Transcript
SOURCE TRANSCRIPT
This transcript is downloaded from the source you provided but we haven't reviewed it for accuracy. Treat it as a starting point, not a verbatim record. You can also request an AI-transcription of the audio file with the button to the left.
These are YouTube's auto-generated captions, not a human transcript — expect occasional errors, especially with names and technical terms.
[0:05]
Good evening everyone. We're going to
get started. Uh thanks for coming out
[0:10]
tonight for our track redevelopment
meeting. We're still waiting on a couple
[0:14]
people, but I figure we'll get started
and we'll we'll roll right in. Um just a
[0:20]
couple house. By the way, I'm Terry for
those of you who don't know me. I'm the
[0:24]
burough administrator and economic
development director. very excited to
[0:28]
have um the opportunity to present kind
of where we are on this long awaited
[0:32]
project. Um but a couple just pointers,
housekeeping items. Um we will be
[0:39]
recording the meeting. We are zooming
the meeting uh and so everybody will
[0:44]
have the opportunity who couldn't be
here tonight to watch the video and
[0:49]
download uh the slide deck uh from our
website after the meeting. So that's all
[0:54]
going to be available. I've gotten that
question a couple times. Our website's
[0:58]
uh hpb.com.
So, um you can take as many notes as you
[1:04]
like. Uh but you'll also be able to um
download the slides for yourself um
[1:09]
afterwards. Um with that, I think that's
that's it. Um there will be opportunity
[1:14]
for questions and comments, but we're
going to get through the presentation
[1:18]
deck first and um we'll uh do the
questions at the end and we'll stay as
[1:24]
long as the questions in the room. All
right. Thank you. And with that, I'd
[1:29]
like to introduce Mayor Foster. She's
going to kick us off uh get the program.
[1:39]
Good evening everyone and evening.
>> Thank you all for coming out on a
[1:42]
Thursday night. Um it's exciting to be
here and to talk about where we are with
[1:48]
this project, this very very very very
long waited project and um we showed you
[1:54]
some slides
a few years ago now and um we have
[2:00]
wrapped up what we're going to do. We're
looking forward to having
[2:03]
groundbreaking.
But before we do that, we wanted was to
[2:06]
show you where we are in the process and
to get any insights or final inputs that
[2:13]
you may have. But I'm really excited
about getting the project going because
[2:16]
it's been over 20 years in the waiting
for us to get something in our downtown
[2:21]
to keep our town um create a thrivable
downtown. And that's the goal is to
[2:27]
create more traffic in our downtown,
have our town stay alive because if it
[2:32]
stays the same way it is, it's not on a
good track. But I strongly believe that
[2:36]
this is going to be a part of a project
that will help to rejuvenate our
[2:40]
downtown.
And with that said, I'm going to
[2:44]
acknowledge my council member. We have
council member Jason Pollston, council
[2:49]
member Hail, Council Member Hirs in the
room with us tonight. And also I want to
[2:54]
say a special thanks to our economic
development chair um Terry Jover. She
[2:59]
has put in yman's worth of work on this
project and I can't begin to thank her
[3:04]
enough from you know the dayto-day and
us going over every facet of the project
[3:11]
and revisions after revisions. Thank
you, Terry. And also, Chris Kazenza,
[3:16]
want to thank you for your hard work on
this because many, many times we've been
[3:20]
on the phone and trying to make sure
that the stuff fits. And Joe Bowman,
[3:26]
can't say how much I rely on your help
and your guidance and all the legal ease
[3:32]
through this process. But with that
said, I'm going to introduce you to the
[3:36]
the chair of our economic development
committee, and that's council member
[3:41]
Hail. And at this time I'm going to ask
him to come up and say a few words
[3:44]
because I see Bry's here and I think
that I would love for you to lend your
[3:48]
voice to this conversation. Thank you.
[3:56]
» Thank you very much, Mayor. Is this
working well? Oh, there we go. Okay. Um,
[4:00]
I just wanted to to to say a couple
things and and add my sincere thanks to
[4:04]
Chris and to Joe and to Terry, to our
professional staff um for the tremendous
[4:09]
amount of work that it takes um to bring
a project like this to fruition. Um the
[4:14]
pictures that we've seen and the
pictures that you're going to see
[4:16]
tonight um we'll show you the front,
show the aside, show you the room, show
[4:21]
you give you quite amount of detail. But
when you think about the number of
[4:24]
things that we have to do to figure out
that the sewer works and that the
[4:28]
streets work and all of those things, it
really is an amazing um amount of
[4:32]
technical work um at the city, at the
burough level, at the county level, at
[4:36]
the state level. And it really has been
sort of a an eye openening a process for
[4:43]
me to see what it takes to have a de
development like this come to fruition.
[4:47]
Um as the mayor said, this is a long
time coming. Um we have been thinking
[4:52]
about things to do to revitalize
downtown um uh for over 20 years. Um
[4:57]
this particular project um we first went
out to bid to to think about this um
[5:02]
over five years ago. We've had hundreds
of meetings, hundreds of of sessions
[5:07]
working out the details of this and and
this is a a great opportunity to see
[5:12]
where we've come out and where this um
where this project is going to go. This
[5:16]
project has been designed from day one
to try and bring more people right on
[5:20]
the avenue. Bring more people to the
avenue, more people to the businesses,
[5:24]
and more people to our community. Um,
and it is also um uh exciting to see
[5:30]
that as this project at the at track C
right next door on Third Avenue, we're
[5:35]
moving right along with our our project
for a downtown park for turning the
[5:39]
third burrow plaza. Um, so right near
there at Burough Square, excuse me,
[5:44]
sorry, it's Burough Square. Marketing
all the time. Um, Burough Square where
[5:47]
we're going to have have not only just
um the excitement of this new
[5:53]
development, but right next to it um uh
we're going to have a public space, a
[5:58]
very public park right on a street. And
so those things are moving in tandem. Um
[6:03]
this is going to change Highland Park.
There's no doubt about that. It's going
[6:05]
to change it. We think it's going to
change for the better. I think it's
[6:08]
going to revitalize businesses up and
down the avenue. We think it's going to
[6:11]
revitalize um and energize uh uh
Highland Park in a way that we've seen
[6:18]
through the a process in other towns
that has followed. Um we follow
[6:22]
Matuchin, we follow Somerset, we follow
a number of different places where a
[6:26]
project just like this um has really
kickstarted and and kicked off a town.
[6:31]
Um so we're really really excited to
this um uh we have some great pictures
[6:36]
tonight. of great professionals um to
talk about this.
[6:40]
But as all of this teamwork on the
public side um has has brought this
[6:46]
together, we're also partners with our
developer um our developer is Brett
[6:50]
Tansman and Garden Homes. He's here in
the back today. Um uh Brett right there
[6:56]
all the way in the back. Um, and Brett
is is um since day one of this project,
[7:02]
Brett has looked at this um I think with
the eye of this is a good project for
[7:06]
him. Without a doubt, this is good, but
it is also a good project for a town
[7:10]
that he knows very well. Um, and in fact
grew up in um in in some respects. Um,
[7:16]
he's been a partner in this. Um we've
had disagreements, we've had hugs, we've
[7:20]
had all of these things, but we've come
to a place where we think that this
[7:24]
project um uh as a partnership um really
is going to be a great thing for for the
[7:30]
town. Um did Brett want to say do Brett
you want to say any words or you want to
[7:35]
» Sure. I'm happy to after presentation
whatever.
[7:39]
» Come on up Brett. Let's uh
[7:49]
also like to recognize that Councilman
Councilwoman Norma Vargas has joined us
[7:53]
as well. Um so um add that to the mix.
So um you know Brett just to couple
[8:01]
words about your your company, where
you're from and just introduce yourself.
[8:05]
You'll be around for questions and all
that. I think that's great. But after
[8:08]
we're done, we're gonna hear from our
professionals. We're going to hear um
[8:11]
walk through the project. Um we're
looking forward to questions. We're
[8:15]
looking forward to um a discussion. And
we're excited from here. Right.
[8:20]
» Um
good evening everyone, mayor, council,
[8:26]
uh professionals, members of the
community, uh our neighbor, Pastor Seth.
[8:32]
Um,
my name is Brett Tansman. Uh, and we're
[8:37]
I'm part of represented as the the
developer and developer garden homes.
[8:42]
Um, we have a long history of of working
in many communities uh redevelopment
[8:50]
and I personally, as as Councilman Hill
said, have a deep uh history in Highland
[8:56]
Park. Uh I think five generations of my
family have have lived in this
[9:01]
community. Um and it's a special place
and we want to build a project and I
[9:07]
hope you'll you'll see and this is not a
site plan application today. It's just a
[9:12]
high level conversation but we want to
build a project that uh I want to be
[9:17]
just as proud of it as hopefully all of
you are um and really have a deep impact
[9:24]
on the community for generations to
come. So, I didn't want to take up too
[9:28]
much time. I'm happy to answer
questions. Um, and hopefully down the
[9:35]
street you've seen we've developed
redeveloped the Frederick. Um and
[9:40]
there's a number of other projects in
the surrounding community uh that we can
[9:44]
point to where we had a positive um
relationship with the municipality and
[9:50]
with the public where at first they had
concerns and uh ultimately they they
[9:56]
know that what we say we're going to
deliver we're going to deliver. So we're
[10:00]
excited about the prospects of of this
project and the opportunity and um just
[10:06]
grateful to be here. So, thank you.
[10:13]
» All right. Thanks, uh, Brett. And, and
you'll stick around, so if there's some
[10:17]
questions, great. Um, so good. Oh, I
should have probably put this up
[10:22]
earlier. Welcome and introductions.
Check. Um, but what we're about to go
[10:27]
through and then as you can see, we'll
get to questions and comments. Um, we
[10:31]
are I'm going to kind of do a refresher
on the project because we recognize
[10:35]
we've been in kind of collaboration
negotiation mode with Garden Homes for
[10:40]
quite some time and the community hasn't
heard about other than we're working on
[10:46]
it. We're working on it uh in a while.
So, I'm going to kind of click through
[10:50]
some overview sides of kind of what
we're trying to achieve with the project
[10:53]
and then I'm going to hand it over to
our redevelopment council, Joe Bowman,
[10:57]
to walk us through the terms of the
redevelopment agreement that we've all
[11:01]
kind of we think we're we're pretty much
there uh in terms of the things that
[11:05]
need to be memorialized in that
agreement. And we've done a fiscal
[11:09]
analysis related to a potential
financial agreement as well that Joel
[11:13]
will walk us through and kind of give
you a sense for if this moves forward,
[11:17]
what the timelines would look like and
so forth. And a lot of which is
[11:21]
articulated in the reveloping room. Feel
free to sit over here. You can just stay
[11:26]
stand over here too. Um so with that,
I'd like to just uh click in to um kind
[11:34]
of where have we been? Oh, thanks. Um we
uh you might remember I presented a
[11:40]
version of this uh a few years ago. In
2005 we adopted a downtown redevelopment
[11:46]
plan that included uh what we're now
calling the track Clayite which I should
[11:50]
say is between on Ritton between second
and third uh southside. Um and we've
[11:57]
been plugging away and a few years ago
in 2021
[12:01]
uh we took a new approach where we
identified four tracks downtown AB C and
[12:06]
D where we did sight specific
redevelopment plan for that. We issued
[12:11]
an RFP that same year. We took some
time, got proposals in and garden homes
[12:16]
was one of those proposals that we liked
and we ultimately ended up designating
[12:21]
them as the conditional developer for
track C, the site we're talking about
[12:24]
tonight. Um, over between 22 and 26, we
took a lot of time. We had a community
[12:31]
meeting in 2024 where we showed a lot of
photos and answer a lot of questions. We
[12:36]
took a lot of that input to heart in the
in the design work that's been going on.
[12:39]
Um but uh essentially we did expand the
redevelopment area because there were
[12:45]
additional tracks that Garden Homes had
acquired and brought into the project.
[12:49]
Um we amended the redevelopment plan
accordingly in line with the vision of
[12:54]
the project that came together in 2425.
Um and then most recently the final
[13:00]
parcel kind of was a way to put a point
in it was uh purchased in 2026
[13:06]
uh just about a month ago. So, that was
kind of the last piece of the puzzle, so
[13:12]
to speak, so that we could move the
project forward. Um, and now we're in
[13:17]
the process of we've been discussing our
redevelopment agreement, which Joe's
[13:20]
going to walk you through shortly, um,
and the terms of a potential financial
[13:24]
agreement. and um Garden Homes has been
pulling their materials and actually has
[13:30]
begun the process for a site plan
application which would be if we come to
[13:35]
a redevelopment agreement would be the
the next step that could take place in
[13:39]
October or November of this year. So
just to give you a sense of the projects
[13:43]
kind of finally pulling together after
all this time of discussion and I must
[13:48]
confess the question I get more often
than not now is like is anything ever
[13:52]
going to happen? Not I don't want this
to happen. So, I hope you'll see we've
[13:56]
made some progress and we're ready to
move forward. But I I promise a
[14:01]
refresher course for some of you who may
or may not have been uh at our previous
[14:05]
meetings or familiar with the project,
but currently you're you're back to New
[14:09]
Brunswick. You're standing across the
street on Raron Avenue looking uh
[14:13]
towards Second South Second. And here's
these are the exact pictures we showed
[14:18]
in June of 2024. I couldn't believe it
was 2024. Um, and this is a concept
[14:25]
rendering of what we would like to build
here. And similarly, walking down the
[14:31]
street a little further away,
we've got another we kind of a
[14:36]
brownstone walk up. And then we have um
some covered uh public space, which I'll
[14:44]
talk about in a little bit. And then
just looking the other way, looking down
[14:48]
from uh
we're looking at uh that's the building
[14:53]
looking down towards New Brunswick. So
these are the same pictures we showed
[14:57]
way back when and I'm pleased to report
that after a lot of due diligence on the
[15:02]
part of garden homes from geotechnical
to storm water design and engineering
[15:09]
uh they figured out a way to build a
project. And so that's what a lot of the
[15:13]
um due diligence that we've been doing
these last few years at this point has
[15:18]
been to figure out how to make it work
and to fully program the building. How
[15:22]
many units can it really support parking
spaces and things like that? Um this is
[15:27]
my little scheme, so I'll take full
credit for any mistakes that are on this
[15:32]
this detail. But just to break down the
building a little more, it's one
[15:37]
building, but it's designed to look like
five. So that I, you know, if you saw as
[15:41]
we walked down the street, you could see
different typologies,
[15:45]
you know, different setbacks and things
because we really recognize it's large
[15:49]
scale for Highland Park, but we want it
to fit in. Um, so it's one building as
[15:54]
this diagram and this is really kind of
like the first floor. See if this works.
[15:58]
So at the corner, this is the south
second and corner division is a
[16:02]
restaurant. Fairly large one footpoint
there. Uh these are those brownstone
[16:07]
style residential units that we saw on
the rendering. Um moving forward, this
[16:12]
is a a pedestrian connection through to
Magnolia Street and to Raritin, which
[16:17]
I'll talk a little more about. Um this
has now been reinvisioned as potential
[16:22]
retail or commercial space as of right
now. Um a lobby space that was this is
[16:28]
all fronting Ritan. And then this is
very exciting for us. uh indooroutdoor
[16:34]
public space that the burrow can use.
The indoor space will be exclusive to
[16:38]
our operations and then this is a shared
uh covered outdoor space uh that both
[16:44]
the residents here but also the general
public can utilize as well. And then
[16:48]
kind of capping things off here uh
retail and commercial at the end. So
[16:52]
we've got it kind of smack, you know,
that was you know a little bit more
[16:57]
commercial than maybe we thought when we
first started the project. Um very kind
[17:01]
of the parking is interesting. It's on
two levels. They don't speak to each
[17:05]
other. You can't drive from the lower
level to the upper level. So you access
[17:09]
the lower level from south second. And
uh this way and again this is just a
[17:15]
first level scheme that I've imposed my
own lines and drawings on. Um, and then
[17:22]
the other way on the upper level, which
is really more at grade when you're
[17:26]
coming in off Magnolia Street, will be
access from Magnolia Street. Importantly
[17:31]
to the burrow, um, and highlighted in
this yellow bar is we've kind of come to
[17:37]
agreement that there'll be 40 public
spots in perpetuity. Um and the ones on
[17:44]
the surface lot that we're we've already
utilized currently will remain as public
[17:50]
spots in perpetuity. Um again uh I
believe it's about um 27 on the surface
[17:58]
lot and 13 interior, but it's definitely
40 total. So I'll let Brett speak to
[18:03]
that if I got something wrong. Um, so
we're really talking about, and I should
[18:08]
mention the final programming came to
134 new apartments, downtown living with
[18:15]
20 of them, 15% being affordable. Um,
about 14,000 square feet of retail and
[18:20]
commercial space broken down as I kind
of write there on the screen for you. um
[18:25]
that indoor outdoor space comes to a
total of 6,000 square feet of indoor
[18:29]
outdoor space, the 40 spaces of
permanent public parking, and then a
[18:33]
total of 250 spaces. So that's kind of
like the broad strokes of the project
[18:38]
that some of you who may not be as
familiar with it. I feel like I've been
[18:43]
studying it for four years. Uh so sorry
if I I went through it. A couple really
[18:48]
important things that we want to
highlight, and this is just a kind of a
[18:51]
zoom in on the landscape plan. Um, we
this pedestrian connection I mentioned
[18:56]
before, it it is ADA accessible. There
is an elevator or stairs that one can
[19:02]
utilize. I'll let somebody else who
knows the the program better than I
[19:06]
explain exactly how it works. And very
importantly, in the lower left here, um,
[19:11]
it's designed to feel welcoming to the
public because it is a public access
[19:15]
point through that we are a midblock
crossing there. Um, and it's important
[19:20]
and uh, Garden Homes has agreed to some
probably a sculpture of some sort, maybe
[19:25]
some public art mural up here. We're
going to negotiate that and we're going
[19:29]
to come together on that, but they've
committed to that and in our
[19:32]
discussions, which we're really excited
about as an opportunity to to really
[19:36]
personalize the project to Highland
Park. Um, this is that covered uh,
[19:42]
public space outside of the indoor
community space. Um, it'll be furnished
[19:47]
and finished for us uh by Garden Homes
and they're going to help us maintain
[19:51]
it. We'll also have a role in keeping it
nice and maintain maintaining it, but
[19:56]
it'll include lighting. Both of these
spaces will be well lit and inviting and
[20:00]
really kind of add a lot to the
downtown. Um, importantly, um, and we
[20:06]
heard from our shade tree folks
especially, we're going to have new tree
[20:11]
pits where we can and we're going to
have enhanced tree pits so we can
[20:14]
hopefully see our trees really thrive
and they also serve a better green
[20:18]
infrastructure purpose. Um, and there's
also landscaping uh throughout which if
[20:23]
you're really into the into that, you
can follow their application to the
[20:27]
planning board uh where they'll go into
a lot more detail about uh what they
[20:31]
have in mind and and the finishing
touches. So, in a nutshell, um this is
[20:36]
how the project is going to work. Uh one
thing I should mention is from the rear,
[20:43]
while I don't have a good drawing of
this, the building stays to three
[20:48]
floors. uh in the back on this area and
this is an amenity deck area uh that's
[20:53]
intentional to step back from the church
property and from some of the
[20:58]
neighboring properties thereby so we
don't the the taller portion of the
[21:02]
building will be closer you know in this
more front part closer to rare nav which
[21:08]
was all stuff we put in the re uh
redevelopment plan to try to manage uh
[21:14]
uh putting a larger building where one
wasn't for I think I covered all my
[21:20]
bullets, so we'll move on. Oh, this is
just a concept plan for what would be
[21:25]
our interior um community space. It's
basically a multi-purpose room. We're
[21:31]
envisioning it for Wouldn't it be great
to have uh art exhibits coming through,
[21:36]
other kinds of performances potentially?
