>> welcome, everyone, to
[2:16]
tonight's AUGUST 24th, 2026,
[2:17]
zoning hearing master hearing.
[2:21]
My name is steve luce and I'll
[2:22]
be handling tonight's hearing.
[2:23]
At this point in time, if we
[2:25]
could all rise for the pledge of
[2:29]
allegiance.
[2:43]
[Pledge of allegiance]
[2:44]
Thank y'all.
[2:51]
You MAY be seated.
[2:52]
At that point in time I would
[2:56]
like to introduce MS. Michelle
[2:56]
heinrich from development
[2:57]
services staff who will
[2:59]
introduce the other staff
[3:01]
members and go over any changes
[3:03]
to this evening's agenda.
[3:04]
Michelle?
[3:04]
>> thank you.
[3:05]
Michelle heinrich, development
[3:07]
services.
[3:09]
Up here at the dais from the
[3:11]
county attorney's office is
[3:12]
jared delfino, with the planning
[3:14]
commission staff we have lily
[3:15]
linehan, and with transportation
[3:16]
staff, richard perez.
[3:21]
And we do have some housekeeping
[3:22]
items to announce for anyone
[3:24]
who's waiting for any of the
[3:26]
cases.
[3:27]
Let me see.
[3:29]
We have three cases that have
[3:30]
been withdrawn.
[3:36]
Those include major mod 26-0154.
[3:39]
26-0206.
[3:42]
And 26-0979.
[3:44]
And the remaining cases that
[3:46]
I'll announce have been
[3:51]
continued to the SEPTEMBER
[3:59]
28th, zhm hearing 26-0215,
[4:05]
26-0237, pd 26-0281, pd 26-0283,
[4:14]
major mod 26-0546, pd 26-0665,
[4:23]
pd 26-0706, major mod 26-0735,
[4:25]
or -- planned development
[4:32]
26-0799, planned development
[4:41]
26-0801, pd 26-0802, pd 26-0957,
[4:46]
major mod 26-970, and standard
[4:49]
rezoning 26-1158.
[4:54]
And we don't any unpublished
[4:55]
changes to the agenda to
[4:56]
announce.
[4:56]
>> all right.
[4:58]
Regarding any today's hearing is
[4:59]
there any any additional seating
[5:01]
for anyone who can't find a seat
[5:02]
inside this.
[5:04]
>> yes, we do have the overflow
[5:05]
room available on the first
[5:06]
floor.
[5:06]
It is the glass room when you
[5:08]
exit the elevator to your right.
[5:10]
There should be chairs and a tv
[5:12]
there so you can watch the
[5:12]
hearing.
[5:13]
>> okay and there is generally
[5:15]
enough time between applications
[5:17]
that they can come up when their
[5:19]
item is on the agenda.
[5:19]
>> mm-hmm.
[5:20]
>> okay.
[5:20]
>> yes.
[5:21]
>> very good.
[5:22]
I have a few instructions to
[5:26]
read into the record.
[5:27]
The county attorney's office has
[5:29]
a few instructions into
[5:30]
into read
[5:31]
into the record and then we will
[5:32]
get started with tonight's
[5:32]
cases.
[5:35]
Our hearing today -- consists of
[5:36]
japed items that require a
[5:38]
public hearing by the zoning
[5:38]
hearing master.
[5:40]
I will conduct a hearing on each
[5:43]
agenda item, will file a
[5:46]
recommendation within 15 working
[5:48]
days after the conclusion of
[5:49]
tonight's hearing.
[5:50]
Those recommendations are then
[5:53]
sent to the board of county
[5:54]
commissioners who will make the
[5:55]
final decisions.
[5:57]
Our hearing officering will be
[5:57]
informal.
[5:59]
I will ask questions related to
[6:01]
scope of direct testimony.
[6:03]
i MAY call and question
[6:07]
witnesses as I deem appropriate,
[6:09]
and I will decide all questions
[6:09]
of procedure.
[6:12]
I will take evidence but will
[6:14]
exclude evidence that is
[6:16]
irrelevant, immaterial or unduly
[6:16]
repetitious.
[6:18]
Evidence MAY be presented in
[6:19]
written form and all testimony
[6:22]
must be under oath.
[6:23]
Hearsay evidence MAY be used to
[6:25]
supplement or explain other
[6:26]
evidence but shall not b
[6:30]
sufficient alone to support a
[6:31]
finding by me unless it would be
[6:33]
admissible over objections in a
[6:35]
civil action.
[6:37]
Regarding the order of
[6:39]
presentation for each item,
[6:40]
first MS. Heinrich will
[6:43]
introduce the case on the
[6:44]
agenda, then the applicant and
[6:45]
their witnesses will have any
[6:48]
minutes to present their case.
[6:51]
And development services staff
[6:52]
will have five minutes to
[6:53]
present their case.
[6:55]
Then the planning commission
[6:58]
staff will have five minutes to
[6:59]
present their position.
[7:00]
Next, proponents, those people
[7:02]
in support of an application,
[7:05]
will have 15 minutes.
[7:07]
And those people opposed, the
[7:08]
opponents will have 15 minutes
[7:08]
total.
[7:10]
Then development services will
[7:13]
have an opportunity to provide
[7:14]
additional comments.
[7:15]
They have five minutes for that
[7:16]
purpose.
[7:17]
And finally, the applicant will
[7:21]
have five minutes for rebuttal.
[7:22]
Regarding the time for
[7:25]
proponents or opponents, the
[7:27]
15-minute time frame is a total
[7:29]
time for each category.
[7:30]
If there are a number of people
[7:32]
to speak, we will add up the
[7:36]
total number of people, and the
[7:38]
15 minutes will be divided as
[7:38]
equally as possible.
[7:41]
You MAY wish to designate a
[7:42]
single spokesperson to more
[7:45]
efficiently use the time.
[7:46]
When you come up to the podium
[7:48]
to speak, please start by giving
[7:51]
your name and address for the
[7:51]
record.
[7:53]
The meeting is being recorded
[7:56]
and we want mike sure we
[7:58]
accurate -- make sure we
[7:59]
accurately document who is
[7:59]
speaking on the record.
[8:00]
When you are done speaking,
[8:01]
please sign in with the clerk's
[8:04]
office with your name, address,
[8:05]
and the application number of
[8:08]
the agenda item you are speaking
[8:08]
to.
[8:10]
The pad we sign in is at the end
[8:11]
of the podium.
[8:12]
If you could raise your hand,
[8:14]
that's where you go to put in
[8:15]
your name and address and the
[8:18]
case you're speaking to.
[8:19]
At that point in time, the
[8:20]
county attorney's office will
[8:21]
have a few instructions to also
[8:23]
read into the record.
[8:25]
>> good evening, jared fell
[8:26]
delfino,
[8:29]
assistant county attorney.
[8:30]
Tonight's hearing is the first
[8:31]
step of a tw-step rezoning
[8:32]
process.
[8:34]
This is the time for applicants
[8:35]
andthrusted parties to present
[8:36]
evidence and testimony.
[8:37]
Any evidence presented tonight
[8:38]
will become part of the complete
[8:39]
factual record of each
[8:41]
application and no additional
[8:42]
evidence can be introduced after
[8:44]
the closing of an application.
[8:45]
The second step of the rezoning
[8:49]
process is a public meeting for
[8:49]
for -- before the board of
[8:50]
county commissioners where the
[8:51]
board will make a decision on
[8:52]
each application heard tonight.
[8:53]
Tonights' applications are
[8:54]
scheduled to be heard by the
[8:57]
board at its OCTOBER 13th,
[8:59]
2026, land use meeting, unless a
[9:01]
different date is stated by
[9:01]
staff.
[9:02]
When considering applications,
[9:03]
the board will only review the
[9:04]
record and the recommendation
[9:05]
made by the land use hearing
[9:08]
officer for each application.
[9:09]
The land use hearing officer
[9:10]
will file a recommendation for
[9:12]
each application heard tonight
[9:16]
on SEPTEMBER 15th, 2026.
[9:16]
The board of county
[9:17]
commissioners has established a
[9:18]
policy that directs which
[9:21]
rezoning and major modifications
[9:24]
applications are to be placed on
[9:25]
the consent agenda at the
[9:26]
board's land use meeting.
[9:28]
The following applications MAY
[9:29]
not be placed on the consent
[9:30]
agenda.
[9:31]
One, applications that propose
[9:32]
to add density outside the urban
[9:34]
service area.
[9:36]
Two, applications on roadways
[9:39]
with failing level of service.
[9:40]
Applications that do not have
[9:41]
consistent recommendations of
[9:41]
approval.
[9:44]
And applications that have had
[9:44]
evidence or testimony in
[9:45]
opposition provided to the
[9:47]
record by non-applicant parties
[9:49]
of record, either prior to or at
[9:51]
tonight's public hearing.
[9:52]
The board will allow testimony
[9:54]
by any party of record at its
[9:55]
public meeting to consider the
[9:56]
land use hearing officer's
[9:58]
recommendation for any item on
[9:59]
the regular agenda.
[10:01]
Testimony by a party of record
[10:02]
shall be limited to the record
[10:04]
of the proceedings before the
[10:07]
land use hearing officer unless
[10:08]
additional evidence has been
[10:09]
found admissible in accordance
[10:12]
with section 10.03.04d of the
[10:13]
land development code.
[10:15]
A party of record is an
[10:18]
individual who fits into at
[10:19]
least one of the four following
[10:20]
categories.
[10:21]
First, someone who is present
[10:22]
tonight and presents testimony
[10:23]
or documentary evidence.
[10:25]
Second, someone who has been
[10:26]
certified by the U.S. Postal
[10:28]
service as having been mailed
[10:29]
notice of tonight's hearing.
[10:30]
Third someone who has submitted
[10:31]
documentary evidence to the
[10:33]
master file triste two business
[10:34]
daz -- at least two business
[10:35]
days prior to tonight's hearing.
[10:36]
Or fourth, someone who has
[10:37]
submitted documentary evidence
[10:39]
by proxy at tonight's hearing.
[10:40]
The content of oral argument
[10:41]
before the board shall be
[10:42]
limited to the content of the
[10:43]
testimony and other evidence
[10:45]
submitted verbally or in writing
[10:47]
to the land use hearing officer.
[10:48]
It is the role of the county
[10:50]
attorney's office to ensure that
[10:51]
only individuals who have met
[10:52]
these requirements are allowed
[10:54]
to speak before the board to
[10:56]
ensure that no new evidence or
[10:57]
testimony is introduced or
[10:58]
allowed at the board's public
[10:59]
hearing.
[11:01]
For these reasons, please make
[11:02]
sure all information you wish
[11:03]
the board to consider at its
[11:05]
public meeting is entered in
[11:06]
tonight's record.
[11:06]
Thank you.
[11:08]
>> okay, thank you very much.
[11:10]
All testimony must be provided
[11:12]
under oath.
[11:14]
Therefore, if you plan to speak
[11:15]
tonight, please stand and raise
[11:17]
your right hand so I MAY swear
[11:20]
you in.
[11:28]
[Swearing in]
[11:29]
Okay, thank you.
[11:31]
You MAY be seated.
[11:32]
Okay, and with that we are done
[11:33]
with the introductions and
[11:34]
instructions.
[11:35]
MS. Heinrich, we're ready for
[11:37]
the first tiem.
[11:38]
>> our first application is item
[11:42]
c.1, standard rezoning 26-1168.
[11:45]
The applicant is requesting to
[11:46]
rezone property from cg with
[11:47]
restrictions to cg with
[11:50]
restrictions.
[11:51]
Michelle mont ball no will
[11:53]
provide staff findings after
[11:56]
applicant's presentation.
[12:04]
>> the applicant, please.
[12:06]
>> yes, my name is larry -- do
[12:08]
you want me to just present
[12:09]
myself?
[12:09]
>> okay.
[12:10]
Go ahead.
[12:12]
>> okay, my name's larry
[12:12]
pallner.
[12:17]
I'm inengineer of recordf with
[12:19]
rc -- altmotsprings, florida.
[12:22]
I am here at the pleasure of the
[12:23]
board.
[12:24]
We are just removing one of the
[12:26]
restrictions to allow for --
[12:27]
>> I'm trying to listen.
[12:33]
I can't listen.
[12:34]
>> I'm sorry, sir.
[12:35]
Somebody tried to speak over
[12:39]
you, but please proceed.
[12:40]
>> okay.
[12:42]
The purpose of this rezone is to
[12:44]
remove one of the restrictions.
[12:48]
The original restrictions on the
[12:51]
property were no automotive
[12:53]
sales, no adult shop, and no
[12:54]
agricultural sales of large
[12:56]
equipment.
[12:58]
We do not plan on selling large
[13:02]
equipment like I don't know,
[13:03]
giant -- or anything like that.
[13:05]
This is just a small business
[13:07]
that sells planting supplies.
[13:08]
But we wanted to make sure that
[13:11]
the restriction did not
[13:12]
adversely affect the business.
[13:14]
And that's the whole purpose of
[13:15]
this rezone.
[13:16]
>> okay, very good.
[13:17]
Thank you, sir.
[13:21]
>> you're welcome.
[13:22]
>> all right, and development
[13:28]
services staff?
[13:31]
>> the applicant's requesting to
[13:33]
revise rezoning restrictions of
[13:34]
existing commercial -- the
[13:36]
request is to remove the
[13:37]
language prohibiting sales and
[13:38]
rental of farm and gardening
[13:39]
equipment.
[13:40]
The property is currently
[13:41]
occupied by a farm and garden
[13:42]
supply center which does not
[13:43]
expressly permit the sales and
[13:44]
rental of farm and garden
[13:44]
equipment.
[13:46]
If approved, both uses would be
[13:47]
permitted.
[13:49]
The property's located on
[13:50]
linebaugh avenue near the
[13:52]
intersection of north dale mabry
[13:53]
with the area with commercial
[13:55]
and office uses.
[13:57]
Staff finds the rezoning
[13:57]
supportable.
[13:58]
I'm available if you have any
[13:59]
questions.
[13:59]
>> no questions.
[14:00]
Thank you.
[14:04]
And planning commission staff?
[14:05]
>> lilyann linehan, planning
[14:06]
commission stat.
[14:06]
The subject property is within
[14:08]
the office commercial 20 future
[14:09]
land use category.
[14:10]
It's within the urban service
[14:11]
area and located within the
[14:12]
limits of the greater
[14:13]
carrollwood northdale community
[14:14]
plan.
[14:16]
It is currently developed with
[14:17]
commercial uses and surrounded
[14:19]
by mainly heavy an light
[14:20]
commercial uses, near the west
[14:22]
linebaugh avenue north dale
[14:24]
mabry highway intersection.
[14:25]
And in the surrounding area the
[14:28]
land use is consists of the
[14:28]
primarily commercial development
[14:30]
with some public, quasi-public
[14:31]
institutional and residential
[14:32]
uses to the east and west of the
[14:32]
site.
[14:34]
And there are some light
[14:35]
industrial uses located to the
[14:35]
south.
[14:36]
Collectively these existing land
[14:39]
use patterns establishes a
[14:40]
predominantly commercial context
[14:42]
that supports the proposed
[14:42]
rezoning.
[14:43]
It's compatible with the
[14:44]
surrounding area and consistent
[14:47]
with flu's objective 3.1 and
[14:49]
policy 3.1.3, which require
[14:50]
developments to be compatible
[14:52]
with the surrounding areas.
[14:54]
It also satisfies the intent of
[14:56]
flu's objective 4.4 and policy
[14:57]
4.4.1, which require new
[14:58]
development to be compatible
[14:59]
with the surrounding
[15:00]
neighborhood.
[15:01]
The removal of the restriction
[15:02]
for the sale of farm and garden
[15:04]
equipment will not negatively
[15:05]
impact the surrounding
[15:06]
neighborhood, which consists of
[15:08]
heavy and light commercial uses,
[15:09]
and the applicant is stilt
[15:10]
leaving the other original --
[15:13]
still leaving the other original
[15:14]
restrictions, domestic vehicles,
[15:15]
pleasure craft, hobby vehicles
[15:17]
and prohibits sexually oriented
[15:17]
business.
[15:18]
And the original planning
[15:19]
commission findings were
[15:20]
contingent upon these
[15:21]
restrictions.
[15:23]
The addition of farm and garden
[15:23]
equipment sales will further the
[15:25]
operation of the existing
[15:26]
agricultural plant nursery, and
[15:27]
would result in compatible
[15:28]
development.
[15:30]
And lastly, the addition of the
[15:31]
sale of farm and garden
[15:32]
equipment is supported by
[15:35]
several policies under objective
[15:37]
5.1, which state that in
[15:38]
recognition of the importance of
[15:40]
agricultural as an industry and
[15:41]
a valuable economic resource,
[15:42]
that hillsborough county shall
[15:44]
promote the economic viability
[15:45]
of agricultural activities by
[15:47]
recognizing and providing for
[15:48]
its unique characteristics and
[15:49]
land use planning and land
[15:51]
development regulations.
[15:52]
So based upon the above
[15:54]
considerations, the following
[15:55]
goals, objectives and policies,
[15:56]
planning commission staff finds
[15:57]
the proposed rezoning consistent
[15:58]
with the unincorporated
[15:59]
hillsborough county
[16:00]
comprehensive plan, subject to
[16:01]
the restrictions proposed by
[16:03]
development services department.
[16:04]
>> thank you.
[16:06]
At this point in time s
[16:07]
, is there
[16:08]
anyone in the audience that
[16:09]
wishes to speak in support of
[16:12]
the application?
[16:14]
Seeing no one responding, anyone
[16:16]
in the audience wish to speak in
[16:21]
opposition to the application?
[16:23]
Seeingnone responding, staff,
[16:24]
anything further?
[16:26]
>> no, sir.
[16:29]
>> applicant, opportunity for
[16:30]
rebuttal.
[16:40]
Sir, are you good?
[16:42]
All right.
[16:43]
I don't know what happened to
[16:44]
him, but I think we're good on
[16:46]
this one.
[16:46]
Okay.
[16:47]
>> I have no rebuttal.
[16:48]
i'm sorry.
[16:49]
>> [Laughter]
[16:49]
>> okay.
[16:51]
Thank you.
[16:52]
All right, with that that
[16:54]
concludes this application.
[16:55]
MS. Heinrich, we're ready for
[16:55]
the next item.
[16:57]
>> our next application is item
[17:01]
c.2, standard rezoning 26-1184.
[17:03]
The applicant is requesting to
[17:07]
rezone property from as-1 to
[17:07]
rsc-9
[17:09]
rsc-9 with eare strictions.
[17:10]
Sierra janes
[17:15]
jane?Eetion good
[17:17]
evening, kami corbett, suite
[17:18]
1100, tampa, florida.
[17:20]
Here representing mattamy
[17:20]
homes
[17:20]
.
[17:22]
This is pretty straightforward.
[17:24]
This is a standard rezoning
[17:25]
request to rsc-9 restricted.
[17:27]
The restriction is to the four
[17:28]
units to the acre that's allowed
[17:31]
by the comprehensive plan.
[17:34]
The site that's outlined and
[17:34]
dashicide
[17:36]
dashed is actually a site we
[17:37]
rezoned earlier rast year, and
[17:38]
this is a continuation of that.
[17:41]
You can just see this exhibit.
[17:45]
We're going from as-1 to rsc-9
[17:46]
restricted.
[17:52]
We have minimum lot widths of 50 feet, I'm sorry, 60 feet with
[17:53]
7200-foot lots.
[17:56]
And a maximum density of four
[17:57]
dwelling units per acre.
[17:58]
These are some examples of the
[18:00]
product that mattamy builds.
[18:02]
They do a really nice job.
[18:03]
Staff has found this consistent
[18:04]
and compatible with the
[18:05]
comprehensive plan and the land
[18:07]
development code, and we have no
[18:08]
objections from any reviewing
[18:09]
agencies and we're herer
[18:11]
here to
[18:12]
answer any questions should you
[18:13]
have any.
[18:14]
>> no questions, thank you.
[18:20]
Development services staff?
[18:21]
>> good evening.
[18:22]
Sierra james with development
[18:22]
services.
[18:24]
The applicant is requesting to
[18:26]
rezone the site from as-1 to
[18:29]
rsc-9 with the following
[18:30]
applicant proposed restrictions.
[18:32]
Development will pee limited to
[18:33]
four de -- be limited to four
[18:35]
dwelling units per acre.
[18:38]
7,200 square feet minimum lot
[18:40]
feet, and -- the subject site is
[18:41]
located within the riverview
[18:43]
community plan area off
[18:44]
raulerson road.
[18:45]
Much of the surrounding area
[18:46]
consists of single-family
[18:48]
residential uses, notably
[18:51]
properties to the north are
[18:52]
zoned rsc-9 with similar
[18:53]
restrictions.
[18:54]
Based on these considerations,
[18:56]
staff find the proposed rezoning
[18:56]
approvable.
[18:57]
>> yeah, thank you.
[18:58]
>> thank you.
[18:58]
>> all right, planning
[19:01]
commission staff.
[19:02]
>> lilyann linehan, planning
[19:03]
commission staff.
[19:04]
The subject property is located
[19:05]
within the residential 4
[19:07]
louisiana category, is -- land
[19:09]
use category, within the urban
[19:10]
service area.
[19:11]
>> andrew ross: and -- the
[19:12]
intent of the residential 4
[19:15]
category is for low density
[19:16]
residential development, which
[19:18]
aligns with the proposed use for
[19:20]
single-family detached units.
[19:21]
The maximum potential under this
[19:24]
category is four dwelling units
[19:25]
per grows acre and the maximum
[19:26]
nonresidential development
[19:28]
palings is 0.25 far.
[19:30]
The planning commissiongisted
[19:31]
to add a restriction to the
[19:32]
wrezoning which would limit the
[19:34]
residential development to a
[19:35]
maximum of four dwelling units
[19:37]
and align with the residential 4
[19:38]
future land use category.
[19:40]
The applicant agreed to add this
[19:41]
restriction which made a total
[19:42]
of three restrictions.
[19:44]
The other two include a minimum
[19:45]
lot width of 60 feet and to have
[19:49]
a minimum lot area of 7,207
[19:50]
square feet.
[19:51]
The surrounding land use site
[19:53]
pattern consists primarily of
[19:54]
residential uses with some
[19:55]
agricultural land to the north
[19:57]
and this request would provide a
[19:57]
compatible use that is
[19:58]
consistent with the surrounding
[19:59]
residential uses and existing
[20:00]
character.
[20:02]
And is consistent with objective
[20:05]
3.1 and its associated related
[20:06]
policies.
[20:08]
The surrounding zoning pattern
[20:09]
consists of agricultural-rural
[20:12]
to the east, rsc-3 to the south,
[20:13]
as-1 to the west, and rsc-9 to
[20:15]
the north.
[20:17]
This requested rezoning from
[20:19]
as-1 to the rsc-9 restricted is
[20:20]
consistent with the existing
[20:22]
zoning and development pattern
[20:23]
in the vicinity and therefore
[20:26]
the request is consistent with
[20:28]
objective 4.4 and policy 4.4.1.
[20:29]
And lastly the site is within
[20:31]
the riverview community plan,
[20:32]
which desires to reflect the
[20:34]
vision of the riverview district
[20:35]
concept map.
[20:36]
It is within the residential
[20:38]
district on this map, which
[20:39]
encourages residential
[20:40]
development that complements the
[20:42]
sounderring area.
[20:43]
Surrounding area and promotes
[20:43]
housing diversity.
[20:45]
The request would provide
[20:46]
additional housing opportunities
[20:47]
in an area already
[20:49]
characterizedases a residential
[20:49]
district.
[20:51]
So based upon these
[20:52]
considerations, planning
[20:53]
commission staff finds the
[20:53]
proposed planned development
[20:55]
consistent with the
[20:56]
unincorporated hillsborough
[20:56]
county comprehensive plan,
[20:58]
subject to the conditions
[20:59]
proposed by the development
[21:00]
services department.
[21:00]
>> okay.
[21:01]
Thank you.
[21:04]
At that point, is there anyone
[21:05]
in the audience that wishes to
[21:07]
speak in support of the
[21:10]
application?
[21:11]
Seeing no one responding, anyone
[21:14]
in the audience wish to speak in
[21:15]
opposition to the application?
[21:17]
>> yes, please.
[21:20]
>> yes, ma'am.
[21:26]
>> mary iamb pieri, can you hear
[21:26]
me?
[21:27]
>> yes.
[21:28]
>> okay.
[21:29]
Mute the tv.
[21:32]
Sorry.
[21:35]
We had a meet and greet with the
[21:36]
consultants, and the builders,
[21:37]
which was wonderful.
[21:40]
Answered a lot of our questions.
[21:41]
Just want to kind of make sure
[21:45]
that they're going to stick to
[21:46]
the plan since the other three
[21:47]
developments in the area have
[21:49]
not stuck to the plan.
[21:50]
I got to lower this.
[21:52]
I'm sorry.
[21:54]
We want to make sure she did
[21:56]
mention raulerson road.
[21:57]
We want to make sure that there
[22:00]
is no egress to raulerson road
[22:02]
other than the emergency locked
[22:03]
entrance.
[22:06]
That was very important to us.
[22:08]
We want to make sure that that's
[22:08]
for sure.
[22:09]
Actually I think I'm the only
[22:10]
one that going to be here
[22:11]
because everybody's feeling
[22:12]
totally defeated again since
[22:15]
this is our third neighborhood.
[22:18]
We wanted to have the street
[22:20]
lights to be covered at the top
[22:22]
and pointing down into their
[22:22]
roadway.
[22:23]
Quy discussed that with the
[22:24]
builder also.
[22:26]
We wanted requesting an
[22:33]
eight-foot fence between
[22:34]
their properties and outs
[22:36]
instead of the six -- ours
[22:38]
instead of the six-foot one.
[22:39]
Compliance is another issue we
[22:39]
continue to have a problem with
[22:40]
in all of these developments
[22:44]
that back up to our rural
[22:45]
acreage.
[22:46]
They need to comply with the
[22:49]
work days and times, including
[22:50]
there crews that they hire, the
[22:54]
construction crews, the roofers,
[22:56]
not landscapers, the concrete
[22:58]
trucks, the framing crews.
[22:59]
Been quite the problem in the
[23:00]
past, and we're going to be
[23:01]
doing this for another two years
[23:06]
since this project is the
[23:08]
11 acres, the other project is
[23:10]
the first phase, which backs up
[23:12]
to it.
[23:13]
Anyhow, regardless we want to
[23:14]
make sure that they're going to
[23:16]
honor what they're supposed to
[23:17]
honor.
[23:19]
They weren't sure about if they
[23:20]
were utilizing natural gas or
[23:20]
not.
[23:24]
We were curious about that.
[23:25]
I don't know if that'll get
[23:25]
answered later.
[23:30]
We do have issues about the
[23:30]
density.
[23:32]
Are schools are at just about
[23:32]
full capacity.
[23:34]
We gave them a copy of all of
[23:35]
those percentages.
[23:40]
We have six schools in this area
[23:41]
right across the street from
[23:41]
each other.
[23:42]
Blah blah blah.
[23:43]
It's tearable to get in and out
[23:43]
of here.
[23:45]
You can't until after the school
[23:51]
buses are gone.
[23:53]
We're hoping that that gets
[23:53]
addressed.
[23:55]
We don't know how but we're
[23:57]
hoping that gets a second look.
[23:58]
The drilling of the wells, if
[24:00]
they're drilling any wells for
[24:01]
reclaimed sprinklers, one of the
[24:02]
neighbors just mentioned that,
[24:05]
and I thought that was discussed
[24:06]
they weren't going to have any
[24:07]
wells on that property.
[24:08]
Our wells have never been the
[24:10]
same since they -- last two
[24:11]
neighborhoods in.
[24:12]
A few of them have collapsed.
[24:13]
We've had to pull them up.
[24:16]
We've had to redrill.
[24:19]
Very expensive.
[24:22]
Pump stations are a concern.
[24:23]
There
[24:24]
the new neighborhoods that are
[24:25]
all around our acreage, they
[24:26]
have a pump station but they're
[24:28]
not muntered 24 hours day --
[24:30]
monitored 24 hours a day, so we
[24:32]
could go a day and a half, two
[24:34]
day the sirens going off from
[24:36]
their pumpstition
[24:37]
pump stations.
[24:38]
I understand phase 1 and phase 2
[24:39]
are going to have separate pump
[24:41]
stations, so that of course is
[24:43]
another concern.
[24:45]
Just a curious question about
[24:48]
the notices.
[24:49]
Like they just said this was
[24:50]
done a year ago.
[24:52]
We got a notice put on the
[24:53]
street JULY 15th.
[24:55]
That was the first notice that
[24:56]
we all saw.
[24:57]
inletters came shortly after
[25:00]
that.
[25:01]
I guess I can call the county
[25:04]
tomorrow and find out about how
[25:06]
many other notices they put up
[25:08]
last year here and at the cat
[25:12]
house project.
[25:13]
I'm the only one here because
[25:16]
everybody's feeling pretty
[25:20]
voiceless and bulldozed over.
[25:22]
We used to be country.
[25:24]
We have a little one-lane dead
[25:25]
end road we live on.
[25:28]
We can't get off our property
[25:29]
onto boyette road either.
[25:30]
Takes forever if you want to go
[25:33]
out and go in a different
[25:33]
direction.
[25:34]
Was hoping all this building
[25:36]
wasn't going to keep happening
[25:38]
and hit out here for at least
[25:40]
ten more years.
[25:42]
Not much property left since we
[25:44]
just drove down the road and saw
[25:45]
the girl scout camp has sold
[25:50]
more property.
[25:51]
There was no notice for that.
[25:52]
Nobody saw any signs for that
[25:53]
but it looks like it's going to
[25:54]
be quite a big project down
[25:57]
there too.
[25:59]
So we've lost our overall area.
[26:00]
We're very, very concerned about
[26:03]
the wildlife, the turtles.
[26:05]
We have a number of foxes,
[26:10]
coyotes, armadillos, possums,
[26:11]
raccoons, the bocat we have not
[26:14]
seen him for quite awhile now.
[26:14]
One of the other neighbors on
[26:16]
the adjoining properties to this
[26:17]
on hill crest they were
[26:19]
concerneduct the drainage to
[26:21]
their property also since these
[26:22]
homes are going to be at a
[26:29]
higher elevation than theirs.
[26:30]
I thank you for your time and
[26:31]
consideration, and I just hope
[26:32]
the county just keeps following
[26:34]
policy and doesn't just let
[26:35]
these buildings bulldoze over
[26:35]
them.
[26:36]
Thank you for your time.
[26:37]
>> thank you, ma'am.
[26:38]
Is there anyone else in the
[26:45]
audience that wishes to speak in
[26:45]
opposition?
[26:46]
Seeing no one responding, staff,
[26:50]
anything further?
[26:51]
>> I'll just note for the
[26:54]
citizen who just spoke, we don't
[26:56]
have any restrictions in regards
[26:57]
to some of the items that she
[26:58]
talked about.
[27:01]
Just to let her know and
[27:04]
specifically in terms of the
[27:07]
emergency access, and where that
[27:09]
might be if it's necessary, and
[27:13]
anything with a perimeter fence.
[27:14]
I know he shengzed
[27:16]
she mentioned eight feet.
[27:17]
The highest you can go is six
[27:20]
feet unless you obtain a
[27:20]
variance.
[27:21]
>> cay.
[27:25]
To clarify, it's a request for
[27:26]
euclidian zoning, right.
[27:27]
>> yes.
[27:27]
>> it's not a planned
[27:28]
development, right?
[27:28]
>> correct.
[27:30]
>> that's why you only addressed
[27:33]
a few items.
[27:34]
>> correct.
[27:34]
>> okay.
[27:35]
Very good.
[27:35]
Thank you.
[27:36]
At this point in time, the
[27:40]
applicant has an opportunity for
[27:40]
rebuttal.
[27:41]
>> I think I would just say as
[27:43]
you are aware and as the county
[27:45]
is aware, a lot of the issues
[27:48]
with respect to access and
[27:49]
drainage and those types of
[27:50]
things happen at site
[27:52]
development, and we're happy to
[27:54]
keep a dialogue going with the
[27:55]
neighborhood.
[27:57]
The builder actually did the
[27:57]
community meeting, and they
[27:58]
would continue to meet with the
[28:00]
community and try to address any
[28:01]
concerns that they have.
[28:03]
With that we don't anything
[28:03]
further to offer.
[28:04]
>> all right, very good, thank
[28:06]
you, ma'am.
[28:08]
With that, that concludes this
[28:10]
item.
[28:11]
MS. Heinrich, we're ready if the
[28:12]
next case.
[28:14]
>> -- for the next case.
[28:15]
>> next item is major mod
[28:16]
application 26-00
[28:17]
0062.
[28:18]
The applicant is requesting a
[28:23]
major modification to pd
[28:24]
77-0123.
[28:25]
Sam ball with development
[28:27]
services has reviewed this and
[28:28]
will provide staff findings
[28:29]
after the applicant fts
[28:34]
ppresentation.
[28:38]
>> good even, MR. Luce, tiler
[28:41]
hudson, 400 north ashly drive.
[28:42]
Going to go ahead and jump into
[28:43]
a powerpoint.
[28:45]
The site is located just sort of
[28:47]
behind a publix, behind public
[28:51]
storage and general retail
[28:53]
commercial cluster.
[28:54]
Apollo beach boulevard.
[28:54]
Nine acres.
[28:57]
This is a part of dri59,
[28:59]
specifically this is in pocket
[29:00]
62b, so a lot going on in this
[29:04]
dri from 1979.
[29:06]
The project we're proposing is
[29:07]
a multifamily apartment building
[29:10]
four stories in height, 237
[29:12]
total units with access off of
[29:13]
apollo beach boulevard, this
[29:16]
would really sit sort of
[29:17]
squarely in the green pastural
[29:20]
land behind the publix right
[29:20]
now.
[29:22]
We are not in much of a dispute
[29:23]
with staff about the things that
[29:25]
typically cause disputes in
[29:27]
these chambers, which are things
[29:30]
about compatibility or even the
[29:31]
use of multifamily.
[29:34]
This is really a fairly ideal
[29:35]
multifamily infill site.
[29:36]
Not really fighting about
[29:37]
height.
[29:40]
We're not really in disagreement
[29:42]
about buffers, screening, things
[29:44]
like that.
[29:45]
After some time, we are I think
[29:47]
no longer in disagreement about
[29:48]
the administrative variances and
[29:50]
design exceptions that the staff
[29:54]
report indicated those were
[29:55]
recommended for disapproval, but
[29:57]
I believe that has been squared
[29:58]
away.
[30:00]
What we are disputing is about a
[30:01]
couple of words in the dri
[30:03]
development order, so of course
[30:05]
the apollo beach dri was
[30:06]
implemented through a
[30:08]
development order resolution in
[30:10]
1979 as typical for DRIs of
[30:11]
that vintage it's been amended a
[30:14]
couple of times.
[30:15]
But the section on trip
[30:16]
generation has not been.
[30:19]
Like most DRIs, the coin of
[30:23]
the realm is -- trips.
[30:24]
That is the -- and while there
[30:26]
is a reference in the context of
[30:30]
land use exchanges to
[30:31]
referencing equivalent trip
[30:34]
generation based on ite, we
[30:35]
don't dispute that ite is the
[30:36]
correct what.
[30:37]
That is what you should be
[30:39]
looking for the trip genraigz
[30:41]
numbers.
[30:45]
The dispute we have is that
[30:46]
staff -- the reason that's
[30:47]
problematic for us, and steve
[30:49]
henry is going to speak about
[30:50]
this in greater depth is there
[30:52]
is no A.M. Trip baseline in the
[30:53]
development order.
