[0:02] Soit. Pendant des élections, depuis le mois de avril, en tout écouter,
[0:15] les questions concernant, le système de l'eau au point clare, les non-dation, qu'est-ce qu'on peut faire? Il y a beaucoup moins ici aujourd'hui qu'il y a eu des troubles amazing, et d'autre qu'il y a pas eu des troubles, mais il veut savoir qu'est-ce qu'il se passe?
[0:27] Les décevoir, c'est vraiment de travailler, je ne sais pas si c'est de la bonne plancée,
[0:33] de travailler à marche.
[0:35] Quand j'étais élu, au mois de novembre, mon premier chose est de demander,
[0:39] c'est d'avoir un rapport de où on a l'endue, avec des situations
[0:43] et des solutions pour les non-dations.
[0:46] Puis, à la kept, ici, il y a plus d'un présentation.
[0:49] Puis, j'étais vraiment impressionné avec toutes les travaux
[0:53] qu'il y a fait de lui, le très juillet, l'année passée.
[0:59] Non, le neuf ou l'année passée.
[1:01] Il y a vraiment travaillé beaucoup sur nos systèmes de l'Igu,
[1:04] puis le drainage, puis tout, mais il ne s'est pas quelque chose
[1:07] que je l'ai en peut prolonger pendant une semaine, une idée,
[1:11] il y a beaucoup de dovrages, il y a beaucoup de éteux d'affaires,
[1:15] il y a beaucoup de travail à faire, puis il y a beaucoup de l'argent à dépenser.
[1:17] c'est une idée que vous allez vous donner à un petit débat,
[1:22] que nous sommes en train de faire des choses,
[1:25] ils ont des solutions, ils ont des choses,
[1:28] ils ont des températions, ils ont fait des questions,
[1:32] ils ont été utilisées, et ils ont une autre histoire de l'art.
[1:35] Je vais vous abonner,
[1:37] je pense que le plus de la question,
[1:41] c'est tout à fait pour tout le monde.
[1:41] Je pense que je vais dire que les questions sont aussi
[1:43] et que les questions n'ont pas la answer,
[1:47] Quand il a beaucoup de personnes en la même chose, il a beaucoup de personnes en place de leurs hommes,
[1:50] dans les plus plus de personnes en place de leurs femmes, c'est de plus le plus le plus de personnes dans les femmes,
[1:55] qui sont moins d'un ou moins de évoil de la solution.
[1:57] Et non, il a beaucoup d'autres personnes qui ont des livres.
[2:00] Donc, il nous a beaucoup de personnes qui ont l'air.
[2:02] Là, nous sommes les mêmes comptes.
[2:04] Et donc on a beaucoup de solutions qui ont l'air d'hiver dans des places de l'air d'air,
[2:10] on a beaucoup de choses qui ont l'air d'hiver dans un type de
[2:10] dispositif et à la fin au temps,
[2:13] et on va nous faire faire des effets d'aujourd'hui, on va nous faire
[2:17] et restez des délication.
[2:18] Le truc, ce n'est pas la première fois dans tous les jours.
[2:21] Et je pense que c'est ça que je réfléchis.
[2:23] Je pense que ça n'est pas la nouvelle réunesse.
[2:27] Je vais me trouver une autre chose pour se mettre.
[2:30] Pour l'évalent, je vais sortir d'un autre tres,
[2:33] je vais passer toute l'air.
[2:35] Ce sont les dés nichels au bout,
[2:36] les délication.
[2:37] Une vert fel,
[3:09] on a un peu fait une autre passée, mais les résidences il faut qu'il fait de la passée,
[3:15] il faut qu'on travaille ensemble, c'est pas une solution, c'est pas de sa forte, une personne,
[3:20] c'est, c'est vraiment un travail d'équipe, c'est-à-dire que j'avais pas de micro, Mr. Agéoisle,
[3:26] puis bonsoir, bien merci beaucoup.
[3:30] D'accord, Mr. Mayor, bonsoir à tous, bienvenue à cette session des formations,
[4:04] Nous sommes à l'école d'existivité et nous allons présenter aussi le directeur d'engineering
[4:10] Monsieur Benoit-Philio, le directeur de Public Works, Mr. Eric Hala, et le directeur de ISP,
[4:17] le public security inspection, Mr. Mark Tongue.
[4:22] Donc, throughout this presentation,
[4:24] basically, we'll be providing information with respect to,
[4:27] as Mr. Merit mentioned, what's ongoing, what's current,
[4:41] et ce qui est en
[4:45] dans tous les années, en 2024, dans les années 2025, nous avons un peu d'un peu de récap,
[4:51] mais avec respect de notre
[4:54] une
[4:55] de managers de pares.
[4:56] Nous allons avoir des détails avec respect 2,26,
[5:01] et un projet de management.
[5:05] Donc, vous allez avoir un projet de
[5:37] présentement de cette même
[5:37] et étudiant que ce n'est pas possible à faire,
[5:41] ce n'est pas possible à faire.
[5:43] Et je peux dire que j'en ai
[5:45] et de diversité de l'utilité de résilience.
[5:48] Ces steps on va être identifiées à la psychologie.
[5:51] Alors tous les centres de plus plus forts sont mises et de plus les
[5:56] sont bien plus plus de plus de plus de plus d'interpréhension.
[5:59] Je vais te mettre pour la vidéo que nous étions à la psychologie.
[6:03] A la psychologie est à la psychologie de plus de plus de plus de plus de plus d'interpréhension.
[6:07] Il y a beaucoup d'interpréhension avec plus de plus de plus de plus de plus de plus de plus d'interpréhension.
[6:15] Et des déiclètes travaillent au cours de l'artier des résilience.
[6:23] Donc, on commence à enlever des déclices d'exempleurs, avec respect pour des initiatives.
[6:29] Ainsi, la main d'exempleure cette fois-ci a été
[6:33] avec respect de l'adresseur de l'adresseur de l'artier.
[6:36] On y va en offrir un collaberé en un éclat d'expert
[6:40] et de l'adresseur, et on va y aller,
[7:04] on va
[7:06] sur le 2024, la Storm Water Management Plan et l'Allet m'acollique Ben-Wah,
[7:12] a prévudu les détails et les objectifs de la Storm Management Plan dans la présentation.
[7:18] Mais, en un nutshell, un impliqué de notre modelisation,
[7:22] simulations, avec le climat variable que nous voulons,
[7:26] c'est bien sûr.
[7:28] C'est bien sûr.
[7:30] Certified, the risk areas throughout the territory, and essentially pinpoint what are our most
[7:37] optimal interventions to be done on the territory of the city of point clear.
[7:44] We've seen the consequences of in 2026, and since the premise of these studies have generated
[7:52] a major project in 2026, once again, and my colleague will go through in the following slides.
