Good evening. I'm going to call to order
[0:05]
this being May 28th a meeting of the
[0:08]
committee of infrastructure being held
[0:11]
this Wednesday again May 28th 2025 at
[0:15]
700 p.m. in the automatic chamber and
[0:17]
duly noted in two places including city
[0:21]
hall's websites in accordance with
[0:23]
requirements of RSA 91- semicolon 2
[0:28]
Roman numeral 2. Can the clerk please
[0:32]
take the role?
[0:34]
Absolutely. Alderman Tibido here.
[0:37]
Alderman Sullivan here. Alderman Cle is
[0:40]
here. Alderman Dow
[0:43]
and Alderman at large O'Brien present. I
[0:47]
declare a quarum. You have four members.
[0:49]
Yes.
[0:51]
Okay. Also in attendance is Mr. Tim
[0:55]
Cummings, administrative service
[0:57]
director.
[0:58]
uh Chief Stephen Buckton of the
[1:00]
Nashville Fire Rescue and Don Enright. I
[1:05]
don't know if she's on
[1:07]
I do not see but uh so we'll keep an eye
[1:11]
out if she decides to join us. Okay,
[1:14]
I'll open it up to public comment.
[1:17]
Anybody have
[1:19]
any information from the public? Seeing
[1:21]
none, we'll move on to discussion of
[1:24]
presentations on fire station facilities
[1:28]
update and I'll recognize Chief Buckton
[1:32]
and administrative service director, Mr.
[1:34]
Tim Cummings. Yes. Thank Thank you, Mr.
[1:36]
Chairman. Uh, may we approach? You may
[1:38]
approach. Have a seat.
[1:40]
They're much more comfortable
[1:42]
than the benches.
[1:48]
Commissioner, you want to join them? You
[1:49]
may. Okay.
[1:51]
right here and open it in my
[1:54]
So, uh, as as folks are getting settled
[1:56]
here for the record, Tim Cummings,
[1:58]
director of administrative services, uh,
[2:00]
uh, I'm going to hand it off to Chief
[2:02]
Buckton in one second, who's going to
[2:04]
who's going to go into a little bit more
[2:05]
detail than I am. But to just set the
[2:07]
table here, um, if you recall, uh, a
[2:11]
little while back, we set money aside to
[2:13]
do a master facility planning study, a
[2:17]
deferred capital maintenance study, if
[2:19]
you will. Um, and this evening, I
[2:22]
believe you're going to hear uh some of
[2:23]
the findings and the work that was done
[2:26]
over uh the last few months or so. Um,
[2:29]
the the real genesis behind this
[2:32]
conversation is because what I'm hoping
[2:33]
to do as a follow on to this
[2:36]
conversation is to start to have a
[2:38]
conversation with you all about
[2:40]
developing a plan for for funding the
[2:43]
various uh maintenance needs. Um, I have
[2:46]
some ideas uh kind of sketched out in
[2:49]
the back of my mind as to how to
[2:50]
possibly accommodate it. Uh, but
[2:53]
obviously, you know, I don't want to get
[2:55]
too far ahead of myself and I I welcome
[2:57]
everyone's input here. So, having that
[2:59]
conversation as uh in followup to this,
[3:02]
I think will behoove everyone as we do
[3:04]
want to be good stewards of the of the
[3:07]
city's assets. So, uh, with that being
[3:09]
said, Mr. Chairman, I'd like to hand it
[3:11]
off to uh uh Chief Buckton and uh and
[3:14]
start the conversation in earnest. Okay,
[3:16]
Chief Buckton, please. Thank you. Steve
[3:18]
Buckton, National Fire Chief. Um so, as
[3:21]
you may remember, we went through the
[3:23]
process uh to seek out a vendor to
[3:25]
perform a facility study for us. Uh we
[3:28]
found some people uh far on the other
[3:30]
side of the country um over in Seattle
[3:33]
that actually did the work for us. Um
[3:35]
Assistant Chief Pulot headed up the
[3:37]
project. Um the city invested about
[3:40]
$350,000 for this study. It's very
[3:43]
comprehensive comprehensive uh and it
[3:45]
gives us a good pathway forward uh to be
[3:48]
able to follow for many years for the
[3:50]
work we need to do to our facilities. Um
[3:53]
some of it is uh not a surprise to many
[3:56]
of us, but some of the dollar amounts do
[3:58]
add up to quite a bit. So uh I'll turn
[4:00]
it over to Assistant Chief Pulot. uh
[4:02]
he's worked with these uh two ladies
[4:05]
here and their team uh quite extensively
[4:07]
over the past year to get this study
[4:09]
done. So I'll let them take it away.
[4:11]
Okay. Before you start uh chief uh and
[4:15]
to our guests when if you are asked to
[4:19]
speak can you just identify yourself
[4:21]
because your new people and the
[4:23]
transcription people may not know. So
[4:26]
every time that you go to speak, state
[4:29]
your name and then it will be duly
[4:31]
recorded. Chief Fullard, good evening.
[4:34]
Thank you. So thank you. U as the chief
[4:37]
said comprehensive study of our
[4:39]
facilities that includes all six of our
[4:41]
firehouses, our fire alarm dispatch
[4:43]
center and our training grounds out of
[4:45]
the landfill. So it covers eight
[4:47]
facilities. uh focuses on the building
[4:49]
itself uh plumbing, electrical, HVAC
[4:53]
needs and a lot of focus on health and
[4:55]
safety of our firefighters. Those are
[4:57]
items like um proper separation between
[5:00]
apparatus space, living area, uh indoor
[5:03]
air quality testing, things like that.
[5:05]
So, the study really covered um pretty
[5:08]
much every avenue of of living in a fire
[5:12]
station. And uh to present tonight we
[5:15]
have Sarah Partap from uh Mang Analysis
[5:18]
and Sarah Gladex from Rice Fergus
[5:21]
Miller.
[5:24]
Hi. Thank you. Um I'm Sarah Partap uh
[5:26]
from Megan Analysis. Um I want to start
[5:30]
by just saying hello to everybody and
[5:32]
thank you to Chief Buckton and Chief
[5:34]
Pulot for the ask if you could bring the
[5:37]
microphone a little bit closer to you.
[5:39]
Yeah. Yeah. Is that better? Yeah. Okay.
[5:41]
So, thank you to you guys for the
[5:43]
support through this project. It was a
[5:44]
large undertaking that required a lot of
[5:47]
uh background information and support
[5:48]
while we were on site. As I mentioned,
[5:50]
it was a very extensive study. We had
[5:51]
team members on site in every building.
[5:53]
So, uh they were heavily involved in the
[5:56]
FCA and the planning process. So, we
[5:58]
appreciate your time. Um I was the
[6:00]
project manager of kind of the overall
[6:02]
project itself and then also of the
[6:03]
facility condition assessment portion.
[6:05]
Um and I have Sarah Gladex with me. I'll
[6:07]
let her introduce herself.
[6:09]
Hi, good evening. Sarah Gladex. I'm a
[6:12]
principal and fire station planner with
[6:14]
Rice Fergus Miller
[6:16]
Architects. And uh my job was to help
[6:19]
manage and plan phase two of this
[6:22]
project, which included understanding um
[6:24]
the way that you use all of your fire
[6:26]
facilities and how we can implement
[6:28]
change to make them better and more
[6:30]
modernized. Um and to uh as Chief Pulat
[6:33]
mentioned uh ensure health and and
[6:35]
safety and wellness of of firefighters
[6:37]
now and into the future.
[6:40]
All right, Sarah Partap again. We might
[6:43]
go back and forth. Do we We're going to
[6:45]
go back and forth on some slides. So So
[6:46]
we just keep that That would be fine.
[6:48]
Okay. Um so this is just kind of an
[6:50]
overview of what we were hoping to go
[6:52]
through tonight in our agenda. Uh we
[6:54]
will be brief in some of these. So feel
[6:56]
free to ask us questions at the end and
[6:57]
we can dive deeper into whatever topics
[7:00]
you have questions about. So first,
[7:01]
would you mind questions on topic as
[7:04]
you're going through or do you want to
[7:06]
wait to the end?
[7:08]
Either would be fine. Whatever you're
[7:10]
comfortable with, we could go either
[7:12]
way. I think it's okay. If it if it
[7:14]
starts to get to be like one and
[7:15]
another, then maybe we pause it till the
[7:17]
end. I think we got a good group. I
[7:19]
think they'll, you know, stay on focus.
[7:22]
This is the best committee in the city.
[7:24]
Yeah. Oh, good. Well, we're glad we're
[7:25]
on this one.
[7:28]
Um, all right. So, we're going to start
[7:30]
with just sort of the purpose of this
[7:32]
project and the methodology. We will
[7:33]
give you like highlevel findings sort of
[7:35]
trends across the whole portfolio of
[7:37]
buildings. Then we'll get into some
[7:39]
specifics about each facility and then
[7:41]
summarizing the different types of costs
[7:43]
and what those costs are toward the
[7:45]
end. So the the context for this project
[7:48]
is the city and uh Nashville Fire Rescue
[7:51]
has undergone additional preparatory
[7:53]
work before doing this study. So in 2021
[7:55]
there was a master plan which reviewed
[7:58]
you know the fire service overall
[7:59]
station locations and kind of laid out a
[8:01]
big plan for the future. Um, from that
[8:03]
you guys went into the strategic plan
[8:05]
which had specific items to follow up or
[8:07]
how you're going to achieve this vision
[8:09]
and one of those was a facility study so
[8:12]
you can document all of your backlog of
[8:13]
maintenance and move forward with
[8:15]
decision-m for which to repair, which to
[8:17]
replace etc. So that's where we came in
[8:20]
for the facility condition assessment
[8:22]
and then the long range plan was the
[8:23]
phase two of our project which is taking
[8:25]
the condition data and wrapping it into
[8:27]
little digestible packages of what are
[8:29]
your options for upgrading and repairing
[8:30]
each station.
[8:34]
Uh so just a quick overview about the
[8:36]
facility condition assessment process.
[8:38]
Uh we had a team of specialists that
[8:39]
were from uh architectural, mechanical
[8:42]
engineer, electrical engineer,
[8:43]
structural engineer uh and a civil
[8:45]
engineer. And additionally we had a firm
[8:48]
who specializes in hazardous materials
[8:49]
testing on board to do uh hazardous
[8:52]
materials and air quality testing at
[8:54]
select stations. Um the site assessments
[8:56]
occurred in the summer of 2024. Uh we
[8:59]
were on site for about uh a week. We did
[9:02]
one we did a a one pilot uh in in June
[9:05]
and then we were back on site in August
[9:06]
to get through the rest of the stations.
[9:08]
Um some of the terminology that I'll use
[9:10]
tonight, observe deficiencies. That's
[9:12]
one that I'll use a lot. Uh that's
[9:14]
talking about issues that are either
[9:16]
noted by our surveyors while they're on
[9:18]
site or they're disclosed to them. Say
[9:20]
if it's a roof a roof leak, but we were
[9:22]
there in the summer, you guys could tell
[9:23]
us there's a roof leak, we would we
[9:25]
would note that. and they're things that
[9:26]
are need to be repaired within five
[9:28]
years and that have a direct cost of at
[9:30]
least
[9:31]
$5,000. Uh our longer term costs from
[9:33]
the facility condition assessment are
[9:35]
called predicted renewals and that's
[9:37]
more of like a statistical model of what
[9:38]
we would expect you to need to pay based
[9:40]
on your building types and the ages of
[9:42]
the systems. What you would need to pay
[9:44]
over 20 years across your whole building
[9:46]
portfolio rolled up. So this year you
[9:48]
need a million two. This year you might
[9:50]
need five million. So we we forecast
[9:52]
that out 20 years into the future.
[9:57]
Sarah Gladex from Ricebergus Miller. Uh
[9:59]
the process that we use for phase two um
[10:02]
starts with a needs assessment which is
[10:04]
asking you um a thousand questions
[10:07]
understanding what the department needs
[10:09]
right now and what you envision you
[10:11]
might need into the future. Um and what
[10:13]
your overarching goals are for
[10:15]
department um that also go handinhand
[10:17]
with the goals of the city. Um we
[10:20]
conduct a handful of programming
[10:22]
workshops which we ask even more
[10:24]
questions and get into um kind of the
[10:27]
the high level and into the detail um of
[10:30]
each facility that we're looking into.
[10:33]
Um and from that we are able to uh
[10:36]
prepare some diagrams that will help
[10:38]
with a conceptual understanding of what
[10:41]
your current facility is lacking and how
[10:43]
we can make it better um from a very
[10:45]
high level. Um and then a square footage
[10:48]
analysis which helps us understand how
[10:50]
much square footage do you have overall?
[10:52]
What does each room have? And then it
[10:54]
starts to show us what are the gaps um
[10:56]
in spaces that you don't have that you
[10:58]
may need um in order to house your
[11:00]
equipment. Um make sure you have enough
[11:02]
sleeping rooms for your firefighters. Um
[11:05]
and then uh planning narratives which
[11:07]
are more written um narratives that are
[11:09]
useful for a professional cost estimator
[11:11]
to take um and start putting some
[11:14]
conceptual dollars um to each of these
[11:16]
projects. Um uh and then that will
[11:19]
inform um what what we think these
[11:21]
conceptual cost estimates will look
[11:23]
like. Um and not just hard costs but
[11:26]
soft costs or project costs in other
[11:28]
words. Um which are things like um all
[11:30]
FFN items. So furniture, fixtures and
[11:33]
equipment. Um this will include
[11:35]
architecture and engineering fees, um
[11:37]
permitting fees, um utilities estimates,
[11:41]
things like that, so that you get a real
[11:42]
round um idea of what the project
[11:45]
entails. Um and then we pull all that
[11:48]
information together into a draft report
[11:50]
which um is complete and awaiting
[11:52]
comment which will then get finalized um
[11:54]
and be ready for consumption.
[11:58]
Uh
[11:59]
this this slide here uh is just a a
[12:02]
again a high level understanding of what
[12:04]
we're talking about when we are
[12:06]
discussing needs assessment and
[12:07]
diagramming. Um we go through uh what we
[12:10]
call typical room diagrams and these are
[12:13]
all typical spaces of a fire station of
[12:15]
a modern fire station. Um and we'll go
[12:18]
through and ask you questions about what
[12:20]
you have now, what you think you might
[12:21]
need in the future. Um what is the
[12:23]
clearance required for that piece of
[12:24]
equipment? um you know, does this meet
[12:27]
your needs? And then we just go room by
[12:29]
room and and talk about every single
[12:31]
thing you could possibly imagine on the
[12:33]
wall on the floor. Um and so these uh
[12:36]
these images are sort of the the
[12:38]
starting point for how we start to
[12:39]
diagram because these will translate
[12:42]
directly into a box or a block which
[12:45]
then is used for conceptual diagramming.
[12:49]
All right, Sarah Partap from Mang
[12:51]
Analysis. Um that was sort of our
[12:53]
overview portion of like what we were
[12:55]
doing and how we did it. So now we're
[12:56]
going to get into uh common things that
[12:59]
we saw across all the facilities. Uh and
[13:01]
then we'll go station by station and
[13:02]
kind of give the high level uh portions
[13:04]
of that. So uh for the facility
[13:07]
condition assessment
[13:08]
um the one of the primary things we saw
[13:11]
was uh issues with pavement. You know
[13:13]
there's the freeze thaw cycle here.
[13:15]
There's heavy weight equipment going
[13:16]
over them. So the pavement gets torn up,
[13:19]
beaten up much more than other typical
[13:20]
areas. and you know those can worsen
[13:23]
over time. So that was consistent.
[13:25]
There's alligatoring, there's potholes,
[13:26]
things like that occurring uh at pretty
[13:28]
much all the stations to various
[13:31]
degree. Um another common one that we
[13:34]
saw was the stations, although you know
[13:36]
people live there, it is like their home
[13:37]
while they're on duty. Um so but they're
[13:39]
residential grade finishes in the
[13:41]
kitchens and although it's a residence
[13:42]
kind of um it gets a lot harder use than
[13:45]
a typical residential. So it's um with
[13:47]
residential grade finishes they just
[13:49]
corrode over time. they get beaten up
[13:51]
more than they would in a typical house.