[30:55]
We have a bundle of vested
[30:56]
rights arising from the
[30:57]
ownership of the property going
[31:00]
back to 1979 nat
[31:02]
1979 that said that P.M.
[31:04]
Trips are how you alculate these
[31:05]
conversions.
[31:07]
So we're talking about apples.
[31:09]
Staff is asking us to consider
[31:09]
orfgz.
[31:11]
Orange are good but they have no
[31:12]
business in affecting the
[31:14]
conversion we're seeking here by
[31:14]
this.
[31:15]
So yald
[31:18]
I would ask steve to touch on
[31:19]
a couple of the points on the
[31:20]
slide, and then I will be bak
[31:23]
to wrab it up.
[31:24]
>> okay.
[31:27]
>> good evening, steve henry,
[31:30]
tmc, 5023 west laurel, tampa,
[31:30]
33607.
[31:33]
As tyler had indicated, talked
[31:34]
to you a little bit about the
[31:34]
traffic.
[31:37]
So the reality is we actually
[31:39]
did the original traffic
[31:42]
analysis for apollo beach.
[31:44]
We did the phase 2, phase 3
[31:44]
analysis.
[31:46]
All those were based on the P.M.
[31:47]
Peak hour.
[31:49]
I
[31:51]
I've actually got a cape of the
[31:52]
analysis we can enter -- copy of
[31:54]
the analysis we can enter into
[31:55]
the record if need be.
[31:56]
But in addition to that we did
[31:59]
the dj farms dri analysis that
[32:01]
was based on P.M. Peak hour.
[32:05]
We updated the loom based on
[32:05]
P.M. Peak hour.
[32:08]
We also did the southshore dri,
[32:09]
which was also we updated the
[32:11]
loom for that one.
[32:13]
Had based on P.M. Peak hour.
[32:18]
So the reality is when you're
[32:19]
looking at the trips associated
[32:20]
with it, the analysis for all
[32:23]
DRIs are based on P.M. Peak
[32:23]
hour.
[32:25]
So now to be asked to do A.M.,
[32:26]
the staff had to actually go
[32:29]
through an analysis to determine
[32:30]
what A.M. Trips were even
[32:32]
supposed to be analyzing since
[32:33]
they weren't in the dri.
[32:34]
So from our standpoint we
[32:38]
believe the P.M. Peak hour is
[32:39]
the reasonable equiv whreans for
[32:41]
the purposes of -- equivalency
[32:43]
for the purposes of evaluating
[32:45]
land use equivalencies.
[32:46]
>> okay.
[32:51]
>> thank you.
[32:54]
>> and that slide just says what
[32:55]
steve just said.
[32:57]
So the way the dominoes have
[32:59]
fallen here is we have some
[33:01]
staff opposition to this
[33:02]
request: really comes down from
[33:03]
a very narrow basis which is
[33:05]
what's the appropriate exchange
[33:11]
methodology for a 1979dri that
[33:16]
only provides for P.M. Trips for
[33:17]
the coin of realm.
[33:18]
What we have proposed to do we
[33:20]
think this is redundant.
[33:21]
We think it's not necessary but
[33:23]
we have file
[33:24]
filed a D.O. Amendment
[33:26]
to say what we think it already
[33:27]
says, which is that when we talk
[33:31]
about these land use exchanges,
[33:35]
it's about P.M. Trips as
[33:35]
provided in the original
[33:36]
development order.
[33:38]
I think if that is approved
[33:39]
whether staff recommends its
[33:40]
approval is a separate thing.
[33:42]
If that were approved that would
[33:43]
allay any doubt here, but again
[33:47]
we just see this as just an add
[33:49]
on cures mechanism.
[33:52]
We do dispute the premise that
[33:53]
A.M. Peak trips have anything to
[33:53]
do.
[33:54]
That's completely irrelevant to
[33:55]
staff's analysis on the
[34:00]
conversion, so with that, I will
[34:02]
just note in closing this is a
[34:03]
pretty substantial impact fee
[34:05]
generator for the sieflt this
[34:05]
is.
[34:06]
Site.
[34:07]
This is an infill housing, there
[34:08]
is multifamily in the periphery.
[34:10]
It is a blank piece of land near
[34:11]
a maimer road behind a publix
[34:13]
and some employment centers.
[34:14]
With that, appreciate your time.
[34:15]
Thank you.
[34:17]
>> yeah, if I could, because
[34:20]
read the staff report, and
[34:21]
they're taking the position,
[34:22]
maybe it's information you
[34:23]
tbroided to
[34:25]
provided to them, that the site
[34:29]
is currently entitled for I
[34:32]
don't know, 34, 35,000 square
[34:33]
feet of retail.
[34:34]
>> that's what we're seeking to
[34:35]
convert.
[34:38]
We're seeking to convert 35,000.
[34:41]
>> that's what you think the
[34:45]
entitlements are on this
[34:45]
9.48 acres.
[34:47]
>> correct, converting that
[34:48]
to -- units 72 so if you
[34:49]
.
[34:51]
>> so if you could, or steeive
[34:53]
henry, walk me through how you
[34:54]
get from the 35,000 square feet
[35:14]
of retail to 237 units?
[35:15]
>> well, the staff had done it
[35:17]
based on P.M. Peak hour.
[35:18]
But what they also then looked
[35:19]
at was A.M. Peak hour.
[35:21]
So the P.M. Peak hour gets us
[35:22]
where we want to be.
[35:23]
>> explain that to me.
[35:28]
Walk me through that.
[35:29]
>> okay.
[35:31]
And I will, because we didn't
[35:32]
actually that.
[35:34]
Those were done by staff.
[35:41]
So I will pull that out here.
[35:42]
But essentially what staff was
[35:44]
looking at was, and they were
[35:47]
looking at both the inbound and
[35:48]
outbound trips, and then you
[35:50]
look at the equivalency of those
[35:53]
trips to get there.
[35:55]
And again I will have to go
[35:55]
through the number.
[35:56]
Really it was a matter of from
[35:59]
our standpoint we were asked to
[36:01]
look at what's the reasonable
[36:02]
rate?
[36:03]
Was it P.M.?
[36:04]
A.M.?
[36:05]
We were asked to look at that so
[36:06]
I have actually run through the
[36:06]
numbers.
[36:08]
I'm happy to do that.
[36:10]
>> all right, well let's back up
[36:12]
a step then and just
[36:12]
intuitively.
[36:15]
You've done traffic for a while.
[36:15]
>> yes.
[36:17]
>> 35,000 square feet of retail
[36:24]
is that equivalent to 237 units?
[36:25]
>> yes, again, P.M. Peak hour
[36:27]
when you look at the gross
[36:28]
trips, that would be probably
[36:29]
equiv
[36:31]
quivalency.
[36:32]
>> okay.
[36:33]
>> and again I'm happy to look
[36:34]
at the numbers again because we
[36:40]
were just simply looking at what
[36:41]
was the reasonable, A.M. Or
[36:43]
P.M., so dwrid
[36:44]
I didn't run through
[36:46]
the actual calculations.
[36:46]
I can do that.
[36:49]
>> can I ask the county staff,
[36:51]
transportation planner the same
[36:52]
question, maybe you come back on
[36:54]
rebuttal and show me the math.
[36:55]
>> sure, absolutely.
[36:56]
We can definitely do that.
[36:59]
>> very good.
[37:00]
Thanks.
[37:02]
Does that conclude, MR. Hudson,
[37:03]
your presentation?
[37:05]
All right, at this point in
[37:10]
time, development services
[37:10]
staff.
[37:11]
>> good evenings sam ball with
[37:12]
hillsborough county development
[37:15]
services.
[37:17]
the applicant is requesting a
[37:18]
major modification to pocket
[37:21]
scob of pd 77-0123 to allow for
[37:23]
the development of 237
[37:25]
multifamily dwellings through an
[37:27]
exchange of commercial or office
[37:28]
use entitlements.
[37:30]
This application is being heard
[37:31]
concurrentdly
[37:33]
concurrently with a modification
[37:36]
to the apollo beach dri under
[37:38]
dri do26-2245.
[37:40]
The subject property is located
[37:43]
in the apollo beach community
[37:44]
planning area.
[37:46]
The development site adjoined
[37:48]
properties within the same pd on
[37:50]
all sides which are approved and
[37:51]
developed for a mix of office
[37:55]
and commercial uses that include
[37:56]
retail, light industrial, and
[37:58]
mini warehousing.
[38:00]
Additional uses in the area
[38:03]
include a religious institution,
[38:05]
multifamily, single-family,
[38:09]
conventional single-family
[38:10]
dwellings, multiuser office
[38:12]
complex and a mobile home park.
[38:18]
Balkt 62b is approved for 4 --
[38:18]
commercial or office square foot
[38:19]
use.
[38:21]
The proposes
[38:28]
-- allowing for the 237multifamily dwellings and
[38:29]
established vehicular and
[38:31]
pedestrian access points along
[38:33]
apollo beach boulevard and
[38:34]
pedestrian cross-access for the
[38:35]
property located to the north
[38:38]
and south.
[38:40]
The application includes a p
[38:41]
dvariation request to the
[38:41]
buffering and screening
[38:44]
requirements of ldc section
[38:46]
60606, that if approved would
[38:47]
reduce the required buffer and
[38:49]
screening permits from a 30-foot
[38:51]
c to a 10-foot b between the
[38:52]
proposed building envelope and
[38:53]
the light industrial site to the
[38:54]
north.
[38:55]
the activities associated with
[38:57]
the light industrial use to the
[38:59]
north are contained within a
[39:01]
structure position of
[39:02]
approximately 120 feet north of
[39:03]
the property boundary.
[39:05]
The manufacturing -- the
[39:06]
industrial facility to the north
[39:09]
is also gened from the subject
[39:10]
property -- developed from
[39:11]
subject property dense
[39:12]
vegetation and protected
[39:12]
wetlands.
[39:15]
The load docks of the industrial
[39:17]
facilities are located more than
[39:18]
275 feet from the proposed
[39:20]
development, and are are
[39:22]
oriented towards the opposite
[39:23]
direction.
[39:24]
Based on these findings, staff
[39:28]
finds the approval of, finds
[39:30]
that the approval of the
[39:31]
requested waiver will have
[39:32]
minimal impacts.
[39:33]
Staff finds the proposed
[39:34]
development compatible with the
[39:36]
area based on zoning and
[39:37]
development pattern in the area,
[39:40]
and the above considerations.
[39:41]
However, there proposed number
[39:42]
of residential units would be
[39:43]
provided through a conversion of
[39:44]
commercial entitlements to
[39:47]
residential entitlements as
[39:47]
provided for
[39:50]
for in the appaleo
[39:50]
beach dri.
[39:53]
The trip exchange requires at
[39:54]
least 310,003 square feet
[39:56]
instead of the 34,511 square
[39:58]
feet proposed buy applicant due
[40:01]
to directional daily inbound and
[40:02]
outbound directional A.M. And
[40:04]
inbound and directional P.M.
[40:06]
Inbound trips.
[40:07]
Due to this final consideration,
[40:09]
staff finds the request not
[40:10]
supportable.
[40:11]
That concludes my presentation
[40:14]
if you have any questions.
[40:15]
>> okay.
[40:18]
Only with regard to traffic.
[40:19]
So I would like to hear from the
[40:21]
transportation planner for the
[40:22]
county.
[40:23]
>> okay.
[40:24]
James ratliff.
[40:24]
>> okay.
[40:27]
Thank you.
[40:28]
>> good evening, james ratliff,
[40:30]
development services,
[40:30]
transportation --
[40:32]
>> same question unless you have
[40:34]
other comments you want to make,
[40:35]
but the question I had for the
[40:37]
applicant's transportation
[40:38]
planner, show me the math.
[40:40]
How do you get from 34,511
[40:44]
square feet of retail to 237
[40:46]
multifamily units.
[40:47]
>> sure.
[40:48]
Let me start by saying I think
[40:49]
you asked the question whether
[40:51]
the things they were presenting
[40:52]
about how the other projects had
[40:54]
been done, dg farms, was
[40:55]
something that was presented to
[40:56]
us.
[40:57]
That data was provided.
[41:00]
This went up to the director of
[41:01]
development review which
[41:02]
essentially interpreted what the
[41:03]
development order states in
[41:04]
terms of how we would analyze
[41:05]
this project.
[41:07]
They also then I believe cept
[41:08]
that information to the county
[41:11]
attorney's office who again
[41:15]
agreed with staff's
[41:15]
interpretation of how the
[41:16]
development order reads so not
[41:18]
with responding what was done in
[41:19]
those other projects we have to
[41:19]
review this project based on
[41:21]
what this development order
[41:21]
says.
[41:22]
Not what's usual or customary
[41:26]
but what was approved.
[41:28]
So in terms of the map, let's
[41:30]
see, I haven't used this thing
[41:31]
in about 20 years.
[41:33]
>> sorry, you haveilatal
[41:34]
you have a little
[41:35]
homework.
[41:36]
I gave the other side homework
[41:36]
too.
[41:51]
>> and going to need to zoom.
[41:52]
Okay.
[41:55]
So if that's hopefully you can
[41:57]
see that.
[41:58]
Sales this is essentially a
[42:00]
two-part problem.
[42:02]
So the first part is the
[42:03]
exchange of equivalent uses, and
[42:04]
then the second part of the
[42:07]
problem is assuming that the
[42:08]
exchange was done correctly,
[42:10]
kind of a subpart to the
[42:13]
question, is do they control the
[42:15]
entitlements necessary to
[42:16]
effectuate the exchange.
[42:17]
And the third or main problem is
[42:19]
does that exchange violate the
[42:20]
trip cap.
[42:23]
So those are kind of separate
[42:24]
but related issues.
[42:27]
And in the dri development order
[42:28]
again it introduces this concept
[42:31]
for this particular dri of
[42:32]
directional equivalency, and the
[42:34]
tripp cap only looks at P.M.
[42:36]
Peak hour.
[42:37]
But with regard to the exchange,
[42:41]
we look at all three periods and
[42:42]
directional equivalency as well.
[42:44]
So what you can see here is this
[42:45]
first line basically shows what
[42:47]
they're proposing to exchanger
[42:52]
too, which is 237 dwelling
[42:53]
units of apartments four stories
[42:54]
or higher and that's an
[42:55]
important consideration because
[42:56]
the particular code they used
[42:57]
higher the apartments are, the
[42:58]
lower the traffic they generate
[43:00]
per unit.
[43:02]
So that's what that first line
[43:03]
is showing.
[43:05]
The next line is essentially
[43:08]
taking of the 870,464 square
[43:10]
feet of commercial entitlements,
[43:12]
we said well, how much do we
[43:13]
have to reduce that number by in
[43:18]
order to achieve equiverancy inquiv lane in
[43:19]
all three team pire I understand
[43:21]
in -- periods in both the
[43:24]
inbound and outbound.
[43:26]
Average daily equivalency
[43:27]
inbound and outbound, so on and
[43:28]
so forth.
[43:29]
So it took quite a bit of
[43:32]
nonresidential entitlements to
[43:36]
achieve an A.M. Peak hour
[43:36]
equivalency.
[43:37]
And that's because the code that
[43:40]
was utilized when the code was
[43:41]
studied, generates a relatively
[43:44]
lower number, you know, of
[43:46]
outbound A.M. Trips.
[43:48]
So in order to get the number
[43:50]
and of outbound A.M. Trips to be
[43:51]
equivalent for residential,
[43:54]
which generates right a lot of
[43:55]
outbound A.M. Trips everybody's
[43:55]
leaving for work in the morning
[43:59]
you have to exchange 310,364
[44:02]
square feet in order to achieve
[44:04]
that outbound equivalency.
[44:04]
In
[44:06]
>> okay, so that's what you're
[44:07]
saying.
[44:09]
You're saying they have to
[44:10]
exchange 310,000 square feet of
[44:14]
retail to get to 237 units.
[44:15]
>> correct, and it's all because
[44:17]
of this one column right here,
[44:19]
which is the outbound, in order
[44:22]
to get that 71 units, to be
[44:23]
equivalent, right you have a lot
[44:24]
of overage in these other
[44:28]
categories, it's that one
[44:29]
directional equiv
[44:30]
quivalency in the
[44:33]
A.M. Outbound nat that was the
[44:34]
controlling factor.
[44:34]
>> got it.
[44:34]
Okay.
[44:35]
I understand.
[44:38]
>> and then the second part of
[44:39]
the test was assuming they had
[44:41]
the entitlements to exchange and
[44:43]
they could do that, then how
[44:47]
does it interact with the trip
[44:48]
cap.
[44:49]
So and according to this it
[44:51]
would exceed the cap by 10
[44:51]
trips.
[44:52]
He mentioned that you know they
[44:54]
were looking at a potential do
[44:56]
element as a curative mechanism
[44:57]
I believe, but again that's not
[44:59]
of record as of now so we
[45:02]
reviewed this case based on
[45:04]
what's currently being proposed,
[45:06]
and you know, possibility we
[45:08]
wouldn't support that even if
[45:09]
proposed but the point being
[45:10]
it's not being proposed
[45:11]
currently so we're reviewing it
[45:13]
as it currently sits.
[45:14]
>> okay.
[45:14]
All right.
[45:15]
That's helpful.
[45:17]
Thank you.
[45:17]
>> sure.
[45:18]
>> at this point in time,
[45:22]
planning commission staff.
[45:23]
>> lillian line 00, planning
[45:23]
commission staff.
[45:25]
The site is designated office
[45:26]
commercial 20 on the future land
[45:28]
use map and is within the urban
[45:29]
service area and within the
[45:31]
limits of the apollo beach
[45:33]
community plan and southshore
[45:34]
area-wide systems plan.
[45:35]
Site's also part of a
[45:36]
development of regional impact
[45:38]
development order, and planning
[45:40]
commission staff finding is cub
[45:42]
tingance upon the application
[45:44]
being in compliance with the
[45:44]
dri.
[45:45]
The intent of the office
[45:47]
commercial 20 category is to
[45:48]
accommodate commercial and
[45:49]
office development while still
[45:51]
allowing for the consideration
[45:52]
of compatible residential uses
[45:54]
and the proposed residential
[45:55]
development exceeds the base
[45:57]
density of the 20 dwelling units
[45:59]
per acre allowed under this
[45:59]
category.
[46:01]
However, because of the dri, the
[46:02]
proposed units utilize a portion
[46:04]
of the remaining residential
[46:05]
entitlements, and there
[46:06]
therefore the
[46:07]
proposal is consistent with the
[46:08]
intent of the oc-20 category,
[46:10]
subject to its compliance with
[46:12]
the dri.
[46:15]
Flu's objective 1.1 and of the
[46:16]
future land use section directs
[46:19]
80% of the county's growth into
[46:20]
the urban service area, and
[46:22]
flu's policy 3.1.3 requires new
[46:23]
development to be compatible
[46:25]
with the surrounding uses.
[46:25]
The proposed residential
[46:26]
development is compatible with
[46:28]
the surrounding development
[46:30]
pattern, which includes light
[46:31]
industrial and commercial uses
[46:32]
with residential development
[46:34]
farther west along apollo beach
[46:35]
boulevard.
[46:37]
Proposed development also meets
[46:40]
the intent of flu's objective
[46:42]
4.4, policies 4.4.1, regarding
[46:43]
compatibility with surrounding
[46:44]
neighborhoods, while the apollo
[46:46]
beach community plan discourages
[46:47]
residential development that
[46:49]
exceeds 50 feet in height, the
[46:50]
subject site is located within
[46:52]
an intensive future land use
[46:54]
designation of office commercial
[46:56]
20 and an established commercial
[46:56]
node.
[46:58]
Given the surrounding commercial
[46:59]
intensity and the location along
[47:01]
apollo beach boulevard and U.S.
[47:02]
Highway 41, the proposed
[47:03]
building height is considered
[47:05]
compatible with the surrounding
[47:06]
area.
[47:08]
And lastly, the major --
[47:09]
proposed major modification is
[47:10]
consistent with the vision of
[47:11]
the apollo beach community plan
[47:13]
and southshore area-wide systems
[47:14]
plans, by supporting development
[47:16]
within an established activity
[47:18]
center, and providing additional
[47:19]
residential opportunities in an
[47:21]
area served by existing urban
[47:22]
infrastructure.
[47:23]
So based upon these
[47:24]
considerations, planning
[47:26]
commission staff finds the
[47:28]
proposed major modification
[47:30]
consistent with the
[47:31]
unincorporated hillsborough
[47:31]
county comprehensive plan
[47:33]
subject to conditions proposed
[47:34]
by development services and in
[47:35]
compliants with the requirements
[47:36]
of the dri.
[47:40]
>> okay, thank you.
[47:41]
All right at this in time, is
[47:44]
there anyone in the audience
[47:45]
that wishes to speak in support
[47:48]
of the application?
[47:49]
No one responding.
[47:50]
Anyone in the audience wish to
[47:52]
speak in opposition to the
[47:53]
application?
[47:54]
>> good evening, chair.
[47:55]
I believe we have eight people
[47:59]
signed up online to speak.
[48:00]
>> okay.
[48:05]
First person, please proceed.
[48:06]
>> brad, are you able to hear
[48:07]
me?
[48:09]
>> I am, is I'm sorry, I didn't
[48:09]
know I was first.
[48:12]
My name is brad ahlgren a
[48:14]
business owner at 208 apollo
[48:17]
beach boulevard, about 350 feet
[48:18]
southeast of the proposed
[48:20]
development.
[48:22]
And as I've said on the record,
[48:24]
that I've submitted, I'm not
[48:25]
opposed to progress.
[48:29]
I'm not opposed to improvements,
[48:32]
however, I believe this
[48:33]
application would be to the
[48:36]
detriment of the community, and
[48:38]
a few things were said tonight
[48:39]
that the applicant was not
[48:41]
really in opposition to the
[48:42]
staff on heights and setbacks
[48:46]
and things like that.
[48:50]
In my submission to the county,
[48:51]
I've had viriance with that is
[48:55]
we do have opposition to the
[48:55]
height.
[48:59]
We do have opposition to the
[49:00]
setbacks.
[49:01]
And I trust that you all have
[49:05]
had a chance to read that
[49:06]
submission on the record.
[49:07]
However, I would like to speak
[49:10]
with, speak about the
[49:12]
comprehensive plan objective
[49:17]
2.2, which sets the density, let
[49:17]
me pull that up.
[49:22]
That sets maximum density, and I
[49:25]
don't believe any dri or trip
[49:29]
conversion can allow excess
[49:30]
density nat
[49:32]
that the objective
[49:32]
withholds.
[49:36]
So for oc-20 it allows up to
[49:37]
about 189 units.
[49:40]
I don't believe the dri
[49:41]
conversions, the trip
[49:42]
conversions can now exceed
[49:44]
something that the objective
[49:45]
withholds.
[49:46]
So I do have an you should
[49:48]
issue with that.
[49:51]
And then I also have submitted
[49:52]
on record that I don't believe
[49:55]
it is in, it is consistent also
[49:59]
with policy 3.1 in the scale,
[50:02]
the mass, the bulk of structure,
[50:04]
pedestrian and vehicular traffic
[50:06]
and so for the record, I've put
[50:09]
6 points down that I believe
[50:13]
support and corroborate that
[50:16]
with video evidence, with just
[50:19]
document evidence from the
[50:20]
traffic engineer and e and from
[50:22]
others and so -- how much time
[50:24]
do I have with eight people?
[50:25]
Two minutes?
[50:27]
>> yeah, if you divide it by
[50:28]
eight, there's roughly two
[50:28]
minutes a person.
[50:30]
>> a little under two.
[50:32]
I'm probably very close to that
[50:33]
so I will have to yield my time,
[50:35]
but I trust that you all have
[50:41]
read that document, and towards
[50:42]
the end there I'm asking you do
[50:44]
not grant variances on the
[50:46]
setback or the height.
[50:51]
Keep consistent with the plan.
[50:53]
These plans were put in place.
[50:54]
They're good plans just as you
[50:56]
were looking at the dri and trip
[50:57]
conversion, I believe the
[50:58]
comprehensive plan should take
[50:59]
precedent over all of that.
[51:01]
So I'm opposed to it.
[51:02]
>> all right, very good, thank
[51:03]
you, sir.
[51:06]
All right, next person woo who
[51:08]
wishes to speak in opposition?
[51:09]
>> laura?
[51:12]
>> that's me.
[51:12]
Hi.
[51:14]
My name is laura craig.
[51:17]
I live at 6348 cocoa lane in
[51:19]
apollo beach.
[51:22]
And I'm here to voice my concern
[51:26]
over these major modifications.
[51:27]
First and foremost you guys talk
[51:29]
about P.M. And A.M. Traffic.
[51:31]
Did anybody did these stud ation
[51:32]
actually live in apailo beach
[51:35]
and go down the A.M. And P.M.
[51:37]
Times that they did these
[51:40]
studies in?
[51:44]
The schools, the traffic is just
[51:44]
horrendous.
[51:46]
Apollo beach boulevard is two
[51:48]
lanes in, two lanes out.
[51:50]
You have one car that fits into
[51:53]
the turning lanes.
[51:54]
There has not been any
[51:57]
improvement to apollo beach
[51:58]
boulevard in many, many years.
[51:58]
There
[52:03]
there was a 2025 study, proposed
[52:04]
improvements, they were under
[52:04]
review.
[52:06]
one of those being taken one of
[52:08]
those lanes and putting it into
[52:10]
a golf cart and bicycle lane so
[52:12]
that cuts two lanes down to one.
[52:19]
You want to go and put 237 units
[52:21]
chroughly you figure two people
[52:23]
per unit minimum, roughly 500
[52:23]
people.
[52:25]
Everybody has a car.
[52:26]
In and out.
[52:34]
There is just no, I didn't hear
[52:35]
anything to go and address the
[52:36]
infrastructure about this, and
[52:37]
not to mention the pick-up lines
[52:42]
that extend down going east on
[52:43]
apollo beach boulevard to the
[52:44]
school.
[52:45]
It extends all the way down
[52:47]
apollo beach boulevard, and all
[52:49]
the way down dickman boulevard.
[52:51]
It's or dickman road.
[52:52]
It's impossible.
[52:53]
I'm surprised that there hasn't
[52:56]
been a major accident as of yet
[52:58]
or any children being hurt or
[53:02]
killed by crossing these streets
[53:05]
because it's a 35-mile per an
[53:07]
hour zone, people use it for 50,
[53:09]
60-mile depending on how fast
[53:09]
they want.
[53:11]
So that's my issue with traffic.
[53:13]
It's so close to 41 and apollo
[53:14]
beach boulevard intersection.
[53:18]
There's approximately 33 to
[53:19]
35,000 vehicles that pass
[53:24]
through that intersection
[53:25]
already.
[53:25]
On the other side of 41.
[53:26]
They already built I don't know
[53:31]
how many hundreds of apartment
[53:31]
buildings.
[53:33]
Thaich already proposed another
[53:39]
250 apartments on the south side
[53:42]
of paseo almar and 41.
[53:45]
And to go and voice evacuation.
[53:47]
We're in a flood zone.
[53:50]
We were flooded.
[53:50]
Two years ago.
[53:51]
The whole apollo beach
[53:52]
boulevard.
[53:54]
how do you plan on getting 30,
[53:58]
right now as -- it estimated
[54:00]
about 33,000 people live in
[54:01]
apollo beach.
[54:03]
How do you expect to get all of
[54:05]
these people out in case of an
[54:05]
emergency?
[54:07]
There is one way in and one way
[54:07]
out.
[54:09]
It's, there is, and there is no
[54:11]
evacuation plan in any re view.
[54:14]
There is nothing.
[54:15]
Nobody, when we sound the siren,
[54:19]
it's time to go.
[54:21]
You also have to go and contend
[54:22]
with the water shortage.
[54:25]
We're only allowed to go and
[54:27]
water our grass or plants or
[54:29]
whatever once a week and you're
[54:30]
only allowed 15 or 20 minutes
[54:34]
and now you plan on doing 237
[54:35]
more people in a five-story
[54:36]
building which by the way does
[54:37]
not, is not compatible with
[54:38]
apollo beach.
[54:40]
You don't -- there is nothing
[54:43]
over two stories.
[54:45]
They are trying to get -- there
[54:51]
are two other complexes trying
[54:53]
to -- the waterset complex, the
[54:55]
one I mentioned, and we're not
[54:57]
mentioning the hotel, the
[54:58]
condominiums that they want to
[54:59]
do on surfside boulevard which
[55:04]
is another 50 to 55 condominiums
[55:06]
with retail.
[55:07]
They don't know retail or no
[55:08]
retail, they haven't decided
[55:11]
yet.
[55:12]
So between the water shortages,
[55:13]
the traffic issues, the road is
[55:15]
in horrible condition.
[55:17]
I mean, you have to weave and
[55:21]
dodge potholes, and sinkholes,
[55:23]
and then they come in and they
[55:27]
do a shoddy job patching it
[55:28]
anyway.
[55:30]
Ask r and this doesn't even
[55:30]
address the amount of people
[55:32]
that are going to be -- how many
[55:33]
kids are going to go going into
[55:34]
the schools.
[55:37]
I mean, they're already
[55:38]
overcrowded.
[55:39]
We have five schools right
[55:41]
around us and traffic is just
[55:42]
insane.
[55:42]
I don't leave my house until
[55:43]
after 10:00 in the morning
[55:47]
because you can't get through.
[55:48]
And then I make sure I'm home by
[55:49]
2:00 because the traffic coming
[55:53]
home from school is crazy.
[55:55]
And then at 4:00 all the traffic
[55:57]
coming in from tampa, people
[55:57]
working.
[56:02]
The traffic has made this once
[56:04]
paradise into a nightmare.
[56:05]
You don't even want to leave
[56:05]
your house.
[56:08]
So I don't think that the, what
[56:13]
the developer or the, these
[56:15]
kuddies are show -- studies are
[56:16]
showing is the actual impact of
[56:19]
what you're try doing here.
[56:21]
You know, you're sounding like
[56:22]
yore all
[56:24]
you all live in tampa but how
[56:25]
about flooding?
[56:26]
You guys go and deal with
[56:27]
flooding.
[56:28]
The pipes over here, they're all
[56:29]
50 years old plus, they're all
[56:30]
breaking.
[56:31]
My road already had three issues
[56:34]
with pipes bursting.
[56:36]
So it's just not, it's not
[56:37]
compatible.
[56:40]
Again, I'm not just like the
[56:41]
gentleman before me said, I'm
[56:42]
not against growth but I am
[56:48]
against this unbridled
[56:48]
development, and it's
[56:51]
unfortunate that we live in an
[56:52]
unincorporated hillsborough
[56:53]
county because we don't have a
[56:53]
voice.
[56:55]
We are the voice.
[56:55]
And it seems like we're not
[56:58]
being listened to.
[56:58]
you
[57:01]
you know, we moved here for a
[57:04]
reason, and that reason is being
[57:06]
eroded so quickly that it makes
[57:07]
your head spin.
[57:08]
You know, they have waterset
[57:09]
that's already gone all the way
[57:12]
down through 19th street.
[57:14]
There is no more rural land.
[57:14]
There is none.
[57:16]
What used to be tomato farms and
[57:16]
cattle farms is nothing.
[57:20]
It's just houses and houses and
[57:20]
houses.
[57:29]
So yes, I am, there are high
[57:30]
density projects with everything
[57:31]
around and now they approved
[57:33]
costco and target across the
[57:35]
street from the high school on
[57:35]
big bend.
[57:37]
It's going to be even more of a
[57:37]
nightmare.
[57:40]
I mean to get up it used to take
[57:41]
me 15 minutes to get up to 75.
[57:43]
I'm lucky if I could get up
[57:45]
there in 35 minutes.
[57:46]
Do the
[57:50]
to the highway and then get on
[57:54]
75 to get up to brandon.
[57:59]
It's a 10-mile trip, 45 minutes.
[57:59]
So.
[58:00]
>> ma'am, let's -- there are a
[58:01]
few more people that want to
[58:02]
speak.
[58:02]
>> I know, I'm sorry.
[58:03]
I'm done.
[58:04]
I'm done, yes, I just hone that
[58:06]
these developers give, there's
[58:09]
no thought to the quality of
[58:13]
life, and I respectfully ask for
[58:14]
this major modification to be
[58:14]
denied.
[58:15]
Thank you.
[58:15]
>> all right.
[58:16]
Thank yo, ma'am.
[58:18]
Okay, next person that wishes to
[58:22]
speak in opposition.
[58:23]
>> lynne banks.
[58:24]
>> hello, can you hear me?
[58:26]
>> yes, hi, my name is
[58:28]
lynnebanks and I live at 102 st. George court.
[58:31]
Back in APRIL I put together a
[58:33]
petition as a member of the over
[58:36]
500 unit caribbean isles
[58:38]
waterfront mobile home community
[58:38]
co-op.
[58:40]
I want to express our
[58:42]
significant concern and oppose
[58:44]
the construction of this huge
[58:44]
apartment building and the
[58:47]
reasons are as follows.
[58:48]
Number 1 I want to completely
[58:53]
support the documentation
[58:56]
ubmitted by brad ahlgren his
[58:57]
analysis of the entire process
[59:00]
is absolutelyright
[59:01]
absolutelyright on.
[59:04]
Number two, the problem at
[59:06]
caribbean ieltz rr is water
[59:08]
runoff and our canals are
[59:09]
filling up with silt and other
[59:11]
items causing our canals to be
[59:12]
overrun with silt and filling
[59:13]
in.
[59:13]
Our community spent almost a
[59:14]
million dollars in the las
[59:17]
couple of years dredging the
[59:20]
community that has been touted
[59:21]
as a waterfront boating
[59:22]
community.
[59:23]
Many people can
[59:25]
cannot even get
[59:27]
their boats off the lifts let
[59:29]
alone navigate to tampa bay to
[59:30]
enjoy the wonderful environment
[59:31]
we have.
[59:32]
Number one concern would be to
[59:32]
ask the developer if he is
[59:34]
willing to put up a million
[59:36]
dollar surety bond to address
[59:37]
all damages and issues that MAY
[59:39]
affect the caribbean isles
[59:41]
mobile home community and the
[59:42]
future if this plan should go
[59:46]
through.
[59:47]
I think this is certainly
[59:47]
reasonable.
[59:48]
If there is no damage, there is
[59:48]
no cost.
[59:49]
If there is damage we would like
[59:50]
to be compensated for the
[59:51]
ability to use our canals that
[59:54]
we purchased over the last 40 to
[59:58]
50 years.
[1:00:00]
Secondly as a retired law
[1:00:01]
enforcement officer having
[1:00:03]
watched everything going up and
[1:00:04]
down apollo beach boulevard, I
[1:00:05]
am appalled that the traffic
[1:00:07]
study was number one,
[1:00:08]
inaccurate, and number two, it
[1:00:12]
hasn't been significantly and
[1:00:13]
adequately documented or
[1:00:16]
finalized as to the amount of
[1:00:19]
traffic problems that could be
[1:00:21]
if this apartment building goes
[1:00:21]
through.
[1:00:22]
There is no ability to put in
[1:00:23]
left turn lanes, right turn
[1:00:25]
lanes, there is no ability for
[1:00:26]
traffic to get across apollo
[1:00:27]
beach boulevard to go north and
[1:00:29]
south, and what the developer is
[1:00:31]
proposing is absolutely
[1:00:35]
ridiculous from a staff
[1:00:35]
perspective.
