for both creeks. So um there
[26:28] report looks at different frameworks. Um
[26:31] Cara spoke to that um when she had the
[26:34] table that discussed the probabilities
[26:37] um and that's how the zones relate to um
[26:40] what the level of risk is and so the
[26:43] framework looks at the three options um
[26:46] that were available for the regional
[26:47] district to consider as we move forward
[26:49] and makes a recommendation.
[26:52] So there are four interimm policy
[26:54] recommendations that were made by BGC
[26:57] Engineering and Penis Sustainability and
[26:59] I'll just walk through each of those
[27:00] four at a very high level.
[27:09] The first is a recommendation that there
[27:12] needs to be official community plan
[27:13] amendments. So, as you can see in the
[27:16] little snip from schedule I of the
[27:19] current official community plan that
[27:21] I've included on this slide, when the
[27:23] mapping for the hazard um was done with
[27:26] this OCP, when it was originally done,
[27:29] it very generically just identified that
[27:32] there was a hazard. So, it's not
[27:34] specific in terms of whether it's a
[27:36] debris flood, it's a debris flow, um
[27:39] what type of hazard it is, and it isn't
[27:42] generally really reflective of the scope
[27:45] or scale that's reflected by the fact
[27:48] that there's different zones or
[27:49] intensity of risk related to the
[27:52] hazards. Um the way that the mapping is
[27:55] done is it basically just follows the
[27:58] general uh creek barriers or the creek
[28:02] dispersal areas. um or the broader river
[28:05] Columbia River flood plane. Uh so we
[28:08] would be looking at having new mapping
[28:10] that aligns with the new data that came
[28:12] out of both the reports for both Cold
[28:15] Spring Creek and for Fairmont Creek. We
[28:18] would also be looking to integrate
[28:20] amendments that would recognize the
[28:23] other recommendations that are being
[28:25] made um within this report. So that
[28:28] would reflect integrating the risk
[28:30] tolerance policy that would be
[28:32] considered the hazard zones and
[28:33] development approval policies.
[28:38] So that takes us to recommendation
[28:40] number two which is that the RDK should
[28:43] adopt a formal risk tolerance policy. Uh
[28:47] so this is as Cara discussed is a
[28:51] relatively standard procedure for many
[28:53] municipalities um in BC and Alberta. And
[28:57] so these are being done by communities
[28:59] that have experienced events similar to
[29:02] the regional district and it creates a
[29:05] baseline um that provides direction in
[29:08] terms of where new development should be
[29:11] supported um based on those ratings and
[29:14] where um renovation or changes to
[29:19] existing development um is acceptable
[29:22] levels of risk. Uh so the report
[29:26] identifies that it can either be a
[29:28] standalone policy or it can be OCP
[29:32] specific. So at this time um we would
[29:35] think that it would be something that we
[29:37] would look to have their RDK adopt on an
[29:40] RDK-wide basis. Um but we'll see how
[29:43] that works. So it would include a risk
[29:46] tolerance criteria or risk index. So
[29:49] that would be um reflective of the two
[29:52] tables that Cara showed um that have it
[29:54] ranked based on the hazard zones. So the
[29:58] recommendation that came out of this
[30:00] report was that a combined hazard risk
[30:02] framework be applied for the regional
[30:04] district and this echoes a decision of
[30:08] the board made earlier in the year where
[30:11] they considered some preliminary
[30:13] information and provided some direction
[30:15] to staff and the consultant in their
[30:17] preparation of the report.
[30:23] Recommendation number three is that
[30:26] development permit areas that recognize
[30:29] the debris flow hazard should be
[30:31] integrated into the official community
[30:33] plan. The official community plan
[30:36] currently does not have a hazard
[30:38] development permit area. What a hazard
[30:41] development permit area allows is the
[30:44] segmentation of the parcels um within
[30:48] the hazard zones to be identified to
[30:50] have different guidelines that are
[30:52] required. So again, this very much
[30:54] becomes a public education piece in
[30:57] terms of that people can understand
[31:00] based on their hazard zones and the
[31:03] corresponding guidelines within the
[31:05] development permit area. They can
[31:07] understand what they can or could not do
[31:11] based on having a qualified expert
[31:14] opinion if required that what they can
[31:17] do to ensure that the there is safe
[31:20] build on their property.
[31:24] Uh so one of the key things that the
[31:27] report did identify though is that
[31:30] structural mitigation at the community
[31:32] level which might be that much more
[31:35] expensive or higher level of mitigation
[31:37] that Cara identified shouldn't be
[31:39] considered to facilitate or enable
[31:41] higher level densities. So that means
[31:44] that um that should all be taken into
[31:47] consideration um when we're identifying
[31:50] the guidelines um that would go into the
[31:53] development permit areas um should a
[31:55] development permit uh process be
[31:58] implemented within the official
[31:59] community plan.
[32:02] The last recommendation of the report
[32:04] was that there should be specific
[32:07] development policies integrated into the
[32:09] official community plan. So this really
[32:12] relates to the fact that people need to
[32:14] understand what the different four
[32:16] hazard zones means and
[32:20] how that should apply on a parcel
[32:22] specific basis. So this would also
[32:26] include identification of when sight
[32:28] specific risk assessments would be
[32:30] required and it should be aligned with
[32:34] the adopted risk tolerance policy that
[32:37] would be this is an action that would
[32:39] have to be completed by the regional
[32:41] district and be adopted by the regional
[32:43] district board and it would provide
[32:46] clarity with respect to future land uses
[32:49] based on the identified hazard zone. Um
[32:52] so based on the risk and hazard the very
[32:55] high hazard um residual hazard zones for
[32:59] example are would not be generally
[33:02] anticipated to be supported for
[33:04] residential development or types of uses
[33:08] that would include structures. So they
[33:11] may be more suited to passive recreation
[33:13] or park use. Uh so those are the types
[33:16] of policies that we would anticipate
[33:19] would be integrated into official
[33:21] community plan and the guidance report
[33:24] provides um some very high level
[33:27] information um with respect to that and
[33:30] as the implementation
[33:33] of the guidance report and consideration
[33:37] of the two reports prepared for the
[33:39] engineering department unfold. um the
[33:42] the specifics of that would be something
[33:44] that would be looked at and that there
[33:46] would be community consultation.
[33:49] So more specifically
[33:51] the implementation of the interimm
[33:54] policy recommendations are going to
[33:56] require the dedication of RDK staff
[33:59] resources and we anticipate this would
[34:02] be across multiple departments. So,
[34:05] similar to how uh we have four
[34:08] departments represented here tonight, um
[34:11] we anticipate to see this through um
[34:13] we're going to be needing to work
[34:15] together uh to ensure that the various
[34:17] expertise, knowledge and all those
[34:20] pieces can come together um to ensure
[34:23] that we can be successful moving ahead.
[34:26] Um one of the key things that we want to
[34:29] move forward with first is board
[34:31] consideration of the risk tolerance
[34:33] policy. um because this is a keystone um
[34:36] for moving forward with what the other
[34:38] parts of the puzzle look like with
[34:41] respect to whether we have specific OCP
[34:45] policies, what framework we're working
[34:47] forward and all those different pieces.
[34:49] um we we feel like that's the one piece
[34:52] we need first
[34:56] and then most importantly uh one of the
[34:58] key things about implementation is going
[35:01] to be that there will be community
[35:03] consultation and engagement. Uh so
[35:05] similar to as Cara just spoke to, there
[35:08] are a range of stakeholders um that the
[35:11] regional district will need to and will
[35:13] want to engage as we move forward um in
[35:17] with respect to ensuring that um members
[35:20] of the community have the information
[35:22] that they need um in order to be able to
[35:27] contribute to the processes that we're
[35:29] going to be engaging.
[35:32] So just a quick summary of the next
[35:38] steps recognizing that we have three
[35:41] different reports um and we've had three
[35:43] different speakers um just I'll give a a
[35:47] really quick summary here and so the
[35:50] next steps for each of the different
[35:52] pieces uh for Cold Spring Creek um
[35:55] really the project has wrapped up with
[35:57] the construction um now being completed.
[36:00] So, one of the key items is discussion
[36:02] with the province on ongoing funding
[36:05] support for the debris removal for
[36:08] Fairmont Creek. As Cara identified, um
[36:11] there needs to be mitigation option
[36:13] analysis and stakeholder engagement
[36:17] and very importantly there needs to be
[36:19] investigation of funding sources for
[36:21] that both that options analysis and for
[36:24] potential future construction. um none
[36:27] of the proposals or for the potential
[36:32] mitigation options um were something
[36:34] that are um low dollar u value. And for
[36:39] the guidance report as I just mentioned
[36:41] um the first thing that we would like to
[36:44] embark on um is the development and
[36:46] adoption of an RDKwide risk tolerance
[36:49] policy as this will set the groundwork
[36:52] for us to be able to move forward with
[36:54] the other pieces and the other updates.
[36:58] So, we are all here and recognize that
[37:01] it's a lot of information and that um
[37:06] you may not have questions specifically
[37:09] um but we are here um to answer them um
[37:13] and we have kind of we have expertise
[37:15] for the three different areas and so
[37:18] that if you wanted to take advantage of
[37:21] um having us here today um you can input
[37:24] the question into the Q&A Okay.
[37:28] So, Nathan.