And we may be some of these things may
[21:41]
move, but we'll definitely have full
functioning restroom, a a more of a
[21:46]
closed office setup and a pantry as
well. So if we want to host meetings or
[21:50]
events in there, we have what we need to
do that. And then also really neat,
[21:55]
there will be some larger doors here um
so that they can be kind of opened up.
[22:00]
So if we have an indoor outdoor event um
we can accommodate that as well. Um, and
[22:05]
so, you know, we get we get the full
benefit of the 6,000 square foot of
[22:10]
space. Um,
and then I just can't end without, you
[22:15]
know, by the way, we've got another
project which you heard a couple times
[22:19]
mentioned. We have our Traxxy
redevelopment project, but then we're
[22:22]
also have been working hard on the
Burough Square Plaza, uh, which is on
[22:27]
South Third Avenue, uh, the the closed
portion of South Third being from where
[22:32]
my my arrow is here. Um and then our
expanded parking port and support
[22:37]
functions will be over there. Um those
are um you know this is integral because
[22:43]
we know we'll be displacing activities
from uh track C uh to this new
[22:50]
refurbished space. Uh so we're really
excited these two projects are coming
[22:54]
together. Um, and just as a in case you
haven't heard, these are this is a just
[22:59]
a quick rendering of the Burough Square
project looking from Raritin towards
[23:05]
Magnolia Street. Um, there's a lot of
information about that project up on our
[23:10]
website as well. Happy to answer some
questions, but we're really focused on
[23:14]
uh the track portion of this, but the
two things have been kind of discussed
[23:19]
hand inand So, I just wanted to make
sure everybody was oriented to, you
[23:22]
know, what's happening where. Um, I
think that was all I was going to cover
[23:27]
and I and with that I was going to
invite Joe to come walk you through the
[23:32]
terms of the redevelopment agreement.
Joe, that should work hopefully.
[23:37]
Thanks.
[23:40]
» Hey, Joe. How we doing?
Awesome. Um,
[23:45]
I'm going to take you through the
document uh and talk to you about the
[23:48]
finance of the project, but I would be
remiss if I didn't sort of underscore
[23:54]
the effort and what to get us from here
to there. Clearly, there was a vision 20
[24:00]
years ago or so about a redevelopment
plan that just never took off, right? It
[24:05]
just never happened. Didn't have legs.
Nothing really. There was not a
[24:09]
redevelopment project, I think, ever
undertaken under that original plan. the
[24:13]
governing body
um with their planner and the
[24:17]
professional team started to okay well
that didn't work let's come up with a
[24:20]
new redevelopment plan and we went down
a process of identifying four areas in
[24:26]
town where we felt redevelopment could
actually happen uh tracks A B C and D
[24:32]
and we picked those very strategically
based upon what those projects where we
[24:36]
think we had the highest likelihood of
succeeding track C that we're talking
[24:41]
about we identified
in part because we owned some of the
[24:45]
property which we thought was going to
be an important component. Um and in
[24:49]
initially and we envisioned back in the
day as a much smaller project than we
[24:53]
actually ended up with today um to our
benefit. Um we en envisioned a smaller
[24:59]
project because we were trying to sort
of limited the the number of properties
[25:03]
that would have to be involved in the
private properties that make up this
[25:07]
project that were not the public
project. So we went down the path. We
[25:10]
went through an RFP process which was
very robust. We received several
[25:14]
proposals. We have analyzed those
proposals and after that process we
[25:19]
selected uh garden homes. Now garden
home. So garden home wasn't just sort of
[25:23]
selected uh at will. They competed
through a process. They made a
[25:28]
compelling argument and at the time they
had already decided that they believe in
[25:32]
uh island park that they were going to
start buying properties in this area. So
[25:37]
they made a proposal that said, "We want
to do this project." Oh, by the way, we
[25:40]
started to acquire land in the property
and we just completed a project with you
[25:45]
on River Road and we think we did a good
job. We hope you did, too. And we did.
[25:50]
So, we selected them after this process.
And that process included, as I'll
[25:53]
describe to you a little bit, things
like what's the purchase price going to
[25:56]
be for the land? What's the project
going to look like? We did that, you
[26:00]
know, after about six or seven months of
analysis as uh Terry described to you
[26:05]
and then since then we've been working
on the project. Why has it taken us so
[26:10]
long? So along the way, one of the
things Gardens Home has been doing which
[26:14]
is incredibly beneficial is they've been
acquiring the land and and third party
[26:18]
transactions slowly acquiring all the
parcels that make up this project. Why
[26:23]
is that important for the borrow?
Because without their efforts to acquire
[26:27]
this property in third party
transactions, we would have to be more
[26:30]
aggressive about making that happen. So
they took the yman's job of today
[26:35]
acquiring all those properties which
unless we sign agreement with them,
[26:38]
they're at risk now for owning all that
land without the ability to do a
[26:42]
redevelopment project until they sign a
redevelopment agreement with them. So
[26:45]
they exhibited a significant amount of
faith and trust in both us as a
[26:51]
cooperative partner and in themselves as
proving to us that they would be a good
[26:56]
partner and we could come to an
agreement. So through that process we
[26:59]
had a couple of iterations of our
redevelopment uh plan was amended as
[27:03]
they would suggest as we sort of
expected to our planner. We think we
[27:07]
should do something different. We would
do something different. We expanded the
[27:11]
area. We uh made some bulk standard
changes. all as a enter of to a process
[27:17]
that would get us to today which we
believe is a much better process and
[27:21]
project than we began with when we first
started this. It was smaller. but didn't
[27:26]
control the land to today where they now
own all of the land having worked with
[27:30]
every single uh private property owner
reached third party uh arms link
[27:36]
transactions including with our good
neighbor their good neighbor and uh our
[27:41]
the church we who's been very
cooperative with us frankly extremely
[27:45]
helpful through the process so this sort
of effort sort of coalesed to today so
[27:50]
that project that you've seen is is a
couple years in the making and along the
[27:54]
way we did have a community meeting so
that the community was sort of kept in
[27:58]
at breast along the process but it took
a while but you know like anything
[28:04]
that's hard and difficult u it it's
worth it it's really worth it we're
[28:09]
really thrilled to sort of describe the
project to you and as you as I present
[28:13]
to the planning board I'm I'm confident
that the public will participate in that
[28:18]
process and also uh in uh be proud and
happy with the result of this effort So
[28:25]
the redevelopment agreement. So one of
the things about redevelopment that
[28:28]
doesn't exist in normal zoning is we uh
we get to negotiate with the redeveloper
[28:35]
certain things that we could not do
under the municipal land use law, things
[28:40]
like uh selling them property, things
like uh community space, uh particular
[28:46]
uh other particular requirements that
I'm going to walk through with you
[28:49]
today. So you but for being
redevelopment, none of these things
[28:53]
could happen. Well, we so we now have
this zoning, this redevelopment plan
[28:57]
that describes the the the contours of
the project, the bulk standards that now
[29:04]
is the zoning for this process. That
agreement, that plan into it that
[29:08]
requirement that they have to sign a
redevelopment agreement with us before
[29:11]
they can go to the plan board. So,
that's the step we're at. We've
[29:15]
negotiated a redevelopment agreement.
Then I'm going to walk you through the
[29:18]
terms and we're going to post it online
and they're going to take action in our
[29:21]
next meeting. So people will have heard
about it today. They will have read it
[29:25]
um online and then before we even have a
vote. So there'll be plenty of time
[29:31]
tonight in your leisure when you watch
this video and or you read a
[29:35]
redevelopment agreement to then be
available to uh for when you actually
[29:39]
take a vote. Um so under the
redevelopment law, we had this
[29:43]
opportunity to negotiate with garden
homes for a number of things to make
[29:48]
this project uh better than um than it
would have other frankly under the mun
[29:54]
language.
So um this is sort of a summary of some
[30:00]
of the critical terms that you're going
to see in the redevelopment agreement.
[30:03]
The redevelopment agreement is hundreds
of pages with the the exhibits attached.
[30:07]
Um so the purchase price is1 million uh
$1.5 million. When we went through the
[30:12]
competitive process, a number of the
developers proposed to buy our land from
[30:18]
us to do track city and the purchase
prices from those proposals ranged from
[30:24]
400,000. Eric doesn't know this, he
knows it now. $400,000
[30:29]
to uh $1.2
million. So uh Brett in his proposal
[30:35]
said, "I'll pay you between 1.2 2 1.5
and as of the last minute he was still
[30:40]
very comfortable with 1.2 um but he's
paying 1.5 um sort of an evidence of
[30:46]
their willingness to uh negotiate harder
than come to agreement. So this purchase
[30:51]
price at the end of the day was the most
that anyone offered to buy our land
[30:55]
through the competitive process and it
was the most that uh garden homes had
[31:00]
said they would pay uh back when we did
the process. So, we feel really good
[31:05]
about this purchase price. This $1.5
million, by the way. I don't know how
[31:09]
we're going to purchase it, but it but
it could if we decide to help us fund
[31:13]
the uh uh Pharaoh Plaza that's being
that showed you pictures of it's 134
[31:20]
residential units. Um, this is going to
be a luxury project. Um, it's going to
[31:25]
have some incredible amenities baked
into it. If you ever go see, you can go
[31:30]
see some of the other Garden Homes
projects through the state of New
[31:32]
Jersey. They're They're a quality
developer with just quality projects.
[31:36]
Um, of the 134 15% so 20 are going to be
affordable housing and we afford to
[31:42]
house. So 20 of those will be the
affordable housing projects. Um, if you
[31:47]
do the math 15% is 20.1,
right? So how do you do 0.1 unit? Well,
[31:53]
the way you do that is you come to an
agreement. I'll describe it to you
[31:56]
later. Under the law, there's a
calculation for what a unit would cost
[32:00]
and they can make a payment. So for the
0.1, they're going to make a payment
[32:03]
into our affordable housing trust fund
so that they satisfy the full 20.1 or
[32:07]
the responsibilities on 134 units. But
there's, as Terry described you, there's
[32:12]
going to be 20 parking spaces. So we're
going to deed them. We're going to sell
[32:15]
them all of our land. So they're going
to pay for all of our land at the 1.5
[32:20]
million, but then they're gonna
>> So it's 40 40
[32:23]
» 40. I'm sorry. Sorry.
Um, thank you. Uh, so by the way, jump
[32:30]
in everybody whenever I if I get it
wrong, I can use I can use all the help.
[32:38]
Um, so um
the 40 parking space um and uh um
[32:47]
sorry and then our 6,000 square feet.
Oh, I know. So they're going to sell us
[32:52]
all the land, right? We're going to get
entire all the property is going to be
[32:55]
sold from our property, sold to them
$1.5 million. Um, in exchange though,
[32:59]
they're going to give us back the
easement in perpetuity so we can occupy
[33:03]
for the public can occupy those 40
spaces. So while we are selling them all
[33:07]
of our land, 40 spaces will remain ours
through a easement on the property. So
[33:14]
we will retain through the easement the
right for the public to park and that's
[33:18]
been that was a really important
component of it partly because of our
[33:21]
neighbor who's uh people use that the
public uses it. Um so we wanted to
[33:26]
maintain that we continue to have
availability for the public for those
[33:28]
spaces. Um so in the agreement you're
going to see we've sort of described
[33:34]
some of the core responsibilities. An
agreement is a partnership. It's it's
[33:37]
public part public private partnership.
So the developer is going to have the
[33:41]
obl obligation to acquire the required
properties. He's done it all now um as
[33:46]
recently as this summer completed that
process. He's got to get his approvals.
[33:49]
He's got to arrange his financing. Uh
he's going to have to construct all the
[33:53]
public improvements, the infrastructure.
He's going to have to deliver our
[33:56]
affordable housing which will come with
a deed restrictions so they stay
[33:59]
affordable for 40 years. Um he's going
to have to maintain the site and he
[34:04]
continues to fund the bar. So uh through
this process, all of the work that the
[34:09]
burrows had to spend money on to have
our our professionals do not unlike what
[34:14]
you see at a landlord has been paid
through an escro from for for from for
[34:18]
from Garden Homes and Brett's company.
So the w my time here today for example
[34:23]
they're they're paying not the taxpayers
they're paying they're paying the the
[34:27]
free um our job here is to um we're
going to participate in the process.
[34:31]
You'll see in agreement there's certain
specific things that we're going to have
[34:35]
to do. For example uh we're going to
move the transom um that's currently
[34:39]
they've agreed to relocate it for us. we
have to tell them where um so we have
[34:43]
some sort of limited we got to cooperate
help them along participate in progress
[34:47]
meetings inspect it as appropriate um if
they need an extension of time we have
[34:52]
to consider it again determine where the
pavilion relocation will go we haven't
[34:56]
sorted that out they've agreed to put it
where we tell them um and then you know
[35:01]
there's going to be there's schedules
that require government approvals
[35:04]
project closing when you get occupancy
when it gets completion it's a very
[35:10]
regulated
uh process that's going to you know
[35:15]
could take us through the next year or
year and a half to get to the opening of
[35:19]
the facility.
So the burough the purchase price is $
[35:24]
1.5 million. you'll see on one of our
our agenda coming up uh not this meeting
[35:29]
but the next meeting they'll be
authorizing the purchase of sale
[35:32]
agreement for the $1.5 million um with a
closing uh so within 14 days of the
[35:39]
receipt of the government approvals um
and then it remains subject to certain
[35:43]
conferences. This uh closing date is a
very important timing for us. We do not
[35:49]
want to release our property to them
until the last minute when we sure
[35:53]
they're ready to get started building um
for a number of reasons. Uh we just
[35:59]
don't want to be in a situation where
they acquire a property for $1.5 million
[36:03]
and nothing happens, right? So one of
the concerns whenever you're in the
[36:07]
redevelopment context is you sell your
property and you get an Asbury Park. How
[36:11]
many years ago already you have this
monolith gets half built never gets
[36:14]
completed. So in our documents, there's
also this reverber clause. And the
[36:18]
reverter clause says that if the
developer acquires our property and
[36:23]
doesn't commence construction or fails
to complete the construction, we can
[36:27]
take our property back under certain
with certain conditions. We have to make
[36:29]
sure the lender gets paid their money.
But at the end of the day, it's designed
[36:33]
to make sure that we don't expect this,
but if something were to happen with our
[36:38]
pro with this project, we want to be
able to take our property back and and
[36:42]
try again. Um, again, no expectation
that would happen. Um, Brett's company
[36:48]
wouldn't let that happen. I can't
imagine if they ever had, honestly, they
[36:51]
don't know where um, the banks wouldn't
let it happen. But, but because it's
[36:55]
public property, it's we have a
fiduciary responsibility to the public,
[36:58]
we insist on a reverter claw clause in
the deed that indicates if if something
[37:03]
fails along the way, we're going to take
our property back again. Never expected
[37:07]
to have to do that.
So we we getting back to the
[37:12]
redevelopment world versus the useful
land use law. This is the things that we
[37:15]
negotiate into the unit that we couldn't
have done but for redevelopment. So we
[37:19]
have our uh 3,000 square feet of indoor
community space. There's going to be a
[37:23]
lease. Everybody's also going to approve
that. That lease is that they're going
[37:26]
to lease they're going to build out our
facility for us and they're going to
[37:30]
lease it to us for a dollar. It's going
to be for 50 years with 25 year renewal.
[37:34]
So effectively a lease, you know, for
very long before any of us are still in
[37:39]
this in this room or still around. Um,
so that's a that's a long-term lease.