[1:00:37]
You can't ask trucks, fire
[1:00:37]
department engines, or
[1:00:38]
ambulances or anything else to
[1:00:41]
make u-turns at the south end of
[1:00:42]
the north end of this building
[1:00:43]
so that's not going to work for
[1:00:44]
them.
[1:00:46]
Plus we also had a golf cart
[1:00:50]
fatality at the road apollo
[1:00:52]
beach -- where curib crn
[1:00:54]
caribbean isles
[1:00:55]
gets off apollo beach biewbd
[1:00:56]
tat was never documented, that
[1:01:00]
was in DECEMBER of 2024.
[1:01:01]
So I think the traffic study
[1:01:01]
needs to be done.
[1:01:03]
I also think that we are in
[1:01:06]
agreement that a final traffic
[1:01:07]
study from hillsborough county
[1:01:09]
as to what the plan is for
[1:01:11]
apollo beach boulevard from the
[1:01:13]
bay all the way to highway 41.
[1:01:15]
It's absolutely ooze i
[1:01:18]
-- as I can
[1:01:19]
only imagine as everybody agrees
[1:01:20]
is a nightmare.
[1:01:24]
Nobody would want to drive on
[1:01:24]
that.
[1:01:25]
Thirdly the height is not cub
[1:01:30]
forming to the 50-foot
[1:01:31]
guidelines.
[1:01:32]
A 65-foot building I will be
[1:01:35]
able to change the televisions
[1:01:37]
with my remote control to the
[1:01:39]
people that live on the third,
[1:01:40]
fourth, and fifth building if
[1:01:41]
this should go through.
[1:01:42]
What irritates us to no end is
[1:01:44]
that because the zoning
[1:01:46]
purpose -- notification purposes
[1:01:49]
are only 350 feet, you MISS
[1:01:51]
Notifying caribbean isles
[1:01:52]
community by about 125 feet.
[1:01:55]
Which we consider completely
[1:01:56]
unfair and actually kind of
[1:01:57]
disappointing because it sounds
[1:01:59]
like the developer was trying to
[1:02:02]
hide from us.
[1:02:03]
So the heighth is awful.
[1:02:05]
There are no other four or
[1:02:06]
five-story buildings west o
[1:02:08]
highway 41, and what's going on
[1:02:10]
east of highway 41 is already at
[1:02:14]
a 40% or more vacancy.
[1:02:16]
They are not filling these
[1:02:16]
buildings up.
[1:02:19]
Nobody can afford them.
[1:02:20]
Lastly, as was pointed out in
[1:02:26]
the documentation from
[1:02:27]
MR. Ahlgren, the sewer and water
[1:02:28]
issues going to be a huge
[1:02:28]
concern.
[1:02:30]
The wastewater is not able to be
[1:02:31]
handled right now with what is
[1:02:32]
in place.
[1:02:33]
You start building more of these
[1:02:34]
buildings without having a plan
[1:02:37]
in place, who's going to pay for
[1:02:37]
that?
[1:02:39]
That's going to have to come out
[1:02:41]
of taxes someplace.
[1:02:42]
There is absolutely no way
[1:02:43]
you're going to put in a new
[1:02:44]
water treatment plant without
[1:02:46]
costing everybody in appallee
[1:02:47]
beach
[1:02:50]
appalleeobeach an exorbitant amount of
[1:02:50]
money.
[1:02:53]
So with that said I'm going to
[1:02:55]
defer my time to anybody else
[1:02:55]
that wants to speak.
[1:02:57]
Just remember we have over 500
[1:02:59]
people in our community, and 350
[1:03:01]
of them signed a petition
[1:03:03]
against and opposing this
[1:03:03]
development.
[1:03:05]
Please stick to the rules and
[1:03:06]
the regulations that have been
[1:03:08]
written and that have been
[1:03:08]
planned.
[1:03:10]
Major modifications don't need
[1:03:11]
to be addressed right now.
[1:03:13]
I think that's just totally
[1:03:14]
unheard of.
[1:03:15]
Thank you for your time.
[1:03:16]
>> okay, thank you, ma'am.
[1:03:18]
All right, about out of 15
[1:03:18]
minutes.
[1:03:19]
How many more people wish to
[1:03:23]
speak in opposition?
[1:03:25]
I see one, two, people.
[1:03:28]
Three?
[1:03:29]
Okay.
[1:03:31]
I'm going to grant --
[1:03:33]
>> there are people in the
[1:03:33]
audience as well.
[1:03:34]
>> and there are people in the
[1:03:35]
audience.
[1:03:35]
Raise your hands.
[1:03:36]
I got two people if
[1:03:38]
in the audience
[1:03:39]
as well, so that's five.
[1:03:44]
Grant five more minutes.
[1:03:46]
That please keep that in mind.
[1:03:48]
That's a minute per person
[1:03:52]
unless you have a designated
[1:03:53]
speaker.
[1:03:56]
Next speaker, please.
[1:03:57]
>> mary lavry.
[1:03:59]
>> 123 st. Martins way in
[1:04:01]
appallee beach, and I'm speaking
[1:04:05]
then in opposition to this.
[1:04:07]
My concerns are with the
[1:04:09]
existing traffic and the
[1:04:11]
intensity as lynne banks had
[1:04:13]
stated that there was a death
[1:04:17]
from our community tat was not
[1:04:18]
documented in the -- that was
[1:04:18]
not documented in the traffic
[1:04:19]
study.
[1:04:23]
I also want to talk about the
[1:04:24]
237 unit dri.
[1:04:27]
Thank you for acknowledging that
[1:04:29]
there are still questions with
[1:04:30]
that exchange because it did not
[1:04:36]
make sense to me.
[1:04:37]
, 435,000 square feet being
[1:04:42]
changed into 310,000 square feet
[1:04:44]
so that was a shortage of
[1:04:45]
275,000 square feet.
[1:04:47]
It did not make sense the math
[1:04:51]
did nt make sense to me.
[1:04:55]
Speaking about the height and
[1:04:55]
compatibility.
[1:04:57]
We in apollo beach really only
[1:04:59]
have two-story buildings so
[1:05:03]
having this now go to four story
[1:05:04]
buildings,
[1:05:05]
, that's definitely not
[1:05:06]
compatible.
[1:05:10]
We probably need to have ayes on eyes on
[1:05:11]
whether than paperwork submitted
[1:05:13]
to say yes, it's curppatible.
[1:05:14]
There is also concern for
[1:05:16]
drainage and the environmental.
[1:05:20]
As lynne also spoke about, we
[1:05:22]
are in a canal community, and
[1:05:25]
those canals are significantly
[1:05:28]
impacting our way of life, and
[1:05:33]
there is also then concern about
[1:05:36]
the coastal evacuation that has
[1:05:39]
not been addressed soy where, so I would
[1:05:41]
request the board that the
[1:05:43]
transportation access changes
[1:05:50]
have not really been resolved.
[1:05:53]
The 237 unit dri entitlement
[1:05:56]
exchange remains deficient.
[1:05:58]
The transportation staff
[1:05:59]
concerns are -- continues to
[1:06:00]
object.
[1:06:02]
And there is specific questions
[1:06:04]
regarding the intensity, the
[1:06:11]
drainage and community,
[1:06:12]
cumulative impacts.
[1:06:13]
Transportation impacts have not
[1:06:16]
been answered fully and for
[1:06:17]
these reasons I respectfully ask
[1:06:18]
the board not to approve.
[1:06:19]
>> okay, thank you, ma'am.
[1:06:26]
Next person, please.
[1:06:27]
>> michelle read.
[1:06:27]
Thank
[1:06:31]
reed, thank you verymuch.
[1:06:32]
Can you hear me.
[1:06:32]
>> yes.
[1:06:33]
>> the traffic is a problem.
[1:06:34]
I come out
[1:06:35]
out of our small
[1:06:36]
community on gulf and sea and
[1:06:38]
there are no adequate turnoffs
[1:06:38]
anywhere.
[1:06:39]
It is very dangerous to cross
[1:06:43]
from the south side of apollo
[1:06:43]
beach boulevard to the north
[1:06:45]
side in any u-turn fashion and
[1:06:46]
vice versa.
[1:06:48]
It is just extremely dangerous
[1:06:49]
and you just wait and wait and
[1:06:50]
wait.
[1:06:51]
I would like to give the rest of
[1:06:59]
my time to MR. Ahlgren to speak
[1:07:00]
to the six points.
[1:07:02]
>> can you please give your
[1:07:03]
address.
[1:07:05]
>> 423 island cay way, apollo
[1:07:06]
beach.
[1:07:14]
>> okay, next person, please.
[1:07:16]
>> mauro vitone and I believe
[1:07:17]
besides him we had two more
[1:07:21]
people signed up online.
[1:07:25]
>> hi, mario vittone.
[1:07:26]
We're the lght industrial
[1:07:28]
building to the north of the
[1:07:29]
property, and with nine acres.
[1:07:31]
I need 30 seconds.
[1:07:35]
Our concern is just the impact.
[1:07:38]
All we want to do with our land
[1:07:41]
is develop it as the pd says to
[1:07:44]
develop it, just with more, we
[1:07:48]
want to put about 20 more light
[1:07:49]
units for the people of apollo
[1:07:51]
beach to work in apollo beach.
[1:07:53]
We're just looking to put up
[1:07:54]
some places that small
[1:07:56]
businesses can open up there.
[1:07:59]
So our concern is that we'll --
[1:08:02]
if this development will impact
[1:08:03]
the amount of square footage we
[1:08:04]
have left when it comes time for
[1:08:05]
us to develop our land.
[1:08:06]
That's it.
[1:08:07]
And so it's not really -- I'm
[1:08:11]
not for or against the property.
[1:08:12]
Mostly because we moved out of
[1:08:13]
apollo beach because of traffic,
[1:08:15]
so we escaped it but it sounds
[1:08:17]
like a valid complaint but for
[1:08:18]
us, my concern is just what it
[1:08:21]
does to the, ours, chis the last
[1:08:23]
remaining land to be developed.
[1:08:24]
R in
[1:08:25]
in the zone.
[1:08:26]
Thanks very much.
[1:08:26]
>> thank you, sir.
[1:08:30]
All right, next person, please.
[1:08:35]
>> rick french.
[1:08:46]
Rick, are you there?
[1:08:50]
>> rick, are you there?
[1:08:50]
>> hello?
[1:08:53]
Hello?
[1:08:53]
>> hello, rick.
[1:08:54]
>> well, if you don't mind, I'm
[1:08:55]
going to put him on hold, there
[1:08:57]
are a couple of people in the
[1:08:58]
audience that raised their hand.
[1:08:59]
I wanted
[1:09:02]
that wanted to speak in
[1:09:02]
opposition.
[1:09:03]
If you could please come
[1:09:07]
forward.
[1:09:08]
Good evening.
[1:09:08]
>> good evening.
[1:09:09]
Thank you.
[1:09:10]
My name is robert dauby.
[1:09:14]
I live at 1407 jupawno loop,
[1:09:14]
apollo beach.
[1:09:17]
I moved to florida.
[1:09:19]
It'll be five years in JANUARY
[1:09:21]
because california turned into a
[1:09:23]
ses pit of certain things.
[1:09:28]
In areas of crime and the
[1:09:29]
whatnot hoping florida was a
[1:09:30]
little different than it is.
[1:09:34]
it's a terrific state except
[1:09:36]
this, I am all for live local
[1:09:39]
thing nat is nice but the
[1:09:40]
section 8 housing and there are
[1:09:42]
a lot of vouchers in california
[1:09:45]
and those crime rates do ego up
[1:09:46]
and has not been addressed yet.
[1:09:48]
Crime rates go up in those areas
[1:09:49]
unless there is a real good
[1:09:51]
screening of people that come
[1:09:51]
in.
[1:09:52]
I have experienced, I have a
[1:09:52]
7-year-old.
[1:09:57]
The traffic is, is out -- it's
[1:09:58]
crazy.
[1:09:59]
I've seen it increase since I
[1:10:01]
first got here five years ago.
[1:10:02]
It's just increased and as they
[1:10:04]
said there are the costcos,
[1:10:06]
there's this, the wal-mart,
[1:10:07]
they're building up like crazy.
[1:10:08]
There are homes all over the
[1:10:09]
place, and there is, you know to
[1:10:11]
put this here in apollo beach,
[1:10:11]
it'll
[1:10:13]
it'll hurt land values and if
[1:10:15]
that happens, I think then
[1:10:16]
developers that are putting this
[1:10:19]
kind of thing in should be held
[1:10:20]
responsible.
[1:10:20]
>> okay.
[1:10:20]
Thank you.
[1:10:21]
>> all right.
[1:10:21]
>> thank you, sir.
[1:10:24]
All right, one last speaker.
[1:10:26]
Sir, can I get you to sign in?
[1:10:27]
>> oh, sorry.
[1:10:31]
>> get the last speaker here.
[1:10:32]
Because time's up.
[1:10:35]
>> I live at 6510 dolphin cove
[1:10:36]
drive.
[1:10:37]
There are a lot of reasons to
[1:10:39]
not approve this, major
[1:10:40]
modification, I think we heard
[1:10:41]
them here this evening, there is
[1:10:44]
a lot of stuff with the traffic
[1:10:46]
counts that you know like I hope
[1:10:47]
everybody realizes the inbound
[1:10:48]
and outbound traffic is based
[1:10:50]
probably on the 237 units but
[1:10:51]
there is also a low income
[1:10:52]
apartment building that was
[1:10:54]
already approved that no one
[1:10:55]
could stop right beside this
[1:10:57]
current one that's up for
[1:10:58]
approval.
[1:10:58]
In addition to that, we
[1:11:00]
obviously heard that the
[1:11:01]
traffic's awful but that traffic
[1:11:03]
signal right there at 41 and
[1:11:05]
boulevard to substandard, it
[1:11:07]
cannot handle the traffic that
[1:11:08]
goes there currently.
[1:11:09]
It was originally designed for a
[1:11:11]
t intersection now it's a
[1:11:12]
four-way.
[1:11:12]
It was also the county is
[1:11:14]
getting ready to approve
[1:11:15]
administrative variance for
[1:11:17]
median spacing, the boulevard is
[1:11:19]
substandard as it is.
[1:11:20]
So I don't know why we would go
[1:11:21]
approve a variance.
[1:11:22]
In addition the county is also
[1:11:23]
going to approve a design
[1:11:26]
exception but the rode is --
[1:11:27]
road is substandardo even if you
[1:11:28]
acquire more right-of-way or get
[1:11:29]
more right-of-way to put a
[1:11:31]
shared use path in there, it's
[1:11:32]
still, there are no other shared
[1:11:34]
use paths there so why are we
[1:11:34]
jumping through hoops to approve
[1:11:35]
somebody that -- approve
[1:11:39]
something that nobody wants.
[1:11:40]
>> okay, I'm done.
[1:11:40]
>> thank you, sir.
[1:11:44]
All right, with that,
[1:11:45]
development services staff,
[1:11:49]
anything further?
[1:11:51]
>> nothing further.
[1:11:52]
Nope, transportation is saying
[1:11:57]
no as well.
[1:12:02]
>> applicant has opportunity for
[1:12:03]
rebuttal.
[1:12:04]
>> evening hearing mast, lots to
[1:12:05]
cover in five minutes.
[1:12:07]
Don't want to be late with
[1:12:09]
homework so MR. Henry is going
[1:12:10]
to talk about the assignment you
[1:12:19]
gave him, and then I'll be back.
[1:12:21]
>> we looked at the P.M. Peak
[1:12:24]
hour, and so as MR. Ratliff
[1:12:26]
ratliff had
[1:12:27]
indicated we were looking at
[1:12:30]
inbound and outbound so in this
[1:12:31]
case the A.M. Peak hour, the
[1:12:33]
apartments on top which match
[1:12:36]
MR. Ratliff's table, is 57 cars.
[1:12:39]
So that's the inbound for the
[1:12:40]
apartments.
[1:12:43]
So we compare that to the retail
[1:12:46]
trips and for 36,000 square
[1:12:49]
feet, it's about 57 trips
[1:12:51]
inbound in the P.M. And about 60
[1:12:52]
outbound.
[1:12:54]
So that's how you get that
[1:12:55]
equivalency based on the actual
[1:12:56]
trip generation.
[1:12:57]
So now again, when you look at
[1:12:59]
A.M., that's where the
[1:13:00]
difference is because of the
[1:13:01]
trip generation and A.M.
[1:13:03]
But this gives you what that is
[1:13:04]
for the P.M. Which we believe is
[1:13:05]
the appropriate --
[1:13:07]
>> as far as you know,
[1:13:09]
development services,
[1:13:13]
transportation staff, do not,
[1:13:14]
they are going to argue with you
[1:13:16]
about the P.M. Peam
[1:13:17]
peak hour.
[1:13:19]
>> it's they are going to agree
[1:13:21]
with the numbers, it's a
[1:13:24]
question of whether you do A.M.
[1:13:24]
Or P.M.?
[1:13:26]
>> you agree on the numbers?
[1:13:28]
>> on trip generation, when he
[1:13:30]
did his table, he did worst
[1:13:32]
case, which was the outbound in
[1:13:33]
the A.M.
[1:13:35]
>> all right, so I got it.
[1:13:44]
>> thank you.
[1:13:46]
>> close briefly, in 1979 the
[1:13:47]
county commission adopt
[1:13:47]
addevelopment plan for this
[1:13:49]
area, and that
[1:13:52]
preceded a lott of the
[1:13:53]
externalities of growth you
[1:13:54]
heard about.
[1:13:57]
you hear about it every time
[1:13:58]
you're on this side of the
[1:13:59]
podium.
[1:14:02]
-- how much growth we've had.
[1:14:04]
And some other infrastructure
[1:14:05]
shortages we have had.
[1:14:07]
This is popular to note but it's
[1:14:07]
through developments of any kind
[1:14:09]
that new rev nigh comes into the
[1:14:10]
county, and it's the new
[1:14:11]
buildings that fill the
[1:14:12]
potholes.
[1:14:14]
That's just math, that's how it
[1:14:15]
is.
[1:14:16]
The comprehensive plan, one of
[1:14:17]
the folks in opposition,
[1:14:19]
mentioned that the comprehensive
[1:14:21]
plan imposes some type of
[1:14:22]
ceiling on the density that
[1:14:23]
we're piercing.
[1:14:25]
This is a vested development
[1:14:27]
order that goes back to 1979.
[1:14:29]
And the trips and the uses that
[1:14:31]
are attended to that are vested
[1:14:32]
rights that run with the
[1:14:32]
property.
[1:14:33]
And again, what we're really
[1:14:38]
talking about is how those r are
[1:14:38]
exchanged.
[1:14:39]
We believe to be true to the
[1:14:41]
text it aligns with our
[1:14:43]
interpretation and our proposed
[1:14:45]
conversion that that is the most
[1:14:46]
legally defensible, strict
[1:14:48]
reading of the way the text as
[1:14:51]
it is and as it's been since
[1:14:52]
1979 and appreciate your
[1:14:52]
patience tonight.
[1:14:54]
I have nothing further.
[1:14:54]
Thanks.
[1:14:55]
>> thank you, sir.
[1:14:56]
Okay.
[1:14:57]
With that, that concludes this
[1:14:58]
application.
[1:14:59]
MS. Heinrich, we're ready for
[1:15:01]
the next case.
[1:15:02]
>> our next application is item
[1:15:06]
d.2, pd 26-0363.
[1:15:08]
The applicant is requesting to
[1:15:11]
rezone property from pd 1373 to
[1:15:12]
planned development.
[1:15:16]
I've viewed this for development
[1:15:17]
services and will provide staff
[1:15:18]
findings after the applicant's
[1:15:19]
presentation.
[1:15:31]
>>> okay, the applicant, please.
[1:15:32]
>> good evening, hearing
[1:15:34]
officer, staff members, todd
[1:15:36]
pressman, 200 second avenue
[1:15:38]
south, number 451 in
[1:15:39]
st. Petersburg.
[1:15:43]
This r intrrks pd 26-0363.
[1:15:47]
Planning commission finds
[1:15:48]
consistent, development services
[1:15:49]
supports.
[1:15:50]
There are no agency objections.
[1:15:51]
We are located in the seffner
[1:15:53]
mango area, 4.11 acres.
[1:15:54]
You can see that we're close to
[1:15:57]
I-75 and mlk, JR. Boulevard.
[1:16:01]
We're located on lakewood drive
[1:16:05]
abutting south end jim john lane
[1:16:06]
as shown by the property
[1:16:06]
appraiser.
[1:16:08]
So the issue is the pd for 14
[1:16:10]
single-family homes.
[1:16:11]
It was previously approved for
[1:16:15]
four to six single-family homes.
[1:16:17]
This is the proposed pd again
[1:16:19]
for 14 single-family homes.
[1:16:20]
It is being removed out of a
[1:16:25]
much larger pd, a companion prs
[1:16:28]
is filed.
[1:16:31]
And the existing pd is primarily
[1:16:33]
mobile home community.
[1:16:35]
This is being removed for the
[1:16:38]
single-family as indicated.
[1:16:43]
And that larger pd is a 425 unit
[1:16:45]
mobile home community.
[1:16:46]
Zoning is really sort of a mix
[1:16:49]
on the residential side.
[1:16:52]
You see rsc-6, you see as-1, a
[1:16:55]
lot of PDs, it is a variable
[1:16:59]
residential area but primarily
[1:17:01]
almost exclusively residential.
[1:17:03]
This is just to show you an
[1:17:04]
aerial to the side you can see
[1:17:05]
the scrairious
[1:17:07]
various types of residential
[1:17:10]
from mobile homes to
[1:17:11]
single-family.
[1:17:12]
Planning commission does note
[1:17:13]
we're compatible.
[1:17:14]
Could be consider for
[1:17:16]
considered for up to
[1:17:18]
three to six dwelling units and
[1:17:20]
they note the intent supports
[1:17:21]
goal 2 of the seffner mango
[1:17:22]
community plan.
[1:17:23]
Development services note while
[1:17:26]
it's located residential area
[1:17:26]
featuring single-family detached
[1:17:28]
mobile home park uses,
[1:17:29]
single-family residential,
[1:17:32]
again, a nice mix of different
[1:17:33]
various types.
[1:17:35]
The proposed density is one of
[1:17:37]
the maximum in the rs9 future
[1:17:42]
land use category.
[1:17:43]
Hearing officer, I will tell you
[1:17:45]
we sent out 26 notices two
[1:17:46]
times.
[1:17:49]
There are two letters in the
[1:17:49]
file.
[1:17:53]
One has to do with referring to
[1:17:54]
clear road improvements or
[1:17:55]
traffic study would make safety,
[1:17:57]
and would make safety and
[1:17:59]
congestion worse.
[1:18:00]
The county transportation
[1:18:04]
department does indicate no
[1:18:04]
objections.
[1:18:06]
And our transportation expert is
[1:18:07]
here.
[1:18:11]
The other letter has to do with
[1:18:12]
no infrastructure being
[1:18:13]
considered when of course
[1:18:16]
infrastructure is considered for
[1:18:17]
the location.
[1:18:21]
And concerned about lakewood
[1:18:23]
only having two lanes and there
[1:18:26]
are trees that should not be cut
[1:18:27]
down, but of course as a
[1:18:28]
standard, that's not an issue at
[1:18:30]
the moment, and that's an issue
[1:18:32]
of course that would have to go
[1:18:32]
through quite a few departments
[1:18:33]
and approvals as it would come
[1:18:35]
in for site plan.
[1:18:38]
So with that, if you have any
[1:18:39]
questions or concerns, I'd be
[1:18:46]
happy to answer them.
[1:18:48]
Jason, jason, are you here?
[1:18:49]
Do you want to make any comments
[1:18:52]
if you feel necessary?
[1:18:55]
If you would allow.
[1:18:55]
>> sure.
[1:18:57]
>> good evening: thank you.
[1:19:00]
My name is jason rinard.
[1:19:01]
I'm 3242 henderson boulevard,
[1:19:02]
tampa, florida.
[1:19:04]
I'm a landscape architect with
[1:19:05]
the group that's looked at this
[1:19:07]
from the civil and
[1:19:08]
transportation components.
[1:19:11]
We just wanted to kind of
[1:19:12]
reiterate what todd just talked
[1:19:12]
about.
[1:19:14]
We are going to have to
[1:19:16]
obviously moving forward if this
[1:19:18]
is approved we will move forward
[1:19:19]
working with, you know,
[1:19:20]
requirements of land development
[1:19:22]
code in terms of the trees.
[1:19:23]
We understand we would certainly
[1:19:25]
have to do an arborist report to
[1:19:27]
determine if there are grand
[1:19:28]
trees along lakewood drive and
[1:19:29]
certainly any impacts we would
[1:19:31]
have to address as part of that
[1:19:32]
process.
[1:19:33]
So we
[1:19:35]
we fully support we would
[1:19:36]
have to meet that criteria.
[1:19:37]
>> okay, very good.
[1:19:38]
Thank you, sir.
[1:19:41]
Please sign in.
[1:19:41]
Okay.
[1:19:44]
All right, MR. Pressman, that
[1:19:46]
conclude your presentation?
[1:19:47]
>> yes, sir, thank you.
[1:19:49]
>> all right, thank you.
[1:19:49]
All right.
[1:19:51]
Development services staff.
[1:19:52]
>> michelle heinrich,
[1:19:54]
development services.
[1:19:57]
Staff reviewed a 4.11-acre
[1:19:58]
parcel located on the west side
[1:20:00]
of lakewood drive south of clay
[1:20:01]
pit road.
[1:20:02]
the subject site is located
[1:20:05]
within the res 9 future land use
[1:20:06]
category and within the urban
[1:20:09]
service area.
[1:20:11]
The subject parcel is parcel b
[1:20:14]
within pd 18-1373.
[1:20:16]
And parcel a as you heard from
[1:20:17]
applicant, the remainder part of
[1:20:21]
this pd, is approved for a 425
[1:20:25]
space mobile home park.
[1:20:26]
Parcel b alone is permitted for
[1:20:28]
four single-family lots, which
[1:20:31]
can be subdivided or left on one
[1:20:32]
parcel.
[1:20:34]
To recognize the removal of this
[1:20:38]
parcel from pd 18-1373, the
[1:20:41]
applicant has filed a companion
[1:20:42]
prs application.
[1:20:43]
The site is located within area
[1:20:45]
developed with single-family
[1:20:47]
detached residential, and mobile
[1:20:48]
home park uses, all within the
[1:20:52]
res 9 future land use category.
[1:20:54]
The applicant's request is for
[1:20:55]
14 single-family lots resulting
[1:20:57]
in a density of 3.4 units per
[1:20:58]
acre.
[1:20:59]
Proposed development standards
[1:21:01]
are comparable to the rsc-9
[1:21:02]
standard zoning district.
[1:21:03]
Staff received no objections
[1:21:05]
from reviewing agencies, and
[1:21:07]
finds the request supportable
[1:21:08]
subject to proposed conditions
[1:21:11]
of approval.
[1:21:14]
>> just for the record, how big
[1:21:19]
was the parent pd that this is
[1:21:23]
being sort of taken away from?
[1:21:25]
>> for that one idon't know how
[1:21:29]
large the original pd is.
[1:21:32]
It is just visually when I've
[1:21:33]
looked at that site plan it is
[1:21:35]
quite large, takes up almost a
[1:21:36]
city block.
[1:21:38]
>> yeah.
[1:21:43]
And it's has approval for 400
[1:21:45]
and something mobile home park
[1:21:45]
spaces.
[1:21:46]
>> mm-hmm.
[1:21:47]
>> is density calculated the
[1:21:53]
same way for mobile home park
[1:21:54]
spaces?
[1:21:54]
>> it is.
[1:21:57]
>> so there is no issue with
[1:22:01]
this track contributing to thick the
[1:22:03]
acreage needed to maintain the
[1:22:07]
425 face mobile home park?
[1:22:08]
>> no.
[1:22:08]
In
[1:22:10]
>> okay, so thootsler
[1:22:12]
that's not an issue.
[1:22:13]
>> correct, not an issue.
[1:22:14]
>> all right, planning
[1:22:15]
commission staff.
[1:22:16]
>> lilyann linehan, planning
[1:22:17]
commission staff.
[1:22:18]
Subject property is within the
[1:22:19]
residential 9 future land use
[1:22:20]
category, and in the urban
[1:22:21]
service area, and within the
[1:22:22]
limits of the seffner mango
[1:22:25]
community plan.
[1:22:26]
Objective 1.1 of future land use
[1:22:27]
section directs 80% of the
[1:22:29]
county's anticipated growth into
[1:22:31]
the urban service area, flu's
[1:22:33]
policy 3.1.3 requires that new
[1:22:34]
development be compatible with
[1:22:35]
the surrounding uses, and
[1:22:36]
recognizes that compatibility
[1:22:38]
does not mean the same as but
[1:22:39]
refers to the sensitivity of the
[1:22:40]
development proposals and
[1:22:41]
preserving the character of
[1:22:43]
existing development.
[1:22:45]
And additionally objective 4.4
[1:22:48]
and policy 4.4.1 require new
[1:22:49]
development to be compatible
[1:22:50]
with the surrounding
[1:22:51]
neighborhood.
[1:22:52]
In this case, single-family two
[1:22:54]
two-family and multifamily uses
[1:22:56]
are present in the immediate
[1:22:56]
vicinity of the site and the
[1:22:57]
existing land use pattern
[1:22:59]
establishes a predominantly
[1:23:00]
residential context that
[1:23:01]
supports the proposed
[1:23:02]
development.
[1:23:03]
the intent of the residential 9
[1:23:05]
category is to recognize low to
[1:23:08]
medium density residential uses
[1:23:09]
and residential 9 future land
[1:23:10]
use surrounds the subject site
[1:23:13]
to the north, south, and east,
[1:23:14]
while residential 12 and urban
[1:23:16]
mixed use 20 is to the west.
[1:23:18]
The request is to allow 14 units
[1:23:19]
and is consistent with the uses
[1:23:21]
allowed under the residential 9
[1:23:22]
future land use category, and
[1:23:25]
therefore, is consistent with
[1:23:26]
future land use section goal 2
[1:23:28]
and objective 2.1.
[1:23:29]
Additionally the request
[1:23:31]
supports the intent of goal 2 of
[1:23:32]
the seffner mango community plan
[1:23:34]
and its associated strategies,
[1:23:36]
by providing additional housing
[1:23:37]
opportunities while maintaining
[1:23:39]
compatibility with the character
[1:23:40]
and development pattern of the
[1:23:41]
surrounding area.
[1:23:43]
Based upon the above
[1:23:44]
considerations and the following
[1:23:46]
goals, objectives, and policies,
[1:23:47]
planning commission staff finds
[1:23:48]
the proposed planned development
[1:23:49]
consistent with the
[1:23:50]
unincorporated hillsborough
[1:23:52]
county comprehensive plan
[1:23:53]
subject to the conditions
[1:23:54]
proposed by the hillsborough
[1:23:55]
county development services
[1:23:56]
department.
[1:23:56]
>> okay.
[1:23:58]
Thank you.
[1:24:00]
At this point in time, is there
[1:24:02]
anyone in the audience that
[1:24:03]
wishes to speak in support of
[1:24:04]
the application?
[1:24:06]
No one responding, anyone in the
[1:24:08]
audience wish to speak in
[1:24:12]
opposition to the application?
[1:24:14]
Seeing no one responding, staff,
[1:24:16]
anything further?
[1:24:18]
>> no, sir.
[1:24:19]
>> applicant, opportunity for
[1:24:19]
rebuttal.
[1:24:20]
>> we're good, thank you.
[1:24:21]
>> very good.
[1:24:22]
All right, with that, that
[1:24:25]
concludes this application.
[1:24:25]
MS. Heinrich, we're ready for
[1:24:26]
the next case.
[1:24:31]
>> our next item is item d.3, pd
[1:24:31]
26-0445.
[1:24:33]
The applicant is requesting to
[1:24:35]
rezone property from cg to
[1:24:37]
planned development.
[1:24:40]
Tangia chapela with development
[1:24:43]
services has reviewed this and
[1:24:44]
will present staff's findings
[1:24:47]
after applicant's presentation.
[1:24:48]
>> applicant, penalize.
[1:24:53]
>> good evening hearing officer.
[1:24:56]
-- this is pd 26-0445.
[1:24:57]
Planning commission finds
[1:24:59]
consistent, meets the locational
[1:25:00]
criteria.
[1:25:05]
It reduces the average trips by
[1:25:08]
3,438, reduces the A.M. Peaks
[1:25:11]
tremendously, 256, 234
[1:25:13]
respectively, no objections by
[1:25:14]
seven agencies.
[1:25:15]
We are in the general town 'n'
[1:25:19]
country area,.55 acres.
[1:25:24]
The issue is cg to pd to
[1:25:26]
specifically allow 11,979 square
[1:25:27]
feet of professional services,
[1:25:30]
health practitioners, officer,
[1:25:33]
medccialtion dental, laboratory,
[1:25:35]
medical offices, clinical with
[1:25:37]
emergency services scheduled by
[1:25:38]
physicians.
[1:25:40]
The floor would be open area for
[1:25:41]
permitted uses so we're located
[1:25:42]
on west waters avenue as you can
[1:25:44]
see here.
[1:25:46]
Per property appraiser.
[1:25:48]
Surrounding uses are shopping
[1:25:49]
center across the street,
[1:25:51]
shopping center to the west,
[1:25:53]
apartments, which are located to
[1:25:56]
the east and to the south.
[1:25:58]
This is a close aerial that you
[1:25:59]
can see in regard to the
[1:26:00]
apartments and the shopping
[1:26:01]
center next door.
[1:26:07]
the site is currently vacant.
[1:26:09]
Waters avenue carries
[1:26:10]
approximately 47,500 vehicles
[1:26:12]
per day, very intensive arterial
[1:26:13]
roadway.
[1:26:16]
So again the issue is for more
[1:26:19]
or less business professional
[1:26:21]
offices, which is a down zoning
[1:26:22]
from the commercial general that
[1:26:27]
it is now, and that is the main
[1:26:28]
direction, the main issue here
[1:26:30]
is a significant down zoning of
[1:26:31]
the uses.
[1:26:35]
So looking at the pd plan on
[1:26:37]
waters avenue, I've outlined the
[1:26:39]
building footprint as proposed.
[1:26:46]
We're showing a 15-foot building
[1:26:47]
setback -- on the east to the
[1:26:49]
rear of the apartments are
[1:26:52]
significantly further back,
[1:26:55]
75 feet, going back to the
[1:26:56]
aerial as you can see there's a
[1:27:01]
lot of separation to the south.
[1:27:03]
>> okay if you could just to
[1:27:06]
clarify for me the building
[1:27:08]
footprint is sort of a darker
[1:27:10]
solid black line?
[1:27:10]
>> yes.
[1:27:13]
>> and that building location is
[1:27:15]
closest to waters avenue?
[1:27:17]
>> yes.
[1:27:17]
>> okay.
[1:27:19]
And if you don't mind, regarding
[1:27:24]
the just to clarify, the office
[1:27:25]
space, is there parking below
[1:27:26]
the building?
[1:27:29]
>> parking would be below, yes,
[1:27:30]
below the building and some
[1:27:32]
would be to the rear.
[1:27:34]
As you note there is a note on
[1:27:36]
the conceptual plan for the
[1:27:36]
parking.
[1:27:37]
>> so there is parking below and
[1:27:39]
there are two floors of office
[1:27:39]
space?
[1:27:40]
>> three floors -- well,
[1:27:41]
proposed three floors of office
[1:27:43]
space, and then a fourth which
[1:27:45]
is really an open.
[1:27:47]
>> okay so three floors of
[1:27:49]
office space and that fourth
[1:27:51]
floor is gathering spot of some
[1:27:51]
kind.
