[0:00]
>> so my name is tom locascio.
[0:03]
I'd like to welcome you to our december 2nd public
[0:07]
comment session on the reform management contract
[0:09]
with pseg long island.
[0:11]
I'm going to turn it over to life as chief executive
[0:15]
officer tom falcon, who's going to go through a
[0:19]
presentation on some of the key elements of the
[0:22]
reform contract that will be before the life of
[0:26]
board on december 15th.
[0:28]
and then we'll go to our public comment portion,
[0:31]
tom.
[0:32]
um, good evening everybody.
[0:33]
and it's my pleasure to be here with you.
[0:37]
I would say that it is a special treat to spend any
[0:42]
evening with a group of people that want to are
[0:46]
interested in and want to spend time talking about
[0:49]
their local electric utility.
[0:51]
you are my kind of people.
[0:53]
uh, I'm joined here tonight by many members of
[0:57]
lipid, senior staff and our board.
[0:59]
uh, the comments as tom locascio mentioned are
[1:02]
recorded, uh, they will be put online.
[1:05]
uh, you will be able to look at the webinar on
[1:09]
life website and a summary of the comments will also
[1:13]
be provided to the lipid board at its december 15th
[1:17]
meeting for their consideration.
[1:19]
uh, this is one of a series of public events,
[1:23]
uh, and we are also accepting written comments
[1:26]
on the reform contract.
[1:27]
the one thing I wanted to do is start tonight with a
[1:32]
little bit of background to frame our discussion,
[1:35]
and then we're here to listen to you.
[1:39]
and so with that, uh, can we move to the next
[1:43]
page, tom?
[1:44]
so what brought us here tonight?
[1:46]
it's been a rather long journey along odyssey and
[1:50]
it all started as you may recall, on august 4th,
[1:54]
2020, uh, that was tropical storm east
[1:56]
[inaudible] and it was a big storm.
[1:59]
uh, it was very damaging to the electric grid on
[2:03]
long island measured by the damage to the grid.
[2:07]
it was one of our top five storms to hit the long
[2:11]
island electric grid.
[2:13]
it caused about 645,000 customer outages.
[2:15]
uh, and it took about eight days to restore.
[2:18]
we're not here though because, uh, 645,000
[2:21]
outages, uh, we're here because the restoration
[2:24]
did not go well.
[2:25]
if it had, we understand and know that we live on
[2:30]
an island and occasionally we're going to be affected
[2:33]
by big storms.
[2:35]
it doesn't make it, uh, something that we strive
[2:38]
for.
[2:38]
in fact, we strive to minimize that dislocation,
[2:42]
but occasionally there will be big storms and
[2:45]
there will be damaged the electric grid and it will
[2:49]
take time to restore, but you have a right to
[2:53]
expect, uh, good information and quick and
[2:55]
efficient restoration.
[2:57]
and to be able to get in touch with your local
[3:01]
electric utility, these are all reasonable
[3:03]
expectations and you have a right to expect that.
[3:07]
and the storm didn't meet that criteria.
[3:10]
in fact, all of our major it systems failed.
[3:13]
and these were systems that you, our customers
[3:16]
had invested a lot of money in on august 4th.
[3:20]
it was not clear what was going wrong, but it was
[3:24]
clear that something was going wrong.
[3:27]
and on august 5th lipa at the request of its board
[3:31]
began an investigation to get to the bottom.
[3:34]
even while the storm was ongoing.
[3:37]
you get to the bottom of what happened.
[3:40]
uh, the department of public service, which is
[3:43]
the staff arm of the state public service commission,
[3:46]
the regulatory commission also opened an
[3:49]
investigation.
[3:49]
those opened on august 5th and lipid at the request
[3:53]
of its board issued a 30 day report with our
[3:57]
initial findings in september, that initial
[3:59]
report focused on the failure of the it systems,
[4:03]
their proximate causes and immediate fixes that
[4:06]
needed to be done to stabilize the systems, go
[4:09]
to the next page.
[4:11]
then the board also requested a 90 day report.
[4:15]
by the time of that 90 day report, we had looked not
[4:19]
just at the proximate causes, but the underlying
[4:23]
root causes of what failed and concluded that they
[4:26]
were management issues.
[4:27]
and then deciding that they were management
[4:30]
issues.
[4:31]
and that lipid pays a lot of money for management
[4:34]
services, the board of trustees, as well as the
[4:38]
department of public service, uh, voted and
[4:41]
asked the lipid staff to either terminate our
[4:44]
relationship with pseg or renegotiated unacceptable
[4:46]
terms.
[4:47]
the board also adopted 85 recommendations that were
[4:50]
made public and that pseg filed plans to implement.
[4:53]
and we have in a quarterly basis, uh, shown you the
[4:58]
progress against those plans, that decision to
[5:00]
either terminate or, uh, renegotiate the contract
[5:03]
led to an initial view.
[5:05]
once again, at the lipid board's request to hear
[5:09]
and present publicly what our alternatives were.
[5:12]
we delivered that report in december, which was a
[5:15]
complete report, but a quick one, uh, the board
[5:19]
asked us pursuant to that report and its findings to
[5:23]
proceed with discussions with pseg and simultaneous
[5:26]
simultaneously also evaluate our other
[5:27]
alternatives.
[5:28]
those alternatives included privatization of
[5:30]
the utility.
[5:31]
we're a public utility publicly owned or
[5:33]
renegotiated contract with pseg or a contract with
[5:37]
somebody else as our management service
[5:39]
provider or life management.
[5:40]
we issued a report on april 28th in that april
[5:44]
28th report.
[5:45]
we detailed and made public, uh, our findings
[5:48]
on those options, as well as the requirements.
[5:51]
if we were to reach and renegotiated deal with
[5:55]
pseg, what it would need to look like, go to the
[5:59]
next page, uh, at points, it did not appear like we
[6:04]
would be able to seek adequate terms.
[6:06]
the board directed us to issue and fully explore
[6:10]
alternative providers.
[6:11]
and in may, we issued a request for information
[6:14]
and began that process.
[6:16]
we also sought from you members of the public,
[6:20]
your feedback on those alternatives.
[6:22]
in that report in june, by late june, we had reached
[6:26]
a tentative settlement agreement with pseg long
[6:29]
island that met the eight reform objectives that the
[6:32]
board had set out in that tentative agreement.
[6:35]
we presented those terms publicly to the board, and
[6:39]
that was a settlement, but it was a term sheet.
[6:43]
it wasn't the final contract language.
[6:45]
if you go to the next page, I think the most
[6:50]
important thing was that it ensured stronger
[6:52]
management structure, accountability, and
[6:54]
oversight, and it also shortened the contract
[6:57]
term.
[6:57]
we, uh, at that point proceeded at the board's
[7:01]
direction to negotiate with pseg.
[7:03]
if you go to the next page and it took until november
[7:07]
9th to reach an actual settlement agreement, a
[7:10]
proposed settlement agreement, the final
[7:12]
terms, and we made that more than a hundred page
[7:16]
agreement available on our website.
[7:19]
in addition to making that a hundred page
[7:22]
agreement available on our website, we also posted
[7:25]
2022 performance metrics that would be under this
[7:28]
agreement.
[7:29]
and I'll talk more about those in a minute.
[7:32]
you see to the right, those eight items that we
[7:36]
detailed in that options analysis.
[7:38]
and I'll spend a minute talking about each of
[7:42]
those eight elements, the things that were requisite
[7:45]
for us to continue a relationship with pseg the
[7:48]
board instructed us to not come back without
[7:51]
addressing at least these eight things you go to the
[7:55]
next page, I'll briefly cover these and these
[7:58]
materials are also available online on our
[8:01]
website, but objective one, a greater share of
[8:04]
pseg is management compensation had to be at
[8:07]
risk.
[8:08]
we pay approximately $80 million a year.
[8:11]
and under our old contract, only 10 million
[8:14]
of that was at risk compensation for
[8:17]
performance under the new contract proposed new
[8:19]
contract, 40 million or 51% of the contract fees
[8:23]
would be at risk.
[8:25]
number two, the board said that there have to be
[8:29]
a new way of gauging performance under the old
[8:32]
contract.
[8:33]
the performance measures that that $10 million were
[8:36]
determined by were set in 2013 and it required
[8:39]
mutual agreement to update.
[8:41]
I think the contract was well-intended however, as
[8:44]
time marched on those measures became somewhat
[8:47]
stale and reaching mutual agreement to update to
[8:50]
stronger, more strict performance measures that
[8:52]
also accounted for all the variety of services pseg
[8:56]
provides to weipa and its customers became
[8:59]
challenging under the new agreement.
[9:01]
the board said, no, there has to be an independent
[9:04]
process to set standards pursuant to the, uh, the,
[9:08]
uh, desires of the board for the service to the
[9:12]
customers.
[9:12]
and that, that this contract does that.
[9:15]
it also expands the number of metrics from
[9:18]
approximately 25 to more than 110 covering all the
[9:22]
scopes of services.
[9:23]
so for example, under the prior contract, there were
[9:27]
no performance measures related to the it systems
[9:30]
that failed under the new contract.
[9:32]
there are many go to the next page.
[9:36]
it wasn't, uh, it was not just sufficient that we
[9:39]
have incentives.
[9:40]
we also have to have penalties for failure to
[9:44]
achieve minimum levels of performance.
[9:46]
and under the contract 10 to $20 million is at risk
[9:50]
for exceeding budgets.
[9:51]
five to 10 million is at risk for failures to, uh,
[9:56]
to implement the emergency response plan that the
[9:59]
lipid board and the department of public
[10:01]
service approved each year, that pseg is
[10:04]
supposed to execute in the event of outages.
[10:07]
this is about a thousand page document, and you can
[10:11]
see it on our website.
[10:13]
uh, if reliability, the average minutes, uh,
[10:16]
customers out of power fall below a minimum
[10:19]
standard.
[10:20]
there's a 10 million automatic penalty in the
[10:23]
contract customer satisfaction, a 3 million
[10:25]
penalty.
[10:25]
and if there's two consecutive failures, we
[10:28]
have the right to terminate the contract.
[10:31]
I should mention failures to implement the emergency
[10:34]
response plan for a 72 hour or more storm.
[10:38]
also give us a right to terminate the contract
[10:42]
violations of the emergency response plan or
[10:44]
failure to provide safe and adequate service
[10:47]
subject to an investigation, another 20
[10:49]
million.
[10:50]
so in total 10 million is at risk based on a
[10:54]
calculation of failures to meet a minimum level on
[10:58]
the emergency response plan.
[10:59]
and we can terminate and additional 20 million.
[11:02]
so 30 million in total, if an investigation finds
[11:06]
other violations of the emergency response plan in
[11:09]
the event of a major outage, a failure to
[11:13]
implement minimum protocols for
[11:14]
cybersecurity, also an event of failure or an
[11:17]
event of default for which we can terminate the
[11:21]
contract term has also been shortened.
[11:23]
and, uh, the importance of this is that the old
[11:27]
contract had a, uh, gave to pseg, essentially a
[11:31]
right of renewal at their option for an additional
[11:34]
eight years.
[11:35]
so while the contract term extended to 2025, with
[11:39]
that right of renewal, the contract could extend all
[11:42]
the way to 2033.
[11:44]
we eliminated that option, uh, of pseg to
[11:47]
automatically extend the contract at their right.
[11:50]
uh, if we agree to extend the contract, it will be
[11:54]
based on the performance over the next four years.
[11:58]
and that will be a future decision of the lipid
[12:02]
board based on how the contract goes.
[12:05]
number, uh, the next objective on the page, in
[12:08]
the middle of the page management, it was
[12:11]
ultimately a management failure.
[12:13]
and you can read all about in those publicly
[12:16]
available reports, but we insisted on a dedicated
[12:19]
and strengthened management team with all
[12:22]
the authority necessary to provide service to long
[12:25]
island, to make sure that those individuals who run
[12:29]
the utility every day are exclusively focused and
[12:32]
dedicated and coming in every day, thinking about
[12:35]
long island, it also requires the addition of
[12:38]
five new senior level positions, all based on
[12:41]
long island.
[12:42]
uh, the contract requires a duty of candor.
[12:45]
and if there's a violation of the duty of
[12:49]
candor, uh, as described to you on the page that
[12:53]
also provides a right to terminate the contract
[12:56]
early, go to the next page.