[37:30] » Yeah. Thanks, Karen. Um, I will start
[37:32] with reading the questions that we did
[37:34] receive on the engage page. Um, and then
[37:37] after we've gone through those, then
[37:38] we'll move on to the Q&A questions that
[37:41] have been asked during this meeting or
[37:43] this webinar here. Okay. Um, so sorry.
[37:45] Um, the first question on the engage
[37:48] page is on the Fair on the Fairmont
[37:52] Creek map, the high zone reaches the
[37:54] Columbia River. Has there been any
[37:57] modeling to determine the risks or
[37:59] potential impact up and or downstream?
[38:11] » Uh
[38:12] Beatus, could you answer that one?
[38:14] » Yeah, absolutely. Uh yeah, so we didn't
[38:18] specifically look at um the impacts to
[38:21] the Columbia River in this scope of
[38:23] work, but uh if we kind of look at the
[38:27] 2012 event, we know that sediment could
[38:29] reach the river similar to that event.
[38:32] uh and a separate study would need to be
[38:34] done to look at the capacity um for the
[38:38] Columbia River to take away the sediment
[38:40] um in 2012, which is kind of as Cara
[38:43] said, similar to what we'd expect in a
[38:45] 100 to 300year event. Uh it didn't block
[38:48] the river. Um and I believe the sediment
[38:52] was mostly carried away naturally. Um,
[38:55] so that's kind of gives you a scale uh
[38:58] an idea of what could happen in the
[39:01] future. But with a larger event, we
[39:03] would probably expect more sediment to
[39:05] reach the river, but we did not study it
[39:08] quantitatively. No.
[39:13] » Great. Um, I will move on to the next
[39:15] question from the engage page. Uh, how
[39:18] can the community members communicate to
[39:20] the RDK that we do not want to pay for
[39:22] any further exper
[39:28] mitigation?
[39:38] Um, I'll take that. there, as we've um
[39:43] as we've noted a couple times in this
[39:45] presentation, um there will definitely
[39:48] be opportunities for future engagement
[39:51] with the community and you'll have the
[39:54] opportunity opportunity to uh let us
[39:56] know how you feel at that time.
[40:03] Okay. Um and then the next question from
[40:05] the engage page. If the Fairmont
[40:08] guidance report is to guide future
[40:10] development, why are the developers not
[40:12] paying for these studies and flood
[40:14] mitigation projects?
[40:24] Uh I'll speak a little bit to the who
[40:26] paid for the project. Um the guidance
[40:29] report um was funded I think it was
[40:33] about 93% by UBCM which is the union of
[40:37] BC municipalities grant program um and
[40:41] the remaining 7% was paid for through
[40:43] the planning function which means it was
[40:46] not specific to the service area paying
[40:49] for that remaining funds that were
[40:51] required to be um inind type
[40:54] contributions. um they were p paid for
[40:57] actually through the entire planning
[40:59] function which is uh funded both through
[41:01] the municipalities and all of the
[41:04] taxpayers within the electoral areas. Um
[41:07] so that was for that report and then the
[41:10] um some of funding as well came through
[41:13] that UBCM funding program
[41:17] and then I'm not sure if Cara wanted to
[41:19] speak to the other piece.
[41:22] » Yeah, I can do that. Um I guess the the
[41:25] short answer really is that
[41:29] the reason
[41:31] the reason that we did any mitigation is
[41:34] for the existing community. Um
[41:37] if there wasn't a community there, if it
[41:40] was only if it was only for future
[41:42] development,
[41:45] the project would not have happened.
[41:50] Um, and I guess I'll I'll add a little
[41:52] bit to that. There are places in the
[41:54] province where barriers are being built
[41:57] um, much larger than this. And in those
[42:00] cases, they are being paid for by the
[42:02] developer.
[42:11] Okay. Um, so the next question is, will
[42:13] any future mitigation projects be voted
[42:16] on by the community?
[42:28] do I can take this one if if you want.
[42:32] Um I I think in this uh at this point as
[42:37] we move forward in through the process
[42:39] we're not at that stage. uh what's
[42:42] determined in the next steps. There will
[42:45] be public consultation
[42:47] and that would be certainly would be the
[42:50] intention to get the feedback from the
[42:51] community to discuss what the options
[42:54] are. Um and that that's how we'll that's
[42:57] how what our intention is to move
[42:58] forward.
[43:07] Okay. Um, sorry, juggling a couple
[43:10] screens here at the moment. Um, so the
[43:13] next comment from the engage page, um,
[43:16] thank you for your efforts to support
[43:18] hazard and risk mitigation on Cold
[43:20] Spring and Fairmont Creek. The Fairmont
[43:22] Creek footpath from the mountainside
[43:25] golf course to the Fairmont Hotring
[43:27] Lodge area has remained closed since the
[43:30] landslide in 2012. Despite the trail
[43:33] closure, many people still use the trail
[43:35] to access the waterfall. Along the foot
[43:37] path below the Fairmont Hot Springs
[43:39] pools, there is an exposed black pipe
[43:42] along the creek bed. There's also a
[43:44] broken white pipe. These pipes have been
[43:46] exposed since the landslide in 2012.
[43:49] Over the past year, there have been
[43:51] concerns from the community regarding
[43:53] the state of the potable water
[43:54] infrastructure.
[43:57] Please advise the purpose of these pipes
[43:59] and the status of the trail restoration
[44:01] efforts.
[44:05] Yeah, I can take that. Um, so these
[44:07] pipes
[44:09] are Fman Hot Springs infrastructure and
[44:13] they are for irrigation,
[44:15] not for potable water.
[44:18] As far as restoring the trail, that is
[44:22] all private land um owned by the resort.
[44:26] And it wouldn't be because it's not
[44:29] really a flood, it's not a flood
[44:30] mitigation type project. um that would
[44:32] fall on the resort to uh repair.
[44:39] » All right. Um if the debris flow were to
[44:41] cross and block the highway, would that
[44:44] not be a provincial or federal
[44:45] jurisdiction? Why then is our LSA the
[44:49] only ones paying for the dam?
[45:03] Uh the capital costs of the dam were 98
[45:07] 99% covered by provincial and federal
[45:10] funding.
[45:12] So they have uh contributed greatly to
[45:15] the cost of the structure and
[45:17] mitigation.
[45:21] Christina, could you speak to the role
[45:23] of the RDK as the local responsible
[45:27] local authority in cases of emergency
[45:30] management?
[45:32] » Yeah. Uh so I mean if a if we had a
[45:35] debris flow that impacted the community
[45:37] as well as the highway, there is a lot
[45:39] of coordinated efforts between uh
[45:42] various agencies, the RDK itself, um the
[45:44] Ministry of Transportation if the
[45:46] highway was impacted. uh and there is a
[45:48] concerted effort to you know clean
[45:50] things up as quickly as possible uh look
[45:53] through or activate funding through the
[45:55] province and whatnot. Um but yeah it
[45:59] it's
[46:01] it's a complicated and uh coordinated
[46:04] effort when we have a big event.
[46:12] » Okay. Um, so the next question, the RDEK
[46:15] was presented with a petition at the
[46:17] grand opening of the dam in October.
[46:20] Rather than address the serious and
[46:21] numerous concerns raised in it, a short
[46:24] response was provided advising to
[46:26] contact the ombbuds person. Why did the
[46:28] RDK choose to dismiss the concerns and
[46:31] pass the responsibility off on it?
[46:36] » Certainly, I can speak to that. I don't
[46:38] think the RDK chose to dismiss the
[46:41] concern. was actually quite the
[46:42] opposite. the the the
[46:46] uh petition as I understood it was
[46:49] asking that a complete review be done
[46:53] and that is the role of the umpids
[46:55] person's office is to complete those
[46:58] types of re reviews as a uh impartial
[47:02] and third party to make sure that any
[47:05] there was nothing done incorrectly or
[47:07] against policy or out of outside of the
[47:10] public interest. So it is the
[47:12] appropriate vehicle for uh for the the
[47:16] request that was in the petition.
[47:25] Okay. Um how was the guidance project
[47:28] and updated hazard and risk assessment
[47:30] been funded to date? How will the
[47:33] implementation of the recommendations be
[47:35] funded?
[47:42] So the guidance project as I mentioned
[47:44] was primarily funded through UBCM uh
[47:47] funding program and that was through a
[47:50] disaster um recovery and climate u
[47:54] mitigation stream. Um some of the
[47:58] preliminary work will be covered through
[48:01] the planning function
[48:03] and beyond that uh similar to Kara uh
[48:08] the regional district will be
[48:10] investigating additional uh grant
[48:13] funding streams um where it is
[48:16] identified that there is um expertise or
[48:19] guidance um that is required that is
[48:22] outside of the scope and capability or
[48:25] qualific ifications of RDK staff. Um so
[48:28] it's going to be a bit of a mix um with
[48:32] respect to it being paid through um
[48:35] existing um regional districtwide
[48:39] services um instead of just being born
[48:41] by the local service area and grant
[48:44] funding as the different um
[48:47] opportunities or requirements come
[48:50] about.
[48:55] Okay. Um, and will any of the costs of
[48:58] these reports, RDK staff hours,
[49:02] administration input, and subsequent
[49:04] meetings be borne by a new or the
[49:07] existing Fairmont Flood and Landslide
[49:09] Service Area Fund.
[49:22] I say generally speaking, um I'd say
[49:25] kind of what I just said for the
[49:27] previous response. Um the majority of
[49:30] the staff hours and administration is
[49:33] getting covered through um existing um
[49:36] regional districtwide service um
[49:39] taxation. Um the local service area is
[49:43] very specific with respect to uh what
[49:46] the funds generated from that local
[49:48] service area are eligible to cover. Um
[49:51] it is a small service area. It has
[49:53] limited taxation available. Um so where
[49:56] it is feasible um it is covered through
[49:59] those broader taxation
[50:02] um considerations and services.
