[0:00]
Uh with that said, uh we should be at
[0:02]
the point of finally getting that one
[0:04]
closed out. We have notified them of
[0:06]
liquidated damages, uh which are in the
[0:08]
amount of $28,800.
[0:10]
So, it is our intent to collect on those
[0:12]
liquidated damages for failure to
[0:14]
failure to meet milestone completion
[0:15]
dates. And we really want to push it.
[0:18]
We're definitely well over the final
[0:19]
completion date, too. But, uh um
[0:21]
certainly the milestone completion date.
[0:23]
» Okay. And then in the future we will
[0:25]
probably not um entertain any of their
[0:29]
proposals.
[0:30]
» Yeah. That Yeah. So any any u any bids
[0:34]
coming from that contractor would um
[0:36]
likely be rejected.
[0:38]
» So So Chris, just for um just for their
[0:41]
sake, it mentions the 2026 project being
[0:43]
substantially complete, but they will
[0:45]
see lots of pipe sticking out of the
[0:47]
ground about every two weeks or about
[0:48]
every two blocks or a block or so. I
[0:50]
believe those are street lights,
[0:51]
correct? at this correct utilities.
[0:53]
» Yeah. So the work the work to be
[0:55]
performed by the uh by the project um
[0:58]
contractor is complete mostly complete
[1:00]
um new utilities is installing uh
[1:03]
lighting on the east side of the road
[1:05]
and they wanted to have our contractor
[1:08]
complete before they came through to
[1:09]
complete those that light installation.
[1:10]
So that's why it's happening um
[1:13]
sequentially instead of at the same
[1:14]
time. So
[1:14]
» Do you know a rough timeline on when
[1:16]
they plan to have those lights
[1:18]
installed? Uh, I thought they said two
[1:19]
to three weeks somewhere in that that
[1:21]
neighborhood if that sounds right.
[1:22]
» Two weeks.
[1:23]
» Two weeks.
[1:24]
» Yeah.
[1:25]
» Okay.
[1:27]
» And then there's some work on Highway
[1:28]
19, but that's not related to our our
[1:30]
project. So that's something else.
[1:32]
» Oh, you mean with the
[1:33]
» With the gas going on? Yep.
[1:35]
» Because that's in what state
[1:38]
» There? It's in the state right away, but
[1:40]
private utility.
[1:41]
» Okay. Any other questions for Kurt or
[1:45]
Chris before we go on to the item B?
[1:49]
Okay. If not, we'll get into the First
[1:51]
Avenue Southeast uh turnback.
[1:53]
» Okay. Uh next item I have for you
[1:55]
tonight is related to the First Avenue
[1:57]
Southeast uh Lassour County Lassur Cas
[2:00]
60 uh uh potential turnback project. Uh
[2:04]
so I believe it's back in June. We are
[2:06]
authorized to complete a uh complete a
[2:09]
preliminary engineering report um to uh
[2:12]
review the uh potential turnback of this
[2:14]
roadway from Lisser County ownership to
[2:17]
the city of New. Um we have been uh
[2:20]
looking at this potential turnback for
[2:23]
three years now probably at this point.
[2:25]
Um and uh just need to kind of nail down
[2:28]
a few things as far as what the cost
[2:30]
would be, what the cost shares would be
[2:32]
and what the potential improvements
[2:33]
would be. So, uh we did uh review the um
[2:37]
existing roadway um make um proposed uh
[2:42]
uh made recommendations for proposed
[2:44]
improvements um and uh some costs and
[2:47]
potential funding. Um the the roadway
[2:50]
itself we have split into four different
[2:51]
areas working from south to north.
[2:53]
[snorts] Um area one and area two are in
[2:56]
the worst condition. Area two is um from
[2:59]
about 11th Street uh circle southeast to
[3:01]
about fifth street. southeast. Um, so
[3:05]
that would take care of the south half
[3:06]
mile line.
[3:13]
» So, so we're good. Yeah.
[3:16]
» Okay.
[3:16]
» You woke me up. [laughter]
[3:19]
» So, that'd be the south half mile of the
[3:20]
roadway. Uh, the remaining half mile is
[3:22]
is considered areas three and four. Um,
[3:25]
areas one and two were uh improved. um
[3:29]
the middle area two was improved in 1986
[3:32]
to show what show how old that roadway
[3:34]
was. Um area one was uh in the in the
[3:38]
90s it was 1998 and then area three um
[3:41]
the north portion and uh area threes and
[3:44]
four uh were early 2000s and then I
[3:46]
guess with the more recent Main Street
[3:48]
paving project. So um so we have gone
[3:51]
through this. We have had a meeting with
[3:53]
Lassour County to review um the cost and
[3:55]
cost for the project, the potential
[3:57]
funding splits. Um and um we did have a
[4:00]
very positive meeting with them.
[4:02]
Everything seems to be in agreement with
[4:03]
what we show in the report as far as how
[4:05]
we would um likely go through a a
[4:07]
turnback. So, um, as far as the costs in
[4:11]
this project, we did, uh, largely match
[4:15]
what was performed on the Scott County
[4:18]
turnback projects more recently, 209
[4:21]
and, uh, 2022. So, we're regarding uh,
[4:25]
Columbus Avenue, more most the most
[4:27]
recent one. Um, copied identically how
[4:30]
the cost share was done on those as far
[4:32]
as who paid for what, um, whether it's
[4:34]
street cost, sidewalk costs, utilities,
[4:36]
and and so forth. Um and uh that's what
[4:40]
was used as a guide for preparation of
[4:42]
this report. Um so with that said um as
[4:45]
I mentioned before working from south to
[4:48]
north um we do have costs for um area
[4:52]
one uh which we have estimated to be
[4:54]
about $850,000 $847,000 total project
[4:58]
cost. Um area two we have a total
[5:02]
project cost estimated $977,000.
[5:04]
that's including engineering and soft
[5:06]
costs and all the other associated
[5:08]
items. Um and then uh areas three and
[5:11]
four have been kind of lumped together
[5:12]
since they um would have similar
[5:15]
improvements at about $713,000.
[5:18]
So areas one and two we are proposing to
[5:20]
do a pavement reclamation which is to um
[5:23]
leave the curb in place but grind up the
[5:25]
black top with the gravel um repave the
[5:27]
roadway um remove the excess material
[5:30]
and then repave the roadway with six
[5:31]
inches of new black top. Um so the
[5:33]
roadway would be um same geometrics as
[5:36]
it is today just with new surfacing. Um
[5:39]
that would be for areas one and two. The
[5:41]
south half of 1 Avenue Southeast while
[5:43]
the north half is proposed for Melon
[5:45]
overlay um because it is in much better
[5:47]
condition and that uh um is currently
[5:52]
being proposed to uh potentially be a
[5:54]
future project whether it happens at the
[5:56]
same time or not because it is
[5:58]
[clears throat] in much better
[5:59]
condition. So there's seven inches of
[6:00]
black top on that portion of the roadway
[6:02]
which is probably the heaviest roadway
[6:04]
in the section in town I imagine with
[6:06]
that um section.
[6:10]
Uh I mentioned some timing on there. Um
[6:15]
the next step in this process uh we do
[6:18]
have the the report in front of you here
[6:20]
today would be to move into a memorandum
[6:21]
of understanding which is to outline the
[6:24]
expected cost participation by uh city
[6:26]
new and um lassur county. Um and then uh
[6:31]
moving after that it'd be moving towards
[6:32]
a uh turnback agreement. Um that'd be
[6:36]
the more formal process which would have
[6:38]
all the same findings um from the
[6:41]
memorandum of understanding but would
[6:42]
likely be uh take place uh concurrently
[6:44]
with with bidding of the project when
[6:46]
costs are a little more finalized.
[6:49]
There's a process to kind of follow
[6:50]
through that. Um the turnback process
[6:53]
itself wouldn't be initiated until um
[6:56]
likely March at the latest so that the
[6:58]
turn back of the roadway at the soonest
[7:00]
could happen in uh 2028. Doesn't mean
[7:03]
the improvements can't happen before
[7:04]
that, but that's when they officially uh
[7:06]
would change jurisdiction.
[7:09]
Um and that is uh just based on mind
[7:12]
cycles as far as when those when that
[7:14]
timing would happen.
[7:16]
So, uh, with that said, um,
[7:22]
I I don't have information on
[7:24]
assessments. That wasn't part of this
[7:25]
report. That would be something that'd
[7:27]
be completed afterwards if the project
[7:28]
does move forward. Um that is something
[7:31]
that uh we didn't want to include with
[7:33]
the u report uh beyond just saying city
[7:36]
share of costs because assessments are
[7:38]
would not be um something that the
[7:41]
county would participate in a cost for
[7:43]
determining since they are uh going to
[7:45]
be uh providing about 50% funding
[7:47]
towards this report that was put
[7:49]
together. So we as a city item we
[7:51]
decided to leave that one out. So the
[7:54]
next step would be a feasibility report
[7:56]
and uh if the project moves forward well
[7:58]
sorry the next step would be a
[7:59]
feasibility report for assessments and
[8:01]
then as a project moves forward all your
[8:03]
normal um normal improvement schedule
[8:05]
for prioritizing [clears throat] bidding
[8:07]
and construction all that stuff.
[8:10]
So
[8:13]
this is all broken down in areas. Is it
[8:15]
something that we're planning to do
[8:17]
everything next year?
[8:19]
» No. So, uh, section one and two
[8:23]
» Mhm.
[8:23]
» Are the ones that we were proposing that
[8:25]
I proposed to the county of last week
[8:26]
when we met that we would like to see
[8:28]
one and two done. That would be the 600
[8:31]
block roughly to the south and then
[8:33]
anything north of that was done in 2002
[8:36]
2003ish. Um, that is the proposed just
[8:39]
to leave it and just pay the city lump a
[8:41]
lump sum payment and then we'll do that
[8:43]
down the road. In my opinion, we could
[8:46]
hopefully see another 10 years out of
[8:48]
that, maybe five years. Obviously depend
[8:50]
on Minnesota winner. Um but that that
[8:53]
road still has a lot of life in it
[8:54]
before we would do any maintenance to
[8:55]
it. So and the county was in in
[8:57]
agreeance. Um me, Chris, and Ken met
[9:00]
with the the county and it was a very
[9:02]
good meeting. They were agreeance on
[9:04]
pretty much everything we proposed. We
[9:05]
like Chris said, we just pretty much
[9:07]
everything the council approved in 2019
[9:09]
and 2022 on the Scott County agreement.
[9:12]
That's what we proposed to them. So,
[9:16]
» And again, I just asked Chris to come um
[9:18]
since he was here today already to
[9:20]
present this. I know this has been a
[9:21]
major top topic for three, four years
[9:24]
with that First Avenue on the south side
[9:25]
deteriorating as fast as it has been.
[9:27]
So, um I thought it was good information
[9:29]
for you guys to see where we're at and
[9:31]
all the steps that we have been taking
[9:32]
already to get to this point.
[9:37]
» Um I got a few questions. In area three,
[9:39]
you talk about the last sentence on the
[9:41]
2.2 2.3 area 3. Um, improvements to this
[9:47]
portion of 1 Avenue Southeast may not be
[9:49]
imminently needed, but would generally
[9:51]
be expected within 5 years. So, uh,
[9:54]
because of that, we are doing a Milan
[9:57]
overlay because it's going to be only
[10:00]
useful life of five years. Are we doing
[10:02]
a Millan overlay and that's only going
[10:04]
to last for five years?
[10:05]
» Yeah. So the the improvements that are
[10:07]
identified in um area three which is the
[10:09]
north half mile of the road. So there's
[10:11]
a north half I should just um put it
[10:13]
that way. Uh we've identified mill
[10:15]
overlay of the pavement surface and then
[10:18]
ADA improvements are probably the most
[10:19]
substantial part of the project on that
[10:21]
one. Um the uh sidewalks go through
[10:24]
driveways and a lot of those were done
[10:25]
the way they were done 20 years ago and
[10:27]
don't meet any current standards. But
[10:30]
there's nothing in there that's um
[10:32]
there's it doesn't have potholes.