[13:53]
So, um you know, upgrading to commercial
[13:56]
grade finishes though will last a lot
[13:58]
longer. Um ADA accessibility is a
[14:02]
challenge at every station. Uh Sarah
[14:03]
Gladics, we'll get into that a little
[14:05]
bit more detail later, but from, you
[14:07]
know, the the right of way getting into
[14:08]
the building to navigating within the
[14:10]
building, uh you know, compliant door
[14:13]
handles and door hardware, heights of
[14:14]
drinking fountains, it just there's a
[14:16]
lot of ADA um issues throughout all the
[14:18]
stations.
[14:20]
security. There's minimal security at
[14:22]
most of the stations. You know, there
[14:23]
are some secured doors. Um, but you
[14:26]
know, most stations may may lack
[14:27]
separation between public and private
[14:29]
spaces. Um, parking is limited and
[14:33]
there's just general security
[14:36]
challenges. And then one of the largest
[14:38]
ones was mechanical controls. So,
[14:40]
there's the mechanical actual systems
[14:43]
and the pieces of equipment like the
[14:44]
chillers and the air handling units. And
[14:45]
then there's the mechanical controls
[14:46]
that program them all and tell them when
[14:48]
to do what correctly. There's problems
[14:50]
with both, but the mechanical controls
[14:53]
were consistently um needing a lot of uh
[14:57]
they're they're out of date. Some of
[14:58]
them are not they're not ne network
[15:00]
control, so they can't be controlled
[15:01]
from a single location. You have to go
[15:02]
to each station and kind of try and fix
[15:04]
it. So there's a lot of uh problems with
[15:07]
mechanical controls.
[15:09]
Um and then probably the most
[15:12]
significant from the FCA is the lack of
[15:14]
dedicated maintenance staff. So we know
[15:17]
that NFR right now the firefighters and
[15:19]
the employees are the ones who are
[15:20]
responsible for doing a lot of the
[15:22]
day-to-day troubleshooting kind of
[15:24]
maintenance and then the rest is
[15:25]
performed by contractors you know
[15:27]
maintenance contractors which one can a
[15:30]
lot more expensive and two you know have
[15:32]
varying quality of work. Some are great
[15:33]
and some sort of just you know check the
[15:35]
box and don't do the best work. So, um,
[15:38]
there's a lot of issues that because
[15:40]
they don't get handled when they're
[15:41]
small, they escalate to be much larger
[15:43]
and much more expensive.
[15:47]
Sarah Gladex from Rice Fergus Miller. um
[15:50]
a handful of items that we found from a
[15:52]
planning standpoint um again lack of ADA
[15:56]
compliance um throughout um lack of
[15:59]
consistency in sort of modern or typical
[16:02]
fire station spaces like bunker gear
[16:04]
rooms um decontamination spaces um
[16:07]
lacking some industry best practices
[16:09]
what we see for modern fire stations um
[16:11]
and then lacking some space for both
[16:14]
current and new technology and
[16:16]
firefighter specialty equipment um and
[16:18]
then inadequacies in your fire training
[16:20]
uh facility and
[16:22]
grounds. So ADA compliance um you can
[16:26]
see just for example um getting to a
[16:28]
basement uh only via stairs would
[16:30]
provide no accessibility. Um a fire
[16:33]
station is a public facility. Therefore
[16:35]
it is required to um be held to the
[16:38]
international business international
[16:41]
sorry IBC I'll just call it IBC. um uh
[16:45]
it is required to meet the intent of the
[16:47]
code as far as a public facility um
[16:49]
using public dollars. And so there is no
[16:52]
real workaround for compliance with ADA,
[16:55]
but we do our best to make sure that
[16:56]
it's um that it makes the most sense for
[16:59]
the function and the use of the
[17:02]
occupants. Um but you still need to be
[17:04]
able to get into a building or get to a
[17:06]
second level or a basement, for example.
[17:08]
And that is something that's lacking
[17:10]
kind of throughout the portfolio.
[17:12]
um inconsistent Yep. Inconsistencies
[17:15]
with some of these spaces like bunker
[17:17]
gear rooms and decontamination rooms um
[17:20]
is really important because uh we
[17:22]
understand that uh decontamination helps
[17:25]
prevent um bloodborne pathogens from um
[17:28]
spreading throughout your station. It
[17:30]
keeps your crews healthy. Um, and that
[17:32]
decontamination space is where you need
[17:34]
to be able to wash all of your gear. Um,
[17:37]
handle specialty equipment. And, uh,
[17:39]
bunker gear needs to be stored
[17:41]
specifically. Um, and it it becomes
[17:44]
degraded with UV light over time. Um,
[17:46]
and it also has harmful chemicals that
[17:49]
are integral to the actual fabric of the
[17:52]
bunker gear. Um, and they should be
[17:53]
separated after they've been used and
[17:55]
cleaned and put into a room with a
[17:57]
closed door. Um, so things like that,
[17:59]
not storing them in in anywhere that's
[18:01]
getting direct light and also not
[18:03]
storing them um in the tub room, which
[18:06]
is then getting diesel exhaust um into
[18:09]
your
[18:11]
gear. Um, industry best practices, kind
[18:14]
of a a catchall for a lot of things that
[18:16]
we're seeing um trends within the
[18:19]
industry. Uh, gender equity and
[18:21]
neutrality, um, such as having
[18:23]
individual sleep rooms, uh, which you do
[18:26]
well in. Um I think all but station five
[18:29]
have individual sleep rooms which is
[18:30]
excellent. Um and then also having
[18:32]
single occupant restrooms with shower.
[18:35]
Um it just gives a little bit more
[18:36]
autonomy to the firefighter um when
[18:39]
they're on shift and some privacy both
[18:41]
acoustic visual um uh and also
[18:44]
individual temperature controls. Um so
[18:46]
that's something that we pretty much
[18:49]
across the board are always doing in a
[18:51]
new fire station. That way each occupant
[18:53]
of of the space, especially during
[18:55]
sleeping hours, um can control if they
[18:58]
want it warmer or cooler, they want
[19:00]
natural light, they want um artificial
[19:03]
light. So blackout blinds and and sleep
[19:05]
room controls um are very important. Uh
[19:08]
non-porous surfaces again for bacteria,
[19:12]
um bloodborne pathogens, um things like
[19:14]
that being able to be easily cleaned and
[19:17]
maintained. Um use of the tub room. Um,
[19:20]
tub rooms should not be used for
[19:22]
gathering um or meeting of any kind. Um,
[19:25]
they should be used for a working space
[19:28]
and should not have couches or chairs or
[19:30]
tables for kind of congregating. Um, and
[19:33]
so we do see that um, across some of the
[19:36]
stations and I know it's a cultural
[19:37]
thing. Um, but we will uh, we will raise
[19:40]
awareness to um, the dangers um, of
[19:43]
being in that space for longer than
[19:45]
needed. Um, and then staff parking. Um
[19:48]
again as Sarah mentioned um site
[19:50]
security and site parking u we really
[19:53]
need to have adequate parking for shift
[19:54]
change. So the number on shift times two
[19:58]
would be how much parking you would want
[20:00]
to have at every station. Um which could
[20:02]
be a challenge at certain stations but
[20:04]
it's definitely something to
[20:07]
consider. Um and then uh space which can
[20:11]
be uh well if it's decontamination space
[20:15]
you know extractors we see um you know
[20:17]
in the tub room or kind of out in the
[20:19]
open you know we really want to get
[20:21]
space dedicated for um some of the
[20:23]
specialty equipment um that will help
[20:26]
keep your gear maintained um keep folks
[20:28]
clean the station um you know there's
[20:31]
new technologies that are coming out and
[20:34]
um you know we need to be able to think
[20:36]
and futureproof for some of that
[20:37]
equipment that may be coming or that
[20:39]
already has come but there's no room to
[20:41]
implement into the
[20:44]
facilities. And then just generally uh
[20:47]
your fire training or drill grounds um
[20:49]
have limited limited site availability
[20:52]
um deteriorating deteriorating
[20:55]
infrastructure. Um it's been the tower's
[20:58]
been burned uh many times and um needs
[21:01]
to be replaced. Um and then there's just
[21:03]
lacking of of uh of training um
[21:06]
objectives to meet the needs of the
[21:08]
city.
[21:11]
All right. So that was oh sorry Sarah
[21:13]
Partap from Mang Analysis. Um that was
[21:15]
our uh kind of overview of the common
[21:18]
trends throughout all the stations. So
[21:19]
now we're going to dive a little deeper
[21:21]
into individual stations and facilities
[21:23]
and their uh specific needs. So we'll
[21:26]
just go in order starting with uh fire
[21:28]
station one which is Amherst Street. Um
[21:31]
the way we'll do this is I'll just cover
[21:33]
quickly some of the top FCA related
[21:35]
issues. So you know actual issues with
[21:37]
the building besides the programmatic
[21:39]
issues and then Sarah Gladex will talk
[21:41]
through the programmatic ones. So
[21:43]
Amherst Street Station that was that
[21:45]
staircase photo I believe that Sarah
[21:47]
showed on her ADA slide. Um that station
[21:50]
one of the primary issues is moisture
[21:51]
intrusion. The photo I'm showing here is
[21:53]
just a example of the downspout not
[21:56]
being directly connected to the
[21:57]
groundwater drainage system and it's
[21:59]
right over a crack. So there's obviously
[22:01]
there's moisture intrusion that's coming
[22:03]
down into the basement um which causes
[22:05]
erosion and can cause mildew and things
[22:07]
like that. Because this is your oldest
[22:09]
station, it has a lot of hazardous
[22:11]
materials. It predates all the laws that
[22:14]
say what you can and can't put in a
[22:15]
facility like this. So you know there is
[22:17]
uh asbestous, there's lead paint, uh
[22:20]
there's several noted hazardous
[22:22]
materials there. Um and then the third
[22:24]
big issue I wanted to highlight was just
[22:26]
end of life HVAC equipment. So in this
[22:28]
case it's equipment and controls I
[22:30]
believe. Um but just you know boilers
[22:32]
and things like that they might last if
[22:33]
you upkeep them well 20 years and then
[22:36]
they just need to be replaced. So these
[22:37]
are at end of
[22:39]
life. Um and as far as programmatic um
[22:43]
deficiencies. There's not a dedicated
[22:46]
decontamination room. There's not
[22:47]
dedicated bunker gear storage that isn't
[22:49]
in the tub room on the walls. Um there
[22:51]
is not sufficient office space which
[22:54]
would include um a firefighter work
[22:56]
area. So kind of afteraction reviews or
[22:59]
debriefs um report writing things like
[23:01]
that. Um we're lacking space for those.
[23:04]
Um and then lack of private single
[23:06]
occupant restrooms.
[23:09]
Sarah partap again. So station two Lake
[23:12]
Street station. Um this one an
[23:15]
interesting problem. The way the roof is
[23:17]
configured is when ice and snow melt it
[23:19]
kind of all converges in a single point
[23:21]
which happens to be right over the
[23:22]
entry. So, if there's large snow or ice
[23:25]
melt, it can, you know, obviously get
[23:26]
moisture on people that are coming in,
[23:28]
but the ice could actually fall uh, you
[23:29]
know, onto somebody who is coming
[23:31]
through that door. Uh, there's floor
[23:33]
corrosion um from I believe that
[23:35]
probably the hydronulic piping and the
[23:37]
flooring. And then again, HVAC, the
[23:39]
problem with this one is the boilers
[23:41]
themselves are at end of life and have
[23:43]
been failing and have had uh fixes and
[23:45]
patches and things like that, but
[23:46]
they're needing to be replaced now.
[23:49]
um programmatically um site parking is
[23:53]
is an issue there. Uh we know there's a
[23:55]
through road that goes uh right through
[23:57]
the parking area um for staff and public
[24:00]
parking. Um and so that needs to be
[24:02]
addressed. Um there's no dedicated
[24:04]
kitchen space for the admin since it is
[24:07]
now headquarters. So level one um off of
[24:10]
the public parking is is where uh
[24:13]
firefighter administration is um
[24:16]
currently located and they don't have
[24:18]
the proper um accessory spaces for that
[24:22]
use. Um it is a a relatively new station
[24:25]
by the by fire station standards. Um and
[24:27]
so it's been wellmaintained. There's
[24:29]
there's a lot of good happening. So, we
[24:31]
only really recommend um converting some
[24:35]
sleep room or I'm sorry, converting some
[24:37]
uh space in the living quarters at the
[24:38]
fire station side um for single occupant
[24:42]
restrooms and the rest is is in pretty
[24:44]
good
[24:46]
shape. Okay. Station three, which is
[24:48]
Fitbook Road. Um this is actually the
[24:51]
pilot facility that we did. So, our
[24:52]
first station that we assessed um end of
[24:55]
life roof uh the roof the the roofs are
[24:58]
a problem throughout all the stations.
[25:00]
Uh but this one in particular, this one
[25:03]
is additionally challenging because just
[25:04]
accessing the roof, you have to go out
[25:06]
through a window. There's not uh
[25:08]
built-in, you know, roof hatches. So,
[25:09]
it's not easy to access. And when a roof
[25:12]
is not easy to access, it means that
[25:13]
you're not maintaining it as frequently.
[25:15]
So, your roof drains can get clogged
[25:17]
with tree debris, then water ponds on
[25:19]
the roof, and then you develop a roof
[25:20]
leak over time. So, having convenient
[25:22]
and safe roof access is an important
[25:24]
thing to consider in any fire station,
[25:26]
any building really. Um and then the
[25:28]
boiler and heat pumps at this one are
[25:30]
also nearing end of life.
[25:33]
Um from our perspective, this also um
[25:36]
has a parking challenge and that's
[25:38]
something we addressed in the planning.
[25:40]
Um there's just not enough parking
[25:41]
spaces um especially for shift change.
[25:44]
Um and then this uh this station
[25:47]
actually they had an addition. So, a new
[25:49]
uh tub room was put in not that long ago
[25:52]
um which enabled them to uh include a
[25:54]
secondary bunker gear storage room. And
[25:57]
so, they've got two instead of one
[25:59]
larger single room. Um and this is a
[26:02]
station in particular where uh folks are
[26:04]
gathering in the tub room and that space
[26:07]
could be uh very well utilized for a a
[26:11]
dedicated decontamination room um as the
[26:14]
extractor just sits in the tub room um
[26:16]
out in the open. So, um there's some
[26:19]
there's some great things at that
[26:20]
station and there are a few challenges
[26:22]
that could be fairly um easily solved.
[26:27]
All right. Uh next is station 4, Crown
[26:30]
Hill Station. Um this one is the newest
[26:32]
in the portfolio. I believe it's from
[26:34]
2006 or thereabouts. 2008. Thank you,
[26:37]
Sarah. Um and this one, of all the
[26:40]
stations, we think this one probably has
[26:42]
the worst HVAC issues even though it's
[26:44]
the newest. The picture you're seeing
[26:45]
here is of the hydronic heating system.
[26:47]
And I'm not a mechanical engineer, so
[26:49]
don't ask me detailed questions about
[26:50]
this, but essentially, you know, it's a
[26:52]
hot water piping system that goes
[26:54]
throughout the building and that's
[26:55]
what's used to heat the building. And
[26:57]
the water in that system should be clear
[26:59]
water. That water is obviously not
[27:01]
clear. It's got oil in it. Um there's a
[27:03]
lot of, you know, uh pin prick leaks
[27:05]
that are starting to happen within the
[27:07]
system. And we're guessing that probably
[27:09]
the system wasn't um completely flushed
[27:12]
during the construction time. You know,
[27:13]
once they install it, there should be a
[27:15]
full flush. And if that didn't occur, it
[27:17]
can lead to problems over time. The
[27:19]
water quality issues will corrode the
[27:20]
pipes leading to those small little
[27:22]
leaks. Uh so that's what you're seeing
[27:24]
there.
