NRG Steering Committee - August 2026

Naugatuck Valley Planning Region, CT · · More Naugatuck Valley Planning Region, CT meetings · More Connecticut meetings

Transcript

Download: Text · SRT ·
SOURCE TRANSCRIPT

This transcript is downloaded from the source you provided but we haven't reviewed it for accuracy. Treat it as a starting point, not a verbatim record. You can also request an AI-transcription of the audio file with the button to the left.

[0:00] Why don't we start with the
[0:01] introductions? Uh, I don't see Rrista,
[0:04] so I guess I'll start. Uh, Jack Walsh
[0:07] from Derby, and I'm co-chair of the
[0:09] committee.
[0:11] » Uh, Desra.
[0:13] » I'm Desra Blanchard, uh, communications
[0:16] and community engagement director with
[0:17] NVCOG.
[0:18] » Yeah. Aaron Yaron Budd. I'm the
[0:21] environmental planning director here at
[0:22] NVCOG. Tom
[0:26] Dhy, environmental planner, NVCOG.
[0:29] Emily.
[0:32] » Hi, I'm Emily. I'm a designer at Stimson
[0:34] Landscape Architects.
[0:36] » Uh, Christine.
[0:39] » Hi, I'm Christine. I'm a senior
[0:40] environmental planner with Envy Cog.
[0:43] » Paul.
[0:44] » Yeah. Paul Benvich Water, downtown
[0:46] engineer.
[0:48] » Okay. The other Paul. [laughter]
[0:50] Paul.
[0:51] » Paul Woodworth. Uh, senior director of
[0:53] ecological restoration at Save the
[0:54] Sound.
[0:57] Michael.
[0:59] » Hi, Michael Inquis from Simpson
[1:00] Landscape Architect.
[1:02] » Okay. City of Waterberry.
[1:05] » Good morning. Judy Mancini. I'm adviser
[1:07] to Mayor Paul Pernooki.
[1:10] » Molly,
[1:17] » You just muted yourself. Molly,
[1:25] you want to unmute yourself and
[1:27] introduce yourself? There you go.
[1:29] » Hi, sorry having technical issues, but
[1:31] I'm Molly Johnson, uh, environmental
[1:33] planner at NVCOG.
[1:35] » Mark
[1:38] Nielsen with NVCOG. Um,
[1:42] okay Jeff.
[1:51] » Hi Jeff Barilla. Uh, community liaison
[1:54] at Save the Sound for the Kenny Town Dam
[1:56] Removal Project.
[1:59] » Jerry Jerry Lucowski, director of public
[2:02] works, Water Town.
[2:04] » Daisy.
[2:07] » Hi, Daisy Everingham. I'm an
[2:09] environmental planning intern here at
[2:10] MVCOG.
[2:12] » Kevin.
[2:13] » Uh, good morning. Kevin Ellis, senior
[2:15] engineer at MVCOG.
[2:17] » Okay, Glenn.
[2:19] » I'm Glenn Valentine, principal from
[2:22] Stimson Landscape Architecture.
[2:24] » Okay, Michael.
[2:30] » How you doing? Michael Dham, uh,
[2:32] director of parks and recreation,
[2:33] Watertown.
[2:35] » Okay, next one I'm going to butcher.
[2:39] video.
[2:40] Not even close, I don't think.
[2:42] » That's all right. Good morning,
[2:43] everyone. Um, my name is Tao Ola. I'm a
[2:47] transportation planner at Envy Chicago.
[2:49] » Okay. Denise.
[2:51] » Uh, Denise Rap, First Leman, Town of
[2:53] Lichfield.
[2:55] » Cleave.
[2:56] » Yes. Hi, I'm Cle, town of Lichfield.
[3:00] » Tommy.
[3:08] Tommy Rack, you there?
[3:11] » Yeah. Yeah, I'm here.
[3:13] » Okay. Who are you representing, Tommy?
[3:15] » I'm with Envy Cog.
[3:16] » Okay. Bobby.
[3:19] » Hi. Bobby Brown, a communications
[3:21] associate with NVCOG.
[3:23] » Hey, Tony.
[3:26] » Tony Adilly, town of Thomson ladies
[3:28] administrator.
[3:29] » Hey, Burke.
[3:34] » Hi, Amanda. Uh Thomas Greenway chair.
[3:37] » Okay. Uh KP's iPhone.
[3:42] » Hey, good morning. This is Kate Peipa,
[3:45] transportation planner and VCOG.
[3:47] » James. Oh, James Culpa.
[3:50] » Uh James Culpa, VHP oversee projects in
[3:53] the transportation alternatives program
[3:55] as well as a steep grant program.
[3:57] » Okay. Vince.
[3:59] » Yeah, Vince Seafford. I'm a volunteer
[4:02] for Ngatuck and when I'm doing my paid
[4:05] job, I'm a construction engineer at GGA
[4:07] Geo Environmental.
[4:10] » Chris.
[4:13] » Hi everybody. Chris Roberts. I'm with uh
[4:15] the active transportation unit at
[4:17] Connecticut DOT.
[4:20] » Okay. Did I miss anyone?
[4:23] » Jim Stewart, public works Nagatuk.
[4:26] » Hey, this may be the largest crowd we've
[4:27] ever had. I can't remember this many
[4:29] people being on board. So, uh, those are
[4:33] introductions. All right. Uh, let's see.
[4:36] Erin, shall we go right into the
[4:38] updates? Waterberry.
[4:43] » Uh, good morning everyone. Um, we're
[4:46] still in design on the greenway part.
[4:48] We're in the process of finishing up our
[4:50] rideway acquisitions and we're moving
[4:53] slowly but surely forward in in process.
[4:56] It's still being reviewed by the federal
[4:59] government as far as that could be a
[5:01] little bit up in the air, but we're
[5:02] still proceeding forward and moving
[5:04] along with the timelines as if we are
[5:06] absolutely getting the remaining funding
[5:09] on our project.
[5:10] » Let's hope so. What What's the actual
[5:12] distance of that section you're you're
[5:14] working on?
[5:15] » You know, I don't I think it's a couple
[5:16] miles, but I can get that for you. I
[5:18] don't have that right in front of me.
[5:19] » Okay. Right. Uh and you got some good
[5:22] publicity I saw the other day.
[5:24] » Yeah, we did. It was a great day. It's a
[5:26] great It's It's great. People enjoy it.
[5:28] So hopefully again, slowly but surely
[5:31] we'll get there.
[5:33] » Let's hope so. [clears throat] Uh and
[5:35] Sonia,
[5:37] is that going to be you, Erin?
[5:41] » Yeah. So, the last thing I heard and
[5:43] maybe Jim Culpa can can chime in here.
[5:46] Um was that um
[5:50] were they approaching 30%. I think it
[5:52] was under review. I can't remember
[5:53] exactly what what the status was on
[5:56] that.
[5:56] » Uh Bill Anderson is typing right now. So
[6:00] get an update from him. I think that's
[6:02] where it's at.
[6:05] » Working through some design details cuz
[6:07] like one portion of that alignment is
[6:10] getting excavated right now for a coring
[6:12] operation.
[6:14] » Okay. Yeah, that's controversial.
[6:18] All right. But work is being done, so
[6:20] they're moving along. Yeah, I'll circle
[6:22] back when he's done typing me an update.
[6:25] » Okay. All right. Uh, Watertown Jury, you
[6:28] going to do both of those?
[6:34] » I could have uh Paul briefed the our
[6:36] Ngatuck uh um section. I could brief the
[6:41] Watertown Steelbrook Greenway. Um it's
[6:44] just about a mile length from French uh
[6:47] street with flashing vehicans with a
[6:50] bridge that's in production uh right now
[6:52] in Alabama. Um the abupments uh are set
[6:56] up, they're going to be poured uh
[6:57] tomorrow for the bridge. Um once the uh
[7:01] it's poured the concrete uh we're going
[7:04] to start the paving and it's going to go
[7:07] down to uh Unico uh field which is about
[7:10] a mile away at the Unico Bridge. Uh
[7:14] Colona is the contractor doing a good
[7:16] job. Um and we look to be done uh
[7:20] substantial completion on October 25th.
[7:25] » Well, that's great. That's really good.
[7:28] Right. How about the water town
[7:30] sections?
[7:30] » Yeah, the uh Noak River Greenway, we're
[7:33] looking to hire a design engineer for
[7:36] that 2.38 miles of trail. I'm trying to
[7:40] get a status update and our request for
[7:42] extension from deep uh wreck trails
[7:45] because our uh grant runs out next
[7:47] month. So, I've been a little been
[7:49] working on that. I haven't heard back
[7:51] from Kim Bradley yet or anybody up
[7:53] there. So, I need to check today on
[7:55] that. So,
[7:59] Um, Beacon Falls.
[8:03] Erin, is that back to you?
[8:05] » Um, so is Kevin on?
[8:08] » Yes, I am here.
[8:10] » So, so, uh, Beacon Falls is working on a
[8:12] lot application to, um, well, originally
[8:16] it was to repave their main street. Um,
[8:18] we've had discussions with the with the
[8:20] municipality about, you know, it being a
[8:23] really good opportunity to do a little
[8:24] bit more or, you know, make a make a
[8:26] bigger impact on downtown. And there's
[8:28] definite implications with the greenway.
[8:31] So, Kevin, who's our transportation
[8:33] engineer here on staff, has been working
[8:35] to sort of develop some concepts and
[8:38] Kevin, if you want to sort of run
[8:39] through those and talk about how, you
[8:41] know, it impacts the or could impact the
[8:43] greenway, um, that'd be great.
[8:45] » Yeah, of course. Uh I will be sharing my
[8:47] screen so we can go back to PowerPoint
[8:49] right after but I can show the concept
[8:51] plans.
[8:52] » Um like like Aaron said uh we have a
[8:54] lots of application with the town. It's
[8:56] been in the works for a while and we've
[8:57] been working with them to kind of uh
[8:59] reinvision what uh Main Street can be uh
[9:02] between uh if you're familiar with the
[9:03] Beacon Falls between Route 42 the
[9:05] intersection route 42 at Bethany Road
[9:07] all the way north up to uh Church Street
[9:09] where it kind of turns off of the old
[9:11] route 8 alignment. Um, so I'll give a
[9:14] quick highlight of the plans here. Uh,
[9:16] and I guess I'll I'll double check. Can
[9:17] everyone see my screen?
[9:20] » Yes. Yes.
[9:21] » All right. Excellent. So, um, I think
[9:24] the biggest part of for that's relevant
[9:26] for the for the Arctic River Greenway is
[9:28] actually uh this little call out here,
[9:31] which is kind of outside of the plan
[9:33] scope, but is important to this project.
[9:35] So, as part of the whole project, uh,
[9:37] it's existing four lanes. Uh, as a
[9:39] project goal, we wanted to slim it down
[9:41] to two. So, and I'll talk more about
[9:43] that when I go up the corridor, but
[9:45] essentially we are cutting the roadway
[9:47] width in half. So, question is how do
[9:50] you tie into the existing state section
[9:52] on South Main Street, Route 42 as it
[9:54] goes south along the river and then what
[9:56] do you do with that? So I talked to the
[9:58] department maybe I started the
[10:00] conversations maybe six weeks ago and we
[10:02] decided together that what we can do is
[10:05] we will abandon the uh 42 side the I
[10:10] guess the westbound side the the the
[10:12] side closer to the river and in part of
[10:15] that abandonment we're not going to tear
[10:16] up the pavement or anything we'll just
[10:18] leave the pavement there and the Narctic
[10:19] River Greenway can then just use the
[10:21] existing alignment going all the way
[10:23] down from the intersection Route 42 here
[10:25] with uh South Main street all the way
[10:28] underneath the Route 8 bridge all the
[10:29] way to uh what's the name of the park?
[10:31] Riverbend Park. Did I get that right,
[10:32] Aaron?
[10:33] » Yep.