[50:10] Okay. And this is the last question from
[50:13] the engage page and then we will move
[50:14] over to the Q&A section. Um, at several
[50:18] recent public meetings and forums hosted
[50:20] by the RDK, it has been noted that the
[50:23] time period for public input and
[50:24] questions was insufficient. Will this be
[50:27] addressed at this and future meetings
[50:29] going forward?
[50:36] Yes, that would be an area that we would
[50:39] look for direct feedback and potentially
[50:42] some guidance on. Um if there is a
[50:45] feeling from the community that you
[50:47] aren't being given enough time um then
[50:50] that should be articulated to the
[50:52] project managers um specific to the
[50:55] different pieces as we move forward and
[50:58] then where it is practicable
[51:01] um that those can be worked into the the
[51:03] work plan um and that can be considered
[51:06] moving forward.
[51:11] » Okay. Um, I'm going to move over to the
[51:14] Q&A. Uh, I believe that everyone can see
[51:17] these. Um, and I'm going to start from
[51:21] the top and work my way down um, in
[51:24] order that they came in. Okay, so first
[51:27] question is, what about not I guess it's
[51:29] more a statement. What about not
[51:31] spending tons of money and keeping our
[51:33] property taxes in a small community low?
[51:35] The risk is on the homeowners.
[51:39] » Uh, I can comment on that one. Uh so I
[51:42] mean as Cara mentioned earlier the the
[51:44] next step is to do a detailed mitigation
[51:47] uh options analysis and figure out what
[51:50] is actually recommended and what we need
[51:52] to look at. Uh as local government we do
[51:54] have an obligation when we are aware of
[51:56] a life safety hazard to do something
[51:58] about it. Um and then further to that uh
[52:01] the new emergency and disaster
[52:03] management act or EDMA uh has a section
[52:06] in it uh 26 uh 2B I believe uh that
[52:10] actually empowers the minister of
[52:12] emergency management to actually order a
[52:15] local authority to actually place
[52:17] mitigation works in place uh if there is
[52:20] a significant risk to a community and
[52:22] they aren't satisfied with the actions
[52:23] taken by the local government. So there
[52:25] is a chance that we may not have an
[52:27] option. Um and that would be with the
[52:30] province.
[52:33] » Okay. And then the next statement here,
[52:35] it says that there's 31 members of the
[52:37] FHS community at the Lion's Den. So
[52:40] yeah, that's wonderful to hear that um
[52:42] because it shows that we've got a much
[52:44] bigger turnout than the numbers on this
[52:47] Zoom indicate. So thank you for letting
[52:49] us know that.
[52:52] Um and then the next statement is stop
[52:56] spending our money without the complete
[52:58] determination of the community.
[53:03] Um and then the next question is
[53:06] consultation and engagement means
[53:09] exactly what
[53:19] I'll answer from um sort of the OCP
[53:23] change or the risk tolerance policy that
[53:25] may be forthcoming. Um and consultation
[53:28] and engagement is largely going to um
[53:32] include opportunities for public
[53:34] education um and to ensure that that the
[53:37] community understands um the different
[53:40] pieces that we're considering um and has
[53:44] an understanding of why the regional
[53:47] district is proposing um ultimately what
[53:50] we end up proposing. Um so there it it's
[53:54] going to vary um depending on the the
[53:57] different um parts of the project. Um
[54:00] but key thing is is that we want to make
[54:02] sure that the community is informed at
[54:04] each step as we move forward. Um, so
[54:08] recognizing that there's a whole
[54:10] continuum of what consultation
[54:13] engagement can mean and sometimes it
[54:15] does mean inform and sometimes it does
[54:19] mean we're looking for feedback that is
[54:22] directly going to impact what the end
[54:24] result is. Um, and depending on which of
[54:27] the projects um, we're consulting on,
[54:29] which ones we're engaging on, it
[54:32] potentially is going to um, run the
[54:34] gamut of that spectrum. Um, as Christina
[54:38] identified, um, at some point the
[54:41] regional district might get marching
[54:42] orders. Um, we do have these reports
[54:45] now. Um, there are actions that we do
[54:48] need to proceed with. Um, but we do want
[54:50] to make sure that the community is
[54:52] informed about um, what's happening in
[54:54] your community, why things are happening
[54:56] in your community. um and to make sure
[54:58] that you have the information um that
[55:00] you need to feel comfortable um with
[55:03] understanding why the regional district
[55:05] is going down the various paths that
[55:07] we're going to go down.
[55:10] » Okay. And
[55:12] » I'd like to add a bit to that.
[55:15] » Um I guess from my perspective, a lot of
[55:18] what Karen said applies to my projects
[55:20] also. Um when when when we're looking at
[55:23] things like future mitigation projects,
[55:26] um
[55:27] ultimately ultimately we want our
[55:29] experts to provide us with options that
[55:31] we can move forward with. But what we do
[55:34] want when we're choosing potential
[55:36] options should we have should we have
[55:38] them is we want to know what the
[55:40] community wants. um what's important to
[55:42] the community, like what the what their
[55:45] priorities are
[55:48] and
[55:49] um [clears throat] we'll do the best
[55:51] that we can
[55:53] to to meet those wants and needs. Um
[55:59] provided that, you know, we are
[56:02] continuing to um work towards a safe
[56:06] community.
[56:09] Thanks, Nathan. Is that perfect? Um,
[56:12] what is the delta between the old risk
[56:15] assessment and the new one?
[56:19] » Um, okay. [clears throat]
[56:23] the numbers are the numbers are higher
[56:27] in the new one and it's quite a bit more
[56:30] detailed. So, we do have um we have
[56:33] numbers for for different um levels of
[56:36] an event. So, you know, we have our 10
[56:38] to 20 or 10 to 30, our 30 to 100,
[56:43] but the general
[56:45] um
[56:48] the general outcomes are not that
[56:50] different. Um I'm wondering I do have a
[56:54] map I do have the old map at the very
[56:56] end of this presentation. If we could
[56:58] skip forward just so I can show it
[57:00] quickly.
[57:03] Yes. So this is our 2013 mapping and
[57:08] if you compare it if you compare it to
[57:10] our new mapping the general shape is
[57:13] very very similar. Um
[57:17] the new one like I like I said is just
[57:19] more detailed.
[57:24] Okay. Um next one. What constitutes an
[57:27] event and what are the characteristics
[57:29] of an event and what can be done to
[57:32] mitigate the severity of the event?
[57:35] Example, annual inspection and removal
[57:38] of debris from the creek sides.
[57:42] So I can should I just quickly go over
[57:44] that again? What constitutes an event?
[57:47] What are the characteristics of an
[57:49] event? And what can be done to mitigate
[57:51] the severity of the event?
[57:56] Um, I can I can take this question. Um,
[57:58] I'm going to assume that the person
[58:01] who's asking this question is asking
[58:04] about uh debris flows and debris floods
[58:08] events. Um, so the kind of they
[58:10] constitute between floods to landslides
[58:13] is kind of what we're looking at on
[58:14] these two creeks. Uh, and when we say an
[58:19] event, uh, we're saying, um, some kind
[58:22] of flooding or or landslide or debris
[58:24] has come down the creek that's
[58:26] potentially larger than what the creek
[58:29] can handle. So, it often uh has impacts
[58:32] to um, like maybe the banks you see
[58:36] might see erosion down some of the paths
[58:38] or on Fairmont Creek, the golf course
[58:41] pond might fill with sediment. um or um
[58:44] the stream the creek a bit lower from
[58:46] the golf course pond might uh have too
[58:48] much water in it and it might flood onto
[58:51] roads or into people's uh homes or their
[58:54] backyards. So that's what kind of what
[58:56] we mean when we have say an event. And
[58:58] then there's different magnitudes. So,
[59:00] that's kind of what we're describing
[59:01] where we might have some fl um smaller
[59:03] floods that are at that 10-year return
[59:06] period and then we have the larger ones
[59:08] or moderate size that might be like the
[59:11] 2012 event on Fairmont Creek where you
[59:14] saw a lot of mud and rocks and trees
[59:16] come down. Um and I think um the last
[59:20] part of the question was something about
[59:21] how we can mitigate that or bring down
[59:23] the severity of the event. Uh and a lot
[59:27] of what would need um need to be done to
[59:30] bring down um make the event less severe
[59:32] might need to happen in the watershed if
[59:35] we think about it because the this is
[59:36] all coming from up in the watershed when
[59:38] it gets rained on or when we have
[59:40] landslides and generally we don't see
[59:43] that as being feasible uh in Canada.
[59:46] These wersheds are really large. We're
[59:48] not going to be able to secure every
[59:50] slope in the whole watershed. So that's
[59:53] why we start to look at mitigation uh
[59:56] right where it's needed most. So um on
[59:59] the fan where there's uh homes and
[1:00:02] people. Uh hopefully that answers the
[1:00:04] question and maybe Cara might have
[1:00:06] something to add.
[1:00:08] » Um no I think you've said a lot of it uh
[1:00:10] Beatus.
[1:00:12] Um,
[1:00:14] I think right now the best we can do to
[1:00:16] mitigate severity of events is to make
[1:00:18] sure that our existing structures are
[1:00:21] maintained and to have an awareness
[1:00:24] of weather systems that are coming
[1:00:26] towards us and be prepared for them.