[8:00] Development number two prevention and intervention.
[8:05] This is important.
[8:07] So in essence, proactive weather monitoring, which is done by our teams at public works, by our teams at public security, as well as communication, and deploying our employees,
[8:20] from these services, proactively throughout the territory and ensure that our network will function.
[8:26] It also includes continuous maintenance to ensure that our network is free of debris,
[8:33] a loss and certainly not lease.
[8:35] It implicates integrating within our major capital investment projects,
[8:42] so I'm storm water management initiatives.
[8:44] Two of which were introduced in 2025.
[8:48] So when we, in essence, worked on the infrastructure project
[8:53] a winter off avenue, we introduced a bio swell, small little project, but in essence the
[8:59] intent varies to retain the water preventing it from flowing to our network. Same thing
[9:05] with Algan Park, our retention area was created in 2025. So it was the accumulation of these
[9:11] steps and the integration of these projects over time that will help increase our overall resilience.
[9:23] intervention area number three structure support. So the previous two intervention areas you saw were with respect mostly to the public domain.
[9:32] This one pertains to the private domain. So how do we support use citizens?
[9:37] The one undertake some initiatives within your own personal dwellings are pieces aligned with respect to storm water management.
[9:43] So as such, in 2026, you'll see the adoption of a Baila that allows us to present a financing
[9:52] program subsidy program with respect to interventions that can be made on the private domain.
[9:59] In addition to this, we're also revisiting our construction Baila and I'll go in detail
[10:05] in the next slides with respect to this, but essentially
[10:11] it's with respect to the orientations
[10:14] in principles that are put forth by organizations like
[10:19] abstracts or smartphones that I get back, that are geared towards making our
[10:23] buildings more resilient, our environments more resilient to climate change.
[10:31] And last but certainly not least is we've created an emergency measures web
[10:36] page which will be launched as well in 2022 and a guide that will have a
[10:41] section on heavy rainfall episodes identifying
[10:45] what needs to be done before during and after
[10:48] those heavy rainfall events and what are some of the risks
[10:52] that are involved there in.
[10:58] Development area number four communication and I can't stress the
[11:01] important is this for us within the community.
[11:06] So the importance of communicating regularly with all of you
[11:09] with respect to our own initiatives and also what can be done
[11:13] throughout the territory on the private domain.
[11:16] That's why we plan future conferences on the matter
[11:19] in 2026, you'll see those deployed throughout the year,
[11:23] as well as a website web page that is
[11:26] that will be dedicated to storm water management.
[11:30] We also encourage citizens to be insight them
[11:34] to essentially register to our automatic alert system as well
[11:38] to be alerted when we feel that it could be a heavy rainfall
[11:43] episode. So these are all steps that we deployed and taken as well in 2026.
[11:50] Now I'd
[11:50] mention at the beginning that we've collaborated with many entities, some of them that
[11:57] are here. We've also been able to get some feedback from perhaps some of you that are present
[12:04] today with respect to your experiences, what you've lived through the past two years and it
[12:11] It hasn't gone in vain, it has had an impact on the conceptualization of one of our major projects, and we'll get into that in the next slide as well.
[12:24] So this is just a little bit of a snapshot. It's not the entirety of the web page, but you'll have sections that will explain what's done in a preventative matter in terms of maintenance.
[12:34] This will be communicated once again in 2026 launch by our communications team.
[12:41] What the ins and out of our storm water management plan is, as well as a project that
[12:47] will be undertaken throughout the territory and our past projects as well.
[12:52] And how to stay informed with respect to this topic.
[12:59] Now, this is a bit of a recap.
[13:01] So here you have some of the entities that we've been collaborating with.
[13:05] So our chefs are not full-cycabec has created a reference to the eye.
[13:10] I strongly encourage you to go seek out on their website.
[13:13] It's a reference guide that essentially promotes adaptation measures
[13:18] that can be done on the private domain.
[13:20] We'll have a conference on this in 2026 for citizens of Point Claire.
[13:25] But this content will influence the revision of our bylaws.
[13:29] In order to make our bylaws more adaptable to the orientations and principles therein.
[13:35] In addition to this, we've been collaborating with the City of Montreal, which has spawned
[13:40] basically the subsidy program that you'll see launched as well in 2026, and with respect
[13:45] to private domain interventions.
[13:49] A powerful Rocks Bowl, Rocksboro, we essentially exchange with them based on their experience
[13:54] and fortunate experience that the episodes, the flooding episodes that they've lived over
[13:59] the past decades, and see whether or not there's some equipment that could be adapted
[14:04] for heavy rainfall episodes. This is this analysis is still ongoing.
[14:10] The College of Technology spare youts get back. Mr. Fidel will get into that detail
[14:15] but they're basically the individuals that are working on a stormwater management plan
[14:20] and the type of interventions that could be done on the public domain in a short
[14:25] medium and long-term. It works more optimal to intervene and last was certainly not
[14:32] We've got equiabitasyon kebek, as I said, kebek, kwaozef, totechnology, GFSA.
[14:38] This is in supplement of the subsidy program we're looking at, perhaps, having a turnkey solution
[14:46] for individuals that want to introduce a ring garden within their land.
[14:51] So they come in, they evaluate basically your context and see whether or not it's a feasible solution
[14:58] to read a rep.
[15:00] Water away from the network. Once again, it would be a turnkey solution, so we're working on that, and to
[15:07] introduce that with the subsidy program. Same concept with echo evitation, Quebec or GFA, they come in and
[15:13] basically evaluate your dwelling to see what type of measures in your particular context,
[15:19] because every context is different. So what is the best measure for you to protect your house
[15:25] I guess these unfortunate events.
[15:27] So once again, these details will be deployed in 2026.
[15:35] So on that note, I'll pass on the presentation
[15:37] to my colleague that I'll go a little bit more
[15:40] into the prevention intervention session.
[15:47] Thank you.
[15:47] Thank you.
[15:48] As Jill mentioned, I'm Eric Rolla,
[15:50] I'm the Director of Public Works in Buildings for the City.
[15:54] Have you ever thought of working
[15:56] at the time of the Contamna County in Arizona,
[15:59] And we want to know how to work with this state in the field.
[16:02] So the first thing to do is to understand how much we work with this state.
[16:09] We can see that we have a discrete number of rows.
[16:13] And we need a total number of rows as well.
[16:15] This number is 70,000,000,000,000,000,000,000,000,000,000.
[16:29] the points of entry, are direct connections to the residence in the
[16:34] office in the ministry. So it's the conduit that is
[16:37] protected directly from your home, which will directly
[16:41] in the network. The types of contaminants, it's
[16:45] made of commercial chemistry, so often there are a lot of
[16:49] sites in the middle, there's no way out of the gray, there's
[16:51] things that will stick to the conduit that we tend to rest
[16:53] in the conduit. And by the way, it's a bit succumbed with
[16:57] So, in a second, you are a cyclist who has been doing this for years.