[10:34]
doesn't have a lot of surfacing surface
[10:35]
raveling or anything like that that's
[10:36]
creating a a condition where we need to
[10:39]
take care of it right now. Uh when I say
[10:41]
five years, it's just more of a and and
[10:43]
matches at 10 years. So something five
[10:45]
to 10 years somewhere in that range. The
[10:47]
expectation would be that the the
[10:48]
pavement would need a repair a mill
[10:50]
overlay um but not before five years. Uh
[10:54]
if it goes after 10 years, it probably
[10:56]
becomes something more substantial than
[10:57]
a mill overlay. But that's just as
[10:59]
» Okay. My mind is a turn around. One and
[11:01]
two would be done now. three and four be
[11:03]
done later.
[11:04]
» The the Yeah, that the expectation is
[11:05]
that areas one and two would be
[11:07]
completed um as soon as 2027
[11:11]
and um the areas three and four would be
[11:14]
yeah the city has received receive the
[11:16]
funding now and take care of that
[11:18]
project when you're ready.
[11:19]
» Then if we when this happens, we would
[11:22]
sign an agreement to take it back with
[11:25]
the stipulations that they would still
[11:27]
share cost in area three and four.
[11:32]
» [clears throat]
[11:32]
» Usually in the past, Scott County had
[11:34]
paid like Scott County has paid us a
[11:36]
lump sum payment for objects that we
[11:38]
were looking at doing down the road. So
[11:40]
assume that's how we do the same thing
[11:41]
as
[11:42]
» So they would pay us and then we'd say
[11:44]
we just have that money in a
[11:45]
» That is correct.
[11:45]
» An account uh that
[11:47]
» A fund that we could use it when we're
[11:49]
ready to.
[11:49]
» That is correct. Yep.
[11:52]
» Uh talking about new sidewalks. Um it
[11:55]
references that the expectations that
[11:57]
we'll get traffic back up to what it was
[11:59]
and maybe I think it was cited as 2024
[12:01]
or something like that. Okay.
[12:03]
» Uh in the report,
[12:04]
» Something like that. And then this is
[12:06]
more of a comment than really a question
[12:08]
I guess.
[12:09]
» But then you talking about the
[12:11]
sidewalks.
[12:12]
Um,
[12:15]
I think you say something about it be
[12:16]
preferable to have on both sides, but
[12:20]
I'm not sure if it's financial is the
[12:22]
main reason that it's just one side or
[12:24]
» And I apologize. I didn't I didn't go
[12:25]
into the sidewalks when I when I talked
[12:27]
about the project improvements. So, uh,
[12:29]
the north halfway, north half of the
[12:30]
project primarily has sidewalk on one or
[12:32]
both sides. Most of it, both sides. I
[12:34]
think the south block or so only has it
[12:36]
on one side, the east side of the
[12:37]
roadway. Uh we are proposing to extend
[12:40]
the sidewalk a six foot wide five or six
[12:42]
foot wide sidewalk further south all the
[12:44]
way to um highway 29 15th street
[12:47]
southeast. Um the uh sidewalk is only
[12:50]
proposed on one side of the roadway at
[12:52]
this time. Um topographically it'd be
[12:55]
difficult to put the sidewalk on the
[12:56]
west side due to steep driveways,
[12:58]
steeper areas, retaining walls, things
[13:00]
are kind of in the way.
[13:01]
» The west side is steeper.
[13:02]
» There's some steeper driveways. There's
[13:04]
some retaining walls too. So it it it
[13:06]
becomes one of those things that yes,
[13:07]
you can put it in there um but becomes a
[13:09]
much more extensive um type of
[13:11]
improvement when you've got some
[13:12]
driveways that are exceptionally steep.
[13:15]
So trying to put in a sidewalk
[13:17]
» Means we're probably taking out driveway
[13:19]
up to someone's garage practically in a
[13:21]
couple spots. So
[13:21]
» Yeah, I think of the east side as being
[13:23]
more steep.
[13:23]
» It's I think there's one driveway on the
[13:25]
east side that identified as being kind
[13:27]
of tough. Um but uh
[13:29]
» Yeah, I was referring to sidewalks, but
[13:31]
yeah.
[13:32]
» Yeah, sorry. Yeah. Well, the sidewalk
[13:33]
through the driveway is okay. Is what
[13:35]
I'd say. So, when the the steepness is
[13:37]
usually a bigger concern at driveways
[13:38]
because we're going to have a grade
[13:39]
break to put the sidewalk through there.
[13:41]
Um, and then you have to u remove
[13:43]
everything around it to make it work.
[13:45]
And that's why the north half of the
[13:47]
project does have so much sidewalk
[13:48]
replacement is because a lot of them go
[13:50]
through driveways and a lot of that
[13:51]
sidewalks directly behind the curb. Uh,
[13:53]
so it's preferable to have sidewalk on
[13:55]
both sides if we can take it all the way
[13:57]
to the south end. Um, I would say we do
[13:59]
have sidewalk allocated into the city
[14:01]
share. new sidewalk allocated to the
[14:03]
city share of the project. So, um if as
[14:05]
you move forward you had the um wanted
[14:07]
wanted to install a sidewalk on both
[14:09]
sides, you certainly can make that
[14:10]
decision. There just be of course a cost
[14:12]
associated with that.
[14:14]
» Yeah, I'm not advocating that we do
[14:16]
both, but I do when I think about the
[14:18]
geography in that area,
[14:21]
we do have kind of a geographic
[14:23]
bottleneck in that part of town. That is
[14:26]
our main exit for quite a ways.
[14:30]
I imagine when the Tokulski side on the
[14:32]
west side might get developed, there may
[14:34]
be other access to 29 coming off of
[14:36]
there maybe or something.
[14:38]
» But um and I'm not saying that we need
[14:41]
another pedestrian way there, but that
[14:43]
is the most that would be the most
[14:46]
widely used pedestrian
[14:48]
access to get out of there. But uh
[14:52]
unless there's really a community
[14:55]
the community really is wanting it or
[14:57]
screaming for it. I guess I would I just
[15:00]
wanted to ask about that I guess.
[15:02]
» Yeah. And we did try to include future
[15:04]
pedestrian improvements. So you know
[15:05]
hope at some point maybe there's a trail
[15:07]
on on 29 or something and we are trying
[15:09]
to account accommodate that but uh we
[15:11]
did accommodate for it with the 10th
[15:12]
Avenue improvements
[15:14]
» Or something to maybe happen later on
[15:15]
but uh at this point just accounting for
[15:17]
it not necessarily designing for it. the
[15:20]
east side where I I saw a sidewalk would
[15:22]
be going and the steepness there. I
[15:24]
think in the diagram you referenced that
[15:26]
the hill would be shaved down. I was
[15:28]
just curious
[15:29]
» Who was going to give us permission to
[15:31]
shave down the hill and is that cost in
[15:33]
the
[15:34]
» There's a cost associated with that and
[15:35]
we did have a conversation with the
[15:36]
property owner seemed able with it. Yes.
[15:39]
» Okay.
[15:40]
» So, and I should probably mention that.
[15:42]
So, um on the the east part of the prop
[15:44]
east side of 10th Avenue um north of uh
[15:48]
north of the county 29 that is um
[15:52]
private property the center line of the
[15:54]
road. So there is a rightway acquisition
[15:55]
that is needed before the turnback
[15:56]
agreement actually goes fully processed
[15:59]
because um the goal is with the turnback
[16:01]
um process is this is inherited as a
[16:04]
turnback a casad turnback onto your
[16:06]
state aid system. So you're able to
[16:08]
collect uh needs funding from it. Um if
[16:11]
you uh did not collect it that way or
[16:13]
not uh acquire that right away or the
[16:16]
county did not acquire that right away
[16:17]
um as part of the turnback process, then
[16:19]
you would not be able to collect needs
[16:20]
over the south
[16:22]
» Thousand feet of the road or whatever it
[16:24]
is.
[16:24]
» The uh intersection at 29 is is that
[16:27]
area going to be built up more? I mean
[16:30]
um on the east side because
[16:33]
roundabout or something there's it's
[16:35]
really low there.
[16:36]
» Yeah.
[16:37]
Nothing's proposed as far as what we're
[16:39]
talking about with the turnback at
[16:40]
least. Um I haven't had any
[16:42]
conversations with with uh Dave Tees
[16:45]
regarding any improvements at the
[16:47]
intersection there though. So
[16:49]
um not there there's nothing proposed at
[16:51]
the intersection um the far south end.
[16:53]
» Yeah. I don't know if it's you know more
[16:55]
than I do if that's something that
[16:58]
should be considered to build it up more
[17:00]
around the sides. But
[17:02]
» Will you look for volunteer flaggers if
[17:04]
you're interested? flaggers.
[17:07]
» Yeah, that that would be likely uh if
[17:09]
it's if that's something that was to
[17:10]
ever be to go through, there' probably
[17:11]
be extensive amount of work going in all
[17:13]
four legs of that intersection, make
[17:15]
something work. So, outside the scope of
[17:17]
a turnback, but certainly could be
[17:19]
something that uh maybe in the future.
[17:22]
» Yeah, I was just curious when I drive by
[17:25]
there, the 11th Street Circle, the U
[17:28]
that that just seems like it needs
[17:31]
attention. I don't know if that
[17:32]
» That's part of this project, but
[17:33]
» Oh, it is. Well, it's part of the
[17:35]
project, but not part of the turnback.
[17:36]
So, that's why we're not even discussing
[17:38]
11th Avenue. That would be added on to
[17:39]
the project as that that needs a milling
[17:41]
overlay. That still coding failed
[17:42]
extremely bad. And it's um we were
[17:44]
waiting to get to First Avenue so we
[17:46]
could do 11th Street.
[17:47]
» Okay. Y sounds good.
[17:50]
» Okay.
[17:52]
» Any other questions? Uh so, what are the
[17:53]
steps we have?
[17:55]
» At this point, there's no action to
[17:56]
take. I did get a uh and I mentioned
[17:58]
these guys. Yep. I did get an example
[18:00]
memorandum of understanding from Lura
[18:01]
County. Um you just had one other
[18:02]
question through that.
[18:04]
» So I mean the next step would be the me
[18:06]
memorandum of understanding I guess
[18:08]
» The cost of the rightaways in the budget
[18:12]
» In this plan.
[18:12]
» It is not and I'm not sure if we talk
[18:14]
about that Ken or not if they're the
[18:16]
property owner.
[18:16]
» Yeah. [clears throat]
[18:17]
» So the property owner would be expected
[18:18]
to dedicate that rightway with the
[18:21]
development of their property
[18:23]
[clears throat] when we have met with I
[18:24]
met with the property owner a couple of
[18:25]
times and then most recently I think it
[18:26]
was Matt Chris myself uh met with the
[18:29]
property owner the family I should say.
[18:31]
And um I think they realize that whether
[18:34]
they develop or a future property owner
[18:36]
develops, it's going to be provided as
[18:38]
rightaway. I we have not talked cost to
[18:41]
acquire that because that would be a
[18:42]
requirement of obviously platting the
[18:44]
property.
[18:45]
» So in the map when you showed the I
[18:47]
thought it was the rightways with the
[18:48]
blue dotted line. Is that meaning
[18:50]
rightaways for all of property owners
[18:52]
all the way in section three?
[18:54]
It would just be the uh the only one
[18:56]
we're looking at needing right away from
[18:58]
is going to be the south two properties
[19:00]
on the east side. The farm field and
[19:01]
then the the um house at the corner.
[19:05]
» I misunderstood then. What's the dotted
[19:07]
sidewalk
[19:09]
» Sidewalk?
[19:10]
» Oh, okay.
[19:11]
» Yeah.
[19:12]
» Acquisition needed on parcels.
[19:15]
» Yeah. So, we'd be looking at I believe
[19:16]
40T I think [snorts] is what we
[19:18]
identified from center line of the
[19:19]
roadway um onto the east side of the
[19:21]
road. [laughter] So we did stake that
[19:24]
last year just where we thought [snorts]
[19:25]
it would be for the property owner to
[19:27]
» That acquisition label for those that
[19:30]
those two pages just goes to the farm
[19:32]
field through there and so they're just
[19:34]
signifying that we would need to have
[19:35]
that rightway dedicated along that last
[19:39]
section on the south part of it.