[12:58]
it requires that if lippa fines and the board adopts
[13:02]
with the recommendation of the department of public
[13:05]
services, well, if lipid finds that there is a
[13:09]
deficiency and operations, there is a period of time
[13:13]
with which to correct that deficiency under the
[13:16]
contract and it's term limited objective seven,
[13:18]
uh, long-term planning, budgeting development, and
[13:21]
cost management.
[13:22]
the contract requires the development of long-term
[13:24]
plans to meet the scopes of services that are
[13:28]
required.
[13:28]
uh, objective eight, uh, the partitioning of the
[13:31]
long island.
[13:32]
it systems separate from new jersey, which provides
[13:35]
greater clarity responsibility.
[13:37]
this was another core ease-of-use finding, and
[13:39]
you can read all about it in our report.
[13:43]
if you go to the next page, those described the
[13:47]
contract terms, but let's come back to what we're
[13:50]
trying to achieve.
[13:52]
we're not just trying to achieve a better contract.
[13:55]
the real ultimate goal is to provide great service
[13:59]
to our customers service that you should be proud
[14:02]
of, clean, reliable, resilient service at
[14:05]
affordable prices.
[14:06]
the lipid board has adopted standards
[14:08]
directives of what that service should look like.
[14:11]
and you can read all about them on our website, but
[14:15]
they include great customer satisfaction,
[14:17]
high reliability benchmark to the top 10% of
[14:21]
utilities industry leading emergency response, clean
[14:23]
energy, 70% renewable energy by 2030 and
[14:26]
entirely carbon-free grid by 2040 and rates that are
[14:29]
comparable to our region.
[14:31]
so you can read all about the board's standards in
[14:35]
this contract, provides the mechanism to make sure
[14:38]
that pseg management comes in every day, focused on
[14:41]
achieving those objectives.
[14:43]
if you go to the next page, I mentioned there's
[14:46]
$20 million at risk for meeting these performance
[14:50]
standards.
[14:50]
and there's another 20 million at risk for
[14:53]
failures to provide safe and adequate service.
[14:56]
basically subject to an investigation.
[14:58]
did talk a little bit about these performance
[15:01]
standards, because they're a key part of the contract
[15:05]
on the next page.
[15:07]
what you can see is that they cover all the types
[15:11]
of services that pseg management or pseg is
[15:14]
managing to, to, uh, provide services to lipids
[15:17]
and its customers.
[15:18]
so reliability, resilience, risk
[15:20]
management, customer satisfaction, external
[15:21]
affairs, it operations major projects, and they
[15:24]
cover all the scopes information technology,
[15:27]
customer service t and d business services, power
[15:30]
supply, and clean energy.
[15:31]
you can read all the details on our website.
[15:35]
if you click on that link or go to ally [inaudible]
[15:39]
dot com forward slash reform contract, there's a
[15:42]
more than a hundred page document.
[15:45]
and on that a hundred pages you can see for each
[15:49]
measure how it's defined and whether how pseg would
[15:53]
get paid under that measure.
[15:54]
if you go to the next page, I'll just highlight
[15:58]
a few examples.
[16:00]
so you understand the types of things I'm
[16:03]
talking about.
[16:04]
for example, there are three performance metrics
[16:07]
metrics of the 96 performance measures.
[16:09]
there are three around asset management.
[16:11]
why should you care about asset management?
[16:14]
well, the utility business is a very asset intensive
[16:18]
business, all those poles and wires and substations,
[16:21]
and they will have to be maintained reliably.
[16:24]
and, uh, not just reliably, we have to
[16:27]
collect the right data.
[16:29]
we have to maintain them.
[16:31]
uh, and, uh, on the right schedule, we have to use
[16:35]
the data that's available to us.
[16:37]
doing all these things increases reliability and
[16:40]
reduces costs.
[16:41]
implementing a world-class asset management program
[16:43]
is what this goes, uh, is about and the standards
[16:47]
and progress towards that.
[16:49]
you can read all about, uh, customer information
[16:52]
system.
[16:52]
why should you care?
[16:54]
well, that's the backbone customer system that when
[16:57]
you call and interact with our call center, or you
[17:01]
get a bill, that's the backbone system by which
[17:04]
we deliver all services.
[17:06]
and if you don't have a modern customer
[17:10]
information system, it's going to be very hard to
[17:13]
keep up with providing the types of services that
[17:17]
people come to expect in an age when you can do one
[17:21]
or two clicks or use an app and find out more
[17:26]
about your service, your billing, and meet your
[17:29]
needs, your own way, reliability.
[17:31]
there are many standards in the 2022 metrics that
[17:34]
you can read about just to highlight it.
[17:37]
uh, pseg has to fall within the top 10% of
[17:41]
utilities for, uh, reliability on blue sky
[17:44]
days.
[17:45]
they have to reduce the number of customers that
[17:48]
have four or more outages a year by 22%.
[17:52]
next year, they have to reduce the numbers that
[17:55]
have flicker outages by, uh, more than 13% and
[17:59]
reduce customers with six or more flickr outages by
[18:02]
20%.
[18:03]
these are all good reliability measures,
[18:05]
resiliency.
[18:06]
we have very aggressive storm resiliency programs.
[18:09]
we all know storms are getting worse.
[18:11]
we have not just things that we'll be executing
[18:15]
next year, but also pilots that will lead to new
[18:19]
plans and programs in future years.
[18:21]
and you can read all about those types of initiatives
[18:25]
that we'll be delivering on in the coming year.
[18:29]
and in future years, customer satisfaction,
[18:31]
pseg has to implement seven particular projects
[18:34]
to improve customer satisfaction.
[18:35]
next year, they have to respond to your calls and
[18:39]
emails in a timely manner.
[18:41]
they have to respond to social media and tweets,
[18:45]
especially ones related to health and safety in a
[18:48]
timely manner.
[18:49]
they have to expand our low-income discount
[18:52]
programs for our customers that are less well off by
[18:56]
34% compared to the historic level of
[18:58]
participants.
[18:59]
in those programs, you go to the next page.
[19:02]
more of these measures include an integrated
[19:05]
resource plan, which is something that we've run a
[19:09]
public process around.
[19:10]
this is planning for how we're going to meet a zero
[19:15]
carbon electric grid over the next 20 years, uh, to
[19:18]
deploying more energy storage on the grid in a
[19:22]
word, those contracts complete the analysis to
[19:25]
award those contracts by the end of next year, meet
[19:29]
very aggressive energy efficiency and
[19:31]
electrification goals for transportation and for
[19:33]
home heating.
[19:34]
these will reduce carbon in other sectors of the
[19:37]
economy, not just the electric grid, but in the
[19:41]
biggest sources of carbon emissions for long island.
[19:44]
and you can read all about those plans on our
[19:48]
website, doing things to make long island more evie
[19:52]
ready, uh, simplifying the interconnection process
[19:54]
for customers who want to put solar on their roof,
[19:58]
uh, expanding time of use rates.
[20:00]
what does that, that's an option for you to pick
[20:04]
different rates that perhaps better meet your
[20:07]
needs or save you money, a work management.
[20:10]
we all want efficiency tracking work better.
[20:13]
uh, making sure we have the right staffing levels,
[20:17]
uh, reducing over time, completing capital
[20:19]
projects on time.
[20:20]
these are all just examples of measures,
[20:23]
including the it measures where one is about, uh,
[20:27]
measuring and benchmarking, uh, to a
[20:29]
life, a hired a benchmark expert consultant to come
[20:32]
in and look at how well we implement our major it
[20:37]
systems and make sure we're following best
[20:39]
practices in those areas.
[20:41]
go to the next page.
[20:43]
so the importance of all this is that this is not
[20:47]
a, a second chance for pseg that's based in hope.
[20:51]
this is a second chance based on binding
[20:54]
contractual commitments with incentives, with a
[20:57]
stronger local management structure that we believe
[21:00]
fundamentally address the core issues out of
[21:02]
tropical storm east.
[21:03]
yes, we're putting this in front of, uh, our, uh,
[21:07]
citizens you're on long island, our customers, our
[21:11]
stakeholders, and ultimately our board.
[21:13]
and what we're here to do is listen to you.
[21:17]
and what you think about this, uh, our timeline for
[21:21]
public review includes, uh, a, uh, having released
[21:24]
the contract on our website, which you can
[21:27]
download it if you have not already, uh, starting
[21:31]
on november 9th, our november 17th meeting,
[21:33]
where we hold heard from some members of the
[21:37]
public.
[21:37]
and we also discussed in detail, the contract and
[21:41]
the performance standards, these public comment
[21:43]
hearings, as well as the ability to submit written
[21:47]
comments to help tonight, I will be accepting
[21:50]
written comments through december 9th, and then we
[21:53]
will be presenting the, uh, the, uh, views of our
[21:57]
stakeholders to the board on december 15th.
[22:00]
and they may consider the pseg contract on that date
[22:04]
as well, along with metrics and budgets
[22:06]
further that you can find right on our website.
[22:10]
so if you go to the next page, there is a lot of
[22:15]
information on the website.
[22:17]
we've put out a couple of fact sheets that
[22:21]
summarize this information.
[22:22]
there's links here on this page, where you can find
[22:26]
it on the website, but you can find everything.
[22:29]
you can find all those investigative reports.
[22:32]
you can find our quarterly reports.
[22:34]
we issued over six written reports, each one,
[22:37]
generally in the 50 to a hundred page range over
[22:41]
the last 15 months, you can find previous public
[22:45]
comments that we have received.
[22:47]
you can find videos from the last, uh, year, uh,
[22:51]
you can find summaries.
[22:52]
so there's a lot of information there.
[22:55]
and if anyone has suggestions or more
[22:58]
information, we're happy to have it.
[23:00]
and with that, if you go to the next page, we're
[23:05]
going to turn it back over to you for what we intend
[23:09]
to do tonight, which is hear from you.
[23:12]
but I, as I started out with, uh, we're here to
[23:17]
listen and we're excited that you're excited and
[23:20]
have participated many, uh, of the people on this
[23:23]
call participated with passion over the last 15
[23:27]
months and care about your community and care about
[23:30]
your electric service.
[23:31]
and so we celebrate that.
[23:33]
we thank you for your active involvement and
[23:36]
participation, and thank you very much.
[23:39]
great.
[23:40]
thank you, tom.
[23:41]
so this will begin the public comment portion of
[23:44]
our meeting tonight.
[23:45]
uh, at this point I would ask anybody that's in the
[23:50]
attendee log to please raise your hand if you
[23:53]
would like to speak.
[23:55]
um, what I will do is I'll call off three names.
[23:59]
um, and then we'll keep adding to that list.
[24:03]
we do have several members of the community here
[24:06]
tonight that would like to speak on this, and we want
[24:11]
to make sure we give you ample opportunity, um,
[24:14]
prior to calling on you.
[24:16]
um, so our first three speakers, uh, based on an
[24:20]
order that hands were raised, uh, legislative,
[24:23]
bridget fleming, casey scheid, and fred harrison.
[24:26]
so at this time I'm going to bring legislator
[24:29]
fleming, um, into the panelists from hi
[24:32]
legislator.
[24:32]
good to see you again.
[24:35]
good evening, mr. Locascio good to see
[24:37]
you as well.
[24:38]
I appreciate the opportunity to be heard on
[24:42]
this important topic and that you'll be hearing
[24:45]
from members of the public as well.
[24:48]
suffolk county.
[24:48]
I am suffolk county legislator, bridget
[24:51]
fleming.
[24:51]
I serve as the vice chair of the public
[24:55]
transportation.
[24:55]
the public works transportation and energy
[24:57]
committee.
[24:58]
I am the chair of the, uh, community choice,
[25:01]
aggregation task force and the renewable energy task
[25:04]
force at the legislature and the chair of the ways
[25:08]
and means committee suffolk county is a major
[25:12]
customer of the utility.
[25:13]
our electric bill has run as high as $20 million in
[25:17]
recent years on june 8th, noting with alarm that
[25:21]
prolonged power outages and a breakdown of the
[25:24]
system use to communicate with the public after a
[25:28]
tropical depression, ies caused widespread hardship
[25:30]
and tried the patients of long island electric, uh,
[25:34]
customers, the suffolk county legislature, uh,
[25:36]
wrote, uh, to life, a board of trustees
[25:39]
unanimously urging that full consideration.
[25:41]
be given to the analysis of alternative options to
[25:45]
the current third party management system, rather
[25:48]
than seizing the opportunity to make real
[25:50]
change to the failed third-party management
[25:53]
system that has given us high costs, reliability,
[25:56]
and customer care failures and outdated technologies
[25:59]
as the world faces increasingly alarming
[26:01]
climate impacts.