[17:03] We have learned some different sections.
[17:05] We learned a section of the city of Paradise.
[17:07] And we have made the years of finally explanations...
[17:12] a new journey about Edwin, a new project that has been done on the island,
[17:16] surrounded by the desert, of Sanitaria.
[17:20] For the most often, it is like, like, to spread,
[17:23] without looking in thealtry moments...
[17:24] Because I'm talking about the most of our lives.
[17:26] We are, we are in Pomp.
[17:27] We are in Pomp, which may be a new month.
[17:30] It's a major part of the O-Pro.
[17:32] We are the most part of the O-Pro.
[17:35] And we are also in Fosse.
[17:38] In terms of contaminants, we are also in Pomp.
[17:41] It's the O-Pro.
[17:42] Then we are in the O-Pro.
[17:44] The O-Pro is the O-Pro.
[17:44] There is the O-Pro.
[17:44] In fact, and the O-Pro is the O-Pro.
[17:47] We are in the O-Pro, and the O-Pro is the O-Pro.
[17:49] The O-Pro, because we are in the O-Pro.
[17:54] in a political way, a political way, a political way in a number of abrasives.
[18:00] So normally, in the majority of the villages, there is a abrasive that is used in the
[18:04] river to go with the ice, so the ice, or the salt, or the salt, and it's in the
[18:10] way that we don't have a transport, and it's not in the rivers, so we don't have a
[18:15] debris in the river, which is a good effort.
[18:17] If you're wondering, you don't have a cyclone, but it's not a cyclone, it's not a cyclone.
[18:24] And also naturally, but with the falsets, there are a lot of branches of the fire that can be
[18:29] marked in the air, in the air, in the air, in the air, in the air, in the air, in the air,
[18:34] especially those that are passing through, in the air, like the falsets that are passing through,
[18:39] in the air, in the air, in the air.
[18:41] So for Jerry, it's a very good thing.
[18:45] It's just a very positive work to come back to the end.
[18:47] We are going to go back to the corner of the school.
[18:52] We are going to start with the average neighborhood by this stardom.
[18:55] They are all at that level, to become the one above the street.
[18:58] And also to become the last school.
[19:05] We also go to the school, and become the first school, because the others are able to solve the problem.
[19:11] We are going to come to the field.
[19:13] There's a lot of people who are more beautiful than we are.
[19:15] So, everything is flat and a lot of people are already in the background.
[19:18] So, it is basically a systematic way, only one man's room,
[19:20] one is a man.
[19:21] There is a person of the most beautiful place in the black sky.
[19:25] The black sky is very nice.
[19:26] The blue sky is the most beautiful in the black sky.
[19:29] So, all the black sky, especially the black sky.
[19:31] The black sky is the white sky.
[19:32] The black sky is the white sky.
[19:36] So, it's called a symbol of a century.
[19:38] It's a symbol of a century.
[19:39] There's a symbol of a century.
[19:43] can be treated more easily directly in the system of the vaccine.
[19:48] And so, it's in real time, and it's the end of an inspection,
[19:53] and it's a work of the conduit.
[19:57] But in the next months, we have also mentioned the suicide process,
[20:00] which we can offer in the West, from the Bronx,
[20:02] which is known for the crime of the treatment of a treatment,
[20:04] which is mostly a lot to do, and therefore I'm going to take into account the suicide process,
[20:08] and it's transported by us to the conduit.
[20:11] But in fact, in a foreign language, in a foreign language.
[20:15] In all of it, that's what the United States or the United States
[20:18] is, if we detect, we suspect there's a blockage
[20:21] that's what we're going to do, and we're going to do it in a foreign language.
[20:26] I mean, there's a big example of that.
[20:28] We're going to find out, in a foreign language,
[20:30] who works at the C&N and the C-P.
[20:33] We detect that there's a blockage part of that kind of thing.
[20:37] But in fact, we're going to work with the C&N and the C-P.
[20:40] I'm just going to put the word for the word to assure the good
[20:44] function of our network, but it's an example for me.
[20:51] Plans are also in the field, so we know that there's a lot of
[20:56] it's good that the principle of the field is always the same, we don't know
[21:02] what we're talking about, we don't know what we're talking about, we don't know what
[21:08] we're talking about, we don't know what we're talking about, we don't know what
[21:13] So we have the preparation of the countries,
[21:15] which we are going to receive from the contaminants.
[21:17] So the United States, the forces, especially.
[21:19] The preparation of the countries,
[21:21] in certain countries, we are going to say,
[21:22] that we need to be in the country or in the country
[21:24] in the direction of which we are going to come from.
[21:27] And also the preparation of the states,
[21:29] so in the same way that the United States,
[21:31] the preparation of the states,
[21:33] but the government must also protect
[21:35] the assets of the government,
[21:37] to make a preparation of consequences
[21:38] to minimize the potential damage.
[21:40] and also, well, we're going to discuss the economic and the personnel.
[21:48] During the time period, because we're talking about the surveillance, the surveillance,
[21:52] debates, and the intelligence agencies, if it's necessary.
[21:59] And finally, we're going to talk about our own science, and we're going to talk about the
[22:04] development of libraries that we're going to bring in certain sectors.
[22:07] We're going to have some inspection and a three-inch consequence.
[22:13] It's a fact that we're going to do a new project, but we're going to do a new project, but we're going to do a new project,
[22:18] and then we're going to take a look at the LESP project.
[22:27] I could say the English if you'd like. I'll go.
[22:30] All right, I'll go quick. All right, no problem. Sorry, we would go back and forth. So no problem. In terms of the senate, so city point clear, we have two, we have two networks. We have a sanitary network and we have a stormwater network. Two separate networks entirely. So for each of these networks, there are entry points, there are contaminants, and there's maintenance that we do according to each, to each separate network. On the sanitary side, we have direct connection.
[23:00] from homes, industries and businesses, these connections come directly, they're piped in straight from the home right into the conduit.
[23:11] So there's no exterior contaminants that can come in, they're just the ones that come from the home.
[23:15] But from the home, there's often residue, there's debris, it can be greasy.
[23:21] These things have a tendency to stick to the pipe and make it necessary to come to a cleaning at some point.
[23:27] So, for these contaminants, what we do for the cleaning is we come and we do a cyclical cleaning of the city.
[23:33] So we do certain sections of the conduits per year and over the course of three or four years, we will have done an entire cleaning of the entire network from head to toe.
[23:45] On the storm water side, it's a little different. Our entry points are some pumps, cash basins and ditches.