[27:28]
Yes. Uh since it is a newer station,
[27:30]
there's a lot that is working really
[27:32]
well. Um, I would say the biggest
[27:35]
challenge is that it was formerly where
[27:38]
headquarters was before it went to
[27:39]
station two. And so there is a lot of
[27:42]
unused uh sort of public andor um
[27:45]
administrative spaces in the front of
[27:47]
the station. Um and so being able to
[27:49]
better utilize that um and get the fire
[27:52]
marshals some additional space as well
[27:54]
as maybe a true reception and
[27:56]
administrative office space um and some
[27:59]
storage uh will help that um help solve
[28:02]
those problems. Um and then there isn't
[28:04]
really what we would consider a true
[28:06]
decontamination room. It's sort of
[28:08]
utility catchall space um that happens
[28:11]
to have some decontamination in it. So,
[28:13]
there's a few minor things that can be
[28:15]
um updated from a programmatic
[28:16]
standpoint.
[28:20]
All right, station five, Pineh Hill Road
[28:22]
Station is the next one. Uh this one
[28:24]
overall the building, I think everybody
[28:26]
knows the building of this one is
[28:27]
essentially at end of life, but just
[28:29]
some issues that will highlight
[28:30]
hazardous materials. Um again, this is
[28:32]
one that has a fair amount of hazardous
[28:34]
materials. The photo you're seeing
[28:35]
there, uh the black squares on the floor
[28:37]
are where um tiles have become loose.
[28:41]
And so that's the actual the black
[28:42]
adhesive that you're seeing, which is an
[28:44]
asbestous containing material. And
[28:46]
asbestous when it's not touched and it's
[28:48]
intact, it's it's okay. You don't still
[28:51]
don't want it, but it's not going to do
[28:52]
any harm. But when it becomes uh
[28:54]
airborne and fryable from, you know,
[28:55]
people walking over it and picking up
[28:56]
particles, as you can assume that's
[28:59]
happening here because it's the floor,
[29:00]
that is not good. Um, this station also
[29:03]
has pretty poor ventilation. I believe
[29:05]
the upstairs there's no cooling. It's
[29:07]
just windows. So, uh, and a lot of their
[29:09]
ventilation comes through operable
[29:10]
windows instead of, you know,
[29:11]
mechanical, uh, systems doing it. And
[29:14]
the roof, another one, this is another
[29:16]
one with the end of life roof.
[29:19]
Um, this one, um, as you can see by my
[29:21]
little paragraph there, it is deficient
[29:24]
in almost all programmatic elements that
[29:27]
would make a a functioning and healthy
[29:29]
fire station. Um not I mean that's just
[29:33]
beyond the hazmat issue that we have but
[29:36]
you know fitness is happening in the tub
[29:38]
room where it you know that is a dirty
[29:41]
space um and so you shouldn't be working
[29:43]
out in there um no dedicated um anything
[29:46]
as far as operational um decontamination
[29:49]
room bunker gear storage um and then
[29:51]
sleeping quarters. Uh it is the only uh
[29:54]
facility that does not have individual
[29:55]
sleep rooms and restrooms. Um, and so it
[29:58]
it's uh it doesn't provide any privacy
[30:01]
of any kind for any of the crews to have
[30:04]
um adequate and healthy
[30:08]
sleep. So what we did was discuss um
[30:12]
during the needs assessment and
[30:13]
workshops, what would a new station 5 on
[30:16]
Pineh Hill Road look like? Um is it
[30:18]
feasible to remodel what you have? Sure.
[30:22]
But let's think bigger and let's think
[30:24]
into the future. what does the city need
[30:26]
and what does the fire department need?
[30:27]
And that's where we've landed is uh is
[30:30]
enabling a new station to be to be
[30:33]
discussed and planned um that also
[30:36]
houses a citywide EOC and emergency
[30:38]
management which is a really excellent
[30:41]
use of a public facility to put in um to
[30:44]
put in several entities. Um and you've
[30:47]
got the room for it. Um, and you can do
[30:50]
it single story, which was fun to figure
[30:53]
out because all of your stations are uh
[30:56]
more than one story currently. Um, so it
[30:59]
was a really it was a great exercise to
[31:00]
find out, you know, how many sleep rooms
[31:02]
will you need? Um, you know, what other
[31:05]
uh accessory spaces would you need to,
[31:08]
you know, to handle more recruitment and
[31:10]
retention and what can you provide your
[31:12]
current firefighters on staff? um as
[31:15]
well as um who do you want to bring in
[31:17]
in the future and how do we make that
[31:18]
happen? So just understanding the goals
[31:21]
um understanding the needs um and this
[31:24]
is where we have come conceptually.
[31:26]
Sorry, you're good.
[31:29]
Okay, next uh station six Conan Road. Uh
[31:32]
this one again it has an end of life
[31:34]
roof and it's hard to get on the roof.
[31:36]
Um not great ventilation. This is kind
[31:38]
of funny. We were our mechanical guy was
[31:40]
out there and he was talking to one of
[31:42]
the firefighters who's like, "Oh no, we
[31:43]
have a ventilation. we have a ceiling
[31:44]
fan. We're like, well, I mean, yeah,
[31:46]
that moves the air around, but you know,
[31:48]
actual exhausting ventilation to get
[31:49]
clean outside air into the building. Uh,
[31:52]
the cooling unit there is undersized.
[31:54]
Um, so it can't really perform for the
[31:56]
full cooling load that's needed at this
[31:58]
building. And then this one is unique
[32:00]
because it it has the fire station and
[32:02]
it also has the mechanics area, the
[32:04]
shop. And uh the heating system is
[32:07]
connected. So there's like a single
[32:08]
control for the fire station half and
[32:10]
the shop half, which the shop half, they
[32:12]
might have more doors open. they might
[32:13]
have they have different needs than the
[32:15]
building that's sort of left alone. So,
[32:17]
um decoupling those heating and cooling
[32:19]
systems would be a priority.
[32:22]
Um, this station uh also I I believe
[32:24]
it's had several kitchen remodels um all
[32:27]
of which are residential grade and you
[32:29]
know the the use and abuse of
[32:31]
firefighters in kitchens and uh
[32:35]
materials finishes um is understood and
[32:38]
um I think that's that would be a
[32:40]
priority is getting in some commercial
[32:42]
grade um uh appliances. Um there is no
[32:46]
real lobby or or obvious entrance which
[32:50]
I think from a public standpoint is you
[32:52]
know you want to make sure someone knows
[32:53]
where they're going to go if they were
[32:55]
going to have an emergency or they
[32:56]
needed to stop by um also for security
[32:59]
purposes. So that's something that we
[33:01]
looked into when when uh talking about
[33:03]
needs um and assessing what that program
[33:05]
might look like. Um decontamination and
[33:09]
bunker gear they kind of they're a
[33:11]
little muddy there. Um, I think that we
[33:13]
need some true spaces, some true
[33:15]
separation. Um, and, uh, maintenance
[33:18]
bays, uh, certainly need better storage.
[33:21]
Um, both interior storage and exterior
[33:24]
storage. Um, and they're woefully
[33:26]
lacking in their, uh, very small living
[33:28]
quarters and office
[33:32]
space. All right. The fire alarm
[33:34]
building. Uh this one I believe it has a
[33:37]
heated uh floor, you know, through
[33:38]
piping embedded in the floor, which is
[33:40]
hard to replace because it's embedded in
[33:42]
the floor, but uh there's issues with
[33:44]
that. So that's going to require some
[33:45]
repairs. The roof is at end of life.
[33:47]
Again, mechanical controls, and this one
[33:49]
houses a data center, you know, which
[33:51]
generates a lot of heat, so there should
[33:53]
be a dedicated cooling system in the
[33:54]
data center just to keep it from
[33:56]
overheating and failing.
[33:59]
Um, a couple uh fairly major items at
[34:02]
this uh facility is ADA compliance.
[34:05]
Again, I mean, we've we said that on
[34:07]
both uh phase one and phase two, ADA
[34:09]
compliance is an issue. Um, this one in
[34:11]
particular, um, and I say it very
[34:14]
gently, um, but, uh, this is not a a
[34:19]
station. This is not for firefighters.
[34:21]
Um, this is for fire alarm and
[34:22]
dispatches located there. Um, and you
[34:25]
could certainly have a dispatcher who
[34:28]
has mobility issues and there is no way
[34:30]
currently to get a person up and into
[34:33]
the dispatch room. Um, so that is an
[34:36]
issue that that needs some kind of
[34:38]
resolution. Um, and that's important
[34:41]
because you want to make sure that um,
[34:43]
you're able to have folks, you know, who
[34:45]
are wheelchair bound or any otherwise
[34:47]
have mobility issues um, able to enter
[34:49]
and or work in the space. um generally
[34:52]
just inadequate office space for the
[34:54]
staff members that are are working out
[34:56]
of there. Um and there is no real
[34:59]
ability to expand um that facility
[35:02]
because of the small site that is
[35:03]
already too small and there's already
[35:05]
not enough parking. Um so it's it's a
[35:08]
tough one. It'd have to be a very light
[35:10]
touch remodel um in order to not trigger
[35:13]
um major code compliance upgrades.
[35:18]
Okay. Then our final one is the drill
[35:20]
yard. So, some of the condition issues,
[35:23]
um, I mean, obviously the building is a
[35:24]
burned building, so we did write some of
[35:26]
that up, but we're not going to talk
[35:28]
about that because that is the intent.
[35:29]
It's supposed to be beaten up and
[35:30]
burned. But the site itself had some
[35:32]
issues. Uh, one, the type of pavement
[35:34]
that's out there is not strong enough
[35:36]
um, for, you know, the apparatus that
[35:37]
are going back and forth on it. So, it
[35:39]
is uh, corroding faster. And then, uh,
[35:43]
the drainage is not great. So in the
[35:44]
winter, you can see there, this is the
[35:46]
summer, there's a puddle there where
[35:47]
they're, you know, releasing many, many,
[35:49]
many gallons of water and then it
[35:51]
becomes icy and it's dangerous to drive.
[35:53]
Um, additionally, there's no permanent,
[35:55]
uh, like training building out there, so
[35:57]
no restrooms or showers, so they don't
[35:59]
have an opportunity to clean up before
[36:01]
they get back in the truck and go back
[36:02]
to their station.
[36:04]
Um and at this current site, not
[36:06]
currently where the um ConX uh tower is
[36:09]
located, but uh elsewhere at the
[36:11]
landfill, um there's an opportunity for
[36:14]
potentially about four acres of
[36:15]
development for a new training and drill
[36:18]
grounds. Um so we use that footprint to
[36:21]
um to discuss mostly with Chief Pulot
[36:24]
and Captain Nielsen uh with training to
[36:27]
find out what, you know, what are the
[36:28]
what are the objectives for training?
[36:30]
what does the city of NSHA need as far
[36:32]
as different types of response? Um, you
[36:36]
know, what are the props that you might
[36:38]
want? And so, uh, we went really in
[36:40]
depth with the training program and
[36:42]
ended up, well, a train training site is
[36:44]
always going to be very large and very
[36:47]
expensive. Um so thinking about it from
[36:49]
a phased approach, uh we felt confident
[36:51]
that um you could get a lot of the um
[36:54]
the infrastructure put into place and
[36:56]
some facilities on the site in phase one
[36:59]
and then down the road as more funding
[37:01]
becomes available, you could really
[37:03]
outfit it with all the different props
[37:05]
and uh urban search and rescue, confined
[37:07]
space, training options, um hazmat. But
[37:11]
for phase one, um it would really focus
[37:13]
on what you need. Now, um an outdoor
[37:16]
classroom, a covered area with restrooms
[37:18]
so you can train outdoors during all
[37:21]
kinds of weather. Um relocating the
[37:23]
existing ConX uh burn tower to that
[37:26]
site. Um using the site topography in
[37:29]
order to do some wildland um potential
[37:32]
wildland training. Um so just that was a
[37:36]
fun one. There's a lot of really fun
[37:37]
stuff you can do with the training site.
[37:39]
Um, and I think it would be very
[37:41]
beneficial to not only the city and the
[37:44]
fire department, but the region.
[37:48]
Okay, so that was sort of the end of um
[37:50]
the station bystation analysis and now
[37:54]
more getting into the planning portion
[37:57]
of the evening. Um, yeah, just a couple
[37:59]
of things. Uh we discussed um in one of
[38:02]
our first uh initial meetings or
[38:04]
workshops um what does the future of
[38:07]
Nashua look like and what does that do
[38:09]
for response times um and are there
[38:13]
developments coming right now or coming
[38:15]
in the future where you're going to need
[38:16]
to expand the service area or is your
[38:19]
you know the response times are going to
[38:20]
get a little too long from your current
[38:22]
stations. Um, so what we did was just
[38:25]
come up with, you know, what would like
[38:26]
a satellite station be or or a smaller
[38:29]
um smaller station that could go, you
[38:31]
know, maybe nearby a new school or or
[38:33]
other new developments in the city,
[38:35]
maybe on the outskirts that don't have
[38:38]
the greatest response times. So, we just
[38:40]
came up with a prototype that would meet
[38:42]
those needs um and then be easily
[38:44]
adaptable at any time in the future um
[38:48]
if if chosen.
[38:53]
And we also did the same kind of
[38:54]
exercise um with fire alarm um
[38:57]
discussing those needs again and
[38:58]
diagramming you know what is the space
[39:00]
required um what are you missing right
[39:03]
now in your current facility um you can
[39:06]
ignore uh this the site image on the
[39:09]
right but we just what we do is we use
[39:11]
that as a test to fit and we we figure
[39:14]
out you know how much acreage might you
[39:16]
need in order to accommodate the size of
[39:18]
the facility and the um associ
[39:20]
associated parking requirements. Um, so
[39:23]
we went in depth with Fire Alarm and and
[39:26]
the folks there and and got their
[39:27]
feedback to figure out what does the
[39:29]
future fire alarm facility need to look
[39:31]
like.
[39:36]
All right. So, now getting a little bit
[39:38]
into some of the costs for some of these
[39:40]
pieces. Uh, Sarah Gladex will cover most
[39:43]
of this, but we wanted to call out a few
[39:44]
things uh up front. One is about the
[39:46]
level of detail of the cost estimates
[39:48]
that we're providing. So, From the
[39:50]
facility condition assessment, there is
[39:52]
a lot of those short-term and long-term
[39:54]
deficiency costs, the predicted renewal
[39:56]
costs. These are rough estimates sort of
[39:59]
to plan your budget. So, rough order of
[40:01]
magnitude. Is it a $10,000 project or is
[40:03]
a $100,000 project, but we're not giving
[40:05]
you is it a $10,000 versus a
[40:07]
$12,60 project. So, it's really kind of
[40:10]
um planning purposes, not a full
[40:14]
estimate. And
[40:16]
um an important thing we've mentioned
[40:19]
kind of throughout is extensive repairs
[40:21]
can trigger code compliance upgrade. So
[40:24]
with the facility condition assessment,
[40:26]
if by some way you were able to fund all
[40:29]
of the deficiencies in a single station,
[40:30]
like we're going to make all the repairs
[40:32]
they suggested over the next 5 years,
[40:33]
it's likely going to be a significant
[40:35]
enough of an investment that it would
[40:37]
trigger a full code compliance upgrade,
[40:39]
which would bring in, you know, hazmat
[40:40]
remediation, ADA compliance. It would
[40:42]
bring in a lot. So the the costs can
[40:45]
grow quite quickly if you're required to
[40:47]
do a full compliance upgrade. Um and
[40:50]
then getting into the LRFP, sorry, the
[40:52]
long range facility plan costs, those
[40:54]
are more they're taking our costs from
[40:56]
the FCA and rolling those into a larger
[40:58]
project cost. So the facility condition
[41:00]
assessment costs are sort of a the intro
[41:03]
level budget planning and then the um
[41:06]
the long range costs will include like
[41:08]
Sarah said soft costs like your internal
[41:10]
costs of doing business, the design
[41:12]
fees, permitting fees. They try to make
[41:14]
their best guess at all in what are
[41:15]
these things going to cost.