[1:00:31] And we do our our all of our
[1:00:33] infrastructure is inspected several
[1:00:36] times a year. So we we do keep close eye
[1:00:40] on things.
[1:00:43] Okay. Um so next question in one of the
[1:00:46] first slides it states quote to ensure
[1:00:49] we met uh provincial expectations
[1:00:53] should not the province bear most of
[1:00:55] that cost?
[1:00:57] And then the second part of this
[1:00:58] question or I guess it's a statement to
[1:01:01] use numbers like 300 years and 1,000 and
[1:01:04] 3,000 years is not realistic.
[1:01:08] » Yeah, I can comment on the the first
[1:01:09] part of that um question there Nathan.
[1:01:12] Uh so just for awareness I am in
[1:01:15] conversations with uh emergency
[1:01:17] management climate readiness uh senior
[1:01:19] staff trying to advocate for our
[1:01:22] residents uh in coming up with some sort
[1:01:24] of sh cost sharing model when it comes
[1:01:27] to funding of uh mitigation and ongoing
[1:01:30] maintenance of mitigation and and
[1:01:32] response costs in general. Uh it is an
[1:01:34] ongoing conversation so there isn't a
[1:01:36] specific update I can share on that
[1:01:37] right now but um we are advocating and
[1:01:40] working really hard to try and get costs
[1:01:42] kept down.
[1:01:48] Um I guess to look at the second part of
[1:01:52] that using numbers like 300 years and
[1:01:54] 1,000 years
[1:01:56] not being realistic. Um,
[1:02:00] so a 300-year event
[1:02:04] has a 15% chance of occurring in a
[1:02:07] 50-year period.
[1:02:10] So a 50% chance of an event occurring
[1:02:14] in that part of someone's life
[1:02:18] is actually fairly significant.
[1:02:21] And even a thousand-year event is a 5%
[1:02:25] chance occurring. So these these
[1:02:27] actually these are
[1:02:29] these actually are
[1:02:33] these actually do warrant a they do
[1:02:34] warrant a response from us and they do
[1:02:38] need to be mitigated from and these
[1:02:41] these events are are life safety events
[1:02:44] that we can't just ignore.
[1:02:51] » Okay. Um, the next question, we were
[1:02:54] told the Cold Spring Creek project was
[1:02:57] for a 1 in300-year event. Now it is
[1:03:00] apparently for a 1 in 1,000-year event.
[1:03:03] Was the risk assessment wrong of or
[1:03:06] sorry, was the risk assessment wrong or
[1:03:09] was the dam built bigger than expected?
[1:03:17] » Could you address that, Petus? the
[1:03:19] changes between the diverse.
[1:03:22] » Sure. Um I don't have the specifics off
[1:03:26] hand um as I was I was involved in this
[1:03:29] a little bit more adjacently but I think
[1:03:31] maybe where the confusion is here um is
[1:03:36] that I I think the basin was built um a
[1:03:41] little bit larger than they had they had
[1:03:43] [clears throat] originally designed just
[1:03:45] based on the space that was available.
[1:03:47] um they were able it was the idea was
[1:03:50] that they went to the budget that was
[1:03:52] available um to to the design. So um so
[1:03:56] there's that part but um really I think
[1:03:59] what we're saying is it's that 300 to
[1:04:01] a,000year range. Um so we in geoscience
[1:04:05] we never put exact numbers on things.
[1:04:08] It's hard uh because we don't understand
[1:04:10] um or sorry um because there's like a
[1:04:13] lot of uncertainty in some of the work
[1:04:15] we do. Um, so that's where we have those
[1:04:17] ranges, that 300 to a thousand-year. Uh,
[1:04:19] and then we compare that to the volume.
[1:04:22] Um, I think that's what Cara did in this
[1:04:23] presentation. Um, compared that to the
[1:04:26] volume of the 1,00 to 3,000-year event,
[1:04:28] just showing how much um, residual
[1:04:31] hazard there still is and why there is
[1:04:34] um, a bit of risk still shown on that
[1:04:38] map. It's from that higher return period
[1:04:40] event. And some of these return periods
[1:04:42] that we study, they um might seem quite
[1:04:45] large like uh but as Cara was
[1:04:47] explaining, they do have the chance of
[1:04:50] happening during someone's lifetime. And
[1:04:51] they're actually um we're instructed to
[1:04:54] look at these large return periods by um
[1:04:57] some of the provincial authorities. Um
[1:05:00] so yeah, just give me a bit of context
[1:05:02] there. Um to add to that a little bit
[1:05:05] further, so we were targeting the 100 to
[1:05:08] 300
[1:05:10] year event as as a minimum for our
[1:05:12] mitigation. And
[1:05:15] that's the event that we looked at
[1:05:17] because it's it's the event that is the
[1:05:21] most likely to happen that is really
[1:05:22] severe if if that makes any sense.
[1:05:26] » Um
[1:05:28] and the project it was built as
[1:05:31] designed. um we didn't build it we
[1:05:33] didn't build it larger but we are
[1:05:35] looking at um
[1:05:39] we're looking at such a big area that it
[1:05:40] takes a very a very small change to make
[1:05:43] a big difference in volume. So,
[1:05:46] you know, we have an extra maybe half
[1:05:48] meter high on the dam than we might have
[1:05:52] needed to get to the 63, but that covers
[1:05:54] a it's such a large area up top that it
[1:05:56] makes a big volume difference.
[1:06:01] Okay. Um, next
[1:06:04] one is
[1:06:07] Okay. But there is one open pipe that is
[1:06:10] pouring water into creek or into the
[1:06:13] creek at the start of the bottom of the
[1:06:16] Marble Canyon Trail. So I'm maybe
[1:06:18] assuming this is in relation to that
[1:06:20] previous
[1:06:23] trail question.
[1:06:27] » I was not aware of that. Um it's not RDK
[1:06:30] infrastructure, but
[1:06:33] I'll let the resort know.
[1:06:35] » Thank you. Okay. Um,
[1:06:39] next one. There's a lot of modeling
[1:06:41] going on. So, is there modeling showing
[1:06:44] the financial and public safety effect a
[1:06:48] flood, debris flow, or landslide has on
[1:06:51] a transportation corridor?
[1:06:53] In our service area, the highway 9395 is
[1:06:56] used daily by business from Cranrook to
[1:06:59] Golden and beyond. The loss of business
[1:07:02] revenue would be substantial, not to
[1:07:03] mention the cost of highway cleanup
[1:07:05] and/or replacement.
[1:07:07] millions even our education system and
[1:07:09] emergency services would endure a long
[1:07:11] period of disruption.
[1:07:13] So the question in there was is there
[1:07:16] modeling showing the financial and
[1:07:17] public safety effect a flood, debris
[1:07:20] flow or landslide has on a
[1:07:21] transportation corridor
[1:07:24] specifically I guess highway 9395.
[1:07:28] » Uh yeah I think I I can take that to
[1:07:30] start with. Uh so as Cara mentioned in
[1:07:34] the presentation, we did do a
[1:07:37] preliminary economic risk assessment on
[1:07:40] Fairmont Creek. So that's taking into
[1:07:42] account um approximate costs of the
[1:07:46] damage that um these events would do. Uh
[1:07:50] but ours is uh the assessment that was
[1:07:53] done is is quite preliminary. We mostly
[1:07:55] just looked at damages to buildings and
[1:07:58] properties and then the cleanup costs
[1:08:00] that um RDK has has taken um in previous
[1:08:05] events such as like the the annual or
[1:08:07] every two-year uh filling of the we um
[1:08:11] so we didn't look at all of the business
[1:08:14] loss and and I think it's mentioned in
[1:08:16] there as a large limitation of our study
[1:08:18] that that obviously um was not accounted
[1:08:21] for. Uh and um that's
[1:08:25] Definitely. It it makes sense that that
[1:08:27] needs to or that that is a large loss
[1:08:30] though if if the highway was closed.
[1:08:45] Sorry, I was muted there. My apologies.
[1:08:47] RDK is creating the risk tolerance
[1:08:49] policy. Will that not drive which flood
[1:08:53] mitigation is recommended? Should the
[1:08:55] community not have input as the degree
[1:08:57] of risk that as the degree of risk be
[1:09:01] willing to tolerate?
[1:09:09] Maybe if I could get Tamson to speak to
[1:09:13] um the risk tolerance policy
[1:09:14] recommendation.
[1:09:16] » Sure. Um thanks Karen. Uh so certainly
[1:09:20] risk tolerance policy would be one of
[1:09:23] the inputs um one of the elements in
[1:09:25] making decisions about mitigation but
[1:09:27] along with many other ones and um I
[1:09:30] think I've heard Karen and Cara speaking
[1:09:34] to further engagement on the mitigation
[1:09:36] options. Um, if we think about the risk
[1:09:40] tolerance policy, um, it's there really
[1:09:43] to drive land use decisions. Um, and
[1:09:48] really applies to existing development,
[1:09:51] uh, as well as new development. And
[1:09:52] often there's different tolerances for
[1:09:55] that new development as well as the
[1:09:57] existing development. with existing
[1:09:59] development having a higher tolerance,
[1:10:02] the the priority is really to um prevent
[1:10:05] future exposure to to the the hazard.