[23:52] contaminants, well, the contaminants that come in from the pump side, or our clean, it's clean water that's filtered that comes from the napkinetic.
[24:01] We have, but we, on the, but we also have leaves and branches and a lot of debris from the road.
[24:07] One thing in point clear, in the winter, we have a policy where we don't use abrasives.
[24:13] So, no sand and no stone to control ice, it's only salt.
[24:20] There's pros and cons to this, but one of the pros is that we don't end up with those contaminants in our network,
[24:27] because obviously those will drain out and end up in the catch basins.
[24:31] The type of cleaning that we do in order to combat this, to respond to these contaminants,
[24:36] as well first of all we do the street cleaning, which we carry out all through the summer months,
[24:41] in order to clean the debris off the road and also to clean the debris that accumulates
[24:46] over the cache-based ingrills. Also, the cache-based ingrills are built with a reservoir
[24:53] at the bottom. There's a drop so that everything that ends up in the cache-based and
[24:58] sinks will end up at the bottom and will stay there. So we have a cyclical program where
[25:03] we come and we will clean these cache-based, we do a certain amount of year, over about
[25:10] through for your period, we will cycle through all of them and they're all cleaned up and we continue,
[25:15] we repeat the cycle.
[25:17] The next point where we have contaminants that can enter the network is our ditches.
[25:23] Ditches, especially the ones that will run through forests like Terracotta, those can bring
[25:27] debris directly into the conduits, especially in some areas we have to either remove the grill or
[25:33] to it and so that it doesn't get blocked during an event.
[25:36] So, in these locations, after a storm, when we know we're going to have to inspect how we're going to have to clean,
[25:42] a lot of debris will end up in the network and carried out.
[25:45] Some get carried out to the lake, but some doesn't, and so we carry out a cleaning after.
[25:51] In all these cases, with feathers, they blockage, that is suspected or detected.
[25:56] We will go on, we will carry out an inspection, and do the necessary cleaning in both networks.
[26:01] And a good example of this is the the the pipe that runs across CNCP. It's a CNCP pipe
[26:08] but it's part of our network and we detected a partial blockage of it. And so we've been working with CNCP in order to
[26:15] Unblock this pipe to ensure that our network flows as best as possible. When it comes to heavy rainfall intervention plans
[26:25] We have activities that are done before during and after in order to ensure proper management of the event
[26:32] So we have ditch cleaning and preparation of entry points.
[26:35] So those entry points where we know there's a lot of debris that could end up in the network.
[26:39] We do as best possible a cleaning of the ditch in order to reduce the probability of
[26:44] contaminants entering the ditch and we also will clean the grills so that the maximum
[26:50] amount of water can enter the system. During, we'll do surveillance of the network.
[26:54] I'll sorry to skip to an important. We also validate in the before we do the preparation of the
[27:02] that residents will prepare their homes.
[27:05] In a case of a heavy rainfall, the city does the same things
[27:07] with his buildings.
[27:08] We prepare them in order to make sure
[27:10] that we minimize the impact from the heavy rainfall.
[27:14] And we prepare our equipment and our personnel accordingly.
[27:18] During the rainfall, well, that's what we'll do network
[27:20] and building surveillance and urgent interventions
[27:23] when required.
[27:25] And then finally, after we'll do the inspection
[27:28] and cleaning of the sensitive areas.
[27:30] of the areas where we could have had some debris enter the system or carry out an inspection
[27:36] and do a cleaning. I'm limited at two languages, but alright, alright, alright.
[27:58] Hello to the world.
[28:01] For the public security,
[28:04] we have two options to see.
[28:07] They have a map for us.
[28:08] We are already on service 24.
[28:09] 365 days per year.
[28:13] Our communication center, the point clear,
[28:15] and the point clear,
[28:16] the point clear,
[28:17] where the public security is.
[28:20] What is important to you,
[28:21] is that we have,
[28:23] if we are all alone,
[28:25] that will see an event,
[28:26] in the capital of St. Perry.
[28:27] We have to finish the employment of a supplementary,
[28:33] we have to make the opportunity to quit the rescue.
[28:38] The point-clear volunteer rescue unit,
[28:41] we have to be the monitoring for our public health care,
[28:46] that is, we detect the anomalies,
[28:49] the Department of Health, the health care,
[28:51] we will go to the local health care,
[28:53] the health care systems we are going to have,
[28:57] We can see the services of the police, the services of San Addi.
[29:01] We have to tell you that in our work, in collaboration, we have the right to the point of view,
[29:05] with which we call the M.U.C.C.A. M.U.C.A.
[29:08] in the United Nations of the National Assembly.
[29:12] We have to be aware that we are not in the initiative of the National Assembly.
[29:15] We have also been part of a more inclusive team of the National Assembly.
[29:20] On the other hand, these are the ones who will give us the information that
[29:24] attention to the end of the year will be in the end of the year.
[29:25] They will be so much more than ever.
[29:28] If everyone has the ability to come and see who is going to be.
[29:31] So, when we are at the front, we are at the front of the next.
[29:34] In the other words, we learned the names of the young men, as the young men
[29:42] have been in the world since the beginning.
[29:44] It was not the most difficult, nor the service of the children, nor the children,
[29:49] nor the people of the village, it was all the same.
[29:53] It was the nature of the events.
[29:58] At that moment, I was happy.
[30:03] On essaie de cours d'années des appels, on essaie de prioriser certains appels, qui sont des appels qu'on peut aider plus d'emmonds, tout en n'a pas mettant à danger, nous employés.
[30:16] C'est un sujet d'étonner des quatre pieds de dos, l'activité est un co-active, j'en verrai ni mon personnel, ni mon équipe de PCVIO, parce que, à ce moment-là, j'ai l'est des dangers.
[30:29] Je l'ai sous spécialiste, de services d'incendie, de choses comme ça.
[30:33] Des fois, il faut bloquer des rues, parce que même sur des rues comme
[30:37] High Miss même ces débassines de l'attention, il y a des accumulations d'eau.
[30:41] On est tout en train de travailler en équipe, puisque c'est ce qui est important.
[30:45] On connaît notre ville, on connaît les points d'identibilité.
[30:48] On en a une bonne collaboration avec nous citoyens. On continue à travailler avec eux autres.
[30:54] Mais dans la dernière fois, on a plus toutes les informations de toutes les personnes qui ont été
[30:58] impliquées, on donne ses informations là, nos équipes d'ingénélie, communication, puis on travaille.
[31:03] On travaille avec les communications aussi pour préparer les messages, pour vous, pour que vous soyez préparés aussi vendement.
[31:08] Parce que comme nous on doit se préparer, vous devez vous préparer aussi.