[26:02]
we now see that we are returning to a
[26:05]
relationship with a failed partner.
[26:07]
from my perspective, this is a mistake on november
[26:11]
10th.
[26:11]
in fact, senators gordon, senator gordon, and
[26:14]
assemblyman feel urge the board to delay voting on
[26:18]
the contract and to suspend the process until
[26:21]
the current investigation by the attorney general is
[26:24]
complete in her investigation as to
[26:26]
whether the failed response to eis actually
[26:29]
violated state law 535,000 customers were left
[26:32]
without power and without any effective
[26:34]
communication about when the lights would go back
[26:37]
on some for as long as 10 days, the public needs
[26:42]
additional time to review this contract work is
[26:45]
underway, uh, by legislators to take a hard
[26:48]
look at the alternative option of a fully public
[26:51]
utility with some of the highest rates in the
[26:55]
nation.
[26:56]
and with another rate hike proposed in the 2022
[26:59]
budget and more than 90% reliance on fossil fuel
[27:03]
resources.
[27:03]
it's high time that we pause before obligating
[27:06]
rate payers to another four years with a partner
[27:10]
who has failed in so many ways has not been fully
[27:14]
forthcoming throughout this process and is still
[27:17]
missing milestones with revamping the outage
[27:19]
management system.
[27:20]
um, I know, um, tom, that you mentioned that, um,
[27:24]
that this all began on august the fourth.
[27:27]
uh, I want to disagree with you on that.
[27:31]
I think the failures, uh, at following the storm
[27:34]
ease ias in fact, gave us the opportunity to take a
[27:39]
hard look at a failed third party management
[27:42]
system.
[27:42]
unfortunately, the options analysis, which was a
[27:45]
great effort that was underway in august was
[27:48]
suddenly hijacked.
[27:49]
and without notice to many of the stakeholders who
[27:52]
had been involved, we were informed in the newspaper
[27:56]
that a contract was being pursued.
[27:59]
once again, with a failed partner tweaking this
[28:02]
failed third-party management system will not
[28:04]
serve rate payers.
[28:05]
I appreciate that increasing penalties for
[28:08]
failure to perform a shorter term and
[28:10]
flexibility to terminate the contract for failure
[28:13]
to comply with a long list of new items is moving in
[28:18]
the right direction.
[28:19]
but I urge you as have others to recognize that
[28:23]
considerations are underway both in albany,
[28:25]
under the attorney general and the state legislature
[28:28]
to look, take a hard look at what you, once we're
[28:33]
looking at.
[28:34]
and that is a real rigorous, uh, options
[28:37]
analysis and consideration of a fully public utility.
[28:40]
the urgency for fresh thinking that was
[28:43]
presented to us on, uh, on august the fourth, that
[28:47]
the hardships that our rate payers payers
[28:49]
suffered in august needs to be capitalized on
[28:52]
before we move forward with a contract with a
[28:56]
failed partner, I urge you to return to the public
[29:00]
options analysis delay entering into this
[29:02]
contract with someone, with a partner who has
[29:05]
failed to be forthcoming and has failed to meet
[29:09]
metrics time and time again, that basic
[29:12]
third-party management system is not serving
[29:14]
library.
[29:14]
quit payers.
[29:15]
please take the opportunity presented by
[29:18]
the hardships suffered by our rate payers to take a
[29:22]
fresh look and not go back to the same old ways.
[29:26]
thank you very much for the opportunity to be
[29:29]
heard.
[29:30]
it's a tough issue.
[29:31]
I wish you all the best.
[29:34]
I know we're all in it to serve the rate payers in a
[29:39]
reliable and cost effective way, and I offer
[29:42]
my support for that those efforts.
[29:44]
thank you very much and have a great evening.
[29:48]
thank you, legislator fleming.
[29:50]
and, uh, one other thing that I didn't mention, but
[29:54]
I do think it's important is that among all of our
[29:58]
termination rights is the right determinate for
[30:01]
municipalization who would have to pay a penalty to
[30:04]
do so about a $60 million, which was, uh, built into
[30:09]
the options analysis, but that is not different than
[30:12]
what we have currently.
[30:14]
so I do want to just note one thing, which is, uh,
[30:19]
if the governor and the legislature as a life, as
[30:22]
a public entity, to decide that we should go a
[30:26]
different way, uh, we have done nothing in the
[30:30]
contract that precludes that decision.
[30:32]
I do appreciate that.
[30:34]
and I know there's no, you, you don't want to
[30:38]
back and forth, but $60 million is three times the
[30:42]
annual cost of electric to suffolk county, uh, uh,
[30:45]
taxpayers for the suffolk county services.
[30:48]
but I appreciate that.
[30:49]
and I hope that you continue to think hard
[30:53]
about the things that I've presented.
[30:55]
thank you.
[30:56]
thank you.
[30:57]
thank you, legislator.
[30:59]
next step.
[30:59]
we'll have casey casey shy, followed by fred
[31:03]
harrison and then followed by antonio cruz.
[31:05]
so casey, we're going to move you in to the
[31:09]
panelist mode now.
[31:11]
hey guys, how are you?
[31:13]
um, okay.
[31:14]
uh, my name is casey shine.
[31:16]
I'm the political and communications director
[31:18]
for the international brotherhood of electrical
[31:21]
workers, local union, 10 49.
[31:23]
we represent 4,500 proud members.
[31:25]
that's almost 2000 members working each day to
[31:28]
operate, maintain the electrical transmission
[31:30]
and distribution system.
[31:31]
um, I wanted to come speak tonight on behalf of the
[31:35]
union and support other advise contract between,
[31:38]
uh, long island power authority and pseg long
[31:41]
island.
[31:41]
uh, lifetime pseg have been, they've maintained
[31:44]
such a strong partnership with ivw 10 49, and
[31:48]
they've always provided open lines of
[31:50]
communications on issues are important to our
[31:53]
members besides consistency, being
[31:54]
beneficial for our workforce.
[31:56]
uh, pseg took over in 2014 and the company's
[32:00]
commitment to safety has resulted in a 62%
[32:03]
improvement in osha cases.
[32:04]
this means our members are going home to their
[32:08]
families safely every day.
[32:09]
uh, in addition, pseg long island's commitment to
[32:13]
reliability has not only benefited customers, but
[32:15]
it's created jobs for our members since they took
[32:19]
over 900 miles of distribution.
[32:21]
mainline circuits have been storm pardoned, uh,
[32:24]
in 2021, the section circuits that have been
[32:27]
storm hearted has seen a 53% reduction in damage
[32:30]
leading to outages compared to the rest of
[32:33]
the distribution system.
[32:35]
this increases reliability and enhances customer
[32:37]
satisfaction.
[32:37]
uh, we're proud of the work that we do to support
[32:42]
long island and we enjoy our partnership with
[32:45]
light, but npcg so thank you for the opportunity to
[32:49]
speak.
[32:49]
uh, let's see.
[32:51]
it looks like a beautiful cat.
[32:53]
thank you.
[32:54]
you didn't do this all day.
[32:57]
so just now just to start.
[32:59]
all right, thanks guys.
[33:01]
okay.
[33:01]
next up will be fred harrison again, followed
[33:04]
by antonio cruz.
[33:06]
and then charles means, uh, and one of the
[33:09]
reminder we are timing everyone.
[33:11]
there is a five minute limit per speaker.
[33:14]
um, so far we've been held to that.
[33:17]
so we are keeping track and we will let you know
[33:22]
if you hit that point.
[33:24]
fred, you're moving in now I've read the floor is all
[33:28]
yours.
[33:29]
okie dokie.
[33:30]
thank you.
[33:30]
uh, I'd like to start by.
[33:33]
my name is fred harrison.
[33:35]
I'm a homeowner in merrick.
[33:37]
I'd like to start by thanking, uh, the life of
[33:41]
staff and mr. Falcon for their work and for that
[33:45]
thorough presentation tonight.
[33:46]
um, I'd like to say about the new contract, the
[33:50]
following, the proposed new contract documents,
[33:52]
how peace ag has been a money pit for rate payers.
[33:56]
uh, I thought that the cost of having pcyc
[34:00]
managed system was $80 million per year.
[34:03]
that's wrong management fees and profits.
[34:05]
only part of the story, looking at all the new
[34:09]
metrics and deliverables required by the proposed
[34:12]
agreement.
[34:12]
those 96 performance standards makes it pretty
[34:15]
clear.
[34:15]
that piece said long island has been getting
[34:18]
paid for work.
[34:19]
it has not done adequately, and it's not
[34:23]
just it work.
[34:24]
this is the eighth year of pcyc managing the system.
[34:28]
they profited handsomely receiving hundreds of
[34:30]
millions of bottles, of rate payer money in fees
[34:34]
and profits.
[34:34]
what have we gotten for our money accompany, which
[34:38]
he needs intensive supervision in virtually
[34:40]
every area of operation, transmission and
[34:43]
distribution on t power supply programs.
[34:45]
you name them mr. Falco, 13 major operation areas
[34:49]
and all, and this is no ordinary contractual
[34:52]
supervision.
[34:52]
leica will be closely watching p sec and dps
[34:56]
will be watching as well.
[34:58]
lots of rate payer money and staff time will be
[35:02]
devoted to all of this.
[35:04]
I was a high school teacher for decades.
[35:07]
the contract reads like a pins petition on steroids.
[35:11]
what exactly does of corporate bring to the
[35:14]
table?
[35:14]
how does piece of tech management contribute to
[35:17]
pair interests?
[35:18]
the evidence leads to the conclusion that piece sex
[35:22]
orientation is to advance peace.
[35:24]
and that's understandable.
[35:25]
we've seen that in their past performance.
[35:27]
we see it in their new ad campaign on subs september
[35:32]
22nd, mr. Eichorn declared in a report to the lack of
[35:36]
board that peace was quote back to controlling the
[35:40]
messaging unquote that's for sure.
[35:42]
and it's new ads piece seg takes credit for the hard
[35:46]
work and goodwill of its workers.
[35:48]
it takes credit for the programs and improvements
[35:51]
paid for by life and its repairs.
[35:54]
not by pisa.
[35:56]
they don't do the job they're paid to do, but
[36:00]
they do take credit for what others do.
[36:03]
not a bad racket.
[36:04]
mr. Icahn's language gives it all away at that same
[36:08]
september 22nd meeting, he reported that quote, the
[36:12]
next storm will benefit us.
[36:14]
we welcome the next storm.
[36:15]
mr. Falco remembers that incident.
[36:17]
can you imagine welcoming a major storm?
[36:20]
think the death toll from ida, mr. Eichorn was not
[36:24]
thinking about me or my neighbors.
[36:26]
he's focused on what's good for peace second at
[36:30]
shareholders.
[36:30]
so the contract is clear evidence that you do not
[36:34]
and cannot trust pisa.
[36:36]
you've said that if the inadequate all contract
[36:39]
remains in force, the misfeasance suit continues
[36:42]
and we have a peace sag, which must be heavily
[36:46]
policed by lifeline.
[36:47]
if we have a new, stronger agreement, that it is a
[36:51]
much better and stronger agreement, no doubt.
[36:54]
we have a piece that must be thoroughly policed,
[36:58]
either way.
[36:58]
we have the albatross of peace and it's 80 million
[37:02]
in fees and profits.
[37:04]
we are counting on you to find a way out of this.
[37:09]
we need you to outline a clear roadmap leading to
[37:12]
the well-documented rate savings there for the
[37:15]
taking.
[37:16]
we don't need [inaudible] or any other profit molded
[37:19]
service provider to manage things for us.
[37:22]
we trust the capabilities of a life of staff.
[37:25]
they are very good at what they do.
[37:29]
they are fine public servants.
[37:31]
we hope that you trust them to trust them enough
[37:34]
to run the system without peace sec.
[37:37]
thank you.
[37:38]
thank you, mr. Harrison, for your very consistent
[37:42]
interest in lipid fairs over the last year, you've
[37:45]
come to many, many board meetings and public
[37:48]
comment hearing.
[37:49]
so we do appreciate your interest.
[37:52]
thank you.
[37:53]
okay.
[37:53]
next up, we will have antonio cruz followed by
[37:57]
charles leaves and then eric weltman antonio,
[38:00]
we're going to move you in to the panelists for you
[38:04]
now.
[38:05]
awesome.
[38:05]
can y'all hear me?
[38:07]
okay.
[38:07]
great.
[38:07]
thank you so much.