[19:40]
» Okay. Yeah, it wasn't delineated what it
[19:43]
was referring to I guess in the map.
[19:46]
[snorts]
[19:47]
» Thank you.
[19:48]
» Any other questions?
[19:51]
Then I guess the ne letter C the MS4
[19:56]
proposal that uh is in front of us.
[19:59]
» Yes. So the next item I have in front of
[20:01]
you is uh in relation to the uh MS4 um
[20:05]
permit that the city is um now going to
[20:08]
be u required to complete. So you're
[20:10]
notified a couple years back um that uh
[20:14]
the city of New Prague would become an
[20:16]
MS4 community. Um, this is in relation
[20:19]
to
[20:20]
MS4 communities typically are of a
[20:22]
certain population. I believe it's
[20:23]
10,000 or larger. Um, or you're within
[20:26]
uh a distance of an impaired water of
[20:29]
significance. Um, and in this case, Sand
[20:33]
Creek is is that waterway. Um and
[20:36]
because um that [clears throat] uh uh is
[20:38]
an impaired water um the city of New
[20:40]
Prague has been notified that you will
[20:42]
need to start uh um start preparation of
[20:47]
MS4 documentation. So uh this is a uh
[20:51]
technically you're into it now. Started
[20:53]
January 1, 2026. There's no
[20:55]
documentation needed the first year. So
[20:57]
you get a lot of little bit of leeway to
[20:59]
kind of start getting your bearings and
[21:00]
figure out what you need to do. um what
[21:02]
we have done is provided you a proposal
[21:04]
uh to um assist you with um assist you
[21:09]
with that documentation. So um on the
[21:12]
first [snorts] level we have a phase one
[21:14]
uh approach which is a um largely a
[21:16]
document uh information seeking type of
[21:19]
a proposal. So um a lot of the items
[21:22]
that you need to include with your MS4
[21:24]
um permit um are things that you're
[21:26]
likely already doing. Um there's
[21:28]
probably a lot of things you still you
[21:29]
need to start doing. Um and we largely
[21:33]
don't know what that is yet. So this is
[21:34]
kind of an information gathering process
[21:37]
um meeting with city staff uh [snorts]
[21:38]
meeting with uh um uh council and and uh
[21:43]
going through some sort of a public
[21:44]
involvement uh stage here at the
[21:46]
beginning. So um the the the biggest
[21:48]
things right now uh we've identified for
[21:51]
for this information is what we kind of
[21:53]
identified in this um schedule at the
[21:55]
bottom here and we're we're some of
[21:57]
these will get pushed back. We're we're
[21:58]
reviewing it here today instead of
[22:00]
August 17th. But u we do have a a
[22:02]
questionnaire which is a documentation
[22:04]
we send out basically saying what are
[22:06]
you doing now so we can kind of start
[22:08]
adding that information. Um and then we
[22:10]
do have um a couple workshops and then
[22:12]
uh summary report and checklist. So
[22:15]
that's putting together uh basically
[22:18]
uh what are you doing, what do you need
[22:20]
to do and um this would all be used in
[22:23]
preparation of um like we have phase two
[22:25]
which is implementation um and that's
[22:29]
starting to to uh complete the the items
[22:31]
that you need to do for your for your uh
[22:34]
MS4 permit which I believe would be um
[22:37]
ultimately submitted in in May which is
[22:40]
I think it's May every year. So this is
[22:42]
kind of one of those things that um
[22:45]
it's going to be kind of a learning
[22:47]
process
[22:48]
um for not FCS has done many of these
[22:51]
but just learning what you are doing um
[22:53]
at the beginning here and uh kind of um
[22:57]
working with the city as far as um what
[23:01]
you need to do, what do you want to do,
[23:02]
what do you want us to do. And then
[23:04]
that's kind of what goes into the second
[23:06]
phase is u we do have the ability to
[23:08]
complete a lot of this documentation for
[23:09]
you but there's probably not much reason
[23:10]
for us to [snorts] to do that um at
[23:14]
least not uh you know forever because
[23:16]
this is something you'll be doing on a
[23:18]
annual basis. It doesn't mean you'll be
[23:20]
doing this proposal on annual basis but
[23:22]
once you start doing the the submitts
[23:24]
and documentation that you need to
[23:25]
prepare that is something you have to do
[23:27]
every year. Um there will be a um every
[23:30]
five years you should expect to be
[23:32]
audited from that information. Um so
[23:34]
there are certainly um certainly some
[23:38]
reasons to getting sure you get it I
[23:39]
guess the way you need to do it. So
[23:41]
you're probably doing a lot of the work
[23:42]
you need to [snorts] do pond inspections
[23:43]
and things like that um that get
[23:45]
implemented into it. Um you're going to
[23:47]
have a lot more stuff you need to do.
[23:49]
you're going to identify someone that's
[23:51]
doing um SWIP inspections, looking at
[23:53]
private developments, doing all sorts of
[23:55]
stuff you aren't necessarily doing now,
[23:57]
but uh so you will have some extra work
[23:59]
added to your [snorts] um to your staff,
[24:02]
but uh um that's basically what we need
[24:05]
to find out. What do you need to do
[24:06]
here?
[24:08]
» Okay.
[24:09]
» So, the proposal we have in front of you
[24:11]
here today is an hourly not to exceed uh
[24:13]
fee of $29,900.
[24:16]
Um this would be led by uh Jeremy
[24:18]
Walgrave who's in our water resources uh
[24:20]
group. Um Jeremy's met with uh city
[24:23]
staff here through a couple meetings now
[24:25]
already. I think maybe a year two years
[24:26]
ago I think we had the first time and
[24:28]
then um early this summer as well. So um
[24:31]
he's prepared these [snorts]
[24:33]
um he's assisted several cities with
[24:35]
preparation these documents and has has
[24:38]
a good background for that.
[24:40]
So, is this December 15th
[24:43]
date a firm date, which means I know
[24:47]
we're we're missing some of the earlier
[24:48]
dates, but
[24:49]
» Yeah. So, the
[24:50]
» Something that we can still achieve.
[24:52]
» Uh the December 15th date, I would
[24:54]
expect we'd still be able to to stick
[24:56]
with that. Um or [clears throat]
[24:58]
certainly before Christmas. There's
[24:59]
nothing in here that says you have to
[25:00]
get it done by 4, December 15th. This is
[25:02]
just trying to get us prepared so that
[25:04]
um we know what we need to do so we can
[25:06]
start working on that next step in
[25:07]
January is the general idea so that uh
[25:10]
then everything do need to get ready for
[25:12]
that first uh permit submittal um first
[25:16]
documentation is ready for that I think
[25:17]
it's I believe it's May has to be
[25:19]
submitted. So it's just uh yeah I think
[25:22]
a lot of stuff will probably be shifted
[25:23]
back a little bit but I don't see that
[25:24]
December 15th date changing a whole lot.
[25:26]
Maybe I would probably just say before
[25:28]
Christmas on that one. Okay.
[25:31]
» Besides uh inspections, do you uh
[25:34]
foresee us in the future needing to
[25:36]
either adjust zoning or ordinances or
[25:39]
how we uh allow developments to occur or
[25:42]
our permit process?
[25:43]
» Yeah, there will some of the items put
[25:45]
in there is are going to include
[25:47]
ordinance um updates and that's going to
[25:49]
be some of the things that whether it's
[25:51]
Ken and his staff work on it or
[25:52]
something that a CH helps out with.
[25:54]
there's some template um items that we
[25:57]
can provide and you just kind of orient
[25:58]
it towards how you want to work with it.
[26:00]
We can write them all directly and do
[26:01]
all that kind of stuff. So again goes
[26:03]
into our determination of what you need
[26:04]
to do. But yes, you will need to change
[26:07]
change things um that that are in your
[26:10]
um in your city code.
[26:12]
» Someone building a commercial building,
[26:14]
will they notice notice a difference
[26:16]
from yesterday to next year?
[26:20]
I'd say most uh most developers that are
[26:22]
coming in at this point, we're making
[26:24]
them aware of the changes and I think
[26:26]
the the items that we're referring to
[26:27]
right now are going to still follow
[26:29]
those guidelines that MS4 will have the
[26:31]
the storm water requirements. Um so we
[26:34]
are trying to get them oriented towards
[26:35]
that even though it's not officially
[26:37]
ordinance, [clears throat] but once you
[26:38]
have the permit, I mean you're you're
[26:41]
going to be you're going to be the
[26:42]
permit holder and people in your in your
[26:44]
city are going to have to be following
[26:46]
it as well.
[26:49]
Okay.
[26:50]
» One thing I want to point out, Chuck, um
[26:52]
or mayor, sorry. Been talking to you too
[26:54]
much lately outside of the council
[26:55]
meetings. Um [clears throat] so the cost
[26:58]
for this um study is 29,900 like you
[27:01]
said. So I pro I budgeted 15,000 for
[27:04]
this in the 2026 budget. We've had a
[27:07]
good uh budget this year for the storm.
[27:09]
Um I anticipate we'll have the
[27:12]
additional 15,000 to cover that
[27:14]
difference, but if we do not, we would
[27:15]
have to take out of the fund balance. Um
[27:18]
and we are sitting uh very well in the
[27:21]
storm budget so that would not be an
[27:22]
issue but this is a necessary step. It's
[27:25]
one audit and they miss we miss one
[27:26]
thing in our um paperwork and that fine
[27:30]
would exceed this. So this is a
[27:31]
necessary step but uh on top of that
[27:33]
we've talked about this for so many
[27:34]
years now that the city will become an
[27:36]
MS4 city. It's coming up. We've been
[27:38]
preparing for it. Um, we doing a lot. I
[27:40]
know we're doing 75% of the things that
[27:42]
we should be doing already to be an MS4
[27:43]
city, but there are that 25% of stuff
[27:46]
that we could be missing that we need an
[27:48]
expert that's done this with other
[27:50]
cities to understand exactly what we're
[27:51]
missing.
[27:53]
» What triggers that, Matt, becoming an
[27:56]
MS4 city?
[27:57]
» Well, this one doesn't You would think
[27:59]
New Prairie hasn't changed much in five
[28:00]
years. How could this um how did we fall
[28:04]
into this lap now? Well, I know a lot of
[28:06]
the bordering cities, New Market, Bell
[28:07]
Plane, I think just recently landed in
[28:09]
at the same time we did. I think it's
[28:11]
because what who we dump into. Is that
[28:13]
correct?
[28:14]
» Yeah. So, if you're over 10,000
[28:16]
population or if you are part of a
[28:18]
regional water significance or impaired
[28:20]
water, I should say. So, Sand Creek
[28:22]
wershed is is the reasoning for it. So,
[28:23]
once that got designated as an impaired
[28:25]
water um and I want to say it was within
[28:28]
I can't remember the the range of miles.
[28:30]
I think it might be within five miles. I
[28:31]
can't recall exactly, but um but because
[28:34]
of the proximity to Sand Creek um that's
[28:37]
why you got put on to it. So um yeah,
[28:41]
even though you're less than 10,000
[28:42]
population, so a lot of the other that's
[28:44]
why the metro communities are included
[28:45]
in there, but uh you were not.
[28:50]
» Okay, any other questions?
[28:53]
If not, I guess I'll look for a motion
[28:55]
to approve this uh proposal, the MS4
[28:58]
proposal.
[28:59]
» So move
[29:01]
And I will second. I got a motion by
[29:03]
Rick S, second by Chuck Nikolai.
[29:06]
There's no other questions. All in favor
[29:08]
say I.
[29:09]
» I.
[29:09]
» I. Any opposition? Okay. Passes 5-0.
[29:12]
Thanks, Chris.
[29:12]
» See you in two weeks.
[29:14]
» Okay,
[29:17]
next we have John, right?
[29:20]
» Yes.
[29:20]
» From Wald.
[29:23]
» Unless it's easier for me to do it. I
[29:24]
can either way.
[29:26]
» Either way. Plug in there.
[29:32]
» [snorts]
[29:43]
[snorts]
[29:50]
» There we go.