[10:34] » Okay. So, that that that that's probably
[10:36] the biggest news with all this is we'll
[10:38] be almost getting a free greenway just
[10:40] using the old alignment. No need no need
[10:42] to change the pavement. The striping the
[10:44] striping can just be there. It doesn't
[10:45] matter. Um and it's going to be really
[10:47] wide section because this is what the
[10:48] existing pavement structure is. We're
[10:50] talking maybe 25 20 25 ft plus of
[10:54] pavement that would just become the
[10:55] greenway.
[10:57] That's kind of the really the biggest
[10:58] change as part of these plans and none
[11:00] of it is being shown here because it's
[11:01] technically outside of the project
[11:02] limits.
[11:04] But uh as you kind of go uh move uh
[11:08] towards the north uh we'll have the
[11:10] section of greenway tying to the
[11:11] existing section that's ex that's right
[11:14] that that's right uh against the Route
[11:16] 42 or not Route 42 South Main Street
[11:18] along the river that will remain in
[11:20] place. That will just continue being as
[11:22] is. Um, so as you move north, that
[11:27] sector to greenway is still going to be
[11:28] there. Obviously, the roadway corridor
[11:30] is not very different. There's a lot
[11:31] more grass between the greenway and now
[11:34] the new two-lane road, on street
[11:35] parking, that sort of thing.
[11:38] And then even further north, uh, kind of
[11:41] halfway between that, uh, on South Main
[11:43] Street heading towards Depot Street
[11:44] where that old like iron bridges, the
[11:46] town wants to have some developable land
[11:47] in this area. So really for the
[11:49] greenway, we're talking about like
[11:52] amenities, shops, sort of things that if
[11:53] you're riding a bike, you can stop for
[11:55] like a cup of coffee, maybe some ice
[11:57] cream, maybe just like local shops along
[11:59] the way. Just kind of it kind of gives a
[12:01] really different context to the greenway
[12:02] and more of an economic driver, which
[12:04] obviously the town of Beacon Falls is
[12:05] very interested in.
[12:08] And then once we get to Deeper Street,
[12:09] uh the existing greenway ends, but as
[12:12] part of this project, we'll be creating
[12:13] a multi-use trail that will be
[12:15] continuing along North Main Street from
[12:17] the greenway. So, we have this little
[12:18] connector piece here, crosswalk across
[12:20] depot, and then we'll kind of having a a
[12:23] 12t wide greenway moving all the way up
[12:26] along the corridor kind of past all the
[12:28] existing businesses. Uh, again, the
[12:31] roadway is now two lanes. So, with the
[12:33] extra roadway space, we have room for
[12:35] grass plantings, but but relevant here,
[12:38] the greenway. So, this will kind of
[12:40] continue up past the route 8 uh on and
[12:42] off ramps intersection, and it'll
[12:45] continue all the way up to the end of
[12:47] the quarter, which is where North Main
[12:49] Street will turn into Church Street. So,
[12:50] this is where the greenway will end for
[12:52] now. I know there are plans to get it
[12:54] through the Naggatuck forest somehow. I
[12:57] know I've had a lot of conversations of
[12:58] how to do that, how much money it will
[13:00] cost, but that that's a different topic
[13:01] for a different day.
[13:03] So really here uh the big highlights are
[13:06] the Route 42 alignment south of Bethany
[13:09] Road will the river side will become the
[13:12] Narctic River Greenway which will extend
[13:14] the greenway uh pretty significantly
[13:16] down I think for about a mile or so and
[13:19] then using the existing greenway
[13:20] footprint. Obviously, the whole context
[13:22] will be different, but really the
[13:25] existing greenway will be there with new
[13:27] shop shops along the way. And then we'll
[13:29] be extending the greenway up past Depot
[13:32] Street all the way up along North Main
[13:33] Street to Church Street, kind of where
[13:35] the end of the project limits are. So,
[13:38] those are the big highlights for Beacon
[13:39] Falls. I know it's a lot. I kind of
[13:41] quickly said at once, so of course I'll
[13:43] take any questions or comments or
[13:45] thoughts about this whole project.
[13:48] Do you have funding for this yet or?
[13:51] » Yes. So, so the way lots of works is uh
[13:53] they already applied for for application
[13:56] funding. As part of the pro process, you
[13:58] need to allocate funding for it. So, the
[14:00] board has already approved this. Uh
[14:01] right now we're looking at a $16 million
[14:03] price tag for the whole quarter
[14:04] improvements. Um this number is a is a
[14:06] living number. It might change as the
[14:08] project develops over time, but the way
[14:10] lots of works is as an MVCOG, we get
[14:13] around $10.8 million per year. projects
[14:16] continuously roll in and then once a
[14:18] project's ready to construct and we have
[14:20] the funding set aside for in in our
[14:22] coffers, uh, we can get it built. So, we
[14:24] do have the funding kind of set aside
[14:25] for this project already.
[14:27] » Great.
[14:29] Any questions?
[14:33] Okay, let's move on. Good luck with
[14:34] that. That sounds great.
[14:35] » Thank you.
[14:37] » All right. How about uh Harington?
[14:44] All right, I guess we're back to you.
[14:45] [laughter]
[14:49] » Um,
[14:53] so Nog I think Ngatuck we skipped.
[14:58] » Oh, okay. Let's go back to I thought
[15:01] that was part of the water tub report.
[15:04] [clears throat]
[15:05] » So Jim Stewart, uh, public works. Um,
[15:10] Kleinfelder is still in preliminary
[15:12] design.
[15:13] We're currently grappling with uh the
[15:16] section of of trail that goes between
[15:20] Fields and in the existing driveway and
[15:23] and the Salem Bridge over the Ngatuck
[15:26] River. Um it's very tight. The road is
[15:29] probably only, you know, 19 18 ft
[15:32] two-way road at this point or the the
[15:34] the access way to the fields. Um, so we
[15:38] have to figure out what we're going to
[15:40] do uh with the the parking which which
[15:43] would be affected the the roadway and
[15:46] the fencing to the field. So So we're
[15:49] trying to figure out how much of the
[15:51] fields we can lose, how much parking we
[15:53] can lose, where we can relocate it, and
[15:56] and how we're going to get through there
[15:59] um with a trail.
[16:03] » That sounds like a challenge. Yeah, it's
[16:05] it's we're going to lose somewhere.
[16:07] That's for sure.
[16:08] » Yeah.
[16:10] Lose somewhere and gain elsewhere. So,
[16:12] » Yep.
[16:14] » Okay. Anything else?
[16:17] All right. Now, we'll go to Harington.
[16:21] » I don't have any updates on Harington. I
[16:24] think Ra was going to give an update and
[16:26] I don't see her on.
[16:27] » Well, if she comes on, we'll go back to
[16:29] her.
[16:30] » Okay.
[16:31] » I I've got one that's not on there. Um,
[16:34] and it's not for an extension,
[16:37] but Derby got a grant of over a half a
[16:41] million dollars, and it's going to be a
[16:42] little different. Uh, the grant was
[16:44] actually written by the economic
[16:46] development director, and his effort is
[16:50] to encourage development in downtown by
[16:54] lighting the greenway.
[16:57] So, they got over a half a million
[16:59] dollars and it includes security cameras
[17:03] and solar lighting.
[17:06] Um, there are in the stage of putting
[17:09] together an RFP for this. Uh, so we'll
[17:12] see. But, you know, I don't know if any
[17:16] other sections of the greenway have
[17:18] intentionally put lighting on their
[17:20] greenway and the implications that that
[17:22] will have, but that that will be
[17:24] something to watch and I don't have a
[17:25] time frame. Erin, did you hear anything
[17:27] more about this or Mark?
[17:30] » No.
[17:32] » Uh, no, I haven't. But uh, Jack, I think
[17:35] the short section Seymour has lights on
[17:38] it.
[17:39] » Oh, okay. I didn't I didn't realize.
[17:41] [clears throat]
[17:42] » Yeah, it runs from uh 67 down to the
[17:45] Ting uh Dam area. You know, it's real
[17:48] short, but very put lights on that.
[17:51] » I wonder if it gets any use. Yeah. See,
[17:55] in Derby, the idea is that they're
[17:57] building the all these new apartments
[17:58] downtown, and I think it giving them
[18:02] access to the uh the greenway after
[18:06] normal work hours will be an incentive.
[18:08] We'll we'll see, but it will cause
[18:11] [clears throat] some challenges as well.
[18:13] Uh I I thought the original grant was
[18:15] including new fencing, but it looks now
[18:18] it's not new fencing. It's just poles
[18:20] that will be metal instead of the wood
[18:22] that's there now. And the poles will
[18:24] only be for the cameras um and the
[18:28] lighting. So, we'll we'll see.
[18:31] » And and Jack sort of remember going back
[18:33] a number of years when uh that we were
[18:36] first, you know, looking at redeveloping
[18:38] the south side of Main Street. There was
[18:41] a commitment on the on behalf of the of
[18:43] the city to provide a some kind of trail
[18:49] connection between the greenway over by
[18:51] the river to the uh Derby train station.
[18:57] was supposed to go more directly through
[18:59] the um through that development site as
[19:02] opposed to you know requiring people to
[19:04] sort of go down to O Sullivan's Island
[19:06] and sort of loop around and kind of a a
[19:09] roundabout way you know and that was
[19:12] always part of you know an agreement
[19:16] with the city to to do that as the
[19:18] redevelopment of the southside took
[19:20] place. So just going forward if you can
[19:23] keep that in the back of your mind and
[19:25] see if that actually can ever be done.
[19:28] » Yeah. I I don't even know who's in
[19:30] charge of the city. I tried to find out
[19:32] and all I got was that they're working
[19:34] on an RFP. You know, they've had the the
[19:37] grant was announced several months ago.
[19:39] So
[19:39] » Yeah,
[19:39] » It's not moving along very quickly. Uh
[19:43] » So we'll see what happens. But you know
[19:45] it is important as you said Mark the
[19:47] work on the the train stations all up
[19:49] and down the north are taking place now.
[19:52] So
[19:53] » The idea of that was to uh because you
[19:55] know one of our ideas when we were doing
[19:57] the main street Route 34 project was to
[20:00] build a section of trail along right
[20:03] along the road right adjacent. But, you
[20:05] know, the mayor uh you know, wanted on
[20:07] street parking instead. And so, but sort
[20:10] of the compromise was okay, on street
[20:13] parking would go back in, but the city
[20:15] would commit to try to build a more
[20:18] direct connection to the train station
[20:20] from the Derby Shelton Bridge uh point
[20:24] again just to make it a quicker, you
[20:27] know, quicker connection between Shelton
[20:29] and Derby.
[20:30] » Yeah. Well, we'll see what happens, but
[20:33] again, they they they got over a half a
[20:35] million dollars, so
[20:38] they've got money to play with, so we'll
[20:39] see what happens.
[20:41] » The the other consideration there, and
[20:42] I'm sure they're they're working on
[20:44] this, but I know at least for the
[20:46] sections that are on the flood control
[20:48] wall, um, you know, there's very limited
[20:51] things they can do and, you know, a
[20:53] limited depth that they can excavate to.
[20:56] So, you know, that that may be
[20:58] difficult.
[21:00] They also have an issue that they're
[21:02] dealing with been dragging on for three
[21:04] years now. Uh they have to do some major
[21:07] work on the bridge that goes over the
[21:10] railroads uh on the Husatonic side. They
[21:14] actually allocated the money three years
[21:16] ago and nothing has been happening.
[21:20] story I keep getting is that uh they're
[21:23] not able to contact the railroad company
[21:26] and you know the railroads have
[21:28] basically absolute control but uh they
[21:31] determined that they had an agreement
[21:34] with the railroad when they built the
[21:36] bridge
[21:38] and they can't proceed to do a half
[21:40] million dollars worth of work if that
[21:43] agreement isn't renewed because it
[21:46] expired and no one knew. So, submissions
[21:49] and derby. Uh, why don't we move on uh
[21:52] to the funding submissions and
[21:54] opportunities? Who's going to talk about
[21:56] the Connecticut Deep Recreation Trails?
[22:01] I don't know if Kim is on.
[22:05] I don't see her. Um, so I think a bunch
[22:08] of us are waiting to hear about uh
[22:10] awards for the last round of Rec Trails.