[41:19]
Um some additional considerations on
[41:21]
cost uh timing and escalation. If you
[41:24]
know anything about the construction
[41:25]
industry, you know that escalation and
[41:28]
the economy are really big factors in um
[41:32]
and the cost of materials and goods um
[41:34]
and the cost of construction and timing
[41:37]
um is really important because when
[41:38]
you're adding in 4 and a.5% escalation,
[41:41]
which could change, it could be higher,
[41:43]
it could be lower. Um that's just going
[41:46]
to make it it's always going to be more
[41:48]
expensive if you do it later. um not
[41:50]
because anything changes but because
[41:52]
escalation will change and the costs of
[41:54]
things uh increase over time. Um and
[41:57]
it's also good to understand the timing
[41:59]
of a project. For example, a new fire
[42:02]
station um on average is going to take
[42:04]
about a year to design and get through
[42:06]
permitting. Um and it's going to take
[42:08]
about a year to 18 months to build.
[42:10]
That's fairly typical. Um can be
[42:13]
slightly different depending on the size
[42:15]
of and the scale of the facility or any
[42:17]
complexities. Um, also customary uh 10%
[42:22]
uh estimating and design contingency.
[42:24]
Um, that contingency goes down as you
[42:27]
have more knowns. So when you're early
[42:29]
on in, you know, schematic design, for
[42:31]
example, you're going to have a higher
[42:32]
contingency and then as you get towards
[42:34]
construction documents um, and well into
[42:36]
your bid sets, your contingency is going
[42:39]
to continue to go down uh because more
[42:41]
things have been figured out. Um and
[42:44]
then in the case of today um we we have
[42:47]
added uh quite a bit of additional
[42:49]
contingency to these projects just to
[42:51]
capture any unknowns. Um you know you
[42:54]
want to go in and ask for as much money
[42:56]
as you think that it may cost plus some
[42:59]
so that you're not going back out and
[43:00]
and oh we forgot this or we didn't
[43:03]
account for that. So we try to be really
[43:05]
conservative with our estimating to make
[43:08]
sure that you are covered. Can I chime
[43:12]
in right here? Yes. Yes. So, uh, I'm
[43:14]
gonna just naturize this a little bit
[43:19]
because I I I get very sensitive at this
[43:22]
as the typically the person who's up
[43:24]
before you that has to explain the
[43:26]
various project costs. Um, you know, I I
[43:29]
tend to want to make sure we're very
[43:30]
clear on this. So, the 4.5 escalation, I
[43:33]
think that's low. I would I would carry
[43:35]
more something like 10% for
[43:36]
year-over-year escalation just by the
[43:38]
New England market being the way it is.
[43:40]
Um, and that's what we currently carry,
[43:42]
just so everyone knows, four projects to
[43:44]
to to be safe. Uh, relative to the
[43:48]
estimating design contingency, we
[43:50]
typically carry 15%. And I want to be
[43:52]
clear, this contingency is reduced as a
[43:54]
design contingency, but we have two
[43:56]
other contingencies that we always carry
[43:58]
as well, an odin contingency and a
[44:00]
general contractor's contingency. Those
[44:02]
contingencies are on top of this
[44:04]
contingency. So, I just want to make
[44:06]
sure that that's that's kind of
[44:07]
understood. And then we're carrying
[44:09]
anywhere between 1 and 5% for tariffs
[44:12]
and and various, you know, inflationary
[44:15]
factors right now on our on our projects
[44:17]
based on what we're hearing and seeing
[44:20]
in the marketplace. Uh and that's
[44:22]
obviously evolving.
[44:24]
Thank you. Y that's great.
[44:28]
Um a few other things to consider
[44:30]
related to cost um are uh delivery
[44:33]
methods. So a traditional design bid
[44:35]
build delivery method is usually the
[44:37]
cheapest um which means all of your
[44:39]
documentation is done and then you go
[44:41]
out and hard bid it on the street and
[44:42]
you take the lowest um what do they call
[44:46]
it the lowest responsible bidder um and
[44:49]
then you can also do alternative
[44:50]
delivery methods which which are
[44:52]
becoming a lot more popular um things
[44:54]
like CMGC uh construction manager
[44:56]
general contractor um or design build or
[44:59]
progressive design build um they're all
[45:01]
very great methods in their own Okay.
[45:03]
Um, I would say alternative delivery
[45:05]
methods can be a little more expensive
[45:07]
on the front end, but you're bringing in
[45:08]
your contractor early to help solve any
[45:11]
design issues with the architect and
[45:13]
engineers from the beginning. Um, and so
[45:16]
there are pros and cons, but you can
[45:18]
anticipate some higher costs with some
[45:20]
of these different methods. Um, and also
[45:23]
considerations for an owner's
[45:24]
representative. Um, a large a small
[45:26]
project may not need it, but you need
[45:28]
someone to be able to manage uh the
[45:31]
work, the project, the contractor, the
[45:34]
architect. Um, so we like to add in some
[45:36]
uh contingency or allowance in your soft
[45:38]
costs for an owner's representative um
[45:41]
for the project if
[45:46]
needed. Um, and just an overview um for
[45:49]
the new stations uh that are part of the
[45:52]
long range the phase 2 long range plan.
[45:54]
Um all new facilities are just you know
[45:57]
one conceptual design option and an
[45:59]
estimate. Um the training grounds as
[46:02]
mentioned has a phase one and a phase
[46:03]
two component. Um and then each remodel
[46:06]
um based on on the needs assessment the
[46:09]
remodels that were determined um have
[46:12]
several different options. Um, just to
[46:14]
give you uh an overview of what you
[46:17]
could expect from, you know, more of the
[46:19]
FCA data that Sarah and her team come up
[46:22]
with. Um, if you're going to address
[46:24]
more deficiencies and opportunities,
[46:26]
it's going to be more expensive. Um, if
[46:29]
you do all of the planning work that
[46:30]
phase 2 represents, it's it's going to
[46:33]
be more expensive. So, we tried to break
[46:34]
it out so you get a little bit of a
[46:36]
different um idea of the opportunities.
[46:39]
So, option A mostly correcting all
[46:41]
deficiencies. um and and opportunities
[46:44]
being created. Um and then really the
[46:47]
biggest component there is full
[46:49]
planning. So option A is going to have
[46:51]
everything necessary from the phase one
[46:54]
uh FCA data, everything from phase two.
[46:57]
Um and it's also going to take into
[46:58]
account upgrades needed. Um option B is
[47:02]
kind of like one tier down. So maybe
[47:04]
like option A is best and then better is
[47:08]
option B which would be you know some
[47:10]
light refresh to the spaces you know
[47:13]
getting new paint new
[47:16]
materials you're not getting any new
[47:18]
programming no new walls but you're
[47:20]
getting something um and then you're
[47:22]
also getting the priority items that are
[47:25]
deficient um based on the FCA um and
[47:28]
those would be replaced in kind so that
[47:30]
will help keep the cost down and you
[47:32]
hopefully can avoid triggering ing a
[47:34]
full code compliance upgrade. Um and
[47:37]
then option C is basically just no
[47:40]
planning. You're not changing anything
[47:42]
within the station except for when it
[47:43]
comes to um systems and um
[47:46]
infrastructure and things that are are
[47:48]
deficient with the building itself and
[47:50]
and its uh necessary
[47:55]
systems. So this is where I start to to
[47:59]
talk about big millions. Um, and I like
[48:02]
to say big millions because it all feels
[48:04]
kind of like it's not real.
[48:06]
Like fire stations are are very
[48:09]
expensive. Um, they need to um be held
[48:13]
to a um a higher structural um
[48:16]
consideration than other facilities.
[48:18]
They're also public facilities. Um, and
[48:21]
those come with hefty price tags.
[48:25]
Um, these are all conceptual costs and
[48:28]
they are also um, uh, there is a high
[48:32]
contingency involved. Um, but we wanted
[48:34]
to make sure that when we're talking
[48:36]
about what your needs are, we're
[48:38]
covering them all and more. Um, and Tim
[48:42]
may Tim may disagree. I think our we
[48:44]
have different numbers. Um but uh this
[48:47]
is just giving you kind of an idea of
[48:49]
what you can expect when you read
[48:51]
through um the final draft of uh phase 2
[48:55]
uh report. Um and so we're going through
[48:57]
and we're we're indicating um visually
[49:00]
what the hard construction costs are,
[49:02]
what the soft project costs uh could be,
[49:05]
and then what that total looks like. Um
[49:08]
so if you were going to say we're going
[49:09]
to do all of these new facilities, it's
[49:12]
probably about $und00 million give or
[49:14]
take. It's probably less, but again,
[49:17]
being very conservative, we're going to
[49:19]
estimate a little higher um because it's
[49:22]
safer in this
[49:25]
economy. And then again, just another
[49:27]
visual of of what you can expect in the
[49:29]
report is um going through station by
[49:32]
station for remodels and then indicating
[49:34]
what those option A, B, and C kind of
[49:36]
that good, better, best um scenario
[49:38]
might look like. And so of course it
[49:40]
varies because you could pick all option
[49:42]
C and then you're going to be on the
[49:44]
lower end or you could pick all option A
[49:45]
or you can do a mix. So there's kind of
[49:47]
a range there um of what you're looking
[49:52]
at. Uh and this is just showing um kind
[49:56]
of some uh behind the scenes like when
[49:58]
we're going through and we're indicating
[50:00]
um you know what projects could look
[50:03]
like. It could be a remodel. It could be
[50:06]
um a new station. And in this case,
[50:08]
we're just giving um examples of what it
[50:11]
would look like to do uh re- roof and
[50:13]
HVAC projects on all of the existing
[50:15]
facilities. Um so that's also an option
[50:18]
is to kind of pick and choose and and
[50:19]
select projects uh based on priority for
[50:22]
the fire department and for the city.
[50:28]
Uh so now getting into recommendations
[50:30]
in the short term. You guys I believe
[50:32]
have probably already heard some of this
[50:34]
information. Um but you know sort of
[50:36]
decided the department has identified a
[50:38]
few priorities. The first one is again
[50:40]
working through all those HVAC issues
[50:42]
with equipment and controls uh across
[50:44]
the department. Uh repairing or
[50:47]
replacing as many roofs as possible
[50:49]
across the department. And then uh the
[50:51]
new Pinehill uh road station, station
[50:54]
five, which the feasibility study for
[50:56]
that is beginning soon. Um those are the
[50:59]
kind of the the identified priorities.
[51:02]
And then getting into the the next
[51:04]
steps, we're essentially done with our
[51:06]
work for this project. It's more just
[51:08]
kind of finalizing any comments,
[51:10]
answering questions from you guys. But
[51:12]
um uh the facility condition assessment
[51:15]
report is complete, just unless there's
[51:17]
any final comments or edits. the long
[51:19]
range plan is similarly complete just if
[51:21]
there's any final comments or edits. So
[51:22]
both of those deliverables would be
[51:23]
formalized uh as the final version. Um
[51:27]
and then just you know being here
[51:30]
ongoing to answer questions as you kind
[51:32]
of get into it and then obviously the
[51:34]
feasibility study for the Pine Hill Road
[51:36]
Station is going to be beginning
[51:39]
soon. So
[51:41]
that was kind of the end of what we
[51:43]
wanted to tell you and we're happy to
[51:46]
answer questions. Yes. All right. Well,
[51:48]
I'll recognize Alderman Clay.
[51:51]
Thank you. I I don't think that it's
[51:55]
anything that we weren't surprised to
[51:58]
hear. I think um um Chief Buckston and
[52:03]
previous chiefs have been kind of
[52:04]
telling us that this has been been
[52:07]
happening and uh something we need to uh
[52:10]
um address and have needed to address
[52:13]
for a long time. Um, and those the the
[52:17]
things that you told us at the end
[52:18]
obviously are something we need to to
[52:20]
look at first and make our our priority
[52:23]
and so on. But something that you kept
[52:25]
talking about, you kept talking about
[52:27]
parking and and so on. How would you
[52:29]
address something like parking in a
[52:31]
place
[52:32]
that there's only so much right land. So
[52:36]
how how would you address something?
[52:39]
That's a great question. I mean you you
[52:41]
you're kind of landlocked. Yeah. You
[52:43]
can't exactly like mow down somebody's
[52:45]
home just so that you have more parking
[52:48]
spaces. Yeah. In some instances that's
[52:50]
true. I mean street parking, right?
[52:53]
Yeah. Amherst Street and Fire alarm. I
[52:55]
mean, you're kind of just you deal with
[52:57]
with what you can deal with and and
[52:58]
that's that. Um but in terms of, you
[53:01]
know, station two Lake Street station or
[53:03]
station 3 Spit Brook Road, um there are
[53:06]
opportunities for additional parking.
[53:07]
And so in our planning documents which
[53:09]
are in the final report, you can see
[53:12]
where you know we're indicating there is
[53:14]
additional site area that can
[53:16]
accommodate sometimes it's just a matter
[53:18]
of a couple of of parking stalls but um
[53:21]
there are opportunities at several of
[53:23]
the stations to accommodate more parking
[53:25]
but yeah there are there are that are
[53:28]
not just followup. Yeah thank you. So th
[53:31]
those four items that you talked about
[53:33]
like the HVAC and so on roofs. So, so
[53:36]
within that report, do you actually
[53:38]
break those down um and kind of talk to
[53:42]
address those particular things rather
[53:43]
than the entire
[53:46]
um wish list? I mean, and I I say wish
[53:48]
list and I don't mean that it's a wish
[53:50]
list because in in truth, it's it's
[53:52]
something that's honestly needed and and
[53:55]
I don't I'm not belittling anything.
[53:57]
Honestly, I'm not um HVAC is important.
[54:00]
We talked about it here in city hall.
[54:02]
You know, we we want the firefighters to
[54:04]
have something more than I want them to
[54:06]
have heat. I want them to have
[54:07]
everything that that they need. I want
[54:10]
our I want our equipment not to fall
[54:12]
through the floor.
[54:15]
You know, I I want our equipment to to
[54:17]
be housed. I want our, you know, men and
[54:19]
women to to have the facilities and so
[54:22]
on. So, I think Sarah Yeah, she can
[54:24]
address that directly on the screen
[54:27]
here. Yeah. So, tonight we didn't want
[54:28]
to get too into the details because I
[54:30]
could go on for many hours. So we kind
[54:32]
of just want to give you the overview
[54:34]
but in the the report that's the facil
[54:36]
so from the FCA there was two primary
[54:38]
deliverables there was a an executive
[54:39]
summary report which presented more of
[54:41]
the uh departmentwide trends and issues
[54:43]
that we were seeing and more about the
[54:45]
methodology and then there's the very
[54:46]
detailed report uh which goes through
[54:49]
you know system by system within each
[54:50]
building and describes what type of roof
[54:52]
it is what we would score it on a one to
[54:55]
five scale five being completely failed
[54:57]
one is excellent and usually within
[54:59]
warranty period so there's a lot of
[55:01]
threes um except station five. There's a
[55:03]
lot of fours and uh and probably some
[55:06]
fives. Uh and then those individual
[55:08]
observed efficiencies, each one that
[55:09]
meets that threshold of we feel it needs
[55:12]
to be addressed within a 5-year period
[55:13]
and has a direct cost of at least
[55:15]
$5,000. Uh those are written up as this
[55:18]
page I'm showing here uh as just an
[55:20]
individual deficiency. So, if you wanted
[55:22]
to go through and like kind of pick and
[55:23]
choose just individual spot issues, like
[55:26]
let's just talk about the boiler and the
[55:28]
controls at this station, you can look
[55:29]
into that and see a more detailed
[55:30]
description of the issue and the cost
[55:33]
related to it. Okay. Did that answer
[55:35]
your question? Yes, it did. Thank
[55:38]
Alderman Solomon, thank you. Um, but
[55:42]
first a comment. Uh, oh my god. Um,
[55:47]
which part? Kind of the whole thing. I I
[55:50]
know that, you know, we're looking at
[55:52]
the
[55:53]
um that we have a bonding resolution for
[55:56]
tomorrow night, which I would assume is
[55:58]
part of this. Yes. Um it's going to
[56:00]
cross some items off the list.
[56:04]
Kind of wish we had seen this before we
[56:06]
started the budget conversation. Um but
[56:08]
it is what it is.