[29:53]
» Evening, [clears throat] mayor and
[29:54]
council. It's good to be back on a
[29:56]
different project this time. And this
[29:58]
one is is is the relocation of city hall
[30:02]
over to the uh building that uh the city
[30:05]
just recently purchased. Um we've met a
[30:08]
couple of times with city staff to kind
[30:10]
of go over some ideas on what we can do,
[30:13]
what we can defer in the building and um
[30:16]
are looking for some feedback tonight on
[30:19]
a couple of different ideas that um are
[30:21]
important as we look at this building.
[30:23]
not only from a building usage but also
[30:26]
from the side of public access. Um so
[30:29]
those of you that are looking at this,
[30:31]
we do have a public parking area on the
[30:34]
south side. It's noted on the drawings
[30:36]
here as there's 11 stalls there. Uh
[30:38]
there is a sizable parking lot behind
[30:40]
the building with 41 stalls in there.
[30:43]
And so while there isn't a lot of
[30:45]
traffic to city hall, there are
[30:46]
sometimes meetings in the council
[30:48]
chambers and whatnot that will involve
[30:51]
the potential of using uh the back lot
[30:53]
for public parking. So we wanted to make
[30:55]
sure to present some options that would
[30:57]
not only help with access to those
[31:00]
public spaces, but also uh enhance
[31:03]
security in the building as well, so
[31:04]
that we don't have people kind of
[31:06]
walking up back ways like what we do in
[31:08]
this building here. Um, so this is just
[31:10]
to illustrate that there are a number of
[31:12]
entries on the building that we'll need
[31:14]
some level of control over. And so we've
[31:16]
had a number of conversations related to
[31:18]
how we want to do that. And we'll kind
[31:20]
of talk through that uh as we go through
[31:23]
the presentation.
[31:25]
So for option number one is kind of a
[31:28]
more traditional um look at how we might
[31:30]
organize the building. Kind of the main
[31:32]
vestibule on kind of the southeast side
[31:35]
there at the angle. Um there's a very
[31:37]
large open rotunda in there, that
[31:40]
octagonal space uh that sets up nicely
[31:43]
for some sort of a service counter in
[31:45]
that area. And so what we would envision
[31:47]
is capturing probably about half of that
[31:49]
area uh for city staff to have a
[31:53]
singular uh service counter in that
[31:55]
building. So kind of combining those
[31:57]
into one location so that uh the public
[31:59]
coming in has kind of a one-stop shop
[32:01]
for city services. Um, a couple of
[32:04]
things to note in that lobby is there is
[32:06]
no security in that lobby from uh what
[32:09]
we're noting in this option as the
[32:10]
council chamber. So, we would add some
[32:12]
[snorts]
[32:12]
some doors in that area to allow uh for
[32:16]
the public to kind of be in that public
[32:18]
area and the staff spaces and the
[32:21]
council chambers uh would be secure and
[32:24]
only opened based on uh usage. Uh this
[32:28]
option here would add two handicap
[32:30]
accessible toilets. We have done a
[32:32]
preliminary occupancy count of the
[32:35]
council chambers and based on the usage
[32:37]
of that and the square footage of that
[32:39]
space it kind of dictates how many
[32:40]
restrooms we would need in that public
[32:42]
area and two are the number. So we are
[32:45]
proposing two uh unisex bathrooms in
[32:48]
that area non-gendered toilets. Uh we do
[32:51]
have um a service counter that we're
[32:55]
proposing to have um impact resistant
[32:58]
glass, not ballistic glass, but impact
[33:00]
resistant glass, kind of similar uh but
[33:02]
more uh designed into that space. Uh a
[33:05]
little public uh terminal in there. Um
[33:07]
and then a kind of a sub lobby area
[33:09]
leading into the council chambers. Uh
[33:11]
this option here envisions uh doing some
[33:14]
renovation in that corner by the council
[33:16]
chambers to not only add a toilet but to
[33:18]
add a a conference room in that area. So
[33:21]
not unlike the conference room that's
[33:23]
downstairs in this building. Something
[33:24]
that's in the more public area so that
[33:27]
uh we don't have uh to escort people
[33:29]
into the back area. We are showing a
[33:32]
council chambers as oriented to the
[33:34]
south. So the council would sit on the
[33:36]
south side against that southern part of
[33:38]
that octagon octagonal area there. We
[33:41]
are suggesting that that existing side
[33:43]
door would be a safe and secure way for
[33:47]
uh city staff and council to exit that
[33:49]
space should there be some emergency
[33:51]
that's necessary that so that we don't
[33:53]
have to go back through the public area.
[33:55]
Um and then from our conversations with
[33:57]
staff, we have added a um side area uh
[34:00]
to connect our uh staff positions to the
[34:04]
council uh DAS in there. The council
[34:07]
disated similar to what you have in
[34:09]
here. We are budgeting to add uh
[34:12]
ballistic protection to the council dis
[34:15]
uh safety reasons. It's a traditionally
[34:18]
the way that we do uh council chambers
[34:20]
uh today. And we do have a desk in there
[34:24]
for uh the media location um similar to
[34:27]
what you have here. Um during our
[34:30]
conversations, [snorts] it was noted
[34:31]
that we would likely relocate all of the
[34:34]
council equipment that's in here to the
[34:36]
new building. And so that would be
[34:37]
something that would need to be
[34:38]
coordinated uh during construction as to
[34:41]
how that IT stuff gets moved over there.
[34:44]
Uh the remainder the remaining part of
[34:45]
the building would pretty much stay as
[34:47]
is today. Maybe a little painting and
[34:49]
touchup here and there, but as if you've
[34:52]
toured through the building, it's in
[34:53]
good shape. So, we don't expect there to
[34:55]
be a lot of changes that are necessary,
[34:57]
but we would be adding a card access
[34:59]
system to the building. And through our
[35:01]
conversations with code official, we
[35:03]
would need to provide uh handicap
[35:05]
actuators to uh any location where we
[35:08]
would have the public coming and going
[35:10]
from the building. Um, in this option
[35:13]
here, we're leaving the existing
[35:14]
training room on the east side, uh, as
[35:17]
is. Um, and adding a door near where
[35:21]
those bathrooms are. So, as it's being
[35:23]
used as a polling location with two
[35:25]
separate polling areas in there, uh,
[35:27]
having access to public bathrooms would
[35:29]
be important. So, adding another point
[35:32]
of security in that area would allow the
[35:34]
public to use those restrooms um, if
[35:37]
there is a need for that.
[35:40]
When we go to option two, uh we had some
[35:43]
conversations related to um usage of the
[35:48]
east training room versus the um
[35:51]
octagonal space. And we had some
[35:53]
conversations related to the the parking
[35:56]
lot on the north side, having more
[35:58]
parking available there. Would it be uh
[36:01]
possible to put the council chambers in
[36:04]
that training room and have it
[36:05]
completely separated from the rest of
[36:07]
the building? uh we would still provide
[36:09]
access to those public restrooms. That
[36:11]
would solve uh the need to provide two
[36:14]
bathrooms off the main lobby. Uh in this
[36:16]
version, we would only need one unisex
[36:18]
bathroom off of the main lobby. It would
[36:21]
retain the octagonal space as a training
[36:23]
room in future growth for the city. Uh
[36:26]
and the rest of it would remain the
[36:28]
same. It's just a different way of
[36:30]
looking at it. And that's one of the key
[36:32]
components that we would like to um get
[36:35]
feedback from the council uh tonight. So
[36:38]
I'll pause there before we go through
[36:40]
the um the current estimate for the
[36:44]
project and u look for any questions
[36:46]
from the council we would like to get
[36:49]
some consensus on which option that we
[36:51]
want to go with so that we can advance
[36:53]
the drawings to the next stage. Is the
[36:56]
yellow meaning construction or does
[36:59]
yellow mean something in particular?
[37:01]
» It's where we're doing the most
[37:02]
renovation. Yes.
[37:03]
» Okay.
[37:05]
And I guess more question for Josh. I I
[37:07]
was just surprised when I looked at this
[37:08]
that there aren't that many offices. Are
[37:11]
we still having
[37:14]
do we have enough
[37:16]
space for the individual staff members?
[37:19]
» Yes. So, if you were to count current
[37:21]
city hall staff members today, we have
[37:22]
about 12 people that work out of city
[37:24]
hall full-time. So, when you look at the
[37:27]
various spaces, there's the what amounts
[37:30]
to four kind of office environments. If
[37:33]
you make that one a council uh a
[37:35]
conference room, you the one, two, three
[37:38]
kind of as they go around the curve.
[37:39]
There's a larger space that could work
[37:41]
as an office. Um, right now we're kind
[37:44]
of viewing it more as like a supply
[37:45]
closet, copers, all the noisy stuff that
[37:49]
we deal with, a kind of a work room with
[37:50]
maybe a desk in there.
[37:52]
» Then there's another a fourth office
[37:54]
kind of across that little hallway there
[37:56]
then.
[37:56]
» And then you end up having um
[38:00]
kind of going south there, you've got a
[38:03]
large enough space that you can put four
[38:04]
or five kind of workstations in there.
[38:07]
And then in that front lobby area, the
[38:09]
staff that would are the most direct
[38:11]
with the public all of the time, there's
[38:13]
enough space for three or four
[38:14]
workstations kind of right up front
[38:16]
there um for those people that deal with
[38:18]
the counter on a consistent basis. So
[38:20]
you end up dealing with I guess roughly
[38:23]
that gives you
[38:25]
uh off top my head
[38:26]
» 13 14
[38:29]
» 13 spaces without really having to jam
[38:31]
people into spaces that don't make
[38:33]
sense. Um, like I said, then as you get
[38:35]
into it, I mean that that works that
[38:37]
work office space is large enough you
[38:40]
could fit desks in there in the future
[38:41]
if [clears throat] you have to.
[38:42]
» And then ultimately, as we kind of
[38:44]
talked through this whole process, um,
[38:46]
depending on which way you went, you
[38:47]
would have a space on one side that
[38:50]
would be able to be expanded into in the
[38:53]
future if you saw a staff staff
[38:55]
expansion, if that became something that
[38:57]
um, was a big need of the city at the
[38:59]
time. So when you walk in, are you
[39:02]
envision or am I to envision that
[39:05]
there's a person standing on that part
[39:08]
that's diagrammed as a wall
[39:10]
» Is as a service counter that would be
[39:12]
actually like a a built-in desk service
[39:15]
counter.
[39:16]
» But I Yeah. And I don't know at least we
[39:18]
talk it doesn't sound like there's
[39:20]
somebody working directly at the
[39:21]
counter.
[39:22]
» Yeah. To clarify we based on our
[39:24]
conversations we want the most
[39:25]
flexibility there. So staff would be
[39:27]
sitting at their workstation and then
[39:28]
whoever would walk up to the counter,
[39:30]
whether it's somebody to see the
[39:32]
building official, planning and zoning
[39:34]
question, a finance question, uh the
[39:36]
staff would come up to the counter to
[39:38]
service them. So it'd be more of a
[39:39]
standup work area uh on both sides.
[39:42]
» So it wouldn't be someone sitting there
[39:44]
then?
[39:45]
» No, not permanently. No.
[39:46]
» Okay. So otherwise the spacing didn't
[39:48]
seem to see seem right if you have four
[39:51]
three or four people behind a person
[39:54]
sitting at the front here. So those
[39:56]
those beige dashed things are intended
[39:58]
to be workstations for staff.
[40:01]
» Okay.
[40:03]
» So in my [clears throat] packet I see
[40:06]
the
[40:08]
um proposed budget for option one
[40:12]
» But not for option two and
[40:14]
[clears throat] the pages are
[40:15]
sequential.
[40:16]
» Correct.
[40:17]
» Um what would be the proposed budget for
[40:21]
option two? uh the because there is more
[40:24]
construction that's needed for option
[40:26]
two with adding a vestibule and um into
[40:30]
the council chambers and some of the
[40:32]
additional work that would be needed in
[40:33]
there. Uh our opinion is is that the
[40:35]
cost estimate is negligible between the
[40:37]
two of them. So council can make the
[40:39]
decision based on operationally what
[40:40]
works the best.