[1:27:52]
>> is it what?
[1:27:53]
>> gathering spot.
[1:27:53]
>> yep.
[1:27:54]
>> of some kind.
[1:27:57]
>> yep.
[1:27:57]
>> okay.
[1:27:58]
>> okay and so the height
[1:28:00]
proposed is 48 feet.
[1:28:03]
So does that work?
[1:28:07]
>> we know it's a tight site,
[1:28:08]
and we know asb
[1:28:10]
as weave
[1:28:11]
we've gone
[1:28:12]
through the process there have
[1:28:14]
been a lot of issues to go
[1:28:15]
through and we know there is
[1:28:16]
going to be some nipping and
[1:28:17]
tucking.
[1:28:18]
Putting some paper
[1:28:21]
pencil to paper for
[1:28:23]
site planning it is going to be
[1:28:24]
tight.
[1:28:25]
Whether that's all going to be
[1:28:27]
able to fit into a site, we're
[1:28:28]
going to see.
[1:28:31]
>> okay, got it.
[1:28:31]
>> continue?
[1:28:32]
>> go on, yes.
[1:28:34]
>> so zoning as I've indicated
[1:28:36]
is kcg.
[1:28:40]
Cg and cn is predominant.
[1:28:43]
Rn16 for multifamily is for the
[1:28:44]
east and for the south.
[1:28:46]
That corridor is an intensive
[1:28:48]
corridor with CGs and CNs
[1:28:50]
along waters avenue.
[1:28:51]
Future land use is, 12
[1:28:54]
r12 which
[1:28:57]
allows commercial uses -- p is
[1:29:00]
down zoning.
[1:29:01]
Development service note --
[1:29:03]
permitted in the cg zoning
[1:29:05]
category.
[1:29:08]
Cg allows car wash, 24 hour
[1:29:10]
major minor autoo repair,
[1:29:11]
recyclable materiality recover
[1:29:12]
deargs material recovery,
[1:29:14]
24-hour shopping centers,
[1:29:15]
restaurants to eating
[1:29:19]
establishments not drive-thru,
[1:29:20]
banks and receptions.
[1:29:22]
We have a list of
[1:29:23]
restrictions -- actually most of
[1:29:24]
these were brought forward by
[1:29:25]
the staff which we were
[1:29:29]
accepting of them about the
[1:29:31]
fourth floor being recessed
[1:29:34]
having an opaque wall, no
[1:29:35]
balconies, disheeld
[1:29:36]
shield lighting,
[1:29:38]
screening, and location of
[1:29:40]
dumpster and loading services
[1:29:41]
would also be controlled.
[1:29:43]
Planning commission notes that
[1:29:45]
the cg which permits a broad
[1:29:47]
range of commercial uses MAY
[1:29:49]
generate greater external
[1:29:50]
impacts, and that what's
[1:29:52]
proposed are generally lower
[1:29:54]
intensity and more compatible
[1:29:55]
with adjacent multifamily
[1:29:56]
residential development.
[1:29:58]
I will say too that I did check
[1:29:58]
this morning.
[1:30:02]
We've had no e-mails or
[1:30:04]
communications of opposition or
[1:30:06]
concern raised from anyone in
[1:30:07]
the public.
[1:30:08]
Planning commission continue to
[1:30:10]
notes were consistent, directs
[1:30:11]
development toward the
[1:30:12]
appropriate land use
[1:30:14]
arrangement, crring
[1:30:16]
considering the
[1:30:17]
surrounding uses and miimizes
[1:30:19]
impacts or incompatibilities and
[1:30:20]
notes restrictions throughed
[1:30:21]
planned developments, provides a
[1:30:23]
more suitable intensity and
[1:30:25]
scale.
[1:30:28]
And notes regarding goal 7 that
[1:30:29]
it promotes employment
[1:30:31]
opportunities and contributes to
[1:30:33]
economic growth, and compatible
[1:30:34]
development pattern providing
[1:30:35]
appropriate transition between
[1:30:36]
commercial and residential which
[1:30:39]
i think is an important finding
[1:30:40]
by the planning commission for
[1:30:43]
this particular project.
[1:30:45]
Development services finds the
[1:30:45]
evelopment compatible with the
[1:30:47]
surrounding development pattern.
[1:30:48]
Staff further finds the
[1:30:49]
requested pd variance related to
[1:30:50]
buffering, screening
[1:30:50]
supportable.
[1:30:53]
So when you look at the site,
[1:30:54]
what we would suggest to you is
[1:30:58]
that the uses under cg would be
[1:31:02]
terribly impacting, terribly
[1:31:03]
disrupt fn to
[1:31:04]
disruptive to the multifamily,
[1:31:08]
which would be permissible now.
[1:31:09]
For example car washes, which
[1:31:15]
would be 24/7, outdoor banquets,
[1:31:18]
outdoor events, auto repair,
[1:31:22]
tire repair, restaurants,
[1:31:23]
24-hour restaurants, and just
[1:31:28]
for the record, I would like
[1:31:29]
to -- one second, if I MAY.
[1:31:31]
We did get one -- I'm sorry,
[1:31:32]
there was one letter, I
[1:31:36]
apologize, there was one email
[1:31:42]
of concern specifically about
[1:31:43]
stormwater.
[1:31:43]
I do have
[1:31:45]
have a letter here from the
[1:31:47]
engineer that the site is flat
[1:31:49]
but does drain south to a north
[1:31:50]
direction into a storm sewer
[1:31:52]
system within the west waters
[1:31:52]
right-of-way.
[1:31:53]
The site would be subject of
[1:31:55]
course to all meeting stormwater
[1:31:56]
requirements of the county and
[1:31:59]
swfwmd.
[1:35:57]
The applicant is proposing
[1:35:59]
enhanced screening along the
[1:36:02]
eastern and southern property
[1:36:04]
boundaries adjacent.
[1:36:06]
This is canopy trees at sa foot
[1:36:08]
intervals and this enhanced
[1:36:10]
buffering exceeds the standard
[1:36:12]
spacing requirements, will help
[1:36:13]
reduce visual impacts and
[1:36:14]
provides an appropriate
[1:36:15]
transition between the proposed
[1:36:17]
office use and the surrounding
[1:36:18]
residential development.
[1:36:20]
And lastly, the proposed
[1:36:22]
development meets the locational
[1:36:24]
criteria as the site fronts
[1:36:27]
along waters avenue and provide
[1:36:28]
office uses serving the
[1:36:29]
surrounding community.
[1:36:31]
Based upon these considerations,
[1:36:32]
the prayer
[1:36:33]
public to be
[1:36:37]
planning commission staff
[1:36:39]
finds this consistent subject to
[1:36:40]
the conditions proposed by the
[1:36:41]
hillsborough county development
[1:36:43]
services department.
[1:36:44]
>> hearing master: is there
[1:36:44]
anyone in the audience that
[1:36:46]
wishes to speak in support of
[1:36:48]
the application?
[1:36:49]
Seeing no one responding.
[1:36:50]
Anyone in the audience wish to
[1:36:56]
speak in opposition to the
[1:36:56]
application?
[1:36:58]
Seeing no one responding.
[1:37:00]
Staff anything further?
[1:37:03]
>> no, sir.
[1:37:04]
>> hearing master: michelle, if
[1:37:05]
you could, just the terminology.
[1:37:07]
In terms of the building itself,
[1:37:11]
just to be crystal clear, we say
[1:37:14]
four stories and 48 feet.
[1:37:16]
How do you -- you have ground
[1:37:17]
floor parking.
[1:37:19]
So it's below the building.
[1:37:22]
And then there's per the
[1:37:23]
applicant's testimony three
[1:37:24]
floors of office space.
[1:37:27]
And then a top floor of the
[1:37:29]
community gathering area.
[1:37:33]
So that's -- when you sa four
[1:37:36]
stories, that's fine.
[1:37:37]
>> it would not include -- I
[1:37:38]
believe they said the first
[1:37:40]
would be open parking.
[1:37:42]
>> hearing master: the top, open
[1:37:42]
underneath.
[1:37:43]
>> right, that would not be
[1:37:44]
considered a story.
[1:37:45]
>> hearing master: okay, got it.
[1:37:50]
Just wanted to make that clear.
[1:37:50]
All right, very good.
[1:37:52]
At this point in time, the
[1:37:56]
applicant has an opportunity for
[1:37:56]
rebuttal.
[1:37:58]
>> I would just say quickly that
[1:38:01]
we did notice 15 persons twice.
[1:38:06]
So we're glad that the immediate
[1:38:07]
community did not come forward
[1:38:08]
with any concerns.
[1:38:09]
Thank you.
[1:38:09]
>> hearing master: all right,
[1:38:10]
very good.
[1:38:11]
Thank you, sir.
[1:38:15]
With that, that concludes this
[1:38:15]
application.
[1:38:17]
MS. Heinrich, ready for the next
[1:38:17]
case.
[1:38:21]
>> next item is d-4, pd 26-0671.
[1:38:23]
The applicant is requesting to
[1:38:29]
rezone property from ar and pd
[1:38:31]
to planned development.
[1:38:33]
Tania chapela will provide staff
[1:38:36]
findings after the applicant's
[1:38:37]
presentation.
[1:38:37]
>> hearing master: the
[1:38:40]
applicant, please.
[1:38:42]
>> kami corbett, 400 north
[1:38:46]
ashley drive, suite 1100 tampa,
[1:38:47]
florida 33602.
[1:38:50]
Subject property is located in
[1:38:51]
the urban service area along
[1:38:53]
county road 672.
[1:38:55]
You can see it's near a lot of
[1:38:57]
development that is very similar
[1:38:59]
to what we are proposing.
[1:39:01]
We are proposing to rezone from
[1:39:03]
ar to pd.
[1:39:05]
And there is already a pd that's
[1:39:06]
approved on part of this site,
[1:39:10]
but we're converting the whole
[1:39:11]
thing.
[1:39:12]
So we are proposing standard
[1:39:16]
four units to the acre density
[1:39:19]
of 319 units -- I'm sorry.
[1:39:21]
Four units to the acre would be
[1:39:24]
319 units of proposed density of
[1:39:26]
2.75 units to the acre with a
[1:39:28]
standard 4400 square foot lot
[1:39:30]
that is pretty common in this
[1:39:31]
area.
[1:39:34]
And we have minimum setbacks of
[1:39:35]
20 feet.
[1:39:37]
Corners 10.
[1:39:38]
Side 5.
[1:39:39]
Rear 10.
[1:39:41]
Access, you can see is through
[1:39:43]
other developments, existing
[1:39:43]
developments.
[1:39:46]
So the primary access is to balm
[1:39:49]
road and we have a cross
[1:39:50]
connection to west acadia grove
[1:39:52]
line and you can see in the
[1:39:54]
staff report that traffic cannot
[1:39:58]
use that acadia grove lane.
[1:39:59]
>> hearing master: could you
[1:39:59]
repeat that?
[1:40:00]
>> I believe in the staff report
[1:40:02]
there's a condition that
[1:40:03]
construction access cannot come
[1:40:05]
and use --
[1:40:05]
>> hearing master: construction
[1:40:06]
access?
[1:40:07]
>> yes, construction access
[1:40:08]
cannot use.
[1:40:09]
>> hearing master: got it.
[1:40:10]
>> this has been found
[1:40:11]
consistent and compatible with
[1:40:13]
the comprehensive plan or many
[1:40:14]
policies that staff will review
[1:40:15]
when they present their reports
[1:40:17]
and in the interest of time, I
[1:40:18]
will yield my time and answer
[1:40:20]
any questions should you have
[1:40:20]
any.
[1:40:21]
>> hearing master: no questions.
[1:40:22]
Thank you.
[1:40:30]
Development services staff.
[1:40:33]
>> tania chapela, development
[1:40:33]
services.
[1:40:42]
I have a revised report.
[1:41:14]
>> hearing master: okay.
[1:41:18]
>> this is a request to rezone
[1:41:21]
approximately 79.9 acres from ar
[1:41:25]
and pd 93-0005 to a new planned
[1:41:28]
development allowing a maximum
[1:41:31]
of 220 single-family detached
[1:41:32]
dwelling units.
[1:41:36]
The proposed density is
[1:41:37]
approximately 2.75 dwelling
[1:41:38]
units per acre, below the
[1:41:41]
maximum density permitted by the
[1:41:44]
res-4 future land use category.
[1:41:48]
The project would provide
[1:41:51]
minimum 4,400 square foot lots,
[1:41:53]
40-foot lot width and a maximum
[1:41:56]
building height of 35 feet.
[1:41:58]
The surrounding areas include
[1:41:59]
agricultural and single-family
[1:42:01]
residential uses to the south
[1:42:04]
and the east and approved
[1:42:06]
residential development of
[1:42:08]
comparable density to the west.
[1:42:09]
Staff, therefore, finds the
[1:42:12]
proposal compatible with the
[1:42:14]
surrounding development pattern.
[1:42:15]
Development services staff
[1:42:16]
recommends approval subject to
[1:42:19]
the proposed conditions.
[1:42:21]
I'm presenting a revised report
[1:42:24]
to incorporate the
[1:42:24]
transportation conditions that
[1:42:26]
were missing in the previous
[1:42:30]
version of the report.
[1:42:32]
>> hearing master: okay, thank
[1:42:33]
you.
[1:42:33]
Planning commission staff.
[1:42:35]
>> lily linehan, planning
[1:42:36]
commission staff.
[1:42:37]
The subject property is located
[1:42:38]
within the residential 4 future
[1:42:39]
land use category.
[1:42:41]
It's within the urban service
[1:42:42]
area and within the limits of
[1:42:49]
the balm community plan,
[1:42:51]
riverview community plan.
[1:42:52]
Objective 1.1 of the future land
[1:42:54]
use directs approximately 80% of
[1:42:57]
the county's future growth and
[1:42:58]
development and F.L.U. Policy
[1:42:59]
requires that new development be
[1:43:01]
compatible with the surrounding
[1:43:01]
area.
[1:43:03]
The proposed residential
[1:43:04]
community provides an
[1:43:05]
appropriate transition between
[1:43:06]
the existing agricultural and
[1:43:08]
residential land uses and is
[1:43:10]
consistent with the established
[1:43:11]
development pattern in the
[1:43:12]
vicinity.
[1:43:13]
Additionally the intent of the
[1:43:14]
residential 4 future land use
[1:43:16]
category is to designate areas
[1:43:18]
that are suitable for low
[1:43:19]
density residential development.
[1:43:22]
And this designation permits a
[1:43:23]
maximum density of four dwelling
[1:43:25]
units per gross acre.
[1:43:27]
Based on the site's gross
[1:43:30]
acreage of 79 acres, under the
[1:43:31]
residential 4 designation they
[1:43:33]
could be allowed to consider up
[1:43:34]
to 319 dwelling units.
[1:43:36]
The applicant proposes a
[1:43:38]
residential community consisting
[1:43:39]
of 220 single-family detached
[1:43:41]
dwelling units and the proposed
[1:43:44]
development is of a use and of a
[1:43:46]
density that does not exceed the
[1:43:48]
allowable maximum under the
[1:43:49]
residential 4 future land use
[1:43:50]
category.
[1:43:51]
The development is also
[1:43:53]
consistent with the intent of
[1:43:56]
F.L.U.'s objective 4.4 and
[1:43:57]
policy 4.4.1 which require new
[1:43:58]
development to be compatible
[1:43:59]
with the character and
[1:44:00]
development pattern of
[1:44:01]
surrounding properties.
[1:44:02]
The proposed residential
[1:44:03]
community of single-family
[1:44:04]
detached homes is compatible
[1:44:06]
with the surrounding development
[1:44:07]
pattern and serves as a
[1:44:09]
complementary use to the
[1:44:11]
existing residential
[1:44:11]
neighborhoods, agricultural
[1:44:12]
lands and institutional uses in
[1:44:13]
the area.
[1:44:14]
The proposed planned development
[1:44:17]
is consistent with goal 2 of the
[1:44:18]
riverview community plan and
[1:44:20]
goal 1 of the cultural and
[1:44:23]
historical objective of the
[1:44:24]
southshore areawide systems plan
[1:44:26]
and the proposal preserves on
[1:44:28]
site wetlands and adverse
[1:44:30]
impacts so it is consistent with
[1:44:32]
the applicant comprehensive plan
[1:44:32]
policies and objectives that
[1:44:34]
cover growth in environmentally
[1:44:35]
sensitive areas.
[1:44:36]
Based possible the above
[1:44:37]
considerations and the following
[1:44:39]
goals, objectives and policies,
[1:44:39]
planning commission staff finds
[1:44:42]
the proposed planned development
[1:44:44]
consistent with the
[1:44:45]
unincorporated hillsborough
[1:44:45]
county comprehensive plan
[1:44:46]
subject to the proposed
[1:44:47]
conditions by development
[1:44:49]
services department.
[1:44:50]
>> hearing master: all right.
[1:44:51]
Thank you.
[1:44:52]
At this point in time, is there
[1:44:53]
anyone in the audience that
[1:44:55]
wishes to speak in support of
[1:44:58]
the application?
[1:45:00]
Seeing no one responding.
[1:45:01]
Anyone in the audience wish to
[1:45:04]
speak in opposition to the
[1:45:10]
application?
[1:45:13]
Yeah.
[1:45:14]
Good evening.
[1:45:17]
>> I have been sworn in.
[1:45:17]
>> hearing master: okay.
[1:45:18]
Good, raise your right hand.
[1:45:20]
Do you swear to tell the truth,
[1:45:21]
the whole truth and nothing but
[1:45:23]
the truth so help you GOD?
[1:45:24]
>> so help me GOD.
[1:45:29]
My name is al brunner, I live in
[1:45:30]
carlton lake road.
[1:45:31]
I am the PRESIDENT Of the balm
[1:45:35]
civic association.
[1:45:38]
And yes, I oppose this
[1:45:40]
development along with the other
[1:45:42]
developments that have violated
[1:45:44]
the balm community development
[1:45:47]
plan which this already said is
[1:45:50]
within, which is one house per 5 acres.
[1:45:51]
We don't want it grouped and we
[1:45:53]
don't want it reduced.
[1:45:57]
We already have too much traffic
[1:46:02]
on that main truck route and
[1:46:03]
this adds just one more entry
[1:46:05]
point into that road that's just
[1:46:09]
a two-lane road.
[1:46:12]
Our school is overloaded.
[1:46:13]
Sumner high school, during the
[1:46:15]
planning and the school board
[1:46:16]
folks -- when that went in, they
[1:46:19]
didn't plan.
[1:46:20]
They did grow so fat.
[1:46:22]
Within the second year of
[1:46:25]
operation, it was about 70%
[1:46:27]
beyond its planned capacity.
[1:46:30]
I know, my daughter graduated
[1:46:30]
there.
[1:46:32]
We don't have the firehouses.
[1:46:35]
We don't have the medical
[1:46:37]
response.
[1:46:38]
Our schools are overloaded and
[1:46:40]
all you guys do is approve more
[1:46:41]
and more housing.
[1:46:43]
Our roads are crap.
[1:46:44]
The person -- some of the people
[1:46:47]
in opposition to the apollo
[1:46:48]
beach that I got to hear before
[1:46:49]
I jumped in the car to come
[1:46:51]
running down here from balm,
[1:46:55]
since I couldn't tune in and be
[1:46:59]
made a speaker from online.
[1:47:01]
I literally got here right
[1:47:03]
before this happened.
[1:47:06]
Because I'm busy, I'm working, I
[1:47:10]
do a lot of work travel.
[1:47:11]
But the area is getting to a
[1:47:13]
point where I'm going to take my
[1:47:15]
money and our resources --
[1:47:17]
because I make good money -- and
[1:47:20]
go somewhere else that has good
[1:47:22]
planning and a balanced planning
[1:47:23]
and governance for all, not a
[1:47:25]
select few.
[1:47:26]
Get the infrastructure in there.
[1:47:32]
Don't get any more housing by
[1:47:33]
the tens of thousands.
[1:47:38]
you are coming down 674, 85 to
[1:47:39]
15,000 more homes.
[1:47:41]
We won't even talk about what
[1:47:44]
that does for reduced
[1:47:45]
agricultural capacity and
[1:47:49]
building for food.
[1:47:51]
While we reduce our capacity to
[1:47:52]
grow it locally here in
[1:47:54]
hillsborough county, we're
[1:47:55]
exponentially increasing that
[1:47:56]
demand to come from somewhere
[1:47:58]
else and assuming that those
[1:47:59]
other places aren't doing the
[1:48:02]
same thing that we're doing I
[1:48:06]
reckless overdevelopment with no
[1:48:06]
infrastructure.
[1:48:09]
We want to keep one house per 5,
[1:48:10]
that's reasonable.
[1:48:12]
It doesn't make these houses so
[1:48:13]
close together you can spit and
[1:48:15]
go across three houses.
[1:48:16]
That doesn't produce them to
[1:48:19]
make a fire hazard when they are
[1:48:21]
separated by five to 10 feet
[1:48:21]
apart.
[1:48:22]
Where you can actually drive
[1:48:23]
into your backyard.
[1:48:28]
You can actually have a
[1:48:29]
playground.
[1:48:33]
We need the right
[1:48:33]
infrastructure.
[1:48:34]
I am opposed to growth.
[1:48:35]
I would fight it and stop it
[1:48:36]
where it is.
[1:48:38]
I know that won't happen.
[1:48:39]
But every time we try to do
[1:48:43]
managed growth, this body keeps
[1:48:44]
undercutting us and letting the
[1:48:46]
developers come in and change
[1:48:48]
the rules by coming in here and
[1:48:50]
getting more changes.
[1:48:52]
Every motion to change is for
[1:48:54]
changing agriculture to high
[1:48:54]
density.
[1:48:55]
And when they do get the
[1:48:56]
approval for a lower density, a
[1:48:58]
couple of months later they come
[1:49:00]
in and ask for more density.
[1:49:04]
When they think nobody else is
[1:49:05]
watching.
[1:49:07]
You are making -- you are not
[1:49:08]
doing balanced governance.
[1:49:11]
You are not doing balanced
[1:49:11]
growth.
[1:49:12]
You're putting all the houses in
[1:49:14]
one area and no infrastructure
[1:49:17]
to get to the jobs or create
[1:49:20]
businesses, industrial,
[1:49:20]
commercial, etc. That are going
[1:49:24]
to generate the incomes without
[1:49:27]
making commutes exponentially
[1:49:27]
longer.
[1:49:30]
I know that there is some issues
[1:49:31]
with the state and some of the
[1:49:32]
state regulations.
[1:49:35]
By GOD, we need to fight it.
[1:49:36]
There's people here that want to
[1:49:39]
fight it.
[1:49:40]
So please, let's do balanced
[1:49:43]
governance.
[1:49:46]
Let's not violate the community
[1:49:47]
development plan that balm has
[1:49:52]
had for the last 20 years any
[1:49:52]
further.
[1:49:55]
1 to 5, I don't like it.
[1:49:57]
I don't like the balm grove.
[1:49:58]
It's caused all kinds of
[1:49:59]
problems.
[1:50:02]
We're having increased number of
[1:50:03]
people going on to other
[1:50:04]
people's properties as a result
[1:50:05]
of it.
[1:50:07]
We don't have the -- again, we
[1:50:09]
don't have the first responders.
[1:50:11]
We don't have the firehouses.
[1:50:13]
And everywhere is getting
[1:50:14]
exponentially longer.
[1:50:16]
As the person in apollo beach
[1:50:19]
had said, it's taking them 25
[1:50:21]
minutes plus to get just to the
[1:50:23]
interstate.
[1:50:26]
I live seven miles off the
[1:50:26]
interstate.
[1:50:28]
I have to plan at least 30
[1:50:29]
minutes plus whatever traffic
[1:50:29]
jam there is.
[1:50:31]
I don't go anywhere during rush
[1:50:33]
hour because it takes too
[1:50:34]
doggone long.
[1:50:35]
Not to mention everybody is
[1:50:37]
rushing because everybody is
[1:50:38]
trying to get to their place to
[1:50:39]
get their demands, whether to
[1:50:42]
pick up kids from school or
[1:50:44]
extra activities or just get
[1:50:45]
gas, just get groceries.
[1:50:46]
And they are rushing.
[1:50:50]
and we're having more and more
[1:50:50]
accidents.
[1:50:52]
In addition to the planning of
[1:50:54]
just the overloaded
[1:50:55]
infrastructure, not to mention
[1:51:00]
the lack of water that we have,
[1:51:12]
many of the main they areow
[1:51:12]
they
[1:51:14]
and now
[1:51:16]
everybody has to do u-turns that
[1:51:17]
generates lines which causes
[1:51:19]
more people to drive more
[1:51:20]
reckless to get to where they
[1:51:21]
want to go and cut more people
[1:51:23]
off and more accidents, again
[1:51:25]
without the first responders
[1:51:27]
that we have in existence
[1:51:27]
already.
[1:51:28]
We're already behind.
[1:51:29]
Thank you for my time.
[1:51:32]
>> hearing master: thank you,
[1:51:32]
sir.
[1:51:33]
Is there anyone else in the
[1:51:39]
audience that wishes to speak in
[1:51:39]
opposition?
[1:51:41]
No one responding.
[1:51:43]
Staff, anything further?
[1:51:45]
>> no, sir.
[1:51:46]
>> hearing master: applicant has
[1:51:49]
an opportunity for rebuttal.
[1:51:50]
>> sure, kami corbett again.
[1:51:58]
Let's go back to one of my
[1:52:00]
slides that shows -- on the
[1:52:03]
right, you'll see there's an
[1:52:07]
existing pd that allows for 200
[1:52:07]
units.
[1:52:08]
And I have a copy of that I'm
[1:52:16]
going to place in the record.
[1:52:17]
This will all fit in one place.
[1:52:18]
Thank you.
[1:52:20]
So that's existing approved
[1:52:20]
development.
[1:52:23]
And so we are just seeking 220,
[1:52:25]
so we're adding 20 additional
[1:52:27]
units to what's already
[1:52:27]
approved.
[1:52:29]
And we're just spreading the
[1:52:31]
density around the site.
[1:52:34]
The issue of density and
[1:52:35]
intensity as far as the balm
[1:52:38]
community plan, this subject
[1:52:40]
site was previously rp-2 which
[1:52:41]
has now been changed by the
[1:52:42]
board of county commissioners to
[1:52:44]
be inside the urban service
[1:52:46]
boundary and res-4.
[1:52:49]
And so what we are asking for is
[1:52:51]
2.75 units to the acre.
[1:52:52]
Under the old comprehensive
[1:52:54]
plan, we would have had to have
[1:52:56]
had a minimum density of 75%.
[1:52:57]
The board modified that policy
[1:52:59]
to allow us to be under, to have
[1:53:01]
development that is actually
[1:53:03]
under the maximum density that's
[1:53:03]
permitted.
[1:53:05]
And we are below that.
[1:53:08]
So in terms of traffic and
[1:53:10]
schools, those are -- this is
[1:53:11]
not a legislative decision.
[1:53:13]
This is a quasi-judicial
[1:53:14]
rezoning decision.
[1:53:15]
And there are certain rules that
[1:53:17]
are applied and laws that need
[1:53:19]
to be applied when analyzing the
[1:53:19]
case.
[1:53:21]
And that's what the professional
[1:53:22]
planners for the county and the
[1:53:23]
planning commission have done in
[1:53:23]
this case.
[1:53:24]
And they have found that the
[1:53:26]
proposed request is consistent
[1:53:28]
and respectfully request your
[1:53:29]
approval.
[1:53:30]
>> hearing master: okay, thank
[1:53:31]
you, ma'am.
[1:53:34]
With that, that concludes this
[1:53:35]
application.
[1:53:36]
MS. Heinrich, ready for the next
[1:53:36]
case.
[1:53:39]
>> our next application is item
[1:53:42]
d-5, pd 26-0673.
[1:53:43]
The applicant is requesting to
[1:53:48]
rezone property from rfq 9 to
[1:53:53]
planned development.
[1:53:55]
Tim lampkin will provide staff
[1:53:57]
findings after the applicant's
[1:54:05]
presentation.
[1:54:05]
>> good evening.
[1:54:08]
My name is catherine coyle with
[1:54:11]
bogs engineering, 607 south
[1:54:15]
alexander striet, plant city
[1:54:19]
representing the cdc of tampa
[1:54:20]
incorporated.
[1:54:21]
The project is located at the
[1:54:23]
southeast corner of east 23rd
[1:54:26]
avenue and 65th street.
[1:54:29]
Next slide.
[1:54:31]
The project location, as you can
[1:54:33]
see, just to the north of this
[1:54:34]
aerial is I-4.
[1:54:36]
There's a large wetland along
[1:54:38]
that area.
[1:54:40]
On the southern portion of this
[1:54:41]
aerial, the reason I included it
[1:54:43]
is that's columbus broadway.
[1:54:45]
That is about 120 feet north of
[1:54:47]
that roadway is the city of
[1:54:50]
tampa boundary, which is
[1:54:51]
predominantly industrial
[1:54:51]
commercial along that street.
[1:54:54]
And you can see the development
[1:54:55]
pattern within the area.
[1:55:00]
Next slide.
[1:55:02]
Future land use is residential
[1:55:02]
12.
[1:55:04]
We are proposing 12 units per
[1:55:05]
acre.
[1:55:06]
There's no bonus density
[1:55:07]
requested for this.
[1:55:10]
This is within the urban service
[1:55:10]
area.
[1:55:11]
And water and sewer service is
[1:55:12]
actually provided by the city of
[1:55:18]
tampa in this particular
[1:55:19]
location.
[1:55:19]
Next slide.
[1:55:22]
The zoning is rsc-9 currently.
[1:55:25]
We're requesting the pd for the
[1:55:26]
units in question.
[1:55:27]
You'll notice the pattern of
[1:55:30]
zoning surrounding the area,
[1:55:32]
rsc-9 is the bulk of the body in
[1:55:34]
there with pd surrounding from
[1:55:36]
different years, ranging all the
[1:55:40]
way back to '84 up to 2024.
[1:55:43]
There's a scattering of rdc12 as
[1:55:46]
well and a couple of commercial
[1:55:47]
properties located in this
[1:55:47]
particular district.
[1:55:49]
immediately to the north is
[1:55:54]
rsc-9, rdc12 and cg to the west.
[1:55:55]
Rsc-9 to the east.
[1:55:57]
Next slide.
[1:56:00]
The surrounding uses -- oh, next
[1:56:00]
slide, sorry.
[1:56:01]
Yeah, there you go.
[1:56:05]
The surrounding uses I put in
[1:56:06]
there just to show you.
[1:56:10]
It's a large -- previous slide,
[1:56:10]
please.
[1:56:11]
Thank you.
[1:56:15]
It's a large block.
[1:56:17]
East 23rd avenue is on the
[1:56:18]
north.
[1:56:21]
East 21t is on the south.
[1:56:23]
65th is on the west side.
[1:56:27]
The cg and the rdc12 is on the
[1:56:30]
west and that is a small -- it's
[1:56:33]
listed as a store commercial.
[1:56:35]
It's some type of vending
[1:56:35]
company.
[1:56:36]
And they have some outdoor
[1:56:38]
storage of some equipment.
[1:56:40]
Then there's a single-family
[1:56:42]
house as well to the north of
[1:56:42]
that.
[1:56:43]
There's four single-family homes
[1:56:46]
to the north side.
[1:56:48]
The large parcel to the east is
[1:56:50]
actually also owned by the
[1:56:50]
county.
[1:56:52]
And I just put this in
[1:56:53]
reference.
[1:56:54]
This property is owned by the
[1:56:55]
county as well and it's been
[1:57:00]
transferred to the cdc for
[1:57:01]
development.
[1:57:02]
There are three multi-family
[1:57:03]
buildings to the south.
[1:57:05]
And then to the southeast, I
[1:57:06]
would highlight as well there is
[1:57:08]
a public school, an elementary
[1:57:09]
school with parking.
[1:57:11]
And you can see the parking lot
[1:57:11]
there.
[1:57:15]
Next slide.
[1:57:18]
What's being proposed here,
[1:57:19]
single-family residential
[1:57:20]
duplex.
[1:57:20]
these will be platted as
[1:57:22]
single-family and sold fee
[1:57:22]
simple.
[1:57:24]
This is under agreement with
[1:57:24]
hillsborough county affordable
[1:57:27]
housing services to develop
[1:57:28]
affordable housing for homes
[1:57:33]
that are 80% ami and under only.
[1:57:34]
It is limited to that.
[1:57:36]
20 units total which meets the
[1:57:38]
12 units per acre density.
[1:57:40]
There are 10 fronting 23rd and
[1:57:43]
10 fronting 21st.
[1:57:44]
The development, as I mentioned,
[1:57:46]
will be subdivided and platted.
[1:57:49]
There's a 20-foot front setback,
[1:57:50]
6 feet interior between the
[1:57:53]
buildings, so it's 12 feet
[1:57:54]
total.
[1:57:56]
20-foot side street to north
[1:57:59]
65th and 26 feet to the east
[1:58:03]
side which is lots units 10 and
[1:58:03]
20.
[1:58:05]
We did include an additional
[1:58:07]
type "b" buffer, a 20-foot
[1:58:09]
buffer on the east side as well.
[1:58:10]
Not knowing what that future
[1:58:12]
development will be, so we
[1:58:15]
enhanced that buffer on that
[1:58:15]
side.
[1:58:17]
And there's large stormwater
[1:58:18]
area in the center of the
[1:58:20]
property which will then convey
[1:58:21]
to 65th.
[1:58:23]
Next slide.
[1:58:26]
This is the concept elevation as
[1:58:28]
of today.
[1:58:30]
It does resemble a single-family
[1:58:32]
home, however, those are two
[1:58:32]
units.
[1:58:36]
Each is approximately 1400 to
[1:58:37]
1450 square feet.
[1:58:39]
There's two units per building.
[1:58:42]
Each one will have three
[1:58:43]
bedroom, two to two and a half
[1:58:45]
bath and one car garage.
[1:58:46]
That's the front elevation and
[1:58:47]
that's the rear elevation.
[1:58:48]
So we're being careful to make
[1:58:51]
sure that both sides actually
[1:58:54]
have some ornamentation to them.
[1:58:59]
And in summary, next slide.
[1:59:02]
As I mentioned, what will be
[1:59:03]
developed is affordable housing
[1:59:05]
under an active agreement with
[1:59:06]
hillsborough county affordable
[1:59:06]
housing services.
[1:59:08]
The density is consistent with
[1:59:09]
r-12 land use category.
[1:59:11]
It is located within the urban
[1:59:13]
service boundary and serviced by
[1:59:15]
the city of tampa water and
[1:59:15]
sewer.
[1:59:16]
It's compatible with a mix of
[1:59:18]
existing residential,
[1:59:18]
commercial, institutional uses
[1:59:20]
in the surrounding areas.
[1:59:22]
It has been found consistent by
[1:59:23]
the hillsborough planning
[1:59:24]
commission.
[1:59:26]
We do agree with those findings.
[1:59:27]
Specifically, I would like to
[1:59:29]
note in the liveable communities
[1:59:31]
element under east lake orient
[1:59:33]
park which is this particular
[1:59:36]
community, it does note two
[1:59:37]
points in particular.
[1:59:39]
New residential development to
[1:59:41]
provide homeownership are
[1:59:42]
preferred, which these are going
[1:59:43]
to be fee simple.
[1:59:46]
And the plan also speaks to
[1:59:46]
support affordable housing
[1:59:47]
opportunities that accommodate a
[1:59:48]
diverse population and income
[1:59:50]
levels that promote
[1:59:53]
homeownership which this does.