[22:14] Um, from what I understand,
[22:17] um,
[22:19] there's the bond commission actually
[22:20] authorized more funding than than DEP
[22:23] had originally um, expected, so they had
[22:26] to go back and sort of re-examine
[22:29] all of the applications that they
[22:31] received. Um, it's quite a while ago
[22:33] now. Um, so
[22:36] you know, I was hoping to have an update
[22:38] from Kim today and and sort of know when
[22:40] we're gonna we're going to hear, but um
[22:44] but I guess we'll just keep holding our
[22:45] breaths.
[22:47] » Well, it's nice to hear there's more
[22:48] more money allocated anyway, so better
[22:50] chance.
[22:51] » I guess it's a good problem to have, but
[22:53] [laughter]
[22:54] [clears throat]
[22:55] » Yep.
[22:55] » All right. How about the DOT microrant
[22:58] program?
[22:59] » Hi everybody.
[23:01] Uh quick update for you guys. Um year
[23:05] three so far, um we've awarded just a
[23:09] little over 600 and just about 650,000
[23:14] of our 750,000 plus we had some change
[23:18] left over from last year. Giving out 140
[23:21] awards this year and we do have around
[23:24] three. Um but we do have a limited
[23:27] amount of funding. So, we're going to be
[23:28] giving out two awards per COG um for
[23:31] that and then that'll be it for this
[23:33] year. Um no word yet on continued
[23:37] funding next year, but hopefully we will
[23:39] get another $750,000 to continue the
[23:42] program.
[23:43] » And what's the maximum amount for any of
[23:45] the the individual grants?
[23:46] » Uh $5,000.
[23:48] » 5,000. Okay.
[23:49] » Yep.
[23:49] » Yeah.
[23:52] » Okay. Any other funding uh reports?
[23:55] » I don't know. So, if anybody is
[23:57] interested in in our region at least, um
[24:00] you can reach out to Taio who is on the
[24:02] call. Um Taio, I don't know if you have
[24:04] any
[24:06] anything to add.
[24:09] » No. Um Chris has said it all. I just
[24:11] want to say thank you to this committee
[24:13] because um I did get a lot of um um
[24:16] applications as a result of it. Um Aaron
[24:19] talking about it at the last meeting and
[24:21] which was good. Um
[24:23] we I can proudly say that we've been
[24:25] able to award um grants to at least um
[24:30] to all our municipalities at least two.
[24:33] They've been two every municipality has
[24:36] been covered under this program. We're
[24:38] doing well. Um thank you to this
[24:40] committee. We'll still keep receiving
[24:42] applications
[24:44] um until there's funding available
[24:46] hopefully next year. So please keep
[24:49] those applications coming in. Thank you.
[24:51] Is the application available on on the
[24:53] website?
[24:56] » I have a website.
[24:57] » Yes, it's on the CT website.
[25:01] » Which website?
[25:02] » I can drop the link in the chat.
[25:04] » Okay. And if you go look in the chat,
[25:07] James gave an update on the Ansonia
[25:10] project. So, that's in the the notes.
[25:14] Okay. Uh, well, we already mentioned it,
[25:16] but how about an update on the
[25:17] Waterberry Summer Family Day, which was
[25:20] held on August 1st.
[25:23] » Yeah, we had a we had a booth out there
[25:25] along with some other um organizations
[25:27] around Waterberry. Um, I think it was
[25:30] aimed more at like school kids, but we
[25:33] talked to a lot of parents about the
[25:35] Greenway. There were probably a few
[25:36] hundred people there. Um, a lot of
[25:40] excitement about the greenway. a lot of
[25:41] people we're we're so right in front of
[25:44] the booth there where I'm standing and
[25:46] and talking about something is the
[25:49] greenway. So everybody that was actually
[25:50] standing on the greenway when we're
[25:52] talking to them and a lot of them didn't
[25:53] realize that. So, it was it was really
[25:56] cool to to talk to people about about
[25:58] the greenway and about the plans and see
[26:01] that, you know, everybody really seemed
[26:03] pretty excited about about the prospects
[26:05] and especially about Waterberry section
[26:08] that's being designed now that, you
[26:09] know, you could get from downtown all
[26:12] the way down to um to uh Platill Road on
[26:15] the greenway. Um was really exciting to
[26:18] people. So, uh, it was fun and, uh, you
[26:22] know, we're we're always willing and and
[26:24] able to come out to your communities to
[26:26] do these sorts of events, too. So, if
[26:28] you want to promote the greenway,
[26:30] um, we have a lot of materials, uh, we
[26:32] can come out and speak if if we're
[26:34] available. Um, so keep that in mind if
[26:37] if you guys are having any kind of, um,
[26:41] public engagement fairs, um, anything
[26:43] like that, you know, we're we're always
[26:45] happy to come out and talk to the
[26:46] public.
[26:46] » Hey, hey, Erin, it's Judy. I just want
[26:48] to add to that that that came about um
[26:51] as part of a committee we have here in
[26:53] Waterberry, the Friends of the Greenway,
[26:54] and they're very strong advocates of it
[26:57] and and how great of a resource it is.
[27:00] So, I know they are very excited by the
[27:02] turnout, and we definitely appreciate
[27:04] you guys all turning out for it as well.
[27:06] It was a great day. A lot of people
[27:07] turned up and we gave away backpacks to
[27:10] some school kids and it ended up being a
[27:12] really great day. I would encourage it
[27:14] if you have Greenway that you want to
[27:16] either refresh or introduce. It's it's a
[27:19] great way to to get people out and
[27:21] understand what they're all about,
[27:24] » Right?
[27:24] » It was a lot of fun. And there was free
[27:26] ice cream. So,
[27:28] if you guys have free ice cream,
[27:29] » We needed that now.
[27:31] » Well, we paid for it now. [laughter]
[27:36] » How's the traffic on uh the the water
[27:39] greenways now? I I didn't look at the
[27:40] latest statistics from the Yukon census,
[27:43] but how is the traffic on there?
[27:45] » Um, it's still not very busy and I
[27:47] think, you know, I think it's sort of a
[27:49] short section and I think people are
[27:51] start it it has grown over the past
[27:53] couple years. So, you know, I think more
[27:55] and more people are are realizing that
[27:56] it's there and I think once that
[27:58] connection to downtown is made, I think
[28:00] it's really going to really going to
[28:02] bump up.
[28:03] » There's some beautiful
[28:04] » Too. I think Amazon going over there,
[28:06] Aaron, too. I think it might make a
[28:08] difference for use at least people to
[28:09] enjoy the park over there.
[28:11] » Yes.
[28:12] » Yeah, it was well done. Very well done.
[28:15] That was one of our field trips.
[28:18] » Okay, let's let's move on. Any other
[28:20] business or news?
[28:25] We did install a couple of plaques on on
[28:27] the Derby Greenway. Uh we have a project
[28:30] in town for derby 350th and uh just
[28:35] historic markers and two of them were
[28:37] installed on the uhatonic side of the
[28:40] greenway. One with the um the mural that
[28:44] was painted earlier this year and the
[28:45] other one was just the history of the
[28:47] greenway itself. So,
[28:50] » All right,
[28:51] » Jack. I I know I've seen on Facebook
[28:52] that I think you're leading um history
[28:55] tours
[28:56] » In in on the greenway.
[28:58] » There's there's one going on right now
[29:01] uh this summer. The um Derby Historical
[29:05] Society and the Derby Neck Library have
[29:07] organized a series of history talks. I I
[29:11] did the first one and every Thursday,
[29:14] even though this one is on Wednesday,
[29:17] they have different speakers coming in
[29:20] and talking about derby history while
[29:23] people casually walk on the greenway.
[29:26] The problem they've had is uh most of
[29:29] the days have either been too hot or too
[29:31] rainy. So, I think there have only been
[29:33] two hell so far, but the one today
[29:35] should be fine. So, it's another great
[29:38] idea, great way to promote your uh, you
[29:41] know, section of Greenway. I did one
[29:43] couple years ago and it was too hot. I
[29:46] had uh over 30 people
[29:49] that came out. It was about 90 degrees.
[29:51] So, we started with 30. I think we ended
[29:53] up by the time we got back with 15. So,
[29:56] got to worry about the heat when you do
[29:58] it. But, it's a great idea. I I would
[30:01] think others might incorporate some of
[30:02] the history of the town on a ward like
[30:05] that. pretty easy to do.
[30:08] » Okay. Who's taking over now for the
[30:10] Kenny Town Dam project?
[30:12] » I guess that will be me. Um, so
[30:15] [clears throat]
[30:16] we've been talking a little bit about
[30:17] this over the past several meetings,
[30:19] several years. Um, but NBC is is leading
[30:22] an effort to remove the Kennytown Dam.
[30:25] Um, I have uh Paul Woodworth is is on
[30:28] the line. Um, he's uh he's with Save the
[30:31] Sound. I'll let Paul introduce himself.
[30:35] Hey, good morning everybody. I'm Paul
[30:37] Woodworth, senior director of the
[30:38] ecological restoration team at Save the
[30:40] Sound and uh our our project manager for
[30:44] uh working closely with Aaron on the
[30:46] Kenny Town Cam Removal Project.
[30:50] So, we've talked a little bit about
[30:51] this, but I think we're going to Paul
[30:53] and I are going to go through some some
[30:54] of the background and and why we're
[30:56] doing this project and what the project
[30:58] looks like. Um and then sort of the more
[31:00] exciting part of this project for this
[31:02] group is the you know the opportunities
[31:05] it's it's presenting for continuing the
[31:08] the Nagatuck River Greenway through you
[31:10] know basically from downtown Ansonia to
[31:12] downtown Seymour. Um so we'll we have
[31:15] Stimson um who's a landscape architect
[31:19] consultant on the line as well that will
[31:23] take over uh toward the end of this
[31:25] presentation and talk about those
[31:26] opportunities and and present some some
[31:29] concept plans as well. So uh we'll we'll
[31:32] start it off here about you know talking
[31:35] about the background of of Kennytown Dam
[31:38] and the Ngatuck River. And I know a lot
[31:39] of you know a lot of this so I'll go
[31:41] I'll go kind of quickly through the the
[31:42] history but Nagatuck River is the
[31:44] largest tributary of the Husatonic. Um
[31:46] before European settlement migratory
[31:48] fish had free passage from Long Island
[31:50] Sound through the Husatonic River to
[31:52] miles of habitat in the Ngatuck and its
[31:54] tributaries. Um, and you can see, you
[31:57] know, evidence of that on the town of
[31:59] Seymour Town Seal, um, where, you know,
[32:03] from what I understand is is a really
[32:05] important fishing place was right in
[32:07] downtown where where Tinu Dam is now.
[32:10] Um, but it just sort of hints at, you
[32:12] know, the bounty of fish that that, you
[32:15] know, were were in this river uh,
[32:17] historically.
[32:20] Um but the steep grade of the Nagatuck
[32:22] and its tributaries provided really an
[32:24] ideal source of of power for for early
[32:27] sawmills and and grist mills. And then
[32:30] later the river was damned extensively
[32:32] to produce um produce tech textiles,
[32:35] copper, brass and other industrial
[32:37] products. Um really drove the economy of
[32:40] the valley for for nearly two centuries.
[32:44] But all that industry took a toll on the
[32:45] river. All of you have heard stories or
[32:48] may have seen seen the river at at its
[32:50] worst. Um it really became one of the
[32:53] most polluted rivers in the country. Um
[32:56] it actually caught fire several times.
[32:58] Uh this this example was from 1943, but
[33:02] we found other historic uh mentions of
[33:04] fires on the river um from all of that
[33:08] that industrial waste that that was
[33:10] being dumped into the river.
[33:13] But we've really come a long way since
[33:14] then. water quality has improved uh
[33:18] thanks to environmental regulations, the
[33:20] decline of some of those industries. Uh
[33:21] the Nagto River has made a remarkable
[33:23] comeback. Um fish, birds, uh wildlife
[33:26] have have returned and so have people.
[33:29] Um and communities are really starting
[33:30] to embrace the river and I think, you
[33:32] know, the Nagto River Greenway is really
[33:34] a great example of of all the
[33:36] communities sort of embracing the river
[33:38] once again after, you know, turning
[33:40] turning their backs on it for so long
[33:42] because it was in such a bad state.