[38:09]
and to begin, um, mr. Falcon, I saw that,
[38:13]
um, in 2019, your base pay was over $280,000.
[38:16]
and, you know, for the sake of creating
[38:19]
cost-effective measures for ensuring people have
[38:22]
access to public utilities, um, ensuring
[38:24]
that electricity access is basically a right at this
[38:28]
point.
[38:28]
um, I think we need to address some concerns
[38:31]
about, um, the privatization of our
[38:34]
electric grid and our energy system here in long
[38:37]
island.
[38:38]
um, I see that the contract being proposed,
[38:41]
but essentially render long islanders putting the
[38:44]
cost of and efficiency, whether that is in the
[38:47]
form of a 2.3, um, price hike in 2021 in 2022 is in
[38:52]
your contract, which I believe even pseg
[38:55]
projected was supposed to be lower in costs, but
[38:59]
anyway, or in the tens of millions of dollars, uh,
[39:03]
should pseg fail to meet the demands for
[39:06]
eco-friendly efficient and consistent power
[39:08]
distribution on long island.
[39:10]
now I bring this up because regardless of good
[39:13]
faith arguments or speculation, which is
[39:15]
essential, but long islanders are going to be
[39:19]
doing at this point, because at the end of the
[39:23]
day, until we have a dangerous storms and stuff
[39:26]
like that, that are caused by climate change, which
[39:30]
again, pseg is not even projecting, um, to meet
[39:33]
these deadlines by like 2040, which is still
[39:36]
beyond recommendations to meet this by 20 25, 20 30.
[39:40]
so again, we are seeing issues with this, but, um,
[39:44]
I don't think long islanders should be paying
[39:47]
30 milli should have paid 30 million for a poor
[39:51]
system maintenance and stuff like that.
[39:54]
and I believe that if we need this supplies, we
[39:58]
could see cost cutting measures like municipal
[40:00]
bond access department income, and having this
[40:03]
all be, um, essentially streamlined.
[40:05]
in my case through suffolk county departments, like
[40:08]
the public works department and
[40:10]
infrastructure funding, as well as the long island
[40:13]
power authority, all of these institutions can do
[40:16]
a lot more to ensure unionized jobs, lower
[40:20]
costs, um, safer electric systems, et cetera.
[40:23]
so to bring this back, and again, I'm really
[40:26]
trying to be brief here.
[40:28]
this contract really doesn't address the
[40:31]
concerns that a lot of us have.
[40:33]
this contract creates more administrative level jobs
[40:36]
that would be salaried and protected this, um,
[40:39]
doesn't ensure that, um, we'd actually be
[40:42]
addressing as well as the inflation crisis here in
[40:46]
long island because higher utility costs are part of
[40:49]
that problem.
[40:50]
and that's why this crisis goes beyond just keeping
[40:53]
the lights on so people can afford to actually
[40:57]
sustain or live on these costs than just access
[41:00]
another barrier for people to be able to live here.
[41:04]
and that's really what a lot of this comes down to.
[41:09]
so people are paying for an efficiency,
[41:11]
subcontracting, and privatization.
[41:13]
then we see that climate change, electricity access
[41:16]
and power redistribution.
[41:17]
aren't the priorities.
[41:18]
so again, regardless of good faith arguments, I
[41:21]
really do think that, um, like, uh, should undergo
[41:25]
municipalization efforts.
[41:26]
I think we need to ensure that efforts to make sure
[41:30]
that this is strictly a public utility and not
[41:33]
something that is contracted would make this
[41:36]
far more efficient, far more safer, and far more
[41:40]
cost effective.
[41:41]
thank you.
[41:42]
thank you, antonio.
[41:43]
uh, next step is charles then eric weltman and then
[41:47]
margaret mahler will be up next on charles.
[41:50]
we're going to move you in to panelists view now.
[41:54]
good evening.
[41:55]
my name is charles nunez and the ecosocialist
[41:58]
working group chair of the nassau county chapter, the
[42:02]
democratic socialists of america and a partner in
[42:05]
the re-imagined life.
[42:06]
but coalition, I keep my statement relatively
[42:09]
brief, but I'm just going to come tonight to say
[42:13]
transparently I'm off from the time of tropical
[42:16]
storm.
[42:16]
esa is he sets failures, which they lied about on
[42:20]
multiple occasions.
[42:21]
you all even sat there on the board, calling out to
[42:25]
your sides lies.
[42:27]
dan eichorn lie to everyone's faces multiple
[42:29]
times about the progress we were assured that you
[42:33]
said had gotten their act together.
[42:35]
but when hurricane henry was threatening to coast,
[42:38]
my memory, according to my memory, I remember seven
[42:42]
to 14 day warnings of failure, potential
[42:45]
failures.
[42:45]
you know, power might be also in 14 days.
[42:49]
I thought pcyc had said they were fixed
[42:52]
everything, but that's, that's what we heard.
[42:54]
thankfully for long islanders.
[42:56]
henry did not hit long island and mind you, it
[43:00]
hit rhode island and their power was back in one or a
[43:05]
one to two days.
[43:06]
I believe, you know, versus the seven to 14
[43:10]
days that piece said was warning us about, you also
[43:14]
said at the beginning of this, that to listen to us
[43:18]
through the public comments, 90% of the
[43:21]
comments or for full municipalization.
[43:23]
tell me how us coming here.
[43:26]
talking about a renewed contract with p sag was
[43:29]
listening to us.
[43:30]
it wasn't, I'm just going to say this in closing.
[43:34]
if you all vote for this contract, you all should
[43:38]
resign.
[43:38]
and if you don't, the legislature needs to step
[43:42]
in and take over.
[43:44]
and if they don't, then they should resign.
[43:47]
thank you.
[43:48]
okay, eric, weltman followed by margaret
[43:50]
mahler and then laura mckeller, eric, we're
[43:53]
going to move you in now, eric, you're on mute.
[43:57]
sorry about that.
[43:59]
great.
[43:59]
my name is eric weltman and I'm a new york senior
[44:03]
organizer with food and water.
[44:05]
watch a national non-profit environmental
[44:07]
organization, food and water watch is a proud
[44:10]
member of the re-imagined lipid campaign, along with
[44:13]
the long island, progressive coalition,
[44:15]
mothers out front or energy, and so many
[44:19]
incredible activists and allies.
[44:20]
and we're here to send a message to the lipid board
[44:24]
and to governor hoeckel long island deserves long
[44:28]
island needs a publicly owned, controlled and
[44:30]
managed power authority.
[44:32]
long island deserves long island needs to sever its
[44:35]
relationship with pac and g a company with a track
[44:39]
record, a long track record of failures and
[44:42]
lies.
[44:43]
it's time to establish new standards for
[44:45]
accountability, equity, resilience, and democracy
[44:47]
in our energy systems, and to create an institution
[44:51]
that's equipped to meet these standards and one
[44:54]
that will prevent climate catastrophe by moving the
[44:57]
region off fossil fuels and transition long island
[45:00]
to soar and wind power.
[45:03]
the time has come.
[45:04]
the time has come for the long island power
[45:08]
authority to end its relationship with pse and
[45:11]
g.
[45:11]
and to finally end decades of failed public private
[45:15]
partnerships, they have put profit over people, no
[45:18]
contract, no contract can alter repair or rectify
[45:21]
the fundamental disconnect between pse and g and the
[45:25]
region's needs.
[45:25]
the fact that the proposed contract contains a duty
[45:29]
of candor requirement is alarming.
[45:31]
we have to ask pse and g to commit not to lie.
[45:36]
what if they're lying about not lying, no
[45:39]
contract can overcome the fact that this is a flawed
[45:43]
model that is causing widespread widespread
[45:45]
hardship at great pasta rate pairs.
[45:47]
long island has been repeatedly battered by
[45:50]
storms, the intensity and fruit qfc, which are
[45:53]
heightened by climate change.
[45:55]
climate change is an existential threat to long
[45:58]
island.
[45:58]
creating an urgent need to move off fossil fuels.
[46:02]
we must stop transporting and burning
[46:05]
frack gas.
[46:05]
public power is the means by which we can ensure the
[46:10]
long island fulfills our legal and moral obligation
[46:13]
to transition to a hundred percent clean, renewable
[46:16]
energy.
[46:17]
we have a new governor.
[46:18]
we have new board members and even more will be
[46:22]
appointed the hopeful administration and the
[46:25]
lipid board have the opportunity to acknowledge
[46:28]
and move past the mistakes of andrew cuomo and put
[46:31]
the relationship with psng where it clearly belongs
[46:35]
in the dustbin of history.
[46:37]
food and water roster concludes with our call to
[46:40]
governor cuomo.
[46:41]
coco now is our moment to re-imagine lippa and
[46:44]
corporate control and abuse of our energy
[46:47]
systems and realize the benefits of public power
[46:50]
and formulas of smoothness or polarization, real
[46:53]
accountability where liable service, affordable
[46:55]
power and a transition off fossil fuels.
[46:58]
thank you.
[46:59]
thank you, eric, for your comments.
[47:01]
next, we're going to move in margaret mahler
[47:04]
followed by laura mckeller and then mike brady will
[47:08]
be up after laura.
[47:10]
hi, welcome.
[47:11]
hello.
[47:11]
hello.
[47:12]
all my name is margaret maher.
[47:14]
I'm a volunteer for food and water watch.
[47:17]
I'm a long island power authority rate payer as
[47:21]
well.
[47:21]
and I just want to put my 2 cents in saying that we
[47:26]
need public power.
[47:27]
now this new contract with pse and g does not fix or
[47:32]
lower outreach.
[47:33]
we need to manipulate view, sorry, municipalize.
[47:36]
now we all know how much it costs to live on this
[47:40]
island.
[47:41]
it is so expensive between the taxes, the water, the
[47:45]
gas, the electric, these municipalities should all
[47:47]
be public.
[47:48]
we pay high bills that seem to serve stockholders
[47:52]
over rate payers.
[47:53]
and this is just unacceptable.
[47:55]
we had many issues in the past, such as tropical
[47:59]
storm isis in 2020 pse and g needs to be held
[48:03]
accountable for their readiness of this storm.
[48:06]
we know they lied about their preparedness, their
[48:09]
response and the upgrades it made afterwards.
[48:12]
we want public power to serve the rate payers, not
[48:16]
the stockholders.
[48:17]
I can't even say this enough, who benefit from
[48:20]
our hard earned money, our money that we make, we are
[48:25]
giving away to stockholders the amount of
[48:27]
money that is made millions upon millions
[48:30]
every year is unbelievable.
[48:32]
speaking for myself and my neighbors.
[48:34]
we, the public want the board to terminate its
[48:38]
contract with pse and g and commit to public
[48:41]
power.
[48:42]
utility utilities like power and water should be
[48:45]
public.
[48:45]
they should all be public.
[48:47]
we need to go green to fight climate change.
[48:51]
we need governor hocal to champion this cause this
[48:54]
is extremely important.
[48:55]
we are paying so much money and the benefit to
[48:59]
us is very, very little.
[49:01]
it's really upsetting.
[49:02]
and one other thing, before I close, I don't
[49:06]
know who cuts the trees or who you hire to cut the
[49:11]
trees, but it is awful.
[49:13]
I just want to put that in there.
[49:16]
I thank you for letting me speak and say my piece.
[49:20]
thank you very much.
[49:22]
thank you, margaret laura mckeller, you are up next
[49:26]
then followed by mike brady and then call
[49:29]
merchenson after my hi laurie.
[49:31]
you're in the panelist view.
[49:33]
you're on mute.
[49:34]
am I unmuted?
[49:35]
can you hear me?
[49:37]
yep.
[49:37]
okay, good.
[49:38]
so my name is laura mckeller.
[49:41]
uh, I am a rate payer in greenlawn, new york.
[49:44]
I am also a, um, I'm a registered nurse and I'm a
[49:49]
mother of two teenage boys.
[49:51]
um, I think one thing that I've heard over and over
[49:55]
again, and I myself have said in these meetings is
[49:59]
that we are just all really fed up with pse and
[50:04]
g we are, we're just done.
[50:06]
we we're done.
[50:07]
we are done with this relationship.
[50:10]
um, not only were they ill prepared and not only was
[50:14]
their response poor to issais.
[50:16]
um, we relied too.
[50:17]
now, if this were any other relationship in my
[50:21]
life or in my children's lives or my friends'
[50:25]
lives, I would say just ended if this were an
[50:28]
obstetrician, for example, um, I would not be setting
[50:32]
new performance standards.