[31:12] On essaie de vous donner la maximale des informations, ça fait partie de notre présentation, ce soir.
[31:16] avec un agré.
[31:19] Can I?
[31:20] Public Security est 24h, 70h a week de service.
[31:25] Our Communication Center is located in Point Claire,
[31:29] but we're part of a bigger team,
[31:31] who we work with the Sound of the Meso de D'Augilance
[31:34] et de la Géromanation de Montreal.
[31:37] Which means that it's the whole entire island
[31:39] and the Montreal working together.
[31:40] They have a specific team for emergencies
[31:43] that cover large areas of the island.
[31:44] ils peuvent mettre leur Sergne de laいます,
[31:47] ils peuvent peut ici, ils sont plus locales,
[31:49] mais ils nous aient le faire.
[31:51] Ainsi, nous avons uneiance, et ce ne sera pas pour un peu plus transparent.
[31:55] En fait, nous pouvons mettre et mettre plus plus de l'humilatine de la communication
[31:58] et nous allons être une question de capacité.
[32:01] C'est dans les sections de la communication sur la station.
[32:03] Il y a une enthème personne que l'on va faire,
[32:07] j'ai pas un ou un,
[32:08] j'ai pas un aujourd'hui une chère.
[32:11] same thing with my staff.
[32:13] We work with the rescue unit,
[32:15] which is a group of volunteers,
[32:17] and they're 100% volunteers,
[32:19] but when emergencies like this happen,
[32:22] we put them on call,
[32:23] they're already,
[32:24] and if we need them to cut trees or pump,
[32:28] then we can use them for that.
[32:29] But again, it's a question of capacity.
[32:31] I don't have 1,000,
[32:33] there are about 25 presently.
[32:37] We set up, we help public works by monitoring the area,
[32:41] en
[32:41] public works et de la zone,
[32:44] setting-up, Watergate,
[32:45] public works de protecte,
[32:47] specific buildings de la city,
[32:48] because if we lose
[32:50] archipassité de l'alpre et
[32:51] then,
[32:52] ouhad,
[32:53] at disadvantage,
[32:54] we have to make sure
[32:54] that the city continues to be
[32:55] able to operate,
[32:57] regardless of the storm.
[32:59] And in certain places,
[33:00] we will move equipment around,
[33:02] we'll try to help everybody.
[33:03] When we have a reactive situation,
[33:05] it's because we don't know what's coming along.
[33:07] In last August, nobody knew.
[33:09] Not invitarement de Québec,
[33:11] Si c'est mûl, j'utilise la nouvelle d'oeil,
[33:14] ce n'est pas sauté.
[33:16] C'est l'objectif que je me touche avec la réelle.
[33:16] J'ai cette chose.
[33:17] J'ai quelque chose avec 5 mm de range.
[33:19] Le l'objet s'est déjà fait, avec 5 mm de range.
[33:22] J'ai eu aussi un petit peu deal.
[33:24] Si c'est de la seule chose,
[33:25] nous pouvez débrasser 100 mm de range.
[33:27] Mais au début de l' JASON de la semaine et de la休che grande.
[33:30] Donc, si nous faisons une chose de la même chose,
[33:33] les plus et plus,
[33:34] on s'est de faire faire et on ressource les plus.
[33:38] On a quand même ses styles,
[33:40] et on s'vient faire un autre chose.
[33:40] qui ne s' litteraient pas les mecs tout à fait pour moi.
[33:45] Il peut aussi accommodate des mecs les gens qui sera obligés de les pratiquer,
[33:48] mais tous quand vous avez reçu tout,
[33:49] et tous iV.
[33:51] Ce que vous n'avez pas reçu dans les cours de la route et de la route de la route,
[33:55] c'est juste pour une chose pour l'autre,
[33:56] comme un
[33:58] pour tous
[34:36] les
[34:36] Un niveau de l'Asianérit, c'est-à-dire que nous avons un dernier basé,
[34:40] c'est vraiment un gâterne de l'information, d'attaque de collection.
[34:44] Donc, throughout notre année, dans notre propriétaire,
[34:46] notre culture, d'autres projets, que nous avons
[34:48] on ne va bien le faire pour la nexte année.
[34:51] Nous avons des collections collectives,
[34:53] les sous-ritifs et les inspections.
[34:55] Et c'est pas le temps de l'intérêt de la
[34:56] C'est un problème que nous nous sommes pour nous nous faire,
[34:59] pour notre culture, de la crée, de la nexte commune.
[35:03] Nous nous faisons de l'enseignement de nous faire,
[35:07] pour nous nous faire, pour nous nous faire des designs.
[35:10] Nous faisons un directeur de l'État,
[35:13] envers en matale,
[35:14] qui nous a fait des
[35:16] spécialiste des administrations de la ministre.
[35:20] Nous avons tous venu de faire des vêtements et des vêtements,
[35:22] nous faisons des soils testées,
[35:24] depending sur que ce soit sur le site,
[35:27] peut-être qu'on peut-être qu'on peut-être
[35:29] nous sommes en
[35:58] ou d'une
[36:00] de la situation.
[36:02] Et aussi, avec tous les détails et les émails,
[36:08] avec tous les informations,
[36:10] que nous sommes tous les communes et les commentes que nous sommes
[36:13] dans les publics et que nous nous sommes able à analyser et d'identifier
[36:18] les problèmes de l'arrière, et nous sommes tous les mâts.
[36:23] C'est très difficile d'avoir une idée de la
[36:26] Et nous avons des mesures que nous avons un variant de l'adresses.
[36:31] Nous avons un variant de l'adressage avec le trainage system avec le variant de base.
[36:35] Et les autres cas, c'est à dire que le couteau de l'adressage, c'est le 2024,
[36:43] c'est le 2024, c'est le 2026, c'est le 2025.
[36:46] Nous avons travaillé dans ces informations de ces mesures.
[36:49] Et pour nous, nous avons focus dans les problématiques et les areas.
[36:54] As you can tell,
[36:55] there's a bit of red a bit everywhere,
[36:57] it's not like we could say,
[36:58] okay, at this area,
[36:59] specifically is where we should address
[37:02] in the next two, three years.
[37:04] But we have an idea.
[37:05] We have certain areas
[37:06] that we should be looked into more details.
[37:09] If we think of Belmont Glenland,
[37:12] this is something that we'll be talking about later on.
[37:15] If we're talking about the Craig Moore,
[37:17] Brave Rook, that's something else also,
[37:19] that has been mentioned in the past.
[37:21] Et quand nous avons des très similations,
[37:24] avec des droits de la trône,
[37:27] nous avons la fin de la fin de la fin de la fin de la fin.
[37:30] Aswell, when we gather all these information.
[37:35] So, before I go ahead with the various projects that we are going to look into in the future, just a few information, it's nothing new.