[33:45] So in the 1990s uh the state recognized
[33:48] the improvements that had been made on
[33:50] the river and they started implementing
[33:52] a plan to restore the Ngatuck River and
[33:55] and and remove barriers to fish that
[33:57] included move removing and bypassing
[33:59] dams all along the Ngatuck and on
[34:01] tributaries. Uh some of the more notable
[34:04] examples on the screen here are the
[34:07] Chase Brass Dam, the Anaconda Dam, um
[34:10] and the Freight Street Dam, all in
[34:12] Waterberry that were removed in the '9s.
[34:14] The Plats Mill Dam and Unit City Dam in
[34:16] Ngatuck also removed in the '9s. Um the
[34:20] Tinu Dam bypass was opened in 2014 in
[34:23] downtown Seymour and also in the '9s, a
[34:27] fish ladder was installed at Kennytown
[34:29] Dam. Uh but now we know that that fish
[34:33] ladder was never really working very
[34:35] well, has completely stopped working um
[34:38] and was really pres preventing fish from
[34:40] even reaching any of that restored
[34:42] habitat.
[34:48] So a little background about Kenny Town
[34:49] Dam. It was built in the 1840s in
[34:51] Seymour to divert water into a series of
[34:54] canals that delivered it all the way
[34:55] into downtown Ansonia where it powered
[34:57] factories. Uh you can see the canal um
[35:01] to the right of the screen on the right
[35:03] hand side of the train tracks. Um
[35:06] upstream of the dam is what we call
[35:08] Kenny Town impoundment. Um and you can
[35:10] see the the newer powerhouse uh to the
[35:13] left along with the fish ladder that
[35:15] that empties right right below the
[35:17] powerhouse.
[35:19] Um, so
[35:22] there was a powerhouse built in Ansonia
[35:25] in in the 1910s, we believe, um, that
[35:30] really started the hydroelectric power
[35:32] generation at the site. Um, in the
[35:33] 1980s, the the powerhouse on the screen
[35:36] here was built um, in Seymour uh, to
[35:39] produce hydroelectric hydroelectric
[35:41] power. At that time they started feeding
[35:43] power into the grid and because of that
[35:46] they had to get licensed by the Federal
[35:48] Energy Regulatory Commission or FK. Uh
[35:50] as a small hydro facility, FK issued it
[35:53] a permit exemption in 1983.
[35:56] Um exemption is sort of a misnomer. It
[35:59] doesn't mean that it's exempt from
[36:00] licensing. It's sort of a mini license.
[36:02] Um but there are a bunch of um
[36:04] requirements that that have to be met in
[36:06] order to uh to keep that that um that
[36:10] exemption uh active. So they have to
[36:13] operate the powerhouses to generate
[36:15] electricity. They have to maintain the
[36:16] facility and when called upon um by FK
[36:20] they had to provide fish passage at the
[36:21] site which is why the fish ladder was
[36:23] built in the 1990s.
[36:29] So, we first learned that the fish
[36:32] ladder was not working from Kevin Zach,
[36:33] who I don't think is on the call now,
[36:35] but is a member of this group. Um, Kevin
[36:38] is a local environmentalist. He lives
[36:41] right near the Ngatuck River and is
[36:43] really passionate about the river. And
[36:45] he'd noticed that migratory fish um
[36:47] existed below the dam and had never seen
[36:50] them above the dam even after the fish
[36:52] ladder was was constructed. So, he spent
[36:54] years documenting schools of fish below
[36:56] the dam, dead and dying fish at the base
[36:58] of the dam. He made really moving videos
[37:00] that you can see on YouTube um and on
[37:02] our website. And he shared his concerns
[37:05] widely to environmental groups like Save
[37:07] the Sound and to NBC staff um and also
[37:11] to several of our chief elected
[37:12] officials that are that sit on our our
[37:15] NBC board. Um, and I think because of
[37:19] Kevin's advocacy and and his passion
[37:22] about this, a lot of our CEOs got really
[37:24] passionate about it and they made it a
[37:27] made it a a priority of our of Envy Cog
[37:31] to to do something about this and to
[37:33] look into it and figure out exactly what
[37:34] was going on. So, in 2018, we started
[37:38] working with Kevin and with Save the
[37:40] Sound to investigate the issue.
[37:46] Um, and I'll turn it over to Paul here
[37:48] to to talk about about this slide and,
[37:50] you know, what we found about the ladder
[37:51] itself and and why it wasn't working.
[37:55] » So, the [clears throat] ladder was
[37:56] designed at the with the
[37:57] state-of-the-art technology at the time.
[37:59] Uh, was actually modeled after other
[38:01] ladders uh built up north um and and in
[38:05] some cases for different fish. Um, but
[38:08] this hairpin turn you see here is one of
[38:09] the structural deficiencies of it that
[38:11] was a a major issue in deterring lots of
[38:13] fish passage. Um but the other thing it
[38:15] was meant to run at its best conditions
[38:17] when hydroele electricity was being
[38:19] generated and once the units started to
[38:22] go offline that redirected the flow of
[38:24] water in different areas and created
[38:26] more distraction flow and less
[38:28] attraction flow and so after we analyzed
[38:31] a lot of the records that have been
[38:32] collected by deep over about a two
[38:34] decade period
[38:36] we found that there was a really poulry
[38:38] passage uh these are video records that
[38:40] we were able to sort of uh distill down
[38:42] into into spreadsheets eats and found
[38:45] that it was like an average of 12 fish a
[38:47] year or something like that. So really
[38:48] pathetic passage. Uh and once once the
[38:51] the dam went off power um it kind of
[38:54] shut it down to to nearly zero. So um
[38:57] without generating any power, this dam
[38:59] was just basically sitting there uh no
[39:01] longer serving any benefit to society
[39:03] and and that's when we really started to
[39:04] amp up the effort to um to pursue
[39:07] removal.
[39:10] And uh Erin, do you want to jump to the
[39:12] next slide? and um and cover that or do
[39:15] you want me to?
[39:16] » No, I could I could speak to this one
[39:18] and then I'll throw it back to you in a
[39:19] minute. Um so, you know, we work to save
[39:22] the sound and Kevin um and really try to
[39:27] tried to explain to FK and to the the
[39:30] fish and wildlife agencies that, you
[39:33] know, fish passage was not happening
[39:35] here. So, we really got got into this
[39:38] project in the beginning trying to force
[39:39] the owners at the time who initially was
[39:42] NL um and then Hydroland
[39:46] um really trying to get them to comply
[39:48] with their with their license and to to
[39:52] facilitate fish passage, real meaningful
[39:54] fish passage at the site. Um so, you
[39:58] know, we began petitioning FK. We were
[40:00] very active on a on a on a docket that
[40:02] FK has. Um,
[40:07] and you know what we basically came to
[40:10] realize was that uh ENL had no intention
[40:13] on on fixing the fish passage issue and
[40:16] then Hydroland who the the project was
[40:18] sold to in in 2019 um also did not have
[40:21] have any intent to do anything. Um
[40:26] but we also started to learn about all
[40:28] of these other downsides to the dam. Um,
[40:31] it was no longer operational. Um, the
[40:34] first the the older powerhouse went
[40:36] offline in 2013. The new powerhouse went
[40:39] offline in 20120. The facility is in
[40:41] really poor condition. It's no longer
[40:43] commercially viable as a hydro
[40:44] generator. Uh, the owner was effectively
[40:47] abandoning it. Um, and indicated to FK
[40:50] that they did not have the ability to
[40:51] make even minor repairs. Um, the
[40:55] facility was just continuing to fall
[40:56] further and further into disrepair. And
[40:59] despite providing no benefit, Kenny Town
[41:01] Dam was continuing to cause huge
[41:03] negative impacts beyond blocking fish
[41:05] passage. Um it was increasing flood
[41:07] risk. It was negatively impacting water
[41:10] quality. Um it really became clear to us
[41:12] that and to our partners that dam
[41:15] removal was really the only way to
[41:16] permanently address all of those
[41:17] negative impacts. Um and at the same
[41:20] time, Hydroland was actually shopping it
[41:22] around to other hydro providers. Um and
[41:26] there were no takers. I think everybody
[41:27] saw that, you know, there was no way to
[41:29] generate electricity here in a in an
[41:31] economically viable way.
[41:34] Um,
[41:38] so
[41:40] with all those negatives, you know,
[41:41] removing the dam is going to fix a lot
[41:43] of them and and provide a lot of
[41:45] benefit. Paul,
[41:46] » Yeah. So, [clears throat] one of the one
[41:49] of the big selling points for this
[41:50] project and and attractive points for
[41:52] this for for save the sound is that a
[41:55] removal of this would restore about 30
[41:56] miles or access to about 30 miles of
[42:00] river habitat for American shad ale wife
[42:02] and blue back herring and deep had done
[42:05] their own analysis. deep fisheries. Um
[42:07] once they realized the dam was no longer
[42:09] viable, uh they updated their um their
[42:12] plan to restore diademous fish is to
[42:15] migratory fish to the Nagatuk River
[42:16] water. So they basically concluded with
[42:18] removal as the best option. They
[42:20] [clears throat] used their own metrics
[42:21] for calculating what kind of population
[42:23] impacts that could have and judging by
[42:26] these miles and and uh acreage of of
[42:28] river access. They're anticipating a
[42:30] population. It could sustain a
[42:32] population about 20,000 American shad,
[42:34] 140,000 uh river herring. So these are
[42:37] numbers that are kind of off the charts
[42:38] for dam removals in Connecticut. We are
[42:40] very damn dense and so when you remove
[42:42] one dam, you often provide access up to,
[42:44] you know, another mile or so, but 30
[42:46] miles is pretty substantial. And then
[42:48] another 30 or so miles for tributary
[42:51] habitat. So 70 70 70 or so miles for sea
[42:54] lamp and American eel which are able to
[42:56] to navigate up the steeper tribes that
[42:58] drain down into the Ngatuck. So uh and
[43:01] they estimated a population of about
[43:03] 6,000 sea lampray. So like really big
[43:05] numbers for dam for a single project in
[43:08] Connecticut. And uh so that was a huge
[43:10] selling point for us and and one of the
[43:12] reasons why we sought funding from Noah
[43:15] uh which provided our first uh sort of
[43:17] purse of of of funding at about 15 uh
[43:21] million or so. Uh some of which has been
[43:24] uh since uh sort of frozen by the Trump
[43:27] administration, but uh essentially is
[43:28] still uh is still supplying a lot of our
[43:31] uh design work, including some of that
[43:33] work um uh that uh we're presenting
[43:36] today. So Aaron, you can move ahead. And
[43:38] so in addition to the fish passage,
[43:40] there are a myriad of other
[43:41] environmental benefits, capitalizing on
[43:44] the benefits of the upstream removals
[43:46] that uh Aaron had mentioned, the tank
[43:49] bypass, for example. Also reducing flood
[43:52] risk in the community that lives
[43:54] immediately upstream of the dam. This
[43:55] would drop water surface elevations at a
[43:58] at normal flows and and uh for some of
[44:00] the more uh frequent and uh nuisance
[44:03] flood levels. It also helps to address
[44:05] some of the health and safety concerns
[44:07] that have emerged with the uh with the
[44:10] abandoned um canal that's accumulated a
[44:13] lot of debris and contaminated sediment.
[44:15] Uh we're hoping to restore access to the
[44:17] Nagguk River with uh with footpaths and
[44:20] act utilizing some of the bridges that
[44:22] exist there now under the rail line to
[44:23] get people out to the shores of it. And
[44:25] then of course we're trying to connect
[44:28] uh the greenway from Ansonia to Seymour.
[44:31] All of which we anticipate will improve
[44:32] sport fishing opportunities and restore
[44:34] natural sediment flows through the river
[44:36] valley uh which helps sustain our
[44:38] coastal areas as well. So um lots to be
[44:42] gained from from most dam removals and
[44:44] and even more to be gained from from
[44:46] this particular project.