[50:33]
I would not be, um, creating a shorter
[50:36]
contract with him or her.
[50:39]
I would not be setting any sort of differences in
[50:43]
risk and compensation.
[50:44]
I would say this person does not delivery my next
[50:48]
child.
[50:48]
um, and I think that's what we need to do.
[50:52]
um, not only because of what we've seen in the
[50:56]
past, but because of what we are going to be
[51:00]
encountering in the future, we are truly at a
[51:03]
crossroads right now that I think all of us see
[51:07]
ordinary people like me see, in terms of climate
[51:11]
change, not just in terms of storms, but we see
[51:15]
what's going on out west.
[51:17]
we see the threat to our food.
[51:20]
we see the threat to our health health.
[51:23]
we see potential changes as the infectious disease
[51:26]
of elderly people dying because they're too hot.
[51:29]
like we see the threats, we cannot turn away
[51:33]
anymore.
[51:33]
um, so as we end the relationship with pse and
[51:37]
g, this gives us an opportunity for a new
[51:40]
relationship, that public power grants us.
[51:43]
um, we're also going to have to entirely change
[51:47]
the way that we produce and consume energy.
[51:50]
we have to do it.
[51:52]
there is no option.
[51:53]
um, and on top of it, the way we consume energy is
[51:58]
actually going to be more electrified.
[52:00]
so it's going to be putting even more pressure
[52:04]
and strain on the infrastructure that is in
[52:07]
turn, also threatened by these storms that are only
[52:11]
going to get bigger and bigger.
[52:13]
um, so in the process, we also need to be creating
[52:17]
clean energy and efficient energy.
[52:19]
we need to get away from fossil fuels so that we
[52:24]
are not exacerbating the problem that is creating
[52:27]
the storms.
[52:28]
um, but it's not all doom and gloom.
[52:31]
like I said, it really is an opportunity for public
[52:35]
power.
[52:35]
this is a huge opportunity for us.
[52:38]
um, we can create new jobs.
[52:40]
we can make sure that those jobs are going to
[52:44]
people who have been most unjustly effected by
[52:47]
climate change by pollution, by all of this,
[52:50]
by just the unfairness of life itself.
[52:54]
this is a huge opportunity and we cannot
[52:57]
rely on a corporate entity to do this.
[53:00]
this is something that we have to do together as
[53:04]
communities, as government, as scientists,
[53:06]
and we need community input.
[53:08]
we need community members at the table.
[53:10]
I said before, in other meetings, we know what we
[53:14]
need.
[53:15]
we know what we want.
[53:17]
and when we work together with experts and we work
[53:21]
together with labor, we can do this.
[53:23]
we do not need pse and g um, we need to end, um, we
[53:29]
need to end this relationship and we need
[53:32]
public power.
[53:33]
thank you so much for letting me speak.
[53:36]
thank you, laura, for your comments on next up
[53:40]
will be mike brady followed by ryan madden
[53:43]
and then george, povo like, we're bringing you
[53:46]
in now.
[53:47]
I, can you hear me?
[53:49]
we can.
[53:50]
great.
[53:51]
uh, my name is michael brady and I am a repair
[53:55]
from kings park.
[53:56]
I am also an attorney by profession and I am a
[54:00]
volunteer with law and progressive coalition and
[54:03]
cooperation long island.
[54:04]
I'm here to encourage the board to end leiper's
[54:08]
relationship with pse and g and to instead pursue
[54:11]
full municipalization of the long island power
[54:14]
grid.
[54:15]
other speakers tonight have.
[54:16]
and we'll continue to outline for you a variety
[54:20]
of excellent reasons for municipalization,
[54:22]
including enormous cost savings, operational
[54:24]
efficiency, and the overwhelming public
[54:26]
support that has been expressed in virtually
[54:28]
every recent meeting of this board.
[54:31]
as well as into public hearing that was held in
[54:35]
may your own options analysis shows the
[54:37]
overwhelming benefit of full municipalization.
[54:39]
it is abundantly clear that this is the only way
[54:43]
to go yet, almost immediately after the
[54:46]
hearing in may this board, perhaps with some strong
[54:50]
prodding from a certain governor, decided to
[54:52]
pursue a different path and double down with pse
[54:56]
and g despite its abysmal performance.
[54:59]
well that governor is gone now.
[55:01]
so perhaps we can revisit things and pursuing a
[55:04]
rational course.
[55:05]
I'd like to take a different tack and try to
[55:09]
convince you to change this course because
[55:12]
entering this contract is a horrible business
[55:15]
decision.
[55:15]
as an attorney, I often tell my clients that a
[55:19]
contract is only as good as the parties that are
[55:23]
involved in the transaction.
[55:24]
it is my belief that pse and g is not a good
[55:29]
partner and cannot be trusted.
[55:31]
why do I believe that?
[55:33]
because the lipid board has repeatedly told me, so
[55:37]
the board has accused pse and g of being woefully
[55:41]
unprepared for hurricane.
[55:42]
I say, yes, the board has repeatedly told us that
[55:46]
pse and g is not meeting the benchmarks that were
[55:50]
set to ensure that assistance upgrades were
[55:52]
completed in a timely manner.
[55:54]
so that such a disastrous storm response never
[55:58]
occurs again.
[55:58]
why would you trust pse and g and reward it with a
[56:03]
new contract?
[56:04]
well, we're told that this new contract is the
[56:08]
best deal that lipid has ever had, and that
[56:11]
includes large compensation penalties at
[56:13]
pse.
[56:14]
and g fails us again to that.
[56:16]
I say, so what, I'm here to tell you that as rate
[56:21]
payers, we don't want pse and g to reimburse our
[56:25]
money.
[56:25]
we don't want them to be paid in the first place.
[56:30]
what we do want is for our money to go towards a
[56:34]
durable and reliable power grid.
[56:36]
we want accessible communications and updates
[56:39]
in the advent of power outages.
[56:41]
we want rapid and efficient restoration of
[56:44]
service.
[56:44]
we want to pay electric fees that are not among
[56:48]
the highest in the country.
[56:50]
we want a utility that is agile and capable enough
[56:54]
to rapidly complete the critical transition to
[56:57]
renewable energy as mandated by the climate
[57:00]
leadership and community protection act.
[57:02]
as margaret said, we don't want our money going to
[57:06]
shareholders, which has been happening for far too
[57:09]
long after we built bailed out lipid, I'm sorry, loco
[57:13]
so many years ago, um, at a cost that we're still
[57:17]
paying today.
[57:18]
what we demand is utility that is responsive and
[57:21]
accountable to the people we demand public power.
[57:24]
thank you.
[57:26]
thank you, mr. Brady.
[57:27]
uh, next step.
[57:28]
we'll have ryan madden then george paval and then
[57:32]
timothy carson after george ryan, we're moving
[57:35]
you in now.
[57:36]
can you hear me wonderful.
[57:38]
um, good evening, everyone and lovely to see everyone
[57:42]
again this week.
[57:43]
uh, my name is ryan madden.
[57:45]
I'm the sustainability organizer with the long
[57:48]
island progressive coalition.
[57:49]
uh, we are a grassroots community-based
[57:52]
organization founded in 1979.
[57:53]
we fight for structural change at the local state
[57:57]
and national levels to attain racial justice,
[57:59]
build community wealth and realize adjust, transition
[58:02]
to a hundred percent renewable energy future
[58:05]
beginning in november of, uh, 2020, the long island,
[58:08]
progressive coalition, suffolk county and nassau
[58:11]
county chapters of dsa and food, or waterwatch came
[58:14]
together to urge the long island power authority,
[58:17]
determinate his contract with pse and g long island
[58:21]
municipalize and democratize in the
[58:23]
aftermath of tropical storm, sis, which resulted
[58:26]
in a 645,000 long island residents without power
[58:29]
for on average, more than two to seven days.
[58:32]
over the past, we have built a network of
[58:36]
supporters through the re-imagined lipid
[58:38]
statements consistently mobilized rate payers to
[58:40]
weigh in at monthly board meetings, held forums on
[58:44]
the benefits of public power with diverse
[58:47]
stakeholders and decision makers created toolkits.
[58:49]
this for additional public action, worked with
[58:52]
relevant elected officials to amplify those issue
[58:55]
statewide and publish op-eds and letters to the
[58:58]
editor and multiple media outlets and light all, all
[59:02]
of this.
[59:02]
um, the groundswell of community elected and
[59:05]
public support, um, for, uh, the full
[59:08]
municipalization of the long island power
[59:10]
authority.
[59:11]
uh, we are here to say that this new contract
[59:14]
does not fix the fundamentally flawed model
[59:17]
of our utility and that we need to meet as flies.
[59:22]
it is impossible to comment on this reform
[59:25]
contract without noting the structural issues
[59:27]
surrounding this.
[59:28]
we are also concerned as was raised earlier that
[59:31]
this contract is moving forward.
[59:33]
uh, moving ahead, uh, before the attorney
[59:36]
general finishes or investigation into whether
[59:38]
pse and g has failed sis response broke state laws,
[59:42]
uh, and before we know the responsiveness of the new
[59:46]
storm outage management computer system that pse
[59:49]
and g has been collected to deliver on, we urge the
[59:53]
lipid board to delay this vote and suspend this
[59:57]
process until they have more information on which
[1:00:00]
to make a sound decision as was noted earlier, too,
[1:00:04]
um, and reflected by, um, by other speakers, is that
[1:00:08]
decisions about the future of the long island power
[1:00:11]
authority and its relationship to pse and g,
[1:00:15]
um, should belong to the rate payers of this region
[1:00:19]
and the rate payers of this regional loan and
[1:00:22]
former governor.
[1:00:23]
andrew cuomo only had his legacy in mind when he
[1:00:27]
pushed light pcyc to renew terms earlier in july.
[1:00:31]
he, in that decision deliberately ignore long
[1:00:33]
island rate payers and elected officials, um, and
[1:00:37]
instead exerted his influence on behalf of pse
[1:00:40]
and g as was mentioned, his resignation, this
[1:00:43]
entire deal has been called into question, and
[1:00:46]
we believe the onus is now on governor.
[1:00:49]
hocal just your course back towards public power.
[1:00:52]
she must reject her predecessors failed vision
[1:00:55]
for our region and embrace a power proven model for
[1:00:59]
ensuring long island enjoys, reliable,
[1:01:01]
affordable, and renewable power, regardless of the
[1:01:04]
content of this new contract, a decision to
[1:01:07]
move ahead and not commit to public power, um, would
[1:01:11]
be an insult long island and rockaway's
[1:01:14]
communities, the dereliction of
[1:01:15]
responsibility to the need of democratic management
[1:01:18]
of our system and a grave mistake as the climate
[1:01:22]
crisis worsens, as we know, lipid can save
[1:01:25]
nearly $1 billion over the next day decade through
[1:01:29]
this process.
[1:01:30]
so instead of bonuses to unaccountable managers and
[1:01:33]
dividends to distant stockholders, we could see
[1:01:36]
lower rates and improved services for customers.
[1:01:38]
it was communicated earlier this year, uh,
[1:01:41]
during a new york state senate budget, hearing
[1:01:44]
that life, uh, had in its power, the ability to
[1:01:48]
municipalize on its own, once the tentative
[1:01:51]
agreement was struck in july, this assertion was
[1:01:54]
walked back and pushed to albany to decide while we
[1:01:58]
will work with albany to make necessary legislative
[1:02:01]
changes.
[1:02:02]
we asked that lipid continue to flesh out
[1:02:05]
options for and support the development of a
[1:02:08]
roadmap to a fully system.
[1:02:10]
if the lipid board does move ahead with this
[1:02:13]
contract, it must at the very least commit to not
[1:02:17]
renewing it.
[1:02:18]
after 2025 and began working with community
[1:02:21]
stakeholders right now to build a public power
[1:02:24]
system, we deserve lipid must also heat the call to
[1:02:28]
engage in more robust, intentional community
[1:02:30]
engagement in the conduct of utility operations.
[1:02:33]
while these public comment sessions are
[1:02:36]
appreciated and vital, they also feel somewhat
[1:02:38]
insincere by their impact.
[1:02:40]
maybe not by their intense, the public had
[1:02:43]
less than 30 days to read a 300 page contract,
[1:02:47]
digest it, develop comments on it, and then
[1:02:50]
deliver those comments.
[1:02:51]
the majority of the turnout for these, uh, um,
[1:02:55]
sessions is based on the work of community
[1:02:58]
organizations like ours and not the efforts of the
[1:03:02]
utility to seek input.