[37:45] Et tout le monde, c'est à dire que les plus trancières qu'on a vécu au cours des dernières années.
[37:53] On voit que ça l'engmente considérablement.
[37:55] On peut plus dire que c'est une fois de temps en temps, il y aura de telles plus.
[38:00] On peut voir depuis 2022, on a pratiquement, depuis une fois au temps, une à deux fois par année.
[38:08] Donc, on voit que c'est la temps d'encer les changements climatiques, c'est quelque chose avec lesquels on devrait travailler pour le futur.
[38:16] Il y a des méthodes aussi qu'existe. On avait un an depuis l'attempagne des billes pour régler ça.
[38:21] Qu'est-ce qu'on a fait ? Qu'est-ce qu'on a fait ? Qu'est-ce qu'on a fait ? Qu'est-ce qu'on a fait pour régler ça ?
[38:24] On s'entend que les réseaux des goûts d'aide de plusieurs années.
[38:29] C'était bas de s'ils lorsqu'on parle d'un climat du XXe siècle. On a eu beaucoup beaucoup d'adaptations
[38:36] qu'on a des dernières années. C'est pas que tout d'un coup depuis qu'on ne s'est plus tard en celles-là qu'on pense
[38:41] au réseau plus bien, depuis que je suis tissé en 2000 et même avant ça, mais près des
[38:46] sassants, il y a écluée, l'edrénage, c'était des simulations, il serait l'éconfaisée
[38:52] évidemment, les types de pluies ont changé, on a adapté les types de pluies avec les nouvelles
[38:58] réglementations gouvernementales aussi pour s'agister, mais là ça va plus vite que ce qu'on
[39:04] était habitué, puis c'est quelque chose avec lesquels on devra travailler dans le
[39:11] L'argelé qu'on se dégoût, on n'a pas d'avec beaucoup d'argent dans l'experte de racata qui pourrait nous aider pour investir et faire tous les travaux-là.
[39:27] Ces résuments et spruffs, pour le soemoir de ce système,
[39:31] how does it work, mais, well, basically, le storm water network is designed to collect
[39:34] and direct rain water from streets and properties to the storm sewer pipes,
[40:09] alors que c'est inclus et
[40:09] Donc, je vais vous appeler pour la situation sur la suite.
[40:13] Et bien, c'est quand on nous fait la situation avec notre network, avec notre hydraulique de la suite.
[40:21] C'est pas un peu de plus de plus de plus de plus de plus de plus de plus de plus d'attention.
[40:26] Quand on va avoir un peu de plus de plus de plus de plus d'attention, c'est pas un peu de plus de plus d'attention.
[40:30] Mais c'est pas de la console de la zone pour une 1 à 5.
[40:34] Une fois-le-mouille, ça a été considérée de la société normalement.
[40:39] Et, on a fait de pouvoir faire de la propriété.
[40:43] Et, en l'extrême, le système est complètement faible.
[40:48] Et, en fait, on a fait de la fleau.
[40:50] Et il est le fleau, et c'est de le faire de le faire de la fleau.
[40:53] Ce sera la très très longue de la fleau.
[40:56] C'est quand même quand même l'alcool.
[41:00] Donc, comme j'ai dit, vous avez des gens qui ne nous ont pas eu ce que 5 ans pour l'air et l'avaient de l' Suffolk.
[41:06] C'est un petit qui est une seule chose que nous avons eu au long de temps.
[41:09] Nous prouvons de nous nous appeler au milieu, et le plus de l'inélaire de l'Azouhée.
[41:17] Et nous avons eu ce qu'on a, comme nous nous avons eu au long.
[41:21] Et aussi les conseils de l'Azouhée, l'Azouhée, les dessous de l'Azouhée, et aussi les grés de la�e des infrastructures.
[41:29] le monde va faire un côté de l' Neben-Louette dans le monde,
[41:32] en fait ça va se faire en tout direction à la tête.
[41:35] C'est ce que nous aurez de faire, et je pense que nous pouvons m'adapter à ce que nous pouvons m'adriver.
[41:43] Comme vous n'aurez pas de séil,
[41:46] le séil est un état de la base de la maire.
[41:49] Le séil est un élaborant,
[41:52] mais c'est une façon que nous avons de faire un autre,
[41:53] et c'est ce que c'est quelque chose qui nous a changé.
[42:00] Donc, le but des infrastructures verte, c'est vraiment ça, ça va être important, puis ça
[42:07] c'est des verbes, c'est super important qu'il faut retenir de rediriger, collecter, emagasiner,
[42:13] relancer, filtrer, et redistribuer les opulaires. Comme j'ai dit, on ne veut pas envoyer
[42:19] l'eau immédiatement au réseau parce que c'est ça qui fait en sorte que ça vient en
[42:23] le plus rapidement possible. Donc, évidemment, en faisant de telles et aménagements,
[42:31] hopes. Regardez pas, gardez pas.
[42:37] C'est-ce qu'on veut améliorer la qualité de l'eau diminuer les risques des
[42:40] donances, des donances, des raisons et des raisons, et de s'assurer de travailler avec
[42:45] les napriates, c'est aussi. Des fois, nos beaux d'air, on verra l'entir, mais la napriatique
[42:49] qui est tellement haute, qu'on doit travailler avec ses données et ses informations-là pour
[42:54] ensuite allerger la pression sur nos infrastructures.
[42:58] Donc, lors de faibles plus les partes et les espaces-vare, j'ai relo, promener sur
[43:02] face et des rues à j'assante.
[43:05] Donc le but c'est de prendre l'eau, à ce que des accumulations, en tant normas, on peut
[43:11] dire, de bonne pluie et de la réduire dans des espaces-vare ou dans des partes.
[43:17] pour ensuite permettre aux résoudes de résorber ensuite.
[43:25] Lors de fortes pluies,
[43:28] l'encore une fois ça se va vers les surfaces en gazonais,
[43:33] et s'allagir comme un réson vant naturel,
[43:35] parce que l'on peut voir des accumulations à l'intérieur de ces infrastructures.
[43:41] Donc, ce sont des bénéfices,
[43:42] de l'inélection de l'altre et de l'exemple de l'élection du
[43:49] pétien et de plus les plus bonnes.
[43:54] Et c'est comme un example que nous nous avons été utilisées,
[43:59] faire des petites squales et d'iciens,
[44:03] nous avons un permeéraux bonnes pavement.
[44:06] Et d'une autre grâteuse,
[44:08] nous avons aussi des bons bio-retentionnations
[44:11] Dans un cas où on y a eu un peu d'arrêt sur un nouveau type,
[44:16] même si c'était un peu plus que le plus que du coup par rapport aux guilds.