[37:43]
And then there's this outdoor space
which is really cool. And as Terry
[37:46]
described it, it's going it's being
designed so that you can open the doors
[37:51]
uh to have access to the indoor and the
outdoor space at the same time. Sort of
[37:55]
doubling the space for an event. uh
because the outdoor space is covered and
[38:00]
then the indoor space and it will be
it's going to turn out to be a really
[38:02]
cool opportunity for the uh for the
municipality to uh figure out how to use
[38:07]
that space and that's ours you know
that's ours to use for the next hundred
[38:11]
years and it's ours to program and to
make the best of use of and you know
[38:17]
that's money that Brett is forgoing
right he could have leased this to
[38:21]
somebody else he could have had a retail
tenant in this project increase his
[38:24]
revenues but as part of our negotiations
and our community benefits It's he's
[38:28]
turning over those square feet again
finished for us so that we can enjoy for
[38:32]
uh for the community for the public uh
the 40 spaces you're aware of and then
[38:36]
there we have these EV ready spaces and
the public spaces u that they're also
[38:41]
giving. So summarizing community outdoor
space um also this pedestrian connection
[38:46]
that Terry described and sort of showed
to you. Uh we we're pretty excited about
[38:51]
that opportunity because we see it if
you see the pictures and when you I
[38:55]
think when it's completed you'll see
that it's it's really sort of this cool
[38:58]
entryway into the into the garage. So,
not into a necessarily exciting, sexy
[39:04]
place, but into the garage, but it has
the opportunity to have some really uh
[39:08]
interesting artwork that they've agreed
to light and work with us to have it be
[39:13]
sort of a centerpiece to the building as
as you will sort of walk as you want to
[39:17]
if you want to pass through the middle
of the building to go all the way
[39:20]
through the public parking to the back.
So, it's going to be sort of a pretty
[39:23]
cool um uh public space in the sense
that open. we're going to program with
[39:29]
art in some other in a way to make it
sort somewhat of a meaningful uh uh
[39:35]
centerpiece for Highland Park. And it
really uh when you see the design, it's
[39:39]
very cool the way it um it's buried next
to these town halls, right? So along
[39:44]
their project, I don't know if we gave
it enough credence, but they they're
[39:47]
doing these uh walkups.
So, so it's not your typical throw up a
[39:53]
big multif family residential project.
It has these this series of walkups that
[39:57]
then lead into the restaurant on the
corner which is like this beautiful
[40:00]
anchor and then in the other direction
uh more retail and and in fact near the
[40:05]
end they added additional lot with some
more retail again how the project
[40:08]
evolved in a way where every every step
of the way we sort of added something
[40:13]
even more interesting again like this
last that was a addition that I think
[40:17]
was in the last couple months that last
piece of retail on the corner which you
[40:21]
know we were very happy about. So, um,
that's the community benefits part. Oh,
[40:27]
and yeah, oh, the the again the pavilion
is going to get relocated.
[40:33]
Um, so I know Highland Park, I know your
council are particularly uh interested
[40:40]
in um some of the things that are on
this slide. They were definitely uh very
[40:46]
by the way this mayor this governing
body are were so in the weeds on this
[40:50]
process um compared to you know you were
blessed to have a governing body that
[40:54]
spends the time energy ask the hard
questions of our professional
[40:58]
professionals challenges us to do a
better job to do better on our
[41:01]
negotiations. Um but this is a slide
where they were particularly interested
[41:06]
and that not not every client of mine is
particularly interested in. So they were
[41:10]
very interested in sustainable design,
very interested in EV charging, very
[41:15]
interested in universal design and very
interested in making sure that this was
[41:18]
an 100% electric building. So in the in
the redevelopment agreement, it calls
[41:23]
out that um there's not going to be gas
uh stoves for example. Um this is going
[41:29]
to be this is sustainable. So these are
some of the things that are either in
[41:34]
the redevelopment plan that uh our
planner Chris was careful to put in and
[41:37]
or we've included them in the
redevelopment agreement but things that
[41:41]
are that are uh designed to make this
sustainable uh to rely on electricity
[41:45]
instead of natural gas. Um and then to
adopt you know all the sort of things
[41:50]
that are listed there that ADA
accessible everything is sort of laid
[41:55]
out in that in that chart. Um again some
of the sort of things are not that
[41:59]
financial maybe not as um as interesting
as community space but very important to
[42:06]
this to this mayor of this governing
body as we did the negotiations.
[42:11]
Uh also uh Highland Park I know is
particularly interested in its
[42:15]
streetscape. Right. So we you have a
very robust um downtown uh management
[42:21]
commission. You have a very robust
street commission. Um and uh I know
[42:25]
Terry spends a lot of time interacting
with them and directing the team uh to
[42:29]
make sure that all those kinds of issues
are being addressed. Are we addressing
[42:33]
the interests of the downtown
commandment commission? Are we
[42:36]
addressing and the special improvement
district? Are we addressing the concerns
[42:39]
of the U treat commission? So all again
also u sort of pet head pet issues for
[42:46]
the governing body. We heard a lot from
the governing body about the importance
[42:49]
of uh streetscape. Uh and then the last
one's over here. Um in our redevelopment
[42:55]
agreement, we asked the redeveloper to
engage in good faith efforts to try and
[43:00]
hire local uh contractors, local
Highland Park residents. Um and there's
[43:05]
you when you'll see the re
redevelopment, it'll describe on
[43:09]
describe how they're going to go about
that do that. I I have no doubt they're
[43:12]
going to make good faith efforts to uh
try and make that happen. There are
[43:16]
legal limitations on what you can ask
them require them to do or not. Um but
[43:20]
they were they were more than happy to
you know make these efforts and do all
[43:24]
the things necessary to try and find uh
local island park residents that um can
[43:30]
you know their businesses that could
benefit from this redevelopment project
[43:33]
and the construction of it
affordable housing again a very
[43:39]
important uh component uh in Highland
Park uh this project will provide the
[43:46]
15% affordable housing uh the the law on
affordable housing housing is dictated
[43:51]
by the state of New Jersey. So, this is
the breakdown. They're going to have
[43:55]
these these categories uh and these
bedroom counts which tie back to the
[43:59]
state New Jersey requirements that they
will include. They'll we're going to put
[44:03]
on their property. So, in the deed,
there'll be another deed restriction
[44:08]
that says that this this uh affordable
housing requirements will continue for
[44:12]
the next 40 years. In the past, it's
been 30 years. Now, it's 40 years. Um,
[44:16]
so, uh, under the current law, we we
held them to the 40-year requirement.
[44:21]
Um, and so, so these these affordable,
uh, units and these numbers, um, will be
[44:28]
available, uh, in this budget. So
beating the 15% and continuing to
[44:33]
continuing to meet our obligation to
fair housing the New Jersey Constitution
[44:38]
and then morally to the uh people that
are required for housing in
[44:44]
um and then by I talked to you about
that point one it's worth $22,291
[44:50]
so that's our fraction uh can we get
another question? Yeah, sure. I'll ask.
[44:54]
I just want to remember that.
>> I want to ask a question on that slide.
[44:57]
So, as long as we can come back,
>> I will come back to slide. Yeah.
[45:03]
» All right. So, because this is not your
typical land use law, we're very
[45:07]
involved in the process. So, baked into
the redevelopment agreement, are not a
[45:11]
lot of items that um some of them are
typical in any construction project. Uh
[45:16]
but we also put them into our contract.
uh things like there'll be the
[45:20]
pre-construction meeting where Garnomes
meets with our professional team so
[45:24]
everyone is on the same page when the
construction begins. Uh pedestrian
[45:28]
safety. So all this project it's going
to be an enormous project going to be
[45:32]
the largest ever. It's as you'll see
later it's a 70 plus million dollar
[45:36]
investment in our community. Um but we
want to make sure the pedestrian is
[45:40]
safe. Uh where the con construction and
parking is going to have to be parked.
[45:44]
So where are the people that are working
on site going to going to be? where's
[45:47]
the layown going to happen? Um all these
sort of maintenance things that have to
[45:52]
happen along the way and after they're
completed the project. Um and then um we
[45:57]
do have in the agreement to our neighbor
again. U we call that a specific
[46:01]
requirement that we um we have to sit
down and make sure that we have an
[46:06]
adequate solution to the solid waste
disposal that currently occurs in the
[46:10]
parking lot u for the church. Um so
that's actually baked into the agreement
[46:14]
that we reached uh reached in a a
consensus on how best to make that
[46:17]
happen. Um that satisfies the church and
the burrow in the development.
[46:24]
So the financial analysis so um we we
understood um that uh a project like
[46:32]
this may require a payment of little
taxes. Uh but you don't really decide
[46:40]
that or come to that conclusion until
you go through a robust process of
[46:45]
analyzing the developers cost. So that
process begins by garden homes providing
[46:50]
us the burrow with all of their
financial proforms, financial analysis,
[46:57]
construction cost, anticipated rents, um
their uh how they're going to finance
[47:03]
the project, what their operating
expenses are going to be when they
[47:06]
finally open the project, a fully baked
um uh financial analysis that we then
[47:13]
turn over to our financial consultant,
Beacon Planning, who has done this
[47:16]
throughout the state of New Jersey and
it is for us here to vet their numbers
[47:21]
and that begins a negotiation about what
will be the appropriate pilot for this
[47:26]
project. And that process happened um
and as a result of that process our
[47:31]
consultants um and garden homes and
their lawyers and myself came to an
[47:37]
agreement about what we think would be
the appropriate payment in little taxes
[47:41]
for this project. The magic of the
payment of those taxes. How do you kind
[47:46]
of get to that number? It's it's math,
but it's also somewhat art. The goal is
[47:51]
to reach a number that we believe is
sufficient to allow them to succeed at
[47:57]
their project, but not so much that they
would get a windfall from their project.
[48:01]
And we did have a lot of history already
because we know um from what happened in
[48:06]
the river road at least at some level
lots of their numbers because the river
[48:10]
road project has a pilot and it's
already been opened and operating and
[48:15]
we've received audits on that project.
So we we've sort of begun to understand
[48:20]
um the best you know what the economics
are and able to invent the Garn's
[48:24]
numbers and and to be fair to Garn um
unlike many other developers they came
[48:31]
in what we thought were very fair
numbers. didn't try to show up with a
[48:35]
bunch of incredibly low rents that that
demonstrate they're going to lose money
[48:40]
or extraordinarily high operating costs
that show they're going to lose your out
[48:45]
of whack construction costs. Um they
they showed off with a what we thought
[48:49]
was a fair representation. We had some
negotiations, some conversations. We
[48:54]
didn't agree with everything they said,
but I think they sort of per usual with
[49:00]
working with them. um they didn't try
to, you know, start somewhere in left
[49:05]
field and, you know, have to have us
come to a close. We got we got to a a
[49:10]
close relatively fast. Um so the the a
so some of the some of the statistics
[49:16]
that go into this analysis. So the uh
there's going to be again 114 market
[49:20]
units, 20 affordable. The average rental
side is about 1,300
[49:24]
square feet. Obviously less for the
studios, more for two and three
[49:28]
bedrooms. and their projected rent rent
rent is about $5,500,000
[49:33]
and that takes into consideration the
rents on the on the various units the
[49:38]
affordable housing rents based on on the
UAC numbers um so they're protected uh
[49:48]
uh and then they have their retail rents
so they do have these retail spaces ours
[49:52]
is free to us but the other spaces we
projected that they would have about
[49:56]
$420,000 of uh retail on the retail
spaces and that assumed an NOI of 5% um
[50:05]
then we came to an NOI which I'll walk
you through and we assume about a 5%
[50:08]
vacancy um and we assume some prevailing
2026 ret real estate taxes we do do an
[50:15]
analysis can you just say what NOA oh
I'm sorry net the net operating income
[50:20]
so in our what I'll get to you next is
net operating income in our analysis
[50:24]
it's net operating income after taxes or
pilot so NOI is uh total revenues less
[50:30]
expenses and in our in our NOI would
also subtract the the annual service
[50:36]
charge andor the rent um as appropriate
in the analysis and again the affordable
[50:41]
housing the rents we use the so the the
rents or the affordable units is
[50:46]
dictated by law state law um based upon
what the affordability of the whatever
[50:52]
your income limitations are on the
number of
[50:57]
So, uh, the project is slated to be 74
almost $75 million. So, this is going to
[51:03]
be a $75 million investment in Highland
Park. I don't think we've seen a $75
[51:09]
million investment by a single project
in quite some time, maybe a decade. Um,
[51:15]
the estimated cost for that project is
about $239 per square foot. Um, and the
[51:21]
estimated cost per residential unit is
$557,500.
[51:25]
Uh that's the that's the cost to
construct. Um if we were doing
[51:29]
conventional taxes um they would have
and we did the again the total gross
[51:34]
income is the 5675. You back out the
operating expenses um and the taxes they
[51:40]
end up with about a 3,55,000 net
operating income after taxes. Um and
[51:46]
then but if you did the 10% annual
service charges which is what we're
[51:50]
recommending for the borrow for the
initial uh period it's it goes up over
[51:54]
time um they end up with a higher uh net
operating. So the pilot clearly has an
[52:00]
economic benefit to their project right
they're going to enjoy from going from
[52:05]
three million to almost four million. So
it's there's roughly a million dollar
[52:09]
economic benefit to them uh to have to
pay the annual service charge versus the
[52:15]
taxes. So clearly a value to them. Why
uh why does that make sense to us? And
[52:21]
it makes sense to us because when we do
the analysis it is clear that without
[52:27]
the pilot they would effectively build a
project that would be worth more less
[52:34]
when completed than it costs to build
it. So, and we run various cap rates to
[52:39]
figure out what that analysis will be.
But, as you can imagine, if I'm going to
[52:44]
build a project for $74 million, and
when I'm done building my project, it's
[52:49]
worth $60 million, nobody makes that
investment in the project. So our goal
[52:55]
working with our financial advisor was
to determine what's the right level of
[52:59]
pilot um that we would give them where
the value once built stabilized is more
[53:08]
than the cost to build. Again I wouldn't
spend none of us would spend $7 million
[53:13]
$7 million to buy something that's then
worth 50 million once we borrow. Um so
[53:18]
same analysis we go through in this
process. Um so um
[53:25]
at the end of the day well we we stress
test the uh con conventional taxes we
[53:30]
stress test the pilot um and we
concluded that now we our financial
[53:34]
adviser um that um using a six and a
half terminal cap at a 10-year we
[53:41]
calculated the 10-year unleveraged irr
we get to a 4.25%.
[53:46]
So what that is is if you assume
uh a fully uh stabilized asset with the
[53:52]
revenues we projected over 10 years and
then they sold it in the 11th year um at
[53:58]
a 6 and a.5% cap they would enjoy a 4.25
5% internal rate of return um at 15
[54:06]
years it will be 5.33%
the expected range um for an investment
[54:11]
of this type is somewhere between five
and a half to 7%. Um, so even at the
[54:16]
15-year IRRa, they don't quite get to
the number. That demonstrates um the
[54:22]
need for the pilot because this is this
is using the the pilot numbers. Um,
[54:28]
I think we benefit in part because
Garden Homes is a legacy builder and
[54:34]
holder. This is a family business. They
buy their assets, they hold their
[54:38]
assets, they're patient. Um they are not
a buy and flip company which is also
[54:43]
part of the reason we wanted to hire
them is their uh their business model um
[54:49]
and will correct me on anything I might
have said here is to own assets not to
[54:54]
build assets and flip assets which is
different than some other
[55:00]
uh so the key takeaways on the financial
analysis again these are the residential
[55:04]
units you find unrestricted the the
estimate on the value the cost uh the
[55:09]
various returns at the end of the day
that um I'll allow us to recommend. So
[55:15]
that what we basically concluded that
the 10% uh annual service charge um this
[55:23]
would be the equivalent of a with a 5%
cap rate um which is slightly below
[55:28]
market again um I know garden homes uh
initially said to us they would like to
[55:34]
do less than 10% to be honest with you
um because they probably did the same
[55:39]
math we did um that would have required
us to do bonds and a whole another
[55:43]
process so we said look we're just not
going to do We're not going to go down
[55:45]
that path. And the 10% that I'm talking
to you about, this also ratchets up over
[55:50]
time. So that's a that's an initial
number. And over time, over the 30
[55:53]
years, that percent goes up as does
their stage increases that tie into a so
[55:59]
by the end of the last several years,
the pilot begins looking like 80% of the
[56:04]
otherwise full taxes in now in those
years. So this is a pilot that ramps up
[56:09]
with the intention that when they call
off the pilot, now they're paying full
[56:12]
taxes. And by the time you get to the
last several years of the pilot um again
[56:16]
starts to also begin to look a lot like
taxes% mean that's what they start
[56:21]
paying in taxes.
>> They pay 10% of the annual gross
[56:24]
revenue. So maybe I wasn't clear about
that. So you take the the simplicity of
[56:28]
the analysis is they add up every dollar
they receive and then they pay us 10% of
[56:34]
that number and then they audit it every
year and if there and then there's a
[56:37]
true up if it's not right from year
because they obviously pay taxes and has
[56:41]
to true up so
>> for 30 years
[56:44]
» but eventually it goes up to 11 12 and I
think by the last years it's 15.
[56:48]
» Are you going to questions or are you
taking questions?
[56:51]
» I'm almost done. This is it and then
I'll jump to questions. Um so um what's
[56:56]
next? So I'll give you the what's next
and we'll come we'll continue with that
[56:59]
question. So um with the redevelopment
agreement we are anticipating
[57:04]
considering that at our next governing
body meeting and we're going to post it
[57:08]
online um so that people have time to
read it. The financial agreement which
[57:12]
is a pilot analysis we'll we'll follow
that. Um it's going to be at the
[57:17]
self-split meeting um is the current
expectations. So that and that's a two
[57:21]
meeting endeavor. was an introduction,
notice, public hearing, adoption. So,
[57:27]
it's two plus meetings. Uh the purchase
sale agreement also going to be two
[57:31]
meetings. You generally understand the
terms of that. Um it's 1.5 million bucks
[57:35]
with the reverter clause and affordable
housing restrictions. Um then they have
[57:41]
uh to get all their government approval.