[1:03:03]
and as seen during the options analysis comment
[1:03:06]
sessions, public input does not translate into
[1:03:09]
utility response.
[1:03:10]
it often feels that proposals put before us to
[1:03:13]
comment on our decisions already made.
[1:03:16]
we need a democratic lipid that is accountable to our
[1:03:20]
region's communities.
[1:03:21]
a lipid that is led by those most impacted by
[1:03:24]
decisions concerning our energy system.
[1:03:26]
that includes rate payers, workers, municipalities,
[1:03:29]
community organizations, low-income households, and
[1:03:31]
environmental justice communities.
[1:03:32]
we must ensure that those who use pay for and work
[1:03:36]
for the system have a say in how it runs despite the
[1:03:41]
flawed model utilized and its conduct lipid is, and
[1:03:45]
probably claims to be a public power utility.
[1:03:48]
and that must mean the operation management and
[1:03:51]
policy making of the electric utility
[1:03:54]
exclusively by the public for the public interest,
[1:03:57]
which can only be the case with ongoing and
[1:04:00]
meaningful engagements.
[1:04:01]
lipomas heed the call for public power, which only
[1:04:05]
grows louder every day on long island throughout the
[1:04:08]
state and across the country.
[1:04:10]
we can not afford more delays, further delay as
[1:04:14]
for their time money and resources waste on a
[1:04:17]
utility model that is structurally unreliable
[1:04:20]
and accountable and more expensive, more expensive.
[1:04:22]
none of this is addressed by the proposal before us
[1:04:26]
today, and we deserve better.
[1:04:28]
thank you for your time.
[1:04:31]
thank you for your comments, brian.
[1:04:33]
I was certainly always going to do want to
[1:04:37]
acknowledge the tremendous amount of time that ryan
[1:04:40]
has spent, and he's been at every life, a board
[1:04:44]
meeting and follow these first so closely.
[1:04:47]
so I do appreciate that.
[1:04:49]
uh, so george will be next followed by timothy
[1:04:53]
carson and then william novella, george, we're
[1:04:55]
bringing you in now, george you're on mute.
[1:04:59]
hey everybody.
[1:05:00]
it's george paul, val from all our energy executive
[1:05:03]
director.
[1:05:04]
uh, look, all our energy is a long island energy
[1:05:07]
and environment protection non-profit organization.
[1:05:09]
and I want to thank you, tom.
[1:05:12]
and the board for all of the work that you have
[1:05:17]
parked to improve our utility over the past 16
[1:05:20]
months in the push to move to what was for everyone
[1:05:24]
involved, the obvious choice of public power.
[1:05:27]
it's not that this contract doesn't make an
[1:05:30]
improvement.
[1:05:31]
the problem is not just about the contract, nor
[1:05:34]
the contractor.
[1:05:35]
it's the system of a public private
[1:05:38]
partnership.
[1:05:38]
it just continues to leave long islanders vulnerable,
[1:05:41]
to storms in favor of profits and business
[1:05:44]
interests above rate payer interests and leaves us
[1:05:48]
not ready for the future.
[1:05:50]
that system just has to go.
[1:05:52]
we need a full public takeover of pseg long
[1:05:55]
island operations to the municipal and accountable
[1:05:58]
lipid to gain greater grid security, cost reduction,
[1:06:01]
resiliency, responsiveness, and
[1:06:02]
accountability.
[1:06:03]
any new contract merely just extends the current
[1:06:06]
problems, risks, our safety and delays.
[1:06:09]
the inevitable transition that we truly thank the
[1:06:12]
past and presently outgoing board members for
[1:06:15]
their service with much of the board to be new
[1:06:19]
members early in the year, we do feel having them
[1:06:23]
decide such an important matter and then leave in
[1:06:26]
the coming weeks, just diminishes the great work
[1:06:29]
the board has done, and it diminishes accountability
[1:06:32]
that has been so missing from this entire process.
[1:06:36]
this regression back to unaccountability was
[1:06:38]
dropped like a bomb on all of us by the disgraced
[1:06:43]
former governor, and for better, for worse.
[1:06:45]
this allows his outgoing appointees to approve his
[1:06:49]
backroom deal and walk away.
[1:06:50]
and likewise we'll allow any new board members
[1:06:54]
simply to point to the past board, uh, leaving
[1:06:57]
the rest of us vulnerable for this, uh,
[1:07:00]
accountability, uh, that will be missing.
[1:07:03]
additionally, those contract on paper allows
[1:07:05]
for more metrics for accountability.
[1:07:07]
will the board actually go out of their way to fully
[1:07:12]
enforce it?
[1:07:12]
when we will be faced with the same question then,
[1:07:16]
which is who will control our grid.
[1:07:19]
if an unhappy contractor holds all the power and
[1:07:23]
stands between us and our grid, the provision for
[1:07:26]
nearly a year severance as well in management fees
[1:07:30]
for failure on such a short term contract still
[1:07:33]
leaves us in diminishing returns.
[1:07:35]
it might be a bonus for them to even get fired.
[1:07:40]
at some point, the proof of this is, is this being
[1:07:44]
a possible outcome is pseg long island testifying to
[1:07:47]
the new york state assembly a month after
[1:07:51]
this, uh, contract was announced that everything
[1:07:53]
was under control and not going to be a problem.
[1:07:57]
and then just a few days later with hurricane henri
[1:08:01]
coming up the coast, we were told to prepare for
[1:08:05]
10 to 14 days without power.
[1:08:08]
wait, what?
[1:08:09]
anyway, not withstanding that there still is no
[1:08:12]
guarantee.
[1:08:12]
they are going to be a willing and cooperative
[1:08:16]
participant in any transition away from them
[1:08:19]
ever.
[1:08:19]
and I see little difference, whether it
[1:08:22]
happens sooner or later, they have done much to
[1:08:25]
prove that they will not act in a way that benefits
[1:08:30]
us as, uh, as, as shown by their public duty attested
[1:08:34]
in accuracies and untruths, um, which I've
[1:08:37]
just mapped that past the breaking point.
[1:08:39]
we cannot allow them to continue to hold our power
[1:08:43]
over us.
[1:08:44]
we need to take it back.
[1:08:46]
this resolution to the ongoing problems though,
[1:08:49]
exemplifies why we believe that the lipid board and
[1:08:53]
ultimately governor hogan have a responsibility to
[1:08:55]
steer our course forward towards public power.
[1:08:58]
thank you all so much.
[1:09:00]
thank you, george timothy carson.
[1:09:02]
you're up next followed by william novella then
[1:09:05]
jennifer green.
[1:09:06]
good afternoon, everybody.
[1:09:08]
uh, my check.
[1:09:09]
everyone can hear me right.
[1:09:11]
cool.
[1:09:11]
could even hear me, everybody.
[1:09:13]
I live in cinereach.
[1:09:15]
my name is tim and I'm an organizer with the suffolk
[1:09:19]
county democratic socialists of america.
[1:09:21]
this reformed contract with peace egg is a half
[1:09:25]
measure when leiba needs to use a full measure.
[1:09:28]
the contract needs to be terminated.
[1:09:30]
the failed public private partnership model needs to
[1:09:34]
go and like it needs to be fully democratized, a
[1:09:38]
shorter leash on pse and g doesn't mean much when
[1:09:41]
public power is a better deal for long island.
[1:09:45]
maybe there's a $60 million fine.
[1:09:47]
like you said, mr. Falcon, but lipid zone analysis
[1:09:51]
says it would save nearly a billion dollars over the
[1:09:55]
next decade.
[1:09:56]
if the piece of that contract was terminated in
[1:09:59]
favor of full municipalization, the only
[1:10:01]
reason the contract was agreed upon the first
[1:10:05]
place is former governor cuomo.
[1:10:07]
so why should we settle for this?
[1:10:10]
exactly long island can make such a powerful
[1:10:13]
statement by severing ties with wasteful and
[1:10:16]
inefficient management of psa and siding with the
[1:10:19]
people that serves stakeholders and
[1:10:21]
ratepayers and climate change is unfortunately
[1:10:23]
here to stay.
[1:10:24]
we can expect some storms in the future to be worse
[1:10:29]
than tropical storms that we've witnessed in the
[1:10:32]
past.
[1:10:32]
personally, I want us to be prepared in the best
[1:10:36]
way we can not by having a private management service
[1:10:40]
provider, but a publicly owned and operated
[1:10:43]
utility, which of course already service about 15%
[1:10:46]
of americans are 13% cheaper and have 46% fewer
[1:10:49]
power outages.
[1:10:50]
the benefits of public power check, all the
[1:10:53]
boxes.
[1:10:54]
the choice is easy.
[1:10:55]
terminate the contract with peace sag and let's
[1:10:59]
democratize our power system.
[1:11:00]
thank you.
[1:11:01]
thank you, timothy.
[1:11:02]
uh, william develo will be up next followed by paul
[1:11:06]
merchenson.
[1:11:07]
I know, um, there were some folks that had their
[1:11:11]
hand up to put them down.
[1:11:13]
um, if there are people that would like to speak
[1:11:17]
on this matter, I would ask, please raise your
[1:11:21]
hand, william and the vela.
[1:11:22]
we are gonna move you in.
[1:11:25]
okay.
[1:11:26]
thank you.
[1:11:26]
my name is william novella.
[1:11:28]
I am a member of the nassau county chapter of
[1:11:32]
the democratic socialists of america.
[1:11:34]
and you know, when I came here tonight, there are a
[1:11:39]
few words that I had when I thought of pse and g um,
[1:11:44]
one was albatross.
[1:11:45]
the other was parasite, and either one was changed
[1:11:48]
by the presentation presented the speed,
[1:11:51]
meaning by life.
[1:11:52]
uh, there was absolutely nothing in that
[1:11:55]
presentation that demonstrated that pse and
[1:11:57]
g is performance in their time.
[1:11:59]
contracted out by life, uh, has done anything to
[1:12:03]
benefit really long island and has done nothing but
[1:12:07]
cost taxpayers much and bring harm to the people
[1:12:10]
in our communities.
[1:12:11]
excuse me, the relationship here seems to
[1:12:14]
be that lipid seems to be meaning to pay more and
[1:12:18]
more, create more and more metrics in order to
[1:12:22]
oversight pse and g for the work that they're
[1:12:25]
supposed to be doing on their own, creating more
[1:12:29]
costs for a mill managed relationship.
[1:12:32]
that seems to be quite more contractual and quite
[1:12:35]
frankly, abusive for the people of long island who
[1:12:39]
are clearly having this thrusted upon them.
[1:12:41]
because I would say that there are very few people
[1:12:45]
from the ordinary public.
[1:12:47]
you you're to actually give public testimony.
[1:12:50]
many of us who are privileged to be here this
[1:12:54]
evening, and quite frankly, you know, having
[1:12:56]
less than two months to provide public testimony
[1:13:00]
on it is very disingenuous on your part to push
[1:13:04]
forward such a contract on people.
[1:13:06]
so it seems to me that there seems to be very
[1:13:10]
little to be done here.
[1:13:12]
and this seems to be a decision that is going to
[1:13:16]
be pushed down no matter what happens after
[1:13:20]
december 9th.
[1:13:20]
so I just wanted to express that clearly
[1:13:24]
universalization would be the best course of action
[1:13:27]
that pse and g needs to be eliminated as a working
[1:13:31]
partner with lipid as soon as possible.
[1:13:34]
and if that is not the case and the flippa
[1:13:38]
refuses to do that, then it is up to the public and
[1:13:42]
to the state government to thrust a decision to
[1:13:46]
change that.
[1:13:47]
and that's where I'm at.
[1:13:49]
thank you.
[1:13:49]
and have a
[1:13:51]
good evening.
[1:13:52]
thank you, william.
[1:13:53]
next step will be paul merchenson, uh, followed
[1:13:57]
by jeremy joseph, and then jennifer green.
[1:13:59]
okay.
[1:14:00]
call your unmute.
[1:14:01]
okay.
[1:14:02]
thank you.
[1:14:02]
um, my name's paul mark wilson, uh, I'm uh, on the
[1:14:07]
steering committee of transition town, port
[1:14:09]
washington.
[1:14:10]
we are a local community group on the port
[1:14:13]
washington peninsula, where our mission is to,
[1:14:16]
um, make our community safe, secure, sustainable,
[1:14:19]
and resilient in the face of climate change.
[1:14:22]
and clearly this issue is, uh, you know, uh, dear to
[1:14:26]
our mission of accomplishing those
[1:14:28]
objectives.