[56:10]
If you could, in your professional
[56:14]
opinion, I'd love to know a letter
[56:17]
grade across all eight stations and
[56:20]
facilities that we have. Um,
[56:24]
just whatever. I mean, you don't have to
[56:27]
go and, you know, you're a hard grader,
[56:28]
you're an easy grader. I mean, I don't
[56:30]
know. I mean, your professional opinion.
[56:32]
I mean, what do you think the grade of
[56:34]
our overall NFR facilities are in the
[56:37]
city of Nashville? It's a solid C. I was
[56:38]
going to say also a C average. C
[56:41]
average. Average there, you know. Well,
[56:43]
C is an average grade. Yeah. So, five,
[56:45]
you know, station five is particularly
[56:47]
F. Yeah. Driving. Yes. Um, and then
[56:51]
other stations like, you know, like I
[56:52]
highlighted at station uh four, there's
[56:56]
this significant HVAC issue, but that's
[56:57]
a new station. So, you know, the way
[56:59]
it's been planned, the way it's laid
[57:00]
out, doesn't need a lot of changing. So,
[57:02]
although some of them will have a major
[57:04]
issue that needs to be taken care of,
[57:06]
overall they're still okay. Um we both
[57:09]
of our firms do a lot of work related to
[57:11]
fire and emergency services. So we've
[57:13]
seen a lot of different fire stations uh
[57:16]
a lot in the Pacific Northwest and they
[57:20]
have a lot of similar issues and you
[57:22]
know we also do a lot of work just with
[57:24]
cities and counties and assessing their
[57:26]
municipal buildings. Nobody ever has the
[57:28]
money to fund their buildings. You know,
[57:31]
it's more fun to like build a new
[57:32]
building, but a lot of times it's
[57:33]
forgotten about how much effort and time
[57:35]
and cost it really takes to maintain a
[57:37]
building once you have it. It's not like
[57:39]
maintaining your house. It's a lot more.
[57:40]
So, it's not an uncommon position to be
[57:43]
in. Um, even though it is it can seem a
[57:45]
bit overwhelming. And I I think another
[57:47]
point, too, is uh the deferred
[57:50]
maintenance is is probably the the
[57:52]
number one item just across the board. I
[57:55]
think that um and I think part of the
[57:58]
slide of you know no dedicated
[57:59]
maintenance staff. I mean that is a huge
[58:02]
hindrance because if you were able to
[58:05]
to maintain all of these facilities from
[58:08]
when they were built and then you know
[58:10]
treat them that way through their their
[58:12]
life cycle then you'd have different
[58:14]
stations standing today. Um, some of it
[58:17]
is as simple as, you know, maybe 15
[58:20]
years ago you should have replaced the
[58:21]
carpet or or maybe it, you know, it's
[58:23]
like things just start to fail and then
[58:25]
when you defer maintenance, the overall
[58:28]
quality of the facility just starts to
[58:31]
degrade. Um, and Sarah's right. I mean,
[58:34]
um, the firm that I work for, we've been
[58:38]
planning and designing fire stations and
[58:40]
other fire and emergency services
[58:41]
facilities for 30 years. So, we have
[58:44]
I've been in a lot of fire stations, a
[58:46]
lot of them, and you're not unique. It's
[58:49]
not like when I say a C, you're that's
[58:52]
bad. It's it's pretty average. And you
[58:55]
have a lot of older facilities compared
[58:57]
to, you know, the West Coast where we
[58:59]
see a lot more uh newer architecture.
[59:01]
So, see, and those older facilities,
[59:04]
they do, I mean, they come with a lot of
[59:06]
constraints relative to parking, but
[59:07]
just what you can do for ADA compliance,
[59:09]
you know, we kind of absolutely there's
[59:11]
minimal things you can do. Um, so in in
[59:14]
some ways, you know, they're you're
[59:16]
doing your best, but it's it's not
[59:18]
always going to work. I'm I'm kind of
[59:21]
smirking because the fire alarm building
[59:24]
was Lake Street Station engine ladder,
[59:27]
too, with the crew of six people. So
[59:30]
that means 12 people at shift change. We
[59:33]
got by, you know what I mean? There's
[59:36]
firemen. If there's a will, there's a
[59:38]
way. That's why we pay them like that.
[59:41]
I'm going to right now recognize
[59:43]
director Cummings. He had some. So,
[59:45]
Alderman Tivido, you're in the queue
[59:47]
right immediately after. Thank you. That
[59:50]
Thank you, Mr. Chairman. Tim Cummings,
[59:51]
director of administrative services. I
[59:52]
did just want to note that um a couple
[59:55]
months back, we've started a
[59:57]
conversation about um enhancing our our
[1:00:00]
facilities department. And so I've been
[1:00:03]
before the budget review committee and
[1:00:05]
I've been before the personnel and
[1:00:07]
administrative
[1:00:08]
uh affairs committee and I anticipate a
[1:00:11]
continuing conversation with an idea of
[1:00:14]
us increasing our asset management, our
[1:00:17]
stewardship of our capital uh buildings.
[1:00:21]
We need to maintain them in a in a more
[1:00:24]
strategic way because it will save us
[1:00:27]
money in the long run. Um, great picture
[1:00:30]
that was shown at the kickoff of this
[1:00:32]
presentation was the drains not
[1:00:34]
connected at the firehouse. Um, you
[1:00:36]
know, if the goal that I've aspoused is
[1:00:39]
I'd like to get a maintenance team in
[1:00:41]
and around uh our our city buildings,
[1:00:45]
including fire, to to steward those
[1:00:48]
buildings and the systems the way they
[1:00:50]
should be because if we can squeak more
[1:00:52]
life out of our systems, it will it will
[1:00:54]
save us money in in the long run. And
[1:00:56]
so, um, I say that because I I I I
[1:00:59]
recognize the need, um, and I believe
[1:01:02]
we're working towards a solution. It's
[1:01:04]
not happening as quickly as I would
[1:01:06]
like, but, um, I brought this up at a
[1:01:08]
couple of the, uh, my budget
[1:01:10]
presentations. Um, more recently at at
[1:01:13]
uh, my last buildings and grounds, uh,
[1:01:15]
uh, seeking approval on that
[1:01:17]
department's budget. But I'm hoping um
[1:01:19]
you know come FY27 in our next budget,
[1:01:23]
we will have uh you know a better baked
[1:01:26]
plan that everyone buys into so we're
[1:01:29]
we're handling these buildings in a more
[1:01:30]
efficient
[1:01:32]
way. Can we go back to that recommended
[1:01:35]
slide because I just want to just
[1:01:37]
quickly address a couple of the items
[1:01:40]
that were raised as priority projects.
[1:01:42]
So Yep. So, so, um, it was noted a few
[1:01:46]
minutes ago, um, there is a bond
[1:01:48]
resolution up, I believe, tomorrow
[1:01:50]
night, that's going to actually address
[1:01:51]
item number two. Um, and then I believe
[1:01:55]
also anticipated with that is some HVAC
[1:01:57]
work as well. So, priorities one and
[1:02:00]
two, we're starting um, uh, developing a
[1:02:03]
pathway forward. So, we're managing
[1:02:05]
these assets and then, you know, as as
[1:02:08]
noted, we actually have money
[1:02:09]
appropriated, set aside. I believe we
[1:02:11]
will be, you know, kicking into higher
[1:02:14]
gear the the feasibility study come this
[1:02:16]
summer with it anticipated ending in and
[1:02:19]
around January. My thought process at
[1:02:22]
that time is and this is all subject to
[1:02:24]
change is then we would be seeking you
[1:02:26]
know an appropriation a bond resolution
[1:02:28]
for design and we would start designing
[1:02:31]
uh the Pine Hill station. Um once we
[1:02:33]
have that understood better then we
[1:02:35]
would obviously seek uh approval for
[1:02:37]
construction. Uh this is all baked into
[1:02:43]
the overall comprehensive conversation
[1:02:45]
that we've been having as a community
[1:02:47]
about what our appropriate level of debt
[1:02:50]
service should be and making sure these
[1:02:53]
uh various projects fit within our
[1:02:55]
capital plan. Um, I think after
[1:02:58]
tonight's conversation, um, we owe it to
[1:03:01]
to to this body and to the fire
[1:03:03]
commissioners to to internally discuss
[1:03:06]
how we fit the puzzle pieces together,
[1:03:08]
knowing the policy directive has been
[1:03:11]
that the city of Nasha doesn't want to
[1:03:13]
authorize any more new debt than about
[1:03:16]
uh, approximately $20 million
[1:03:18]
year-over-year over the next five years.
[1:03:21]
So knowing that, how do we make that
[1:03:23]
work with uh the needs that the fire
[1:03:25]
department have as well as all the other
[1:03:27]
needs of the of the city um and and and
[1:03:30]
that's that's very much forefront in in
[1:03:32]
my mind and one of the reasons why I
[1:03:34]
wanted to kind of start that
[1:03:36]
conversation this evening. Thank you,
[1:03:39]
Almano.
[1:03:41]
Um so I I understand that it was it's a
[1:03:44]
u you know not a a firm number. Um but
[1:03:49]
you your estimation was
[1:03:52]
102 million if I remember correctly that
[1:03:55]
included the escalator.
[1:03:57]
Yes that um information is for uh new
[1:04:01]
facilities only. It does not include the
[1:04:04]
remodels. And so that it basically it's
[1:04:08]
a range
[1:04:10]
of I guess let me back up a little bit
[1:04:13]
um because I feel like maybe it's
[1:04:15]
addressing um multiple questions or
[1:04:17]
comments here. Um this information is
[1:04:20]
essentially a menu. you know, it's it's
[1:04:23]
for it's for you to to consider and take
[1:04:26]
our professional opinion and the data um
[1:04:30]
and the needs assessment and then pick
[1:04:32]
and choose what is of most importance to
[1:04:35]
the city and the fire department. So,
[1:04:37]
that's why I'm saying like big millions.
[1:04:39]
It's make believe like it doesn't
[1:04:40]
nobody's going to get 100 million or 150
[1:04:43]
million to do anything ever. But this is
[1:04:45]
just the information that it puts a
[1:04:48]
period at the end of the report that
[1:04:50]
says the these are all of your
[1:04:52]
opportunities and deficiencies both from
[1:04:54]
a building standpoint, infrastructure
[1:04:56]
systems and programmatic um relative to
[1:05:00]
industry best practices. So this is sort
[1:05:02]
of the this is the answer that everybody
[1:05:05]
gets at every meeting that we have like
[1:05:07]
this at the end of a project. It's these
[1:05:09]
kinds of numbers. I mean, some of them
[1:05:11]
are like 200, $300 million because
[1:05:15]
you're just talking all in if we were
[1:05:16]
going to do everything. But I just want
[1:05:18]
to stress that these numbers are just
[1:05:21]
representative of every single thing
[1:05:23]
that we've asked and we've heard that
[1:05:25]
we're needed or doesn't work and needs
[1:05:27]
to be fixed or replaced. So, the numbers
[1:05:30]
aren't real. I don't want to say the
[1:05:32]
numbers aren't important, but the
[1:05:33]
numbers don't really mean anything until
[1:05:36]
you actually make them a project. Say
[1:05:38]
that again.
[1:05:40]
The numbers don't really matter. They
[1:05:42]
only matter when you choose to make it a
[1:05:44]
project. I I can't stress that point
[1:05:46]
enough. I'm I'm very uncomfortable with
[1:05:48]
some of these numbers because we latch
[1:05:50]
on to them and then this is the number
[1:05:52]
that I you know, you say to me, "Oh,
[1:05:55]
we're going to do the project for this
[1:05:57]
amount." I'm going to tell you right
[1:05:58]
now, we are not doing a new station
[1:06:00]
number five for $30 million. Just I I
[1:06:04]
hate to say it, but we can't do anything
[1:06:06]
for $30 million for new construction.
[1:06:08]
That's just the reality of our
[1:06:10]
marketplace. Um there's a lot that needs
[1:06:13]
to be further designed and figured out
[1:06:15]
before we hone in on the number, but I
[1:06:17]
would say that that is uh that is a good
[1:06:19]
jumping off point that to set
[1:06:21]
expectations. It's not going to be
[1:06:22]
anything lower than this. And that's
[1:06:24]
just what we need to kind of understand,
[1:06:26]
right? And that's it just really is the
[1:06:28]
it's the culmination of all of the
[1:06:31]
information that we've been able to
[1:06:33]
process. So it go ahead.
[1:06:37]
followup. Yeah. So, that kind of
[1:06:40]
answered where I was heading. So, and I
[1:06:42]
and I get it. So, my my point was going
[1:06:45]
to be if we're talking 102 that had your
[1:06:48]
uh combined 12 escalator in there. Um
[1:06:52]
the escalator is included. Everything
[1:06:55]
that is included. Yeah, absolutely
[1:06:57]
correct. And that it's two years of
[1:06:58]
escalation, so it's an it's 9% which of
[1:07:01]
course we can adjust. Understood. Um, my
[1:07:04]
point was going to be that director
[1:07:05]
Cummings
[1:07:07]
was suggested that it's probably gonna
[1:07:09]
be 25 to 30% on top of that. Um, and now
[1:07:13]
that this isn't even the full lot, I
[1:07:16]
guess I didn't pick up on that. That
[1:07:17]
that was just the new items. So, if we
[1:07:19]
went with um from the menu and picked
[1:07:22]
all our favorite flavors of all the menu
[1:07:24]
items, I mean, we're probably talking
[1:07:26]
almost $400 million.
[1:07:29]
Well, I Yeah, I I mean I got we have got
[1:07:32]
to talk because I don't know where
[1:07:34]
you're getting your numbers and you
[1:07:35]
don't know where I'm getting my like I
[1:07:37]
but I do I really I'm very curious about
[1:07:40]
and and that's kind of what I was
[1:07:41]
looking for was just all right are we
[1:07:43]
talking you know I get it big numbers I
[1:07:46]
get it um
[1:07:49]
but if there was any conversations that
[1:07:50]
have happened that you know if we really
[1:07:53]
want the best of what's on the menu you
[1:07:56]
know are we approaching the 300, the
[1:07:58]
250, the
[1:08:00]
400 ballpark. His answer is going to be
[1:08:03]
yes and mine's going to be no. Yeah. I
[1:08:05]
mean, it really depends. It really
[1:08:07]
depends. I mean, it's so amorphous at
[1:08:11]
this point because there's so many
[1:08:12]
details that need to be worked out. Um,
[1:08:16]
and I don't know enough yet to comment
[1:08:19]
more than that, but I mean I I I tend to
[1:08:21]
shy away from commenting on deferred
[1:08:23]
capital maintenance this whole side of
[1:08:25]
the ledger because this is this is
[1:08:27]
really specific and really complicated
[1:08:30]
the new construction. I I feel much more
[1:08:32]
confident talking about I mean and I
[1:08:34]
don't know what square footage and we we
[1:08:37]
could just go back to, you know, you
[1:08:40]
know, station number five, the new
[1:08:41]
station number five at $30 million. I
[1:08:44]
don't know what they're projecting for
[1:08:45]
square footage, right? And then what?
[1:08:48]
25,000. So 25,000 square feet and you're
[1:08:52]
projecting what for per square foot?
[1:08:55]
$500ish
[1:08:58]
for fire stations. We're like seven. And
[1:09:01]
I'm going to tell you right now, we're a
[1:09:02]
thousand. Yeah. So that's just a jumping
[1:09:04]
off point. And that's hard construction
[1:09:05]
without even talking about soft cost. So
[1:09:08]
at 25,000 square feet right there,
[1:09:10]
you're going to be at $25 million. and
[1:09:12]
I'm going to tell you to add another 10
[1:09:14]
for soft cost on top. That puts you at
[1:09:16]
35 million. That's just the ball game
[1:09:18]
that we're talking about. So, we we kind
[1:09:21]
of need to talk through the details a
[1:09:22]
little bit more, but that's that's just
[1:09:24]
our market.
[1:09:26]
And it's 10% cheaper here in New England
[1:09:28]
than it is on the West Coast. That's
[1:09:32]
it's wild. Yeah.