So, they got to get their sitement
[57:45]
approval, their TWWA. Um I think maybe
there's a county approval. And then we
[57:50]
have the property closing. Um it says
closing for now they have it's just hard
[57:54]
closing again their lender commitment
and financing closed construction
[57:58]
commences and they expect it to be about
a two-year not construction. Um so you
[58:03]
know you add it all up they they're
opening in called 30 months
[58:09]
and that's my question and you want me
to go back to slide
[58:13]
» affordable housing.
>> Yeah.
[58:17]
» You don't have to go just for me
whatever your model is for taking
[58:20]
questions. I think if we're taking
questions, we'd ask microphone so
[58:25]
everybody else can hear you.
[58:32]
» Seth Coell, one of the pastors at the
Reformed Church of Highland Park and um
[58:38]
yeah, thanks for this presentation. Um I
have a bunch of questions and I'm not
[58:43]
sure which ones are for you and which
ones are are for others, but I'll start
[58:45]
with the affordable housing slide. Um,
I'm not thrilled with the breakdown of
[58:49]
very low, low, and moderate because I
understand those things. Um, but one
[58:54]
thing that would be really nice is if
you keep this, if the moderate,
[58:59]
especially large ones, you'd be willing
to take folks on vouchers. Um, the
[59:04]
biggest problem we have in this state
isn't that there's not enough housing,
[59:07]
it's that we don't have enough landlords
willing to take people who have vouchers
[59:11]
that are actually falling do dollars
wise within moderate gear. um you
[59:16]
wouldn't lose any money, but you're
willing to take a family that um that
[59:21]
qualifies for a voucher and has every
landlord looking negatively on them
[59:26]
because they qualify for a voucher. So,
that that is a special thing that is
[59:30]
important to us and that I think would
help diversify who's able to live in our
[59:34]
town and who can live in your building
and it won't hurt you financially and it
[59:38]
would gain some real bones to to kind of
how we feel about um a project like
[59:44]
this.
I can answer that.
[59:46]
» Yeah. And so the affordable housing is
>> I think the microphone question.
[59:54]
» Yeah. The the affordable
>> No, no, no. I want viewers at home to
[59:57]
hear it as well.
>> Yeah. Yeah. Yeah. So the uh the
[1:00:00]
affordable components handled by a third
party. We currently take vouchers
[1:00:06]
through it's you know whoever qualifies
in working with the third party
[1:00:11]
administrator. they handle like who's
qualified. We don't get in the business
[1:00:16]
of like who's disqualified. So I think
currently as far as I understand our
[1:00:20]
portfolio if someone working with a
third party has a voucher who's
[1:00:25]
qualified, you know, we're not opposed
to that. So it's it's kind of out of our
[1:00:30]
hands. It's more they they do the
certification qualifications and uh and
[1:00:36]
then it comes to us and we just
basically show show the units. um with
[1:00:42]
the assumption that certification is
done by a third party. So
[1:00:46]
» yeah,
>> take a hard look at that.
[1:00:49]
» I would say that's not a satisfactory
answer from me. I appreciate that's what
[1:00:54]
it is. I'd like to know more about the
third party group that's dealing with it
[1:00:57]
and ask them specifically about their
willingness to take people on batteries
[1:01:01]
and it could be a real win for you to
kind of do that in a public way. that
[1:01:05]
could help us with other large important
developers in the state to see somebody
[1:01:10]
stand up um in this way and say yes when
I have available units that are at these
[1:01:15]
rates I'll take vouchers. So I I just
think that's like an easy win um for
[1:01:20]
Highland Park and for for this project
that look really good and hopefully your
[1:01:24]
your third party person on that. Second
thing I ask you about um will this
[1:01:28]
project be subject to the same limits on
how much rent can be raised every year?
[1:01:34]
Um like is it 3.65 or something like
that?
[1:01:38]
» You mean for the um for the
>> rents? For rents not not affordable just
[1:01:42]
general overall rents 134 is the rent
control
[1:01:47]
under New Jersey law projects are not
sub.
[1:01:50]
» No no every every rent in this town is
subject to a limit that you can raise
[1:01:55]
rent every month. I've owned projects
places in this town and every every
[1:01:59]
landlord has this. So
>> that that under New Jersey law, new uh
[1:02:04]
rental projects are exempt from rent,
local rent.
[1:02:07]
» Once it's up and running and you've
charged 3,000 a month for rent or 3,400,
[1:02:12]
which I'm calculating for some of these
units, can you in one year jump at 7% if
[1:02:19]
you want or is the limit like everybody
else that it's a 3% kind of increase per
[1:02:23]
year?
>> It's okay. Something somebody should be
[1:02:27]
really looking at um
uh plan for code blue. Currently,
[1:02:34]
there's a code blue is provided in and
through a mun the town doing that um in
[1:02:40]
one of its buildings that's going to be
torn down. So, that's something we've
[1:02:43]
discussed a bit and I just want to say
it's really important by this winter,
[1:02:47]
especially if this is going to start
happening, that we know what to do with
[1:02:50]
homeless people, of which we have at
least seven right now, who are sleeping
[1:02:54]
on site. um heaters um in the covered
spot along the street. Will we have
[1:02:59]
heaters in the in the outdoor space?
It's just something to think about like
[1:03:04]
you would have for a outdoor dining.
There will be people in the winter for
[1:03:07]
whom that's really central. Um clarity
um clarity about the the walkway between
[1:03:16]
the church and the new building um is
important to us and clarity about fire
[1:03:22]
um trucks being able to get to the
building, ambulances, etc. Um, most of
[1:03:27]
those things I feel like you've already
very carefully looked at with us, but I
[1:03:31]
just want to reiterate before things go
that like especially with a two-year
[1:03:35]
construction phase here. Um, I want to
make sure we have safety of our
[1:03:40]
buildings um, and access to worship for
people with disabilities during the two
[1:03:45]
years. And so if that means that we need
some sort of a shuttle bus parking at at
[1:03:51]
the at Donaldson Park or whatever it is
during those two years and we we are
[1:03:56]
willing to be flexible and I absolutely
believe in the need for redevelopment in
[1:04:01]
our downtown. Um and I'll look past lots
of things but some things I I won't
[1:04:06]
public bathrooms. You didn't show that
but I didn't look enough. I mean the
[1:04:10]
public bathrooms in Highland Park right
now are the Reformed Church of Highland
[1:04:13]
Park, right?
And we proudly share our bathrooms and
[1:04:16]
try our best to keep them clean for
everyone from the municipal workers who,
[1:04:22]
you know, had to go during COVID and
needed to be be there to folks who are
[1:04:26]
homeless day in and day out. And u just
want to make sure that as our parking
[1:04:30]
area or your parking area that we've
used for years has been, you know, will
[1:04:34]
be changed that there's enough public
bathroom space for those who don't have
[1:04:39]
easy access to a place to go um when
they need to go. So that's important.
[1:04:44]
And finally, who pays for the upkeep of
the 40 units um that the public occupies
[1:04:50]
um for the long term. So really happy
about to know that there's this
[1:04:54]
long-term agreement in place, but um you
know, stuff crumbles and who's, you
[1:05:01]
know, it's an easement for us, but where
does the cost come from? Okay, so those
[1:05:06]
are my list of questions. Thank you.
>> Thank you.
[1:05:11]
» Okay. Before
we just move on, just a couple sorry it
[1:05:18]
is a tag team different folks. I just
wanted to the restroom question. I you
[1:05:23]
raised a lot of good points but I have
an answer on the restroom ones off the
[1:05:26]
top. Um when we are having our programs
um the there will be restrooms in both
[1:05:33]
the the uh burrow space in the building
but also in our plaza there's uh
[1:05:39]
restrooms where between one and two
we're doing the pricing for two and
[1:05:43]
hopefully we can afford two. Uh but we
believe you know when we're doing our
[1:05:48]
programs we should be able to not rely
on your facilities anymore or at least
[1:05:53]
much much less. So, I really appreciate
the point and um I just wanted to
[1:05:59]
clarify when you talk about the walkway,
you're are you talking about the walkway
[1:06:03]
in between through from Magnolia to
Rariton or the one along towards
[1:06:08]
» along the church and then we don't have
enough detail here to show that, but
[1:06:12]
we'll certainly talk. Okay, thanks.
Sorry.
[1:06:18]
» I do. I I know I that's our code blue is
our um our shelter during uh cold months
[1:06:25]
that we
are discussing that but it's an
[1:06:30]
important point.
Um, my name is Jessica Hunston and I
[1:06:36]
wanted to ask, you spoke a lot about the
financial benefits of a payment lumen of
[1:06:41]
taxes for the developer, but I I think
it's really important to think about
[1:06:46]
what it means for our community as well.
Um, so you mentioned that um the
[1:06:52]
developer would be um paying 1 million I
think you said less taxes annually. Um
[1:06:59]
the other and and I'm just going to say
a few things and then if it's incorrect
[1:07:02]
you can correct it or you can say yes
you're correct. Um I think the other the
[1:07:06]
part of that is that and I'm sure most
people here or not everybody here knows
[1:07:11]
that when we have payment in li of taxes
those taxes go from usual agreements go
[1:07:18]
95% to the city and 5% to the county and
none of that money unless there's an
[1:07:26]
agreement goes to the public schools.
And so one of the things that is really
[1:07:31]
important and that you have done, the
bureau has done with um the Frederick is
[1:07:36]
to have an annual agreement with the
school district to put some of that
[1:07:41]
money towards the school. So which has
been really and that was in response to
[1:07:45]
the community really advocating for
that. So I'm wanting to know if that has
[1:07:50]
also been discussed because that's a
really important part of this. Um, and I
[1:07:56]
think there are many public school
advocates and supporters here in this
[1:08:00]
room and within our community that would
want to know that that is something that
[1:08:04]
the burrow is committed to doing.
>> It has been a part of our continual
[1:08:09]
discussion.
>> Yes. So there's no commitment to it
[1:08:13]
» at this point. It's under discussion and
it's on the table, but we haven't had
[1:08:17]
that, you know, we're not revealing that
at this point. We don't have the
[1:08:21]
agreement uh finalized at this point.
Okay. But I think the part that might be
[1:08:27]
difficult at least for me and maybe
others to hear is when we talk about
[1:08:30]
that payment and remove tax as having
benefit to the developer, but we don't
[1:08:34]
talk about it as a complete picture of
what it means for our community.
[1:08:38]
» I'll let you speak to that. Oh, you're
not done. I'm sorry.
[1:08:41]
» No. And I have one other question about
um that 1.5 million that you said the
[1:08:49]
developer was paying the bureau. Can you
just um let me know what they're you're
[1:08:54]
they're paying us for? Is it which
property is it?
[1:08:57]
» I I don't know if I have an exhibit that
shows the Oh, I do actually. Let me go
[1:09:02]
back. Um do you have lot lines? So the
burrow owns and the lot lines in the
[1:09:09]
aerial don't match perfectly just to so
this lot here and I don't know them by
[1:09:14]
heart is owned by the burrow and then as
well as I believe
[1:09:20]
This one here, right, Chris or somebody?
Yes. Which is where uh Main Street's
[1:09:26]
office 212 Ritton, that's a burrow owned
property. Um as well as the parking lot
[1:09:33]
basically that goes all the way through.
Those are the the properties owned by
[1:09:37]
the burrow.
>> So how many lots?
[1:09:39]
» It's two.
>> Okay. Those two. Okay. The the reason I
[1:09:43]
ask this question is because the the the
developer has paid much more for like uh
[1:09:50]
land space lot space wise has paid much
more for the acquisitions they have
[1:09:56]
prior to that. In 2023 they paid 1.25
million for lot 6.01. In 2022 they point
[1:10:05]
they paid 610,000 for lot one. In 2022,
they paid 950,000 for lot 34. In um 2022
[1:10:15]
also, they paid 850,000 for lot 9. And
they paid 850,000 also for lot 8. Um one
[1:10:22]
more or two more. One more they paid the
first purchase they made 232. They paid
[1:10:28]
850,000.
So as you can see 1.5 is not a lot for
[1:10:34]
that. So, I just wanted to maybe the
bureau can say why they took such a low
[1:10:39]
amount for that two that large those
large spaces. Um, and I I know I'm
[1:10:46]
asking some maybe challenging questions.
I don't but I really am in support of
[1:10:51]
the redevelopment. I think there's been
a lot of work that is done. It's time
[1:10:56]
for our community to have redevelopment
and in a way that makes sense to our
[1:11:01]
community. But I do think these
questions that I raised are really
[1:11:04]
important ones um for for the reasons
that I raised them.
[1:11:09]
» I'll let Joe pick up on some of these.
>> Okay. U so let me start with the value
[1:11:15]
to the burrow. So uh right now the taxes
um on the properties that are paying
[1:11:22]
taxes or not is about $120,000 I think
annually
[1:11:27]
» 136
turn the math. So 136 um the annual
[1:11:32]
service charge is going to be roughly
570,000. So um there's a so just sort of
[1:11:38]
out of the box the annual service charge
that we're going to uh enjoy is you know
[1:11:43]
400,000 plus more so it's a
substantially more amount of money um
[1:11:47]
than we're currently enjoying from the
from all those properties you described.
[1:11:51]
Um so that's that's the first benefit.
The second one is um you know I think
[1:11:57]
what Terry and the mayor said was you
know as the race to the board of ed um
[1:12:01]
we haven't even had a vote on this yet
and publicist still ask questions about
[1:12:06]
that. So it felt premature um to engage
in any conversation um until we have
[1:12:12]
deal and then what we're talking about
um which is kind of the way we did it
[1:12:17]
last time for river uh the purchase
price. So um the we went through a
[1:12:22]
competitive process and this and many
people felt that it was worth a lot
[1:12:26]
less. What history shows you um when you
do redevelopment is um the property
[1:12:32]
owners in the area that they had to
purchase the property for um had a lot
[1:12:36]
of leverage, right? So um if you have a
property, you sort of have this key
[1:12:41]
piece of property um and you you were
aware and everyone was that they're
[1:12:46]
going to sell it um that they're going
to be selling it. the developer needs it
[1:12:49]
to need this piece of property right
here, right? To make your development
[1:12:52]
work. Um, I would posit that some of
those prices are above market at the end
[1:12:57]
of the day that they pay more than
market to make a project to assemble all
[1:13:00]
the property and make it work. So, and
then sort of the last point of it is um
[1:13:05]
from the burrow's perspective um I think
the the land and if the it's all part of
[1:13:12]
the math, right? It's all goes into the
math. What's the total project cost?
[1:13:16]
What's the pilot they need? you you pay
you get more money from the land you
[1:13:20]
need a better pilot. Um so it all sort
of pulls and tugs at uh at one another
[1:13:27]
$10 million for a land. Um we wouldn't
have been able to give them a pilot low
[1:13:30]
enough to make it work. Um so so it's
sort of all part of this um math
[1:13:35]
analysis that gets us to a number but it
was through a not an auction albe it but
[1:13:42]
through a process um was a piece of was
the number that was the the highest that
[1:13:46]
anyone offered to pay again some
offering to pay substantially less. So
[1:13:50]
it was it's part of the process we went
through. It's part of the math to make
[1:13:53]
sure the transaction works. Um and I do
think at the end of the day uh may
[1:13:58]
disagree I don't know but I do think
that you know often whether it's because
[1:14:02]
our other plan other choice we could
they couldn't negotiate a transaction
[1:14:05]
with property owners we'd have to use as
we've done sparingly but never want to
[1:14:10]
but we are doing it across the street is
use combination which is never a great
[1:14:15]
solution right so I think those property
owners probably um if they were in the
[1:14:20]
market and it wasn't right buying it for
a bigger project would not have seen
[1:14:23]
those values So we're comfortable that
that number based upon the process we
[1:14:28]
went through based upon the analysis of
all the numbers together um is a is a
[1:14:33]
fair number for this and again I think I
think it's also important to always
[1:14:38]
bring back from the public sector side
we're trying to have a game changer
[1:14:44]
happen here for island park this is not
just a development deal this is an
[1:14:48]
effort to um turn the t this is a red
area for a reason it's a redevelopment
[1:14:55]
area because it's fits the criteria of
an area need of redevelopment. Not every
[1:14:59]
piece of property fits that criteria. So
this is as much of a investment in the
[1:15:05]
community. If we took a somewhat less
number for our land for example, make
[1:15:10]
the math work. It's because we're
investing into a project that's gonna
[1:15:14]
put folks living in downtown, gonna put
a restaurant, retailing jumpstart u what
[1:15:20]
we hope to be a much larger development
improvement of the entire downtown. And
[1:15:27]
sort of the last point I would make is
um the pioneer and almost every
[1:15:32]
redevelopment project, which is who they
are in this project, the first one in
[1:15:36]
usually gets most of it gets more
benefits than the second one, the third
[1:15:39]
one. Uh we'll see how that plays out in
how it work. Um but this kind of project
[1:15:44]
is also somewhat untested. You know,
this this side
[1:15:48]
sounds like I was going to add to
>> utilize the microphone.
[1:15:53]
» I was I was gonna add to to Jessica's
question too. We looked at it also as a
[1:15:58]
huge benefit in the space that the
public is going to have for a very long
[1:16:03]
time. So I looked at that as part of the
cost as well. uh as well as the shared
[1:16:08]
parking, public parking, that's property
that I can't we're basically taking over
[1:16:14]
the maintenance. There's a cost to that
and providing what the public has today,
[1:16:18]
but in a way that'll be better than what
is there today. So, I look at that as
[1:16:23]
cost that's part of the purchase price
as well.