[1:14:28]
uh, so we're really urging, um, light, but not
[1:14:32]
to make a rush to judgment.
[1:14:34]
please let the attorney general finisher
[1:14:37]
investigation delay your vote until all the
[1:14:39]
information is there.
[1:14:41]
and I believe, I hope that the timing of this public
[1:14:45]
session is to allow you to hear and gain enough
[1:14:49]
support from the public to do that and to move down a
[1:14:54]
more responsible path, secure and affordable
[1:14:56]
power.
[1:14:56]
it's too important to be subject to private profit.
[1:15:00]
um, I was, you know, I was struck as eric weldon was
[1:15:05]
by the phrase duty of candor.
[1:15:07]
and I just have to say that, uh, I've spent over
[1:15:12]
40 years, um, in the, in the private sector
[1:15:15]
managing, uh, large management and, uh,
[1:15:18]
capital projects and a lot all over the world and
[1:15:21]
never have I come across that phase.
[1:15:24]
now I understand in the public sector that there
[1:15:28]
are regulations and there are different things that
[1:15:31]
affect, uh, contracts, but I've also worked in highly
[1:15:34]
regulated industries in highly regulated
[1:15:36]
environments.
[1:15:37]
and that phrase to me is a exclusionary phrase.
[1:15:40]
it just indicates that there is no level of
[1:15:44]
trust.
[1:15:44]
and you've, you've indicated that in
[1:15:47]
yourselves, in the past dealings, this is not an
[1:15:50]
organization pse and g that's forthcoming and
[1:15:53]
honest and trustworthy, and they need to be
[1:15:56]
eliminated on that basis if not poor performance.
[1:15:59]
so, um, it also speaks if that, if that was in prior
[1:16:04]
contract, it speaks to the bankruptcy of the model,
[1:16:07]
the private public partnerships.
[1:16:09]
and again, municipalization has a
[1:16:11]
much better track record in terms of performance
[1:16:15]
and, uh, and course delivery.
[1:16:17]
so again, it's, it's just, I feel for you because you
[1:16:21]
have to be shaking your heads off screen and
[1:16:24]
saying, yeah, we know this, we know this, we
[1:16:28]
know this, but you obviously have a lot of
[1:16:31]
other things to, uh, uh, you know, to navigate in
[1:16:35]
terms of your decision making.
[1:16:37]
but, uh, the public voice has to be an important
[1:16:41]
part of that.
[1:16:42]
so, you know, as, as, as have said, public power is
[1:16:47]
not new.
[1:16:48]
it works.
[1:16:48]
it's something whose time has come, it's too
[1:16:52]
important, uh, uh, to, to put profit over a public
[1:16:55]
safety.
[1:16:56]
and I just want to say on a personal note that, um,
[1:17:01]
in the park section of port washington, where I
[1:17:04]
lived during, uh, ida, three of my neighbors,
[1:17:07]
their basements completely flooded.
[1:17:09]
now, I'm bringing that up, not to say that, that,
[1:17:13]
you know, that's a direct result of a pse and g is
[1:17:18]
mismanagement or that they all lost power, but it
[1:17:21]
indicates the severity of the climate events that
[1:17:25]
were facing these, uh, black swans are a hundred
[1:17:28]
year events that you're talking about.
[1:17:30]
they are totally unprepared to deal with
[1:17:33]
that.
[1:17:34]
we need a totally different model that can,
[1:17:37]
that can handle events that cannot be foreseen
[1:17:40]
because every year in every community we see
[1:17:43]
these is, there are things we read in the papers.
[1:17:47]
these are the things people are experiencing
[1:17:50]
and people feel threatened.
[1:17:51]
this is not just about their rates.
[1:17:54]
it's about their lives, their security, even if
[1:17:57]
they don't drown in their basements, as other people
[1:18:01]
have done in the region, they're at risk of living
[1:18:05]
in homes that have mold and have other, uh, health
[1:18:09]
and safety results as, as a result of climate
[1:18:12]
events, living and occupying a home that has
[1:18:15]
gone without power for any substantial length of
[1:18:18]
time, also prevents those risks.
[1:18:20]
so these are things that are affecting people's
[1:18:23]
safety, security, and lives.
[1:18:25]
and I just want to leave it at that because I think
[1:18:30]
that the personal element is very important.
[1:18:33]
you have safety of people and their livelihood in
[1:18:36]
your hands.
[1:18:37]
please make the responsible decisions.
[1:18:39]
thank you.
[1:18:40]
thank you.
[1:18:41]
call, uh, next up will be jeremy joseph followed by
[1:18:45]
jennifer green and then amber ruth her, uh, again,
[1:18:48]
a reminder, if you are on and would like to comment,
[1:18:53]
you do need to raise your hand to do so.
[1:18:57]
jeremy you're being brought in now.
[1:18:59]
uh, so I guess my guiding principle for this is
[1:19:03]
pretty simple.
[1:19:04]
uh, utilities are a service to the public and
[1:19:08]
they should be publicly owned.
[1:19:09]
uh, in contrast investors in private corporations
[1:19:12]
like pseg have one motive it's making profit.
[1:19:15]
uh, you cannot provide an essential service to
[1:19:19]
people while operating under a profit motive.
[1:19:21]
these things are fundamentally opposed.
[1:19:23]
uh, a public utility should be accountable for
[1:19:26]
whether it is accountable to the people it serves.
[1:19:30]
uh, whereas a privately operated utility only
[1:19:33]
answers to its shareholders.
[1:19:34]
uh, if pseg were completely competent in
[1:19:37]
its current role, uh, hypothetically speaking,
[1:19:39]
they would still fundamentally not be able
[1:19:42]
to serve the needs of our communities.
[1:19:45]
uh, one of the greatest needs, if not the greatest
[1:19:49]
is to transform our energy system into one that is
[1:19:53]
environmentally sustainable.
[1:19:54]
uh, no one should trust a private corporation to
[1:19:57]
drive these critical changes.
[1:19:59]
they're only interested in these changes as long.
[1:20:02]
it is, it is profitable for them.
[1:20:05]
uh, I'm not willing to leave our environmental
[1:20:08]
fate in the hands of shareholders.
[1:20:10]
um, now as it stands, uh, pseg has not shown
[1:20:14]
themselves to be a competent partner.
[1:20:17]
they have a long history that falls well short of
[1:20:21]
our expectations, and they have not even provided
[1:20:24]
adequate service under a current agreements.
[1:20:26]
so why are we extending more grace to a
[1:20:30]
relationship that shouldn't exist in the
[1:20:32]
first place?
[1:20:33]
um, so I know tonight and even over the however many
[1:20:37]
months, this process has gone on that.
[1:20:40]
you've heard from private citizens, from advocacy
[1:20:43]
groups, even from politicians like
[1:20:45]
legislator fleming tonight, who is
[1:20:47]
extensively very connected to this sort of issue.
[1:20:50]
um, and if overwhelmingly, oppose, continuing this
[1:20:52]
relationship with pseg, the only people I've heard
[1:20:56]
speaking in favor of this contract are those who
[1:20:59]
directly benefits from this con, this, this
[1:21:02]
relationship rather, uh, I don't really see any
[1:21:05]
ambiguity and these discussions, uh, all
[1:21:07]
community stakeholders would benefit from a full
[1:21:10]
month municipalization of our power grid.
[1:21:13]
and this relationship with p seg should end.
[1:21:16]
thank you.
[1:21:17]
thank you, jeremy.
[1:21:18]
uh, jennifer green, then amber ruther and then
[1:21:21]
billy roberto.
[1:21:22]
and I would remind everyone, if you do have
[1:21:26]
an interest in speaking tonight, raise your hand.
[1:21:29]
there's a button on the bottom of the screen on
[1:21:33]
zoom.
[1:21:33]
somebody had suggested we point that out in case
[1:21:37]
there was some confusion.
[1:21:38]
so jennifer, we're bringing you in now.
[1:21:41]
thanks soundcheck.
[1:21:42]
can I be heard?
[1:21:44]
we can hear you.
[1:21:45]
great.
[1:21:46]
hello, and thank you all for the opportunity to
[1:21:49]
speak.
[1:21:49]
turn on my camera.
[1:21:51]
there we go.
[1:21:52]
this is my first time at a public hearing and I will
[1:21:57]
be brief.
[1:21:58]
I am a longtime rate payer in bellport.
[1:22:01]
I'm also a member of suffolk county, democratic
[1:22:04]
socialists of america, and I'm the daughter of an
[1:22:08]
energy economist who studied utilities among
[1:22:10]
other things.
[1:22:11]
and if he were alive today, I know he'd be here
[1:22:15]
speaking to you too.
[1:22:17]
so I'm here tonight to add my voice to the many who
[1:22:21]
are calling for full municipalization of long
[1:22:24]
island's power third-party management.
[1:22:26]
isn't what we need publicly owned utilities,
[1:22:28]
better on numerous counts.
[1:22:30]
and when I learned that the former governor may
[1:22:34]
have exerted undue influence undemocratic
[1:22:35]
interference.
[1:22:36]
I was disturbed.
[1:22:37]
we deserve better.
[1:22:38]
I, and so many others don't want to see you vote
[1:22:43]
in favor of this contract.
[1:22:45]
we want life, but to commit to public power.
[1:22:48]
thank you.
[1:22:49]
thank you, jennifer and birther will be next and
[1:22:53]
then followed by billy rubber king.
[1:22:56]
hello, my name is andrew ruther and I'm with
[1:22:59]
alliance for a green economy, which is a member
[1:23:03]
of the statewide public power in new york
[1:23:06]
coalition, as well as an intervener in utility rate
[1:23:09]
cases around the state.
[1:23:11]
um, and I'm here to ask for an end to like this
[1:23:16]
contract with pcyc in favor of fully public
[1:23:19]
power that is democratically controlled
[1:23:21]
for now.
[1:23:21]
I urge the wipe of board to delay this vote,
[1:23:25]
suspend this process and fully commit to developing
[1:23:29]
a roadmap for public power.
[1:23:31]
we will also be working on developing legislation to
[1:23:34]
implement public power with the real logic
[1:23:37]
reimagine lipid coalition, since legislation is
[1:23:39]
clearly needed at this point, this new contract
[1:23:42]
with p sec, well making minor reforms does nothing
[1:23:46]
to address the root of the issue with their poor
[1:23:50]
performance, that their for-profit monopoly, who
[1:23:52]
profit for providing an essential service because
[1:23:55]
of this, no matter how much we try to micromanage
[1:23:59]
them with complex incentives, which
[1:24:01]
essentially amounts to doing their job for them.
[1:24:04]
and no matter how exhaustively we spell out
[1:24:07]
their responsibilities in a contract, they will
[1:24:10]
always have an incentive to prioritize their
[1:24:13]
profits over workers, rate payers in the environment.
[1:24:16]
and they will always have an incentive to find
[1:24:20]
loopholes to lie and misreport metrics to do
[1:24:23]
the bare minimum in terms of service, to defer basic
[1:24:27]
grid maintenance and to operate with a skeleton
[1:24:30]
crew of workers who are then unable to restore
[1:24:33]
power quickly during climate disasters.
[1:24:35]
so just tropical storm as aas, and then intervener
[1:24:39]
and utility rate cases around new york.
[1:24:42]
and I've seen the ways in which complex performance
[1:24:45]
metrics such as earnings adjustment mechanisms have
[1:24:48]
largely failed to address performance issues and
[1:24:51]
have only led to increased rates for rate pairs at a
[1:24:55]
time when over a million new yorkers already can't
[1:24:59]
afford their utility bills.
[1:25:00]
there's also no true way to hold.
[1:25:03]
[inaudible] accountable to the people they asked
[1:25:06]
sensibly serve.
[1:25:07]
while the dps may find them for more poor
[1:25:10]
performance, they're unable to find them an
[1:25:13]
amount that would severely impact share holder
[1:25:16]
profits, because then psa's cost of capital
[1:25:19]
would go up harming rate payers, and they may even
[1:25:23]
become unable to raise the capital, but they need to
[1:25:26]
function a basic human need.
[1:25:28]
that's a national monopoly should never be left up to
[1:25:32]
a for-profit and long islanders have been harmed
[1:25:36]
by the impacts of failed public private
[1:25:38]
partnerships for far too long.
[1:25:40]
we've seen the worst case scenario of what can
[1:25:44]
happen in places like texas or the energy people
[1:25:47]
need to survive is treated as a commodity to profit
[1:25:51]
from instead of as a human, right.