[1:59:55]
This has also been recommended
[1:59:56]
as approvable by development
[1:59:57]
services staff with no
[1:59:58]
objections from other county
[2:00:00]
staff or external agencies.
[2:00:01]
We respectfully request your
[2:00:02]
approval.
[2:00:03]
>> hearing master: okay, thank
[2:00:03]
you.
[2:00:04]
>> thank you.
[2:00:05]
>> hearing master: development
[2:00:09]
services staff.
[2:00:11]
>> good evening, tim lampkin,
[2:00:13]
development services.
[2:00:16]
The applicant did a really
[2:00:19]
thorough overview so I'm going
[2:00:20]
to breeze through this.
[2:00:23]
They are proposing development
[2:00:26]
on approximately 1.71 acres
[2:00:28]
located on the northeast corner
[2:00:31]
of north 65th street and
[2:00:33]
21st avenue.
[2:00:35]
They are proposing to permit the
[2:00:40]
development of 20 affordable
[2:00:40]
duplexes.
[2:00:43]
The subject site has frontage
[2:00:45]
along east 23rd and east
[2:00:46]
21st street.
[2:00:48]
As the applicant stated with
[2:00:50]
the eastern property boundary
[2:00:51]
adjacent to vacant hillsborough
[2:00:53]
county owned property.
[2:00:55]
The property is surrounded by a
[2:00:57]
mix of existing residential,
[2:00:58]
commercial, institutional.
[2:01:02]
There's a school to the
[2:01:02]
southeast.
[2:01:04]
Duplex development is located to
[2:01:05]
the south.
[2:01:08]
The school is kinley elementary
[2:01:08]
school.
[2:01:09]
And commercial development is
[2:01:12]
located to the west with a
[2:01:13]
single-family residential to the
[2:01:15]
north and northwest.
[2:01:17]
Overall, the proposed
[2:01:18]
development provides an
[2:01:19]
appropriate transition between
[2:01:22]
the existing duplex development
[2:01:25]
to the south, the detached
[2:01:25]
single-family residential, to
[2:01:27]
the north and northwest.
[2:01:28]
The applicant has not proposed
[2:01:30]
any variations.
[2:01:32]
And based upon the
[2:01:33]
considerations, staff finds the
[2:01:35]
request approvable.
[2:01:36]
Unless you have any questions.
[2:01:38]
>> hearing master: no questions.
[2:01:38]
Thank you.
[2:01:39]
>> hearing master: planning
[2:01:40]
commission staff.
[2:01:41]
>> lily linehan, planning
[2:01:42]
commission staff.
[2:01:44]
The subject site is within the
[2:01:45]
residential 12 future land use
[2:01:46]
category within the urban
[2:01:47]
service area and within the
[2:01:49]
limits of the east lake orient
[2:01:51]
park community plan.
[2:01:54]
F.L.U.'s policy 3.1.3 requires
[2:01:54]
new development to be compatible
[2:01:56]
with surrounding uses.
[2:01:59]
And F.L.U. Objective 4.4 and
[2:02:01]
F.L.U. Policy 4.4.1 requires new
[2:02:02]
development to be compatible
[2:02:03]
with the surrounding
[2:02:04]
neighborhood.
[2:02:05]
The subject site currently
[2:02:07]
consists of undeveloped vacant
[2:02:07]
land.
[2:02:09]
There's single-family,
[2:02:10]
two-family residential
[2:02:11]
development in the adjacent area
[2:02:16]
with some existing
[2:02:16]
public/quasi-public
[2:02:17]
institutional uses and this mix
[2:02:19]
of surrounding land uses
[2:02:21]
establishes a land pattern that
[2:02:23]
supports two residential units.
[2:02:26]
And F.L.U. Objective 3.2 and
[2:02:27]
policy 3.2.4 require that
[2:02:29]
community plans throughout the
[2:02:30]
county be consistent with the
[2:02:30]
comprehensive plan.
[2:02:32]
And the housing goal of the east
[2:02:33]
lake orient park community plan
[2:02:36]
seeks to create more housing
[2:02:38]
opportunities within the area by
[2:02:40]
supporting affordable housing
[2:02:41]
opportunities that are used to
[2:02:43]
serve and accommodate a diverse
[2:02:44]
population and different income
[2:02:46]
levels and promote
[2:02:47]
homeownership.
[2:02:48]
It's also stated that new
[2:02:50]
residential developments that
[2:02:52]
provide homeownership are
[2:02:53]
preferred, however, they are not
[2:02:54]
required.
[2:02:56]
The addition of duplex style
[2:02:57]
residential development where it
[2:03:00]
currently exists alongside
[2:03:00]
single-family residential
[2:03:01]
development further promotes the
[2:03:03]
diversity of the existing
[2:03:05]
housing stock and provides
[2:03:05]
additional affordable housing
[2:03:07]
opportunities for community
[2:03:07]
residents.
[2:03:10]
And the request is for fee
[2:03:11]
simple housing so that promotes
[2:03:12]
the additional homeownership
[2:03:14]
opportunities at an affordable
[2:03:17]
rate as explicitly required by
[2:03:18]
the community plan.
[2:03:20]
Based upon the above
[2:03:21]
considerations and following
[2:03:22]
goals, objectives and policies,
[2:03:23]
planning commission staff finds
[2:03:24]
the proposed planned development
[2:03:26]
consistent with the
[2:03:27]
unincorporated hillsborough
[2:03:28]
county comprehensive plan
[2:03:29]
subject to the conditions
[2:03:30]
proposed by development
[2:03:31]
services.
[2:03:33]
>> hearing master: okay, thank
[2:03:33]
you.
[2:03:35]
At this point in time, is there
[2:03:36]
anyone in the audience that
[2:03:37]
wishes to speak in support of
[2:03:41]
the application?
[2:03:44]
>> MAY I speak, please?
[2:03:45]
>> hearing master: ma'am.
[2:03:48]
>> I'm patricia blanton, I live
[2:03:48]
right across the street from
[2:03:51]
where they want to --
[2:03:51]
>> hearing master: ma'am.
[2:03:52]
>> yes, sir.
[2:03:53]
>> hearing master: are you here
[2:03:55]
in support or here in
[2:03:56]
opposition?
[2:03:56]
>> I live on 23rd avenue.
[2:03:58]
And what they want to do is
[2:04:00]
right in front of my house.
[2:04:03]
What they want to do is put a
[2:04:05]
project there.
[2:04:07]
>> hearing master: ma'am, I need
[2:04:08]
to hear --
[2:04:14]
>> I can't hear, sir.
[2:04:14]
>> hearing master: michelle,
[2:04:15]
could you -- maybe if you get
[2:04:17]
closer to her and ask her if
[2:04:24]
she's in support or opposition.
[2:04:25]
>> I oppose.
[2:04:37]
>> hearing master: hold on.
[2:04:38]
>> no one is here to oppose it,
[2:04:40]
they are just going to push it
[2:04:40]
through.
[2:04:41]
>> you are here for the
[2:04:43]
application that was just
[2:04:43]
presented?
[2:04:44]
>> the one they just talked
[2:04:45]
about.
[2:04:45]
>> okay.
[2:04:47]
And are you here to talk in
[2:04:49]
support or opposition?
[2:04:51]
>> I oppose it.
[2:04:51]
>> okay.
[2:04:54]
I think he's going to first call
[2:04:57]
for support.
[2:04:57]
>> hearing master: yes.
[2:04:58]
>> you're for opposition, so
[2:05:02]
just stay close.
[2:05:03]
>> okay.
[2:05:04]
>> hearing master: just give it
[2:05:04]
a sec.
[2:05:05]
>> I'm sorry.
[2:05:06]
I've been sitting here since you
[2:05:10]
opened the doors.
[2:05:11]
>> hearing master: understood.
[2:05:12]
>> my ticket is running.
[2:05:13]
>> hearing master: there's
[2:05:15]
probably not anybody here in
[2:05:16]
support, but let me just ask.
[2:05:19]
>> I wish you could --
[2:05:20]
>> hearing master: ma'am.
[2:05:21]
Is there anyone in the audience
[2:05:26]
wish to speak in support of the
[2:05:26]
application?
[2:05:28]
No one responding.
[2:05:28]
All right, ma'am.
[2:05:32]
Now you wish to speak in
[2:05:32]
opposition?
[2:05:33]
>> you can come on.
[2:05:34]
>> hearing master: ma'am, you
[2:05:39]
can speak now.
[2:05:39]
>> hi.
[2:05:40]
>> hearing master: good evening.
[2:05:42]
>> I've been in the --
[2:05:43]
>> hearing master: ma'am, state
[2:05:44]
your name.
[2:05:47]
>> I was first grade in kinley.
[2:05:47]
Okay.
[2:05:48]
>> hearing master: ma'am.
[2:05:50]
>> I've seen so much destruction
[2:05:52]
here, I can't even tell you how
[2:05:52]
bad it is.
[2:05:53]
>> hearing master: can you get
[2:05:56]
her name for the record.
[2:05:56]
Hold on.
[2:05:58]
>> I'm sorry.
[2:05:59]
I wish I could hear better.
[2:06:01]
>> hearing master: that's fine.
[2:06:02]
>> state your name.
[2:06:03]
>> patricia blanton.
[2:06:07]
>> hearing master: and your
[2:06:08]
address.
[2:06:10]
>> where is the home you are
[2:06:11]
talking about?
[2:06:13]
>> I'm talking about the
[2:06:16]
property on 23rd and 65th
[2:06:16]
street.
[2:06:18]
>> what is your address?
[2:06:22]
>> mine is 6502 23rd avenue.
[2:06:23]
>> hearing master: great.
[2:06:23]
Go ahead.
[2:06:26]
Now you can speak.
[2:06:30]
>> last week alone, last week
[2:06:32]
alone 65th street they came in
[2:06:34]
with bulldozers and just raped
[2:06:37]
an area of trees that are like
[2:06:41]
over 200 years old, you know.
[2:06:43]
In one day, they are all gone.
[2:06:46]
They put a sign on the fence
[2:06:49]
over the weekend that the
[2:06:52]
environmental people were
[2:06:52]
approved of burning.
[2:06:55]
Not only did they rape the
[2:06:56]
trees, but then they wanted to
[2:06:57]
burn them.
[2:07:00]
I lost it.
[2:07:01]
I went and called the
[2:07:02]
environmental people.
[2:07:04]
Oh, it's been approved already
[2:07:06]
on the west side.
[2:07:06]
Well, guess what.
[2:07:12]
All the houses are on the east
[2:07:12]
side.
[2:07:14]
Flakes go up, houses would.
[2:07:15]
Bye-bye my home.
[2:07:17]
Now they want to put a bunch of
[2:07:18]
homes.
[2:07:19]
They want to put projects in
[2:07:20]
front of my house.
[2:07:24]
That's what they really want to
[2:07:24]
do, you know.
[2:07:28]
That whole area is just -- the
[2:07:30]
state road department was there.
[2:07:32]
They killed the water there.
[2:07:36]
And they moved down the '70s
[2:07:38]
so the lot has been empty, thank
[2:07:39]
GOD.
[2:07:41]
It used to be woods there.
[2:07:43]
You could swim at the end of the
[2:07:45]
street, natural springwater.
[2:07:47]
Well, they filled it in.
[2:07:48]
You know what they said?
[2:07:51]
I was a little girl.
[2:07:53]
I asked my mother, why don't
[2:07:56]
these people do something about
[2:07:56]
this?
[2:07:58]
I went as a little girl to this
[2:08:02]
guy, what are you doing?
[2:08:04]
We are swimming.
[2:08:05]
On top of the water the fish
[2:08:07]
were dead.
[2:08:09]
Oh, he says, oh, mother nature
[2:08:11]
will take care of itself.
[2:08:13]
Well, guess what.
[2:08:17]
They came in, filled it in with
[2:08:18]
bricks.
[2:08:19]
The land sinks like this.
[2:08:21]
There's a natural spring under
[2:08:21]
there.
[2:08:23]
There's going to be a sinkhole
[2:08:25]
there because when it rains, you
[2:08:28]
can just see it, where it used
[2:08:29]
to be.
[2:08:33]
And now they want to put -- oh.
[2:08:35]
It hurts my heart to see what
[2:08:38]
they are doing to my
[2:08:39]
neighborhood.
[2:08:41]
I'm so mad right now I'm
[2:08:41]
shaking.
[2:08:45]
>> hearing master: I can tell.
[2:08:45]
Okay.
[2:08:47]
>> they are so just -- don't
[2:08:49]
they want to breathe?
[2:08:52]
There is four recycling plants
[2:08:57]
within a mile of my home.
[2:08:58]
I have skin cancers.
[2:09:01]
i have my own well.
[2:09:02]
The water is poisoned.
[2:09:05]
I have filters on the shower, in
[2:09:06]
the kitchen.
[2:09:07]
I buy bottled water.
[2:09:14]
I can't even drink my well
[2:09:14]
water.
[2:09:20]
And they want to put more
[2:09:20]
projects.
[2:09:20]
What?
[2:09:22]
They didn't want more in the
[2:09:23]
city?
[2:09:25]
They are moving down to my
[2:09:26]
neighborhood.
[2:09:29]
Nobody is speaking up.
[2:09:30]
It's like close your eyes and
[2:09:31]
guess what.
[2:09:33]
The next day, the next week,
[2:09:35]
they are all gone, all those
[2:09:36]
trees are gone.
[2:09:40]
I went to that man's face this
[2:09:40]
morning.
[2:09:42]
I was shaking, I was so mad.
[2:09:43]
I said don't you burn.
[2:09:47]
Please don't burn.
[2:09:49]
Recycle, grind those trees up,
[2:09:53]
make them into mulch, you know.
[2:09:57]
Off of 41, you could take it
[2:09:57]
there.
[2:09:58]
You know why they didn't want to
[2:10:01]
do it that way, because it's the
[2:10:05]
quickest, cheapest way of doing
[2:10:09]
it.
[2:10:09]
>> hearing master: okay.
[2:10:10]
>> I'm done.
[2:10:10]
I don't know.
[2:10:13]
Because in my words, wasting my
[2:10:14]
time being here because nobody
[2:10:18]
is going to stand up for my
[2:10:18]
neighborhood.
[2:10:20]
Hey, tell them to wait until 10
[2:10:21]
years and I'll be gone and I
[2:10:23]
don't have to watch it.
[2:10:24]
But you know what.
[2:10:27]
My son and my family, that was
[2:10:28]
my mother's house.
[2:10:30]
I was in that neighborhood when
[2:10:36]
I was 5 years old.
[2:10:38]
>> hearing master: thank you.
[2:10:42]
>> last hurricane on 65th
[2:10:43]
street, the people that built a
[2:10:44]
new house in the back, they
[2:10:45]
built it on a spring.
[2:10:47]
And guess what happened.
[2:10:49]
The spring rose up.
[2:10:53]
They were draining their lot for
[2:10:56]
two weeks down the thing.
[2:11:01]
And it hit the apartment halfway
[2:11:01]
up.
[2:11:03]
It's going to happen again.
[2:11:04]
>> hearing master: okay.
[2:11:05]
>> I had to laugh because I used
[2:11:07]
to swim there and they filled it
[2:11:10]
in with cement and block and
[2:11:13]
built a house on it.
[2:11:14]
[Laughter]
[2:11:15]
It's all about the money and the
[2:11:19]
power in this town.
[2:11:21]
I'm a poor rich gal.
[2:11:27]
I don't owe anybody, but I don't -- I own my property and
[2:11:31]
my truck.
[2:11:32]
>> hearing master: yeah.
[2:11:32]
All right.
[2:11:33]
Thank you, ma'am.
[2:11:35]
>> they don't need that many
[2:11:37]
buildings in front of my house.
[2:11:38]
>> hearing master: okay.
[2:11:42]
>> come on!
[2:11:42]
>> hearing master: okay.
[2:11:43]
Thank you, ma'am.
[2:11:44]
>> what's going to happen with
[2:11:47]
all the --
[2:11:51]
you go down columbus drive on
[2:11:53]
65th street, they turned it
[2:11:56]
into trucker haven where all the
[2:11:57]
big rigs are.
[2:11:58]
And I was afraid.
[2:12:00]
That's why I was here today.
[2:12:01]
>> hearing master: ma'am.
[2:12:01]
>> I was afraid that they were
[2:12:03]
going to rezone it to where they
[2:12:06]
could allow to do that because
[2:12:08]
that's what they'll do.
[2:12:09]
>> hearing master: okay.
[2:12:10]
>> these truckers don't have any
[2:12:12]
place to sleep or park their
[2:12:12]
trucks.
[2:12:17]
They are parking it on 65th
[2:12:18]
street.
[2:12:18]
>> hearing master: all right.
[2:12:19]
thank you, ma'am.
[2:12:19]
Thank you.
[2:12:22]
>> I need to calm down.
[2:12:23]
>> hearing master: ma'am, let me
[2:12:24]
see if there's anyone else that
[2:12:26]
wishes to speak.
[2:12:27]
Ma'am, if I could get you to
[2:12:27]
sign in over here.
[2:12:29]
Sign your name over here.
[2:12:30]
>> I'm sorry, what?
[2:12:31]
>> hearing master: sign your
[2:12:32]
name over there.
[2:12:37]
>> sign it over there.
[2:12:37]
Yeah.
[2:12:38]
>> hearing master: thank you,
[2:12:44]
ma'am.
[2:12:45]
Is there anyone else in the
[2:12:47]
audience that wishes to speak in
[2:12:52]
opposition to the application?
[2:12:53]
No one responding.
[2:12:55]
Staff, anything further?
[2:12:56]
>> no, sir.
[2:12:57]
>> hearing master: okay.
[2:12:58]
The applicant has an opportunity
[2:13:02]
for rebuttal.
[2:13:04]
>> thank you.
[2:13:06]
Catherine coyle again for the
[2:13:07]
record.
[2:13:08]
As I mentioned previously, this
[2:13:10]
is under an agreement with
[2:13:12]
hillsborough cunty affordable
[2:13:13]
housing.
[2:13:14]
This will not be projects as
[2:13:14]
mentioned.
[2:13:16]
These are going to be fee simple
[2:13:18]
homes so they will be owned
[2:13:19]
individually, each unit.
[2:13:22]
There are 10 units facing
[2:13:25]
23rd, which is MS. Blanton's
[2:13:27]
street and 10 facing south.
[2:13:29]
All I can say is it is the
[2:13:31]
intent of the affordable housing
[2:13:32]
services department of the
[2:13:33]
county to improve this
[2:13:34]
neighborhood and establish
[2:13:38]
homeownership in this area, to
[2:13:40]
better solidify the improvements
[2:13:42]
in this area and not overbuild.
[2:13:43]
It does meet the density of the
[2:13:45]
comprehensive plan.
[2:13:47]
there is no additional bonus
[2:13:48]
sought.
[2:13:49]
There are no variances sought.
[2:13:50]
We have added additional buffers
[2:13:53]
to the east side and to the west
[2:13:55]
as well, 20 plus feet with
[2:13:57]
additional plantings.
[2:14:04]
And as you saw in the layout --
[2:14:07]
I can use the overhead.
[2:14:09]
This is, as mentioned -- I
[2:14:10]
cannot speak to the spring that
[2:14:11]
used to be there or anything.
[2:14:13]
But this is a volume sensitive
[2:14:15]
piece of property.
[2:14:16]
So there is a stormwater issue
[2:14:19]
out here which is why there is a
[2:14:22]
large stormwater pond planned
[2:14:23]
for the center of the project
[2:14:27]
that will convey to 65th.
[2:14:28]
This will again, as I mentioned,
[2:14:31]
tap into public water and sewer
[2:14:33]
with the city of tampa.
[2:14:34]
There are many properties in
[2:14:36]
this area to the north and the
[2:14:37]
surrounding area that don't
[2:14:41]
actually tap in to the public
[2:14:41]
utilities.
[2:14:42]
As mentioned by the neighbor,
[2:14:46]
with the well and the septic.
[2:14:47]
So I cannot speak to the
[2:14:48]
condition of her water.
[2:14:50]
I can say that they will be
[2:14:51]
serviced by the city of tampa
[2:14:56]
and not put any additional
[2:14:57]
impediments to her water.
[2:14:59]
>> hearing master: have you done
[2:15:00]
preliminary engineering on the
[2:15:01]
site?
[2:15:02]
>> we are working through that
[2:15:04]
now actually and this pond is
[2:15:05]
being sized accordingly.
[2:15:07]
>> hearing master: very done any
[2:15:08]
geo tech out here?
[2:15:11]
>> it was actually just
[2:15:11]
completed.
[2:15:12]
>> hearing master: all right.
[2:15:13]
Anything else?
[2:15:13]
>> that's it.
[2:15:16]
We just respectfully request
[2:15:16]
your recommendation.
[2:15:18]
>> hearing master: thank you,
[2:15:19]
ma'am.
[2:15:21]
With that, that concludes this
[2:15:21]
application.
[2:15:24]
Ready for the next item.
[2:15:26]
>> our next application is item
[2:15:30]
d-6, major mod 26-0800.
[2:15:33]
The applicant is requesting a
[2:15:37]
major modification to pd
[2:15:37]
97-0182.
[2:15:39]
This is traveling with a
[2:15:41]
comprehensive plan amendment
[2:15:42]
and, therefore, both the
[2:15:43]
comprehensive plan amendment and
[2:15:45]
this rezoning will be heard at
[2:15:48]
the OCTOBER 8th bocc cpa
[2:15:51]
public hearing.
[2:15:52]
>> hearing master: okay.
[2:15:55]
The applicant, please.
[2:16:02]
>> thank you, good evening.
[2:16:04]
Isabella hoff t.1000 north
[2:16:05]
ashley drive.
[2:16:07]
This is a little bit over
[2:16:09]
24-acre site located in the
[2:16:10]
thonotosassa community plan.
[2:16:12]
It is also in the rural service
[2:16:13]
area.
[2:16:15]
And as MS. Heinrich said, there
[2:16:16]
is a pending comprehensive plan
[2:16:18]
amendment to res-2.
[2:16:20]
And the zoning currently is
[2:16:24]
approved for 14 residential
[2:16:24]
lots.
[2:16:25]
>> hearing master: where are you
[2:16:28]
in the process with the plan
[2:16:28]
amendment?
[2:16:30]
>> we went through the first
[2:16:31]
public hearing of the planning
[2:16:33]
commission and now we're waiting
[2:16:34]
for the board.
[2:16:35]
>> hearing master: you went to
[2:16:36]
the planning commission.
[2:16:36]
>> yes.
[2:16:37]
We went to the planning
[2:16:37]
commission.
[2:16:38]
>> hearing master: and it was
[2:16:40]
heard and they voted on it?
[2:16:42]
>> it was heard and voted for
[2:16:44]
denial.
[2:16:44]
>> hearing master: denial.
[2:16:47]
>> yeah.
[2:16:47]
>> hearing master: okay.
[2:16:49]
>> and so if you look at the
[2:16:52]
area, the surrounding area is
[2:16:53]
mostly residential.
[2:16:56]
And the lot ranges -- the lot
[2:17:00]
size ranges from.2 acres to
[2:17:03]
over 5 or 10 acres.
[2:17:08]
The residential lots are located -- the more intensive
[2:17:08]
uses on the east side while the
[2:17:11]
west side is a bit more rural
[2:17:14]
and the south side is mostly
[2:17:17]
agricultural land.
[2:17:20]
So the request is for 30 units
[2:17:21]
from the approved 14.
[2:17:24]
The density is proposed at 1.2
[2:17:25]
dwelling units to the acre.
[2:17:29]
And this is to mimic currently
[2:17:31]
all the residential 1 mostly
[2:17:34]
surrounding the lake.
[2:17:37]
And prior to the comp plan
[2:17:41]
amendment, the site is about 65%
[2:17:43]
of the site is already
[2:17:44]
residential 1 while the rear
[2:17:45]
portion is ar.
[2:17:52]
So the request was for r-2 to
[2:17:53]
allow for development for less
[2:17:55]
than an acre development.
[2:17:56]
What you can see also is with
[2:17:58]
the new stormwater rules, it
[2:17:59]
takes a large portion of the
[2:18:00]
property.
[2:18:01]
So, therefore, the development
[2:18:03]
is kind of like being pushed in
[2:18:03]
the back.
[2:18:05]
That's why we are requesting
[2:18:07]
that half acre lots.
[2:18:07]
However, it's still going to be
[2:18:09]
the density that's similar to
[2:18:12]
the surrounding area.
[2:18:13]
Development services staff found
[2:18:16]
it compatible with the
[2:18:17]
surrounding area.
[2:18:19]
Planning commission, they found
[2:18:20]
it inconsistent.
[2:18:24]
Mostly when you read the report,
[2:18:27]
they basically say that the
[2:18:28]
nothing in the rural area should
[2:18:31]
be less than 5 acres, one unit
[2:18:33]
to 5 acres as shown on the land
[2:18:35]
use map.
[2:18:36]
However, our site, like I said,
[2:18:38]
of about 15 acres is already
[2:18:39]
residential 1 plus the 9-acre
[2:18:40]
was the ar.
[2:18:43]
But the amendment is for
[2:18:44]
residential 2 which is 2 units
[2:18:48]
to the acre permitting over 40
[2:18:49]
units.
[2:18:51]
But we're just limiting it to 30
[2:18:52]
units.
[2:18:56]
They also found naming different
[2:18:58]
policies, 3.1.3 and 4.4.1.
[2:19:01]
They kept referencing that the
[2:19:02]
density is not compatible with
[2:19:03]
the area.
[2:19:07]
And, therefore, they found it
[2:19:08]
inconsistent.
[2:19:11]
They also at the same time found
[2:19:13]
that the lots for policy
[2:19:15]
4.4.7 -- that the lots around
[2:19:18]
the lake are mostly one unit to
[2:19:20]
the acre and therefore the land
[2:19:21]
fronting the lake should not
[2:19:23]
have a density greater than one
[2:19:24]
unit pr the acre.
[2:19:26]
And because we're doing 1.2,
[2:19:30]
they found it inconsistent with
[2:19:30]
that.
[2:19:31]
And the report goes on and on
[2:19:34]
and on just about that the
[2:19:36]
density is too intense for the
[2:19:37]
area, yet you're supposed to
[2:19:40]
review it as a residential 2
[2:19:42]
which is two units to the acre.
[2:19:44]
And so you go to page 4, they
[2:19:46]
keep talking about the proposed
[2:19:47]
density is not compatible with
[2:19:48]
the existing development
[2:19:49]
pattern, even though there's
[2:19:53]
lots of smaller sites all along
[2:19:56]
the lake.
[2:19:58]
They talk about again the
[2:20:00]
density, the development
[2:20:00]
proposed is not compatible with
[2:20:01]
the area.
[2:20:04]
And they talk about saying
[2:20:05]
that -- I don't know how they
[2:20:06]
came up to that, but the
[2:20:08]
immediate surrounding area on
[2:20:12]
average is density of one per 45 acres.
[2:20:13]
Again, I don't exactly now
[2:20:15]
know how
[2:20:16]
they calculated that.
[2:20:18]
So they go on and on about that.
[2:20:23]
And then they go to the
[2:20:24]
community plan and naming, you
[2:20:26]
know, the third goal is that we
[2:20:33]
are not meeting the -- I was
[2:20:37]
just a bit baffled by the staff
[2:20:38]
report.
[2:20:39]
When we looked at it, we felt
[2:20:42]
like we met all those policies
[2:20:43]
that even they had stated.
[2:20:47]
We felt like we met those
[2:20:48]
policies under the res-2 which
[2:20:50]
allows half acre lots, which
[2:20:52]
allows two units to the acre and
[2:20:53]
everything.
[2:20:56]
And so it also per the community
[2:20:58]
plan provides a different
[2:21:00]
housing style that meets the
[2:21:01]
goal number 4.
[2:21:03]
It also as you can see on our
[2:21:08]
plan, it was protecting the
[2:21:08]
environmental features of the
[2:21:10]
site which is what we are doing
[2:21:11]
on the north side of the
[2:21:14]
thonotosassa road.
[2:21:17]
And so with that, we felt like
[2:21:18]
looking at all those policies
[2:21:22]
that we do feel like the request
[2:21:24]
pd is consistent with the
[2:21:26]
residential 2 future land use.
[2:21:29]
And so this kind of concludes my
[2:21:30]
application and my presentation
[2:21:30]
for now.
[2:21:32]
But I'm here if you have any
[2:21:32]
questions.
[2:21:33]
>> hearing master: all right,
[2:21:34]
thank you.
[2:21:35]
>> thank you.
[2:21:36]
>> hearing master: development
[2:21:52]
services staff.
[2:21:54]
>> good evening, tania chapela,
[2:21:55]
development services.
[2:21:57]
I'm presenting a revised report
[2:22:00]
with changes to the cpa number
[2:22:03]
that was incorrect in the
[2:22:08]
first -- it was prior to
[2:22:13]
certification condition, I'm
[2:22:14]
sorry.
[2:22:16]
Pd 26-0800 is a major
[2:22:18]
modification to increase the
[2:22:19]
approved development from 14 to
[2:22:22]
a maximum of 30 single-family
[2:22:24]
detached dwelling units.
[2:22:27]
The approximately 1.24 units per
[2:22:29]
acre density is below the
[2:22:32]
maximum anticipated under the
[2:22:33]
res-2 future land use
[2:22:36]
designation proposed through
[2:22:38]
concurrent cpa 26-10.
[2:22:39]
The development would provide
[2:22:43]
minimum half acre lots.
[2:22:44]
90-foot lot widths and maximum
[2:22:48]
building height of 35 feet and
[2:22:49]
residential setbacks intended to
[2:22:53]
maintain the area's low density
[2:22:53]
character.
[2:22:55]
The site is within thonotosassa
[2:22:57]
community plan area and is
[2:23:01]
surrounded by primarily vacant
[2:23:02]
agricultural and single-family
[2:23:04]
residential properties.
[2:23:06]
Staff finds the proposed use and
[2:23:07]
development standards comparable
[2:23:09]
to the surrounding residential
[2:23:10]
pattern.
[2:23:11]
The wetland area north of
[2:23:14]
thonotosassa road would remain a
[2:23:16]
private common area with limited
[2:23:20]
passive recreational use and no
[2:23:22]
private pleasure craft access.
[2:23:24]
The environmental permitting
[2:23:26]
requirements would continue to
[2:23:26]
apply.
[2:23:28]
Based on this consideration,
[2:23:30]
staff finds the request
[2:23:31]
compatible with the surrounding
[2:23:33]
area and recommends approval
[2:23:35]
subject to the proposed
[2:23:35]
conditions.
[2:23:36]
>> hearing master: okay, thank
[2:23:37]
you.
[2:23:38]
Planning commission staff.
[2:23:39]
>> lily linehan, planning
[2:23:40]
commission staff.
[2:23:42]
This rezoning is concurrent with
[2:23:46]
the comprehensive plan amendment
[2:23:48]
hc/cpa 26-10 which is a request
[2:23:50]
to change the future land use to
[2:23:52]
residential 2.
[2:23:54]
This has been reviewed as it
[2:23:55]
holds the residential 2 future
[2:23:56]
land use designation.
[2:23:57]
The site is within the rural
[2:23:58]
area and within the limits of
[2:24:01]
the thonotosassa community plan.
[2:24:05]
F.L.U. Objective 1.2 and 1.2.1
[2:24:07]
and 1.2.2 defines rural area for
[2:24:10]
long-term agricultural uses,
[2:24:11]
large lot uses and undeveloped
[2:24:12]
natural areas.
[2:24:15]
The major modification is for 30
[2:24:18]
single-family units on
[2:24:18]
34.22 acres.
[2:24:20]
Based on the pending land use
[2:24:21]
change to residential 2.
[2:24:24]
While the single-family use is
[2:24:26]
compatible with the character,
[2:24:27]
the density is not compatible
[2:24:28]
with the existing rural
[2:24:30]
character of the area and based
[2:24:32]
on initial staff calculations,
[2:24:33]
the immediate surrounding area
[2:24:36]
is on average ata density of 1
[2:24:37]
dwelling unit per 45 acres with
[2:24:40]
the surrounding uses being large
[2:24:41]
agricultural rural lots and low
[2:24:43]
density residential.
[2:24:44]
Additional analysis was done on
[2:24:46]
the stone lake ranch area in
[2:24:49]
development which is
[2:24:50]
approximately 2,100 feet west of
[2:24:52]
the subject site and located on
[2:24:54]
the west side of lake
[2:24:54]
thonotosassa.
[2:24:56]
The density of the stone lake
[2:25:00]
ranch development equates to
[2:25:03]
approximately one dwelling unit
[2:25:06]
to 4 gross acres and clustered.
[2:25:07]
Based on the analysis of the
[2:25:08]
surrounding existing community,
[2:25:10]
the proposed density is not
[2:25:11]
compatible with the existing
[2:25:13]
rural community character.
[2:25:15]
Furthermore, F.L.U. Policy 4.4.7
[2:25:18]
calls for lands fronting a water
[2:25:20]
body to have density and/or
[2:25:23]
intensity comparable and
[2:25:26]
compatible with others and based
[2:25:27]
on the current existing future
[2:25:29]
land use categories that
[2:25:31]
surround lake thonotosassa, the
[2:25:33]
eastern portion of the lake has
[2:25:35]
the agricultural rule 1 to 5
[2:25:36]
designation and the western
[2:25:38]
portion is surrounded by the
[2:25:38]
residential 1 designation.
[2:25:40]
There are no future land use
[2:25:41]
categories along the lake that
[2:25:43]
have a density greater than one
[2:25:45]
dwelling unit per gross acre.
[2:25:46]
While there is a concurrent
[2:25:49]
future land use amendment for
[2:25:51]
the residential 2 designation,
[2:25:54]
F.L.U. Policy 4.4.7 calls for
[2:25:55]
comparable density along the
[2:25:56]
water bodies outside the urban
[2:25:57]
service area.
[2:25:59]
A portion fronts along the south
[2:26:00]
side of lake thonotosassa.
[2:26:01]
Based upon the maximum allowable
[2:26:03]
density per the surrounding
[2:26:04]
future land use designations,
[2:26:05]
the land fronting the lake
[2:26:07]
should not have a density that
[2:26:08]
exceeds one unit per acre in
[2:26:09]
order to be consistent with this
[2:26:10]
policy direction.
[2:26:12]
The subject site is located
[2:26:14]
within the boundaries of the
[2:26:15]
thonotosassa community plan.
[2:26:17]
Goal 3 of this plan emphasizes
[2:26:18]
the importance of maintaining
[2:26:20]
the area's rural residential
[2:26:22]
character, open space and
[2:26:23]
agricultural.
[2:26:24]
The proposed modification of 30
[2:26:26]
single-family units on half acre
[2:26:28]
lots is characterized as smil
[2:26:30]
rural development and does not
[2:26:32]
maintain the current low density
[2:26:33]
rural pattern found within the
[2:26:34]
surrounding areas.
[2:26:36]
Furthermore, the comprehensive
[2:26:38]
plan strategies listed out in
[2:26:40]
the thonotosassa community plan
[2:26:42]
list out requiring minimum sizes
[2:26:43]
of 1 acre for residential
[2:26:45]
development within the
[2:26:45]
residential 1, agricultural
[2:26:47]
state and agricultural rural
[2:26:49]
future land use categories.
[2:26:52]
And even to protect the area's
[2:26:52]
rural character.