[1:16:31]
Peter.
>> So, um, the question is, um, I don't
[1:16:37]
really understand what you were saying
about the pilot. It was confusing.
[1:16:44]
I can't believe what I thought. I heard
that they're paying initially 10% of
[1:16:51]
their gross um, revenues going up to 80%
of their gross revenues, going up to 80%
[1:16:58]
of otherwise applicable taxes. So
there's a there's there's two there's
[1:17:04]
three numbers that we look at every year
to figure out what will be the annual
[1:17:08]
service charge. The first number is
they're campaigning less than they were
[1:17:12]
paying the year before. That's not going
to be a problem because they were paying
[1:17:16]
$120,000.
The second number we look at is a
[1:17:20]
percentage of their annual gross
revenues. In this case, it starts at 10%
[1:17:24]
and then as you'll see in the financial
agreement over a period of time, it
[1:17:28]
rises to I think 12 and a half remember
>> 15%.
[1:17:32]
» Oh, I'm sorry. It rises to 15%. So the
10 becomes 15 over 30 years in
[1:17:37]
increments
>> of gross revenue.
[1:17:39]
» Yeah, gross revenues. So that's the
second set of numbers. First the last
[1:17:43]
four quarters. Second number is this
percentage of annual gross revenues
[1:17:46]
that's growing. So while revenues are
growing, right? the more revenues rents
[1:17:50]
will go up, the base number goes up and
also the percentage goes up. So by the
[1:17:56]
end we will have enjoyed all the rent
increases that happened and then we'll
[1:18:00]
also have a higher percentage of those
numbers. That's
[1:18:03]
» okay. Gross up to 15%
>> at the end of uh so along the way goes
[1:18:08]
to 10 then I think it's 11
>> 11 12 and a half
[1:18:11]
» and you'll how many years is it?
>> I think the first 15 years or 10
[1:18:15]
» first 10 or 10.
>> Yeah. Can you answer that?
[1:18:20]
» Forget
>> the first 10 years I believe it was 10%
[1:18:26]
and then it goes to 11% for 5 years and
then 12 and a half% for five years and
[1:18:32]
then uh 15% for the last 10. But during
that time also it's the greater of your
[1:18:38]
your percentage of the annual gross
revenues or a percentage of what your
[1:18:44]
actual taxes would be. So, so that's the
f first minimum. Second is this
[1:18:49]
percentage.
>> So the total amount of time for the
[1:18:52]
pilot is 30 years.
>> 30 year. Yeah. So our success is like is
[1:18:56]
the burough success. So
>> the more successful we are, the more
[1:19:00]
successful the town will be in
collecting revenue
[1:19:03]
» and the projected um gross revenue for
the first year.
[1:19:09]
» Uh they're stabilized. Hopefully we're
gross revenues at like five, 52, 53. I
[1:19:17]
think you had 55 up here. 56.
>> Yeah. And and one thing to note too,
[1:19:22]
when we submitted our RFP, interest
rates were much lower. Uh I think today
[1:19:29]
we're at the 10 years at 5.85.
Um these numbers don't show the debt
[1:19:36]
service. So what we're really like
there's not a lot of room here. Um, you
[1:19:42]
know, even if you were borrowing a
portion of of the capital that would be
[1:19:48]
put into the project, uh, at we're at
the floor of like 6%, you know, that's
[1:19:54]
on $50 million borrow, you know, if
you're borrowing $50 million, that's $3
[1:20:00]
million in just debt service on interest
only. So, that's a that's also a game
[1:20:05]
changer. There's not, you know, we're
taking a long-term view. as as Joe said,
[1:20:10]
we're here for hopefully for generations
and uh and I'm not looking at just the
[1:20:16]
first 10 years, but it's going to take
time to, you know, there's not and I to
[1:20:22]
actually um you know be long-term
successful financially. So,
[1:20:27]
» so what Brett's saying to you is um this
I know my number doesn't include test
[1:20:32]
service, right? So he just did the
numbers for you. The numbers that shows
[1:20:36]
that I think we agree with had him with
negative cash flow for 15 and get better
[1:20:44]
over time. His rents go up of course,
but he had negative cash flow meaning
[1:20:47]
his operating expenses and service and
the annual service charge um will be
[1:20:54]
greater than his income for many years.
Um and again that's Charlie because
[1:21:00]
they're willing to do that because they
they buy and hold and this will be for
[1:21:04]
breast children's children's children
someday.
[1:21:09]
Um
[1:21:14]
sorry how you doing?
Wonderful to be here talking about this.
[1:21:19]
It's been such a long time in coming.
You said it was about 25 20 years is
[1:21:23]
about 25 but who's counting. Um so um
the um I really support the development
[1:21:32]
um and I think it's wonderful and
congratulations to everyone including
[1:21:36]
our developer partner for getting us to
this point where we can I support the
[1:21:40]
project. So for me this is not a
question about whether or not I support
[1:21:43]
the project but it's how do we make the
most out of this gamechanging you know
[1:21:48]
what's opportunity to shape the town.
Um, some of that comes from tax revenue.
[1:21:53]
Some of that comes from having vitality
on downtown. That's just the nature of
[1:21:57]
development. But the other major thing
is the community benefits. So, um, we're
[1:22:02]
getting a pilot. We're selling a piece
of property as a consideration. And the
[1:22:07]
main community benefit that I think
we're getting is the 3000 foot indoor
[1:22:13]
space and the 3000 foot adjoining pause.
And so, um, I'm wondering
[1:22:20]
what, um, formal assessment of need was
done, like what unmet need are we
[1:22:25]
meeting, um, to make the decision that
that's where we're going to put the big
[1:22:30]
benefit. Um, seems to me that we have
already a number of similar smallalish
[1:22:36]
scale, maybe undersized public spaces.
We have an underutilized environmental
[1:22:42]
center. Uh we've got the senior center
which is about twice as big, maybe four
[1:22:47]
times as big if you just count the
indoor space. Um we've got the teen
[1:22:52]
center. Um and then we have the Burough
Square development where the proper part
[1:22:56]
of it is about 11,000 square feet. Um
and then to accommodate the farmers
[1:23:00]
market, we have to wrap around the
corner and compete with the parking lot.
[1:23:05]
Um and there's been concerns raised that
that's a step down from what we have and
[1:23:09]
that it's undersized. Um, so my question
is does like is the right thing to do
[1:23:16]
with this once in a lifetime chance to
make another sort of
[1:23:22]
disjointed plaza. I guess you can see
where my sympathy sl trying to hide it
[1:23:26]
but not doing a good job. Um, you know,
sort of freestanding as opposed to
[1:23:31]
concentrating our investment to make
something that is really big will stand
[1:23:35]
the test of time. um to make the Burough
Square project bigger um where we could
[1:23:41]
accommodate everyone for big ceremonies,
for tree lighting, for big festivals um
[1:23:46]
as opposed to having to make real
compromises there. And if you go back to
[1:23:49]
the slide that showed the Burough Square
development,
[1:23:54]
» we're getting into my area.
>> Um this one,
[1:23:59]
» the one with the with the this one.
>> Yes. It's just so patent. Yeah. So
[1:24:04]
here's the sort of proper part of
Burough Square. It's quite small. And
[1:24:07]
then here's like the roundabout, right?
So this is really still street and then
[1:24:10]
this is a parking lot, right? So here's
here's where the the thing happens and
[1:24:14]
here's overflow. It's just so obvious to
me that like there's these two
[1:24:18]
residential properties and we're talking
about spending a million dollars, you
[1:24:22]
know, to buy properties. Like you can
buy a house like that for a million
[1:24:25]
dollars. Um, and they they find they
create a new way to connect to the main
[1:24:30]
property and they completely open up and
transform the space and they they
[1:24:35]
provide so much more opportunity to make
something meaningful out of all of this
[1:24:38]
as opposed to a relatively small,
unproven, untested kind of standalone
[1:24:44]
thing. I'll also note that having a lot
of disjointed public spaces can be
[1:24:48]
expensive. Each one has to be separately
managed, maintained, programmed. Um if
[1:24:52]
we ever want to create like
sustainability resiliency hubs for code
[1:24:56]
blue or something like that. So we want
infrastructure
[1:24:59]
um like we want for for the senior
center we want to put solar and battery
[1:25:02]
backup storage and water storage and
other things that can make that in the
[1:25:07]
event of a disaster a community hub. We
would need to invest in that. You can't
[1:25:13]
you can't build all that infrastructure
redundantly and you can't make micro
[1:25:16]
grids on properties that are disjointed.
So concentrating your efforts in one
[1:25:21]
area is just a smarter way to do it than
having all these little thing you know
[1:25:25]
things around scatter but we already
have a number of things that are already
[1:25:29]
like this. Um so I guess my question is
how much opportunity is there to still
[1:25:33]
consider something like that and has
there been a formal kind of unmet need
[1:25:37]
assessment that went into that
particular decision and and just finally
[1:25:41]
I'll just note that the the amount that
is being spent on that as uh Mr. Bowman
[1:25:48]
said is quite significant. Uh so it's
not just the cost to build it, but it's
[1:25:53]
the deferred value of what the developer
could be making from that. Um so it's a
[1:25:58]
significant community benefit and a
significant concession. And although
[1:26:02]
there's things that were listed like um
streetscaping, affordable units, um a
[1:26:08]
good faith effort on hiring, most of
those things are compliance things. They
[1:26:12]
have to be done. They also benefit the
developer. When you talk about the
[1:26:15]
things where a dollar figure can be
attached to it, that can be part of a
[1:26:19]
negotiation. As far as I can tell,
unless I miss something, the the little
[1:26:23]
plaza is the real benefit.
[1:26:28]
» Um, take exception at Little Plaza and
Little Indoor Space. But um
[1:26:34]
to back it up a long ways when we did
the redevelopment plan that envisioned
[1:26:40]
the track project and even I believe
even in kind of earlier visions from
[1:26:45]
2005. Um there was always a desire to
have and and frankly it came out in
[1:26:52]
droves of the public comment when we
were doing the the redevelopment plan
[1:26:56]
that we whatever developments we do need
to have public space incorporated
[1:27:02]
and that was an important component. So
the public did drive maybe not the how
[1:27:07]
it all got laid out but the the
dedication of this space and because
[1:27:12]
this is a large street front that said
we've since you know established south
[1:27:17]
third as the place for our outdoor
community plaza um and we see them as
[1:27:23]
working as complimentary with each
other. I don't disagree with you know
[1:27:28]
that would a nicer larger plaza one day
be nice over here absolutely something
[1:27:34]
as a secondary phase but budget and
other constraints made this very
[1:27:41]
difficult
>> wasn't for sale
[1:27:43]
» and they weren't for sale I mean we were
lucky to some extent that these
[1:27:47]
properties adjacent to our municipal
lots made themselves available um at a
[1:27:52]
time where it kind of worked for our
project. So, but I was just getting back
[1:27:56]
to kind of where the impetus came was
from the planning process from prior to
[1:28:01]
Garden Homes being on the scene. Um, I
lost track of where Randy went in the
[1:28:05]
crowd. There he is there. Sorry, I went
into So, um, you know, doesn't mean down
[1:28:10]
the line, you know, I I don't want to
say you we couldn't reprogramming now,
[1:28:14]
but the deal that we've gotten to and
that we're all, you know, meeting
[1:28:19]
professional staff and the governing
body has, you know, we've been talking
[1:28:24]
about this space since the get and it
would be a a major turn right now to
[1:28:28]
change it. I is that a fair thing to
say? Um, and I think as to no, we did
[1:28:34]
not do a formal, you know, analysis, but
I can tell you my informal analysis is
[1:28:39]
we're teaming over at the community
center where with programming needs. Our
[1:28:45]
our boards and commissions want events
and we're having trouble finding places.
[1:28:50]
Um, and so in my mind, at a minimum,
this is going to be additional community
[1:28:56]
programming space, but we want to keep
it active. Um ultimately we we in and it
[1:29:01]
wasn't shown in this design if we were
hoping Main Street would want to move
[1:29:06]
into this space and use it to also do
incubator and other kinds of spaces. TBD
[1:29:11]
we haven't had in-depth conversations
with them. They know that the that's
[1:29:15]
where we're envisioning long-term office
being available in there. So we see it
[1:29:20]
as kind of a but we don't want it to be
a dead space, but we also feel it's an
[1:29:24]
amenity to the building and it's amenity
to downtown to have a covered space as
[1:29:28]
well. Um, and it also could add an
element to our programming. So, I'm I'm
[1:29:33]
jumping around, but I I guess yes, I
think it would be a major left turn at
[1:29:36]
this point to reprogram. That doesn't
mean that in 30 years or 50 years our
[1:29:40]
lease is out and if there's a better use
or we've decided on something, I'm sure
[1:29:44]
we can negotiate a change with Garden
Homes. Uh, if if it if it doesn't work
[1:29:49]
out, but I'm confident we can make it
work and we're going to have um get a
[1:29:53]
lot of good use out of that space. Um,
did I cover Ian? That's the gist. Okay,
[1:30:00]
» Patrick,
>> thank you. Um, just two things. One, I
[1:30:04]
wanted to I don't know re-emphasize what
Seth said. I work on the uh or serve on
[1:30:10]
the affordable housing authority and it
is very difficult to get uh even with uh
[1:30:15]
people that have vouchers to find them
places because of resistance on
[1:30:19]
landlords. and if there's a possibility
you could work with the burrow and our
[1:30:24]
housing authority to maybe meet your
needs and you know again I don't know
[1:30:28]
the details but it's certainly an avenue
you know we're pursuing that you know
[1:30:33]
could get people
>> who have vouchers into affordable
[1:30:36]
housing so that's that's a possibility
that we can work on and the second would
[1:30:40]
be a kind of a suggestion for you all is
to put the numbers in a in a more
[1:30:45]
readily uh accessible you know fashion
like it Like it's good to know that the
[1:30:52]
existing houses that aren't part of the
burrow property, what it say 135
[1:30:57]
something like that. So that's about 90
in school taxes. So if you put 90 up
[1:31:02]
against $400,000, you can see that
there's a possibility it's not a
[1:31:06]
difficult reach to meet or exceed that
number. So that would be a good thing to
[1:31:10]
do. And then you could put up also the
fact that with 134 plus you know 150 odd
[1:31:16]
units that's a lot of put traffic on the
businesses and so that in and of itself
[1:31:21]
has a positive impact. But I think if
you made some sort of cheat sheet like
[1:31:26]
that and make you know front page it
would go a long way and and also break
[1:31:31]
down the various numbers that people are
rightly concerned with but have it you
[1:31:35]
know very you know simple that a
carpenter would read.
[1:31:38]
» I I agree. Yeah. We can definitely do
the cheat sheet fact sheet. I think
[1:31:42]
that's a really good suggestion. Um, and
that voucher question we are going to
[1:31:48]
look into the it is typical for third
parties to administer the affordable
[1:31:52]
units. They do all the, you know,
vetting and qualifying and we can find
[1:31:56]
out if that's if they if there's any
reason they can't. Uh, I don't, you
[1:32:01]
know, I don't I it never even occurred
to me that that would be a constraint.
[1:32:05]
So, we'll certainly look into it.
[1:32:10]
Um, I want to thank everybody. I very
much support redevelopment. I want to
[1:32:15]
thank everybody who put in a lot of work
on this and I want to thank Homes for
[1:32:19]
their commitment to Highland Park. Uh, I
have two questions. Uh, the first is, is
[1:32:24]
there any potential for acquiring more
properties or are you done?
[1:32:29]
You know, another spot on Magnolia there
became available. Would you consider
[1:32:35]
firing it? how we looked at it, but I
don't think it would make sense for this
[1:32:40]
particular project.
>> Okay. And um my second question is you
[1:32:44]
mentioned earlier that we're facing some
rising borrowing rates. Um you know,
[1:32:49]
there's potential for interest rates to
climb more as we face inflation. How
[1:32:54]
resilient are your plans to rise against
interest rates?
[1:32:58]
» Before you answer, do you mind coming
up?
[1:33:03]
Yeah, look, I I mean, we're,
you know, we're committed to the
[1:33:08]
project. So, I think uh we we built for
for years through different um economic
[1:33:17]
environments. So, yeah, just it doesn't
make it any easier. Hoping that over the
[1:33:22]
next 30 years, things will e flow and uh
things will will come back at some
[1:33:27]
point. So,
[1:33:32]
partnering waits at a certain point it's
like back we can't do this anymore
[1:33:38]
» I I have um two questions one relates to
um to the extent there are any
[1:33:44]
residential uh tenants in many of the
buildings uh for the project even
[1:33:48]
commercial tenants there are a few um
how are the residential tenants being um
[1:33:54]
how are there how's that re relocation
being handled uh are they being treated
[1:33:59]
uh and finding you know, a comparable
place uh to live. Uh that first
[1:34:03]
question. So,
>> um Brett, do you mind fielding that one
[1:34:07]
too?
>> Shouldn't we should invite you up here
[1:34:10]
about your current tenants? Yeah, we're
we're always sensitive to current
[1:34:15]
tenants and um recently we gave notice
um to the existing to the current
[1:34:22]
tenants and uh I think it's through it's
you know it's a month beyond what the
[1:34:28]
statute statute requires knowing that
you know folks will probably say hey can
[1:34:34]
I stay longer and and I know with the
church we're we're having those
[1:34:38]
conversations to see any tenants um you
know that they know of that uh can be
[1:34:46]
impacted. We're we're trying to work
with everyone. So while at the same time
[1:34:49]
want to be reasonable to hopefully get
the projects or we want to we're human
[1:34:54]
beings too.