[1:10:09] So, it doesn't necessarily point to the
[1:10:10] most expensive option for mitigation. Um
[1:10:14] certainly uh engagement would occur
[1:10:17] moving forward on the risk tolerance
[1:10:21] uh policy as Karen's mentioned as well.
[1:10:24] Um there is significant precedent in BC
[1:10:28] in terms of uh risk tolerance policy
[1:10:30] used in other communities
[1:10:33] uh for for this for a similar
[1:10:35] application.
[1:10:42] All right. Um, so the next one, remind
[1:10:45] us again why the annual cost to maintain
[1:10:48] mitigation works on these creeks in
[1:10:50] Fairmont should only be borne by a mere
[1:10:53] 1,000 Fairmont rate payers and not
[1:10:56] spread out through out the valley and
[1:10:58] the MOT. at
[1:11:17] I think I'll I'll start this and
[1:11:19] probably Christina you could uh weigh in
[1:11:22] a little bit on this too because in fact
[1:11:25] a lot of the maintenance some of the
[1:11:27] cleaning out of the wees the debris,
[1:11:29] ponds, that sort of thing. Some of those
[1:11:30] costs are recouped. It's my
[1:11:33] understanding from from emergency
[1:11:34] management. So, all the costs are not
[1:11:38] actually being to maintain the
[1:11:40] infrastructure uh and clear clear them
[1:11:42] out are not being maintained by the
[1:11:44] rate. But it there is a provincial
[1:11:47] expectation with these grants that we
[1:11:50] receive and again Carrie you may want to
[1:11:52] add to that but that that we that the
[1:11:54] grants the 98% that we received um for
[1:11:57] the funding of the of the capital work
[1:11:59] is that there was some responsibility on
[1:12:02] the on the uh property owners in this in
[1:12:05] the service area to maintain that which
[1:12:08] is protecting the properties.
[1:12:11] » I can jump in there. Sorry, I
[1:12:12] interpreted that question slightly
[1:12:13] differently than I think it was actually
[1:12:15] asked. So, um yeah, when it comes to uh
[1:12:18] debris building up in uh the we or in
[1:12:21] any of our debris basins, uh if it is of
[1:12:24] a sizable note, um then the province can
[1:12:28] step in with their response funding,
[1:12:30] emergency funding to help us clean those
[1:12:31] out so we can reduce the risk and get it
[1:12:33] back to a a tolerable standard so that
[1:12:35] everybody is safe. Um and from that
[1:12:38] perspective, we are um we do that with
[1:12:41] every single event that we have. Um the
[1:12:44] other comment sort of ties into what I
[1:12:45] was talking about earlier with the
[1:12:46] advocacy in terms of ongoing
[1:12:48] maintenance. So just looking at like the
[1:12:50] Cold Spring uh debris basin and trying
[1:12:53] to come up with a a cost sharing model
[1:12:54] from that perspective to um ensure that
[1:12:57] it's not just uh our our taxpayers that
[1:13:00] are paying for it, that there is some
[1:13:02] some tie into the province there as
[1:13:03] well. Cara, is there anything you want
[1:13:06] to add to that?
[1:13:09] » Um, not really. I think between you and
[1:13:10] Susan, do you think you you've answered
[1:13:12] the question?
[1:13:16] » Nathan.
[1:13:17] » Okay.
[1:13:18] Um, so next up, does the community
[1:13:21] really have any say when the province
[1:13:23] minister and RDK are creating their own
[1:13:26] guidance report?
[1:13:33] The guidance report is really seen as as
[1:13:36] the starting point. Um we knew we didn't
[1:13:39] have all the answers when it came to um
[1:13:42] what we needed to do in order to move
[1:13:45] forward proactively with um
[1:13:48] acknowledging the outcomes of these um
[1:13:50] technical engineering reports. Um so
[1:13:55] there will be a certain point um where
[1:13:57] the community will have opportunities to
[1:13:59] participate. Um but as it's been
[1:14:03] identified by various speakers um the
[1:14:05] regional district does have obligations
[1:14:07] and responsibilities under various acts
[1:14:11] um at the provincial level um to ensure
[1:14:15] that development is um occurring in a
[1:14:18] safe and responsible manner. Um so
[1:14:21] within those contexts um we will be
[1:14:24] looking at um making sure that um the
[1:14:28] actions that are um undertaken um are
[1:14:31] moving the RDK and the community towards
[1:14:33] those ends. Um and within those
[1:14:36] limitations um when there is
[1:14:38] opportunities for the community to help
[1:14:41] guide the direction um we absolutely
[1:14:43] will be looking to capitalize on those
[1:14:46] um and like working to ensure that the
[1:14:49] community is informed about why um when
[1:14:52] we can't um utilize sort of community um
[1:14:56] consent or community buyin um to an
[1:14:58] extent that you would prefer um why the
[1:15:01] regional district um is moving in that
[1:15:03] direction as
[1:15:05] And I can just add into the ministerial
[1:15:08] comment there. So under the new EDMA
[1:15:10] legislation, uh the minister is not
[1:15:12] currently um to my knowledge ever used
[1:15:15] that power. That's a relatively new one.
[1:15:18] Um, and so I think if we did end up in a
[1:15:21] place where they weren't happy with the
[1:15:23] direction that we were proposing, uh,
[1:15:25] whether that's, you know, a minimal
[1:15:28] mitigation effort or or nothing at all,
[1:15:30] whatever the case may be from what comes
[1:15:31] out of our analysis, um, there would
[1:15:34] likely be conversation between the local
[1:15:36] government uh, and the province and
[1:15:38] potentially the the community, depending
[1:15:40] on how it it all plays out, um, of what
[1:15:44] mitigative [snorts] work would be
[1:15:46] required or would be acceptable. by the
[1:15:48] province. So it may not be like a
[1:15:50] specific one that they they dictate. It
[1:15:51] could be a variety of things. So uh
[1:15:54] there'd be a lot of conversations around
[1:15:56] that if we did come down to that.
[1:16:00] » Okay. And sorry I um accidentally bumped
[1:16:04] over one here. The question is what
[1:16:06] about future use of the director
[1:16:08] consent?
[1:16:12] I'm guessing that one that one's coming
[1:16:15] uh is for me. Um so I'm I'm actually
[1:16:19] just going to provide a little
[1:16:20] background on on when director consent
[1:16:23] was used um for the cold spring work. Um
[1:16:29] when we first presented the hazard a
[1:16:32] similar uh session that we h we're
[1:16:34] having tonight regarding the uh cold
[1:16:36] spring hazard assessment report. Um it
[1:16:40] was the intention to move forward in
[1:16:43] with a uh you know with a lot of
[1:16:46] community engagement referendum if
[1:16:47] necessary before it was determined
[1:16:49] exactly what the mitigation work would
[1:16:51] would be done. Very quickly after that
[1:16:55] presentation, I think we did that
[1:16:57] presentation October, November. In
[1:16:59] December, there was an announcement made
[1:17:02] by the federal government and the
[1:17:03] provincial government of fund that we
[1:17:06] where we could get up to to up to $10
[1:17:08] million of funding from for and we had a
[1:17:12] very brief window uh opportunity to
[1:17:15] submit our application for that. So, we
[1:17:17] decided to do it because when we were
[1:17:19] speaking originally during the
[1:17:20] presentation, we had all envisioned a
[1:17:22] 25-year
[1:17:24] phased approach to building uh
[1:17:27] mitigation works on Cold Spring Creek.
[1:17:30] So, that fund uh that application came
[1:17:34] forward. Um we submitted the application
[1:17:37] in order through a number of questions
[1:17:40] and I think Carrick could probably uh
[1:17:42] add to this. Um it was determined um
[1:17:46] that the best way forward was to do
[1:17:48] director uh consent to whereas I asked
[1:17:53] the board to support the the work going
[1:17:57] forward that then was sent to the
[1:18:01] minister
[1:18:02] uh responsible for their approval. So it
[1:18:05] wasn't just a director uh making the
[1:18:08] decision. It was it was more about the
[1:18:12] process to move forward because the
[1:18:14] timing in order to for us to accept um
[1:18:18] and apply accept the funding that was
[1:18:21] being that was looking very optimistic
[1:18:23] within a very short time of being of
[1:18:26] applying for that grant um
[1:18:29] uh didn't allow for the the timing of a
[1:18:32] of a referendum. and the cost of a
[1:18:35] referendum would have been anywhere from
[1:18:38] $40 to $50,000. So there was a lot of
[1:18:40] factors involved. And so it wasn't just
[1:18:43] me as the director a directing staff to
[1:18:45] make to go forward. It was me asking the
[1:18:49] board to ask the minister. And so that's
[1:18:52] that's what happened there. the minister
[1:18:54] and and the ministerial staff reviewing
[1:18:57] the application both federally and
[1:18:59] proincially looked at the application,
[1:19:01] looked at the hazard assessment and
[1:19:02] determined it was the best uh way
[1:19:05] forward. And that's how we were able to
[1:19:07] get just over $9.7 million from that
[1:19:10] particular fund and subsequent funds
[1:19:13] bringing us to a 98% funding on that
[1:19:15] project. So that's why that decision was
[1:19:18] made. And so at this point, I don't see
[1:19:20] that I'd be shocked if we saw that kind
[1:19:23] of granting opportunity again. So it
[1:19:25] wouldn't be my intention to um to use
[1:19:29] that tool again. Um but that said, I
[1:19:33] don't think we can ever say definitely
[1:19:35] never, but uh certainly not the
[1:19:37] intention um at this stage because I
[1:19:39] don't see us with that same financial uh
[1:19:42] opportunity.