[1:09:35]
Okay. Uh Chief Buckton.
[1:09:39]
Yeah. I'd like to uh Steve Buckton
[1:09:41]
National Fire. I'd like to uh thanks
[1:09:43]
thank them for their work. Uh it's a
[1:09:45]
great presentation as you can see it's
[1:09:46]
very comprehensive and this is just kind
[1:09:49]
of an a high level view for you tonight.
[1:09:52]
Uh Adam's going to be the one that's
[1:09:53]
driving this uh within our
[1:09:56]
organization. Um you know this was
[1:09:59]
kicked off because of master plan that
[1:10:01]
we invested in for the fire department
[1:10:03]
that laid things out for approximately
[1:10:05]
10 to 15 years. Uh we've done three of
[1:10:09]
those at Nashville Fire throughout the
[1:10:11]
years. They're all stacked up on the
[1:10:12]
bookshelf in there. Some of them were
[1:10:14]
done and they went on the bookshelf and
[1:10:16]
really not a whole lot ever happened
[1:10:18]
with them. I'm proud to say this master
[1:10:20]
plan that we did in 2021 and this
[1:10:22]
strategic plan um I have in my office
[1:10:25]
chief roads before me uh myself and we
[1:10:29]
go through and we update it uh when
[1:10:31]
we're checking boxes off. This facility
[1:10:34]
study was laid out in there to be done.
[1:10:37]
This is just another roadmap for us to
[1:10:39]
follow into the future. Uh I agree with
[1:10:42]
uh Director Cummings, you know, don't I
[1:10:44]
don't want to say don't get hung up on
[1:10:45]
the cost, but until we actually turn it
[1:10:47]
into a project, um that's where we we
[1:10:50]
come looking for money. And I think the
[1:10:53]
fire department does a really good job
[1:10:54]
uh of working with uh the members of the
[1:10:58]
board of alderman, the mayor uh to find
[1:11:00]
our place in line, so to speak. Uh we
[1:11:02]
recognize the pie is only so big. So,
[1:11:05]
you know, $100 million is is a really
[1:11:07]
big pie, really big piece of the pie.
[1:11:09]
Um, and at the end of the day, um,
[1:11:12]
somebody has to manage all this within
[1:11:13]
our organization. And that guy right
[1:11:15]
down there, he does a really good job,
[1:11:17]
but facilities is just one one part of
[1:11:20]
his area of responsibility. So, if you
[1:11:23]
let me walk out of here tonight with
[1:11:25]
$100 million to attack all this, we we
[1:11:28]
we don't have the bandwidth to
[1:11:30]
accomplish it at that.
[1:11:33]
Yeah. So, but as as you heard, the
[1:11:36]
priority items are already on the radar.
[1:11:38]
Uh, and I'll be back here tomorrow night
[1:11:41]
uh to uh speak to the bonds that we're
[1:11:43]
looking to get work started. So, thank
[1:11:46]
you. Yeah, I would like to say thank
[1:11:49]
you, Chief.
[1:11:50]
Um, in my involvement with the
[1:11:53]
department of over, you know, for 35
[1:11:56]
years, a lot of these stations weren't
[1:11:59]
built. We have two that are fairly
[1:12:02]
modern and even they have some problems
[1:12:05]
you know due to uh lack of uh
[1:12:08]
maintenance and everything but
[1:12:11]
uh a lot of these are very old
[1:12:14]
structures the
[1:12:16]
uh I don't know the ethic or the new way
[1:12:20]
of the fire service has changed you know
[1:12:23]
we got rid of the horses years ago you
[1:12:25]
know so we have motorized apparatus so
[1:12:29]
stations can be farther apart because
[1:12:32]
horses don't have to run that far
[1:12:34]
anymore, you know, and uh you know, we
[1:12:38]
actually invented the toilet. So, you
[1:12:40]
know, things are working out good. But
[1:12:43]
the thing is, the main thing is, and you
[1:12:46]
you guys are on the infrastructure
[1:12:49]
committee, you've seen it here before,
[1:12:51]
past boards
[1:12:54]
ignored a lot of this problems. Engine 5
[1:12:57]
was built in
[1:12:58]
1961. It was built cheaply in
[1:13:03]
1961. You know, construction is good.
[1:13:06]
The place hasn't fall down, but it's
[1:13:09]
small, cramped, everything. Uh I was
[1:13:12]
captain of the house there. The guys are
[1:13:15]
working out on the same floor that the
[1:13:18]
truck is on. And when the truck starts
[1:13:20]
off, you do get some
[1:13:22]
byproducts of the combustion of the
[1:13:24]
engine, you know, and it
[1:13:27]
stays in there. And uh I don't know,
[1:13:31]
Chief Pullard, did you take him to the
[1:13:33]
former Crown Hill station? Did not. Can
[1:13:37]
you please, cuz I was captain of the
[1:13:39]
house there, please look at that. You
[1:13:43]
know, I mean, you will say they lived
[1:13:46]
here cuz I went there and worked there
[1:13:48]
and said,
[1:13:51]
"God, it was bad." My first night at
[1:13:54]
Lake Street Station,
[1:13:57]
uh, I slept there. It was in the middle
[1:13:59]
of winter time and I I couldn't sleep
[1:14:01]
because the shades the wind was coming
[1:14:04]
right through the window and the shades
[1:14:07]
flipping in the breeze all night. And
[1:14:09]
that just didn't happen the day before.
[1:14:12]
It's the years of neglect until finally
[1:14:15]
they got somebody to do this. We got to
[1:14:17]
as a city, and I'm saying this overview,
[1:14:20]
not just the fire department, but every
[1:14:21]
single facility. Look at we almost have
[1:14:24]
two parking garages that could collapse,
[1:14:27]
but we're working to, you know, smartly
[1:14:30]
so, and I compliment the mayor and and
[1:14:33]
uh director Cummings for prioritizing
[1:14:35]
some of these things. I know it's going
[1:14:37]
to cost the taxpayers some money, but
[1:14:40]
it's their buildings and they look at us
[1:14:43]
to try to maintain them the best way
[1:14:45]
that we can. And out of all the
[1:14:48]
facilities that we have, the one thing
[1:14:50]
to remember with the fire department,
[1:14:52]
people live in them.
[1:14:55]
They leave their nice cushy homes and
[1:14:57]
their lazy boys at home and they go to
[1:15:00]
the fire station, you know. So the
[1:15:03]
facilities the particularly the male
[1:15:05]
facilities and everything else like that
[1:15:08]
and now in the fire service they have
[1:15:10]
come out with right chief with more
[1:15:12]
rules of contamination. When I started
[1:15:15]
they gave you one fire coat and if it
[1:15:18]
got wet at the fire and you were going
[1:15:19]
out to your second one you wore the wet
[1:15:23]
coat. It's the way it was. We were
[1:15:25]
tougher back then, but anyways, you
[1:15:29]
know, not like today, but I don't want
[1:15:32]
to get it cheap, but it was the way it
[1:15:35]
was because the city don't want to buy
[1:15:36]
and they think now what we're buying two
[1:15:38]
sets of gear and we have to meet the
[1:15:41]
standards of the NFPA and everything.
[1:15:43]
So, uh, as far as the living
[1:15:46]
facilities, you know, I think we as a
[1:15:51]
committee, if we focus, this is a lot,
[1:15:54]
and I'm sure, and you stated that, I
[1:15:57]
don't think we have to bite it off in
[1:15:59]
one bite and chew it. You know, I think
[1:16:01]
what we need to do as a committee is sit
[1:16:04]
down with Chief Bucks, Director
[1:16:06]
Cummings, and Chief Pullard and try to
[1:16:09]
prioritize this. And I'm thinking we're
[1:16:12]
talking the bond tomorrow night. And I
[1:16:16]
think that's a good launching point to
[1:16:19]
see if we're going to support this to
[1:16:21]
see if we can mitigate the Pine Hill
[1:16:23]
Station. But I see this as a long-term
[1:16:26]
project. Uh this could take us
[1:16:30]
unfortunately as what we did with the
[1:16:32]
schools. We didn't build all the new
[1:16:34]
school facilities in one year. We did it
[1:16:36]
in the long term, you know, and we'll
[1:16:39]
have to watch the bonds the way things
[1:16:42]
are now happening with the economy and
[1:16:44]
everything and we'll have to go with the
[1:16:47]
advice of uh Miss Enright and other
[1:16:50]
people that know more about it. I don't
[1:16:52]
even do the checkbook at home so I can't
[1:16:55]
tell you. So, but anyways, uh I made the
[1:16:59]
money. The wife does it out. You know, I
[1:17:02]
stretched the line. She stretched the
[1:17:04]
the checkbook, you know what I mean? But
[1:17:07]
uh uh we'll have to, you know, just take
[1:17:11]
this in little bites and try to get it,
[1:17:12]
you know, the important things and
[1:17:14]
prioritize. Maybe we might be able to do
[1:17:16]
a roof a year or something like that and
[1:17:19]
you know, and take it value. And uh I
[1:17:22]
think what Director Cummings is saying,
[1:17:24]
I'm very interested and I've said it for
[1:17:26]
years from the beginning. Uh part of the
[1:17:29]
fire department budget is going out and
[1:17:31]
buying lawnmowers and everything else
[1:17:33]
like that to take care of the grounds
[1:17:37]
and you know plowing and sometimes we
[1:17:39]
need to help a DPW in some of the
[1:17:41]
stations to get rid of the big pile of
[1:17:44]
snow so that the drivers can see
[1:17:48]
access and vacating the building and not
[1:17:51]
cutting out in the middle of traffic. So
[1:17:53]
you know they need help with a lot of
[1:17:55]
these things. So, as we go in the
[1:17:57]
future, we'll take the small bites, I'm
[1:18:00]
hoping, and uh try to prioritize what we
[1:18:04]
need to do, and we're going to look at
[1:18:06]
you, chief, to come up with uh your list
[1:18:08]
of
[1:18:09]
priority priorities and uh we can
[1:18:12]
mitigate that. And uh Chief Pullard,
[1:18:16]
please take them to the former Crown
[1:18:18]
Hill station.
[1:18:20]
probably doesn't look much different
[1:18:21]
than Oh, I I had a mayor come in and
[1:18:26]
showed him when I was captain of the
[1:18:29]
facility and he says, "I'm sorry you
[1:18:32]
guys have to live like this and I'm
[1:18:33]
going like, you know, but you worked
[1:18:36]
there, Chief Bucks." Yeah. So, those
[1:18:39]
were the good days, you know. So, I'm
[1:18:42]
I'm glad we're on the right course and I
[1:18:44]
thank you for your presentation.
[1:18:47]
I'll have to ask uh what you presented
[1:18:50]
on the screen. Can we get a copy? Yeah,
[1:18:53]
I've asked I've asked Yeah, director
[1:18:55]
Cummings. All right. Because then we'll
[1:18:57]
put that as part of the uh minutes, the
[1:19:00]
minutes and everything. Is everybody
[1:19:03]
satisfied with their questions or
[1:19:07]
comments? No, I think we're good. So,
[1:19:10]
we'll move along on the agenda. Thank
[1:19:12]
you, Chief and Company. Thank you. And
[1:19:15]
it was good seeing you guys again. Thank
[1:19:18]
you. Thank you.
[1:19:31]
We can probably go on while they're
[1:19:33]
vacating. They don't seem like to be a
[1:19:36]
noisy group, so we can go on.
[1:19:39]
communications.
[1:19:41]
Uh, when are you guys heading back to
[1:19:43]
Seattle? Tomorrow. Tomorrow morning. Oh,
[1:19:46]
let's go to Reno tomorrow. Just like at
[1:19:48]
home.
[1:19:51]
All righty. Thank you again.
[1:19:55]
All right. Uh, communications
[1:19:59]
from Sam
[1:20:00]
Dery, planning manager. Referral from
[1:20:03]
the board of alderman on resolutions
[1:20:05]
R25159.
[1:20:09]
R25160,
[1:20:11]
R25161,
[1:20:13]
R25166, and the amended petition for
[1:20:16]
street discontinuence regarding a
[1:20:17]
portion of Veterans Memorial Parkway.
[1:20:20]
Okay, there being no objection, I'll
[1:20:22]
accept the communication and place it on
[1:20:24]
file. Unfinished business, there is
[1:20:27]
none. New business resolutions.
[1:20:31]
R25156 authorizing the sale of taxdeed
[1:20:35]
property located at
[1:20:39]
115-117 West Hollis Street. Um, Mr.
[1:20:42]
Chairman, I motion to recommend
[1:20:44]
approval. Final approval.
[1:20:48]
Final passage. Sorry, final passage.
[1:20:50]
Very good. Uh, director, you could have
[1:20:52]
a seat if you wish or you're fine there
[1:20:55]
at the Diaz. I anticipate a more
[1:20:56]
transient visit, but that's okay.
[1:20:59]
Well,
[1:21:00]
Mr. Chair, I'm joking.
[1:21:08]
Mr. Chair, may I? Yes, you may, please.
[1:21:11]
Uh, good evening. For the record, Matt
[1:21:13]
Sullivan, community development division
[1:21:14]
director for the city of Nshawa. Uh,
[1:21:16]
here on behalf of R251 156, authorizing
[1:21:21]
the sale of taxdeed property located at
[1:21:23]
115 through 117 West Hall Street. Uh
[1:21:26]
before I get into the substance of the
[1:21:28]
legislation, which is albeit fairly
[1:21:30]
brief in in the number of words, um I
[1:21:33]
want to just note for the record that
[1:21:34]
this address may be familiar to some of
[1:21:36]
you uh sitting around the horseshoe this
[1:21:38]
evening. This was actually part of a
[1:21:40]
previous piece of legislation through
[1:21:41]
the tax deeding process, but I'm going
[1:21:43]
to give you a brief history and then
[1:21:45]
talk about what this legislation does
[1:21:47]
moving forward. U the property itself,
[1:21:49]
115 through 117 West Hall Street, is
[1:21:52]
located on West Hall Street. It's a a
[1:21:54]
2-unit building currently with a parking
[1:21:55]
area and a garage in the rear of the
[1:21:57]
site. It's approximately 28.29 acres in
[1:22:01]
size. Uh and was actually on April 21st
[1:22:04]
of 2023 uh taken by the city of
[1:22:06]
Nashville via the taxing process that I
[1:22:08]
think you're all familiar with. Uh
[1:22:10]
subsequently as part of that process in
[1:22:12]
September of 2023
[1:22:14]
uh via an auction process or the the
[1:22:16]
city rather authorized an auction
[1:22:18]
process which is of course customary to
[1:22:20]
these properties. Subsequently on
[1:22:22]
October 7th of 2023,
[1:22:24]
um the property was in fact auctioned,
[1:22:27]
but over the course of uh the coming
[1:22:29]
weeks and months, ultimately the buyer
[1:22:32]
chose not to close on the property. As
[1:22:34]
part of that, they actually forfeited a
[1:22:36]
$10,000 deposit, but ultimately the
[1:22:38]
property was not closed upon and
[1:22:39]
therefore the city has remained or
[1:22:41]
rather the property has remained in the
[1:22:43]
city's care over the course of time
[1:22:44]
since then. Subsequently, as part of uh
[1:22:47]
what I would call strategic discussions
[1:22:50]
between the city's land use leadership
[1:22:51]
team and the tax collection leadership
[1:22:53]
team, um we had some conversations about
[1:22:56]
this property in the context of the
[1:22:58]
city's affordable housing and housing
[1:23:00]
needs more generally. And admittedly,
[1:23:02]
we've been having uh conversations in a
[1:23:04]
variety of different ways around
[1:23:06]
properties like this, particularly
[1:23:07]
multifamily or duplex properties that
[1:23:09]
may for one reason or another uh be a
[1:23:12]
small step forward or an incremental
[1:23:14]
step forward in solving some of the
[1:23:15]
city's affordable housing challenges and
[1:23:17]
crisis. And particularly we've looked at
[1:23:20]
these properties in the context of uh a
[1:23:22]
section of state statute that allows the
[1:23:24]
city to dispose of properties through an
[1:23:26]
alternative method if in fact
[1:23:29]
disposition through an alternative
[1:23:30]
method meets a public interest or a
[1:23:32]
public purpose. Uh and it's been our uh
[1:23:35]
conversation internally at least and I
[1:23:36]
think that's why we're here this evening
[1:23:38]
that solving or incrementally working
[1:23:40]
towards bettering the city's affordable
[1:23:42]
housing challenges is in fact a public
[1:23:44]
purpose and in the public's interest.