>> I can answer that.
[1:34:58]
» Thank you. I would just um reiterate I
think it's important for um the burrow
[1:35:03]
or or the developer to help tenants find
a comparable location uh with comparable
[1:35:09]
rents and the extent that there are
moving costs and inconveniences that
[1:35:12]
that somehow not be born on the backs of
the renters. Uh the second question um
[1:35:19]
just you know relates to um I think you
have this concept plan and few slides
[1:35:24]
ahead and um yeah thank that one that
was fun um there is a bus I'm like the
[1:35:30]
bus guy but um one of the bus guys but
there was a bus stop um sort of at the
[1:35:35]
corner of second and Ritton and um like
>> on on the on the north side
[1:35:42]
» on the north side. Yeah. Well, well,
actually on the on both sides just
[1:35:45]
there's there
>> isn't isn't it over here on
[1:35:48]
» there's one on every block. Okay.
>> It's pretty busy will tell you it's
[1:35:52]
probably too many bus that that being
said um there is a bus stop on beginning
[1:35:55]
of each block as you head there's a
shelter.
[1:35:58]
» Yeah. Um
>> that's why it's I think um given the
[1:36:03]
investment in the you have a lot of
parking your building. Um there's a bus
[1:36:06]
stop there. Uh I don't believe there may
be a bus shelter. I don't think so. But
[1:36:10]
I think what you have is an opportunity
to really uh you know really make a
[1:36:15]
space for people who are waiting for the
bus and make that a real kind of spot
[1:36:20]
for people to now either be you know
shel you know shelter from the elements
[1:36:24]
when they're waiting for the bus um you
know be able to take part of some of the
[1:36:28]
activities along there. So I think
really making a that bus stop a real
[1:36:32]
space and a real place uh and you know
sort of making that front um that would
[1:36:36]
be something I could encourage you to
think about
[1:36:39]
» and and you just joged my mind. Sorry,
you can say um one important benefit
[1:36:44]
although it's you know it seems like
obvious but sometimes you we I forget
[1:36:48]
too we we have a lot of driveways
cutting these sidewalk through this area
[1:36:55]
because of all the individual parcels
that are there and this closes them with
[1:37:00]
the exception of our pedestrian access
way here which is going to make it more
[1:37:05]
safe for pedestrians but also allow us
potentially to expand avail available on
[1:37:11]
street parking and one important point
that uh it was in a slide but we didn't
[1:37:15]
really hit on it um to provide uh with
DOT approval ADA at least one but maybe
[1:37:22]
we can do more ADA accessible spots on
Ritin. So we should think about your bus
[1:37:28]
suggestion in that context as well. Um
[1:37:33]
» hi so I just have a I just have a quick
question about the indoor outdoor 6000
[1:37:38]
space. Um, right now I understand it's
like a 50-year lease and then after that
[1:37:42]
it's up for renewal. Are there any terms
in the agreement about the renewal
[1:37:46]
process? So like in 50 years about
generations, will my bankage see a
[1:37:51]
storefront there or will that still be a
public space?
[1:37:53]
» Still be a public space.
>> Okay. Now for a dog.
[1:37:58]
Just wonder are any um studies being
done on the effect of new businesses and
[1:38:04]
apartments on Rare Avenue because it'll
be bumper to bumper or the traffic
[1:38:10]
lights going to be regular how many the
new businesses and apartments or the new
[1:38:15]
cars.
>> That sounds like a traffic question
[1:38:18]
which I'm not able to answer. I hope it
gets bumper to bumper and we have a lot
[1:38:23]
of people walking around our town and
shopping in those shops. Uh so we're we
[1:38:29]
know it's going to be I mean you don't
need to be a traffic engineer to be to
[1:38:32]
assume there will be a little more
traffic as a result of this development.
[1:38:36]
They have the parking um and you know we
have signalized intersections to help
[1:38:41]
manage the traffic. Um but I'm assuming
DOT looks at these things and we'll have
[1:38:46]
an opinion but we think this works. Um
[1:38:54]
» hi. Um, also just continuing on that,
you just talk a little bit about
[1:38:59]
explaining in detail where the parking
spaces for the the tenants and what the
[1:39:07]
flow is. When I when I look at that, it
looks like all the parking will have to
[1:39:12]
come in through all the
>> I I can explain the confusion. It's
[1:39:16]
because I did the I did this uh the uh
>> Huh. Brett.
[1:39:22]
» Uh but but well no because I don't want
to put Brett on the spot for my bad my
[1:39:26]
layout. I stole from his plans uh the
landscape plan the first floor. So
[1:39:33]
you're looking at basically and that's
the lower level of parking here. Okay.
[1:39:38]
» Covered parking.
>> Yes.
[1:39:40]
» So there's parking
>> and then there's and it's under So this
[1:39:42]
is structured podium parking, right
Brett? I don't know what you call it.
[1:39:46]
Maybe you could do a better job. But
what I was trying to show in one shot,
[1:39:49]
which is hard to do, um, is that there
are two levels of parking, covered
[1:39:55]
parking in in this area, right, Brett?
>> Yes.
[1:39:58]
» Uhu. And the surface is the surface
here, which is more or less what we're
[1:40:04]
used to as the surface parking.
>> Street level parking.
[1:40:07]
» As street level parking. What's
interesting is because the topography
[1:40:10]
here, Raritin's lower than here. So they
were able to tuck in a layer of parking
[1:40:16]
at grade there, but then as you the
project moves back on the site, it's at
[1:40:21]
a higher level and they could have
parking on two levels, but it's not like
[1:40:25]
a deck where you can circulate within
the two levels. But Brett, please help
[1:40:29]
me.
>> Yeah. Understand how everybody's coming
[1:40:33]
in.
>> There's so here this is one way in on
[1:40:37]
the lower level and then this is another
way in on the upper. The upper is not
[1:40:40]
depicted here.
>> Okay. Um,
[1:40:42]
» yeah, there's a Oh, sorry.
>> I'll try.
[1:40:44]
» So, there's a 10-ft grade change from
Raritin to Magnolia. So, to play into
[1:40:49]
the grade, um, we're able to have like
one level that's on the level with
[1:40:56]
Raritin and then another level when
you're coming up Magnolia that will sit
[1:41:00]
above it. So, it's two levels of podium,
but from the back, it's you're coming in
[1:41:06]
at street level. But when you get
towards the front, you'll be one level
[1:41:10]
above Raritin. You and those cars will
be behind these like brownstone style
[1:41:17]
units. So, and in here on the Raritin
level, there are uh dedicated spots that
[1:41:26]
are shared um parking that'll are
undercover. And this is an amenity deck
[1:41:32]
above the parking. So, there's no units
sitting above here. It's it's an amenity
[1:41:36]
deck. Um
and then these are the surface spots. So
[1:41:41]
the circulation is like from this side
and then that side. They're not they're
[1:41:46]
independent of each other.
Does that make sense?
[1:41:50]
» And and I can assure you they're much
better exhibits uh pending for the
[1:41:54]
planning board site plan review. So, uh,
when that becomes available
[1:41:58]
» and there's also, if you can see here,
there'll be like an elevator and a
[1:42:04]
there's an elevator here,
>> I think. Is it here or there?
[1:42:07]
» Or it might it might be further up, but
there's a way basically accessibility
[1:42:11]
from Magnolia to Raron.
Um, you could take the stairs, too.
[1:42:17]
» Yeah. So, so, um, we could probably get
you a better, this was a highle, um,
[1:42:23]
diagram. Um but the the the nuts and
bolts are there are 258
[1:42:30]
spaces probably 30 something are out
here maybe in total the rest are in the
[1:42:38]
structure.
>> Every everyone enters or exits on
[1:42:42]
» you can enter the lower level this way
and you enter the upper level this way.
[1:42:46]
» But those are the two entry points for
all the new residents
[1:42:49]
» for the cars. Yes. the the human beings
can access their units as they're
[1:42:55]
» everybody comes in or leaves in the
morning when they go to work and when
[1:42:58]
everybody comes back the end of the day
kind of thing.
[1:43:00]
» Fortunately, it doesn't really work out
that everybody's coming in at the exact
[1:43:04]
same moment. But yeah, there there will
be times of the day where it will there
[1:43:09]
will be peaks two ways.
>> Snor, you got to get in line.
[1:43:16]
» No, no, behind.
>> Fine. It's fine.
[1:43:20]
Okay. Um, so I just want to say I'm I'm
so excited to to be here tonight to see
[1:43:26]
this moving forward, to see the
progress. I'm super excited for Bar
[1:43:29]
Square. Um, I've been waiting for that
to to happen ever since the town tables
[1:43:34]
were shut down after COVID. Um, one
thing I'm really excited about and
[1:43:37]
really interested in is the public
space. And I was wondering what's going
[1:43:41]
to be the process for deciding what goes
there, for programming it. What are the
[1:43:44]
conversations going to be like? Because
I'm, you know, thinking in my head, what
[1:43:47]
could go there? Like could we have an
ice skating rink? It's probably too
[1:43:50]
small, but can the rec department get
involved? Will there be rec classes
[1:43:54]
there? If there are going to be rec
classes, say like adult fitness,
[1:43:57]
gymnastics classes for our kids, that
kind of stuff. Can the site be the space
[1:44:01]
be designed for, you know, like have the
softer floors be designed to host things
[1:44:06]
like that? So, I was just wondering
what's the process for deciding how that
[1:44:09]
space is going to be used and how it'll
be designed and when would that happen?
[1:44:12]
» Yeah, we've talked about that. We want
to have a committee, the rec directors,
[1:44:17]
you know, both Ann Marie and Kim will be
very much involved as well as Main
[1:44:21]
Street Highland Park because we see them
both as being frankly the most likely
[1:44:25]
primary users and programmers of the
space. Um, and I think all of I think
[1:44:32]
it's probably flex space is the word of
the day. So similar to how we use the
[1:44:36]
community center, you know, to the
extent we could even do partitions so we
[1:44:40]
can carve it up in different ways, we
were we were looking at that and we were
[1:44:44]
discussing that with Garden Homes. So we
will be talking with them about kind of
[1:44:49]
the fit out in more detail. We just the
agreement basically puts a pin in. We
[1:44:54]
got to get restrooms, we got to we need
the plumbing, we need certain things.
[1:44:58]
But certainly within reason, I'm sure
they will accommodate. If it's something
[1:45:01]
we think is a value ad, we may have to
do additional, you know, special
[1:45:06]
flooring or acoustics or something like
that, we would have to. But I think the
[1:45:11]
most practical thing and what I see the
most need for is the kind of space
[1:45:15]
you're describing. I just think it would
be great if you know to the gang could
[1:45:19]
do their rehearsals there. You know,
things like that I think would be and
[1:45:23]
and the arts commission has a a gallery
exhibit that could be open for time. You
[1:45:27]
know, those are the kinds of things that
I've heard over the years that we just
[1:45:30]
where would we put it, you know, um but
we we will have a committee that kind of
[1:45:35]
formulates it and we'll obviously have
rules and facility use agreements and
[1:45:40]
things like that, you know. Um but I'm
pretty confident we can find lots of use
[1:45:45]
for it. Um so I hope I answered your
question.
[1:45:48]
» Yeah. And just one thing I wanted to
clarify, I think you did touch on this,
[1:45:51]
but is the closed space going to open up
entirely into the outdoor space? It's
[1:45:54]
not like wide open, but there are large
kind of large door openings. I don't
[1:45:58]
know if there Brad, I don't know if
you've gotten any further on the design
[1:46:01]
of the those doors that would divide the
open and the closed spaces, but the idea
[1:46:07]
is it breeds. So like my vision is, you
know, we've had these markets and then
[1:46:11]
the weather didn't cooperate or wouldn't
it be cool to do it and you could have
[1:46:15]
it inside outside still, but it you
you're not going like please please
[1:46:20]
don't snow rain, you know, whatever. So
that was kind of the vision behind the
[1:46:24]
the design process that we had with
Garden Homes.
[1:46:31]
» I um my kind of like I just have some
curiosities. It's kind of similar to
[1:46:37]
that. Um so like just to preface this, I
am definitely for renovating and and
[1:46:44]
rejuvenating the downtown. Um, my
family's been living in Highland Park
[1:46:48]
since they moved from Italy in the 50s
and we've all grown up in the town. So,
[1:46:53]
I have a lot of respect for it and I
value the town a lot. Um, I was kind of
[1:46:58]
thinking as you guys were talking is I'm
very curious to know because I was born
[1:47:02]
in 2000 so a lot of this planning all
through the years I just I you know as a
[1:47:06]
kid
>> where were you at
[1:47:07]
» I know I'm not paying attention to it.
I'm so sorry. Um, but I'm paying
[1:47:12]
attention now. I was kind of curious
what inspired it. Um because I've been
[1:47:18]
hearing a lot of talk about like we want
more foot traffic. Um we want more
[1:47:22]
people to come to our businesses which I
agree. I feel like our restaurants don't
[1:47:26]
get as much business as they should
because they're very good. Um but I'm
[1:47:32]
thinking like
as a a person in their 20s, a lot of
[1:47:36]
like my friends, what makes them want to
come to Highland Park is like our
[1:47:40]
community things. like the farmers
markets is like a really big one. Um
[1:47:45]
sometimes like the businesses will have
little things like pinos or um the
[1:47:50]
fitness studios. So I'm kind of worried
a little bit that we're having maybe
[1:47:54]
like more restaurants potentially
because I'm worried that since they're
[1:47:59]
not doing maybe as well as we want them
to that even though we have more people
[1:48:04]
it just might not like attract their
interest. So that's why I was kind of
[1:48:08]
curious like what inspired
this in the like what inspired everyone
[1:48:12]
to want to do this and like design it in
the first place?
[1:48:16]
» Well, as the exhibit I'll just say the
the need to kind of re redevelop and
[1:48:22]
energize this area has been in the
burrows before I was living here. Okay.
[1:48:27]
Um and working here for sure. Um and
this site in particular has been the
[1:48:32]
subject to a lot of attention over the
years. Um, this particular mix was
[1:48:37]
something that we collaborated with
Garden Homes on in terms of the
[1:48:40]
restaurant. That corner would make it
makes a great
[1:48:43]
» In the picture, it looks really like
stunning, you know.
[1:48:46]
» Yeah, it it's it's it's a high because
of the way the road turns. It's a very
[1:48:51]
prominent corner. We wanted to kind of
emphasize that. And while yes, we have a
[1:48:56]
lot of really good restaurants. Um what
we heard from some of the ones that have
[1:49:01]
come and gone was a that you know we
didn't have enough brick traffic built
[1:49:07]
in um but also b some of our restaurant
space is awkward to put it kindly okay
[1:49:16]
and we've all been in there you know
what I mean so they have weird
[1:49:20]
stepups and ADA challenges and so this
is kind of I think a space for a larger
[1:49:26]
format restaurant that wouldn't
otherwise be able to come to Highland
[1:49:31]
Park. You know, hopefully more of a
funky mom and pop thing. And I know
[1:49:35]
Brett has a lot of fun ideas about the
kind of ten that might go in there um to
[1:49:40]
complement what we've got, not to try
to, you know, and and
[1:49:45]
for some reason restaurants like High
Park. So, I think there is we are kind
[1:49:49]
of a restaurant destination. So I think
there is some rationale but it's a
[1:49:53]
combination of having a nice outdoor
dining like I don't know about you but
[1:49:57]
when I'm looking for a place to go if
sometimes the first thing I think where
[1:50:00]
can I sit outside you know and there's
not a lot of options just because of our
[1:50:04]
sidewalks and our our spaces are so
small. So this is an opportunity to put
[1:50:09]
a kind of destination uh restaurant uh
but so that's that's the theory. The
[1:50:14]
theory is it rises all boats. We're not
doing this to poach business away from
[1:50:19]
other businesses in town. this is
supposed to make everybody do better.
[1:50:23]
Um, and by adding in a new dimension to
what's already there. I hope I answered.
[1:50:28]
» Yeah. And if if this development does
well like with in terms of people coming
[1:50:34]
to rent, the businesses are doing well.
Would Highland Park consider doing this
[1:50:38]
to other spots of the downtown area?
>> Welcome to tract A. We'll talk about
[1:50:43]
that another night. Yes, we have a lot
of ideas.
[1:50:47]
OF THIS ONE.
>> SO, we hope this will be the snowball
[1:50:50]
that starts the bigger snowball or
whatever that
[1:50:54]
is.
>> And then just last curiosity is um I
[1:50:57]
don't I don't know if it was mentioned
or not. Where where would the farmers
[1:51:02]
market move to? Would it be that
indooroutdoor space or is it So,
[1:51:07]
» I can't wait to get you on our mailing
list. Um, we're moving, we're building a
[1:51:12]
plaza here, like a closing south third
to foot traffic, I mean to cars, excuse
[1:51:17]
me. Opening it to people is what I'm
supposed to say. Um, expanding this this
[1:51:24]
parking area, but also adding a lot of
function to this. Uh, so it's an
[1:51:28]
L-shape, but the just like we take over
a parking lot now on Fridays, the idea
[1:51:33]
is we'll take over this bigger parking
lot and this plaza on Fridays for the
[1:51:38]
farmers market. So, we will it'll be
half a block away.
[1:51:42]
» Okay.
>> Oh, yeah.
[1:51:45]
» There we go. So, that's the concept
rendering and we're literally in the
[1:51:49]
final stages of designing and
engineering and hopefully going out to
[1:51:52]
bid in a few weeks so that we can
actually construct this.