[44:50] So because of all those benefits, you
[44:52] know, we really made a priority to to
[44:53] try to do something about this and the
[44:55] plan sort of aligned in in 2022
[44:58] when funding became available through
[45:00] Noah. that Paul just just mentioned and
[45:03] Envy Cog um spearheaded an effort to to
[45:07] put an application in with with Save the
[45:09] Sounds Assistance um for funding to
[45:12] design the dam removal. Um
[45:16] we had support from the dam owners at
[45:18] that point uh who realized, you know,
[45:20] there there was no, you know, it was not
[45:21] e they weren't going to be able to find
[45:23] a buyer for it. So this was this is sort
[45:24] of their easy way out of this this
[45:26] problem that they had. Um, we had
[45:28] support from the governor, from from the
[45:30] federal delegation, from all of the the
[45:33] uh resource agencies,
[45:35] and we were fortunate enough to receive
[45:37] uh $15 million to begin the Candy Town
[45:40] Dam Removal Project. Just an overview of
[45:43] the project. Um, you know, the plan and
[45:46] and we have since uh acquired the
[45:48] facility through the Connecticut
[45:49] Brownfield Land Bank. um that initial
[45:52] funding was the you know was going to
[45:55] fund all of the engineering design of
[45:57] the removal. Uh
[46:00] sort of an added complication to this
[46:02] project is that Seymour has two sewer
[46:04] siphons that are situated in sediment
[46:07] above the dam. Um and those have to be
[46:10] moved um before we can remove the dam.
[46:14] So as a separate project which is in
[46:16] itself a big complicated project uh we
[46:19] are NBCOG is taking that work on um with
[46:22] some federal funding that we've received
[46:24] um to do we're doing that design right
[46:26] now. Um
[46:29] there's a lot of impounded sediments
[46:31] we'll talk about a little bit about that
[46:32] uh in a minute that that have to be
[46:34] dealt with. We're going to decommission
[46:37] the dam through FK and ultimately remove
[46:39] it restore the river channel.
[46:42] all this time protect the railroad and
[46:44] route 8 which are adjacent to the
[46:46] empoundment um develop recreational
[46:49] access and extended the NRG trail and
[46:52] engage stakeholders and residents
[46:54] throughout. So that's what the project
[46:56] looks like.
[46:59] It's being funded through a bunch of
[47:01] different sources uh that initial $15
[47:03] million from Noah. We have funding
[47:05] through Connecticut Deep. Uh we have EPA
[47:08] funding in uh and and assistance in
[47:11] dealing with the sediments. Um DECD has
[47:14] has provided funding. Uh for this group
[47:17] though, we we received $270,000
[47:20] um two years ago now through the Deep
[47:22] Wreck Trails program to design the trail
[47:25] as part of this design project. Um so
[47:29] total right now we have about $53
[47:31] million um committed to the project. As
[47:35] Paul alluded to, the federal government
[47:37] is is not releasing some of that Noah
[47:41] funding that that we were promised and
[47:43] that we have a contract for. So, you
[47:45] know, we likely won't receive some of
[47:47] that funding, but we are always working
[47:49] on, you know, trying to find new funding
[47:51] to backfill that and to to fund the rest
[47:53] of the project that we know is going to
[47:55] cost more than $53 million.
[47:58] Um
[48:00] our provisional timeline at this point
[48:02] um you know we are working through a
[48:05] sediment management plan right now. Um
[48:07] the design is continuing through this
[48:09] year. We're planning to hire a uh
[48:12] construction contractor early at at the
[48:14] 60% design phase so that they can have
[48:17] some say in in some of the the details
[48:20] about how we're going to do the the dam
[48:21] removal.
[48:23] Um we're hoping to to finish the sewer
[48:26] siphon design this year. Um and then 27
[48:29] and 28 sediment management probably
[48:31] construction starting on the the sewer
[48:34] project at least. Um and then hopefully
[48:38] if everything goes right possibly 2029
[48:40] we'll be enjoying a restored Nagatuck
[48:43] River.
[48:46] Um, and just for everybody to sort of
[48:48] get a understanding of of what the site
[48:51] looks like right now and and some of the
[48:53] some of the issues that we're dealing
[48:54] with that will lead to a condition where
[48:57] we'll be able to put a trail. Um, this
[48:59] is what the site looks like right now.
[49:01] Um, at the center of the screen is
[49:03] Kennytown Dam. Uh, to the west of it is
[49:06] what we're calling Kennytown
[49:07] empoundment. That's the still water
[49:09] that's backed up behind the dam. Um, you
[49:12] can see um on
[49:16] Let's see if I can get a laser pointer
[49:18] here. Um,
[49:20] » At one point we could see your mouse.
[49:22] » Oh, okay. Well, here's Can you see my
[49:24] laser point?
[49:24] » Yeah, I can see that. Yeah.
[49:26] » So, um, this is the entrance to the
[49:29] canal. The canal runs all the way down
[49:31] on on the east side of the the train
[49:35] tracks all the way into Cove Pond. Um,
[49:38] and then the canal actually continues.
[49:40] The the second powerhouse in Ansonia is
[49:42] is located here.
[49:44] Um you can see, you know, north of the
[49:47] dam, it's really constrained by Route 8
[49:50] and the railroad. Um south of the dam
[49:54] there, you still have we still have a
[49:55] railroad to deal with the canal. Um so,
[50:00] you know, because of all of these
[50:01] constraints, because this was all
[50:03] federally regulated property, this was
[50:06] always a big question mark on the NRG uh
[50:08] root map. Um,
[50:11] but because of what we're doing here,
[50:13] um, you know, there's there's really a
[50:16] lot of new opportunities that are
[50:17] presenting themselves.
[50:19] Um, and I think it's important to
[50:25] sort of understand um,
[50:28] some a little bit about the sediment
[50:31] management. Paul, I don't know if you
[50:32] want to run quickly through through the
[50:34] sediment management and and some of the
[50:35] concepts that that GI's come up with.
[50:37] And I think that will really inform what
[50:40] what uh Stimson will be speaking about
[50:42] in a minute.
[50:42] » Sure. I I'll do a really high level
[50:44] overview. I mean, we have we have many
[50:46] hundreds we have over nearly 800,000
[50:50] cubic yards of sediment to deal with
[50:52] here. Um
[50:54] fortunately for us, 350,000 of that is
[50:58] surficial sand and gravel that is um not
[51:01] in elevated in concentrations above
[51:04] background conditions. So, we have a
[51:06] little bit more freedom in how we can
[51:07] deal with that. But what lies below is
[51:10] another 300 300,000 cubic yards of
[51:14] sediment that is elevated in PCBs and
[51:16] copper um among others. And so, that's
[51:19] going to need to be excavated and uh and
[51:22] moved uh down into Cove Pond. So, it's a
[51:24] it's a very costly operation. Um so, in
[51:27] addition to the infrastructure
[51:28] constraints, the sediment is the other
[51:30] sort of big complicating factor on this
[51:32] project. Um, and I I guess I can leave
[51:36] it at that. We're we're working through
[51:37] a very complicated or complex
[51:40] uh sediment management plan to to deal
[51:42] with those large volumes.
[51:44] » Fortunately for us, this has also been
[51:46] looped into the brownfield program uh
[51:48] through Envy Cog and and EPA has been
[51:50] the one leading the effort in assessing
[51:52] the sampling and assessing the sediment.
[51:55] uh so they've gone through uh an initial
[51:57] round that identified and sort of
[51:59] initially quantified and then a
[52:00] supplemental round that helped us uh
[52:03] stratify it or delineate it more
[52:04] vertically so that we could identify
[52:06] layers that could be handled and managed
[52:08] differently. So that's um that's still
[52:10] going and now we actually are embarking
[52:12] I think in September early September on
[52:15] a on a what we what should be a third
[52:17] and hopefully final round of sampling
[52:19] looking at uh toxicity assays. Uh so if
[52:22] we if we are uh proposing to release
[52:25] some of that surficial sediment, we're
[52:27] running toxicity tests to make sure that
[52:29] there wouldn't be any adverse ecological
[52:31] impacts to uh ecological receptors
[52:33] downstream or like stream biota
[52:35] basically. So um so that's still
[52:38] underway. Aaron, do you want to add
[52:39] anything to this
[52:41] » Comment?
[52:42] No, I I you know I think
[52:45] you know a lot all of that sediment is
[52:47] going to have to be dealt with or or
[52:49] moved um or a lot of that the dirty
[52:52] sediment at least. Um so GI's come up
[52:54] with these concepts of of how that can
[52:56] be done. Um we know that the you know
[52:58] once the dam is gone the river is going
[53:01] to try to find its original course. Um,
[53:05] so there's going to be quite a bit of
[53:07] new land um made available on either
[53:10] side of of where that course ends up
[53:12] being. Um,
[53:19] and the idea now is to move a lot of
[53:21] that dirty sediment into Cop, which has
[53:23] its own very dirty sediment, actually
[53:25] dirtier than uh what's what's upstream.
[53:28] Um, so Cop is is no longer going to be a
[53:31] pond in the long term. It's probably
[53:33] going to be full of of sediment from
[53:35] behind
[53:37] um
[53:39] behind Kenny Town Dam. If you want to
[53:41] talk a little bit more about that, Paul,
[53:43] but I think Simpson is going to talk
[53:44] about, you know, what what could be done
[53:47] with with a lot of this reclaimed land.
[53:50] » Yeah. Uh I just add that Copound was
[53:52] basically created by the canal system
[53:54] that feeds Ansonia. Uh so it's a
[53:57] man-made dam. Uh it's been I've been
[53:59] it's been appreciated by the neighbors
[54:01] that live above it. um kind of not so
[54:04] appreciated by the neighbors that live
[54:05] on the downstream end of it. Uh but it
[54:07] does, as Aaron said, it's been a
[54:09] receptor of the finest grain sediment
[54:10] that's been floating down river for
[54:12] decades. And so it has the highest
[54:14] contaminant levels of all the
[54:15] contaminants found in in our sediment.
[54:18] So we have a strong impetus to take it
[54:20] out of the aquatic setting basically by
[54:22] dewatering it and ultimately capping it
[54:25] with uh first sediment from behind town
[54:27] and then ultimately some sort of a clean
[54:29] cover uh clean fill on top of it so that
[54:32] this could be a usable space uh when
[54:35] we're done.
[54:39] And then I'll just set the stage for
[54:40] Stimson here. Like I said, we we
[54:42] received the Deep Breck Trails grant.
[54:45] Um, and the scope of that was to fully
[54:47] design the Ngatuck River Greenway Trail
[54:49] on the Kennytown Dam property. Um,
[54:52] basically from the pump station on Derby
[54:54] Derby Avenue in Seymour to the fourth to
[54:57] fourth street in Ansonia. Um, and also
[54:59] look at conceptual routing to connect
[55:01] the Nagatuck River Greenway sections to
[55:03] the north and to the south. Um, and what
[55:06] we did was wrap up the wreck trails
[55:09] scope into the overall dam removal
[55:12] design scope so that, you know, we could
[55:14] take advantage of all of the work, all
[55:16] of the data collection that was already
[55:18] being done and so that, you know, the
[55:20] designers on the trail and the designers
[55:21] on the dam removal were working, you
[55:23] know, handinand on, you know, what this
[55:25] property is going to look like after the
[55:26] dam is removed. Um, so I will stop
[55:31] sharing there. Um, and I'll introduce
[55:36] Well, let me stop sharing. Okay.
[55:39] And I'll introduce
[55:42] I saw Glenn Valentine, Emily Hayes, and
[55:45] Michael Linquist from Stimson. Um,
[55:51] who are the designers, the the
[55:53] subconsultants um designing the the
[55:55] trail.
[55:58] » Okay. Thanks, Aaron. Um, so you just got
[56:03] a lot of good background information
[56:05] that we've been dealing with um and sort
[56:07] of analyzing and thinking about for the
[56:09] past six months as we've thought about
[56:13] different options for how to um engage
[56:18] the realigned river and where the new
[56:21] trail alignment might go. And this
[56:24] morning we're going to talk about four
[56:26] different trail alignments or three
[56:28] really three. one is a with a subset
[56:30] that Emily's going to share with you in
[56:32] just a minute and then we're going to
[56:34] share some very preliminary
[56:37] um ideas about what the final shape of
[56:41] of Copond might look like and um those
[56:45] are really just thought exercises about
[56:47] some of the opportunities that we might
[56:48] have just through shaping the land um
[56:52] that goes of all that sediment that's
[56:54] going to go into Copan that Paul was
[56:57] talking about just a few minutes ago.