[1:19:50] Okay. Um, next question. At the 2025
[1:19:55] area F town hall meeting, the RDK
[1:19:57] responded yes when asked whether the
[1:20:00] residents of Fairmont would be given the
[1:20:02] opportunity to participate in a
[1:20:03] referendum regarding Fairmont Creek
[1:20:06] flood and landslide mitigation project
[1:20:08] works. Will the RDK continue to hold
[1:20:11] this position?
[1:20:15] Um, so I believe that was me that
[1:20:17] responded yes at that area F town hall.
[1:20:19] So I'll take this question.
[1:20:21] Um, I don't know if it'll be a
[1:20:23] referendum or exactly what the process
[1:20:25] would look like. Um,
[1:20:28] our intent is to engage the community as
[1:20:30] much as we can and still
[1:20:33] um, meet our obligations with protecting
[1:20:36] community. And like in my my ideal
[1:20:40] world, you know, we have plenty of time
[1:20:42] to go through all the engagement we want
[1:20:44] and to select a project
[1:20:47] and um you know, plan for plan for the
[1:20:52] future as much as we can and you know
[1:20:55] maybe in 2 years we have that great
[1:20:57] funding opportunity that came up that we
[1:20:59] were able to apply for for Cold Spring
[1:21:01] Creek.
[1:21:03] Um so yes my our intent is to engage
[1:21:07] community as much as we can and to
[1:21:10] listen to your wants and
[1:21:14] and also your what you don't want.
[1:21:21] » Okay. Um what level of risk is tolerable
[1:21:26] and who decides the residents or the
[1:21:29] developers? I am free to choose the risk
[1:21:31] to drive my car. Why do I not have the
[1:21:34] input in choosing the risk I will accept
[1:21:36] in a flood?
[1:21:39] » Yeah, I can take that one. Um, it's a
[1:21:40] good question. There's a number of
[1:21:42] factors involved in this one. So, uh,
[1:21:45] for starters, I guess just to look at
[1:21:46] your example, um, driving your car is an
[1:21:50] individual choice, whereas what we're
[1:21:52] looking at here is a communitywide
[1:21:54] impacts potentially to a large group of
[1:21:56] people, not just an individual. um when
[1:21:59] it comes to determining risk and from
[1:22:01] the provincial perspective, uh they look
[1:22:04] at the BC emergency response sort of
[1:22:07] goals or guidelines uh which is
[1:22:09] protecting lives, uh protecting public
[1:22:12] health, um reducing suffering,
[1:22:14] protecting property and infrastructure.
[1:22:16] Uh there's a whole list including
[1:22:18] economic and social losses. Uh there's a
[1:22:20] whole variety of things there. There's
[1:22:21] also a lot of precedents already set um
[1:22:24] both legally and just in um response to
[1:22:28] other emergencies and and mitigative
[1:22:30] works where where exist um disasters
[1:22:33] have existed. Uh so it there's all a lot
[1:22:36] there. Um we look at recommendations
[1:22:38] from qualified professionals as well. Um
[1:22:41] yeah, that kind of sums that one up I
[1:22:43] think.
[1:22:46] » Okay, thanks for that. Um, would it not
[1:22:49] be better to have mitigation upstream to
[1:22:52] avoid destruction in the flood fan?
[1:22:54] Example, annual inspection of the
[1:22:56] watershed done by a drone,
[1:22:59] identification of debris piles and
[1:23:00] removal to bring down costs.
[1:23:05] » Uh, I can take this question. Uh, this
[1:23:08] is a really interesting and uh, great
[1:23:11] question. Um, and the reason we
[1:23:14] generally don't look at mitigation in
[1:23:17] wersheds is due to the cost. So, the
[1:23:21] idea of flying a drone and taking a look
[1:23:23] at the wershed. Excellent. I love it. I
[1:23:25] like looking at what's happening up
[1:23:26] there and seeing what the sediment
[1:23:28] supply is like. Uh, it gives us an idea
[1:23:30] of what we can expect in the future. Uh,
[1:23:33] but the access to be able to clean that
[1:23:35] out if we do see debris building up is
[1:23:38] is really really challenging. uh you're
[1:23:40] not going to be able to get excavators
[1:23:42] up there or trucks and things like that.
[1:23:44] And so that's why we tend to look at
[1:23:46] mitigation options that are accessible.
[1:23:49] Uh so that brings the cost um down
[1:23:52] substantially.
[1:23:58] » Okay. Um our costs for the local service
[1:24:02] area have already increased 600% from
[1:24:06] 2020 to 2024. How much more can we be
[1:24:09] expected to bear with this new project
[1:24:11] on Fairmont Creek? We need a tax
[1:24:14] decrease, not increase.
[1:24:20] Um, at this point, we absolutely can't
[1:24:23] put a number on it at all. Um,
[1:24:28] and this possible project on Fairmont
[1:24:31] Creek could be many years into the
[1:24:34] future. At this point, it'll be
[1:24:35] dependent on funding and on what we look
[1:24:39] at doing on the creek.
[1:24:46] » Okay. Um at our last area F town hall
[1:24:49] meeting, um community members asked
[1:24:52] about costs and mitigation of Fairmont
[1:24:55] Creek. The response was that possibly
[1:24:58] very little will be needed to be done as
[1:25:01] work was completed in 2017 2018.
[1:25:05] Now we're looking at costs upwards to 20
[1:25:07] million for flood mitigation. What
[1:25:10] changed in the last 4 months?
[1:25:17] » Well, at the area F town hall, we did
[1:25:20] not have the results of the updated
[1:25:23] hazard assessment yet. So, we didn't
[1:25:25] know what the new what the outcome of it
[1:25:27] was going to be, what the new volumes
[1:25:28] were going to be, and what the map was
[1:25:29] going to look like. Um, so we do have
[1:25:32] some mitigation on the creek, which is
[1:25:36] um which has done a very good job of
[1:25:39] protecting community and the events that
[1:25:41] have happened in the last few years. Um
[1:25:45] but now that now that we have the
[1:25:48] results, we do know that we you know
[1:25:50] more work is likely warranted
[1:25:54] and um we'll move forward as best we can
[1:25:58] with community engagement and um working
[1:26:01] with our consultants.
[1:26:05] » Okay. Um what is the order of natural
[1:26:09] hazard risks to Fairmont? We are very
[1:26:12] focused on flood mitigation yet. Is not
[1:26:15] forest fire a much greater risk that
[1:26:17] might strike while we are looking at the
[1:26:19] creek hazards?
[1:26:21] » Yeah, that's a good question. Um, so we
[1:26:23] are actually currently undertaking our
[1:26:25] hazard risk and vulnerability analysis
[1:26:27] update. Uh, in the last one, I don't
[1:26:30] have the exact ranking for uh Fairmont
[1:26:32] in front of me, but our top three
[1:26:34] hazards across the entire East Coupney
[1:26:35] are wildfires, floods, and dangerous
[1:26:37] goods. each community's uh vulnerability
[1:26:40] to each of those is going to be a little
[1:26:41] bit different uh depending on where you
[1:26:43] are and what your hazards are uh in that
[1:26:46] immediate area. Um but that is uh what
[1:26:49] is being looked at right now. So um and
[1:26:52] on the wildfire comment, we have a very
[1:26:55] active and engaged fires smart program
[1:26:57] throughout the region that works with
[1:26:58] homeowners to reduce the risk of
[1:27:00] wildfire around your house. Um and so we
[1:27:03] have that going on. And then the
[1:27:04] province uh also has a wildfire risk
[1:27:06] reduction program that they actively
[1:27:08] work on as well.
[1:27:13] Okay. The pro this is the next question.
[1:27:15] The process as I understand it was a
[1:27:18] recommendation to the RDK board who
[1:27:20] unanimously approved the recommendation
[1:27:22] to the minister for approval. This
[1:27:24] resulted in 98% plus of total costs
[1:27:27] being ultimately covered in order to
[1:27:29] best protect us as rateayers. Thank you.
[1:27:33] So I guess that was just not a question
[1:27:35] that was a statement.
[1:27:43] Caris stated sorry this is the next
[1:27:46] question. Car stated there would be lots
[1:27:48] of engagement regarding future
[1:27:50] mitigation projects. There are over 31
[1:27:52] people sitting in a room in FHS
[1:27:56] sorry hot springs. Believe me we are
[1:27:58] engaged. You should be here in person.
[1:28:05] I I just would like to comment on that.
[1:28:08] I think that's great and we also have 30
[1:28:10] participants online. So, I think it's a
[1:28:13] great combination that this Zoom meeting
[1:28:15] has really enabled um participation by
[1:28:20] uh a large group of of community members
[1:28:23] and and whether they're here in Fairmont
[1:28:26] Hot Springs as I am or as um or in uh
[1:28:32] elsewhere in the country or even um in
[1:28:34] the world. So, I think I really
[1:28:37] appreciate that so many people are
[1:28:38] engaged. this is this uh just proves to
[1:28:41] me that this was a great way to have
[1:28:42] this initial this initial meeting
[1:28:44] because it provided access for um over
[1:28:48] 60 people. So, thank you.
[1:28:53] Okay, for uh the next one, for some
[1:28:56] community members, and um you're going
[1:28:58] to have to forgive me because I don't
[1:29:00] know what one of these what this means.