[1:51:55]
» Okay. And then in the meantime while
construction is going on, are we holding
[1:51:58]
the farmers market or is it just
>> We're trying to align that this will be
[1:52:02]
done before we need to be out but we
also have some plan B's we want to keep
[1:52:06]
the market
we absolutely that is one of their our
[1:52:10]
downtown amenities for sure.
>> That's great. Thank you so much.
[1:52:15]
» You made it to the line.
>> I only I didn't see them. Um I really
[1:52:20]
like I think the uh design is beautiful.
>> Oh, thank you. and better than I
[1:52:24]
expected. Um, I really do like the idea
of the covered up area to sit. Um, and I
[1:52:33]
wish that there were rendering up there
of what the apartments would look like.
[1:52:39]
I mean, they should know what they're
designing and it's not in there. So, I
[1:52:44]
don't know when that's going to be
>> You mean the interiors?
[1:52:46]
» Yes.
>> Gotcha.
[1:52:52]
» Maybe there's a place they can go visit.
Yeah. Do you have a
[1:52:55]
development that has similar units?
>> Yeah, we're we're just opening up the
[1:52:58]
angle. Go to our website and there's
there's many developments, but if you go
[1:53:03]
to garden communities.com,
you can see some of the newer products,
[1:53:08]
» but you don't have
>> So, we're working on the interiors. Um,
[1:53:12]
I don't have like an interior elevation
I can show you, but they're going to be
[1:53:17]
it's going to be a luxury product. So
>> my sister's looking at so
[1:53:23]
that gives you a good flavor.
[1:53:27]
» Hi.
[1:53:30]
» Hello. Um,
I wanted to uh second um the the traffic
[1:53:39]
study
um or necessity for it. Um because as a
[1:53:46]
commuter I do have to deal with the
traffic very much.
[1:53:51]
um coming in from uh RI 18. And as some
of you know, it backs up quite far. And
[1:53:59]
uh with the new um
um apartments coming in, there will
[1:54:05]
definitely be more people in cars. Um
hopefully because of where we're
[1:54:13]
located, I mean, I hear you and I won't
disagree. There's going to be more
[1:54:17]
people physically there than not, but
the location is good. We have the bus
[1:54:22]
that somebody else raised, but we also
have walkability. I know that doesn't
[1:54:26]
help you, but we see this downtown
location, especially in light of some of
[1:54:32]
the commercial development going on in
New Brunswick now for the Helix project.
[1:54:37]
Hopefully, we see some people who maybe
want to walk to work but want to live in
[1:54:40]
Highland Park. But, but you're right.
Then they they will present their
[1:54:43]
numbers to the planning board.
>> And Terry mentioned we are looking at
[1:54:47]
some transportation opportunities.
>> Yes. And mayor wanted to mention we are
[1:54:51]
also looking at other transportation
opportunities to help uh get people out
[1:54:56]
of their single occupancy vehicle.
[1:55:01]
» Uh and I don't know if this was
addressed yet, but I was wondering if
[1:55:04]
there was an estimate to how long the
construction will take.
[1:55:09]
» Two years is what's in the agreement.
Yeah,
[1:55:12]
» they'll do it quicker, but that's
>> that but that's the outside gate.
[1:55:19]
» And um do you know which streets and
parking would be affected during
[1:55:25]
construction?
[1:55:30]
I mean,
>> Raritan Avenue for sure because and um
[1:55:36]
the but I don't know if we have the full
like logistical plan, but I think we're
[1:55:42]
trying to minimize disruption to on
street parking in the neighborhood.
[1:55:45]
Hopefully, they can do most of what they
need on the site itself. Um right,
[1:55:50]
Brett,
>> it's a tight site. So, we're looking at
[1:55:55]
that. What's the most efficient?
>> I could see maybe them needing to
[1:56:00]
utilize the frontage and and you know,
we also have to keep access for the the
[1:56:06]
you know, to the church's ADA entrance
as well. So, we're we're juggling a lot.
[1:56:10]
I mean, if if you live in the area, it
will likely be disruptive uh during the
[1:56:16]
till things settle in and rhythms
establish themselves. Um
[1:56:23]
um and I was wondering if there was um
efforts made to um
[1:56:30]
reduce noise of air and water pollution
their construction
[1:56:39]
our developer I mean we're following
noise ordinances.
[1:56:43]
» Yeah. We're sensitive to all that. I
mean, I don't know if anyone's here from
[1:56:48]
Walter
um when we're doing construction there.
[1:56:52]
» Step into the microphone.
>> Sorry. Yeah. No, I don't know if
[1:56:55]
anyone's here from Walter Avenue when
we're doing construction over there. I
[1:56:58]
know there was a lot of um unrest prior
to construction and I think everyone was
[1:57:05]
happy on the street as far as I know and
we're very sensitive and we're we're
[1:57:10]
hands-on like I'm not here today and
then leave like we we don't hand off our
[1:57:16]
construction to a third party. We're
we're involved in every way with the
[1:57:20]
project. So
>> and there's a problem like
[1:57:22]
» yeah let us know.
>> People got to know garden homes
[1:57:26]
directly. if you live in an adjacent
area, they'll give you their number if
[1:57:29]
you have an issue. Um, you can always
contact me if you're having issues and
[1:57:33]
we'll try to address them. But again,
it's a tight site. We're we're working
[1:57:38]
in these these margins. You know, we're
going to have to all work together to to
[1:57:42]
get through it.
>> And I I can say that River Road, that
[1:57:46]
was certainly the case when we were
building River Road, there was a lot of
[1:57:50]
worry about the construction debris and
constru all the things that were going
[1:57:53]
on. And Garden Homeless is incredibly
accessible to all of the neighbors to
[1:57:57]
say, "You got a problem? Give me a
call." And they fix the problem right
[1:58:01]
away. So, we do work very closely with
neighbors to make sure
[1:58:04]
» because we have the church right there.
I mean, really, you know, in there. So,
[1:58:07]
we're going to have to to m you manage
that.
[1:58:12]
» That's good to hear. Um, and last
question. Uh I was wondering if there
[1:58:18]
was uh an effort to match the historical
character of art with the design of I
[1:58:25]
guess the architecture.
[1:58:29]
» That's right.
>> Absolutely.
[1:58:32]
» You got to be same rule applies to you.
[1:58:36]
Um, so one of the when we were talking
about the design, this walkway through
[1:58:41]
here, this walk right there, one of the
things we talked a lot about was that's
[1:58:44]
a characteristics of the walkways on the
north side, the ones that go in between
[1:58:49]
um, you know, the catwalks, the catwalks
that are up and down. We want we those
[1:58:53]
those are a version of catwalks to tie
into the rest of of Highland Park. We
[1:58:57]
thought that was a really neat amenity.
That was just one that jumped to my
[1:59:00]
mind. This is going to be like a place
where people can walk through from
[1:59:04]
Raritton down to Magnolia just like in
many places um you know uh on the north
[1:59:10]
side you can walk between the streets
right and so we wanted to make an homage
[1:59:14]
to sort of that. Um the other thing is
that
[1:59:18]
unlike many different places um as Terry
mentioned it's not one monolith all the
[1:59:24]
way across. It doesn't all the way from
across doesn't look like one thing. It
[1:59:28]
looks like five different things, right?
>> They look like New York brownstone.
[1:59:32]
» So, you have you have things that look
like this. You have others that look
[1:59:36]
more like the traditional apartment. You
have this right here. So, it breaks it
[1:59:39]
up. And one of the things that we were
really intent on is that we didn't want
[1:59:42]
to have something that looked like this
massive um uh institutional like
[1:59:48]
building, right? Um which one of the
people that that um bid on this, that's
[1:59:53]
what they were going to build, right?
And so we like the idea that there is
[1:59:56]
some diversity within the um uh within
the project. So it looks like five
[2:00:01]
different things rather than one big
thing. And we thought that was um
[2:00:05]
characteristic of Island Park as well.
[2:00:10]
» And and I would also just challenge you
to articulate what our architectural
[2:00:14]
character of Highland Park is. I think
it's a very difficult uh question to
[2:00:19]
answer because it kind of depends on
what era and what your personal taste.
[2:00:22]
So I think we tried to strike a balance
between typologies and just the massing
[2:00:27]
was what I guess I felt the most
passionate about was not having that
[2:00:32]
kachchunk feel that the streetscape
varies. Those were things that we even
[2:00:36]
put in the redevelopment plan you know
early days because we knew you know that
[2:00:42]
was something that we had to manage.
>> Thank you.
[2:00:51]
» Hi Alan. Hello, I'm Alan Williams, uh,
president of Highland Park, also on the
[2:00:57]
environmental commission planning board,
but this is me as a resident. The
[2:01:04]
you've taken away roughly 40 parking
spaces from the parking lot by the by
[2:01:11]
the uh church.
It's got to have a m Yes.
[2:01:15]
» What do you mean taken away? There are
only 30 plenty of them which if you come
[2:01:22]
it's either 31 or 40 lots that are
spaces that are left.
[2:01:28]
» Okay. And that has a major impact on the
church and all the organizations that
[2:01:32]
use the church. And I mean it's bad
right now with
[2:01:39]
uh traffic or parking spaces on uh South
Second and where's the where's the
[2:01:46]
borrow going to do about that?
>> Well, I'll tell you during construction
[2:01:50]
it'll be a challenge. Yes.
>> But but what we did was it wasn't by
[2:01:54]
accident. Oh, just for a farmers market,
we're expanding the parking lot on South
[2:01:58]
Third, a half a block away, we've added
public spaces. So, the idea is, you
[2:02:05]
know, those same individuals who have
utilized the full parking lot, you know,
[2:02:09]
during once we're fully up and running,
we should be able to I don't have all
[2:02:14]
the numbers handy between the two
projects, Alan, but okay. But we're
[2:02:17]
offsetting some of the surface lot that
is now being uh developed uh with our
[2:02:24]
own public parking over here and it will
be public just like this was public.
[2:02:29]
It's just not quite adjacent to the
church but it is a
[2:02:34]
» and that was one of the reasons having
you know the the two ways in and out and
[2:02:39]
all that stuff. And like I mentioned
too, there'll be more on street
[2:02:43]
available because we've opened up or
closed those curb cuts. So we can
[2:02:47]
rejigger the on street parking on Ritton
to add some and none of those numbers
[2:02:52]
included spots on Ritton.
>> Okay. Has the church again. Has the
[2:02:57]
borrow considered trying to lease the
Baptist church parking lot on Dennis and
[2:03:06]
» we have had that thought many times and
had attempted communications
[2:03:12]
periodically to different degrees of
effect.
[2:03:14]
» Okay.
>> And one question for Mr. Johnson, you
[2:03:20]
can have washer and dryers in the
individual units.
[2:03:23]
» Yes, of course. washers and dryers in
the individual units. Yes.
[2:03:29]
» Just for those who couldn't hear the
answer.
[2:03:31]
» Council member Hershe, you had a
question or
[2:03:34]
» I just had a comment. No, thank you,
Mayor. Nothing's
[2:03:39]
» Thank you. Um, I want to just I I did
just want to acknowledge the comment uh
[2:03:43]
regarding
uh regarding the the historical nature
[2:03:47]
of Highland Park. Yes, sorry. Um, it's
it was and I am by no means taking
[2:03:54]
ownership or agency over this, but but
it but that's it was super important to
[2:03:58]
the council to take into historic
nature, how the town was developed. Um,
[2:04:04]
you know, I mean, we have such an
assortment of Cape Cods, colonials,
[2:04:08]
split levels, garden apartments,
apartment buildings in in Highland Park,
[2:04:12]
but it's really exciting the diversity
of buildings, and that really was the
[2:04:15]
impetus to to to give the appearance of
a of of a more diverse looking
[2:04:21]
structure. Um I did just want to also
just mention um you know a couple years
[2:04:25]
ago when I was leazison to the uh to the
historical commission uh we we uh we we
[2:04:31]
received a grant uh that that actually
did a survey of all the properties in
[2:04:34]
the avenue uh to examine their their
history. Um none is designated historic
[2:04:40]
or lives up to that standard. But the
history is really important and I and I
[2:04:45]
and and I'm I think we're all really
sensitive to that. I will note though
[2:04:48]
that our history, one thing that that
study revealed,
[2:04:53]
one thing that that study revealed was
that our history really is an automobile
[2:04:57]
corridor uh that connects, you know, uh
New Brunswick to the world uh and the
[2:05:03]
other way around. We didn't have a
planned public square. We didn't have
[2:05:07]
the things that other towns might have.
And you know, it's just one spine of the
[2:05:11]
state highway. So this really presented
a huge opportunity to create new
[2:05:16]
history, create public spaces where, you
know, our community really can come
[2:05:20]
together, you know, in a in in in a you
know, in in in a way that they can 365
[2:05:26]
days a year. Uh so so so that was really
important. But the diversity in the in
[2:05:31]
in the design, the walkthrough like
Councilman Hail mentioned, um uh uh and
[2:05:36]
then creating new history uh is is is
essential. But I did just want to
[2:05:40]
mention that that that was really a
sensitive issue for for the council and
[2:05:44]
in our consideration for sure and it
will continue to be. Yeah. Thanks.
[2:05:52]
» Good evening. I had three questions. At
the outset of this project, Mayor Foster
[2:05:57]
had promised that the town would not
move forward until an equally suitable
[2:06:01]
or better permanent location for the
existing farmers market had been fully
[2:06:05]
developed and completed. Is the mayor
and council willing to assure us tonight
[2:06:10]
that you are going to honor that
commitment and that the farmers market
[2:06:14]
will have an adequate or better
permanent location in place before the
[2:06:17]
four existing publicly owned lots are
sold to the developer.
[2:06:22]
» Why don't you allow your question?
>> Okay.
[2:06:24]
» It was also said at the beginning of
this that the council was being
[2:06:27]
considerate of the tremendous liability
that the developer had taken on by
[2:06:32]
purchasing those properties on Rickton
Avenue. Are you also considering the
[2:06:36]
tremendous liability that every single
homeowner in Highland Park has in the
[2:06:41]
properties that they have purchased in
this town? I mean, that's my single
[2:06:45]
largest investment right now as my
house. Uh, for the developer, those four
[2:06:49]
properties are probably nowhere near as
significant as they are to me. So, every
[2:06:55]
action that you take tonight has to
balance not only the developer's
[2:06:59]
interest, but the liability that every
single homeowner has and renter has in
[2:07:05]
this town when you develop this
property. You're putting in a load of
[2:07:11]
housing, uh, a little bit of public,
>> right, and one restaurant. And it just
[2:07:19]
seems like you're ignoring a lot of the
development practices and ideas that
[2:07:23]
came in early on. And then uh my
now I can't try to grab my third point.
[2:07:31]
» They always come in threes.
>> It's late for me.
[2:07:36]
» How about I start? I'll I'll and then uh
I'll take a stab at a couple. I don't
[2:07:41]
want to speak for the mayor and the
governing body on your first question.
[2:07:44]
That's not appropriate for me. Um, but I
because I've been working very hard on
[2:07:50]
the new plaza on South Third, I could
speak to the fact that we're trying to
[2:07:54]
move heaven and earth to get it open and
ready. But, you know, I know, you know,
[2:07:59]
contracting in life, it doesn't always
jive. So, will they
[2:08:05]
exactly line up? I don't know. But, we
are, I believe, committed to making sure
[2:08:10]
the market has a place to operate. Um,
maybe not on February 1st. we might ask
[2:08:14]
for a more of a spring start date. Um
but that we will have these these
[2:08:20]
projects will come together uh nicely.
We just you know I'll let others speak
[2:08:25]
to you know do we want to delay you know
a developer who's interested and ready
[2:08:31]
to invest this kind of money in our town
for three more months or just you know
[2:08:37]
inconvenience the market for a couple
months. I think that's the trade-off
[2:08:40]
that we're looking at. We are hoping we
don't have to make that trade-off and we
[2:08:44]
can get it all to line up perfectly. Um,
and then I'm not sure I totally
[2:08:50]
understand the liability. I mean, I I
can attest to the fact that we did our
[2:08:56]
absolute best to make sure the burrow
and as your representatives in this
[2:09:01]
negotiation
got everything we wanted out of this
[2:09:05]
project. Um, and we thought that the
community had asked for. Um, and we
[2:09:09]
thought we, you know, when we've kind of
already expressed a lot of the kind of
[2:09:13]
pieces of the deal and we feel really
good about where it came out and we take
[2:09:19]
very seriously our roles as kind of
protecting the public interest in this
[2:09:23]
deal. Um, and I too own a house here and
it is my single uh point of as do I
[2:09:30]
believe every member of the council in
some way or shape.
[2:09:33]
» Oh, sorry. Sorry, I forgot. But even the
renters have invested in your your
[2:09:38]
message. So I I take it seriously. I
mean, you know, we we will never know
[2:09:43]
because we have squeezed a little more
out, but we really feel like we got our
[2:09:47]
high priority items addressed in in this
project. And I think Mar
[2:09:58]
to answer your question about our
commitment to making sure that the
[2:10:02]
farmers market have a home. We're still
committed to that that the farmer
[2:10:05]
farmers market will have a home.
However, we have seen the weather that
[2:10:10]
we've had this past winter and
construction does not go on in that kind
[2:10:16]
of weather and we're hoping that we will
not have that kind of weather. But if we
[2:10:19]
do and there's inclement weather where
the work cannot be completed, it it will
[2:10:24]
take a step back because we'll have to
stop doing construction and what have
[2:10:28]
you. But I can assure you that the
farmers market will have a home in which
[2:10:32]
to operate.
>> Thank you.
[2:10:36]
I thought of my third question too.
>> I see bought you some time.
[2:10:40]
» The um right now you said earlier that
um it wasn't so much about closing south
[2:10:45]
third to cars but opening it to the
public. I I fully believe that all
[2:10:50]
streets are already open to the public.