[1:23:46]
And therefore, uh, we've brought forward
[1:23:48]
the legislation tonight to actually
[1:23:50]
through an alternative disposition
[1:23:52]
process put 115 117 West Hollister
[1:23:55]
Street out through a request for
[1:23:56]
proposal process. This will be familiar
[1:23:58]
to you in particular you Alderman Tibido
[1:24:00]
going recently through um, of course the
[1:24:02]
Elm Street process. This is a much
[1:24:04]
smaller scale. This is a very small
[1:24:05]
property. it's a two-unit property, but
[1:24:07]
ultimately the goal is the same, and
[1:24:09]
that is to put out an RFP likely to a
[1:24:11]
very small developer that owns
[1:24:13]
properties of this size, uh, or perhaps
[1:24:15]
even an area nonprofit that works on
[1:24:17]
affordable housing. We would solicit
[1:24:19]
proposals into the city. There would be
[1:24:20]
a review team. We would ultimately go
[1:24:22]
through the selection process, but the
[1:24:24]
idea would in fact be to see an
[1:24:25]
affordable housing proposal for this
[1:24:27]
site at 115 and
[1:24:29]
117. Um, therefore, the legislation in
[1:24:32]
front of you, just to overview, does a
[1:24:33]
couple of different things. One, it
[1:24:36]
authorizes the city to dispose of the
[1:24:38]
property through an alternative method
[1:24:40]
that is typically used, which is
[1:24:41]
typically the sealed bid and auction
[1:24:43]
process. In replacement, it allows us to
[1:24:45]
go through an RFP process and put this
[1:24:47]
this property out to the public and
[1:24:49]
development community to respond to. And
[1:24:51]
then lastly, it of course authorizes the
[1:24:54]
mayor to enter into a purchase and sale
[1:24:56]
negotiation and to ultimately sell the
[1:24:58]
property to an affordable housing entity
[1:25:00]
that will uh convert the property
[1:25:02]
whether through demolition of the
[1:25:04]
current structure or redevelopment of
[1:25:05]
the site uh or redevelopment of the
[1:25:07]
current structure that exists there. Um
[1:25:09]
again, this is all underpinned and this
[1:25:11]
is laid out in the legislation before
[1:25:13]
you by the idea that affordable housing
[1:25:15]
and housing creation and affordable
[1:25:17]
housing preservation is in the public's
[1:25:19]
interest. And that's why we're bringing
[1:25:20]
this forward to you this evening. Happy
[1:25:22]
to answer any questions that you might
[1:25:23]
have, but look forward to working on not
[1:25:26]
only this property, but potentially
[1:25:27]
other smallcale properties that are
[1:25:29]
taken through the tax deeding process to
[1:25:30]
hopefully uh better the city's efforts
[1:25:33]
towards creating affordable housing.
[1:25:34]
Thank you. Thank you, Alderman Clay.
[1:25:38]
Thank you. Um Mr. chairman.
[1:25:41]
Um I guess the question that I have is
[1:25:45]
does this mean that this sale can happen
[1:25:48]
without the city having to recoup the
[1:25:52]
back taxes or any of the the loss of
[1:25:59]
um cost of of all of this? And the
[1:26:01]
reason I'm asking about this is that for
[1:26:05]
complete transparency, I will um I I
[1:26:09]
don't know if I had this conversation
[1:26:10]
with you or I know I had it with
[1:26:13]
somebody within the city. Um I was
[1:26:15]
approached um and I'm not going to say
[1:26:18]
by who. um by an entity that was um
[1:26:22]
asked if I would try to shepherd um a
[1:26:26]
almost a donation of this property um to
[1:26:30]
an entity um that wanted to
[1:26:34]
um build homes something similar to
[1:26:37]
this. And um in in looking into this, I
[1:26:41]
I think I spoke to Miss Enright and you
[1:26:43]
know the the whole process was this was
[1:26:46]
not allowed and I said it would be for
[1:26:49]
the public good and I kind of looked at
[1:26:51]
that one particular process and the
[1:26:54]
whole thing was that no the city had to
[1:26:55]
recoup it and and so on. So I kind of
[1:26:58]
went through all this whole thing. Um
[1:27:01]
the the person said oh no you know I'm
[1:27:03]
willing to try to do money and and so
[1:27:06]
on. I'm gonna be on. It was not a a
[1:27:08]
private person. It was a an
[1:27:10]
organization. So, but I don't want to
[1:27:13]
give the name and so on. Sure. Um, so
[1:27:17]
that's why I'm asking this question. So,
[1:27:20]
certainly, Mr. Chair, I I'll respond to
[1:27:21]
that if you're comfortable. Um, so
[1:27:24]
the the statute contemplates a few
[1:27:27]
different modifications to the rules and
[1:27:29]
and I'll ref I'll reference the two that
[1:27:31]
you're referring to, uh, Alderwoman Cle.
[1:27:33]
one being the the payment of back taxes
[1:27:36]
and what's owed to the city and the
[1:27:37]
other being the idea of disposing to the
[1:27:40]
of the property through a a reasonable
[1:27:43]
uh fair market value. Right. That's the
[1:27:45]
other contemplation of the statute and
[1:27:47]
and like you've like you've said we have
[1:27:49]
had inquiries from several entities uh
[1:27:51]
interested in in this property whether
[1:27:53]
for affordable housing, market rate
[1:27:55]
housing or even other uses. And so
[1:27:57]
there's no secret that we've had those
[1:27:59]
those inquiries.
[1:28:02]
What the use of an alternative process
[1:28:05]
or disposal process does is it does
[1:28:09]
modify albeit indirectly the fair market
[1:28:14]
value piece of the statute. And what I
[1:28:16]
mean by that is if an public purpose is
[1:28:20]
identified, there's it's not held to
[1:28:22]
necessarily the same standard when it
[1:28:24]
comes to what a fair market value is.
[1:28:27]
Now here the fair market value metric
[1:28:29]
will be fair market value affordable
[1:28:31]
affordable housing development and so we
[1:28:33]
still satisfy that section of the
[1:28:35]
statute. To my knowledge and perhaps I
[1:28:38]
should confirm this and I guess I'll
[1:28:39]
commit for the record that I will. To my
[1:28:41]
knowledge the need to as far as back
[1:28:43]
taxes being paid that is not modified in
[1:28:46]
any way by al by identifying an
[1:28:48]
alternative disposal method. Those
[1:28:50]
obligations still exist. Okay. That
[1:28:52]
process still is in place. But what does
[1:28:55]
change is the fair market value
[1:28:57]
establishment that's outlined in statute
[1:29:00]
that changes sort of inherently by
[1:29:03]
moving towards whether it's an
[1:29:04]
affordable housing play or some other
[1:29:06]
use that's identified as being a public
[1:29:08]
benefit or in the public interest.
[1:29:10]
Hopefully that answers your question.
[1:29:11]
Followup.
[1:29:14]
So please um correct me if if I'm saying
[1:29:18]
this. the the audience that you're
[1:29:20]
looking at kind of changes because
[1:29:23]
you're changing the the definition of
[1:29:26]
fair market value. So, prior to that,
[1:29:29]
you were putting it out to the highest
[1:29:31]
bidder. The city can only still
[1:29:34]
take can only accept a certain amount
[1:29:38]
and the remainder would have had to go
[1:29:39]
to the who you took it from. That's
[1:29:43]
absolutely. Now, what you're doing is
[1:29:44]
you're changing the audience to whom
[1:29:46]
you're selling it to because you changed
[1:29:48]
the definition of fair market value. Is
[1:29:50]
that correct? Uh, Mr. Chair, I'll
[1:29:53]
respond. That that is correct. One
[1:29:55]
assumption I want to be careful that we
[1:29:57]
don't make, which I've almost implied
[1:29:58]
I'm making myself, is that an affordable
[1:30:02]
housing uh development of the site will
[1:30:05]
absolutely undermine the market value.
[1:30:07]
That's not necessarily the case. It is
[1:30:09]
possible of course uh but ultimately
[1:30:12]
there will be the same obligation to if
[1:30:14]
there are excess revenues as a result of
[1:30:16]
the sale that same obligation exists to
[1:30:19]
dispose of back to the the prior owner.
[1:30:22]
I I want to confirm all of this outside
[1:30:23]
of this meeting because I I do want to
[1:30:25]
point out that there's a unique history
[1:30:27]
and fact pattern for this property
[1:30:29]
having gone out to auction having been
[1:30:31]
entered into through a a purchase and
[1:30:32]
sale but not ultimately closed. But I am
[1:30:35]
fairly certain that all of the same
[1:30:36]
provisions would apply. But I'll send a
[1:30:38]
confirmatory answer back to this
[1:30:40]
committee before this legislation
[1:30:41]
returns to the full board. Okay. Thank
[1:30:44]
Thank you. Okay. Alderman Solomon. Thank
[1:30:46]
you. I just want to understand
[1:30:49]
the process and what this resolution
[1:30:52]
says. So you you said it. Now I
[1:30:55]
processed it. Now I'm going to spit it
[1:30:57]
back to you and I want to make sure that
[1:30:58]
I understand it. The city owns this
[1:31:00]
property through the tax deeding
[1:31:03]
situation. There were back taxes. City
[1:31:05]
took it over. Typically that gets
[1:31:08]
auctioned off. Back taxes get
[1:31:11]
paid. Everything proceeds as normal. In
[1:31:14]
this situation, the city is going to
[1:31:16]
retain ownership of the
[1:31:19]
property for
[1:31:21]
now
[1:31:23]
until we get we're going to put it out
[1:31:26]
to RFQ for
[1:31:29]
um someone to develop it for affordable
[1:31:32]
housing. Once that happens, at that
[1:31:35]
point, the city will then sell the
[1:31:38]
property to said
[1:31:40]
contractor and and that money will come
[1:31:43]
back to to the city to satisfy back
[1:31:46]
taxes. I know I'm simplifying it, but I
[1:31:50]
want to make sure that I understand it.
[1:31:52]
Uh I think perhaps I should let you
[1:31:54]
speak to my legislation moving forward
[1:31:56]
because I think that's a perfect
[1:31:57]
summary. Okay. Y with the one exception
[1:32:00]
being that it will be an RFP process
[1:32:01]
rather than a qual process. But that is
[1:32:04]
essentially what will happen here. Yes.
[1:32:05]
Okay. City will retain ownership. RFP
[1:32:07]
will be released. RFP will reflect the
[1:32:09]
values contained within this resolution.
[1:32:12]
There'll be a selection process of a
[1:32:13]
preferred uh respondent essentially.
[1:32:16]
Yeah. Price will be negotiated.
[1:32:18]
Ultimately, the sale will proc will be
[1:32:20]
processed and then the same the
[1:32:22]
customary process with the sale of any
[1:32:24]
taxi to property will then go into place
[1:32:26]
as far as being paid back. All right.
[1:32:28]
Can I have a followup? Follow up. Are
[1:32:30]
you able to reveal what the back taxes
[1:32:32]
are on this property?
[1:32:35]
Uh, Mr. Chair, I I actually do not have
[1:32:37]
that answer tonight. I'm happy to send
[1:32:39]
it to the committee perhaps as part of
[1:32:40]
the the response to Alderman Cle's
[1:32:42]
question, but I I do not know Alderman
[1:32:43]
Sult.
[1:32:45]
That would be good if you could do that.
[1:32:47]
But also keep in mind where the person
[1:32:51]
that bid it on the property defaulted
[1:32:53]
and did not go to close. The initial
[1:32:56]
deposit is in the custody of the city.
[1:33:00]
10,000 $10,000 went to the city, not to
[1:33:02]
the auctioneer. That is correct. Let me
[1:33:05]
confirm that there wasn't a split on
[1:33:07]
that though. There may have been some
[1:33:08]
split so I can get that answer as well.
[1:33:11]
Okay. All right. Anybody else questions?
[1:33:16]
Okay, then I will call for a vote. Uh,
[1:33:20]
all those in favor signify by saying I.
[1:33:23]
I oppose. Motion carries. Thank you.
[1:33:28]
Will the clerk, please? Next on the
[1:33:30]
agenda.
[1:33:32]
Thank you, Mr. Chairman.
[1:33:35]
R25-161 authorizing an amendment to
[1:33:37]
resolution R72-75
[1:33:41]
laying out common sewers as it pertains
[1:33:43]
to the redevelopment of land in the
[1:33:45]
Veterans Memorial Parkway redevelopment
[1:33:49]
VMPR overlay
[1:33:52]
district. Mr. Chairman, I recommend
[1:33:56]
final
[1:33:57]
passage of our 25161.
[1:34:00]
All right. Uh you gentlemen, welcome.
[1:34:02]
You might as well come up and sit down
[1:34:04]
because you're here for two, right? Yes,
[1:34:07]
Mr. Chair. Okay. So, why don't you come
[1:34:09]
in? Welcome to the horseshoe.
[1:34:14]
Well, Director Cummings be
[1:34:17]
uh happy to I don't know if he wants to
[1:34:20]
associate with us. Rip. No, I was
[1:34:22]
actually getting ready to to get up to
[1:34:24]
the to the podium here and I was so I
[1:34:27]
was like, "All right, I might be." At
[1:34:28]
least they were nice to director
[1:34:29]
Sullivan this time. Director could join
[1:34:32]
us here if you He looks especially
[1:34:33]
sharp.
[1:34:36]
I learned sharing this week.
[1:34:39]
Alder woman Cle director Sullivan
[1:34:40]
certainly looks especially sharp
[1:34:42]
tonight. I know.
[1:34:45]
I know. I don't blame him. All right.
[1:34:47]
Since Director Cummings, you join us. Do
[1:34:49]
you want to segue into this? Yes. Thank
[1:34:52]
you, Mr. Chairman. So, uh uh again for
[1:34:55]
the record, Tim Cummings, director of
[1:34:56]
administrative services. Uh what we have
[1:34:59]
before you is legislation amending uh
[1:35:02]
some some contracts and some some prior
[1:35:05]
agreements that we had uh previously
[1:35:07]
approved because what we are here
[1:35:10]
tonight to talk about is the Mohawk
[1:35:12]
Tannery redevelopment. Um this has been
[1:35:14]
an ongoing project uh that's been near
[1:35:17]
and dear to to me over the years and to
[1:35:20]
many others in the city. Thank you alder
[1:35:23]
Clay. Um you click
[1:35:29]
uh so um
[1:35:31]
uh so with that being said uh the
[1:35:34]
project was uh a little bit way laid. We
[1:35:36]
were originally anticipating getting
[1:35:38]
underway with con uh remediation of the
[1:35:41]
site um uh last summer uh last fall.
[1:35:46]
That didn't necessarily come to
[1:35:47]
fruition. Um due to that we had to
[1:35:50]
rework uh some some some of the finer
[1:35:53]
details of the of the project to be able
[1:35:55]
to keep moving it forward. Um I will
[1:35:58]
leave it to the to the um development
[1:36:01]
team here to to speak to to speak in
[1:36:03]
more detail of the technicalities but um
[1:36:06]
I believe we are very close to getting
[1:36:08]
this project underway. Uh it is my
[1:36:11]
understanding that we have received uh
[1:36:14]
we have received or were about to
[1:36:15]
receive the final sign off from uh EPA
[1:36:19]
dees for 100% design of the remediation.