[2:26:54]
And while the proposed rezoning
[2:26:55]
is accompanied by a future land
[2:26:56]
use amendment to the residential
[2:26:58]
2 category which is not
[2:27:00]
technically required to have a
[2:27:03]
minimum lot size of 1 acre,
[2:27:03]
according to the community plan,
[2:27:05]
the site is adjacent to and
[2:27:06]
surrounded by residential 1 and
[2:27:09]
agricultural rural 1 to 5
[2:27:10]
designations on all sides and
[2:27:11]
should remain sensitive to the
[2:27:14]
lot size requirements of these
[2:27:14]
designations.
[2:27:15]
Based upon the above
[2:27:16]
considerations and following
[2:27:18]
goals and objectives and
[2:27:20]
policies of the comprehensive
[2:27:20]
plan, planning commission staff
[2:27:22]
finds the proposed major
[2:27:25]
modification inconsistent.
[2:27:26]
>> hearing master: thank you.
[2:27:27]
At this point in time, is there
[2:27:28]
anyone in the audience that
[2:27:30]
wishes to speak in support of
[2:27:36]
the application?
[2:27:37]
Good evening.
[2:27:38]
>> good evening.
[2:27:40]
My name is lori walker.
[2:27:45]
My address is 13016 country view
[2:27:46]
road, dover, florida.
[2:27:49]
I live about two miles away from
[2:27:51]
this area.
[2:27:53]
I just saw the sign for the
[2:27:58]
first time -- signs on friday,
[2:28:01]
which they were way away from
[2:28:03]
the road that's only two lanes
[2:28:06]
that people are going down.
[2:28:08]
I wouldn't have even seen them
[2:28:12]
had the county not have mowed.
[2:28:13]
It's heart breaking because we
[2:28:18]
were just here a few months
[2:28:18]
back.
[2:28:19]
Right down the street less than
[2:28:22]
a mie away, it's already been
[2:28:24]
approved for 14 homes.
[2:28:26]
I'm fine with that down
[2:28:30]
Down the street, another 14
[2:28:30]
homes.
[2:28:31]
You know change is going to
[2:28:32]
change.
[2:28:33]
People are going to buy stuff.
[2:28:34]
But we are ag.
[2:28:36]
We are res-1.
[2:28:39]
We want to continue that.
[2:28:42]
Our roads can't handle this.
[2:28:45]
The roads are so potholed out,
[2:28:47]
they barely fix them.
[2:28:51]
Half of the road on the other
[2:28:52]
side of the -- on the
[2:28:53]
thonotosassa side where they
[2:28:55]
want to put two houses, that's
[2:28:57]
very low lying.
[2:28:59]
It's always flooded out.
[2:29:01]
There's cypress over there.
[2:29:02]
The road kind of crumbles on
[2:29:07]
that side of the road all the
[2:29:07]
time.
[2:29:08]
The other one that's been
[2:29:10]
approved, they are supposed to
[2:29:11]
resurface the road.
[2:29:12]
That doesn't help.
[2:29:13]
It helps somewhat, but that's
[2:29:15]
not going to take care of the
[2:29:17]
traffic problem.
[2:29:18]
Had I have had more time, I
[2:29:22]
would have brought video of
[2:29:25]
traffic, more people would have
[2:29:25]
came.
[2:29:27]
We want to keep it where it is.
[2:29:29]
We don't want rezoning.
[2:29:33]
If they want to do the 14
[2:29:34]
houses, most everyone that I
[2:29:37]
have talked to, we're okay with
[2:29:37]
that.
[2:29:39]
Don't rip out everything.
[2:29:40]
Don't tear everything down.
[2:29:45]
You go down kingsway from
[2:29:46]
thonotosassa, they are nice
[2:29:47]
homes that are being built on
[2:29:49]
big lots.
[2:29:54]
they are not taking everything
[2:29:54]
away.
[2:29:58]
We're just seeing it day by day
[2:30:02]
getting torn down.
[2:30:04]
And literally, the
[2:30:08]
infrastructure can't handle it.
[2:30:12]
So I oppose going forward with
[2:30:14]
30 more homes, you know, in that
[2:30:14]
area.
[2:30:15]
You're putting another -- just
[2:30:17]
say three, four people in a
[2:30:18]
home.
[2:30:20]
That's another 90 to 120 people
[2:30:22]
using this little tiny dinky
[2:30:26]
road that's going to be
[2:30:27]
resurfaced.
[2:30:29]
Thank you for your time and your
[2:30:29]
consideration.
[2:30:30]
>> hearing master: all right,
[2:30:32]
thank you, ma'am.
[2:30:34]
All right.
[2:30:35]
Let me back track.
[2:30:37]
Is there anyone in the audience
[2:30:38]
that wishes to speak in support
[2:30:40]
of the application?
[2:30:45]
It's okay.
[2:30:47]
See no one responding.
[2:30:48]
Anyone else in the audience that
[2:30:49]
wishes to speak in opposition to
[2:30:51]
the application?
[2:30:51]
>> yes.
[2:30:52]
>> hearing master: please come
[2:30:52]
forward.
[2:30:54]
>> we also have two individuals
[2:30:56]
online.
[2:31:03]
>> hearing master: okay.
[2:31:04]
Good evening.
[2:31:06]
>> good evening, MR. Zoning
[2:31:06]
master.
[2:31:10]
My name is robert alvi ask.
[2:31:14]
I reside at 11907 thonotosassa
[2:31:14]
road.
[2:31:17]
I am also speaking for my
[2:31:20]
daughter elizabeth who resides
[2:31:22]
at 11907 thonotosassa road.
[2:31:25]
She cannot attend tonight.
[2:31:26]
She's working second shift and
[2:31:29]
can't be here.
[2:31:32]
I'm not sure why we're even
[2:31:32]
here.
[2:31:34]
a couple of years ago, this
[2:31:37]
property went up for a major
[2:31:38]
modification.
[2:31:39]
And it went before the county
[2:31:40]
commission acting as the zoning
[2:31:43]
board and was denied.
[2:31:45]
They tried for 24 homes, one to
[2:31:47]
an acre.
[2:31:49]
It does not fit the area.
[2:31:52]
It should not exist.
[2:31:54]
A couple of years later, we come
[2:31:56]
along and now they are trying
[2:31:57]
for 48 through the back door at
[2:32:00]
the planning commission.
[2:32:03]
Well, that didn't work either.
[2:32:33]
The math just doesn't work.
[2:32:34]
If 24 isn't viable, 30 certainly
[2:32:39]
isn't.
[2:32:40]
So, and, of course, everybody
[2:32:43]
harps on the roads.
[2:32:46]
Don't know if you know it or
[2:32:48]
not, but thonotosassa/plant city
[2:32:52]
road is I believe the oldest
[2:32:54]
paved road in unincorporated
[2:32:55]
hillsborough county.
[2:32:57]
It does not need to be modified
[2:33:00]
to handle the increased traffic.
[2:33:00]
Paved, yeah.
[2:33:10]
Modified, no.
[2:33:11]
That cannot be allowed.
[2:33:14]
It's historical.
[2:33:17]
Everybody else has said the same
[2:33:17]
thing.
[2:33:18]
The planning commission was
[2:33:25]
correct.
[2:33:27]
It doesn't fit, it shouldn't be
[2:33:32]
there, and I urge you to report
[2:33:34]
that to the commission
[2:33:35]
>> hearing master: thank you,
[2:33:35]
sir.
[2:33:40]
>> thank you, sir.
[2:33:40]
>> hearing master: is there
[2:33:41]
anyone else in the audience that
[2:33:51]
wishes to speak in opposition?
[2:33:52]
I thought I heard someone else
[2:33:53]
say they wanted to speak, maybe
[2:33:56]
I'm mistaken.
[2:33:58]
No one else wants to speak in
[2:34:01]
opposition, at this point in
[2:34:01]
time --
[2:34:03]
>> we have people online.
[2:34:06]
>> there were two people online.
[2:34:07]
>> hearing master: all right,
[2:34:08]
next speaker, please.
[2:34:10]
>> suzie lee.
[2:34:10]
>> can you hear me?
[2:34:11]
>> yes.
[2:34:17]
>> hi, I'm sue zealy, I live on
[2:34:17]
red hawk lane.
[2:34:23]
I'm speaking in opposition of
[2:34:24]
mm260800.
[2:34:26]
First, this area simply cannot
[2:34:29]
and should not sustain this type
[2:34:31]
of development on the table.
[2:34:33]
And addition ali, it's not
[2:34:35]
consistent with the area, it's
[2:34:36]
incompatible with the
[2:34:38]
comprehensive plan, and found to
[2:34:41]
be inconsistent by staff.
[2:34:43]
The road is substandard, which I
[2:34:46]
know everybody's gone over.
[2:34:48]
Did you know that thonotosassa
[2:34:50]
road is designated as a rural
[2:34:51]
scenic corridor?
[2:34:54]
How can it be rural or scenic if
[2:34:57]
it's full of traffic.
[2:35:01]
It's just -- it's just insane.
[2:35:03]
For every house, concrete pad
[2:35:05]
and additional pavement brought
[2:35:07]
in the area, the consequences to
[2:35:09]
the outlying area, and the
[2:35:13]
residents who have been here
[2:35:15]
forever are awful, they flood,
[2:35:16]
there's flooding where flooding
[2:35:18]
has never occurred.
[2:35:21]
When they built the stone lake
[2:35:22]
ranch division that was
[2:35:24]
referenced earlier, I have
[2:35:26]
friends with horse farms who
[2:35:27]
flooded who had never flooded
[2:35:30]
before, as a result of that
[2:35:30]
development.
[2:35:32]
So the consequences to the
[2:35:33]
residents that have been here,
[2:35:35]
it's just not fair.
[2:35:37]
They pay with the flooding, they
[2:35:38]
pay with the traffic, the
[2:35:41]
congested roads, and their
[2:35:42]
lifestyle.
[2:35:43]
our rural lifestyle out here,
[2:35:44]
it's totally disrupted.
[2:35:47]
And I'm not even going to
[2:35:49]
mention the wildlife that also
[2:35:49]
suffers.
[2:35:53]
We're called to be caretakers,
[2:35:57]
not destroyers of the land.
[2:35:59]
I'm not against growth, but this
[2:36:01]
growth is unparalleled in our
[2:36:02]
county, and it needs to be
[2:36:06]
stopped.
[2:36:08]
Especially during the drought.
[2:36:10]
Our roads and our environment
[2:36:11]
can't sustain it.
[2:36:13]
We will have no future for our
[2:36:15]
children and grant children if
[2:36:17]
we just continue at this pace.
[2:36:19]
So please, I ask you, do not let
[2:36:20]
this move forward.
[2:36:22]
Thank you.
[2:36:23]
>> mayor ross: okay, thank you,
[2:36:26]
ma'am.
[2:36:27]
I believe there's another person
[2:36:30]
on line that wishes to speak?
[2:36:39]
>> yes.
[2:36:42]
My name is teagan zealy.
[2:36:54]
I'm here in opposition to
[2:36:54]
mm26-0800.
[2:36:57]
I apologize for repeating
[2:36:59]
everything that everybody else
[2:37:02]
is on saying, but it needs to be
[2:37:03]
heard.
[2:37:06]
Thonotosassa is designated as a
[2:37:08]
rural scenic corridor, not a
[2:37:12]
road full of clustered planneds
[2:37:13]
development.
[2:37:15]
It isn't designed to handle the
[2:37:17]
traffic it deals with.
[2:37:18]
Furthermore, even on the row
[2:37:22]
zoning application summary, it
[2:37:24]
states that thonotosassa road is
[2:37:26]
substandard, and the future
[2:37:30]
improvements of the road are
[2:37:31]
substandard.
[2:37:33]
The property in question is
[2:37:35]
surrounded on all four sides
[2:37:39]
with ar designation, and res-1
[2:37:40]
designation, that's not
[2:37:41]
compatible with res 2.
[2:37:44]
How do you get res-2 out of
[2:37:46]
completely being surrounded with
[2:37:48]
ar and res-1.
[2:37:49]
The rezoning application
[2:37:50]
actually states in one spot,
[2:37:53]
that to the northeast of the
[2:37:56]
property or the northwest, to
[2:37:57]
the northwest of the property,
[2:37:59]
there are houses on less than 1
[2:38:01]
acre lots, I would encourage you
[2:38:03]
to look at the map.
[2:38:05]
There's a lake to the northwest
[2:38:05]
of the property.
[2:38:09]
So I'm not sure how they came up
[2:38:11]
with that one.
[2:38:13]
Pretty much everything else I
[2:38:14]
wanted to say, the staff has
[2:38:16]
already said.
[2:38:17]
I completely concur with what
[2:38:19]
the staff has said about it not
[2:38:21]
being compatible, it just does
[2:38:22]
not make sense.
[2:38:24]
I can repeat that if you wish.
[2:38:25]
I won't waste your time unless
[2:38:28]
you'd like me to.
[2:38:30]
So just going into it, the
[2:38:32]
proposed request does not
[2:38:34]
further the vision of the
[2:38:35]
thonotosassa community plan,
[2:38:38]
which requires one acre lot
[2:38:39]
minimum for residential
[2:38:41]
development, and it does not
[2:38:44]
promote compatibility within an
[2:38:45]
established rural community.
[2:38:50]
I respectfully request you to
[2:38:54]
deny this application thank you.
[2:38:56]
>> hearing master: thank you,
[2:38:56]
ma'am.
[2:38:57]
Is there anyone else in the
[2:39:00]
audience or online that wishes
[2:39:04]
to speak in opposition.
[2:39:07]
At this point in time,
[2:39:08]
development services staff,
[2:39:09]
anything further?
[2:39:12]
>> michelle heinrich, it was
[2:39:14]
noted by MISS Albert and we
[2:39:17]
neglected to put in our report
[2:39:20]
that if the project is
[2:39:22]
successful in changing to the
[2:39:25]
res 2 future land use category,
[2:39:27]
the senior corridor will change
[2:39:30]
from a rural to scenic suburban
[2:39:31]
corridor, it will go down from
[2:39:34]
30 feet to 15 feet.
[2:39:35]
>> hearing master: all right, at
[2:39:37]
this point in time, the
[2:39:40]
applicant has an opportunity for
[2:39:45]
rebuttal.
[2:39:50]
>> william malloy, tampa,
[2:39:52]
florida.
[2:39:54]
There are two distinct points I
[2:39:56]
want to touch on, the first is
[2:39:57]
thonotosassa road, we are on the
[2:39:59]
hook, and it's in the staff
[2:40:01]
report for making sure that
[2:40:05]
thonotosassa road is
[2:40:07]
appropriately wide and
[2:40:09]
resurfaced, one mile to the west
[2:40:11]
to taylor road, that's a pocket
[2:40:13]
of r-6 right there, we're going
[2:40:17]
from r-2, building a mile of
[2:40:19]
road, to r-6, that's compelling.
[2:40:21]
The planning commission has put
[2:40:24]
a lot of merit in the idea that
[2:40:27]
we're putting lakes -- excuse
[2:40:29]
me, houses on the lake, and we
[2:40:32]
need to make some kind of
[2:40:34]
adjustment with the lake.
[2:40:36]
We have no development planned
[2:40:37]
north of thonotosassa road.
[2:40:40]
All of our development is south.
[2:40:45]
If you see the site plan, it's
[2:40:47]
houses, two giant ponds.
[2:40:49]
Skip the right-of-way, and yes
[2:40:51]
our parcel front is the lake.
[2:40:52]
We're not developing on the
[2:40:54]
lake, it's far from it.
[2:40:55]
There's a point I'd like to make
[2:40:55]
too.
[2:40:58]
That I think has to be
[2:40:58]
addressed.
[2:41:01]
This case should be heard and
[2:41:03]
judged as though r2 were in
[2:41:04]
place today.
[2:41:06]
And I'm of the firm opinion that
[2:41:08]
that staff report from the
[2:41:09]
planning commission does not
[2:41:09]
consider that.
[2:41:11]
Thank you.
[2:41:11]
>> hearing master: thank you,
[2:41:13]
sir.
[2:41:15]
okay, with that, that concludes
[2:41:17]
this application, and MR.
[2:41:18]
Malloy, please sign in.
[2:41:21]
And michelle, do we wan the to
[2:41:22]
take a break now or --
[2:41:26]
>> sure, sounds good.
[2:41:28]
>> hearing master: let's just
[2:41:31]
take a 10 minute break, we'll
[2:41:32]
reconvene at 8:50.
[2:43:18]
>> thank you.
[2:43:19]
>> hearing master: ladies and
[2:43:21]
gentlemen, if we could be
[2:43:23]
seated, reconvening tonight's
[2:43:30]
AUGUST 24th, 2026zhm hearing.
[2:43:31]
Folks, if we could have a seat,
[2:43:33]
if we could get going, we have
[2:43:34]
three more items on tonight's
[2:43:40]
agenda.
[2:43:46]
>> our next application is
[2:43:46]
rz-pd26-0803.
[2:43:53]
The applicant is requesting to
[2:43:59]
rezone pd85-0286 and spi-uc-2 to
[2:44:05]
planned development.
[2:44:10]
This is combined with another
[2:44:11]
amendment that will be heard in
[2:44:13]
OCTOBER.
[2:44:16]
>> kami corbett, tampa, florida.
[2:44:18]
This site is located in the
[2:44:22]
university mall area, directly
[2:44:23]
north of the university area
[2:44:25]
mall, and this is the plan
[2:44:26]
amendment that michelle is
[2:44:29]
referring to, currently r20,
[2:44:32]
we're having a plan amendment
[2:44:34]
only to the west side of the pd
[2:44:36]
parcel, and I'll explain that in
[2:44:39]
a minute, to r35, and the
[2:44:41]
planning commission has found
[2:44:42]
that request consistent.
[2:44:45]
Both staff and the planning
[2:44:46]
commission.
[2:44:48]
The existing use was really
[2:44:50]
for -- what you have is on the
[2:44:54]
eastside of 22nd street, there's
[2:44:58]
an existing A.L.F., on the west
[2:45:00]
side is an existing retirement
[2:45:03]
home, and then there's a
[2:45:05]
parcel -- we'll number the
[2:45:06]
parcels in a little bit.
[2:45:08]
There was another parcel to the
[2:45:10]
east, this is like a major
[2:45:11]
modification, because it's a new
[2:45:12]
pd because we're adding
[2:45:19]
property.
[2:45:22]
The original pd that had
[2:45:23]
different parcels.
[2:45:27]
The alf parcel 4 is a drainage
[2:45:28]
and storm water area, that is
[2:45:29]
owned and controlled by the
[2:45:31]
property owner that owns the
[2:45:33]
eastside of 22nd street.
[2:45:35]
>> okay.
[2:45:43]
>> my client purchased both
[2:45:45]
parcel 2 and the other parcel.
[2:45:47]
The purpose of this request was
[2:45:49]
to allow for traditional
[2:45:51]
multifamily to be located on
[2:45:55]
parcel 2 and in the spi-uc
[2:45:57]
rather than limit them to
[2:45:57]
retirement.
[2:45:59]
The reason why we had to bring
[2:46:02]
in the whole pd, there was a
[2:46:07]
blended density at one point.
[2:46:11]
The A.L.F. Is computed
[2:46:12]
differently.
[2:46:14]
We had to get the additional
[2:46:17]
density allowed, and to leave
[2:46:18]
them whole.
[2:46:20]
I think they only built 110
[2:46:22]
beds, but they have entitlement
[2:46:24]
for more, and we can't take that
[2:46:25]
away from them.
[2:46:28]
This is the new parcel
[2:46:28]
configuration.
[2:46:30]
In the old pd zoning, they had
[2:46:33]
different labels, parcels, we
[2:46:34]
now in the staff report refer to
[2:46:37]
the eastside as parcel b and
[2:46:37]
parcel a.
[2:46:41]
And what we're asking for is two
[2:46:42]
development options.
[2:46:45]
The first is to allow parcel a
[2:46:47]
to be used as multifamily in the
[2:46:49]
existing buildings, no
[2:46:51]
redevelopment of the site, just
[2:46:53]
able to convert what's already
[2:46:55]
there, regular multifamily, no
[2:46:56]
age restriction.
[2:46:58]
The second was to allow for a
[2:47:00]
redevelopment of parcel a and
[2:47:02]
set paramounters for that in the
[2:47:04]
future, the immediate plan is to
[2:47:09]
utilize what's existing there at
[2:47:10]
parcel a.
[2:47:12]
And then this further -- this is
[2:47:17]
just additional explanation to
[2:47:19]
what I just said, regarding up
[2:47:22]
to 480 multifamily units on
[2:47:23]
parcel a.
[2:47:25]
That that's part of the comp
[2:47:26]
plan request.
[2:47:29]
We're asking for some pd
[2:47:30]
variations, related to the
[2:47:32]
buffering and screening, you can
[2:47:35]
see there's adequate buffering
[2:47:36]
there,ing and the idea is, we're
[2:47:39]
going to utilize these existing
[2:47:39]
buildings.
[2:47:42]
Staff has found the request
[2:47:43]
consistent and compatible with
[2:47:44]
the comprehensive plan.
[2:47:46]
There are no, os from any
[2:47:47]
reviewing agencies, and I'm here
[2:47:50]
to answer questions should you
[2:47:50]
have any.
[2:47:51]
>> hearing master: no, no
[2:47:52]
questions.
[2:47:53]
Thank you.
[2:48:00]
Development services staff.
[2:48:03]
>> good evening, tim lampkin
[2:48:03]
development services.
[2:48:05]
The applicant's proposing to
[2:48:08]
rezone approximately 22 acres,
[2:48:12]
it's located just over 200 feet
[2:48:14]
north of the intersection of
[2:48:18]
north 22nd street and university
[2:48:19]
square mall club drive, which is
[2:48:22]
the ring road surrounding
[2:48:25]
university mall north of fowler.
[2:48:33]
The overall project includes
[2:48:40]
what's currently zoned pd and
[2:48:40]
spi-uc-2.
[2:48:41]
Development standards are
[2:48:44]
applicable to parcel a.
[2:48:49]
Which is on the eastside of the
[2:48:49]
parcel.
[2:48:59]
Parcel a consists of
[2:49:01]
approximately 13.8 acres, and
[2:49:03]
they're allowed to have a
[2:49:06]
maximum of 483 dwelling units.
[2:49:08]
the staff report does say --
[2:49:10]
there will be a revised staff
[2:49:11]
report submitted later.
[2:49:14]
The staff report says 484 and it
[2:49:25]
should be 483 units.
[2:49:28]
The remaining acreage of parcel
[2:49:30]
b is within the existing pd, and
[2:49:33]
developed within an assisted
[2:49:34]
living facility.
[2:49:36]
As the applicant states, parcel
[2:49:44]
b is approved for 260 adult
[2:49:48]
congregate living a.Cl.F. Beds.
[2:49:52]
There are no changes whatsoever
[2:49:54]
to parcel b.
[2:49:56]
The applicant's requesting
[2:49:58]
relief from the 2 for 1
[2:50:01]
compatibility set back, ldc
[2:50:05]
section 6.01 which requires
[2:50:07]
structures with a permitted
[2:50:09]
height over 20 feet, to provide
[2:50:11]
additional 2 feet of set back,
[2:50:12]
for every one foot over th
[2:50:13]
building height.
[2:50:17]
The staff notes under option
[2:50:19]
one, a maximum allowable height
[2:50:22]
of 98 feet with a 1 to 1 set
[2:50:22]
back.
[2:50:25]
Based on additional set back
[2:50:27]
requirements, a setback of 98
[2:50:29]
would BEth be required,
[2:50:31]
recognizes existing building
[2:50:32]
heights and set backs, the
[2:50:37]
applicant proposes to allow
[2:50:38]
demolition of the development in
[2:50:43]
parcel b, and to develop it as a
[2:50:43]
multifamily.
[2:50:48]
Option a would be keep it as is
[2:50:50]
with the assisted living
[2:50:55]
facility, or have multifamily
[2:50:56]
unage restricted with the
[2:50:58]
existing configuration.
[2:51:01]
The applicant has submitted
[2:51:03]
justification for the proposed
[2:51:04]
relief, which staff has reviewed
[2:51:06]
and has no objections.
[2:51:07]
The staff also reviewed and
[2:51:09]
you'll make a determination,
[2:51:12]
they submitted a variance to
[2:51:16]
allow no buffer in lieu of the
[2:51:18]
required 20 foot type b parcel
[2:51:22]
a's, eastern boundary.
[2:51:23]
So more specifically, the
[2:51:25]
applicant's intent for
[2:51:27]
requesting the variation is not
[2:51:28]
the buffer on the eastern
[2:51:30]
boundary of the property,
[2:51:32]
because it's mitigated through
[2:51:33]
existing site conditions,
[2:51:36]
including a large wetland area.
[2:51:39]
Mature trees, are currently
[2:51:40]
preserved, and will continue to
[2:51:44]
be preserved by the new pd.
[2:51:45]
Staff has reviewed the
[2:51:47]
justification, and finds they
[2:51:50]
meet the criteria based upon the
[2:51:52]
above consideration, staff finds
[2:51:58]
the request approvable, subject
[2:51:59]
to conditions
[2:52:00]
>> hearing master: okay, thank
[2:52:02]
you.
[2:52:04]
>> lillian linehan plnning
[2:52:04]
commission staff.
[2:52:06]
The subject site is located
[2:52:16]
within the r-20 area, the urban
[2:52:19]
development boundaries.
[2:52:23]
To change the land use to r-35
[2:52:27]
on folio 3629 will-0000.
[2:52:28]
The analysis provided is based
[2:52:31]
on this future land use
[2:52:32]
amendment.
[2:52:35]
Objective 3.1 requires that new
[2:52:37]
development be redesigned with
[2:52:40]
due consideration, and be
[2:52:41]
compatible with the established
[2:52:43]
character of the development.
[2:52:45]
The subject site is developed
[2:52:47]
with the villas and is situated
[2:52:50]
in an area that is characterized
[2:52:54]
of a diverse mix of commercial,
[2:52:56]
institutional and senior living
[2:52:56]
uses.
[2:52:59]
The surrounding land use
[2:53:00]
pattern, and the existing urban
[2:53:01]
character of the area.
[2:53:03]
The proposed amendment is
[2:53:04]
compatible with the existing and
[2:53:06]
with the existing planned
[2:53:08]
development in the vicinity, as
[2:53:10]
it would allow for additional
[2:53:12]
residential density.
[2:53:15]
while maintaining compatibility
[2:53:17]
and community character, with
[2:53:20]
13.8 acres and r-35.
[2:53:22]
that portion of the subject site
[2:53:26]
can consider up to 483 dwelling
[2:53:26]
units.
[2:53:28]
The proposed request is not
[2:53:29]
modified,ed existing development
[2:53:30]
program remains within the range
[2:53:33]
of uses and development
[2:53:35]
intensities, contemplated by the
[2:53:36]
future land use designations.
[2:53:38]
The proposed planned development
[2:53:41]
is also consistent with goal two
[2:53:42]
of the university area community
[2:53:43]
plan, as it facilitates
[2:53:48]
residential uses and an area
[2:53:50]
targeted for redevelopment and
[2:53:50]
reinvestment.
[2:53:54]
The planned development supports
[2:53:56]
the expanding of housing
[2:53:58]
opportunities and encouraging
[2:53:59]
redevelopment of underutilized
[2:54:00]
properties.
[2:54:02]
The proposed planned
[2:54:04]
development, provides on site
[2:54:06]
wetlands, making the request
[2:54:07]
condition sift end with the
[2:54:10]
objectives and policies that
[2:54:11]
govern growth in environmentally
[2:54:13]
sensitive areas.
[2:54:14]
Based on the above
[2:54:15]
considerations, and the
[2:54:17]
following goals, objectives and
[2:54:20]
policies, planning commission
[2:54:25]
staff finds this plan consistent
[2:54:26]
with the hillsborough county
[2:54:27]
comprehensive plan.
[2:54:30]
>> tim lampkin again.
[2:54:32]
I just realized, hi a couple
[2:54:34]
other minor items that will be
[2:54:36]
part of a revised staff report,
[2:54:37]
and I wanted to put those into
[2:54:38]
the record.
[2:54:42]
On the cover page, says 6.8 acre
[2:54:44]
modified parcel, it should be
[2:54:46]
parcel a located.
[2:54:49]
And on the 3rd bullet point, add
[2:54:52]
a requirement on parcel a just
[2:54:54]
to specify for more clarity,
[2:54:55]
it's only parcel a.
[2:54:58]
And then on the next bullet
[2:55:00]
point, cross out the modified
[2:55:03]
parcel and just specify parcel
[2:55:06]
a, and then on the last
[2:55:08]
paragraph, regarding the current
[2:55:10]
comprehensive plan amendment,
[2:55:11]
crossout modified and put parcel
[2:55:12]
a.
[2:55:14]
And then on the first bullet
[2:55:16]
point, cross out the property
[2:55:18]
after six acres and the folio
[2:55:24]
number which is 36928-0000.
[2:55:26]
And then correct the acreage in
[2:55:29]
all instances.
[2:55:31]
The density for the requirement,
[2:55:34]
it was rounded up to 14, the
[2:55:37]
actual is 13.8.
[2:55:46]
And then to add 260 adds for
[2:55:46]
clarity.
[2:55:50]
And on the east set back, on
[2:55:55]
page 2 at parcel a250 feet,
[2:55:58]
parcel b at 250 feet.
[2:55:59]
Parcel d at 35 feet.
[2:56:02]
And that concludes, thank you.
[2:56:03]
>> hearing master: when do you
[2:56:05]
think those changes will be in
[2:56:05]
optics?
[2:56:06]
>> tomorrow morning.
[2:56:10]
>> hearing master: thank you.
[2:56:11]
At this point in time, is there
[2:56:13]
anyone in the audience that
[2:56:17]
wishes to speak in support of
[2:56:18]
the application?
[2:56:20]
Seeing no one responding, anyone
[2:56:22]
in the audience wishing to speak
[2:56:25]
in opposition to the
[2:56:26]
application?
[2:56:29]
Seeing no one responding.
[2:56:29]
Staff anything further?
[2:56:32]
>> yes, of course, MISS Corbett
[2:56:34]
can address this when she comes
[2:56:36]
up for her rebuttal, we received
[2:56:38]
an email from her today
[2:56:40]
regarding some revised
[2:56:41]
conditions, and I didn't know if
[2:56:46]
she was still proposing those or
[2:56:46]
not.
[2:56:48]
>> hearing master: we'll let her
[2:56:51]
address that on rebuttal.
[2:56:55]
Applicant, an opportunity for
[2:56:55]
rebuttal?
[2:56:58]
>> kami corbett, in reviewing
[2:57:00]
them, I think I've decided not
[2:57:01]
to pursue them this evening.
[2:57:03]
Some of them are nice to have,
[2:57:05]
and they're not anything that
[2:57:06]
needs to be introduced this
[2:57:07]
evening
[2:57:13]
>> hearing master: okay.
[2:57:15]
I listened to the changes, they
[2:57:17]
sounded like typos.
[2:57:18]
>> correct, they were
[2:57:19]
clarifying.
[2:57:20]
Most of the changes we
[2:57:22]
submitted, we're clarifying,
[2:57:23]
making them better or more
[2:57:24]
clear, and that's why I didn't
[2:57:26]
go into all of that this
[2:57:26]
evening.
[2:57:28]
I didn't think it was important.
[2:57:30]
>> hearing master: got it.
[2:57:30]
Okay.
[2:57:31]
Anything else?
[2:57:33]
>> no, thank you.
[2:57:33]
>> hearing master: with that,
[2:57:40]
that concludes this application.
[2:57:45]
>> our next application is
[2:57:45]
mm26-0822.
[2:57:47]
The applicant is requesting a
[2:57:52]
modification from pd92-0135.
[2:57:54]
Tim lampkin will provide staff's
[2:57:56]
findings after the applicant's
[2:57:58]
presentation.
[2:58:02]
Applicant please opinion.
[2:58:03]
>> good evening.
[2:58:07]
Todd pressman, 200 second
[2:58:10]
avenue, st. Petersburg, florida.
[2:58:14]
This is 260822.
[2:58:16]
The sd supports, no agency
[2:58:17]
objections, and as of this
[2:58:22]
morning, there were no emails or
[2:58:25]
letters in the record.
[2:58:27]
We're in the brandon area, 1.78
[2:58:28]
acres.
[2:58:31]
Located just immediately south
[2:58:32]
of state route 60.
[2:58:35]
There are two parcels on
[2:58:35]
morningside drive.
[2:58:37]
right behind that commercial
[2:58:39]
structure as you see there.
[2:58:41]
Issue is a major modification
[2:58:46]
for multifamily duplex, to multi
[2:58:46]
multifamily.
[2:58:49]
Proposed 16 units and two
[2:58:49]
structures.
[2:58:52]
The current pd is 18 duplexes,
[2:58:54]
two common buildings, and one
[2:58:56]
single family.
[2:59:00]
And we're proposing 16 townhome
[2:59:01]
units.
[2:59:03]
So again two parcels the with
[2:59:04]
the commercial building to the
[2:59:04]
north.
[2:59:06]
Looking at the budding uses is
[2:59:08]
the commercial building, you
[2:59:10]
have commercial to the west.
[2:59:12]
You have a small residential,
[2:59:14]
that's also zoned cg.
[2:59:17]
To the rear is commercial, and
[2:59:19]
to the east are two single
[2:59:22]
family residentials.
[2:59:24]
Planning commission notes the
[2:59:25]
surrounding development,
[2:59:27]
consists of a mixture of
[2:59:29]
commercial and residential uses.
[2:59:31]
Development services notes the
[2:59:33]
same thing, a mixture of
[2:59:37]
commercial, shopping retail,
[2:59:39]
restaurants and automotive
[2:59:41]
oriented businesses on brandon
[2:59:42]
boulevard.
[2:59:43]
With residential subdivision
[2:59:46]
generally located # behind the
[2:59:47]
commercial frontage.
[2:59:49]
Which is what this area is.
[2:59:51]
Both those findings are
[2:59:52]
important, because it
[2:59:54]
characterize the vicinity very
[2:59:58]
well, in terms of the
[2:59:59]
compatibility or the existence
[3:00:02]
of the commercial and the
[3:00:03]
residential next to each other
[3:00:04]
throughout that corridor.
[3:00:08]
So when you look at the zoning,
[3:00:11]
you'll see cg, and the rsc-6,
[3:00:13]
which is similar to the
[3:00:13]
corridor.
[3:00:17]
And future land use is oc20,
[3:00:19]
which is a more intensive
[3:00:20]
category.
[3:00:21]
That is reflected along the
[3:00:24]
corridor as the zoning is.
[3:00:27]
So the east abutting, in terms
[3:00:29]
of the abutting uses, I'm
[3:00:31]
showing you the townhome
[3:00:33]
structure, that is the eastern
[3:00:35]
townhome structure, there's 2.
[3:00:36]
Looking specifically at the
[3:00:38]
buffer, we show on the plan, a
[3:00:41]
20 foot building set back and a
[3:00:43]
10 foot type a with ornamental
[3:00:43]
trees.
[3:00:46]
As we went through a lot of
[3:00:47]
discussions, both with natural
[3:00:49]
resources and the staff, on the
[3:00:50]
certified plan, we're going to
[3:00:53]
show that as a 15 foot buffer.
[3:00:56]
So we were able to expand that
[3:01:01]
additional 5 feet, primarily cr
[3:01:03]
roads and transportation found
[3:01:05]
us a few extra feet, so that
[3:01:06]
will be five feet extra on this
[3:01:08]
site, I want to highlight that
[3:01:10]
to you, so there's no confusion
[3:01:12]
when you look at the pd plan.
[3:01:13]
Importantly, on that eastside,
[3:01:14]
as I have it.