[56:59] But I think we'll just jump right in and
[57:01] talk about uh the different alignments
[57:04] that we're looking at for the uh for the
[57:07] trail along the the uh embankments and
[57:11] in various relationships really you'll
[57:13] see to the realigned river.
[57:17] » Go ahead Emily.
[57:18] » Great. Perfect. Can you all see my
[57:20] screen?
[57:21] » Okay, perfect. Great. Um yeah, great
[57:24] introduction that really set us up to
[57:26] describe what we're going to get into
[57:28] today. Um yeah, big overview, but it's
[57:31] important for us to consider the
[57:33] industrial history of the river, where
[57:35] the river fits into the larger water
[57:37] story of the region. um the existing
[57:40] ecologies and access um by community
[57:43] members to the river and the kind of
[57:45] barriers that exist both phys physically
[57:47] and visually um which have led to some
[57:50] design objectives that have kind of
[57:51] guided us which is to celebrate the
[57:53] industrial heritage of the site to
[57:55] improve water quality and management as
[57:58] best as we can to foster a vibrant
[58:00] living river and ultimately you know to
[58:02] connect to the existing energy trail and
[58:04] imagine what Cop will look like um
[58:06] moving forward.
[58:08] So, right, this is a large site. We have
[58:11] Copond down here and then the trail.
[58:13] We're kind of breaking it up into two
[58:15] sections here. So, I'll talk about the
[58:17] trail. Glenn's going to talk more about
[58:18] Copond. Um, but we're connecting from
[58:22] North uh Fourth Street, which is down
[58:24] here, up to the existing bike path at
[58:26] Tinu Dam. Um, what I'm going to fly
[58:30] through is going to talk about basically
[58:32] right at the former Kenny Town Dam site
[58:34] up to Seymour.
[58:37] So it yeah there's a lot of pressure and
[58:39] there's a lot of complications in this
[58:41] but um the first option that we've come
[58:44] up with is what we're calling the rail
[58:46] adjacent trail and it's we kind of move
[58:49] up towards Seymour from the dam. We
[58:52] would uh first not cross the river at
[58:55] the dam. This option would stay along
[58:57] the east side of the river and it would
[58:59] hug along the east side of the rail line
[59:02] and then ultimately it would tie into
[59:04] the sidewalk and the parking lot up at
[59:06] Tenu Dam and Seymour. Um, this would
[59:10] it's there are pros and cons to all of
[59:12] these. Um, it would be simple and
[59:14] consistent, but it would um have
[59:16] obstructed river views and limited river
[59:18] access. It would tie into town
[59:21] infrastructure and parking, but there
[59:22] would be no Derby A connection on this
[59:24] side of the river. It might be the least
[59:26] technically difficult, but it also is
[59:28] the least flexible. Um,
[59:31] » Emily, I would just go back just for a
[59:33] second. It was hard for me to I just
[59:36] want to make sure people on the call
[59:37] because there's so many people probably
[59:38] on a lot of different kind of devices.
[59:41] Can you just point out where the trail
[59:43] what's the trail is that light green
[59:45] line along the north side? Just you can
[59:48] point that out. I don't know if people
[59:49] can see your
[59:51] » Uh mouse or not.
[59:52] » Right. And this is such a big site. Um
[59:54] you know, we're trying to fit a lot of
[59:55] information on on this graphic, but the
[59:57] trail here would would start down here
[59:59] and it would just continue along here
[1:00:01] kind of nestled between the existing
[1:00:03] rail line and the community um up above.
[1:00:07] So, it's a pretty tight area and there's
[1:00:09] a lot of grade change between where the
[1:00:11] rail line is now and kind of where the
[1:00:13] community is up here. which would mean
[1:00:16] that if we look at it in in section it's
[1:00:18] a pretty tight um
[1:00:20] » Sorry sorry could we go back one more
[1:00:22] just for a second yeah in this scheme
[1:00:24] you know there the only real river
[1:00:26] access is under the train tracks if you
[1:00:29] could just point out there's currently
[1:00:31] an underpass under the rails so so when
[1:00:34] you know Emily mentioned limited river
[1:00:36] access it really is kind of only that
[1:00:39] point um so that's a real you know uh
[1:00:42] downside to this particular scheme
[1:00:45] Yeah.
[1:00:49] Um, looking at it in section, I think we
[1:00:52] can better feel what it would what it
[1:00:54] would be like. Uh, this would assume
[1:00:57] this obviously is a really long stretch
[1:00:59] and the the conditions would vary a
[1:01:02] little bit, but typically it would be a
[1:01:05] ideally a 25 ft offset from the center
[1:01:08] line of the rail, which would that would
[1:01:10] begin our trail. Um, it would feel
[1:01:12] pretty tight. there would be a fence
[1:01:14] there. Uh we've got a pretty steep slope
[1:01:16] that goes up towards the the
[1:01:18] neighborhood and then
[1:01:21] a decent amount of flood plane here
[1:01:22] before the actual river. So it would
[1:01:25] feel a little bit disconnected. Um and
[1:01:27] it would be a little a little tight. Um
[1:01:31] but this would be one option that we
[1:01:33] thought was worth just kind of
[1:01:34] considering.
[1:01:38] Our second option would continue along
[1:01:41] the east side, but it would dip to the
[1:01:43] west side of the rail. So, this would
[1:01:46] cross um at the former Kenny Town um dam
[1:01:52] site. It would kind of sneak under the
[1:01:53] the bridge that already exists there.
[1:01:56] And this would bring us out to um the
[1:01:59] west side of the rail. It would not
[1:02:02] cross at the dam, but it would hug along
[1:02:04] this side. um it would take advantage of
[1:02:07] some of the existing topography
[1:02:10] um while dipping into the flood plane.
[1:02:12] There'd be a kind of um
[1:02:16] an elevated or an out of the flood plane
[1:02:19] part of the trail and then some
[1:02:20] opportunities for some um more informal
[1:02:23] and secondary circulation paths that
[1:02:25] would come into the flood plane. In this
[1:02:27] option, we're proposing uh the potential
[1:02:30] for a crossing at a new build bridge, a
[1:02:33] crossing at Derby AB that would bring us
[1:02:35] into the street traffic of of Derby AB
[1:02:37] in Seymour. Um
[1:02:40] and this uh yeah would take advantage of
[1:02:43] some of the repairarian edge, but it
[1:02:44] would still be a negotiation with the
[1:02:46] rail line. Um, and it would avoid kind
[1:02:49] of what it would be like to cross at the
[1:02:52] old dam, but it also means that it would
[1:02:55] add another level of complexity in the
[1:02:57] introduction of a new build bridge. Um,
[1:03:00] something else I think maybe to consider
[1:03:01] is that there might be limited
[1:03:03] construction and emergency vehicle
[1:03:04] access along this path if there's no way
[1:03:08] to cross the rail line. Um, basically
[1:03:11] once we are on one side of the rail line
[1:03:13] at this point, that's kind of where we
[1:03:15] have to stay. there's not going to
[1:03:16] really be a chance to cross over it um
[1:03:18] once once we kind of start moving along.
[1:03:21] » Emily, I'll I'll just add that, you
[1:03:23] know, in this this alignment of the
[1:03:26] trail, we're imagining going right down
[1:03:28] Derby AB. Um so there'd be quite a bit
[1:03:31] of um uh design work needed to make sure
[1:03:34] there's room along that roadway with all
[1:03:37] the adjacent buildings and businesses um
[1:03:40] through that community. But it does
[1:03:42] provide the opportunity for a lot of
[1:03:44] direct engagement with the community
[1:03:46] which we are excited about.
[1:03:51] » Yeah. And and I think looking at it in
[1:03:53] section it it definitely feels a little
[1:03:55] bit less claustrophobic than the first
[1:03:57] option. Um it's still potentially quite
[1:04:01] close to the rail, but it would give us
[1:04:03] a bit more breathing room. there's a a
[1:04:04] potential to consider what uh this kind
[1:04:07] of embankment might look like and what
[1:04:09] how as as the river realignment
[1:04:12] continues what kind of stabilization
[1:04:14] needs to happen to make that possible
[1:04:16] but there's also we can see
[1:04:17] opportunities to come down actually into
[1:04:19] the flood plane um this would be dynamic
[1:04:22] it would it would mean that in flood
[1:04:23] events this might be covered but that is
[1:04:26] something that you know I think would
[1:04:28] pose its own set of complications but is
[1:04:31] exciting and is dynamic it's an
[1:04:32] opportunity to invite people down and to
[1:04:36] I don't know educate about what flooding
[1:04:39] can be, what riparian edges are. Um it's
[1:04:42] an exciting opportunity I think and um
[1:04:45] it would it would be a way to kind of
[1:04:47] take advantage of all of this space that
[1:04:48] we have.
[1:04:52] And then our third option, we're kind of
[1:04:54] breaking into a part A and a part B. For
[1:04:56] the first um section, it's the same and
[1:05:00] then it changes as we get over into
[1:05:01] Derby A. this uh option would cross at
[1:05:06] the former dam. We thought that'd be an
[1:05:09] exciting way to kind of celebrate the
[1:05:11] history of the dam there. It's such a
[1:05:13] big project to remove and it's kind of
[1:05:15] like instead of fully erasing it. Is
[1:05:17] there a way to kind of bring people out
[1:05:19] and to experience kind of what it what
[1:05:21] the dam was like, where it was, what the
[1:05:24] views were, um and the change that it's
[1:05:26] had as it's been removed. So this would
[1:05:28] cross at the former dam and this option
[1:05:31] would kind of hug along Route 8 on the
[1:05:34] east side. And [snorts] similar to the
[1:05:36] previous one, it would like be a kind of
[1:05:38] a formal trail above the flood plane,
[1:05:40] but there'd be opportunities to weave in
[1:05:42] and bring down get water access um in a
[1:05:45] more informal way. And then uh so for
[1:05:49] our 3A option, we were just exploring
[1:05:53] what it would be like to instead of um
[1:05:56] like the previous option, tie into the
[1:05:58] street traffic of of Derby A, what it
[1:06:01] would be like to continue to hug along
[1:06:04] the river's edge. Um which is, you know,
[1:06:07] an exciting option, obviously a
[1:06:09] complicated one. We know that there's a
[1:06:11] community center and a senior center
[1:06:12] over here. There's a cemetery. There's a
[1:06:14] a decent amount of kind of public facing
[1:06:19] properties on this um on this stretch
[1:06:22] that might be something that we could
[1:06:25] tie into and feels like a kind of
[1:06:27] natural way to to continue on this kind
[1:06:30] of public greenway trail. But it also
[1:06:33] there's a lot of private properties and
[1:06:34] we don't really know is a complicated
[1:06:36] thing to to require easements for access
[1:06:39] to the river's edge. But um we thought
[1:06:41] it was worth kind of exploring and
[1:06:42] putting out there um as a as an option
[1:06:45] and as a potential trail condition.
[1:06:48] Um this would allow for more water
[1:06:51] access and unobstructed views. Um
[1:06:53] there's of course just the general risk
[1:06:55] and management of flood plane
[1:06:57] navigation. It would highlight the
[1:06:59] history of the dam and the historic
[1:07:01] structures down here. Um but there's
[1:07:03] also obviously a complexity in what that
[1:07:06] process would be like. Um, and it does
[1:07:08] avoid the traffic of Derby of Derby A,
[1:07:12] but it also would require easements for
[1:07:14] for getting out on on the river's edge.
[1:07:19] Um, and then the 3B option would be
[1:07:23] instead of tying into keeping along that
[1:07:25] edge to then just tie into the traffic
[1:07:27] like the previous option, which again
[1:07:29] would be a complicated thing considering
[1:07:31] that the off-ramp from Route 8 and this
[1:07:34] kind of speed, but I think it's
[1:07:35] something that the community members
[1:07:36] here are interested in because it is
[1:07:38] such a high traffic, high volume um,
[1:07:40] street. Something to kind of make that
[1:07:42] more accessible is is ideal.