[1:29:02] For some community members, the increase
[1:29:04] in tax RT debris mitigation is $1,000 a
[1:29:08] year. Over a 20-year period, this
[1:29:11] amounts to 20,000. Add another dam to
[1:29:14] Fairmont Creek potential to 40,000 for
[1:29:16] one property owner. Is this fair?
[1:29:28] I I don't think we're at that stage of
[1:29:31] quantifying what the impact could be or
[1:29:35] will be at this point. So, I'm not even
[1:29:38] sure the best way to to respond um to
[1:29:43] your question. I guess is it depends on
[1:29:47] on um what the uh what mitigation work
[1:29:50] is determined to be done through through
[1:29:53] the process that we've explained we're
[1:29:55] going to be going through this evening
[1:29:57] and and uh you know what that protection
[1:30:00] of of property infrastructure and life
[1:30:03] is. So um yeah I guess we will determine
[1:30:07] as we move forward what's going to make
[1:30:09] the most sense for the community of
[1:30:11] Fairmont.
[1:30:15] Okay. Um, so this actually that was the
[1:30:17] last question, but now one more has come
[1:30:18] in and I'm I'm not trying to shut it
[1:30:20] down. I'm just sort of letting people
[1:30:22] know if they're sort of maybe last call
[1:30:24] if you will. Um, this next question is
[1:30:27] Oh, one more is coming apparently too.
[1:30:29] Okay, [laughter]
[1:30:30] next question. When do you plan to know
[1:30:33] what mitigation plan will be determined?
[1:30:39] Um that'll depend on what when we can
[1:30:42] get funding to do the options analysis.
[1:30:46] and then however quickly we move through
[1:30:49] that through that process and then
[1:30:50] beyond that we may choose an option.
[1:30:53] However um we will still need to to um
[1:30:59] apply for and be successful in getting
[1:31:01] funding for it. So it
[1:31:05] hard question to answer but it won't be
[1:31:07] in the next couple of months.
[1:31:10] It could be up to yours.
[1:31:13] » Okay. And yeah, I want to be clear. I
[1:31:15] wasn't I'm not trying to rush anyone. So
[1:31:17] we do know that there is one more
[1:31:18] question coming in. So we will gladly
[1:31:20] wait for that one and
[1:31:23] maybe more.
[1:31:25] So um yeah, don't worry. You don't have
[1:31:29] to you don't have to type too fast. You
[1:31:32] got time.
[1:31:49] So, I will just take this moment though
[1:31:51] to remind anyone that once this
[1:31:53] recording is done, we will get it up
[1:31:56] onto the engage page as quick as we can
[1:31:59] um and then send it out the link via the
[1:32:03] um the community emails. So, please make
[1:32:06] sure uh if you're not already signed up
[1:32:08] for it, sign up for that community
[1:32:09] email. You can do that at rdk.bc.ca.
[1:32:14] And at the top it says um what is the
[1:32:17] wording? Stay informed. And so there's a
[1:32:20] little stay informed button at the top
[1:32:21] of our main page on our website. Click
[1:32:24] that and you can sign up for the emails.
[1:32:26] And that way um especially on the on
[1:32:29] projects like this, you will be the
[1:32:31] first one to find out what's going on.
[1:32:34] That's our first way of getting the word
[1:32:35] out. Okay. Um the question has come in.
[1:32:40] Debris flows are created when debris
[1:32:42] piles when debris piles up along the
[1:32:45] creek bed and impair the natural flow of
[1:32:48] water. Under severe weather events, the
[1:32:50] water is impeded by the debris creating
[1:32:52] a dam effect. When this material and the
[1:32:55] dam breaks, it creates a debris flow
[1:32:58] into the fan. Why is everything you
[1:33:01] consider mitigation a local mega
[1:33:03] project?
[1:33:09] Um maybe I'll I'll start and and others
[1:33:12] can jump in if they have other um
[1:33:14] thoughts. So I um this is something that
[1:33:19] could occur um in the watersheds here,
[1:33:22] but that's not actually the only type of
[1:33:25] debris flow we get. Um, a lot of the
[1:33:28] time, um, when we have a large rainfall
[1:33:31] or an intense rainfall, so, uh, really
[1:33:34] high amounts of rain in a short period,
[1:33:36] it can mobilize sediment that's already
[1:33:38] in the channel. And as most of you when
[1:33:40] you look up at the mountains there, you
[1:33:42] know that there's like a lot of, um, big
[1:33:44] rock boulder fields up there. So, all of
[1:33:47] that starts to kind of mobilize. There's
[1:33:50] so much sediment up in these watersheds
[1:33:52] that's available for transport when
[1:33:54] there's enough rain. So that's kind of
[1:33:55] how we see debris flows start um or from
[1:33:58] landslides on the side of the creek
[1:34:01] entering the creek. Um so yeah, that's
[1:34:04] one uh those are a couple different ways
[1:34:06] that debris flows can uh start and I
[1:34:09] think the main question here is why does
[1:34:11] it have to be a large project? Um there
[1:34:13] are different options as Cara presented.
[1:34:16] So there's kind of different levels um
[1:34:18] that we've looked at um but we're aiming
[1:34:21] to improve the life safety risk on the
[1:34:24] fan. So that requires a little bit
[1:34:26] higher of a level of mitigation because
[1:34:29] we're trying to um reduce the risk of
[1:34:32] those larger events impacting people's
[1:34:35] homes. Um but there are like some small
[1:34:38] or like lesser um not as large projects
[1:34:41] and everything that can be done as well.
[1:34:43] Um it just might not have um the
[1:34:46] intended outcome. And I'll let Cara um
[1:34:48] or someone else add to that if they have
[1:34:50] anything else.
[1:34:56] Um, I don't really have anything else to
[1:34:58] add to that. P. I think you've you've
[1:35:00] answered it.
[1:35:03] Okay. Um, next question. Why would the
[1:35:06] annual cost of these mitigation projects
[1:35:09] not be shared throughout the valley
[1:35:10] communities given the potential impact
[1:35:12] to the transportation corridor?
[1:35:30] and um the follow-up question to that
[1:35:33] the next one is it just it's please be
[1:35:35] clear when answering why would the
[1:35:36] annual cost of these mitigation projects
[1:35:39] not be shared throughout the valleys or
[1:35:41] sorry throughout the valley communities.
[1:35:51] Yeah, I think I I'm I might follow up on
[1:35:55] this question maybe through the enga
[1:35:57] engage page because uh I just want to be
[1:36:00] clear this is to some degree this is a
[1:36:02] bit of probably a a decision that was
[1:36:05] made uh 2013 is what the the size of the
[1:36:09] service area and it was certainly before
[1:36:11] my time. Um but this is a uh the service
[1:36:14] area and and it's really depends on it's
[1:36:17] about how the regional districts um pay
[1:36:21] for services. We're not like a
[1:36:23] municipality where we uh have a budget.
[1:36:26] We collect taxes for that budget and
[1:36:30] then that money is spent per the budget.
[1:36:32] Each service area has to have a budget
[1:36:35] and to do any work uh in the regional
[1:36:38] district we have to have a service area
[1:36:40] and the service area for this work is uh
[1:36:45] was determined um um I think it goes
[1:36:47] back to 1989 actually if my memory
[1:36:50] serves um by the Fairmont Flood and
[1:36:53] Landslide Service Area. So that's that's
[1:36:57] where it's at right now and it it is the
[1:37:00] greatest number of impacted residents.
[1:37:03] Um there are opportunities for you know
[1:37:07] transportation to be uh or for for
[1:37:10] people to kind of egress the community
[1:37:13] on either side of Fairmont whether
[1:37:15] through through Cranbrook or through
[1:37:17] through Radium. And so I imagine that
[1:37:20] might have had something to do with that
[1:37:22] original um determination of what the
[1:37:24] service area looked like. So I I think
[1:37:27] we can certainly follow up with a more
[1:37:29] wholesome answer as to what that
[1:37:31] processes, but um this does date back um
[1:37:35] to to the late 80s and how the service
[1:37:38] area was structured and set up.
[1:37:44] » Okay. Um
[1:37:49] The next one,
[1:37:51] can you be more specific about exactly
[1:37:53] what input citizens will have in the
[1:37:56] risk development policy?
[1:38:00] So, I'm going to assume that this is
[1:38:02] with respect to the risk tolerance
[1:38:05] policy. Um so we do have a clear
[1:38:08] recommendation in the guidance report um
[1:38:12] that outlines a proposed framework.
[1:38:16] Um and so I think that um if it's
[1:38:19] largely going to be um at the inform
[1:38:23] level of engagement
[1:38:25] um but that would be determined um based
[1:38:28] on uh direction provided to staff um and
[1:38:32] at the discretion of the regional
[1:38:33] district board. Um I think a key thing
[1:38:37] um that has been touched on by a number
[1:38:39] of different speakers uh this evening
[1:38:42] has been that um these frameworks are
[1:38:45] something that are um have legal
[1:38:47] precedent. Uh they have precedent in
[1:38:49] other comparable communities um and that
[1:38:52] that that's what we're going to be
[1:38:54] drawing from on that. Um so really it's
[1:38:57] largely wanting to make sure that the
[1:38:59] community understands
[1:39:02] um the basis and the premise for um that
[1:39:05] um but that we are like we have a clear
[1:39:08] recommendation in the report um and we
[1:39:10] anticipate that that that's what will be
[1:39:12] brought forward. Um so it it likely will
[1:39:15] be um at the inform level of
[1:39:19] consultation.