[1:25:54]
there's a reason that p sag has poor risk
[1:25:58]
management.
[1:25:58]
it's because they know the biggest risks of their
[1:26:01]
utility operations.
[1:26:02]
the risks of climate change, the risks of
[1:26:05]
safety issues for workers and the risks of blackouts
[1:26:09]
that will force people to miss work through his food
[1:26:13]
and medication, or even freeze to death will fall
[1:26:16]
on the backs of long islanders, not on
[1:26:20]
shareholders in any private monopoly, risks
[1:26:22]
and costs are socialized and profits are
[1:26:25]
privatized.
[1:26:25]
peace is the only utility in the country that
[1:26:29]
operates with a public private partnership model.
[1:26:32]
and there's a reason for that.
[1:26:34]
it doesn't work in the words of assembly member,
[1:26:38]
doug smith.
[1:26:38]
we have a frankenstein monster of utilities.
[1:26:41]
it's the worst of both worlds.
[1:26:44]
life is unaccountable to the people and we have the
[1:26:47]
monopoly of peace egg, which under the current
[1:26:51]
structure is guaranteed to make a profit while
[1:26:54]
utilizing lipos nonprofit status.
[1:26:55]
it's reprehensible that the options analysis,
[1:26:58]
which clearly showed that a fully public system was
[1:27:01]
by far the best option for rate payers and that the
[1:27:06]
public hearings were around 90% of testimony
[1:27:08]
was in favor of public power.
[1:27:11]
it was essentially ignored and overruled by a
[1:27:14]
backroom deal made by disgraced former governor
[1:27:17]
andrew cuomo.
[1:27:17]
we believe the onus is now on governor hoco to steer
[1:27:22]
a chorus back toward public power.
[1:27:24]
she must reject your predecessor.
[1:27:26]
so's failed vision and embrace a proven model for
[1:27:30]
ensuring long island has reliable, affordable, and
[1:27:33]
renewable power.
[1:27:33]
why should long island rate pairs be forced to
[1:27:37]
pay 65 to $75 million more per year for public
[1:27:41]
private partnership that continually fails them?
[1:27:43]
u s the u s already has 2000 fully public
[1:27:47]
utilities are electric co-ops and we know they
[1:27:50]
work.
[1:27:51]
we don't need to guess on average, they're 13% more
[1:27:55]
affordable and have passed the average direct outage
[1:27:58]
duration times of private utilities.
[1:28:00]
public utilities also have more freedom to innovate.
[1:28:03]
many have expanded, renewable energy and
[1:28:05]
electric heat pumps more quickly than private
[1:28:08]
utilities.
[1:28:08]
and chattanooga's electric power board was the first
[1:28:12]
to invest in fiber optics, laying the groundwork for
[1:28:15]
world-class grid.
[1:28:16]
and that has reduced power outages by 60% and save
[1:28:20]
this city close to $60 million annually.
[1:28:23]
we know public ownership in and of itself is not a
[1:28:27]
panacea.
[1:28:28]
we also need robust democratic governance
[1:28:30]
mechanisms to ensure that the interest of workers
[1:28:33]
rate payers reliability and the environment are
[1:28:36]
balanced.
[1:28:36]
that's why I also support the proposal to add an
[1:28:40]
observatory and an elected light lipid board that
[1:28:43]
would foster public engagement.
[1:28:45]
people that are tired of spending hours at sham
[1:28:49]
public hearings, where they have no real voice or
[1:28:52]
influence this board has a choice to make vote in
[1:28:56]
favor of the contract and betrayed like this rate
[1:29:00]
pairs or cut ties with pcyc and commit to fully
[1:29:03]
public power on long islands.
[1:29:05]
I urge you to do the ladder.
[1:29:08]
thank you.
[1:29:09]
thank you, amber.
[1:29:11]
uh, next step is billy roberto.
[1:29:13]
uh, at this point, following billy, uh, there
[1:29:16]
are no other members of the public than currently
[1:29:20]
have their hands raised.
[1:29:21]
so I would encourage anyone that is here that
[1:29:25]
has not yet spoken that would like to please raise
[1:29:29]
your hand.
[1:29:29]
now we're going to bring billy in right now.
[1:29:33]
good evening.
[1:29:34]
my name is billy [inaudible].
[1:29:36]
I'm a member of mothers out front and have been a
[1:29:40]
homeowner in huntington station for 25 years.
[1:29:43]
I have lived through life, a key keyspan like the
[1:29:47]
national grid and lipid pc.
[1:29:49]
and I can tell you the public private model does
[1:29:53]
not work.
[1:29:54]
how many times does the model have to fail before
[1:29:58]
we rejected in favor of a fully public liper?
[1:30:01]
yes, this contract is better than the previous
[1:30:04]
one, but a less flawed contract cannot fix a
[1:30:08]
totally flawed model.
[1:30:09]
I will not belabor what has gone wrong.
[1:30:12]
others.
[1:30:13]
I've already done that.
[1:30:14]
what I will do is share my vision of what we need
[1:30:19]
from an electric utility and what life it can be.
[1:30:23]
if the cheapest one is the one we don't use, then the
[1:30:28]
cheapest private partner is none.
[1:30:30]
libre can do better as a municipal utility, but how
[1:30:33]
we redesign lipase key.
[1:30:35]
that is why I'm part of the re-imagined life.
[1:30:39]
a coalition.
[1:30:40]
we are calling on governor hochul to support us in
[1:30:44]
pursuing a path to an innovative, fully public
[1:30:47]
utility model.
[1:30:48]
the light by electric rate payers.
[1:30:50]
I believe that with the legislation being prepared
[1:30:53]
with the help of re-imagined lipid
[1:30:56]
coalition, we can have a light, but that will
[1:30:59]
become all we needed to be.
[1:31:01]
we need a customer focused utility that is
[1:31:05]
accountable, reliable, transparent, and equitable
[1:31:07]
with more public input and better leadership in
[1:31:10]
decarbonizing our buildings.
[1:31:11]
we need a light bulb that answers to its customers.
[1:31:15]
we need leadership focused on moving aggressively
[1:31:18]
towards electric electrification and the
[1:31:19]
greening of our grid.
[1:31:21]
our future lies in electrification.
[1:31:23]
and for that, it needs to be reliable and renewable.
[1:31:27]
we need to revise the rate structure and make it
[1:31:31]
totally transparent.
[1:31:32]
as it stands now, delivery and service charges are
[1:31:35]
skewed lower for fossil fuel users and higher for
[1:31:39]
all electric homes.
[1:31:40]
as the state moves into electrifying all business,
[1:31:43]
all buildings, we must have a rate structure that
[1:31:47]
shortages customers for what it actually costs to
[1:31:50]
deliver service.
[1:31:51]
this should be the same for both me and my
[1:31:55]
neighbors, but I pay more because I heat with an
[1:31:59]
electric heat pump volume metric consumption costs
[1:32:02]
can be recovered via charge, separate from the
[1:32:05]
delivery charge.
[1:32:05]
your current rate plan for 2022 creates a quote solar
[1:32:09]
tax for new solar adopters.
[1:32:11]
if instead, the basic service charge a per day
[1:32:15]
rate included all the costs associated with the
[1:32:18]
operation and maintenance of electric grid,
[1:32:20]
including the cost of debt service and the transition
[1:32:24]
to a new bubbles, but not the amount of kilowatt
[1:32:28]
hours consumed.
[1:32:29]
it would create a level playing field for all.
[1:32:32]
after all those with net metered solar systems like
[1:32:36]
me utilize the grid to and should pay for its upkeep,
[1:32:40]
as it is those who make this transition early,
[1:32:44]
like me are being penalized by the system
[1:32:47]
charges.
[1:32:47]
while those who remain on fossil fuels are
[1:32:50]
unintentionally incentivized to stay on
[1:32:52]
them.
[1:32:53]
this works against the goals of the climate
[1:32:56]
leadership and community protection act and light
[1:32:59]
bulb because the leica will benefit from the
[1:33:02]
increased consumption as electrification advances.
[1:33:04]
I trust that as we move into the future, both
[1:33:08]
municipalization and a new rate structure will be
[1:33:11]
instituted for the betterment of our children
[1:33:13]
and their children.
[1:33:15]
thank you.
[1:33:16]
thank you, billy.
[1:33:17]
uh, we did have one additional hand raised a
[1:33:21]
christian array.
[1:33:21]
we were going to bring in right now.
[1:33:25]
here we go.
[1:33:26]
hi, my check.
[1:33:27]
cool, good evening.
[1:33:28]
my name is krishna house and I am the co-chair of
[1:33:33]
suffolk county.
[1:33:34]
dss looked so a working group, suffolk county dsa
[1:33:37]
is a full partner in the public power, new york
[1:33:41]
coalition and to re-imagine the lipid
[1:33:43]
campaign, the lipid board members zoned findings
[1:33:46]
after tropical storm [inaudible] are enough to
[1:33:49]
disqualify pisa from handling our electric
[1:33:51]
grid.
[1:33:52]
yet the lipid board is poised to hand it right
[1:33:56]
back to the company that failed to take care of it
[1:34:00]
further.
[1:34:00]
the board determined that repairs can save nearly a
[1:34:04]
billion dollars over the next decade.
[1:34:06]
if it terminated the contract with pcyc, they
[1:34:09]
therefore have the responsibility to explain
[1:34:12]
why that money will be going to management fees
[1:34:15]
and not improving our infrastructure.
[1:34:17]
there are forms list open the terms of the contract
[1:34:21]
are positive, but we have no confidence that they
[1:34:25]
will be fully implemented.
[1:34:27]
pcyc has continued to lie and slow roll.
[1:34:30]
its promised improvements after sies and we are
[1:34:33]
still left in the lurch.
[1:34:35]
tonight is the only say we like the repairs we'll
[1:34:39]
have in the decision.
[1:34:40]
when we spoke last summer, we were nearly unanimous
[1:34:44]
and asking them like, [inaudible] full
[1:34:46]
municipalization.
[1:34:47]
yet you members of the light bulb board ignored
[1:34:50]
us.
[1:34:51]
when governor cuomo called you listen officially,
[1:34:53]
cuomo's no longer in charge yet.
[1:34:56]
this contract has his fingerprints all over it.
[1:34:59]
now with less than a month until your terms expire,
[1:35:03]
you're carrying out the disgrace governors
[1:35:05]
commands without second thought.
[1:35:07]
fortunately, when you municipalize, we will end
[1:35:09]
the days of points of boards that ignore to
[1:35:13]
people.
[1:35:13]
and we will democratize like was born then and
[1:35:17]
will be cleared that if anyone wants to take
[1:35:20]
leadership of our electric grid, they will have to
[1:35:24]
listen to liberate pairs, not political leaders.
[1:35:27]
thank you.
[1:35:28]
thank you, christian.
[1:35:29]
okay.
[1:35:29]
this time we have no one else lined up in the queue
[1:35:34]
to speak one last opportunity for anyone
[1:35:37]
that may have missed the raise hand function in
[1:35:41]
zoom.
[1:35:41]
okay.
[1:35:41]
being none on tom, I will turn it back over to you
[1:35:46]
to close.
[1:35:47]
I just want to thank everybody for spending
[1:35:50]
your evening or a good portion of it with us
[1:35:54]
talking about electricity.
[1:35:55]
as I started off with york, my kind of crowd
[1:35:59]
that you want to spend your evening talking about
[1:36:03]
electric.
[1:36:03]
uh, when I go home, my wife doesn't have the same
[1:36:08]
level of interest that I get here.
[1:36:10]
so I really appreciate it.
[1:36:12]
uh, and thank you for contributing to our public
[1:36:16]
dialogue.
[1:36:16]
uh, we will be, uh, conveying this material,
[1:36:19]
uh, on our website.
[1:36:21]
we will also be accepting additional public comment
[1:36:24]
at our december 15th meeting and in writing.
[1:36:27]
so if you're no anyone that wants to contribute
[1:36:31]
that wasn't able to make it tonight.
[1:36:34]
uh, we have a couple more opportunities, but with
[1:36:37]
that really appreciate everybody coming out.
[1:36:39]
your thoughts are important, especially when
[1:36:42]
I acknowledge many of you that have been, uh,
[1:36:45]
consistently interested reading reports, uh,
[1:36:47]
showing up at board meetings, contributing to
[1:36:50]
the public dialogue for a very long period of time.
[1:36:54]
and you are heard.
[1:36:56]
so with that, thank you very much.
[1:36:58]
and I look forward to continuing our conversation.