[40:42]
» I'm surprised by that because you're
[40:44]
eliminating a bathroom and that the
[40:46]
savings there is going to be eaten up by
[40:48]
the
[40:50]
» The training room. it's within, you
[40:53]
know, it's within5 to$10,000 between the
[40:56]
two of them. And we can certainly run a
[40:57]
detailed estimate on option two. Uh
[41:00]
tonight was to give you kind of an idea
[41:01]
where we're landing from, you know, kind
[41:03]
of the traditional putting the council
[41:05]
chambers in the octagonal space. Um and
[41:08]
once we kind of get that decision, we
[41:11]
can u finalize the details of what it's
[41:13]
going to take to do it and update it uh
[41:16]
at our next council update.
[41:19]
I guess in my opinion having the council
[41:22]
chambers in the octagonal
[41:24]
area makes more sense to me to keep that
[41:30]
training room open for expansion of
[41:33]
employees and perhaps more cubicles
[41:36]
um if needed in the future.
[41:42]
» I would agree with you Maggie.
[41:45]
[clears throat] That's a very large room
[41:47]
and it could have multiple uses.
[41:49]
» Correct. Yeah, it's a nice bit of
[41:51]
flexible space to have available.
[41:52]
» Yeah,
[41:53]
» I'm good with option one.
[41:55]
» Yeah, I also agree with Maggie's
[41:57]
statement, too. I think the the look
[42:00]
that that council chambers on option one
[42:04]
I think gives it
[42:06]
a unique look and I think that's
[42:11]
» We have access to the parking lot from
[42:15]
that public exit then
[42:17]
» Yeah if you look if you go back to the
[42:19]
site plan um there is a sidewalk that
[42:22]
leads to that side door so either coming
[42:25]
our thought was for council meeting
[42:28]
night, we would have the lobby, the main
[42:30]
lobby area be open, but also have the
[42:32]
ability to utilize the back parking
[42:33]
area.
[42:35]
» I Yeah, I mean, for all of this, I would
[42:37]
assume staff will always be parking up
[42:39]
in the north lot, kind of like we do
[42:40]
here now. Um, and then even if with you
[42:44]
guys with key cards to get in, whether
[42:46]
that's locked or not, you guys would
[42:47]
have access. So, if you wanted to park
[42:49]
them behind, too, you just have access
[42:51]
to that back door, leaving that front
[42:53]
lot open for any visitors. Is is there
[42:56]
one uh option that you feel provides
[42:58]
more value to the taxpayer than the
[43:01]
other?
[43:02]
» Initially
[43:04]
um there was some intrigue about the
[43:06]
training room because of its you know
[43:08]
location and that type of stuff but I
[43:10]
think from looking at kind of a more
[43:12]
traditional formal council venue. The
[43:15]
octagonal room kind of fits better for
[43:17]
that because as you can see you're
[43:18]
sitting at a desk with angles in it
[43:20]
already and so that room tends to to
[43:23]
lend itself to that. The only caveat is
[43:26]
it's got a lot of windows in it and so
[43:28]
um we just have to be able to control
[43:30]
daylighting and some of that type of
[43:32]
stuff in there. So, um if you want my
[43:36]
opinion on this, I think option one also
[43:38]
probably provides the best flexibility
[43:40]
in the future, but we wanted to at least
[43:42]
explore a couple of different ideas for
[43:43]
you.
[43:45]
» Yeah, I like option one. And um the
[43:47]
thing I don't like about it
[43:49]
» Is you're cornered in there. So there's
[43:51]
no escape
[43:53]
» Or
[43:53]
» If there was uh something going on with
[43:55]
the residents
[43:56]
» In option one.
[43:57]
» Yeah.
[43:58]
» Well, so there there is that staff exit.
[44:00]
And that's kind of why I know we talked
[44:02]
of where they're positioned and but how
[44:05]
you could potentially build that in a
[44:07]
way that that provides an exit if
[44:09]
needed.
[44:10]
» Yeah. That staff is there is that a
[44:13]
closet in in between
[44:16]
If you look to where the council would
[44:17]
be sitting,
[44:19]
» The the dark line, is that [snorts] just
[44:20]
like a half wall or?
[44:22]
» Yep, that's just a half wall. That's it
[44:24]
would be kind of like this ramp here,
[44:25]
but maybe with a more formal wall to
[44:28]
kind of blend it in.
[44:32]
» Uh, are most new buildings uh putting in
[44:36]
ballistic protection? Yes.
[44:38]
» Is that a pretty standard thing now? I
[44:41]
have since uh I don't know probably a
[44:44]
third of way my through my career uh
[44:46]
we've been putting ballistic material in
[44:49]
uh council desks to be able to give you
[44:51]
the ability to protect in place if
[44:53]
necessary
[44:54]
» And it's only in the desk then that this
[44:56]
would be in
[44:57]
» Y
[44:57]
» Nothing.
[44:58]
» We are proposing to put film on the
[45:01]
exterior windows to provide some level
[45:03]
of impact resistance to those existing
[45:06]
windows in there just because we have
[45:08]
such a large quantity of windows. Uh
[45:10]
certainly that's a budgetary decision
[45:12]
you can make, but it seemed prudent
[45:14]
based on how much glass is in there for
[45:16]
us to have some amount of impact
[45:18]
resistance to um council changes
[45:21]
» And that just and just for their sake
[45:23]
kind of talk there's different ways you
[45:25]
go about that. you could physically
[45:27]
replace the glass,
[45:29]
» Which was the much higher cost option.
[45:31]
And then similar to I'm assuming like
[45:33]
when you put the window tint on your
[45:35]
window, there's a film you can put over
[45:37]
it that just
[45:38]
» I guess probably like putting a
[45:39]
protector on your screen on your phone,
[45:41]
just provides a little bit more
[45:42]
resistance than what the glass provides.
[45:44]
» There's a lot of products that came
[45:46]
about with a lot of the school work that
[45:48]
we do that have transitioned into a lot
[45:50]
of our government projects as well, just
[45:53]
all the research that's been done out
[45:55]
there. So what we're trying to do is
[45:56]
just slow people down.
[45:58]
» Chief Applin, were you consulted in any
[46:01]
of this?
[46:04]
» Just at a high level, but I haven't been
[46:05]
a part of the conversations.
[46:07]
» No.
[46:08]
» Thank you.
[46:13]
» Is staff get ballistic material, too?
[46:15]
» Yes.
[46:15]
» Okay.
[46:16]
» Mhm.
[46:19]
» What are you saying?
[46:20]
» Just smile [laughter] at me.
[46:21]
» Just ask.
[46:23]
because I care about you.
[46:25]
[clears throat] Thank you.
[46:26]
» You'll be expected to wear a target on
[46:29]
yourself.
[46:30]
» So I I think Bruce, are you in thinking
[46:32]
option one is a better option? I I think
[46:36]
» The parking was the only concern I had
[46:38]
on that. But I think if you have access
[46:40]
to the back way,
[46:41]
» Yeah,
[46:41]
» That that's me. I
[46:44]
» So I assume that consensus is option
[46:46]
one.
[46:47]
» Yes, for me. Yes.
[46:48]
» Yes.
[46:50]
for me. But
[46:51]
» Yep, we will uh continue to build some
[46:54]
details around that. We would enjoy to
[46:56]
review with the council at a future date
[46:58]
the design of the dis and what that kind
[47:00]
of public facing piece would look like.
[47:03]
Um we should look at the budget a little
[47:05]
bit. Uh we did a little bit more
[47:06]
detailed budget uh on this based on um
[47:09]
our being on site and some of the design
[47:12]
work that we've done. Uh and right now
[47:14]
including a roughly about a $23,000
[47:18]
estimated contingency, we're at roughly
[47:20]
about $480,000 in construction. Now,
[47:23]
this assumes that a general contractor
[47:26]
is doing all of the work. There has been
[47:27]
some conversation about using city
[47:29]
resources to do that. We have not taken
[47:31]
that into consideration at this point in
[47:33]
time because literally we're just at the
[47:35]
point of finalizing the design and we
[47:37]
would just need to make sure that that
[47:38]
doesn't have overburden uh your other
[47:41]
staff people. But our intent would be to
[47:43]
come back with a recommendation on uh
[47:46]
how we would split that work scope out.
[47:48]
A couple of other things to note in here
[47:50]
that still need some uh additional work,
[47:54]
which is the technology uh budget. We've
[47:56]
established roughly about 115,000 as a
[47:59]
set aside budget for technology just
[48:01]
based on conversations. Um obviously we
[48:04]
would like to reuse uh what we have at
[48:06]
city hall right now. Um and so that may
[48:09]
have some impact on that as well as uh
[48:12]
this does include uh an updated card
[48:15]
access system for the building. So this
[48:17]
includes modification of doors to
[48:19]
provide for card readers and all of that
[48:22]
stuff is included uh in the budget. Uh
[48:24]
there's some miscellaneous site stuff
[48:26]
that will likely be done by the city for
[48:28]
parking lot lights and the sign out
[48:30]
there and then an overall u project
[48:33]
contingency for unknown. So, at at the
[48:36]
schematic design level that we're at,
[48:38]
it's it's critical to have some uh
[48:41]
contingencies in there. And as we go
[48:43]
through the next phase of construction
[48:45]
documents, we'll be working on uh kind
[48:48]
of the final engineering, figuring out
[48:50]
what things we uh can save on and then
[48:54]
bringing back a final recommendation to
[48:55]
council at a future meeting. One thing I
[48:58]
would like to note guys is when you look
[48:59]
at that technology budget um one of the
[49:01]
things that we are having to adapt
[49:04]
around is I guess you could currently
[49:06]
call city hall the brains of our city
[49:08]
operations. We have connected all of our
[49:09]
buildings with fiber and a lot of the
[49:12]
brains of the city are located here. So
[49:14]
we have to move those brains somewhere.
[49:16]
Um and this building uh fiber is about a
[49:19]
block and a half away. And so, um, part
[49:22]
of that technology budget is just
[49:24]
acquiring fiber and then working through
[49:26]
our own utility that can do the work to
[49:27]
run that fiber, um, over to the new city
[49:31]
hall location. So that way we have the
[49:33]
new building connected to the rest of
[49:34]
the hub. But also then working with, um,
[49:37]
Bruce and staff and just trying to
[49:39]
figure out the is would this location be
[49:41]
the best place for a new brains or
[49:43]
center of the city or are we better off
[49:45]
putting it in like the power plant or
[49:47]
that sort of thing. um hopefully trying
[49:50]
to eliminate maybe a need if in 30 40
[49:52]
years to have to move it again, but
[49:54]
that' just be conversations we have
[49:56]
internally.
[49:59]
» Well, Josh, when we walked through it
[50:01]
was going to be a couple of bathrooms
[50:02]
and we thought 200,000 and then it was
[50:04]
then we gave you a check for 650 and now
[50:07]
it's 760 and we're not even done yet.
[50:09]
» You didn't give me a check for anything.
[50:10]
Well, but we in our budget meeting you
[50:12]
asked for 650
[50:13]
» And that was where we I I guess we
[50:15]
working with Matt, him and I kind of
[50:17]
walked the building and we made a very
[50:18]
general guess as to what we thought it
[50:20]
would be. And so um
[50:23]
» Yeah and like I said that that was with
[50:26]
staff doing some work and as as John
[50:28]
mentioned this is uh all contractor work
[50:32]
at this point, contingencies built in,
[50:34]
that sort of thing. So, as we get
[50:36]
through this process, my hope is that
[50:37]
this will get narrowed down a little bit
[50:39]
um to a more realistic number. So,
[50:43]
» I guess I was asking for clarification
[50:45]
on that, too, because the number seems
[50:47]
more than what we talked about. And when
[50:50]
we talked about a $400,000 construction
[50:53]
budget, I'm not sure maybe we the when
[50:56]
we use that word, it might mean
[50:57]
something different for different
[50:59]
people. So, I'm not sure if that was
[51:00]
meant to mean the construction budget or
[51:03]
the direct construction scope, but in my
[51:06]
mind, 400,000 meant the whole
[51:08]
construction part of it.