We get to use them however we want and
[2:10:53]
we just kind of prioritize cars on them.
But if you already have permission from
[2:10:57]
the DOT for the last year and a half to
close that street to cars and open it to
[2:11:04]
the public, why haven't you done so?
>> Well, we have a permit, but it requires
[2:11:09]
a lot of intersection improvements. Like
we don't get it unless we do all the
[2:11:13]
things in that space. the ballards, the
the signalized intersection, all of that
[2:11:20]
work is built is getting built into
arterials design work for the plaza and
[2:11:25]
will get rolled out and phased in
together. So, they didn't approve
[2:11:30]
putting up concrete barriers and closing
the road whenever we want. They approved
[2:11:36]
a very specific method of closure
inclusive of improvements to all those
[2:11:42]
signals on do on DOT property which is
not going to be free. We're going to
[2:11:48]
have to pay for that. So we felt it
would be better to just incorporate it
[2:11:52]
so that we the phasing all works out so
when the pro projects ready to roll out
[2:11:56]
we're we're good to go. Um and so that's
the answer. Yes, we have the approval to
[2:12:02]
close it, but there's very specific way
we must close it.
[2:12:05]
» Thank you.
>> And also speak about the underground
[2:12:09]
infrastructure that you know we have to
get done.
[2:12:11]
» Yes. Um on on South Third in advance of
the plaza construction. We are a couple
[2:12:18]
weeks away. I apologize. Now, if you
live on South Third, we will be But the
[2:12:22]
good news is we're replacing your water
man and cleaning and lining the sewer on
[2:12:26]
South Third well before we build this
plaza because the last thing we want is
[2:12:30]
a problem that requires opening up the
pedestrian plaza for repairs. So, that's
[2:12:37]
going within the next two weeks. We've
already awarded that contract and that's
[2:12:40]
going to be rolling. Demolition of the
two houses will follow the ones on
[2:12:44]
either side of our existing parking lot.
Um we're just synchronizing those
[2:12:48]
efforts. So um a lot of balls in the air
and the thought of doing temporary
[2:12:54]
weekend closures or a permanent Yeah. We
just said we got to just do this as with
[2:12:59]
one contractor in one one face.
>> All right. I think we're done with in
[2:13:05]
person. I should check on the Zoom with
your permission.
[2:13:08]
» Uh yes, please. If there's anyone on
Zoom with any question,
[2:13:13]
your hands up. Is it you?
>> I'll put it down. Thank you.
[2:13:16]
» We just want to note it's 9:15 and we we
want to conclude in another 15 minutes
[2:13:22]
or so to wrap everything up.
>> So, we're going to be wrapping in 15. Um
[2:13:26]
I mentioned at the top, but for those of
you who came in late, these slides will
[2:13:30]
be up on our website tomorrow. Um once
we get the video uh up downloaded, we
[2:13:37]
will upload it to our YouTube channel.
So we will have um that those materials
[2:13:42]
available to you uh to look at in more
detail.
[2:13:47]
» We have one more. Hi. Hi. Um I just
wanted to confirm or clarify what I saw
[2:13:53]
the timeline um slide but the next step
didn't have an a date. So
[2:14:01]
» which which I had two timeline sites.
I'll go to the first one.
[2:14:04]
» Yeah.
>> This one. Uh no
[2:14:08]
that there are a lot of the latter
timeline is contingent upon certain
[2:14:13]
things happening so there aren't
specific
[2:14:15]
» I guess my question is I know there's I
believe there's a council meeting next
[2:14:19]
week is that correct?
>> Yes.
[2:14:21]
» So what is the is there going to be
action taken on this all that council
[2:14:26]
meeting? the the current plan is that
the redevelopment agreement which was
[2:14:31]
not the the money deal but the kind of
who get what who is what we're getting
[2:14:38]
community benefits what the the
developers committed to those terms that
[2:14:43]
Joe presented in the first half of his
remarks we have that pretty well fleshed
[2:14:49]
out and intend to authorize execution of
that redevelopment agreement at the next
[2:14:55]
meeting with the mayor's permission and
the council support. It's not done yet,
[2:14:59]
but it will likely be on the agenda. Um
the financial agreement we we're still
[2:15:05]
like reading through and making sure
there's no mistakes, but we feel like we
[2:15:09]
have the terms as you heard earlier
really well ironed out. So it could be
[2:15:13]
as soon as October, the first meeting in
October that introduced along with this
[2:15:18]
purchase and sale agreement uh event. So
the effective date I is is the date of
[2:15:25]
signature Joe on the red development
agreement.
[2:15:27]
» Yeah.
>> So once we execute that agreement a lot
[2:15:31]
of this stuff flows but a big one here
is you know you know I don't know all of
[2:15:37]
Brett's I would love to know all the
things but DOT is in there probably
[2:15:41]
county there's probably some some other
it's not just burrow approvals there are
[2:15:46]
other levels. um this is uh going to be
for storm water uh a major disturbance
[2:15:52]
or whatever. It's a higher tier storm
water review that goes on and has to
[2:15:56]
have a permit. So there's there's some
additional stuff which they've been
[2:16:00]
working on. So we hope it's not 12
months but you know that's that's it. So
[2:16:05]
then once we've got you know
commencement basically once they start
[2:16:09]
construction they got two years.
>> And my last question is will these
[2:16:13]
slides be posted online after the
meeting? I thought I said that. Yes.
[2:16:16]
Sorry. Yes. So, the slide deck will be
there, the video will be there, um, and
[2:16:21]
our contact information is also there
for any other questions that come up.
[2:16:27]
» Very quick, just understanding what you
said before and understanding that the
[2:16:31]
harshness of the winter, etc., I really
do think that
[2:16:35]
delaying the developer
in line with a valued community asset
[2:16:41]
like the farmers market is would be
acceptable to our community.
[2:16:45]
» Okay.
to share.
[2:16:48]
» Um, oh, we got All right. Did you know
the time was there? I didn't know.
[2:16:53]
» Yes, I did. All right.
>> We start at 9:15. We're ended in 10
[2:16:56]
minutes.
>> Okay.
[2:16:58]
» Um, other people online that haven't
gone yet.
[2:17:00]
» Uh, your hands up at home. Raise your
hand now.
[2:17:10]
» We have no hands up. So I I understand
heard the clear, you know, you said it's
[2:17:15]
late in the process and that it would be
really inconvenient bordering on, you
[2:17:20]
know, pulling your hair out sort of like
to to change at this point. And I I try
[2:17:26]
not to be a stick in the mud, but it is
like a once in a generation land
[2:17:29]
assembly opportunity that's not easily
recaptured. And you know, I think even
[2:17:35]
though it's late, it's not legally
impossible. And I think those at the p
[2:17:39]
dollar pickers that are being, you know,
exchanged in this kind of development,
[2:17:43]
those houses are for sale.
>> Oh, you're talking about I'm sorry. I
[2:17:46]
thought I'm talking about I'm talking
about acquisition of the
[2:17:50]
» We I don't look I would be happy to talk
with the governing body about phase two.
[2:17:55]
» You know, I there's no money for phase
two.
[2:17:59]
Well, if we get some redevelopment going
on, as opposed to I I understand
[2:18:04]
» I'm talking about swapping out the
community benefit of the plaza,
[2:18:09]
» the 6,000 ft of open
>> that I don't think is is is something we
[2:18:13]
we could talk about.
>> I I and I think another point
[2:18:19]
» I was talking about pulling my hair out
about the indoor outdoor cover and the
[2:18:23]
design building.
>> Well, I again the that's the major
[2:18:27]
community benefit. Mhm.
>> Um so in terms of what we're getting
[2:18:30]
that has an assigned negotiating value
or assignable negotiating value, that's
[2:18:36]
it. Um it's comparable in size and value
to some, you know, one or both of those
[2:18:42]
properties that are next to the Burough
Square development. And land assemblage
[2:18:47]
is really key. It's not easy to do. Um
we're not going to have a lot of
[2:18:51]
opportunities to get, you know, another
$2 million to put into something like
[2:18:56]
that. Um, so you know, and you mentioned
maybe in 30 years or 50 years.
[2:19:01]
» You misunderstood me. You totally
misunderstood me. I'll clarify my point.
[2:19:05]
» Okay. So, give me one second. The
>> what I was referring to was this space
[2:19:10]
in in the in the building which you had
questioned which I understand your
[2:19:15]
reasoning is couldn't we give that up
and reinvest whatever
[2:19:21]
which which I and I think we can look at
both. We do we have a history in town of
[2:19:27]
making investments in acquisitions.
I I could talk all night. We talk about
[2:19:33]
tract A where we've done a lot of that.
Um this council has been very aggressive
[2:19:39]
where appropriate, but I think we felt
we there was also a considerable amount
[2:19:43]
of pressure to get this done so that we
could have a place for core functions. I
[2:19:51]
see no reason why this couldn't be a
secondary phase of the bus. And that's
[2:19:55]
how I I we got that feedback at our
community meeting on the plaza and that
[2:20:01]
was kind of where the governing body
landed on it.
[2:20:04]
» Uh but I have a member of the governing
body right next to me.
[2:20:08]
» So throughout this entire process the
indoor outdoor covered space over there
[2:20:13]
the the the public space that is in this
>> in my estimation was the number one
[2:20:19]
priority that we heard from people that
they wanted that
[2:20:22]
» by far. It was the number one. It was
number one from Main Street. It was
[2:20:25]
number one from It was number one from
many many entities that said we need to
[2:20:29]
have what public space are we going to
have a flexible public space. We reacted
[2:20:34]
to that. We have addressed that. We have
done that. And so in the entire process
[2:20:41]
that was something that we heard loud
and clear that that was what people
[2:20:46]
wanted a part of what people secondly
both the house where the little yellow
[2:20:51]
brick road and the one in the other side
of that we bought
[2:20:54]
» we went out and we acquired those
>> brav thank you we have a history I think
[2:21:00]
of acquiring property when we see a plan
and a way to do this right so as Terry
[2:21:06]
said I I I think we certainly can think
of those as additional acquisitions.
[2:21:11]
But what I'm what I'm trying to convey
is that as of now, as of this process,
[2:21:18]
that indooroutdoor community space plus
the space over on Burough Square was
[2:21:24]
probably the most important thing that
we kept hearing again and again and
[2:21:28]
again from people that this was
fundamental that we had to get something
[2:21:31]
like this. We had to get something else.
>> I have an interpretation. Okay. And as
[2:21:35]
someone who does like survey work and
you know public process
[2:21:39]
um I understand how these things go. My
interpretation of it is that when this
[2:21:45]
development was first announced people
were very concerned about losing a
[2:21:49]
farmers market and they wanted public
space. Excuse they were focused on that
[2:21:54]
spot. They weren't really oriented
around the fact or the reality or the
[2:21:57]
possibility or trusting anyone that
would get some other public space
[2:22:01]
somewhere else.
No one was ever presented with the idea
[2:22:05]
or the choice between would you rather
have a smallish space as a plaza here or
[2:22:10]
a really big proper like square which is
the would have been a proper way to
[2:22:15]
frame that and if it was presented as a
choice would you rather have this or
[2:22:18]
that um I'm not going to presuppose the
answers you would have gotten but I
[2:22:23]
think they would have been different so
um I I discount quite a bit the you know
[2:22:29]
claim that that's what the public wanted
the public was given
[2:22:32]
a finite set of choices that shapes the
response. And I'm not saying it was
[2:22:37]
malicious. It's just sort of like the
momentum of the process and the way it
[2:22:40]
evolves. Um,
which doesn't change whether or not this
[2:22:45]
is feasible to change at this point. But
I do think, you know, and and how Park's
[2:22:50]
budget coming up with two million bucks
to buy to acquire two new properties,
[2:22:55]
it's tough. It's tough. and the value of
that indoor outdoor space, especially
[2:22:59]
given the fact that you could turn that
into apartments or commercial space for
[2:23:02]
the next hundred years. That's a lot of
that's a lot of resources to invest into
[2:23:07]
that thing. That's the main community
benefit other than development itself,
[2:23:11]
which obviously is huge, but that's the
main community benefit that we're
[2:23:14]
getting. So, I mean, and we only get one
and I hear what you're saying that we
[2:23:19]
can get it in another phase, but like
how are we going to come up with two
[2:23:22]
million bucks in our little town? So,
that's why I'm a little fixated on it.
[2:23:26]
Let let me suggest that um this is not
the only opportunity. So as you
[2:23:32]
described that's a significant asset
worth money. Um you can envision a time
[2:23:39]
20 years from now where we'd come to
Brett and we say you know what we're not
[2:23:44]
really using this space.
>> I don't want to envision 20 years from
[2:23:46]
now.
>> My point is 25 years.
[2:23:48]
» Brett what would you do to if we want
you want to buy it back from us right
[2:23:53]
now? We have it for for 100 years at a
dollar. It's worth a lot more than that
[2:23:57]
to you. You could envision a
possibility. I'm I'm challenging the
[2:24:00]
point that once we do this, it can never
we could never monetize it.
[2:24:05]
» I understand.
>> I think we can monetize it.
[2:24:07]
» I think you partially, you know, backed
up my point because you're like in 20
[2:24:10]
years like, well, that would to me not
what I'm looking at.
[2:24:13]
» And and I also want to note that that's
a benefit to the developer. I mean, it's
[2:24:17]
an amenity for his building that his
residents get to share provides an
[2:24:21]
aesthetic to the building, but one that
he's not having to compromise more more
[2:24:25]
units for. Um, he's, you know, because
that's checking the ledger for his
[2:24:30]
community benefits.
No, no offense, but you know, um,
[2:24:36]
so again,
>> the only other point is the other
[2:24:38]
property is not for sale.
>> I'm sure they have a
[2:24:42]
» that takes years and years, too.
>> I'm sure they have a price. I don't know
[2:24:44]
if they have, you know, a family burial
ground in the backyard.
[2:24:47]
» I'm going down around I I go I could
talk forever about the plaza. The one
[2:24:53]
thing I want to mention because we did
look at that was a feedback from our
[2:24:56]
community meeting last year about the
plaza. Could we expand? And I had like
[2:25:02]
design concerns about it being too big
because to me some of the most failed
[2:25:07]
plazas are ones that try to be too long,
too big, and they don't really. So I I
[2:25:12]
think we would need an equally robust
plan for your idea.
[2:25:16]
» Main Street's already come out with a
>> Well, it's just a long Okay, I don't
[2:25:19]
want to get back and forth for for
Fridays, Randy and not for 20 365. And
[2:25:26]
so I think this is much more what we
need on a most days of the week basis.
[2:25:32]
That said, I think a phase, a secondary
phase that looks at those potential
[2:25:37]
properties with maybe a little
development there that would frame an
[2:25:42]
extended plaza would be really cool, but
we also want to see this project happen
[2:25:47]
and we need a place to run our farmers
market in the meantime. So, we had to we
[2:25:52]
had to jump. We had a a design that the
community does like. We had really good
[2:25:56]
feedback on it. I'm not saying it can't
be improved. I I get the timing issues
[2:26:01]
and I think you know just to know you
know I've been saying this for a long
[2:26:04]
time other people have been saying this
for a long time. I think the the mini
[2:26:07]
pause had its own momentum and it just
kind of happened and I sort of don't
[2:26:10]
know how it happened but that became the
thing as opposed to focusing more on
[2:26:14]
acquisition. But having said that um I
get that you want the development to
[2:26:20]
happen it's really important that it
happens and you strike when the iron is
[2:26:23]
hot and all the all the elements come
together. I really do understand that
[2:26:28]
and I also really understand that. Um,
and then if that's going to happen, then
[2:26:32]
you need to put the farmers market
somewhere and we don't own those things
[2:26:34]
yet. Even if we decided that's the top
priority, that's still going to take
[2:26:38]
time and then you're going to have to
re-engineer stuff. I get all that. It's
[2:26:42]
unfortunate. I get it though. But how
how realistic is it really to be able to
[2:26:46]
acquire those two properties outside of
like a redevelopment agreement for the
[2:26:50]
town?
>> You're really realistic.
[2:26:53]
So, you're kind of suggesting that we
condemn those properties just to have
[2:26:56]
them
>> or make no pay for them.
[2:26:58]
» Just make try to make an offer.
>> Just make an offer. They can't refuse.
[2:27:00]
» But they're not.
>> I mean, a monetary offer, not like a you
[2:27:03]
know, gangster.
>> They're not interested in selling. So,
[2:27:06]
that would be the next option.
>> What's that?
[2:27:09]
» They're not They're not interested in
selling at this point.
[2:27:12]
» Well, I think you pay a little over
market.
[2:27:15]
» Okay. All right.
So, no.
[2:27:19]
» I'm sorry. Somebody said something. Oh,
sorry.
[2:27:23]
Well, no, I'm not. That's why I'm saying
they're saying
[2:27:28]
» it's amazing to say is that real
>> and and I think my point is maybe it's
[2:27:33]
not.
>> I I
[2:27:36]
» outside of uh outside of significant
windfall that will come out of rebellion
[2:27:42]
with this.
>> All right. Thank you, Randy.
[2:27:44]
» Okay.
>> Um
[2:27:46]
» and this time we're going to conclude.
Oh, mayor, do you want to
[2:27:50]
» set a straight
[2:27:57]
» I want to thank everyone for coming out
and for all the questions you have. We
[2:28:01]
will be posting all of this on our
website. It will be on YouTube, all our
[2:28:07]
social media handles. So you can go and
if you have additional questions that
[2:28:12]
you you think about or you need
additional questions answered, please
[2:28:16]
email us and we will respond to those
questions as well and we'll make all the
[2:28:20]
the Q&A's available online. Thank you
for coming out and thank you for lending
[2:28:25]
your voice and your opinion to the
project. Have a good night.