[1:39:21] um but that we will um embark on that
[1:39:24] and that we will have that and if it is
[1:39:27] uh the decision is made by the board
[1:39:29] that it's original districtwide
[1:39:31] um policy um so it's not that it is
[1:39:34] something that is specific to Fairmont
[1:39:37] or specific to these debris floods um
[1:39:39] but is generally speaking that as um
[1:39:42] Christina's identified we recognize
[1:39:44] there's a range um of hazards and
[1:39:47] vulnerabilities across the regional
[1:39:49] district and that would um factor in to
[1:39:53] that as well um is that it won't just be
[1:39:56] the Fairmont community that we will need
[1:39:58] to have that uh discussion with to have
[1:40:01] that consultation with. Um it will be
[1:40:03] original district-wide discussion that
[1:40:05] we'll be having.
[1:40:12] Okay. Um there's a a two-part sort of
[1:40:15] question statement here. Have you driven
[1:40:17] through the Crows Nest Pass with respect
[1:40:20] to major rock slides?
[1:40:24] Um, I would say that yes, most of us
[1:40:26] have driven through Crow's Nest Pass and
[1:40:28] have seen that rock slide. Yes. I'm not
[1:40:32] sure what the uh statement or question
[1:40:35] is behind that one though.
[1:40:39] And then the next one, the majority of
[1:40:42] Fairmont Creek is on private resort
[1:40:44] land. Will that be taken into
[1:40:46] consideration when the mitigation is
[1:40:47] done on it?
[1:40:51] » Um
[1:40:53] that it's on private land is considered
[1:40:55] to a certain extent. Um the important
[1:40:57] thing really is that
[1:41:00] um the impacts of the debris flows that
[1:41:02] come down Fairmont Creek are not just on
[1:41:04] private resort land. They're they're in
[1:41:07] the wider community
[1:41:12] and water is
[1:41:15] water is considered crown. However,
[1:41:19] it's the impact that we have to think
[1:41:21] about
[1:41:23] and the impact again is in the
[1:41:24] community.
[1:41:35] Um and then a statement afterwards
[1:41:38] saying and water is federally
[1:41:40] controlled.
[1:41:47] I'd just say yes um that that is
[1:41:48] something that's recognized is um
[1:41:50] depending on the type of water. Uh
[1:41:53] generally speaking, the federal
[1:41:54] government is concerned when it's
[1:41:57] navigable waters or if it's with respect
[1:42:00] to um like department of fisheries and
[1:42:03] oceans and fish habitat. Um it's
[1:42:06] definitely something that um is
[1:42:08] recognized is that water um falls under
[1:42:12] multiple jurisdictions and that's why um
[1:42:16] when we proceed with this there's
[1:42:17] different levels of government involved
[1:42:19] in the different stages and processes.
[1:42:28] Okay, we are uh we have no more qu open
[1:42:30] questions right now. There is one that I
[1:42:32] did want to address that was sort of
[1:42:34] earlier uh questioned and I answered it
[1:42:37] um privately to the asker. Um and it was
[1:42:41] just about the water utility issues. Um,
[1:42:43] and the question was or the statement
[1:42:45] was the water utility issues are more
[1:42:47] immediate and should be looked at how
[1:42:49] the and and should be looked at how the
[1:42:51] RDK can support our failing system. And
[1:42:54] so the answer I I answered that
[1:42:56] individual with Fairmont Hot Springs
[1:42:58] Utility. The reason I'm bringing this up
[1:43:00] is I I do know it's big for a lot of the
[1:43:02] people is privately owned and operated
[1:43:05] and falling under the regulation of the
[1:43:07] controller of water rights, Interior
[1:43:09] Health and the province. Uh
[1:43:11] consequently, the RDK does not have any
[1:43:13] jurisdiction or authority and cannot
[1:43:14] intervene directly. However, um director
[1:43:17] Clochuk has been actively involved on
[1:43:20] behalf of the customers of FHSU. Uh
[1:43:23] she's been reaching out to the office of
[1:43:24] the water controller and FHSU staff, the
[1:43:27] MLA and the Ministry of Water, Lands,
[1:43:29] and Resource Stewardship to advocate for
[1:43:31] the community's concerns to be heard and
[1:43:34] for actions to be taken to address them.
[1:43:36] Um, the only reason I bring that up is I
[1:43:38] believe that that answer may have gotten
[1:43:42] lost to that individual. So, I'm sorry
[1:43:44] to that individual.
[1:43:49] Okay. Yeah. And that's it. We have no
[1:43:51] more open um questions any more. So, I'm
[1:43:56] going to mute and allow either Karen or
[1:44:00] Susan to finish us off. So yeah, I'll
[1:44:03] just um I had a a few things I just
[1:44:06] wanted to highlight on this final slide
[1:44:08] that you hopefully can see. Uh and then
[1:44:10] I'll pass it off to Susan to wrap up for
[1:44:12] the night. Um so again, just wanted to
[1:44:15] to draw your attention if you have not
[1:44:18] already been on the engage page. Um we
[1:44:20] do have all three reports available on
[1:44:24] uh the fair um debris mitigation page.
[1:44:28] Uh they will remain available in their
[1:44:30] entirety. Um so um we do recognize that
[1:44:34] um they're large reports. There are
[1:44:35] three reports uh that people might want
[1:44:39] to um you know peruse them at their
[1:44:42] leisure. Uh so we'll keep them
[1:44:44] available. Um and also to recognize that
[1:44:47] um staff contacts so for the RDK and if
[1:44:50] you don't already have the information
[1:44:52] director Clostchuck's contact
[1:44:54] information is also directly on those
[1:44:57] pages. Uh so if you have questions
[1:45:00] you can either send them directly to
[1:45:02] staff or you um we will set it up so
[1:45:06] similar to the advanced questions where
[1:45:09] you could send a response just kind of
[1:45:12] uh generically uh to the page um we'll
[1:45:15] set up something similar um and then um
[1:45:18] if you provide your contact information
[1:45:20] with that um we'll ensure it's set up
[1:45:22] that way um it will be able to be
[1:45:25] directed to the appropriate staff um and
[1:45:27] we will be able to respond to you. Is
[1:45:30] that director club? Chuck, did you have
[1:45:32] anything you'd like to finish on?
[1:45:34] » Yeah, I just I just would like to say
[1:45:36] thank you to everyone who's
[1:45:38] participated, those at the uh at the
[1:45:40] Lion's Den and and those from the
[1:45:42] comfort of your homes um here on Zoom
[1:45:45] tonight. Your questions were great and
[1:45:48] they're really important and we want you
[1:45:49] to keep them coming. Uh, I think what
[1:45:52] I'm going to do is I'm going to ask
[1:45:54] staff to um, you know, reflect on what
[1:45:58] we heard this evening and the questions
[1:46:00] that were asked and provide um, maybe in
[1:46:03] some cases some more wholesome responses
[1:46:06] uh, articulate those questions um, and
[1:46:08] make them available also on the engage
[1:46:11] site. Um, and I really want to thank,
[1:46:14] you know, uh, all the staff that joined
[1:46:17] us this evening, Karen and Cara, uh,
[1:46:20] Christina for your bringing your
[1:46:22] expertise and and Ryan, who I failed to
[1:46:25] introduce, uh, at the beginning, uh,
[1:46:27] who's providing some support there for,
[1:46:30] uh, for Nathan as the as supporting the
[1:46:32] the technology and making sure that we,
[1:46:34] we, uh, got everything done tonight that
[1:46:37] we needed to get done. And of course the
[1:46:38] consultants providing your expertise and
[1:46:40] knowledge and and hearing the concerns
[1:46:43] of the community um through the lens
[1:46:45] that you look at these issues on as well
[1:46:48] I think is is probably very valuable as
[1:46:50] we move forward on where these projects
[1:46:53] may end up. So again thank you so very
[1:46:57] much and um we will uh just keep your
[1:47:02] questions coming. that is the best way
[1:47:04] for us to do to do the work here and
[1:47:06] make sure that the community is is uh is
[1:47:10] safe and and that the community members
[1:47:13] uh feel heard and respected throughout
[1:47:16] this process. So, thanks again and enjoy
[1:47:18] the rest of your evening. And I know
[1:47:20] it's going to feel really cold when
[1:47:22] Nathan just turns off the Zoom. We're
[1:47:24] all just going to disappear into the uh
[1:47:27] into the ether and not it's not like
[1:47:29] wandering out of a room and having a
[1:47:30] chat in the hallway. So, it's it's going
[1:47:32] to feel really odd, but but thank you
[1:47:34] again for your uh participation. Please
[1:47:37] don't hesitate to get in contact if you
[1:47:40] uh need anything.
[1:47:43] » Okay. And um I'm not going to turn off
[1:47:45] quite yet, Director Kchuk. So, you can
[1:47:48] rest assured that we can just spend a
[1:47:50] few more moments together because there
[1:47:51] was one quick question um asked about
[1:47:54] making the maps more easily findable on
[1:47:57] the engage page. And yeah, we will
[1:47:59] definitely uh work on that. And the
[1:48:01] engage page is great cuz we are changing
[1:48:03] it and updating it as much as we can. So
[1:48:06] if you ever do see things on the engage
[1:48:08] page that you want um or have any sort
[1:48:13] of input to the engage page, please let
[1:48:15] us know and we will work on that um and
[1:48:17] keep changing it up to make it the best
[1:48:19] we can. So thank you and um I hope
[1:48:22] everyone has a great evening and thanks
[1:48:23] for all your input.