[1:07:46] Um, this would feel not dissimilar from
[1:07:49] the previous option, but just along the
[1:07:50] other side, there's more space and
[1:07:52] buffer between Route 8 and the primary
[1:07:54] trail, but again, chances to come down
[1:07:56] in, potential for armoring and
[1:07:58] stabilization of that um embankment, and
[1:08:01] then opportunities to come in and
[1:08:03] experience uh flood plane and
[1:08:05] riverfront.
[1:08:07] » I I guess I would add, Emily, um here we
[1:08:10] don't have the complication of the train
[1:08:11] to deal with. Obviously we have route 8
[1:08:13] vehicular traffic to deal with which is
[1:08:16] has its own set of challenges but uh we
[1:08:18] don't have the the train and all the
[1:08:21] negotiation that will be required to get
[1:08:23] permission from them.
[1:08:25] » Exactly.
[1:08:30] » So these are kind of all of them
[1:08:31] overlaid and maybe as we begin our
[1:08:33] discussion or answer any questions we
[1:08:35] can come back to this slide but these
[1:08:36] are they're just you know different
[1:08:38] versions of of how we can get from here
[1:08:40] to there.
[1:08:45] Glenn, do you want to
[1:08:46] » Yeah,
[1:08:46] » Take it over.
[1:08:48] » Yeah, go ahead.
[1:08:49] » So, we're going to move to the second
[1:08:51] part of our our study area, which is Cop
[1:08:54] Pond. And that I'll just quickly say,
[1:08:58] you know, that green area. Uh well, this
[1:09:02] is this is too small that there's
[1:09:03] there's only one alignment we're really
[1:09:05] considering for the bike trail along
[1:09:07] here and it's it's um up on essentially
[1:09:11] the uh the dyke or the um embankment
[1:09:15] that's holding in Copan right now. So,
[1:09:17] we're not going to talk too much about
[1:09:19] that alignment. it shows up on on some
[1:09:22] of these preliminary sketches, but
[1:09:24] that's that's the the through line that
[1:09:26] we're considering and it's going to
[1:09:28] occupy um the canal to the west, which
[1:09:33] were shown in some of the images that
[1:09:35] Aaron was showing before. We're
[1:09:36] imagining that all being filled in uh
[1:09:39] that Copan will no longer have uh a
[1:09:42] running river through it that it will
[1:09:44] just be fed by storm water and that that
[1:09:47] canal will be the connecting part of the
[1:09:49] trail and then run along the dyke
[1:09:52] close to but sometimes parallel or up
[1:09:55] above the train tracks along Cop. So,
[1:09:57] we'll jump to a couple very uh
[1:09:59] preliminary sketches about what some of
[1:10:03] the opportunities are as we re-imagine
[1:10:06] Copond. Um, as mentioned, there's around
[1:10:11] 300,000 cubic yards of material to go
[1:10:14] into
[1:10:16] uh Cop to manage the sediment. And the
[1:10:20] way GEI was initially looking at it,
[1:10:22] that would raise the level of the
[1:10:25] landform about 10 ft above the area
[1:10:28] about of the level of the existing water
[1:10:31] level now in Copond. So that's if you
[1:10:34] spread it out pretty evenly with gentle
[1:10:36] pitches around 3%. So we quickly looked
[1:10:39] at what are some of the opportunities
[1:10:41] that might come out of just how we shape
[1:10:43] that land uh that we're going to be
[1:10:45] working with as we reimagine this space.
[1:10:49] So um
[1:10:52] the um
[1:10:54] the this first this first idea here is
[1:10:57] really to create a series of terraces
[1:10:59] and consider the option of active
[1:11:02] recreation for the space. And I'll I'll
[1:11:05] say right at the beginning, we we
[1:11:07] haven't talked to uh adjacent
[1:11:09] communities about the programming and we
[1:11:11] realize there's a lot of requirements
[1:11:14] for managing a park, for paying for a
[1:11:16] park, for programming a park. But we
[1:11:18] just want to put it out there that one
[1:11:20] opportunity because we have so much fill
[1:11:23] is to create these kind of level
[1:11:24] platforms which could contain future
[1:11:27] programming for a park. So, here we're
[1:11:30] talking about potentially two
[1:11:32] playfields, maybe soccer fields. We're
[1:11:35] thinking maybe there's a a public pool
[1:11:37] in the space and and maybe there's um
[1:11:41] kind of environmental playground or
[1:11:43] nature playground in this space and
[1:11:45] maybe there could be um picnic pavilions
[1:11:49] that could be rented around the
[1:11:51] periphery of of this space to really
[1:11:54] give it opportunities for active
[1:11:57] engagement, recreation from all
[1:11:59] different
[1:12:01] types of population, from the community.
[1:12:03] That's really what we are thinking
[1:12:04] about. And in this option, we're
[1:12:06] imagining a road would be part of this
[1:12:09] for people to get to the new park space
[1:12:13] for people to engage with the games
[1:12:15] being played on the fields. So it come
[1:12:17] in at North Fourth Street connecting
[1:12:20] into the city grid and runs through the
[1:12:23] space wrapping around to the north and
[1:12:27] uh servicing all of these new uh program
[1:12:30] items that we're talking about from you
[1:12:32] know playfields to swimming potentially.
[1:12:35] One other consideration which you saw in
[1:12:38] the diagram that Paul showed earlier is
[1:12:40] there is an intermittent stream which
[1:12:42] comes through the site. So we're
[1:12:43] thinking about how that could be part of
[1:12:45] the experience. Here we have it running
[1:12:47] along the north edge of the park along
[1:12:49] that entry drive and we really want that
[1:12:52] to be quite prominent and build some
[1:12:54] constructed wetlands to help cleanse
[1:12:56] that water before it makes it back to um
[1:13:00] the river itself. So this is this is our
[1:13:02] our first option and this would raise
[1:13:05] the level up um maybe about um 10 feet
[1:13:11] or or 15 ft above what the the level of
[1:13:14] the water is now. So similar kind of
[1:13:17] spreading out of the sediment but
[1:13:20] imagining it in just a different way as
[1:13:23] terraces. That image on the right is
[1:13:26] actually Danahe Park here in Cambridge,
[1:13:27] Massachusetts. That's a park that was
[1:13:30] built on landfill about 20 years ago.
[1:13:32] So, we were kind of inspired by that
[1:13:34] because it has a lot of active
[1:13:36] recreation, but it's very surrounded and
[1:13:38] embraced by trees which have grown up in
[1:13:41] the park since it was u built. Next
[1:13:44] option.
[1:13:47] The next option we're calling the mound.
[1:13:49] And this you'll see has a more u passive
[1:13:54] recreational program. It's still pretty
[1:13:56] active in in terms of allowing people
[1:13:59] into the park. And in this option, we're
[1:14:01] imagining the sediment is brought into
[1:14:04] the center in one area and maybe it it
[1:14:07] comes up to height of maybe 30 ft above
[1:14:11] the existing level of Copond right now.
[1:14:14] So you get views up and over the bike
[1:14:17] trail. You get views of the realigned
[1:14:19] river and surrounding kind of wetlands
[1:14:22] that we're imagining. You can see this
[1:14:24] scheme also has a loop road which comes
[1:14:27] in and wraps around the base of this new
[1:14:30] mound. We're imagining some kind of
[1:14:32] active program here. are showing a pool
[1:14:34] that could be a field or some other kind
[1:14:36] of active wreck, but really inviting the
[1:14:39] community into this space. And then
[1:14:41] access up to that 30- foot high mound
[1:14:44] would be via kind of spiraling pathway,
[1:14:46] which would take you gradually up to the
[1:14:48] top on an ADA path where you'd have an
[1:14:52] overlook pavilion. And here you might
[1:14:54] have a couple other uh small overlook
[1:14:56] pavilions as well.
[1:14:58] Here we've imagined the intermittent
[1:15:00] stream coming in running to the south
[1:15:02] instead of to the north and running down
[1:15:06] and going along the edge of the new bike
[1:15:09] trail through the space and really
[1:15:11] highlighting an area of constructed
[1:15:14] wetlands along that trail. So that your
[1:15:16] passage along the trail here would be
[1:15:19] educational and informed with uh ways of
[1:15:22] treating storm water through the site.
[1:15:25] The image in the upper right is Ferris
[1:15:27] Park up in Lawrence, Massachusetts.
[1:15:29] That's a park we built about 10 years
[1:15:32] ago. And that was built that has a
[1:15:34] central mound in the middle that gives
[1:15:37] um views to the surrounding river and
[1:15:40] historic uh buildings around the site.
[1:15:43] That was built on a mound of slag which
[1:15:46] was left over from the uh foundry
[1:15:49] operations 100 years ago and then capped
[1:15:52] with uh 2 ft of soil. So we we know
[1:15:55] that's going to be part of this program
[1:15:56] no matter what we do. A capping of this
[1:15:58] material as Paul mentioned this is going
[1:16:00] to have to be uh carefully managed. So
[1:16:02] we're we're looking to parks that that
[1:16:04] do the same thing like Danahe or Ferris
[1:16:06] Park for inspiration.
[1:16:09] And the third option is
[1:16:12] uh there it's progressively less active.
[1:16:15] So this is sort of the most passive
[1:16:17] approach that we're imagining and we're
[1:16:19] calling this one the islands. And here
[1:16:21] we're imagining that sentiment mounded
[1:16:23] up into maybe 20 foot high kind of
[1:16:27] landforms throughout the space. Uh five
[1:16:30] or six mounds that you would navigate
[1:16:32] around in this reimagining of the space.
[1:16:35] And here that intermittent stream
[1:16:37] meanders between the new landforms to
[1:16:40] the north and then back south and to the
[1:16:42] north. And that really is the primary
[1:16:44] driver of program in this. And the
[1:16:47] program here is really just one of
[1:16:48] trails. And we'd have a trail system
[1:16:51] that um takes you through this space and
[1:16:54] up to the top of each one of these
[1:16:56] mounds. You can see on the right kind of
[1:16:58] council ring inspired by uh Jensen
[1:17:01] Jensen from the Midwest. But it's an
[1:17:03] idea of just getting into nature and
[1:17:05] seeing nature and and kind of connecting
[1:17:07] with it. We might have a series of
[1:17:09] boardwalks or bridges to allow those uh
[1:17:12] trails to cut through this new park
[1:17:14] space and go over where the intermittent
[1:17:17] stream would flow. And we'd also have a
[1:17:20] a loop trail which would be down low and
[1:17:23] would run through the space pick up
[1:17:25] picking up from the bike trail wrapping
[1:17:27] all the way around providing easy
[1:17:28] passage down low through this new space
[1:17:32] and connecting back into the bike trail.
[1:17:34] You'll notice this one does not have
[1:17:35] vehicular access. It does not have
[1:17:37] parking except we imagine parking right
[1:17:40] at the uh the North Fourth Street entry.
[1:17:43] You'd have some parking there, but
[1:17:45] otherwise vehicles would not go into
[1:17:46] this one except for bikes. uh that
[1:17:49] outside loop trail would be for
[1:17:50] maintenance. So it'd be scaled for like
[1:17:52] a pickup truck or or maintenance
[1:17:54] vehicles. But the other main program
[1:17:56] besides this kind of counseloring here
[1:17:57] would be an outdoor education center
[1:17:59] right near the entrance. So those are
[1:18:02] the three options we're putting out
[1:18:04] there. And as I said, you know, they
[1:18:05] haven't been vetted really with Seymour
[1:18:08] or Ansonia. So, it's we know there's a
[1:18:11] there would be a long way to go and a
[1:18:12] lot of engagement to go in any one of
[1:18:14] these directions, but it's really just
[1:18:16] to get people's imaginations going about
[1:18:18] what could what could happen with all
[1:18:20] this sediment that's going into Copont.