[3:01:18]
I have it as 125 feet from
[3:01:19]
building to building.
[3:01:21]
The two residentials are located
[3:01:24]
pretty far from this site.
[3:01:27]
They're located fronting on the
[3:01:30]
access street, which is
[3:01:31]
morningside
[3:01:31]
morningside.
[3:01:38]
So there is a lot of physical
[3:01:40]
separation between the two on
[3:01:41]
the eastside.
[3:01:43]
And just to give you an idea,
[3:01:44]
you can see the station behind
[3:01:46]
the site, these are the
[3:01:48]
residential -- the two
[3:01:50]
residentials, you see the front
[3:01:51]
on morningside.
[3:01:53]
On the west, I'm showing you the
[3:01:54]
single townhome structure as
[3:01:57]
well on the west.
[3:02:00]
The plan shows the 10-foot
[3:02:02]
building set back, we'll be able
[3:02:04]
to expand that another five
[3:02:08]
feet, on this certified plan
[3:02:11]
will show a 5 foot -- a 10 foot
[3:02:14]
wide buffer, versus the 5 foot,
[3:02:16]
we're going to eke out another 5
[3:02:16]
feet.
[3:02:18]
It's important to know that
[3:02:20]
residential structure is only
[3:02:22]
half of the distance, the other
[3:02:24]
distance is commercial activity,
[3:02:27]
and commercial zoning where
[3:02:30]
notes come.
[3:02:32]
And there's substantial
[3:02:33]
forestation and screening, that
[3:02:34]
would be above and beyond what
[3:02:36]
code calls for.
[3:02:40]
I have it as 35 feet, but again,
[3:02:41]
with some good screening between
[3:02:43]
the two.
[3:02:44]
Development services notes with
[3:02:46]
the additional proposed
[3:02:48]
buffering and screening, they
[3:02:50]
find the uses compatible and
[3:02:52]
supportable, with the additional
[3:02:54]
proposed landscaping and
[3:02:55]
buffering.
[3:02:55]
Planning commission notes that
[3:02:58]
the attached homes would provide
[3:03:00]
a residential use that is
[3:03:05]
compatible with the existing
[3:03:07]
residential.
[3:03:08]
Compatible with existing
[3:03:09]
development patterns around the
[3:03:12]
area.
[3:03:13]
It is substantially below the
[3:03:15]
maximum that could be allowed.
[3:03:18]
It is consistent with valrico
[3:03:21]
community goal plan 1.
[3:03:23]
Strategy 2, also important to
[3:03:24]
notice, this would be a
[3:03:26]
reduction of trips, not a lot,
[3:03:29]
it would be 23 in the 24 hour
[3:03:31]
volume, and just a little bit in
[3:03:32]
the A.M. And peak hour.
[3:03:33]
With that, we're happy to answer
[3:03:38]
the questions you MAY have.
[3:03:39]
>> hearing master: you went
[3:03:42]
through how you added five feet
[3:03:44]
additional buffering side.
[3:03:45]
the staff met with you and
[3:03:49]
discussed that, and are they
[3:03:51]
supporting the variance to the
[3:03:52]
landscaping buffering?
[3:03:54]
>> yeah, supporting it along
[3:03:55]
with the change I indicated to
[3:03:56]
you, yes.
[3:03:58]
Both on the east and west.
[3:03:59]
>> hearing master: got it, thank
[3:04:01]
you.
[3:04:03]
At this point -- are you done?
[3:04:05]
>> yes, thank you.
[3:04:06]
>> hearing master: development
[3:04:07]
services staff?
[3:04:10]
>> good evening.
[3:04:12]
And to clarify, the applicant is
[3:04:14]
not requesting any variance of
[3:04:17]
the buffer, but I'll go through
[3:04:18]
it, and make certain that
[3:04:25]
portion is really clear and why
[3:04:27]
he is -- staff had compatibility
[3:04:29]
concerns du to the proximity of
[3:04:31]
the structure, to the existing
[3:04:34]
single family home to the east
[3:04:35]
and to the southwest.
[3:04:37]
And due to that, I reached out
[3:04:38]
to the applicant and as the
[3:04:43]
applicant stated, transportation
[3:04:44]
planner was able to determine
[3:04:47]
that there was a road didn't --
[3:04:49]
the road didn't need to be as
[3:04:51]
wide as the applicant initially
[3:04:53]
thought, so there was an
[3:04:55]
additional ten feet, and the
[3:04:56]
applicant provided to increase
[3:05:02]
the buffer on the west -- I'm
[3:05:07]
sorry, on the west side from 5
[3:05:09]
feet to 10.
[3:05:13]
Yeah, from five feet to 10 feet
[3:05:15]
type a with ornamental trees.
[3:05:19]
Where before they were proposing
[3:05:25]
a 10-foot -- I'm sorry, a 5-foot
[3:05:26]
with.
[3:05:28]
Let me look at the site plan.
[3:05:38]
Bear with me one second.
[3:05:40]
Essentially they increased the
[3:05:42]
buffer 5 feet on each side.
[3:05:47]
And it increases the set back 5
[3:05:50]
feet on each side.
[3:05:52]
Doing that staff was able to
[3:05:53]
find it supportable.
[3:05:56]
The applicant's request is to
[3:05:59]
develop 16 townhomes, and two
[3:06:01]
different structures, replacing
[3:06:08]
the existing entitlements.
[3:06:10]
And -- and as the applicant
[3:06:13]
stated, there is a substantial
[3:06:15]
distance from the single family
[3:06:17]
home, however, if someone sells,
[3:06:20]
they could be a lot closer than
[3:06:22]
they are right now.
[3:06:24]
The applicant's requesting
[3:06:26]
relief, though, he's not
[3:06:28]
requesting any variations, he's
[3:06:29]
skieding the land development
[3:06:30]
code requirements.
[3:06:33]
He's requesting relief from the
[3:06:35]
additional 2 for 1, which is one
[3:06:36]
additional foot for every foot
[3:06:38]
over 20 feet.
[3:06:39]
So he's going 35.
[3:06:41]
That's 30 feet.
[3:06:43]
And he's not meeting that.
[3:06:47]
And he's provided justification
[3:06:49]
within his narrative for the
[3:06:51]
relief of the additional 30 foot
[3:06:53]
set back, for the proposed
[3:06:55]
townhome height, and adjacent
[3:06:57]
single family homes.
[3:06:58]
The applicant is required --
[3:07:00]
normally, he would be required
[3:07:02]
to provide a 5 foot wide buffer
[3:07:04]
with type a screening.
[3:07:06]
In lieu of not meeting the
[3:07:07]
additional compatibility
[3:07:09]
standard for the height, over
[3:07:13]
20, he's enhancing the buffer.
[3:07:14]
Staff does note that the current
[3:07:16]
approval limits development on
[3:07:20]
the subject property to 18
[3:07:22]
one-story duplex structures with
[3:07:24]
a maximum density of 11 units
[3:07:33]
per acre, as established by
[3:07:33]
pd92-0135.
[3:07:36]
And the applicant also has
[3:07:37]
provided further justification
[3:07:40]
with their narrative request for
[3:07:41]
relief.
[3:07:44]
Further proposed, 30 foot
[3:07:45]
townhome height.
[3:07:47]
staff acknowledges the existing
[3:07:49]
single family residence on the
[3:07:51]
adjacent property situated
[3:07:52]
toward the front portion of the
[3:07:54]
parcel, and currently separated
[3:07:55]
by a proposed development,
[3:07:57]
however, the zoning of the
[3:07:59]
parcel would allow redevelopment
[3:08:02]
and a setback of 25 feet.
[3:08:03]
Therefore, staff evaluated it
[3:08:07]
the way we did, based upon what
[3:08:08]
could be built there.
[3:08:10]
With the additional proposed
[3:08:11]
buffering and screening.
[3:08:14]
Staff finds the proposed
[3:08:19]
mitigated, and the uses
[3:08:20]
compatible with the support, the
[3:08:22]
additional proposed landscaping
[3:08:24]
and buffering, and based upon
[3:08:26]
all that, staff finds the
[3:08:29]
request approvable.
[3:08:30]
>> hearing master: okay.
[3:08:32]
Thank you.
[3:08:33]
Planning commission staff?
[3:08:36]
>> lily linehan, planning
[3:08:36]
commission staff.
[3:08:39]
The site is designated as office
[3:08:40]
commercial 20 on the future land
[3:08:41]
use map.
[3:08:43]
The site is within the urban
[3:08:46]
service area within the limits
[3:08:48]
of the valrico community plan.
[3:08:50]
There's a transition between
[3:08:51]
established commercial and
[3:08:52]
residential development.
[3:08:54]
There are commercial uses
[3:08:55]
located to the north and wet of
[3:08:56]
the site.
[3:08:58]
And residential is located to
[3:09:00]
the south and east.
[3:09:01]
This is compatible with the
[3:09:06]
existing residential uses and
[3:09:08]
provides an appropriate use --
[3:09:10]
under flu objective 2.2 and
[3:09:13]
policy 2.2.1, the category
[3:09:17]
allows for the consideration of
[3:09:20]
compatible development with a
[3:09:24]
maximum capacity of 708 acres,
[3:09:29]
up to 35 dwelling units MAY be
[3:09:31]
considered, approximately 9
[3:09:35]
dwelling units per acre, which
[3:09:39]
is below the max allowed.
[3:09:44]
This meets the objective of flu
[3:09:48]
1.1, objective 4.4, and 4.4.1,
[3:09:49]
by providing appropriate
[3:09:50]
transition between the
[3:09:51]
commercial and residential uses
[3:09:52]
that are existing.
[3:09:55]
The proposed density is below
[3:09:59]
the maximum presented.
[3:10:01]
The applicant is also proposing
[3:10:04]
to preserve the existing natural
[3:10:07]
forestation along the site.
[3:10:10]
And providing forest taking for
[3:10:12]
the adjacent residential
[3:10:13]
properties.
[3:10:15]
Morningside drive is a
[3:10:18]
substandard roadway, and has
[3:10:20]
committed to road improvements.
[3:10:21]
And these commitments are
[3:10:24]
consistent with the
[3:10:25]
infrastructure and mobility
[3:10:28]
goals of the valrico community
[3:10:28]
plan.
[3:10:29]
The planning commission staff
[3:10:32]
finds the major modification
[3:10:34]
consistent with the
[3:10:35]
unincorporated hillsborough
[3:10:35]
county comprehensive plan.
[3:10:37]
Subject to conditions proposed
[3:10:40]
by the development services
[3:10:40]
department.
[3:10:44]
>> hearing master: thank you.
[3:10:44]
Is there anyone in the audience
[3:10:45]
that wishes to speak in support
[3:10:46]
of the application?
[3:10:49]
Seeing no one responding?
[3:10:51]
Anyone in the audience wish to
[3:10:53]
speak in opposition to the
[3:10:53]
application.
[3:10:56]
Seeing no one responding.
[3:10:56]
Staff, anything further?
[3:10:59]
>> no, sir.
[3:11:00]
>> hearing master: applicant, an
[3:11:02]
opportunity for rebuttal?
[3:11:04]
>> just to put on the record, we
[3:11:06]
noticed 24 people, I believe we
[3:11:08]
noticed twice, we've had no
[3:11:10]
feedback or response, thank you.
[3:11:11]
>> hearing master: thank you,
[3:11:12]
with that, this concludes this
[3:11:17]
application.
[3:11:20]
We are ready for the next case.
[3:11:23]
>> pd26-0974.
[3:11:25]
The applicant is requesting to
[3:11:30]
rezone property from as-1 to
[3:11:33]
planned development.
[3:11:40]
Chris granlinier will present
[3:11:41]
after the applicant's
[3:11:44]
presentation.
[3:11:45]
>> hearing master: applicant
[3:11:46]
please.
[3:11:49]
>> good evening, brian deon,
[3:11:51]
johnson pope, 400 north ashley
[3:11:55]
drive, tampa florida.
[3:11:57]
I'm here on behalf of the
[3:11:58]
applicant.
[3:12:03]
Leaders company, llc, regarding
[3:12:04]
pd26-0974, the proposed
[3:12:06]
development consists of a single
[3:12:08]
story convenience store of
[3:12:11]
approximately 4,852 square feet,
[3:12:12]
with a maximum of 12 fueling
[3:12:15]
stations.
[3:12:17]
The request is to change the use
[3:12:21]
category from as-1 to pd.
[3:12:23]
The future land use category
[3:12:28]
will remain unchanged.
[3:12:30]
Staff has identified some issues
[3:12:33]
today that I wish to aggress.
[3:12:36]
-- address, that really fall
[3:12:38]
into two separate categories.
[3:12:40]
Is this a neighborhood serving
[3:12:41]
commercial development
[3:12:42]
appropriate at this location?
[3:12:44]
And the record demonstrates that
[3:12:45]
it is.
[3:12:47]
The second question involves
[3:12:49]
several technical matters
[3:12:51]
concerning wetlands, really two
[3:12:53]
separate issues, wetlands and
[3:12:54]
transportation issues that
[3:12:57]
remain to be finalized, and
[3:13:00]
we're asking to condition our
[3:13:01]
development on addressing those
[3:13:03]
two matters, which I will get
[3:13:06]
into more detail with.
[3:13:07]
While we understand there's
[3:13:10]
legitimate issues that are being
[3:13:11]
addressed through -- that need
[3:13:13]
to be addressed through
[3:13:15]
subsequent approvals, this is a
[3:13:18]
pd rezoning application.
[3:13:20]
Our request today is rather
[3:13:21]
straightforward.
[3:13:22]
We approve the land use, subject
[3:13:25]
to the conditions that we are
[3:13:28]
going to request, and ask the
[3:13:33]
county to consider with this pd
[3:13:33]
application.
[3:13:36]
The site would be used for a
[3:13:37]
convenience store for gas
[3:13:38]
stations.
[3:13:40]
There would be a maximum of 12
[3:13:43]
pumps and a canopy serving those
[3:13:43]
pumps.
[3:13:47]
We meet isr and far
[3:13:47]
requirements.
[3:13:48]
Building coverage requirements,
[3:13:51]
and parking space
[3:13:51]
requirementsing.
[3:13:53]
The building would be one story.
[3:13:57]
We have implemented front rear
[3:13:59]
and side set backs that match
[3:14:02]
the set backs that are
[3:14:03]
consistent with the surrounding
[3:14:06]
area.
[3:14:09]
This is the general location of
[3:14:11]
the property.
[3:14:14]
Surrounding this area, first and
[3:14:16]
foremost, we have veterans
[3:14:18]
highway, which is.3 miles from
[3:14:18]
the site.
[3:14:25]
And there's also additional
[3:14:27]
storefronts, there's walmart 1.3
[3:14:28]
miles away.
[3:14:30]
There are restaurants that are
[3:14:33]
about 2 miles away as well, such
[3:14:36]
as olive garden.
[3:14:37]
This is the plan, which I am
[3:14:40]
going to provide a little more
[3:14:41]
zoomed in version of it.
[3:14:43]
In the red shows the general
[3:14:44]
location of the building.
[3:14:47]
as mentioned, it is within the
[3:14:50]
wetlands setback, which we are
[3:14:53]
asking to condition the pd
[3:14:56]
approval on a variance for the
[3:14:57]
wetlands set back itself.
[3:14:59]
and then you can see the buffers
[3:15:01]
that we have set up around the
[3:15:01]
property.
[3:15:03]
The wetland just to show you
[3:15:07]
visually is in the northwest
[3:15:09]
corner of the property.
[3:15:13]
And we would also be developing
[3:15:16]
sidewalks and pedestrians access
[3:15:18]
points for -- that are 10 feet
[3:15:19]
wide, that would provide a
[3:15:22]
sidewalk itself, but also allow
[3:15:34]
for bikes to traverse in the
[3:15:43]
immediate area.
[3:15:45]
The property -- I do have my
[3:15:46]
engineer here, who can address
[3:15:47]
the drives in and out, as well
[3:15:49]
as the sidewalks.
[3:15:52]
>> good evening, jeremy anderson
[3:15:55]
here, with common oak
[3:15:56]
engineering, orlando.
[3:15:57]
Thank you for the opportunity to
[3:15:58]
be here before you tonight.
[3:16:00]
I'm going to talk a little bit
[3:16:03]
about the proposed driveway
[3:16:05]
access points that are proposed.
[3:16:06]
>> hearing master: okay.
[3:16:08]
>> we have a right in, right out
[3:16:11]
driveway, proposed to bellamy
[3:16:13]
road, which is the drive on the
[3:16:15]
east end side of the project
[3:16:15]
there.
[3:16:20]
It is proposed to be restricted
[3:16:22]
with a raised median.
[3:16:26]
The driveway access includes
[3:16:27]
right-of-way expansion.
[3:16:29]
This driveway is going to be
[3:16:31]
designed in conformance with the
[3:16:36]
traffic study that has been
[3:16:36]
prepared.
[3:16:38]
And again is going to include a
[3:16:39]
raised median as well.
[3:16:41]
It will include a right-of-way
[3:16:42]
expansion on both sides of the
[3:16:43]
road.
[3:16:47]
We will be working with the
[3:16:49]
county on that expansion, on the
[3:16:51]
east hand side.
[3:16:56]
For the driveway connection
[3:16:59]
onner lick, it's another right
[3:17:00]
in, right out driveway.
[3:17:03]
it includes a left turn lane
[3:17:05]
extension for the eastbound
[3:17:05]
driver.
[3:17:09]
And a new right turn lane into
[3:17:12]
the property for that westbound
[3:17:12]
driver.
[3:17:16]
Once again, that right turn lane
[3:17:18]
is going to require an expansion
[3:17:19]
of the right-of-way.
[3:17:21]
Not only for the right turn
[3:17:25]
lane, but also the multiuse
[3:17:28]
trail that's depicted there and
[3:17:30]
a crossed hatch manner.
[3:17:32]
Utilities -- utility services
[3:17:35]
are available, there's a force
[3:17:36]
main available for connection on
[3:17:37]
the right-of-way.
[3:17:39]
There's a 20 inch water main
[3:17:42]
located as well.
[3:17:44]
So again, public utility
[3:17:46]
services are available to the
[3:17:47]
property.
[3:17:48]
On site storm water management,
[3:17:51]
once the trips are captured on
[3:17:55]
site, all the maneuvers will be
[3:17:58]
confined in the property itself.
[3:18:00]
So I want to run through that.
[3:18:01]
And I thank you again for the
[3:18:02]
opportunity to do so.
[3:18:05]
>> hearing master: thank you.
[3:18:08]
>> as skbrar my mentioned, the
[3:18:09]
property is located within the
[3:18:10]
urban service area.
[3:18:13]
The comprehensive plan
[3:18:14]
contemplates growth within the
[3:18:15]
community.
[3:18:18]
And this is a prime spot for
[3:18:19]
that type of growth.
[3:18:21]
The county's commercial
[3:18:25]
locational criteria is met by
[3:18:27]
this location and the proposed
[3:18:27]
use.
[3:18:30]
The criteria exists for a
[3:18:30]
reason.
[3:18:33]
They identify neighborhoods
[3:18:35]
where they appropriately serve
[3:18:36]
residential developments,
[3:18:39]
without allowing residential
[3:18:42]
development to migrate within
[3:18:47]
residential areas, this is on
[3:18:52]
ehrlich road, which is a large
[3:18:52]
corridor.
[3:18:54]
The principle land use concern
[3:18:56]
that was raised by development
[3:18:58]
services is compatibility.
[3:19:00]
Compatibility does not mean that
[3:19:03]
every adjoining property must be
[3:19:05]
categorized within the same use.
[3:19:07]
The question is whether the
[3:19:10]
proposed development can co
[3:19:11]
exist without creating
[3:19:13]
reasonable impacts.
[3:19:14]
First, this is a planned
[3:19:15]
development, a planned
[3:19:19]
development, we are allowed to
[3:19:22]
work with county staff and the
[3:19:24]
local area to develop what that
[3:19:25]
plan means.
[3:19:28]
We're not asking for a broad
[3:19:30]
commercial rezoning of this
[3:19:31]
district.
[3:19:33]
And the county has the ability
[3:19:35]
through this process, to control
[3:19:36]
the use.
[3:19:39]
The buffering, the lighting, and
[3:19:40]
other characteristics of the
[3:19:45]
development itself.
[3:19:48]
Through time we have submitted
[3:19:50]
several proposals to county
[3:19:53]
staff regarding the development.
[3:19:55]
Through time, we've also reduced
[3:19:57]
the size of the building, we
[3:19:59]
revised the circulation pattern,
[3:20:01]
adjusted the fuel canopy to
[3:20:02]
better match the surrounding
[3:20:05]
area as the code dictates, we
[3:20:07]
modified the storm water
[3:20:09]
configuration, we eliminated the
[3:20:10]
pavement behind the building,
[3:20:12]
which would better serve the
[3:20:13]
wetlands adjacent to the
[3:20:15]
property, and developed
[3:20:16]
additional wetland measures,
[3:20:19]
such as moving the building
[3:20:20]
completely out of the wetland
[3:20:22]
itself P.M. These are meaningful
[3:20:22]
changes.
[3:20:24]
The physical context provided --
[3:20:26]
the physical context of the
[3:20:28]
property provides additional
[3:20:29]
separation to the east is the
[3:20:31]
county owned property containing
[3:20:35]
a retention pond which we would
[3:20:39]
use to extend ehrlich, and we've
[3:20:40]
been in discussions with public
[3:20:43]
works, we reached out to public
[3:20:47]
works to address that extension
[3:20:53]
into bellamy road.
[3:20:55]
We have proposed -- our
[3:20:56]
development includes potential
[3:20:58]
set backs and landscape buffers
[3:21:00]
around the property.
[3:21:01]
Planning commission's own
[3:21:09]
analysis recognizes the
[3:21:10]
compatibility of the use.
[3:21:12]
As planning commission stated,
[3:21:13]
compatibility does not mean the
[3:21:17]
same as, so again, compatibility
[3:21:19]
asks, is this viable with the
[3:21:20]
surrounding community.
[3:21:22]
Not is it exactly the same as
[3:21:27]
the surrounding community.
[3:21:29]
These recognizable commercial
[3:21:33]
uses along ehrlich that extend
[3:21:34]
miles each way, that are listed
[3:21:36]
as commercial, gas stations
[3:21:45]
about two miles east of the
[3:21:46]
properties, for example.
[3:21:48]
>> hearing master: please,
[3:21:49]
folks, planning commission's
[3:21:51]
report, come on, please.
[3:21:53]
>> given the current development
[3:21:56]
pattern that consists mainly of
[3:22:00]
residential uses with distance
[3:22:03]
from heavy commercial uses, the
[3:22:05]
proposal is compatible with the
[3:22:06]
surrounding area and
[3:22:07]
neighborhood character, and work
[3:22:09]
to serve the existing
[3:22:09]
neighborhood.
[3:22:12]
The request is consistent with
[3:22:14]
all of future land use
[3:22:15]
objectives and possibilities
[3:22:17]
that relates to the
[3:22:18]
compatibility of the
[3:22:19]
neighborhood protection.
[3:22:20]
The planning commission's only
[3:22:24]
change to make it incompatible
[3:22:25]
was the fact that the building
[3:22:28]
would be within the wetland set
[3:22:28]
back.
[3:22:30]
All other locational criteria
[3:22:31]
was considered consistent by the
[3:22:44]
county.
[3:22:46]
Bellamy road, there are several
[3:22:47]
improvements we're willing to
[3:22:49]
do, which includes the
[3:22:51]
right-of-way dedication to the
[3:22:52]
county.
[3:22:53]
Restricted right in and right
[3:22:56]
out access as jeremy has
[3:22:56]
mentioned.
[3:22:59]
The sidewalk and multipurpose
[3:23:00]
path construction,
[3:23:02]
administrative variances for
[3:23:06]
spacing standards, which we have
[3:23:08]
requested, which would be 130
[3:23:14]
foot spacing variance, along
[3:23:14]
bellamy road.
[3:23:18]
We are willing to implement a
[3:23:23]
concrete separator, and 15 feet
[3:23:26]
around the property.
[3:23:29]
Along ehrlich we would have a
[3:23:33]
right in, right out access.
[3:23:35]
This is our trip generation
[3:23:35]
report.
[3:23:37]
We have our traffic engineer
[3:23:39]
here, if there's any questions
[3:23:47]
about the trip generation.
[3:23:49]
The property is surrounded by
[3:23:50]
residential properties, which
[3:23:51]
are mostly to the south,
[3:23:53]
including some single family
[3:23:55]
homes directly to the north, the
[3:23:56]
county retention pond to the
[3:23:59]
east, an the church that is
[3:24:03]
located to the west of the
[3:24:05]
developable area.
[3:24:08]
Consistency with the greater
[3:24:09]
carollwood/north dale area.
[3:24:11]
it promotes pedestrians friendly
[3:24:12]
growth.
[3:24:22]
And identifies community needs.
[3:24:24]
Our client also has similar
[3:24:25]
values.
[3:24:26]
Community support that they're
[3:24:28]
willing to implement would be
[3:24:33]
partnering with local law
[3:24:33]
enforcement.
[3:24:37]
we would have the locally owned
[3:24:39]
franchisee, who is a community
[3:24:40]
member that would be on site.
[3:24:43]
We have implemented or we can
[3:24:45]
implement steps that would
[3:24:48]
discourage loitering, we have
[3:24:50]
advanced security measures, and
[3:24:52]
we have community outreach
[3:24:53]
programs we're willing to
[3:24:53]
implement.
[3:24:56]
There's also concerns about
[3:24:57]
possible lighting and noise
[3:24:58]
pollutions from the property,
[3:25:01]
but the client -- the client is
[3:25:05]
able to implement hoods
[3:25:06]
overlighting, that would make it
[3:25:08]
localized to the property
[3:25:08]
itself.
[3:25:12]
And they introduce soft music in
[3:25:15]
the outside area, which again
[3:25:18]
would reuce loitering, and also
[3:25:22]
would be supportive of community
[3:25:24]
growth.
[3:25:25]
Comprehensive plan compliance.
[3:25:29]
I just wanted to briefly touch
[3:25:31]
on the comprehensive plan and
[3:25:34]
what objectives -- such as urban
[3:25:35]
service areas and urban
[3:25:39]
expansion areas, which are
[3:25:40]
addressed already within the
[3:25:41]
community.
[3:25:43]
The property is in the usa, the
[3:25:45]
future land use map, identifies
[3:25:48]
land use categories that
[3:25:49]
summarize and establish
[3:25:52]
permitted land uses and maximum
[3:25:54]
densities and intensities, which
[3:25:59]
we do not come close to
[3:26:00]
reaching.
[3:26:01]
There's two conditions that
[3:26:03]
we're requesting with this
[3:26:04]
application.
[3:26:06]
One is surrounding the wetland
[3:26:08]
area, which we would request a
[3:26:09]
variance to the site development
[3:26:13]
of the property, and we're also
[3:26:16]
requesting the bellamy road
[3:26:17]
extension, which again we have
[3:26:20]
already discussed with -- or
[3:26:21]
started, implemented the
[3:26:25]
discussions with public works.
[3:26:27]
We have a growth pattern
[3:26:29]
analysis that was done by rvi
[3:26:32]
that shows consistent growth in
[3:26:35]
the immediate area and multiple
[3:26:36]
studies have been done by not
[3:26:39]
only rvi, but the plan
[3:26:43]
hillsborough county, which shows
[3:26:44]
since 2020
[3:26:45]
08 there has been
[3:26:52]
substantial growth in this area.
[3:26:54]
The review was consistent with
[3:26:56]
our request, and did not have
[3:26:58]
any other requirements for
[3:27:04]
proposed rezoning for the
[3:27:04]
property
[3:27:05]
>> hearing master: how much more
[3:27:06]
time will you need?
[3:27:14]
>> I need like 2 more minutes.
[3:27:15]
>> hearing master: and those
[3:27:19]
people who want to support can
[3:27:22]
speak for an additional amount
[3:27:22]
of time.
[3:27:24]
2 more minutes.
[3:27:26]
>> there are gas stations in
[3:27:28]
close proximity of churches.
[3:27:30]
This is several examples of that
[3:27:32]
which are all located within
[3:27:34]
hillsborough county.
[3:27:34]
And the close to the immediate
[3:27:40]
area.
[3:27:41]
Again, we're asking for
[3:27:42]
conditions that would be placed
[3:27:44]
on the property, which would
[3:27:46]
include the variance for the
[3:27:49]
wetland setback, and then also
[3:27:52]
for the -- all administrative
[3:27:55]
requirements for the access, the
[3:27:56]
right in access points for the
[3:28:00]
property.
[3:28:02]
We would also, of course, obtain
[3:28:05]
the required public works and
[3:28:29]
transportation approvals.
[3:28:31]
I have nothing further to add.
[3:28:31]
Thank you.
[3:28:32]
>> hearing master: okay, thank
[3:28:33]
you, sir.
[3:28:34]
At this point in time,
[3:28:43]
development services staff?
[3:28:49]
>> good evening, guess
[3:28:49]
granlinier with development
[3:28:53]
services.
[3:28:59]
The proposal includes a one
[3:29:00]
story commercial building, and
[3:29:03]
up to 12 fueling stations, with
[3:29:10]
access from both bellamy and
[3:29:11]
erhlich road.
[3:29:14]
A vacant parcel used as a county
[3:29:17]
storm water pond to the east and
[3:29:19]
church with associated school
[3:29:21]
and child care facilities to the
[3:29:21]
west.
[3:29:24]
These uses reflect a
[3:29:26]
predominantly institutional
[3:29:29]
pattern along the corridor.
[3:29:31]
Approximately 38% of the site
[3:29:33]
consists of wetlands in the
[3:29:35]
northwest portion of the
[3:29:35]
property.
[3:29:38]
The limits -- this limits the
[3:29:39]
available area for development,
[3:29:42]
and affects building placement,
[3:29:43]
circulation and storm water
[3:29:44]
management.
[3:29:46]
While the applicant has made
[3:29:49]
adjustments to the site design,
[3:29:53]
the current layout requires
[3:29:54]
encroachment into the wetland
[3:29:57]
buffer, which would require a
[3:29:59]
separate variance that has not
[3:30:00]
been obtained.
[3:30:02]
The site contains wetlands and
[3:30:04]
other surface water and
[3:30:05]
conservation set backs.
[3:30:10]
These areas prohibit filling,
[3:30:11]
excavation, and impervious
[3:30:12]
services.
[3:30:14]
The current layout encrouches
[3:30:17]
into those required set backs.
[3:30:18]
A key consideration review, is
[3:30:21]
the intensity of the proposed
[3:30:21]
use.
[3:30:24]
The convenience store with fuel
[3:30:29]
sales, typically delivers higher
[3:30:30]
levels of travel.
[3:30:32]
This represents a substantial
[3:30:34]
increase compared to the
[3:30:38]
existing conditions
[3:30:39]
s and
[3:30:40]
surrounding uses.
[3:30:43]
This makes it challenging to
[3:30:44]
fully mitigate transitions
[3:30:47]
between the proposed development
[3:30:49]
and adjacent homes and church.
[3:30:50]
Particularly, where natural
[3:30:52]
buffers are crrently provided
[3:30:54]
by wetlands areas.
[3:30:55]
Also, transportation staff
[3:30:56]
identified several outstanding
[3:30:58]
issues, including the need for
[3:31:00]
additional detail on proposed
[3:31:03]
access, roadway improvements and
[3:31:04]
right-of-way dedication.
[3:31:06]
Some submitted materials were
[3:31:08]
either incomplete or
[3:31:09]
inconsistent.
[3:31:11]
Also, public works indicated
[3:31:14]
that they could not adequately
[3:31:16]
evaluate potential use of county
[3:31:17]
property, with the information
[3:31:17]
provided.
[3:31:20]
As a result, transportation
[3:31:23]
staff recommended a denial.
[3:31:25]
I would recommend speaking to
[3:31:27]
transportation after this,
[3:31:29]
regarding their concerns.
[3:31:31]
Considering the intensity of the
[3:31:33]
proposed commercial activity,
[3:31:34]
the environmental constraints on
[3:31:37]
the site, and the unrevolved
[3:31:42]
transportation related issues,
[3:31:47]
staff finds the request
[3:31:47]
unsupportable.
[3:31:48]
I am available for any questions
[3:31:49]
you MAY have.
[3:31:50]
And I also have my revised staff
[3:31:51]
report.
[3:31:51]
I'm sorry.
[3:32:00]
>> hearing master: okay.
[3:32:01]
Folks, please.
[3:32:03]
I'd like to ask transportation
[3:32:07]
staff to provide any comments
[3:32:09]
regarding the application.
[3:32:10]
>> yes.
[3:32:12]
Sarah rose is online and will
[3:32:14]
speak to the objections on
[3:32:14]
record.
[3:32:17]
>> hearing master: okay.
[3:32:22]
>> good afternoon, sarah rose
[3:32:27]
from transportation review.
[3:32:30]
As notated in transportation's
[3:32:31]
rationale for objection as
[3:32:34]
outlined in our report, the
[3:32:36]
applicant did submit several
[3:32:38]
variance requests for their
[3:32:41]
access on to bellamy.
[3:32:44]
Namely an administration spacing
[3:32:47]
variant which was found to
[3:32:48]
contain sufficient information
[3:32:51]
for review, by the manager of
[3:32:53]
transportation review.
[3:32:56]
In addition to that, an
[3:32:56]
administrative design exception
[3:33:00]
was submitted for the
[3:33:02]
substandard roadway conditions
[3:33:03]
of bellamy.
[3:33:06]
That too was found insufficient
[3:33:11]
for review by the manager of
[3:33:13]
transportation review.
[3:33:16]
For both of those variances, one
[3:33:18]
of the outstanding insufficients
[3:33:21]
for both of those requests was
[3:33:22]
the lack of information
[3:33:24]
regarding the right-of-way
[3:33:26]
expansion for bellamy.
[3:33:27]
Neither of the variance request
[3:33:30]
or the site plan does the
[3:33:32]
applicant outline exactly how
[3:33:36]
far or how much width will be
[3:33:38]
required for that expansion.
[3:33:40]
As stated by the applicant in
[3:33:42]
their presentation, the
[3:33:44]
applicant did inquire whether
[3:33:45]
staff could condition the
[3:33:49]
project to be able to continue
[3:33:51]
without the bellamy access if
[3:33:54]
the expansion for bellamy was
[3:33:56]
not in the additional
[3:33:58]
right-of-way, to be taken from
[3:34:00]
county land, county property,
[3:34:04]
which resides east of the
[3:34:05]
subject area.
[3:34:07]
Could not be supported by
[3:34:08]
subject works.
[3:34:11]
At the time of zoning review.
[3:34:14]
Public works, no coordination
[3:34:16]
for public works between the
[3:34:18]
applicant and public works had
[3:34:20]
been completed.
[3:34:22]
and at the time of site
[3:34:24]
construction, if public works
[3:34:27]
were not able to support county
[3:34:30]
land to be taken for that
[3:34:33]
right-of-way expansion on
[3:34:35]
bellamy, if the project could be
[3:34:37]
conditioned in such a way to
[3:34:39]
proceed without that bellamy
[3:34:40]
access.
[3:34:42]
Staff notified the applicant
[3:34:45]
that this would require a
[3:34:46]
stantive change to the
[3:34:46]
application.
[3:34:48]
Meaning that a revision to the
[3:34:50]
site access analysis, and the
[3:34:51]
site plan would be required.