[51:10]
» So, I'm not sure. Are we thinking of
[51:13]
trying to get that back down to what we
[51:15]
thought around that 600,000 number or
[51:17]
» I I mean that that's our hope obviously
[51:19]
and I think working through some of this
[51:20]
a lot of it even comes down to what what
[51:22]
do we need to do now? What can we do
[51:23]
later? Um some of it comes down to um so
[51:27]
uh and we're certainly aware this is
[51:29]
higher than what was anticipated. Uh but
[51:32]
this this is the scope that we've talked
[51:34]
about. Our intent is to continue talking
[51:36]
about it and figuring out if there are
[51:37]
some ways to to save. We haven't even
[51:40]
had our mechanical engineers out to the
[51:42]
building yet to try to figure out what
[51:44]
we can reuse, what needs to be modified.
[51:46]
So we have placeholders in the budget
[51:47]
for what we would expect for restrooms
[51:49]
and that type of stuff and ventilation
[51:51]
systems. And so as we go through the
[51:53]
next stage of design, we're going to do
[51:55]
that field verification and make sure
[51:56]
that we are looking to reuse what we can
[51:59]
in the building.
[52:02]
» Okay. So obviously you understand which
[52:06]
direction the council would like to go.
[52:08]
Uh what's the timeline then of the next
[52:11]
step, Russ?
[52:12]
» So we're early September. I think uh we
[52:15]
had proposed to be pretty well done with
[52:17]
the schematic design here in September.
[52:19]
So, we're on track right now for where
[52:21]
we would hope to be. I think we had
[52:22]
allowed a couple of months to do final
[52:24]
design documents. And so, I'll work with
[52:27]
Josh and staff to kind of finalize the
[52:29]
details on that. And we'll look to come
[52:31]
back to council probably some midpoint
[52:33]
in the next phase of design. So,
[52:35]
probably sometime in October
[52:37]
» To uh review kind of the final design of
[52:40]
the council chambers and we'll have an
[52:42]
updated estimate at that time. and we
[52:44]
expect to be done with the bidding
[52:46]
documents probably in that November time
[52:48]
frame sometime. So, we're still on track
[52:49]
to what we had expected at this point in
[52:51]
time.
[52:52]
» Okay. Any other questions?
[52:56]
» All right. Well, looks good. Thank you
[52:58]
very much.
[52:59]
» Well, thank you.
[53:00]
» Thank you.
[53:05]
» Next on the agenda is
[53:07]
ordinance for introduction. Is this a
[53:09]
first reading uh Ken of ordinance number
[53:11]
367? This would be the first reading.
[53:14]
So, I give you a little background. Um,
[53:16]
council will recall we did do some um
[53:19]
minor amendments to the unified
[53:21]
development code on July 6th that were
[53:24]
adopted. Um, those are some quick
[53:26]
changes we needed to make. Some
[53:29]
kind of more we'll say more important
[53:31]
and more critical amendments from when
[53:33]
we adopted that back in March that
[53:36]
[clears throat]
[53:37]
immediately. uh this next set of
[53:40]
amendments and we hope we've got uh most
[53:42]
of them subject to u one final item
[53:46]
we're bringing back to the planning
[53:47]
commission in September regarding solar
[53:50]
power but um planning commission did
[53:52]
review uh these changes in July and held
[53:55]
a public hearing at our August 26
[53:58]
meeting. We did not have any um public
[54:01]
comment received at that meeting on
[54:02]
August 26, but just wanted to go over uh
[54:05]
in general terms the uh changes that are
[54:09]
proposed. So number one um in the
[54:12]
unified development code wanted to
[54:14]
specifically call out that shipping
[54:16]
containers and storage containers are
[54:18]
not allowed as structures or permanent
[54:21]
buildings. Uh there's a set of concerns
[54:23]
and then also concerns meeting building
[54:26]
code. That was something that um just by
[54:29]
[clears throat] the fact that it wasn't
[54:30]
listed specifically as being uh allowed
[54:33]
that they were prohibited but we want to
[54:35]
make that clearer because we did have
[54:38]
some inquiries about that. Um so the
[54:41]
language he put together surveyed number
[54:43]
of the cities in the area what they were
[54:45]
using for that clarifying language that
[54:47]
is included in that [clears throat]
[54:49]
uh clarifying again language regarding
[54:52]
uh the city requirement building permits
[54:54]
for all solar systems and explicitly not
[54:56]
allowing ground mounted solar um again
[55:00]
the city code or the uh UDC does not
[55:03]
specifically allow these at this point
[55:06]
but we're just clarifying the language
[55:08]
that one you need a permit if put solar
[55:10]
panels on the road. And then number two,
[55:13]
uh, specifically listing that ground
[55:16]
mounted solar are not allowed that
[55:18]
inquiries. Well, ordinance doesn't say
[55:20]
they're not allowed. It's like, well, by
[55:24]
state statute, if you don't allow it, it
[55:27]
is prohibited. So, we're just clarify.
[55:30]
Uh, third one regarding parking vehicles
[55:33]
in uh front yard or even back or
[55:36]
sideyard or residential properties. Uh,
[55:39]
put that language in there. So, you
[55:40]
can't just park on the grass. We had uh
[55:43]
again some questions of people saying,
[55:45]
"Well, I don't have a passenger vehicle.
[55:48]
I have a commercial vehicle." So, we're
[55:51]
uh suggesting making the change saying
[55:53]
that any vehicle parked in the grass in
[55:55]
your front yard, side yard, rear yard is
[55:57]
not allowed unless it's on a paved area.
[56:00]
So, that's another change.
[56:04]
Um we do allow them in certain cases to
[56:06]
be on gravel I should note but this is
[56:09]
saying yeah improved but um this is
[56:12]
being changed so that you can't make the
[56:14]
argument that it's some commercial
[56:16]
vehicle that um you get an exception for
[56:20]
just know we're clarifying that you
[56:22]
can't park.
[56:24]
Uh fourth one uh regarding that uh
[56:28]
commercial industrial building that are
[56:30]
accessory. Um previously to the UDC
[56:33]
being adopted we didn't require any
[56:36]
design requirement requirements for
[56:38]
them. PL commission had quite a bit of
[56:40]
discussion about this uh following the
[56:42]
public hearing uh at the meeting in
[56:45]
August and there's kind of a list of
[56:47]
different things that they have to meet
[56:49]
from uh using varying colors, varying
[56:51]
roof lines, windows,
[56:54]
accents to the the garage door. Um and
[56:58]
the way the code was written, they had
[57:00]
to pick two of these criteria which
[57:01]
applied to principal buildings. We've
[57:04]
never intended that to apply to
[57:06]
accessory buildings. So planning
[57:07]
commission determined that they should
[57:09]
pick at least one of these aesthetic
[57:11]
requirements um that are kind of a menu
[57:14]
of options that they can pick. So that
[57:17]
was what the planning commission
[57:19]
one of the design elements that have to
[57:21]
be incorporated into your commercial or
[57:23]
industrial accessory buildings like a
[57:25]
shed or a garage.
[57:28]
Uh fifth one regarding decks. This is
[57:31]
another kind of clarifying item. U we've
[57:34]
had more and more people wanting to put
[57:35]
decks around uh pools that are in their
[57:38]
backyards. And the way we had UDC
[57:40]
written and even going back before we
[57:42]
did the big adoption and change back in
[57:44]
March, it was just that you couldn't
[57:46]
have a deck less than 20 ft from your
[57:49]
rear lot line that was intended for
[57:52]
attached decks u and for fire uh
[57:58]
separation purposes and and that type of
[58:00]
thing. With these detached decks, they
[58:03]
really are like an accessory building
[58:05]
and pools are already allowed to be
[58:06]
within uh 10 ft of a rear side lot line
[58:10]
anyway. Um and this was limiting people
[58:13]
to not have detached deck above ground
[58:17]
pool is really what this would
[58:20]
play with. This is saying that as long
[58:22]
as they're not attached to the home,
[58:24]
they just accessory structure setbacks
[58:27]
of basically 10 ft instead of
[58:30]
um wasn't an issue that comes up a ton,
[58:32]
but didn't make sense that a detached
[58:35]
deck should have the same setback
[58:37]
requirements as an attached one because
[58:39]
it didn't have the fire connection uh to
[58:42]
the principal structure. Main reason why
[58:45]
we wanted
[58:48]
and then uh finally we said multiple
[58:51]
references to zoning ordinance in the
[58:54]
UDC and I should have said other
[58:57]
sections of the UDC
[59:00]
zoning ordinance. So that was really
[59:02]
just kind of a clean up item. So believe
[59:05]
we have uh all the major items again
[59:07]
planning commission is going to hold a a
[59:09]
hearing on the the topic of solar again
[59:12]
um at their meeting on September 16th um
[59:14]
that's coming up next week. Um so that
[59:19]
will be kind of item I think of this
[59:21]
batch coming out of the uh the new UDC
[59:25]
that again was was initially the major
[59:28]
adoption was handled back in so it's
[59:31]
been working well um so far but we just
[59:33]
believe that there's some good
[59:35]
clarifying uh items uh that the planning
[59:38]
commission wanted to review and did make
[59:40]
the motion to move in front of you for
[59:42]
introduction here uh tonight at the
[59:44]
council level
[59:46]
» And what
[59:48]
issues are coming before the planning
[59:50]
commission with regards to solar.
[59:52]
» Um solar specifically, I think the issue
[59:56]
was we're actually not I shouldn't just
[59:58]
say solar also regarding alternative
[1:00:01]
energy systems. So like um windmills
[1:00:06]
and I think specifically Sean brought up
[1:00:08]
at the meeting, correct me if I'm wrong
[1:00:10]
Sean?
[1:00:10]
» No, you're right. There was once uh
[1:00:12]
particularly a case that came up in Oro
[1:00:15]
with a housemounted um wind
[1:00:18]
» Turbine
[1:00:18]
» Turbine that was noisy unsightly
[1:00:22]
um and in state statute we can't out
[1:00:25]
prohibit them but we can severely limit
[1:00:28]
where they're allowed. So that's what
[1:00:30]
we're going to be looking at commission
[1:00:32]
hearings. And that was a the whole house
[1:00:35]
fan type of deal.
[1:00:37]
» Uh just a I was rough mounted um
[1:00:40]
windmill.
[1:00:41]
» We had a lot of them in the city.
[1:00:43]
» What's that?
[1:00:44]
» We did a lot of them in the city.
[1:00:46]
» Yeah. And we're not saying we prohibit
[1:00:48]
them. We just wanted to put some some
[1:00:50]
guard rails up. So we we have been and
[1:00:52]
are continuing through this week to do
[1:00:54]
research on what other cities have for
[1:00:57]
um regulations for them because right
[1:00:58]
now we don't have any.
[1:01:02]
And mine was not even housebased. I
[1:01:04]
think the orno case was it was out in
[1:01:07]
the backyard, but it was 30 feet high.
[1:01:10]
It was huge. So,
[1:01:12]
» In the farm, huh?
[1:01:13]
» Yeah.
[1:01:14]
» So,
[1:01:15]
» I'm surprised. Don't we have uh
[1:01:17]
residents with shipping containers being
[1:01:19]
used right now as structures to store
[1:01:22]
things?
[1:01:23]
» You know, um I hope we don't because
[1:01:27]
» By the ordinance, we we do not allow
[1:01:29]
them. So, they have not been allowed and
[1:01:31]
we've never had anybody ask to put one
[1:01:32]
in the yard. So, if there are any,
[1:01:34]
they're legally placed.
[1:01:35]
» They're next to the chickens.
[1:01:36]
» Would people ask the coupe?
[1:01:39]
» Um, I don't know that everybody would
[1:01:40]
ask, but if we if we have seen one and
[1:01:42]
we have not at this point, we would
[1:01:44]
definitely address it.
[1:01:45]
» Maybe we should drive through the alleys
[1:01:46]
again.
[1:01:48]
» We definitely can do that. And if you
[1:01:50]
know of an area where we should look, be
[1:01:52]
happy to to hear that.
[1:01:53]
» No, no, no, no, [laughter]
[1:01:56]
» No. I think it is uh
[1:02:00]
I I think that's that's an area that can
[1:02:02]
be u
[1:02:04]
there might be some people that have
[1:02:06]
arguments about that one but
[1:02:09]
» Contentious
[1:02:10]
» Some of the structures that people store
[1:02:11]
stuff in
[1:02:13]
don't look as good as the storage
[1:02:15]
containers.