[44:23] On y a aussi le grand grand état de l'assurance et de l'adresse à l'état de l'assurance.
[44:35] Nous avons un grand grand grand état de l'assurance.
[44:39] On y a un peu de suiveaux,
[44:44] et des solutions un peu plus conventionnelles dans que de la rétention en conduite,
[44:49] surdimensionnée, sous-terrain, ou encore des grands bascins de rétention de
[44:54] ces demandations à s'y allouvoir le tel qu'on voici, ou encore même au Parcère-Mité.
[45:00] C'est un bassein qui est également dans ce style.
[45:05] Donc, pour le plan gestion, les autres plus viales, c'est en lien direct avec notre planification stratégique, 23 2030. Donc, au niveau de l'objectif, c'est, on parlait de transition écologique et résilience. Qu'est-ce que, pour une classe, peut-être, pour vraiment être plus résilient face aux changements climatiques, on veut également, avec cet outil là, être en mesure de mesurer la vie de la rabilité, des différentes infrastructures.
[45:31] Extente, on veut cibler les entrées à retard d'intervention, trouver des solutions à cour
[45:38] moyen et long terme. On veut établir des stratégies d'adaptation dans la plade d'une
[45:43] occasion, nul, des travaux. En d'autres mots, qu'est-ce qu'on peut intégrer aux pétis,
[45:48] d'une année à l'autre ? On s'entend que la liste de besoin est énorme et les enveloppes du
[45:53] retard sont toujours irrespective d'un moment. Donc, c'est ça fait partie de la priorisation
[45:59] également. On veut diminuer les charges, les volumes et les débits dans le réseau et améliorer
[46:06] la résilience de la ville. C'était mentionnée tantôt avec Monsieur Girois, comme quoi? On
[46:13] crée un partenariat avec le TS, donc un de leurs professeurs, un étmane ressource incroyable dans
[46:22] le domaine, partout au Québec, il vont connaître Monsieur Jean-Luc Martel, donc c'est quelqu'un
[46:28] les très combattent en un dame de médecins.
[46:30] On ne sait ce que tu es déjà à ma crise.
[46:33] Alors, on est en bas.
[46:36] Pour le Stormwater Management Plan,
[46:38] pour le point clair.
[46:40] Il n'y a pas de même que des choses.
[46:43] Il n'y a pas un autre.
[46:44] Donc, on peut pas en pleurer.
[46:46] Il y a pas que ce sera sa place.
[46:49] Il y a vraiment de faire de faire de l'attitude.
[46:51] d'autres
[46:53] très très detail, et très bien, je vais vous montrer les results que nous allons
[47:00] faire.
[47:01] On nous a été en dessous en April 2024, donc pour une idée, il y a des
[47:07] pour la augustement de l'aventance, donc pour les gens de l'OI, il y a
[47:11] un moment, il y a un moment, et puis on a les différents
[47:15] avec les tests et les tests de la Mande-Date, et puis nous sommes en train d'appeler
[47:22] comme nous, on peut s'expeccer, en un moment, en un moment, en un moment, en un moment,
[47:33] En bref, c'est quoi, un plan gestant des opulviales, dans le financeur
[47:38] rapidement, c'est un tour, dans le financeur des dents filles, des zones vulnérables,
[47:42] selon l'étapeographie, les infrastructures, leur capacité, c'est d'ajouter de récalibrer
[47:48] l'ensemble de notre simulation hydraulique. Donc on travaille avec un système depuis plusieurs
[47:53] années. On voulait être certain qu'il était à jour qui réflette les nouvelles données de pluie
[47:59] actuelles et on veut parler de pluie actuelle. On ne veut pas parler des plus des années 80. On
[48:05] veut vraiment que ça soit quelque chose à jour, avec les réalités, avec tous les débloitements
[48:10] qu'ils sont également à l'écorpore.
[48:14] On vit dans ce filil,
[48:15] il s'faire à risque à s'arrêter de s'en avoir l'eau d'événement extrême.
[48:21] Nous avons donc des récommendies infrastructures
[48:23] de grés et de grés et d'interventions
[48:25] en public et de privé d' Properties,
[48:28] qui peuvent être récommendations.
[48:29] On peut-être faire des récommendations,
[48:30] on peut-être faire des récommendations,
[48:32] et on peut-être faire des récommendations.
[49:01] de l'assau, pour le product de prioritisation pour la
[49:04] avec les générations et les images.
[49:07] Et c'est une sorte que nous avons adopté de ce qui est venu.
[49:11] Et on propose un tourner en train de faire un état d'également.
[49:20] Donc, les différents projets, j'ai l'avoir dit à Briet-Vein,
[49:23] en Akur, en Akur, en Xavien-Ani, Prashan, et de l'Ani,
[49:28] mais ce que l'on a fait dans le monde,
[49:30] c'est ce que nous avons beaucoup de plus importants
[49:34] Et où ça nous parle de la faim de la faim de la faim de la faim,
[49:37] la faim de la faim est de la faim.
[49:40] Il ne m'a pas vécu à le faire ça.
[49:44] La faim de la faim est un très très avis.
[49:47] Il ne compte pas ce que ça ne va pas faire.
[49:56] Il va pas laisser le
[49:59] une baçon de rétention.
[50:04] C'est une fois à un moment où on peut avoir des partitions à publics.
[50:09] Nous sommes à l'étude de l'époque,
[50:12] et nous sommes dans le premier nombre de ça,
[50:15] pour la
[50:16] sur le site avenue, comme ça.
[50:21] Ce n'est pas le débat sur le projecte,
[50:24] mais il y a une fois que nous sommes dans le monde,
[50:26] et le monde nous a réservé sur le projecte.
[50:34] Pour la 2025,
[50:36] le projecte fait qu'il y a un grand projecte,
[50:38] c'est une partie de l'algin.
[50:40] C'est une partie de l'algin et l'algin.
[50:44] On a fait,
[50:45] c'est une partie de l'algin.
[50:48] C'est une partie de l'algin.
[50:52] C'est une partie de l'algin.
[50:59] D'autres
[51:01] de stronger mon chargement Space Agency.
[51:05] Merci beaucoup sur la grande prochaine question,
[51:07] que j'y a fait par elle.
[51:09] beaucoup plus fort, comme twisted.
[51:11] L'Ottawa est une histoire d'un moment.
[51:14] Et on a aussi le projet du projet desemble.
[51:19] Je n'ai pas cru à la prochaine chose.
[51:24] Pour l'évoil, on va faire un problème de l'évoil,
[51:28] c'est une de ces IPs pour 26 ans,
[51:31] mais on va continuer à continuer à nous marcher avec ministère,
[51:36] pour nous nous donner un tournerin de l'évoil.
[51:42] On va nous donner un tournerin de l'évoil.