[3:34:54]
And that as the revised plan
[3:34:56]
deadline had already passed,
[3:34:58]
such condition could not be
[3:34:59]
considered at that late stage in
[3:35:01]
the review, and there would be
[3:35:02]
insufficient time for the staff
[3:35:04]
and the public to fairly and
[3:35:07]
adequately review and provide
[3:35:08]
comments on justification that
[3:35:11]
the proposed use and density
[3:35:13]
could be adequately supported by
[3:35:17]
a single right in, right out
[3:35:20]
connection on ehrlich road.
[3:35:26]
>> hearing master: anything
[3:35:26]
else?
[3:35:28]
>> not at this time.
[3:35:28]
>> hearing master: okay.
[3:35:29]
Thank you.
[3:35:31]
At this point in time, planning
[3:35:32]
commission staff?
[3:35:35]
>> lily linehan, planning
[3:35:35]
commission staff.
[3:35:37]
The subject property is located
[3:35:39]
within the residential 4 future
[3:35:41]
land use category, within the
[3:35:44]
limits of the greater
[3:35:45]
carollwood/north dale community
[3:35:46]
plan.
[3:35:49]
Given the current pattern of
[3:35:51]
mainly residential uses, but the
[3:35:54]
close proximity to a major
[3:35:56]
highway, the proposal is
[3:35:57]
compatible and would work to
[3:35:59]
serve the existing neighborhood
[3:36:01]
and meets the intent of
[3:36:06]
objective 4.4 and policy 4.4.1.
[3:36:09]
The commercial locational
[3:36:10]
criteria which is established in
[3:36:15]
flu 4.7 and policy 4.7.2, the
[3:36:18]
subject site is located within
[3:36:22]
the 1,000 foot distance of the
[3:36:25]
required intersection.
[3:36:29]
The applicable area complies
[3:36:32]
with the site plan.
[3:36:34]
The proposed building encroaches
[3:36:38]
into the required 30 foot
[3:36:39]
wetland set back.
[3:36:42]
The current proposal does not
[3:36:43]
establish compliance or
[3:36:45]
adequately demonstrate that the
[3:36:46]
potential impacts to the
[3:36:47]
environmentally sensitive
[3:36:50]
resources have been resolved.
[3:36:52]
The proposed planned development
[3:36:56]
has not demonstrated consistency
[3:36:59]
with flu 6.1 and 6.2.
[3:37:04]
Flu policy 6.1.1, objective 3
[3:37:07]
pbt 5 and 3.5.1.
[3:37:10]
As development services has
[3:37:10]
communicated, hillsborough
[3:37:12]
county land development code
[3:37:14]
section 4.01.07b.
[3:37:18]
The proposal has not adequately
[3:37:20]
demonstrated consistency with
[3:37:22]
the greater carollwood north
[3:37:24]
dale community plan,
[3:37:27]
particularly those that address
[3:37:28]
compatibility with the
[3:37:30]
established character of the
[3:37:31]
surrounding community.
[3:37:32]
Based upon the above
[3:37:34]
considerations and the following
[3:37:38]
goals, objectives planning
[3:37:41]
commission staff finds this
[3:37:44]
application inconsistent.
[3:37:45]
>> hearing master: thank you.
[3:37:47]
Is there anyone in the audience
[3:37:49]
that wishes to speak in support
[3:37:50]
of the application?
[3:37:52]
I see no one responding.
[3:37:53]
Anyone in the audience wish to
[3:37:57]
speak in opposition to the
[3:37:58]
application.
[3:38:00]
I see quite a few hands raised?
[3:38:02]
i don't know if you have a
[3:38:04]
spokesperson for the group or
[3:38:05]
not.
[3:38:09]
But otherwise -- I'm sorry, the
[3:38:10]
gentleman in the front row.
[3:38:12]
I don't know if you're the
[3:38:13]
spokesperson or not?
[3:38:16]
>> I'm the attorney for a
[3:38:17]
portion -- for the church, which
[3:38:18]
is a major portion of the people
[3:38:21]
that are here today.
[3:38:23]
My name is jonathan bailey, with
[3:38:26]
the national center for life and
[3:38:29]
liberty, we represent hillsdale
[3:38:30]
baptist church and christian
[3:38:32]
school, one of the neighbors
[3:38:32]
here.
[3:38:36]
They want to put an almost 5,000
[3:38:37]
square foot convenience store
[3:38:42]
building, fueling canopy with 12
[3:38:46]
fueling stations, and gasoline
[3:38:48]
and diesel tanks, right in the
[3:38:49]
middle of a residential
[3:38:51]
community and right next to a
[3:38:52]
church and school.
[3:38:54]
Everything they said around it,
[3:38:55]
about it being community
[3:38:57]
friendly.
[3:38:58]
The impact to these homes, the
[3:38:59]
people living there, and the
[3:39:01]
impact to the school is not just
[3:39:02]
the traffic.
[3:39:04]
It's a severe danger to the
[3:39:05]
community that's going to be
[3:39:06]
there.
[3:39:07]
The type of people that are
[3:39:12]
going to hang out at this
[3:39:13]
7-eleven at night.
[3:39:15]
The people that are going to be
[3:39:15]
coming into this community that
[3:39:17]
are not part of this community.
[3:39:20]
This is not a community centric
[3:39:22]
development plan at all.
[3:39:24]
The development service
[3:39:27]
recommendations, not
[3:39:27]
supportable, transportation
[3:39:30]
staff objects and recommends
[3:39:30]
denial.
[3:39:31]
Everyone that's looked at this
[3:39:33]
says this is a bad idea.
[3:39:35]
and it is a bad idea.
[3:39:39]
The 7-eleven came and talked to
[3:39:41]
the church and said, what if we
[3:39:43]
just serve alcohol after 5:00?
[3:39:46]
That doesn't solve the problem.
[3:39:49]
We're going to wake up and have
[3:39:51]
someone passed out at the school
[3:39:52]
entrance.
[3:39:53]
Serving after 5:00 doesn't solve
[3:39:54]
the problem.
[3:39:57]
To think this is not a wedge
[3:39:58]
principle, where they're going
[3:40:01]
to try to get this in the door,
[3:40:03]
and all of a sudden, we're going
[3:40:05]
to serve beer at 11:00 A.M.,
[3:40:06]
that's going to happen.
[3:40:08]
It's going to create a safety
[3:40:11]
problem at this christian school
[3:40:12]
that's going to be newsworthy.
[3:40:17]
It cannot be allowed to happen.
[3:40:19]
This increases the trips from 28
[3:40:20]
trips to 2800.
[3:40:22]
That's fundamentally changing
[3:40:23]
this entire area.
[3:40:24]
This area coming off this road
[3:40:26]
of veterans is not a highly used
[3:40:28]
area, the walmart is not
[3:40:30]
anywhere close, it's way further
[3:40:31]
than where he was saying.
[3:40:33]
These restaurants are nowhere
[3:40:34]
near where the school is at.
[3:40:36]
This is not the picture he
[3:40:37]
presented of this little area.
[3:40:40]
This is a cozy little
[3:40:43]
residential area, with a church
[3:40:44]
and --
[3:40:44]
>> hearing master: please stop
[3:40:46]
clapping, and making noises.
[3:40:48]
>> this is a church and school
[3:40:50]
area that doesn't have this type
[3:40:51]
of traffic now.
[3:40:53]
The environmental concerns are
[3:40:55]
not to be anywhere overlooked.
[3:40:57]
You have 38% of the site consist
[3:41:00]
of wetlands, and approximately
[3:41:03]
8700 square foot of wetland
[3:41:03]
impact.
[3:41:05]
And 13,000 square feet of
[3:41:07]
wetland buffer impact.
[3:41:11]
You're going to put 20,000
[3:41:13]
gallon, 12,000 gallon diesel
[3:41:15]
tanks right next to a wetland
[3:41:16]
issue, and you're asking for
[3:41:21]
buffers that do not meet the ldc
[3:41:21]
criteria.
[3:41:23]
They need variances they have
[3:41:24]
not applied for.
[3:41:26]
This impact is going to be
[3:41:27]
severe, it's going to place the
[3:41:29]
children at the school at risk.
[3:41:31]
It's going to increase traffic,
[3:41:33]
safety risks, for the area.
[3:41:35]
Trying to get in and out of the
[3:41:37]
school, in the mornings with the
[3:41:38]
traffic is going to be
[3:41:39]
impossible
[3:41:40]
impossible.
[3:41:40]
This is not something that's
[3:41:42]
doable from a site traffic
[3:41:44]
perspective, and the way they
[3:41:46]
propose their traffic plan is
[3:41:47]
laughable at best.
[3:41:48]
The neighborhood that is behind
[3:41:51]
it, are very upset, not because
[3:41:57]
they don't want a 7-eleven, but
[3:41:58]
because it's going to destroy
[3:41:59]
their way of life.
[3:42:01]
This is not consistent to the
[3:42:03]
area and to the way this
[3:42:04]
community has been built and
[3:42:07]
where it is today.
[3:42:11]
We'd ask that hillsborough
[3:42:14]
baptist church and school
[3:42:18]
request the hearing master deny
[3:42:19]
this application.
[3:42:21]
It's incompatible with
[3:42:23]
surrounding uses.
[3:42:25]
Unsupportable by the
[3:42:27]
infrastructure.
[3:42:30]
And poses safety risks to the
[3:42:32]
adjacent church and school.
[3:42:35]
>> hi, sir, can you say your
[3:42:37]
name for the record?
[3:42:40]
>> jonathan bailey, 1790
[3:42:41]
recognize svelte boulevard.
[3:42:47]
>> if you can sign in, please,
[3:42:48]
sir.
[3:42:49]
>> hearing master: next speaker,
[3:42:49]
please.
[3:42:56]
>> I live at 3565 steeplechase
[3:42:56]
boulevard.
[3:42:58]
I want to give some quick
[3:42:59]
background here, that I don't
[3:43:01]
think I heard tonight.
[3:43:05]
17 years ago, the same parcel
[3:43:10]
was proposed -- two parcels I
[3:43:12]
guess, was proposed for a
[3:43:13]
racetrack gas station.
[3:43:15]
The conclusion at that time, was
[3:43:19]
based on testimony, evidence,
[3:43:21]
various planning departments,
[3:43:23]
and a review of the
[3:43:25]
comprehensive plan is concluded
[3:43:27]
that the rezoning is not
[3:43:28]
compatible with the surrounding
[3:43:31]
land uses and zoning, and not
[3:43:32]
consistent with a comprehensive
[3:43:33]
plan.
[3:43:35]
Recommendation denial.
[3:43:37]
Signed by steven lutz.
[3:43:43]
You're still looking good.
[3:43:45]
And we're very appreciative that
[3:43:46]
the significant analysis that
[3:43:49]
the county staff has done on
[3:43:52]
this, because this is a project
[3:43:57]
that I guess -- to put it -- as
[3:43:59]
succinct as possible.
[3:44:00]
Bellamy road is the only way in
[3:44:01]
and out.
[3:44:04]
The major artery for some 2500
[3:44:04]
homes.
[3:44:05]
If you put this gas station
[3:44:07]
there with all the extra traffic
[3:44:09]
they're talking about.
[3:44:13]
They would significantly lead to
[3:44:15]
congestion, lead to safety
[3:44:16]
issues.
[3:44:18]
Not only for the cars, but a lot
[3:44:21]
of people walk and ride their
[3:44:22]
bicycles past that intersection,
[3:44:23]
because there's a very -- I
[3:44:25]
can't think of the name of it,
[3:44:26]
there's a trail north/south
[3:44:28]
that's to the west of there.
[3:44:30]
That a lot of people use -- a
[3:44:32]
lot of people ride their bikes
[3:44:36]
on, and so it's just -- I can't
[3:44:37]
even imagine people coming off
[3:44:41]
the veterans, doing u-turns at
[3:44:41]
that intersection.
[3:44:43]
and another thing that's not
[3:44:45]
mentioned here, I guess I would
[3:44:46]
say there's a flaw in how the
[3:44:49]
county evaluates traffic.
[3:44:53]
There are a lot of speeding cars
[3:44:57]
on ehrlich, I don't know if
[3:44:58]
they're trying to beat that
[3:45:00]
light or get to veterans, for
[3:45:01]
whatever reason.
[3:45:03]
It's not a matter of traffic
[3:45:05]
counts, which will go way up if
[3:45:07]
the station is put in there.
[3:45:09]
There has to be some way, with
[3:45:10]
current technology, the measure
[3:45:12]
of the cars that go by that
[3:45:14]
intersection on a daily basis.
[3:45:16]
How many are exceeding the speed
[3:45:18]
limit by 10 miles or more.
[3:45:20]
I can only say that --
[3:45:22]
especially if the plan is
[3:45:25]
redrawn and bellamy is
[3:45:29]
eliminated, that would create a
[3:45:32]
hazard of unforgivable epic
[3:45:33]
proportions, because people
[3:45:35]
would pull out, speeding, you're
[3:45:36]
asking for a lot of MAY hem.
[3:45:39]
And I think it would be not
[3:45:39]
good.
[3:45:43]
I wish the county would evaluate
[3:45:45]
its traffic count process to
[3:45:47]
also include some measure using
[3:45:49]
lasers or whatever is available
[3:45:50]
with the current tech, to note
[3:45:52]
the speeders on a given road in
[3:46:01]
this case, it's ehrlich.
[3:46:03]
There's not just the wetlands
[3:46:05]
behind the proposed station, and
[3:46:08]
there's a retention pond across
[3:46:09]
bellamy.
[3:46:10]
There's also another pond not
[3:46:13]
indicated on the maps, that
[3:46:15]
shows another small pond behind
[3:46:16]
a home that's directly off the
[3:46:17]
intersection there.
[3:46:18]
It's another pond that's
[3:46:22]
potentially impacted by the
[3:46:23]
spillage from gas and oil,
[3:46:25]
whatever you can buy to put in
[3:46:30]
your car, that's toxic.
[3:46:34]
So we -- again, to summarize,
[3:46:37]
this is the only main road in --
[3:46:40]
this is how we -- see the real
[3:46:40]
world.
[3:46:42]
And if you put all that extra
[3:46:43]
traffic there, it creates a
[3:46:46]
safety hazard, a traffic hazard,
[3:46:48]
a congestion hazard.
[3:46:51]
It could endanger children,
[3:46:52]
bikers, pedestrians, who use
[3:46:53]
that intersection all the time.
[3:46:55]
I've lived there for 25 years, I
[3:46:57]
can't give you a precise count,
[3:46:59]
but every time I drive there,
[3:47:00]
there's someone trying to cross
[3:47:01]
that street.
[3:47:03]
I thank you for listening.
[3:47:04]
>> hearing master: thank you,
[3:47:05]
sir.
[3:47:06]
The next speaker, please.
[3:47:07]
>> if you could please sign in,
[3:47:11]
sir.
[3:47:13]
>> we do also have two people
[3:47:15]
online that wsh to speak.
[3:47:16]
>> hearing master: okay.
[3:47:21]
>> richard alexander, 6516
[3:47:22]
spring oak cort.
[3:47:28]
I want to be quick, there's a
[3:47:30]
lot of passion on this issue.
[3:47:31]
This is a very simple battle.
[3:47:36]
This is a battle of
[3:47:37]
unquenchable, insatiable greed
[3:47:40]
versus families.
[3:47:41]
That's what this is about.
[3:47:42]
This is about a corporation that
[3:47:44]
couldn't care less about
[3:47:46]
husbands, wives, fathers,
[3:47:47]
mothers, elementary, middle and
[3:47:49]
high schoolkids.
[3:47:50]
Because within a stone's throw
[3:47:56]
of bellamy and ehrlich is not
[3:48:01]
only a church, but there's an
[3:48:04]
elementary -- pre-k, elementary,
[3:48:07]
middle and high school.
[3:48:13]
There's one south and north
[3:48:14]
bellamy.
[3:48:16]
It's a very busy intersection.
[3:48:17]
There's residences to the east
[3:48:18]
of that location.
[3:48:20]
What's west of the location?
[3:48:22]
Is the church, the preschool,
[3:48:23]
the middle school and elementary
[3:48:24]
school.
[3:48:26]
This is going to be a disaster.
[3:48:28]
This is a stick of dynamite with
[3:48:30]
a very short fuse.
[3:48:32]
Because you have buses, you have
[3:48:34]
people, you have couples young
[3:48:36]
and old walking hand in hand on
[3:48:37]
that sidewalk.
[3:48:42]
Which is going to go away,
[3:48:44]
7-eleven is open 24 hours, seven
[3:48:47]
days a week.
[3:48:50]
Selling alcohol, beer, wine,
[3:48:52]
vaping products, cigarettes.
[3:48:54]
That's not going to be limited
[3:48:56]
to inside that store.
[3:48:56]
Guarantee it.
[3:48:58]
This is not an isolated event.
[3:48:59]
Thank you for your time.
[3:49:01]
>> hearing master: thank you.
[3:49:04]
Next speaker, please.
[3:49:05]
Good evening.
[3:49:09]
>> hi, I am penelope jacobs.
[3:49:13]
I live at 630 # 3 nesting court.
[3:49:16]
I want to add on to a few points
[3:49:17]
I heard.
[3:49:21]
With the hillsdale baptist
[3:49:22]
church, there's a field where
[3:49:24]
kids play all assorts of games,
[3:49:26]
the only thing protecting from
[3:49:28]
this lot to that church is a
[3:49:32]
bunch o trees, I imagine those
[3:49:33]
would be torn down.
[3:49:35]
So it would leave the children
[3:49:36]
there exposed to alcohol
[3:49:39]
products and smoking, gambling,
[3:49:41]
all that kind of stuff.
[3:49:45]
And on top of that, the
[3:49:46]
intersection is already over
[3:49:46]
crowded.
[3:49:49]
I live back there, I g to a
[3:49:52]
school down ehrlich road.
[3:49:56]
I wake up at 6:45 to get to a
[3:50:02]
school a live 5 minutes away
[3:50:06]
from.
[3:50:07]
Squeezing gas tanker trucks into
[3:50:09]
a tight opening could cause a
[3:50:10]
lot of traffic.
[3:50:11]
Yeah, that's all.
[3:50:12]
>> hearing master: okay.
[3:50:13]
very good, thank you.
[3:50:16]
Please sign in.
[3:50:18]
Next person, there's somebody on
[3:50:23]
the left that's trying to come
[3:50:23]
forward.
[3:50:24]
Good evening.
[3:50:32]
>> hello, ginger wilson.
[3:50:33]
105cragy cliff street.
[3:50:36]
I live off of bellamy road for
[3:50:37]
about 27 years.
[3:50:38]
I moved on the outskirts of town
[3:50:42]
when I moved here, relocated
[3:50:43]
with my company.
[3:50:45]
I did not move downtown into the
[3:50:47]
city because I wanted to live on
[3:50:50]
the outskirts of town, because I
[3:50:54]
enjoy the wildlife in florida.
[3:50:55]
It's amazing.
[3:50:58]
And we have a nice quiet
[3:50:59]
community where there's tons of
[3:51:01]
animals, egrets, rose bills are
[3:51:03]
all in that big retention pond
[3:51:08]
next to us.
[3:51:10]
They're all around.
[3:51:13]
Sand hill cranes.
[3:51:15]
They deserve to have their space
[3:51:15]
to live.
[3:51:17]
The development has continued to
[3:51:18]
move things.
[3:51:19]
The traffic as other people, I'm
[3:51:22]
going to shorten up what I had
[3:51:22]
written.
[3:51:24]
The traffic situation is dire.
[3:51:26]
And whoever did that traffic
[3:51:29]
study, did not do it well
[3:51:32]
because if you live there, you
[3:51:35]
know, I've sign a person killed
[3:51:37]
on a bike at that intersection,
[3:51:38]
hit by a car.
[3:51:40]
Every day, you pull out, there's
[3:51:43]
more garbage in the street,
[3:51:44]
where there's been another
[3:51:45]
collision.
[3:51:48]
Cars back up, all the way past
[3:51:49]
MR. John's house.
[3:51:51]
Every morning, trying to make a
[3:51:53]
right turn out, or to make a
[3:51:58]
left turn out to go east on
[3:51:59]
ehrlich.
[3:52:00]
There's gas stations all around
[3:52:02]
us, in 27 years I've never run
[3:52:03]
out of gas.
[3:52:05]
Even in milton, because there's
[3:52:06]
plenty of gas stations around
[3:52:07]
me.
[3:52:10]
Every direction I can go when I
[3:52:13]
leave my home, has a gas
[3:52:14]
station.
[3:52:17]
There's not a gas station needed
[3:52:17]
there.
[3:52:21]
Not to mention, gas tanks
[3:52:22]
underground, do have
[3:52:23]
contamination.
[3:52:26]
And there's animals and wildlife
[3:52:28]
living out their lives.
[3:52:30]
It's wrong, we don't need it in
[3:52:37]
our neighborhood, we don't want
[3:52:37]
it.
[3:52:38]
The biggest thing, where the
[3:52:40]
church is, there's a cross-over.
[3:52:42]
People are trying to come out of
[3:52:43]
that church, turning left or
[3:52:52]
right.
[3:52:56]
On tom fuller, they built an
[3:52:58]
apartment complex, people are
[3:52:59]
turning out of tom fuller, turn
[3:53:01]
down there, and cut through,
[3:53:03]
make a u-turn at the church or
[3:53:06]
come down to bellamy and ehrlich
[3:53:10]
and make a u-turn there.
[3:53:14]
The traffic is already horrible.
[3:53:18]
I've seen people bumper to
[3:53:19]
bumper, four thick.
[3:53:22]
You put a 7-eleven there, and
[3:53:23]
try to make that another
[3:53:26]
cross-over, you have created
[3:53:27]
another huge traffic jam.
[3:53:30]
And blocking us from leaving our
[3:53:31]
neighborhood every morning.
[3:53:33]
It's wrong, we don't want it.
[3:53:35]
I'm sorry that the people that
[3:53:36]
live in the corner have been
[3:53:38]
unable to sell their house,
[3:53:40]
because it's been for sale for
[3:53:42]
pretty much the 27 years I've
[3:53:43]
lived there.
[3:53:45]
They haven't been able to sell
[3:53:45]
it, I'm sorry.
[3:53:48]
Sell it, figure it out.
[3:53:49]
There's a house across the
[3:53:51]
street from them that was vacant
[3:53:52]
many, many years.
[3:53:54]
Someone's finally there, and a
[3:53:55]
gas station is not consistent
[3:53:56]
with that neighborhood right
[3:53:56]
there.
[3:53:58]
It just isn't.
[3:53:59]
>> hearing master: all right.
[3:54:00]
Thank you, ma'am.
[3:54:06]
>> thank you.
[3:54:07]
>> hearing master: good evening.
[3:54:13]
Claudia cappiello, I live at
[3:54:23]
14949 barbie avenue.
[3:54:25]
>> hearing master: for the
[3:54:28]
record, I gave the applicant 2
[3:54:33]
extra minutes, I'll give the
[3:54:35]
speakers 2 extra minutes.
[3:54:38]
>> I am in opposition of this
[3:54:38]
development.
[3:54:41]
They have 870 signatures to this
[3:54:42]
petition.
[3:54:44]
Back in MARCH, when they were
[3:54:46]
trying to do a standard
[3:54:48]
rezoning, I had over 700 people
[3:54:49]
sign that petition.
[3:54:51]
The changes that these people
[3:54:54]
have put forth with this new
[3:54:55]
application doesn't address the
[3:54:57]
concerns of the community.
[3:54:59]
And they're definitely not in
[3:54:59]
support of having this
[3:55:01]
development.
[3:55:02]
>> hearing master: thank you,
[3:55:02]
ma'am.
[3:55:04]
There's a couple people online
[3:55:05]
that wanted to speak, let's hear
[3:55:07]
from them.
[3:55:09]
Go ahead.
[3:55:12]
>> jennifer?
[3:55:15]
>> hi, good evening.
[3:55:17]
My name is jennifer anderson, I
[3:55:23]
have resided at 1472 red cliff
[3:55:24]
drive for 16 years.
[3:55:26]
Off of bellamy road, we have
[3:55:28]
thousands of homes in addition
[3:55:31]
to those 9hoa communities.
[3:55:33]
Living in our residential area,
[3:55:36]
we have access to large lots,
[3:55:39]
property to house farm animals.
[3:55:41]
Our rural neighborhood is quiet,
[3:55:42]
safe and relatively low traffic
[3:55:46]
when it comes to just
[3:55:48]
automobiles and our residents
[3:55:50]
that travel to and from work.
[3:55:53]
We don't have any commercial
[3:55:54]
traffic that comes on bellamy,
[3:55:57]
as we don't have those outlets
[3:55:58]
to turn around in.
[3:56:01]
At rush hour, traffic increases
[3:56:07]
on ehrlich road, it can be
[3:56:09]
backed up from farmington
[3:56:10]
boulevard, to lynn turner road,
[3:56:12]
taking an additional 15 minutes
[3:56:14]
to travel just one mile.
[3:56:17]
You will find students riding
[3:56:20]
their bikes to and from school.
[3:56:22]
Residents walking between a mile
[3:56:25]
to one and a half miles to one
[3:56:26]
of our two public stores and
[3:56:28]
shopping plazas.
[3:56:31]
The cyclists and even the
[3:56:33]
occasional shetland pony and
[3:56:33]
buggy.
[3:56:36]
The proposed location is
[3:56:37]
dangerous to the potential
[3:56:39]
customers conducting illegal
[3:56:41]
traffic maneuvers, such as u
[3:56:44]
hifr turning at the traffic
[3:56:44]
light.
[3:56:47]
Traffic entering and exiting the
[3:56:49]
veteran's expressway --
[3:56:50]
>> hearing master: ma'am, I need
[3:56:50]
you to wrap up your comments,
[3:56:56]
please.
[3:56:58]
>> the proposed site should nt
[3:57:00]
be approved, there are many
[3:57:02]
environmental concerns, across
[3:57:08]
the street of 14702 bellamy
[3:57:11]
road, there's a sign that states
[3:57:14]
wildlife entering highway.
[3:57:17]
This would be better used as a
[3:57:18]
residential home.
[3:57:21]
The 38% area that is wetland,
[3:57:22]
it's already been mentioned.
[3:57:24]
We have many of the animals that
[3:57:26]
have already been discussed that
[3:57:30]
are at risk of dying or being
[3:57:37]
displaced.
[3:57:37]
Hillsdale --
[3:57:38]
>> hearing master: ma'am, can
[3:57:40]
you wrap up your comments,
[3:57:40]
please?
[3:57:42]
>> it's wrapped.
[3:57:42]
>> hearing master: I think
[3:57:45]
there's one more gentleman on
[3:57:49]
line, and that will cone
[3:57:49]
included
[3:57:50]
--
[3:57:50]
conclude the opposition
[3:57:51]
testimony.
[3:57:52]
>> hello.
[3:57:52]
>> hearing master: go ahead,
[3:57:54]
sir.
[3:57:54]
>> hello?
[3:57:55]
>> can you hear me?
[3:57:56]
>> yes.
[3:58:01]
>> okay.
[3:58:05]
My name is john parachini.
[3:58:07]
I live on bellamy road for over
[3:58:14]
40 years, I came to make
[3:58:15]
comments tonight.
[3:58:19]
I can cut them short, after
[3:58:23]
listening to MR. Bailey from the
[3:58:25]
hillsborough baptist church, he
[3:58:28]
detailed quite a number of
[3:58:33]
objections, very viable
[3:58:35]
objections to this reapplication
[3:58:35]
or rezoning.
[3:58:38]
I would like to make a couple
[3:58:40]
points specific to my own
[3:58:45]
property, relative to specific
[3:58:48]
changes to bellamy road.
[3:58:49]
They are wetlands, water and
[3:58:50]
flooding.
[3:58:53]
The water in the wetlands
[3:58:56]
resides on 14702 bellamy.
[3:58:58]
It doesn't sit on my property at
[3:58:58]
all.
[3:59:00]
The only occasion where it does
[3:59:03]
in fact come on to my property
[3:59:05]
now is during the confluence of
[3:59:08]
storms, tropical storms,
[3:59:09]
hurricanes.
[3:59:11]
Thunderstorms, and my back
[3:59:14]
property now will flood.
[3:59:15]
Historically, excess water from
[3:59:19]
the wetlands moves to the west.
[3:59:22]
That all changed when the church
[3:59:24]
came in and the western edge of
[3:59:27]
the wetlands was fortified.
[3:59:29]
now, any excess water from the
[3:59:31]
wetlands escaping there comes
[3:59:33]
north on to my property
[3:59:33]
directly.
[3:59:37]
As a consequence, you cannot
[3:59:40]
allow for any setbacks, any
[3:59:43]
variances, any reduction in the
[3:59:45]
capacity of the wetlands to hold
[3:59:45]
water.
[3:59:48]
You can't do it, you will flood
[3:59:49]
my property without question,
[3:59:50]
with greater frequency.
[3:59:54]
This is a lived experience.
[3:59:55]
This is not conjecture.
[3:59:57]
Am I out of time?
[3:59:57]
>> hearing master: yes, thank
[3:59:58]
you, sir.
[4:00:00]
Appreciate it.
[4:00:01]
>> thank you very much.
[4:00:02]
>> hearing master: thank you,
[4:00:02]
sir.
[4:00:05]
There are a couple people that
[4:00:06]
stood up.
[4:00:08]
Time has expired, if you'd like
[4:00:09]
to put your name and address on
[4:00:11]
the record, so you can speak at
[4:00:13]
a later hearing, if that's your
[4:00:14]
desire, can you come forward and
[4:00:17]
do that.
[4:00:18]
Otherwise, I'll close opposition
[4:00:22]
testimony at this point in time.
[4:00:23]
Is there anyone that wants to
[4:00:24]
put their name and address on
[4:00:24]
the record.
[4:00:26]
Okay.
[4:00:30]
With that, that concludes the
[4:00:31]
opposition and development
[4:00:34]
services, any further comments.
[4:00:35]
>> no, sir.
[4:00:36]
>> hearing master: okay.
[4:00:38]
The applicant has the
[4:00:41]
opportunity for rebuttal.
[4:00:42]
You have five minutes for
[4:00:45]
rebuttal.
[4:00:49]
I'll give you two extra minutes,
[4:00:50]
given the time to the
[4:00:51]
opposition.
[4:00:52]
>> thank you, I'll keep it
[4:00:54]
within my five.
[4:00:55]
We understand there are several
[4:00:57]
technical approvals that still
[4:00:59]
need to occur on this property.
[4:01:01]
The -- this includes the design
[4:01:02]
exceptions that we mentioned
[4:01:04]
regarding the wetland and also
[4:01:06]
the bellamy road extensions.
[4:01:08]
This is not the time or place
[4:01:12]
for those to be the forefront of
[4:01:12]
discussion.
[4:01:14]
We have opportunities to develop
[4:01:16]
the site, the site development
[4:01:20]
process itself.
[4:01:24]
The rezoning to the planned
[4:01:25]
development, has these
[4:01:28]
discussions as part of what
[4:01:30]
we're trying t prove.
[4:01:32]
We have talked to staff.
[4:01:36]
Staff has reviewed the rezoning
[4:01:37]
application and site plan we
[4:01:40]
submitted for the rezoning,
[4:01:54]
which we have here which does
[4:01:55]
not consider all development
[4:01:57]
standards for a final site plan
[4:01:58]
approval.
[4:02:00]
And we understand that.
[4:02:02]
There has been comments
[4:02:04]
regarding the sidewalk going
[4:02:05]
away.
[4:02:06]
We are extending the sidewalk,
[4:02:08]
we are making it a 10-foot
[4:02:09]
sidewalk on the property.
[4:02:11]
Which would be supportive of
[4:02:16]
pedestrians pathways and bike
[4:02:16]
movement and pedestrians
[4:02:17]
movement across the property,
[4:02:18]
through the property and along
[4:02:21]
the property.
[4:02:23]
There was inconsistent
[4:02:25]
statements regarding bellamy
[4:02:28]
being a main road or an arterial
[4:02:30]
road or a small road that can't
[4:02:34]
support any sort of movement.
[4:02:37]
But our traffic study has shown
[4:02:39]
that one, there's a pass by rate
[4:02:43]
of 75%, and also through our
[4:02:46]
study, there are adequate trips
[4:02:49]
that would be supported by
[4:03:10]
bellamy and ehrlich.
[4:03:12]
Again, there's an important
[4:03:13]
distinction between approving a
[4:03:14]
land use and the development of
[4:03:15]
the property.
[4:03:17]
Approval of the pd, does not
[4:03:20]
give the applicant a building
[4:03:20]
permit.
[4:03:23]
It does not approve the bellamy
[4:03:24]
road design exception.
[4:03:25]
We understand those things need
[4:03:27]
to be discussed with the county.
[4:03:29]
And we're willing to implement
[4:03:32]
any sort of conditions the
[4:03:32]
county is willing to put on this
[4:03:43]
property.
[4:03:46]
>> good evening, michael razor
[4:03:48]
for the record, bruce b. Downs
[4:03:52]
boulevard, tampa, florida.
[4:03:55]
I'm the traffic consultant for
[4:03:55]
the project.
[4:03:58]
As -- I'll just continue -- this
[4:04:00]
is the very rudest hearing I've
[4:04:01]
ever attended.
[4:04:03]
And I've been doing this for 30
[4:04:05]
plus years.
[4:04:10]
The great majority of traffic
[4:04:11]
generated by this site is
[4:04:14]
already back on the road, it
[4:04:15]
turns into the site and out of
[4:04:17]
the site.
[4:04:19]
It's not a dissension, it's a
[4:04:20]
convenience store.
[4:04:23]
We have two right in, right out
[4:04:24]
driveways proposed.
[4:04:27]
The major discussion regarding
[4:04:29]
right-of-way on the eastside of
[4:04:33]
bellamy is proposing to put in a
[4:04:34]
four-foot concrete separator to
[4:04:37]
prevent left turns at that
[4:04:38]
bellamy driveway.
[4:04:39]
That will improve not only the
[4:04:42]
safety of bellamy in this
[4:04:43]
particular area, by separating
[4:04:45]
opposing lanes of traffic.
[4:04:48]
But part of that separator will
[4:04:50]
extend the southbound left turn
[4:04:52]
lane, which is currently
[4:04:52]
deficient.
[4:04:54]
That's why we hear about issues
[4:04:55]
with this particular
[4:04:56]
intersection.
[4:04:57]
The turn lanes are not long
[4:04:58]
enough, in the existing state.
[4:05:03]
If this gets approved, there
[4:05:04]
will be material improvements
[4:05:07]
that will not only cure existing
[4:05:08]
deficiencies, but will also
[4:05:10]
accommodate the particular site.
[4:05:12]
At the intersection now during
[4:05:14]
peak hours as identified in the
[4:05:15]
morning, to be at level service
[4:05:16]
c and b.
[4:05:19]
In the afternoon, that's with or
[4:05:21]
without this station being
[4:05:21]
developed.
[4:05:26]
The only level service in the
[4:05:28]
report is level c, compared to a
[4:05:28]
d standard.
[4:05:30]
And I will conclude by saying
[4:05:34]
that u-turns are not illegal
[4:05:36]
movements, they are permissible
[4:05:38]
as long as there's not a sign
[4:05:38]
restricting those.
[4:05:41]
I would be happy to answer any
[4:05:42]
specific traffic questions you
[4:05:47]
MAY have.
[4:05:48]
>> hearing master: does that
[4:05:50]
conclude your presentation on
[4:05:50]
your rebuttal?
[4:05:51]
>> it does, thank you for your
[4:05:53]
time.
[4:05:54]
>> hearing master: with that,
[4:05:55]
this concludes this application.
[4:05:57]
And that concludes tonight's
[4:05:59]
zoning hearing master hearing.