Awesome.
[0:04]
Hearing none, we'll move back to the
board for a vote. All those
[0:09]
» in favor? I
>> I
[0:11]
» and that passes unanimously. Thank you.
>> All right. Next up,
[0:17]
» city has supported many organizations
that provide services or programs to its
[0:23]
residents more efficiently. City could
provide those services.
[0:28]
organizations considered for or subject
to an application process
[0:34]
which includes a detailed description of
how the funds are used. Organizations
[0:38]
chosen must account for funds for city
manure into an agreement with Laasa Go
[0:45]
in to support the empower partnership
for
[0:49]
progress project for $25,000.
[0:57]
Thank you. Questions, comments, or a
motion from the board?
[1:01]
I move that the city of Goan approve the
agreement with Lasso Go, Inc. to support
[1:07]
the Empower Goan part partnership for
progress project for $25,000 to support
[1:14]
work described in the agreement and
authorizing it to execute the agreement.
[1:21]
» Second.
>> We have a motion and a second. Any
[1:23]
questions or comments from anybody in
the audience? Hearing none, we'll move
[1:26]
back to the board for a vote. All those
in favor? I.
[1:30]
» That passes unanimously. Next item is a
request from the engineering department.
[1:38]
» Good afternoon board engineering
department.
[1:42]
You have before you this afternoon for
your consideration
[1:47]
Stere Avenue and Lincoln Avenue
reconstruction drainage improvements
[1:52]
change order number eight job number
2019 00046.
[1:58]
The intersection
of Lincoln Avenue contain large areas of
[2:04]
unsuitable material. Tensar provided
on-site DCP testing which revealed areas
[2:11]
of low strength soils as thick as 2
feet. After review of several
[2:16]
alternatives and in consultation with
tensor staff determined that
[2:20]
undercutting of 10 installing two layers
of tensor and interacts geog grid with
[2:26]
aggregate in between would provide the
most economical means of adequately
[2:31]
stabilizing the subgrid.
This provided this provides a required
[2:36]
bearing capacity in the roadway and also
allows for approved roll test on top of
[2:41]
the air subbase prior to the placement
of top access wall base. Estimated cost
[2:46]
of all the alternatives reviewed as well
as plan sheets showing the estimated
[2:50]
area required under cutting are
attached. Order number eight includes
[2:55]
estimated cost for this multiaxial
grid. The additional quantity 53
[3:02]
aggreate used for undercutting and the
difference between the installed
[3:05]
material only cost for the TX type 2
grip material
[3:11]
this area but will not be used within
this intersection. Change order number
[3:15]
eight does not include cost for common
excavation which would have been
[3:19]
necessary regardless of the undercutting
method. No additional fees are being
[3:24]
requested to complete this work. The
block excavating price price of $7.76
[3:29]
per square yard for the NX750 geog grid.
This comparable pricing on other recent
[3:36]
and current city projects using the same
material. Go engineering requests the go
[3:41]
public works approved change rate for
$37,55.
[3:46]
This change along with previous changes
increases the value of the contract by
[3:50]
3.67%. 67%
approved. This change order is
[3:54]
anticipated by the go redevelopment
commission after June 9th 2026 meeting
[4:00]
has been approved provided
redevelopments authorization and updated
[4:04]
copy of the chamber will be provided
for.
[4:09]
» Thank you.
Uh
[4:13]
question for you
[4:18]
conditioned on the redevelopment the
redevelopment commission's approval that
[4:23]
it does not have to come back or to save
that extra step.
[4:27]
» So it's it's been approved.
>> It has been I thought
[4:32]
» it was it was approved earlier this
week. So
[4:36]
» never mind.
>> Sorry about that. each night jumped
[4:41]
across that part. It's been approved, so
it's ready for your
[4:43]
» Roger that. Okay, great. Questions,
comments, or a motion.
[4:47]
» Yes, sir.
>> Did we just approve a change order for
[4:49]
the same for the same thing
>> related? So, it's been a dual effort to
[4:57]
uh the intention of going in there once
getting it right the first time. So, we
[5:02]
we added some additional uh drainage. Um
if you think about spokes on a wheel,
[5:09]
the drainage pipe was installed in that
fashion to wick the water away from
[5:16]
below. And additionally, this geode grid
um was placed above that
[5:23]
uh pipe drainage layer and the
associated excavation and stone.
[5:29]
» So this wasn't known at the point that
we were digging to put the other in,
[5:35]
» right? It was just as we as we worked
through it, right? That helped some and
[5:41]
and we took the next step to install the
the
[5:47]
next question.
>> We have a motion from the board. I move
[5:52]
to approve change order number eight in
the amount of $37,55
[5:58]
to address unsuitable materials that
stabilize the subgrade with a high
[6:04]
performance geo grid at the intersection
of Lincoln Avenue at Story Avenue.