[1:02:19]
[clears throat]
[1:02:20]
[snorts]
[1:02:21]
» So any other questions?
[1:02:24]
If not, I guess I'll make a motion for
[1:02:27]
the first reading of ordinance number
[1:02:29]
367.
[1:02:31]
» I'll second.
[1:02:32]
» We got a second by Maggie Bass. There's
[1:02:34]
no other questions, comments. All in
[1:02:36]
favor say I.
[1:02:37]
» I.
[1:02:37]
» I. Any opposition? Okay. Passes.
[1:02:40]
» Thank you.
[1:02:41]
» We don't have any ordinance for
[1:02:42]
adoption. Next is a resolution dealing
[1:02:45]
with officially naming
[1:02:48]
the area where the pops
[1:02:52]
stage is being built. Is that correct?
[1:02:55]
» Correct. Um, so I think I'd given you an
[1:02:58]
update maybe a month and a half ago or
[1:03:00]
so. Um per the adopted policy for uh
[1:03:05]
park naming uh that we have uh council
[1:03:08]
adopted policy I should say had quite a
[1:03:11]
lengthy uh process that had to be
[1:03:13]
followed beginning with the um park
[1:03:15]
board and ultimately ending with the
[1:03:17]
park board [clears throat] uh to collect
[1:03:19]
names collect a public um comment period
[1:03:22]
and all the comments on the names that
[1:03:24]
we had solicited. So, we had six names
[1:03:26]
initially that were um solicited.
[1:03:28]
Milpond Commons, Central Park, D'vorox
[1:03:31]
Landing, Harmony Park, Milpond Park, and
[1:03:35]
I'm going to butcher this from Mavka
[1:03:38]
Park, which I believe is a park in the
[1:03:40]
Czech Republic um that were uh formally
[1:03:43]
submitted, and we had given the council
[1:03:45]
an update on those at that time. So, we
[1:03:47]
did have a public comment period that
[1:03:49]
had run for most of the summer, and that
[1:03:52]
wrapped up on August 10th. Uh the park
[1:03:54]
board did review uh the names and again
[1:03:57]
the comments that were on all the names.
[1:03:59]
I did include that information in the
[1:04:01]
packet here tonight for the city council
[1:04:03]
to consider. Uh but ultimately the the
[1:04:06]
park board did uh pass a recommendation
[1:04:09]
on to the council tonight to um utilize
[1:04:12]
the name of Mil Pond Commons for the
[1:04:14]
formal name of what we've uh temporarily
[1:04:17]
been calling city center where the pops
[1:04:19]
facility is located. So, I do have a
[1:04:23]
resolution in the packet tonight that
[1:04:25]
would uh establish the formal name of
[1:04:28]
Milon Commons for that property uh where
[1:04:32]
the
[1:04:32]
» Before you go into that part, can I ask
[1:04:34]
a question?
[1:04:34]
» Sure.
[1:04:35]
» Why did this come up?
[1:04:37]
» Why did it come up is because
[1:04:39]
» With the comments part at the end, it
[1:04:40]
almost sounds like there's an apartment
[1:04:41]
building right over there. So, that
[1:04:43]
actually did come up at the uh park
[1:04:45]
board meeting with Mil Pond Apartments.
[1:04:49]
And the common's idea was that it's not
[1:04:51]
just simply a uh park, but rather a park
[1:04:56]
with the surrounding development that
[1:04:58]
has not yet occurred on the north end of
[1:04:59]
the property with the council and the
[1:05:01]
concept plan and um all of that small
[1:05:04]
area planning that uh the park board and
[1:05:06]
the council did a few years back with
[1:05:08]
the comp plan that there could be future
[1:05:10]
development both north of Pops as well
[1:05:13]
as on the u adjacent to the railroad
[1:05:16]
tracks on the west side of u the gravel.
[1:05:19]
Third Avenue.
[1:05:19]
» Well, almost definitely the north north
[1:05:22]
end there is going to have to get
[1:05:23]
rebuilt up. Yep.
[1:05:24]
» I'm just saying that we could sell it
[1:05:27]
and everything like that and they could
[1:05:28]
put something anywhere they want there,
[1:05:30]
but
[1:05:31]
» We would be changing the name sooner or
[1:05:34]
later from Commons to something else.
[1:05:37]
» Yeah. And I I I think the the general
[1:05:39]
consensus and again with the public
[1:05:41]
comment was the Milon Commons.
[1:05:43]
Obviously, one of the other ones was
[1:05:44]
Milpond Park. So it wasn't a huge,
[1:05:49]
you know, outpouring of park versus
[1:05:52]
commons. Commons just had more comment
[1:05:55]
in the affirmative for that. And maybe
[1:05:57]
Maggie can shed some more light on
[1:05:59]
» It. Sounds like it was pretty common to
[1:06:00]
have a common.
[1:06:01]
» Yeah, Commons, I think, is is also known
[1:06:04]
as a gathering place. So, because I
[1:06:07]
think of the pops stadium, the storm
[1:06:10]
water pond, maybe a
[1:06:12]
a trail, and you know, some other
[1:06:15]
amenities. It's a place for people to
[1:06:17]
gather. So, it's just a a different use
[1:06:20]
of verbiage.
[1:06:22]
» I think you see it actually on you go
[1:06:24]
south of the border down to Mexico. When
[1:06:25]
you think like traditional
[1:06:27]
Mexican towns, a lot of have that common
[1:06:29]
square right in the middle, right?
[1:06:31]
Commons. Yeah. In this instance, I think
[1:06:33]
common is referring more to the public
[1:06:35]
gathering place open to everybody,
[1:06:38]
but
[1:06:39]
» I think park will kind of screw that
[1:06:42]
you're going to have park playground
[1:06:45]
equipment type there
[1:06:46]
» And I don't think
[1:06:47]
» There there may be but
[1:06:48]
» Maybe at some time but I don't think
[1:06:51]
that I mean growing up in New Prague
[1:06:54]
that was always the mill pond area
[1:06:56]
» Even when there was no pond but
[1:07:00]
I mean I'm you I think that's a a very
[1:07:04]
good option for a name. Um because we
[1:07:07]
are going to have kind some kind of a
[1:07:08]
pond, aren't we? A holding pond of some
[1:07:10]
sort on that end.
[1:07:11]
» We still hope that
[1:07:15]
» Are your buddies at deed having fun with
[1:07:17]
you or
[1:07:18]
» We're getting there.
[1:07:18]
» We're feel like we're this close.
[1:07:21]
» Yeah, we're this close in May.
[1:07:23]
» Isn't that the feeling Yeah. you had in
[1:07:24]
May? The same feeling.
[1:07:26]
» Every month we have
[1:07:27]
» We're not getting any farther away.
[1:07:28]
[laughter] We actually Yeah.
[1:07:31]
Well, now if we got a name, tell them,
[1:07:32]
"Hey, you got to put the pond there."
[1:07:38]
» Any other comments?
[1:07:44]
» Okay. If not, I guess I'll look for a
[1:07:45]
motion to approve resol resolution
[1:07:49]
CC-26-9-08-02.
[1:07:53]
» So moved.
[1:07:54]
» Officially naming mil pond comments. And
[1:07:57]
I got them
[1:07:58]
» A motion by Maggie Bass.
[1:08:01]
» I'll second it.
[1:08:02]
» Second by Rick Syler. If there's no
[1:08:04]
other comments, all in favor say I.
[1:08:07]
» I.
[1:08:08]
» Any opposition? All right, that's fair.
[1:08:10]
» I bet you we have to change that one of
[1:08:12]
these days.
[1:08:13]
» Well, go through the process again.
[1:08:15]
» There you go. Uh, there's no general
[1:08:18]
business. So, we're now at the
[1:08:19]
miscellaneous. Rick, do you have
[1:08:20]
anything?
[1:08:21]
» No.
[1:08:22]
» Bruce?
[1:08:23]
» No.
[1:08:25]
» Maggie? No.
[1:08:26]
» Sean.
[1:08:27]
» Um, just a question for Tim. Do we got
[1:08:30]
an open house date yet set?
[1:08:34]
» We are looking at
[1:08:38]
Give me one second.
[1:08:42]
October the 24th.
[1:08:44]
» Okay, great.
[1:08:45]
» So, we're doing our uh
[1:08:48]
we do our carving with the cops event.
[1:08:50]
» Oh.
[1:08:51]
» So, kind of jointly do that at the same
[1:08:54]
time. Perfect. Sounds great. Thank you.
[1:08:56]
» Yep. Well, we were just uh working on
[1:08:59]
the flyers today, so hopefully it'll be
[1:09:01]
out here by the end of the week. We can
[1:09:03]
start putting that out there.
[1:09:04]
» Okay, good. Thank you. That was it.
[1:09:06]
» No, that was it.
[1:09:07]
» Sean or Josh?
[1:09:08]
» Uh yes, real quick. Um, I had a talk
[1:09:12]
with the fire chief uh about their
[1:09:15]
pension fund and due to some wise
[1:09:17]
investments that fund has continued to
[1:09:19]
grow and so he wanted to sit down and
[1:09:21]
have a kind of a discussion to see if
[1:09:23]
there was possibility maybe of using
[1:09:24]
some of that funds. As you guys may
[1:09:26]
remember, the only way we can use that
[1:09:28]
funds is by disseminating it to
[1:09:29]
firefighters. So, I know in the past
[1:09:32]
generally the council has selected kind
[1:09:34]
of a subcommittee of two people and
[1:09:35]
myself to sit down um with the rural
[1:09:38]
board as well as um kind of the fire
[1:09:40]
board and kind of talk through that and
[1:09:42]
then bring back any sort of
[1:09:43]
recommendation to the council. And so
[1:09:45]
I'm just kind of wondering if the
[1:09:46]
council wants to go through that process
[1:09:47]
again. Um I think the last couple times
[1:09:51]
we've done it, it was the mayor and
[1:09:54]
Sean, wasn't it? And three of us. But um
[1:09:56]
just wanted to check with the council if
[1:09:58]
that's kind of process we wanted to go
[1:09:59]
through again. Um let me just uh trying
[1:10:03]
to understand how that works again. Is
[1:10:04]
that just transferring money into their
[1:10:07]
pension program?
[1:10:08]
» Yeah. So the way that works is cities do
[1:10:10]
it a few different ways. What we do is
[1:10:12]
we receive a fund. We receive basically
[1:10:16]
an amount from the state every year and
[1:10:18]
we as a city just act as a pass through
[1:10:19]
them to move that over into their
[1:10:21]
pension fund. And then when they leave
[1:10:24]
the uh service, whether it's like retire
[1:10:27]
or slightly early, I don't know the
[1:10:28]
exact payout schedules of it, they would
[1:10:30]
get a portion for serving within um the
[1:10:34]
fire department. And so a lot of times
[1:10:36]
when they retire with 20 years and their
[1:10:38]
full pension, they would then take a
[1:10:40]
lump sum of that. And so generally as we
[1:10:43]
um review this and part of it I think
[1:10:45]
they um we use uh
[1:10:49]
Shannon Brouso kind of looks over that
[1:10:52]
fund for them we make sure that that
[1:10:55]
fund can [snorts] hold or pay out
[1:10:57]
basically all of its current debts and
[1:10:59]
if for some reason that drops below 90%
[1:11:02]
which I believe it's happened once
[1:11:03]
hasn't it Sean were you hearing that
[1:11:04]
happen the first time
[1:11:05]
» And Chuck there was one time
[1:11:07]
» Um the city basically has to come up
[1:11:09]
with funds to catch up to that now
[1:11:13]
last couple times that fund is hitting
[1:11:15]
around 115% of being covered and the
[1:11:18]
city said okay there's only one thing we
[1:11:20]
can do with this it's not like we can
[1:11:21]
recoup it for ourselves like it goes out
[1:11:23]
to pay out these funds and so we said
[1:11:25]
okay we're going to up the amount of
[1:11:27]
retirement for the annual years of
[1:11:29]
service
[1:11:30]
» So what they're asking is if they can
[1:11:32]
increase our pension benefits
[1:11:34]
» Yep so right now they're saying our our
[1:11:36]
current fund balance is sitting at
[1:11:38]
whatever it is I I don't know the exact
[1:11:39]
number is there something we could do to
[1:11:41]
look at increasing the pension fund
[1:11:43]
benefits to use some of that fund
[1:11:45]
balance.