[1:36:21]
That is a critical milestone. Um once we
[1:36:24]
have that in hand, we really can can be
[1:36:27]
off to the races for the remediation,
[1:36:29]
which I still hope will be will be this
[1:36:31]
summer. But with that being said, I'll
[1:36:32]
hand it off to to Michael Develin to my
[1:36:34]
left here, who can who can uh walk you
[1:36:36]
through the finer points of of the
[1:36:38]
legislation this evening. Thank you,
[1:36:40]
Director Cummings. Uh, Mr. Chair,
[1:36:42]
members of the committee, can you please
[1:36:44]
just state your name for a
[1:36:45]
transcription, please? Yes. Uh, my name
[1:36:47]
is Michael Devon. I I represent Bllock
[1:36:50]
Holdings. Um, I'm here with attorney
[1:36:52]
Westgate. Uh, without Brad, this project
[1:36:55]
would be lost. I personally would be
[1:36:56]
lost, but um, greatly appreciative of
[1:37:00]
his efforts and his colleagues efforts.
[1:37:02]
Um, the Mohawk Tannery has been uh
[1:37:04]
before this committee as well as the
[1:37:07]
larger board a number of times. Uh, I'm
[1:37:09]
I'm thrilled to be able to report that
[1:37:12]
we're rounding third base, so to speak.
[1:37:14]
Um, we received final comments on the
[1:37:17]
100% design from EPA and DEES uh last
[1:37:20]
week. Uh, we've done an analysis of
[1:37:22]
those comments. Uh, and we anticipate
[1:37:24]
file filing the final 100% uh design on
[1:37:29]
June 6th. Um this is a 2400page document
[1:37:33]
um that is certainly extensive if not
[1:37:37]
downright exhaustive in terms of the
[1:37:39]
level of detail uh that the engineering
[1:37:42]
consultants have gone through to to make
[1:37:43]
sure that we remediate the site uh well
[1:37:46]
um and and safely uh for the public
[1:37:49]
health risk that it imposes. Um great
[1:37:52]
thanks to the city staff for getting us
[1:37:53]
to this point uh and all the dealings
[1:37:55]
that we've had. I can't count the number
[1:37:57]
of times I've had a 10:30 uh call or
[1:38:00]
weekend call from Director Cummings or
[1:38:02]
Director Sullivan uh to make sure we
[1:38:04]
talk about finer points uh of the Mohawk
[1:38:07]
Tannery. Uh the staff has truly been
[1:38:09]
dedicated. Um as we all know, the Mohawk
[1:38:13]
Tannery site sits along the Nashville
[1:38:14]
River. Uh directly east uh is the
[1:38:17]
downtown area. Uh it's a great area uh
[1:38:20]
for development. Unfortunately, uh it
[1:38:22]
has been contaminated for for a number
[1:38:25]
of years. Um things started to change uh
[1:38:28]
for the site uh when Blle Holdings uh uh
[1:38:32]
ran by Bernie Plant at the time uh
[1:38:34]
reached a deal with the EPA uh to
[1:38:36]
redevelop the site uh by first cleaning
[1:38:40]
it up. Um the EPA has since uh increased
[1:38:43]
its commitment to the project from $6
[1:38:45]
million to $9.5 million. uh that was
[1:38:48]
approved by Doge as well as uh upper
[1:38:51]
levels of the US DOJ um just recently
[1:38:54]
and it's currently in public comment uh
[1:38:57]
due to end on June 11th um in order for
[1:39:00]
us to have that agreement uh perfected
[1:39:02]
and and uh ready to
[1:39:04]
go. Um the reason why we've been at this
[1:39:08]
now for a number of years, uh Director
[1:39:11]
Cummings certainly well before me. Um
[1:39:14]
it's a a contaminated site. Um sitting
[1:39:17]
along the Nashville River are these two
[1:39:19]
large lagoons of carcinogenic materials.
[1:39:22]
Uh those lagoons sit within the
[1:39:24]
100red-year flood plane. The tannery
[1:39:26]
started in the 1920s. Uh I I wouldn't
[1:39:28]
want to keep playing those odds if I was
[1:39:30]
the city of NSHA. Um throughout the site
[1:39:33]
there are also a number of uh scattered
[1:39:36]
uh bits of the tannery waste uh as well
[1:39:39]
as a larger landfill here uh which was
[1:39:42]
on the uh fimble uh door property uh as
[1:39:45]
well as scattered asus uh throughout. Um
[1:39:48]
the goal is to uh clean up the site uh
[1:39:52]
consolidate all the uh Carson jig
[1:39:54]
materials into a containment cell uh
[1:39:57]
elevate that containment cell over uh
[1:39:59]
the 500year flood plane line uh in order
[1:40:02]
to uh further protect the site. Put a
[1:40:05]
permeable cap on top uh and then uh make
[1:40:08]
use of the site uh into uh the
[1:40:11]
development that you have seen before
[1:40:13]
you. Um the legislation that has gone
[1:40:16]
before the the larger board uh had
[1:40:18]
various pieces to it uh including a
[1:40:21]
revised master site plan. Uh that's not
[1:40:23]
subject here tonight. Uh but that this
[1:40:26]
depicts some of the changes that that
[1:40:28]
were before uh the board. Uh before the
[1:40:31]
uh committee tonight are two uh pieces
[1:40:33]
of legislation uh
[1:40:37]
R25166. Um this legislation uh
[1:40:40]
contemplates easements uh through the
[1:40:42]
project site to uh the adjacent Tamposi
[1:40:45]
property. Uh one of the dealings that we
[1:40:48]
had to uh uh do with the city uh was to
[1:40:51]
lease the right-of-way parcel. Uh as
[1:40:54]
such uh lease the rightway parcel
[1:40:56]
through the remediation. Um as such um
[1:41:00]
we now have to have the city join in
[1:41:03]
some of the agreements that we've made
[1:41:04]
to the adjacent property uh including
[1:41:07]
access and utilitiesmen. Um to be clear
[1:41:10]
though um tonight we are asking the
[1:41:12]
board to table this uh bit of
[1:41:14]
legislation until the June 11th meeting
[1:41:16]
of this committee. Uh reason being that
[1:41:19]
we just received um redline comments
[1:41:22]
from uh council from uh the Tamposie
[1:41:25]
family that owns the adjacent land and
[1:41:27]
we want to attend to those comments uh
[1:41:30]
route those red lines uh through
[1:41:32]
attorney Leonard uh who's been
[1:41:34]
intimately involved in this project uh
[1:41:36]
so that the city is is accepting of
[1:41:38]
those changes and then uh bring that new
[1:41:41]
uh uh version before this committee on
[1:41:43]
the 11th which we are prepared which we
[1:41:46]
are already set to be before for a
[1:41:48]
public hearing on a street
[1:41:50]
discontinuence petition that we
[1:41:52]
previously had 166 this one here. Yes.
[1:41:55]
Yes, ma'am.
[1:41:59]
R25161. Uh we are asking this board to
[1:42:02]
pro uh or this committee to provide a
[1:42:04]
favorable recommendation to the larger
[1:42:06]
board. Uh what this uh legislation uh
[1:42:10]
contemplates is a uh existing uh sewer
[1:42:14]
trunk line uh which the city has uh
[1:42:18]
along the river uh next to where the
[1:42:21]
containment cell is and there's a sewer
[1:42:23]
siphon over here uh as well as going uh
[1:42:26]
further east. um amending the the the
[1:42:30]
easement itself uh to allow us BLock to
[1:42:33]
do work uh and install the necessary
[1:42:36]
structures that we need for the
[1:42:37]
containment cell um along that easement
[1:42:40]
that currently exists um and ensure that
[1:42:43]
the city uh will follow certain repair
[1:42:45]
protocols um if they ever need to uh
[1:42:49]
repair the sewer uh adjacent to the
[1:42:52]
containment cell. uh our consultants at
[1:42:54]
Halen Aldridge uh put together a repair
[1:42:58]
protocol uh which obviously the city
[1:43:00]
when they put their sewer in uh would
[1:43:02]
not have uh uh uh known at the time
[1:43:06]
because a design hadn't been uh designed
[1:43:08]
for the contain excuse me the
[1:43:10]
containment cell the containment cell
[1:43:14]
um so uh our consultants put forth that
[1:43:17]
protocol to uh city engineering staff
[1:43:20]
engineer Hudson uh and his team uh and
[1:43:23]
we agreed to uh what that protocol would
[1:43:25]
would entail. Uh so this legislation
[1:43:27]
just again reiterates that the city
[1:43:30]
needs to follow certain protocols. Um
[1:43:34]
and then ultimately uh we're we're
[1:43:36]
projected close uh July 15th uh subject
[1:43:40]
to change. There are so many players
[1:43:41]
involved in this project um that uh
[1:43:45]
that's that's the date we're projecting
[1:43:47]
but it is subject to change. Uh once we
[1:43:50]
begin the remediation it'll be two
[1:43:51]
years.
[1:43:52]
uh between uh remediation sign off uh
[1:43:56]
and then uh start moving forward on the
[1:43:59]
redevelopment
[1:44:01]
project and and that that completes the
[1:44:04]
presentation for tonight. Okay. Thank
[1:44:06]
you. Any questions from members of the
[1:44:09]
board? Autumn Sullivan.
[1:44:11]
Thank you. Regarding the uh
[1:44:15]
166, that was the one that you're
[1:44:17]
requesting to the table. Yes. That had
[1:44:19]
the red lines issue. any um I don't know
[1:44:21]
what you can reveal, what you can't, but
[1:44:24]
have you taken a glance at the red
[1:44:25]
lines? Anything that that you see is uh
[1:44:28]
troubling or maybe non-negotiable or
[1:44:31]
anything any any landmines there that
[1:44:34]
you see? The one of the beauties of this
[1:44:35]
project is most people defer to attorney
[1:44:37]
West in terms of the redlinining and his
[1:44:40]
knowledge base. Uh so I have seen the uh
[1:44:43]
red lines because Brad wrote them. Yeah.
[1:44:45]
Okay. But I'll let him answer that
[1:44:47]
specific question if that that's okay
[1:44:49]
with Mr. Sure. If I may, Mr. Chairman.
[1:44:51]
Sure.
[1:44:53]
Thank you again for the record. Brad
[1:44:54]
Westgate, lawyer with Winer and Bennett,
[1:44:56]
402 Ammerst Street here in NSHA. Um the
[1:45:00]
the red lines were creations uh that we
[1:45:03]
made today. We, my colleague Barbara
[1:45:05]
Halevy and I did um as the initial
[1:45:08]
drafts people of the uh easement
[1:45:10]
document based on a conversation we had
[1:45:13]
with council for the Temposi entities.
[1:45:16]
Um fundamentally the red lines are to
[1:45:19]
simplify a complex little aspect of this
[1:45:23]
um document that um I initially drafted
[1:45:26]
which with some comment now having
[1:45:28]
received from uh the Champosies council
[1:45:31]
I can see a way to simplify it and also
[1:45:34]
to indicate how we had to add the city
[1:45:37]
as what I call an accommodation party to
[1:45:39]
the easement as Mr. Devon noted the
[1:45:45]
instead of acquiring fee simple full
[1:45:47]
ownership of the 4.4 4 acres that's
[1:45:50]
coming out of the Veterans Memorial
[1:45:52]
Parkway right away. That's part of the
[1:45:53]
site. We're going to lease it for a time
[1:45:56]
frame, but because of the commitments to
[1:45:58]
the Temposies both under our master
[1:46:02]
development agreement and also the
[1:46:04]
original legislation that contemplated
[1:46:06]
ultimate redevelopment of the Tannery
[1:46:08]
site, um we need to grant them these
[1:46:10]
easements uh upfront, if you will. So
[1:46:14]
that necessitated some structural
[1:46:17]
changes to the document which are
[1:46:19]
reflected in these red lines. I don't
[1:46:21]
think any of what we've done is going to
[1:46:23]
be a showstopper um both with the
[1:46:25]
Tamposies and with city staff and
[1:46:27]
attorney Leonard. Um but I do have to
[1:46:29]
walk through um with the Temposies those
[1:46:32]
changes better and also certainly bring
[1:46:35]
city staff up to speed with the why
[1:46:37]
we've approached it the way we did.
[1:46:38]
Okay. Thank you.
[1:46:41]
Okay. Any other
[1:46:43]
questions? Okay, seeing none, I'll call
[1:46:46]
for the vote. All those in favor signify
[1:46:50]
by saying I. I. Opposed. Motion
[1:46:55]
carries. And right now we're on to R
[1:46:59]
25166 and I'll entertain by
[1:47:02]
recommendation a motion to table.
[1:47:05]
Alderman Clay. Yes.
[1:47:08]
R25-166 authorizing the city of
[1:47:10]
Nashville to join in the granting of an
[1:47:12]
easement for the benefit of map 62 lot
[1:47:16]
100 and adjacent adjacent land in
[1:47:20]
connection with the redevelopment of the
[1:47:21]
former Mohawk tannery site. Mr.
[1:47:24]
Chairman, I recommend table to the next
[1:47:27]
meeting of June 11th.
[1:47:31]
Okay. And any uh discussion on that? Not
[1:47:35]
a table. No, I think he can have that.
[1:47:38]
No, not a table. Not on a tableling. No.
[1:47:40]
Um but I would like to say June 11th.
[1:47:43]
I'll have to check with the
[1:47:44]
administrative.
[1:47:46]
Uh we we do have a one of those intram
[1:47:49]
meetings. Yeah. Yeah. The booking if
[1:47:52]
it's available. Um so if you could check
[1:47:54]
with Don or I'll have Donna check June
[1:47:56]
11th tentative to the Yeah. the clerk.
[1:47:59]
Mr. Chair, just if I may, um I believe
[1:48:02]
that notice has already gone out for a
[1:48:03]
public hearing for that night because
[1:48:06]
there's a there's a petition uh for
[1:48:08]
street discontinuence that we had to
[1:48:09]
amend uh based on uh these changes.
[1:48:12]
Well, if that's the case, that's
[1:48:14]
beautiful. Okay, good, Mr. Chair. All
[1:48:16]
right. I didn't want you to count on the
[1:48:17]
11th and then we get something to
[1:48:20]
arrive. Okay. All right. The motion is
[1:48:23]
the table. All those in favor signify by
[1:48:25]
saying I. I oppose. Motion carries.
[1:48:30]
Thank you, gentlemen. Thank you very
[1:48:31]
much. Thank you very much. Okay. New
[1:48:33]
business ordinances. There is none.
[1:48:36]
Petitions, there is none. We do have
[1:48:39]
another item that is table, but it's not
[1:48:42]
going to come off the table. Nobody's
[1:48:43]
shown
[1:48:44]
interest. And um there's another one.
[1:48:48]
We'll leave that one on the table. Well,
[1:48:49]
yeah, it's petition for that's been
[1:48:52]
tabled for a while there, too. So,
[1:48:54]
general discussion.
[1:48:57]
Yes,
[1:48:59]
just I wasn't vocal on the the first
[1:49:02]
motions. I don't know if you had me as a
[1:49:04]
yes. I was confused for a second on
[1:49:06]
whether which one we were voting for. So
[1:49:08]
I'm a yes on 161. Oh, okay. And to table
[1:49:11]
on 166. I got confused at which one we
[1:49:14]
were Okay. You voted in the affirmative.
[1:49:19]
Correct.
[1:49:22]
Yeah. Okay. And there's nobody here for
[1:49:25]
public comment and remarks by alderman
[1:49:27]
is the same as general discussion. I
[1:49:30]
agree. I get confused by those too.
[1:49:32]
Yeah, we can we were looking to modify
[1:49:35]
splitting hairs. Mike, yeah, I know.
[1:49:37]
Unless somebody has something that want
[1:49:39]
to share. Oh, good. Good. I think we
[1:49:41]
should get rid of general discussion and
[1:49:42]
just go straight to I would agree with
[1:49:45]
that. Mark's bike. I think they're
[1:49:47]
working on it. Yeah.
[1:49:49]
All right. And so now I'll look to
[1:49:52]
Alderman Clay for the next motion. Your
[1:49:54]
favorite one? Yes indeed.
[1:49:57]
I'd like to motion to adjurnn. Okay. The
[1:50:01]
motion is to adjurnn. All those in favor
[1:50:03]
signify by saying I. I. Oppose. Motion
[1:50:07]
carries. Uh, and I'll declare the
[1:50:10]
meeting closed at uh 8:50 p.m.