[6:09]
» Second. Have a motion and a second.
Questions or comments from the audience?
[6:13]
We move back to the board for a vote.
All those in favor?
[6:18]
» Excellent. That passes unanimously.
[6:24]
Item number
[6:28]
on the agenda, Cal Avenue, phase one,
room quarter for NIPCO electric utility
[6:33]
relocation as number 1900 739
21101 631 25501 441 job number 2019 0022
[6:46]
electric is requesting to close college
through traffic from Lincoln Way East US
[6:53]
33 to Centry Drive on Tuesday, June 16th
and Wednesday, June 17th, 2026. There
[6:59]
will be a hard loader near the bridge
over corner
[7:03]
requesting this closure to remove
construction mass following utility pole
[7:07]
and overhead power line relocations for
the College Avenue phase one roadway
[7:12]
reconstruction project. The closure will
utilize the same as the traffic plan as
[7:17]
submitted and reviewed in March which
engineering staff approved as part of
[7:20]
the rightway permit. Copy the plan is
attached.
[7:25]
» Thank you. Questions, comments or
motion?
[7:28]
» I move to approve the closure of Cottage
Avenue from Lincolnway East
[7:35]
S33 East to Century Drive on June 16th
and 17th, 2026.
[7:41]
» Second. We have a motion and a second.
Questions from the audience.
[7:46]
We'll move back to the board for a vote.
All those in favor
[7:57]
» Justin for Works Utilities. What we have
today is Keystone uh Square 16
[8:03]
acceptance of the drainage plan job
number 2026 2013. Uh, in accordance with
[8:08]
the city's subdivision control ordinance
3196 section 512 drainage plan, the city
[8:13]
engineering department has reviewed the
drainage plan for Keystone Square 16th
[8:17]
located at 2490 Birkshshire Drive. The
drainage plan addresses the drainage
[8:22]
needs for lot 20 and lot 20 only with a
combination of inlet structures,
[8:26]
conveyance pipes, and storm water
retention that provides 138 acre feet of
[8:30]
storage. After due consideration of the
proposed drainage plan, go engineering
[8:35]
department recommends the board of
public works and safety and storm water
[8:39]
board accept the subdivision drainage
plan. Standard note typically go along
[8:44]
with this is that the uh record should
show the city of goan in no way
[8:48]
guarantees the proposed drainage
improvements will adequately function as
[8:51]
designed by the developer's licensed
professional. Additionally, the city
[8:54]
accepts no liability conjunction with
this acceptance of the drainage plan. If
[8:58]
drainage plant plants piping and storm
water impoundments are found to be to
[9:04]
underperform construction, the developer
and or propert will be directed by the
[9:08]
city to take additional remedial action.
At that time,
[9:13]
» thank you. Questions, comments, or a
motion to move forward. I move uh we
[9:17]
approve the
uh subdivision train plan for Keystone
[9:24]
Square
16 lot 20 and lot 20
[9:29]
second. We have a motion and second
questions or comments from the audience
[9:34]
back for a vote. All those in favor
[9:47]
just to uh follow on last acceptance
square
[9:57]
and it's secondary sub subdivision for
your acceptance.
[10:02]
The PL we signed here is
all subdivision and so ordinance
[10:10]
requirements
there is existing infrastructure
[10:14]
and just accepted to subdivision trans
[10:20]
» questions comments or motion from the
board. I move to accept the subdivision
[10:24]
flat for Keystone Square 16
with easements.
[10:31]
Second.
>> We have a motion. Second. Questions or
[10:33]
comments from the audience? None. We'll
go back to the board for a vote. All
[10:37]
those in favor?
[10:43]
» Yes. Uh this next request, if you if you
ever had your monthly replacement at the
[10:49]
DN
D. Uh this is this site 28 South
[10:54]
Edition. And what we have in front of
you is
[10:58]
request to accept a replat of that lot
28
[11:04]
to allow the building where DMT was and
then and then another lot for
[11:11]
so it's a replat for a two lot minor
subdivision infrastructure is existing
[11:17]
obviously um there's no subdivision
drainage plan required and it meets
[11:21]
zoning ordinance and subdivision
requirements.
[11:25]
Stephanie's doing a great job there.
Questions, comments, or motion.
[11:31]
I move to accept the subdivision in uh
PL for W 28 South edition.
[11:39]
» Second.
>> We have a motion and a second. Questions
[11:41]
or comments from the audience? Hear
none. Back to the board for a vote. All
[11:45]
those in favor.
That passes unanimously as well. That
[11:49]
brings us to privilege of the floor.
Anybody with a question or comment?
[11:55]
» No one. I move that we approve civil
city and utility claims and adjourn.
[12:00]
Second. We have a motion and a second.
All those in favor?
[12:03]
» I. We are journed. Thank you,
[12:08]
» Mayor. That was kind of the leading.