[1:11:45]
» Okay. So then and I'm not trying to make
[1:11:48]
a statement here or anything but just so
[1:11:50]
I understand the financial part of it.
[1:11:51]
So if we do that increase their benefits
[1:11:54]
then there's a greater risk that we
[1:11:55]
might fall short in the future.
[1:11:57]
» That is correct. That risk exists. I
[1:11:58]
know was it a couple years ago we
[1:12:00]
started putting away a little bit of
[1:12:01]
money at the end of each year when we
[1:12:03]
had revenue surpluses just to kind of
[1:12:05]
hold as a just in case too for that. But
[1:12:07]
yes, obviously as their benefit
[1:12:10]
increases, it does increase that risk,
[1:12:11]
which is why we then look at it and say,
[1:12:13]
"Okay, where is it sitting? What would
[1:12:16]
the market have to adjust to potentially
[1:12:18]
put us into that default risk?" That's
[1:12:20]
» So there's no automatic increase in
[1:12:22]
benefits each year.
[1:12:23]
» Correct.
[1:12:23]
» Is nothing.
[1:12:24]
» That is correct.
[1:12:26]
» Okay. So
[1:12:27]
» Yeah. Yeah. They basically get a benefit
[1:12:28]
based off of years of service and what
[1:12:30]
we have set the annual benefit at. And
[1:12:33]
often it goes two or three years before
[1:12:36]
we ever changing
[1:12:37]
» Without anything changing. So
[1:12:39]
» When was the last time we changed it?
[1:12:40]
Was it two years ago? Probably.
[1:12:41]
» I was going to say I I thought two, but
[1:12:44]
uh it could be as soon as or maybe it
[1:12:46]
was last year.
[1:12:46]
» It wasn't like No, because I mean Chuck
[1:12:48]
wasn't here. It was back when was so I
[1:12:51]
think it was two years ago.
[1:12:52]
» Okay.
[1:12:55]
» Yeah. I'd be in favor of changing it.
[1:12:57]
» Yeah. and not doing it dramatically, but
[1:13:00]
» And I think that you usually we change
[1:13:02]
if we go from like 3,000 to 3,300 or
[1:13:05]
like I said, I know we last few years we
[1:13:07]
put that analysis into it of okay, if we
[1:13:09]
do this, where does that put our fund
[1:13:11]
balance and what are our liabilities and
[1:13:13]
what would that market likely have to
[1:13:15]
change to affect and really affect the
[1:13:18]
city because at this point the city
[1:13:20]
doesn't put anything into that
[1:13:22]
» Where I know some budgeted to put
[1:13:25]
something in it. We started a few years
[1:13:26]
ago when it was fluctuating quite a bit
[1:13:29]
that we just to cover so we didn't have
[1:13:32]
some un
[1:13:32]
» So do you have it in this budget?
[1:13:35]
» Uh no. So yes. Yeah. So we have an so
[1:13:37]
yeah we've taken we get to the end of
[1:13:39]
the year and say oh we've got these
[1:13:40]
excess revenues from the year like and
[1:13:43]
we talk to the auditors and they tell us
[1:13:44]
a little bit of fund balance like that's
[1:13:46]
where we we designate some of that fund
[1:13:48]
balance just to set aside kind of like
[1:13:49]
we've also done for the aquatic center
[1:13:51]
in case for some reason.
[1:13:52]
» Right. But I thought for a few years we
[1:13:54]
actually budgeted an expense
[1:13:56]
» Just so we wouldn't have some huge swing
[1:13:58]
just in case.
[1:13:58]
» We don't do that anymore.
[1:13:59]
» We don't do that anymore.
[1:14:00]
» Okay.
[1:14:01]
» Okay.
[1:14:04]
» I think that housing I think if I
[1:14:06]
remember right it was like 60some
[1:14:08]
thousand that the city had to come up
[1:14:09]
with one time before you and I were on.
[1:14:12]
» Yeah.
[1:14:12]
» But during like the housing crisis when
[1:14:14]
everything
[1:14:15]
» Right end of 2008
[1:14:17]
» Or something. Yeah. There's only been
[1:14:19]
one year I think.
[1:14:22]
Yeah, I guess
[1:14:23]
» So. Oh, yeah. So, I guess would you
[1:14:25]
sorry the whole point of that
[1:14:26]
conversation, would you guys like to
[1:14:27]
kind of do that whole subcommittee thing
[1:14:28]
like we've done before? Like I said, I
[1:14:30]
know Sean sat on the last few ones at
[1:14:32]
least and has been the mayor, but if
[1:14:34]
you'd like a different makeup, we can
[1:14:35]
certainly do that, too. It's up to you
[1:14:36]
guys.
[1:14:37]
» I'd be happy to do it, but if somebody
[1:14:39]
else wants to do it, that's
[1:14:40]
» Happy to do it, too. If it's fine.
[1:14:42]
» It's just an hourlong meeting.
[1:14:43]
» I'd be happy for you guys to do it.
[1:14:45]
Well, then [laughter]
[1:14:47]
» And I I I guess if that's
[1:14:48]
» Second motion,
[1:14:49]
» If that's the case, I know some dates I
[1:14:51]
got kind of right off hand that would
[1:14:53]
work if kind of the 22nd, 24th, or 17th.
[1:14:57]
I guess I put those in the wrong order.
[1:14:59]
17th, 22nd, or 24th work here this month
[1:15:02]
at like six o'clock. So, I think it's a
[1:15:04]
Thursday, Tuesday, Thursday.
[1:15:07]
Be next Thursday or after that, Tuesday
[1:15:10]
or Thursday?
[1:15:11]
» I think Thursday probably works a little
[1:15:13]
better for me. I don't have my I left my
[1:15:15]
phone in my car so I don't
[1:15:16]
» So if I call you tomorrow Yeah.
[1:15:18]
» Just kind of confirm that.
[1:15:19]
» Sure. Okay.
[1:15:19]
» Yeah, that's fine.
[1:15:21]
» Oh, wait. You have golf on Thursday.
[1:15:23]
» Uh
[1:15:23]
» I can do Tuesday.
[1:15:25]
» The 17th is our last golf meet. League
[1:15:29]
meet day.
[1:15:30]
» League? Not your last golf day?
[1:15:32]
» Well, no, but
[1:15:34]
» Okay. I'll I'll call you guys tomorrow
[1:15:35]
and see if I can confirm something on
[1:15:36]
that.
[1:15:37]
» Okay. Anything else?
[1:15:38]
» That's all I had.
[1:15:39]
» Ken, do you have anything? Robin,
[1:15:42]
Kim,
[1:15:50]
» I did want to share a little
[1:15:51]
information. Um, well, I feel like
[1:15:53]
there's so much
[1:15:55]
negative
[1:15:57]
stuff in the world, social media,
[1:15:59]
newspaper, everything. I wanted to share
[1:16:01]
a little bit of positive stuff about the
[1:16:02]
our community. Um, the last three weeks,
[1:16:05]
uh, hopefully I'm not stealing your
[1:16:06]
thunder, Chuck, but the last three
[1:16:08]
weeks, uh, New Prague held the state
[1:16:10]
amateur baseball tournament. Um, while I
[1:16:13]
made, uh, while I was there a lot, I
[1:16:15]
only made one game, but it I couldn't be
[1:16:17]
more impressed with this community. Um,
[1:16:20]
there is talking to Nick Shenker, he was
[1:16:22]
one of the one of the main guys that
[1:16:24]
helped get that tournament here,
[1:16:26]
including many. Uh Chuck was part of
[1:16:27]
that board and everything, but um
[1:16:29]
there's 29,000 people that attended uh
[1:16:32]
all the games through four uh four
[1:16:34]
venues, three main venues with the
[1:16:36]
fourth one. Uh New Prague had the
[1:16:38]
highest attendance at uh over 9,313 paid
[1:16:42]
attendance. Um
[1:16:45]
these events do not take place without
[1:16:47]
hundreds and hundreds of volunteers
[1:16:49]
throughout the three weeks. And I'm not
[1:16:50]
joking. It's hundreds and hundreds of
[1:16:52]
people that uh volunteer their time. Um,
[1:16:56]
city staff spends a lot of time on that
[1:16:58]
field. We are extremely proud of that
[1:17:00]
field. Uh, the big renovations that took
[1:17:02]
place 10 years ago. We were so excited
[1:17:05]
when we see all these people come into
[1:17:06]
our community to get to see our field.
[1:17:08]
Um, I heard nothing but great
[1:17:10]
compliments of how great the field
[1:17:12]
conditions were, how great this
[1:17:14]
community is, and how do you get so many
[1:17:16]
volunteers that are all happy just
[1:17:19]
willing to help and uh just make it a
[1:17:22]
better event. Um, I just I really cannot
[1:17:26]
express how excited I was. Someone
[1:17:28]
that's born and raised in New Prague,
[1:17:30]
New Prague means the world to me. Um,
[1:17:32]
just seeing everybody come together and
[1:17:33]
make this vent, this event, I would
[1:17:36]
argue one of the best events. Um, I
[1:17:39]
think a lot of the people I talked to
[1:17:41]
would say the same thing. So, one, I
[1:17:43]
want to thank all those people that did
[1:17:44]
that uh, volunteer their time. I want to
[1:17:46]
thank my staff for all the time they put
[1:17:48]
into that field. Um,
[1:17:51]
a lot of time, a lot of money has
[1:17:53]
obviously been put into that field. Uh,
[1:17:55]
a lot of money that, uh, this tournament
[1:17:58]
raises to put back into that field. Um,
[1:18:01]
really every dollar they make goes back
[1:18:03]
into that field and it gets lets us do a
[1:18:05]
lot of the projects we've done. So, I
[1:18:08]
really just want to thank everybody in
[1:18:09]
the community, staff. Um, it was an
[1:18:12]
amazing event. and uh coming down hole
[1:18:16]
18 on Sunday when the class B tournament
[1:18:18]
was. I thought they were all cheering
[1:18:19]
for me, but then I realized they
[1:18:20]
weren't. Um but it was really
[1:18:23]
impressive. That's all I wanted to say.
[1:18:24]
Thank you uh to Chuck, everybody that
[1:18:26]
volunteered, if any of you guys did. Um
[1:18:29]
it was I know I'm rambling on, but it
[1:18:31]
was a very special event. So, I just
[1:18:32]
wanted to say that.
[1:18:33]
» And we all thank you guys because I
[1:18:35]
heard that you did a lot of work on this
[1:18:37]
too, Chuck. So,
[1:18:38]
» Yeah. No, I to reiterate that. I mean, I
[1:18:41]
think we had a lot of positive feedback
[1:18:44]
from people who've never heard of New
[1:18:46]
Prague, uh, because we had a lot of
[1:18:49]
class C games, which they came two or
[1:18:51]
three hours, they drove like a New York
[1:18:54]
Mills and and, uh, Buffington and all
[1:18:57]
this stuff and they come in and they
[1:18:58]
were not only impressed with the ball
[1:19:01]
field, but the community as a whole. And
[1:19:04]
uh I I think it really showcases that we
[1:19:07]
uh are doing the right things in this
[1:19:10]
community and uh we got great workers.
[1:19:13]
Matt, your people did a great job and
[1:19:15]
the board was impressed. I know we did
[1:19:17]
it in 2018, we broke a record also and
[1:19:21]
this record that we broke uh stood since
[1:19:24]
1961.
[1:19:26]
So uh we got to be very proud of of what
[1:19:28]
we did. And you are right. Uh the
[1:19:30]
volunteers and there's people Johnny was
[1:19:33]
there two or three times and and other
[1:19:35]
people that you know they they would
[1:19:37]
look on sign up genius and they they
[1:19:39]
didn't care if they were there six
[1:19:40]
hours. They would sign up for different
[1:19:42]
shifts if there was gaps in it and we're
[1:19:44]
very fortunate to that. So
[1:19:48]
all right Mitch, you got anything?
[1:19:51]
Patrick?
[1:19:54]
I don't have anything. So I guess I'll
[1:19:56]
make a motion to adjurnn.
[1:19:59]
Second.