[1:18:27] That's it. I'm going to pass it back to
[1:18:28] you, Paul, and Aaron. Um, we're happy to
[1:18:31] talk about I I don't know. It doesn't
[1:18:33] seem like the format of this meeting is
[1:18:35] one where we need to come to any
[1:18:37] conclusions. Uh, but we just wanted to
[1:18:40] let the group know what we're thinking
[1:18:41] of and that there are a lot of options
[1:18:42] out there right now.
[1:18:45] » Thank you. These look they look great
[1:18:48] and um I I think it is definitely
[1:18:51] a conversation starter and you know I I
[1:18:53] I would love for the committee members
[1:18:56] or or anybody that has questions or
[1:18:57] comments or anything to to speak up and
[1:19:00] um and let's have a conversation about
[1:19:03] it.
[1:19:04] » It's a lot to absorb in one shot.
[1:19:08] » [clears throat]
[1:19:10] » It is. It is. Sorry about that.
[1:19:13] » No, it's great. It's great. I look
[1:19:16] forward to hearing more about it. I
[1:19:18] actually have a better sense of it after
[1:19:20] we do the tour today. I think just uh
[1:19:24] the total lay of the land.
[1:19:27] Jack, this is Mark Nielson. Uh just
[1:19:30] couple of quick comments. Um, [sighs]
[1:19:34] yeah, I've worked on trying to get the
[1:19:36] energy trail sort of built in other
[1:19:38] parts of the region. And one of the
[1:19:42] stumbling blocks we've hit in a lot of
[1:19:44] areas is, you know, proximity to the the
[1:19:47] Waterberry Branch line or even the dog
[1:19:49] truck rail line, you know, in Watertown
[1:19:51] and farther up. Um,
[1:19:55] so I I just see, you know, the options
[1:19:57] of trails along the railroad as being a
[1:19:59] little bit problematic and kind of
[1:20:01] difficult to get the, you know, approval
[1:20:03] and support from the department. Um, not
[1:20:07] impossible, but I think it's just going
[1:20:08] to be a real challenge. And I just I
[1:20:10] know you guys recognized it in the
[1:20:12] presentation and I would just emphasize
[1:20:15] that you know that has to be sort of a a
[1:20:19] very early action item to coordinate
[1:20:21] with the department um to get their sort
[1:20:24] of buy in on u
[1:20:32] any other questions or comments
[1:20:38] » Mark I think you froze. those. So,
[1:20:40] sorry.
[1:20:44] » I'm still frozen.
[1:20:46] » There you there. There you are. You're
[1:20:47] better.
[1:20:47] » There we go.
[1:20:48] » All right. So, Erin may have done that
[1:20:51] just to the to [laughter]
[1:20:53] keep me from talking to
[1:20:55] » Um
[1:20:56] » Where did I leave off? I was just sort
[1:20:58] of saying that the department is, you
[1:21:00] know, somebody have to reach out and
[1:21:01] coordinate with you from the the very
[1:21:04] beginning because it could be a
[1:21:06] challenge to get them to approve. Um, so
[1:21:09] that that was just my comment.
[1:21:11] » Yeah. Yeah.
[1:21:14] » Um, if no one else has a question, um, I
[1:21:16] definitely have a few. I'll be excited
[1:21:18] to talk to you more this afternoon. Um,
[1:21:21] but I am curious, uh, since Copon
[1:21:24] designs are in front of us or concepts
[1:21:26] are in front of us. Um, I'm curious. I
[1:21:30] personally love the constructed wetland
[1:21:32] one. I think that's really beautiful.
[1:21:34] Um, I'm wondering if you guys had an
[1:21:38] assessment of the like uh existing like
[1:21:42] animals and species that have made the
[1:21:46] cop pond their home even if they maybe
[1:21:48] shouldn't have. [laughter]
[1:21:50] Um, and if that helped influence your
[1:21:53] designs.
[1:21:55] Um certainly we've we've begun to um
[1:21:59] evaluate species all along uh the the
[1:22:02] re-imagined
[1:22:04] uh trail and at Copan and I'll just say
[1:22:07] they're um they're preliminary um
[1:22:10] observational that we've seen a wide
[1:22:13] variety of of species living in Cop and
[1:22:16] that was part of the uh impetus to think
[1:22:20] about reconstructing some wetlands in
[1:22:22] that area and making sure we're taking
[1:22:24] advantage antage of the storm water to
[1:22:28] um create habitat. It's not going to be
[1:22:30] pond habitat. Um that's that's going to
[1:22:33] go away, but um that we provide
[1:22:35] opportunities for really a diversity of
[1:22:38] habitat within that space. I I know
[1:22:40] that's not a direct answer to your
[1:22:42] question in terms of evaluation of
[1:22:44] what's there. Um but but we are you know
[1:22:47] clearly we are changing things
[1:22:49] tremendously in that area but we want to
[1:22:51] make sure what we put back provides as
[1:22:54] much habitat or more um in terms of
[1:22:57] diversity and opportunities for wildlife
[1:22:59] and for um native plant communities to
[1:23:02] thrive there.
[1:23:03] » And Glenn I could add to that. I mean
[1:23:04] there's been there hasn't been any
[1:23:05] formal like biological inventory of cop
[1:23:10] um and I'm not I'm not sure we're gonna
[1:23:12] do that. Um I mean our it's essentially
[1:23:16] a an open water body. Uh that's its
[1:23:20] primary feature and and source of
[1:23:23] habitat um and and type of habitat. Um
[1:23:27] there isn't a whole lot of um like
[1:23:30] diverse wetlands. There is there is like
[1:23:32] a where the uh stream the existing
[1:23:34] stream enters the enters the pond is uh
[1:23:37] is now unfortunately a little delta
[1:23:39] that's dominated by frag. Um but that is
[1:23:42] a slightly different type of wetland
[1:23:43] than the rest of the open water. Deep
[1:23:46] Fisheries has been the one that's um you
[1:23:48] know a major proponent of this project
[1:23:51] and um when we've turned to them to say
[1:23:53] hey what are your thoughts about you
[1:23:56] know Copon and what you know what will
[1:23:58] be potentially lost uh by by uh
[1:24:02] dewatering and and utilizing this for
[1:24:04] sediment disposal. Um and their their
[1:24:07] take has been, you know, the the river
[1:24:09] the open river matters way more than
[1:24:11] this one pond. Um and some of the
[1:24:15] surrounding residents have raised
[1:24:16] concerns about, you know, what about the
[1:24:17] eagles and the ospreys? Well, the eagles
[1:24:19] and ospreys have much more to gain from
[1:24:21] the removal of the dam and the
[1:24:23] restoration of of the fisher uh than
[1:24:25] they do from the fish that they may be
[1:24:27] getting out of out of CO pond. And the
[1:24:30] other part of the assessment that has
[1:24:31] not been done is really the biological
[1:24:34] um impacts of like the contamination in
[1:24:36] Copond itself where we we don't really
[1:24:39] know um what kind of um uh burden that
[1:24:44] is being held right now by fish and
[1:24:46] moving up the food chain from the
[1:24:47] contamination in Copond. um we just know
[1:24:50] it's probably not good and we've been
[1:24:52] telling people it this has always been
[1:24:54] private so it's never been fishable in
[1:24:55] that respect but definitely shouldn't be
[1:24:57] fished and nobody should be consuming
[1:24:59] anything out of cop because of the
[1:25:01] potential for that risk. Um so those
[1:25:04] things haven't been assessed because um
[1:25:06] well um I think in the totality of the
[1:25:11] project um it's um it it may be moot you
[1:25:16] know um because there's so much more to
[1:25:18] gain from the restoration of the of
[1:25:20] opening up the river um than the loss of
[1:25:24] of this pond. So ponds and open water
[1:25:26] bodies like them are very common in the
[1:25:28] in the state. Some of them are uh many
[1:25:30] of them may be behind dams but behind
[1:25:32] dams that are serving us a a purpose um
[1:25:35] more than just the pond habitat itself.
[1:25:37] So um whereas open rivers are the are
[1:25:40] the uh the endangered habitat type in
[1:25:43] the state if you will. So um this is all
[1:25:46] perceived as sort of a net game even if
[1:25:49] there is loss to certain wildlife. I'll
[1:25:52] I'll also add Paul, we we even haven't
[1:25:54] talked about this and we're just
[1:25:55] beginning to work on it with GEI, but
[1:25:58] all of the recovered land in the flood
[1:26:00] plane is uh new habitat that's going to
[1:26:03] be created as the empoundment goes away.
[1:26:06] It's and it's a tremendous opportunity.
[1:26:08] All that green. You can go back to that
[1:26:10] one, Emily. Um, and just show all that
[1:26:12] new green land we're imagining as
[1:26:15] potentially new constructed wetlands or
[1:26:17] at least um native habitat zones that's
[1:26:20] going to be going back. Um, that's now
[1:26:23] currently covered up by the empoundment.
[1:26:38] Okay. Any anything else to be brought
[1:26:40] up?
[1:26:44] Going a little bit late and uh I know we
[1:26:46] have to get ready to
[1:26:49] uh get out there for 1:00. Uh Erin, do
[1:26:52] you just want to quickly tell everybody
[1:26:54] again how to get to the location?
[1:26:57] » Sure. So, I sent um I sent an email and
[1:27:00] I sent a um calendar invite to everybody
[1:27:03] that had a link to a Google link to the
[1:27:06] location. Um if you don't have that, you
[1:27:10] can Google or, you know, map yourself to
[1:27:14] the Seymour Public Works Department. Um
[1:27:17] and the dam is right next door to that.
[1:27:19] So, we'll be parking in a parking lot.
[1:27:24] It's sort of a dirt parking area in
[1:27:26] between the public works yard and the
[1:27:28] dam. Um and that's in Seymour. Uh we'll
[1:27:31] be meeting at 1:00. Um we'll do a quick
[1:27:35] tour of the powerhouse and and the dam
[1:27:38] um from that side and then we can go
[1:27:40] over and and explore um over near and
[1:27:42] around Cop um in Ansonia. So um so yeah,
[1:27:49] everybody's welcome. Um I hope to see
[1:27:51] all of you there. Um, folks from
[1:27:54] Stimson, I'm not sure if you're going to
[1:27:55] be able to make it out there. I know you
[1:27:56] guys have a bit of a drive if you are.
[1:27:58] Um, but, uh, you know, just shoot me a
[1:28:01] line to let me know. Uh, thumbs up or
[1:28:03] thumbs down. And, um, and yeah, I'm I'm
[1:28:06] looking forward to showing everybody
[1:28:07] around.
[1:28:08] » Yeah. Luckily, it's not too brutal of a
[1:28:11] day out there today, so looking forward
[1:28:13] to it.
[1:28:13] » It looks nice.
[1:28:14] » Bring some bug spray though, I think,
[1:28:16] Erin. Right.
[1:28:17] » Yeah. Please wear wear sturdy shoes and
[1:28:19] long pants. There's a lot of poison ivy.
[1:28:21] It's It's not easy walking everywhere.
[1:28:25] Um and yeah, there are there are
[1:28:26] mosquitoes out there. I think I have
[1:28:28] some bug spray here that I'll bring, but
[1:28:30] » Okay.
[1:28:31] » Yeah.
[1:28:33] » And area, I see you've got the um our
[1:28:36] next meeting November 4th, which is
[1:28:38] Veterans Day. Uh
[1:28:39] » So so it's it's a week early because of
[1:28:41] Veterans Day. Veterans Day is on the
[1:28:43] 11th um which
[1:28:45] » Not our meeting our normal meeting day.
[1:28:47] So we bumped it up one week. Um so it'll
[1:28:49] be on the 4th. So, it's not it's not the
[1:28:51] usual second
[1:28:52] » Wednesday. It's the it's actually the
[1:28:54] first Wednesday in November.
[1:28:56] » All right. So, everyone adjust your
[1:28:57] schedule accordingly. I don't know if
[1:28:58] we'll see as many people on November
[1:29:00] 4th, but it was great to have so many
[1:29:02] people on today. A lot of great
[1:29:05] information. A lot to think about. Lot
[1:29:07] to think about. So, all right. Thank
[1:29:09] you.
[1:29:10] » Thank you.
[1:29:11] » Thanks everyone. Thanks for