[51:44] Pour 26 ans,
[51:46] les projets de l'évoil,
[51:47] il va être une
[51:48] la
[52:17] D'ailleurs, c'est une sorte de
[52:20] Il y a aussi une petite pâte en partie,
[52:25] qui est un peu hirée au top de la hille.
[52:27] Je ne sais pas si je ne sais pas.
[52:30] As well. A lot of the water that was coming from the top of the hill towards the back of those properties, we had that was one of the issues as well.
[52:42] And when there's big big events, yes, the water can overflow here. There's water accumulations here many times, a little bit further along the Belmont and Faddlewood here as well.
[52:55] So this was the original project, and then as we were going further and further and gathering information,
[53:03] said, okay, what else can we do? The fact that there's a Pepeo butterfly park right here,
[53:10] there's a big soccer field here, a big green space, and when we were looking at various
[53:25] Thank you. Again, I would like to remind you of the fact that we have been in touch with the
[53:30] energy to collect in my garden and to go inside. So it's the icons that you will see
[53:36] on the next, if you see our presentation, but we really really want to pass the message,
[53:40] because we want to do it in a kind of project like that. So we need to present it,
[53:47] to present the project, it's all of the details
[53:51] at the council council meeting.
[53:55] I'm not sure about the details of this project,
[53:58] but in the end, all of the entrants,
[54:00] all the aspects that have been addressed
[54:02] or solved by the preparation,
[54:05] are also incorporated.
[54:07] So, we're going to build a big green space.
[54:10] What can we do with this?
[54:11] So, it's something that we're going to incorporate
[54:14] in our design. Basically, it's not a secret. Well, create a floodplain. So basically, this is
[54:22] our floodplain where we would have excess water going into this area. A little bit higher than
[54:30] this one. So at least if this is flooded for a little bit because of the big, big, big, heavy
[54:36] rain for a certain period, this is not usable. But then after a few hours, if a day may be,
[54:42] and then goes back to the lower section.
[54:45] These are just the basic principles,
[54:48] but we'll finalize the conception
[54:52] with the different données.
[54:54] What we need to complete in the conception,
[54:57] just a matter of what we do,
[54:59] all over the year,
[55:01] we've solved everything we've done,
[55:04] that's a group in the other direction,
[55:07] so if we have a base,
[55:10] the terrain of our curve, for example,
[55:11] It creates a zone in a passage for the law to go through the events.
[55:18] It will be in the point where the surface of the game is still visible,
[55:24] and when the network is in the ground, it will take the law to this accumulation,
[55:30] so it will return back to the network.
[55:32] So that's the great link between the report and the details,
[55:36] but it's the first step of what we will do with a project.
[55:42] So, the difference is that the preliminaries that we must do,
[55:46] so yes, we have a lot of things we do before,
[55:49] there are things that do not speak in the conception.
[55:52] And for finalize our conception,
[55:54] for our understanding of our estimation,
[55:57] we also need to do all those preliminaries.
[56:01] So, we are going to have a family level,
[56:04] we are going to have a conversation with this family.
[56:06] In some regard, we need a biologist,
[56:08] The Nakhpataoziu might not see, yes, we did not need it because it was in Terakata Park,
[56:15] not knowing exactly if it was a pack or a military mid, so we didn't need a specialist in this.
[56:22] When they did the Lancervine in Terakata Park, they surveyed all the various trees.
[56:28] What's the pattern of the water?
[56:31] Where does it go? Where does it drink?
[56:33] And these are all information that was necessary for us to do our design.
[56:38] And obviously the lens surveyor will make sure that we work on our city property, that there's no servitude.
[56:46] Is there a hydro Québec as any services?
[56:49] So stuff like that has to be looked into prior ordering or design.
[56:56] In this case, the lens surveying was done in spring of 2025.
[57:03] Again, characterization of Yoran Matas, so in order for us to get the okay from the
[57:08] minister, we've got to make sure that the biologists are considering their new observatory
[57:14] operator in the summer and in the fall, again, to make sure that all the vegetaux, les
[57:21] onumid, il a présence d'animaux, again, so depending on the season, they come three times
[57:27] at least and make sure that they see all of these information for us to get the OK afterwards.
[57:36] There's many discussions, a lot of communication with them, so it's a lot of back-end
[57:41] forth for us to get the ProBasson later on.
[57:45] And the report should be done, we should receive it within the next few weeks.
[57:51] The last two information that we really like to incorporate is also in this situation.
[57:58] We had this entire sector that was, we sent letters and it was a survey.
[58:04] 185 letters were sent to residents.
[58:07] We wanted to gather the information.
[58:10] Have you ever got any floods?
[58:12] Were was the water coming from, was it coming from the street?
[58:15] Was it coming from the back?
[58:16] We wanted to gather all the information for us to do the design properly and make sure that we address
[58:22] whatever situation that we can do on our property.
[58:26] If we do something here, then it solves something else on the private property, that's our
[58:31] goal, that's what we want to incorporate in our project.
[58:35] And the last thing also, maybe you've seen these machines here, it's basically to do soil
[58:41] testing the determine on a certain area of our project.
[58:46] There's a standard if we have, I don't know,
[58:49] this size of project, then we need to do 30
[58:54] boroughs or there's specific.
[58:56] There's a distance between each borough that's necessary
[58:59] as well for us to gather all the information.
[59:02] When they do the testing,
[59:05] we are going to be able to reuse that material
[59:07] or it has to be excavated and thrown
[59:10] or adult zone,
[59:20] so basically this is the last information that we really need for us to complete
[59:25] the design and again we'll be presenting the final project to council before there's anything
[59:31] public that will be going and be available.
[59:38] Our other project that will be incorporating
[59:41] store management project will be Ivan Ho.
[59:44] Like we said, every single project that we put on the CIP, we look, is it feasible, yes,
[59:50] or not?
[59:51] No.
[59:51] And if it is, we try our best to incorporate it.
[59:55] In this case, again, we had Ivan Ho on our radar.
[1:00:00] For the longest time, you could see the situation with the water main, the sewers were in really bad condition.
[1:00:08] The front road base is really bad as well. So that was a project that was on our CIP for a while.
[1:00:14] And because we're talking so much of stormwater management, we said, okay, what can we do in this case to improve the situation? Just to get back here.
[1:00:25] We have Ivan Ho, that connects on to Braebrook, so obviously we cannot necessarily put a very, very big pipe on Ivan Ho, knowing that Braebrook as a certain diameter.
[1:00:37] We won't put something bigger on Ivan Ho, and then, see, they fit not on well, basically.
[1:00:43] You want to make sure that it collects and retains enough water without it causing any problems to the residents before it goes back into the network slowly.
[1:00:55] So, this is just an existing view of the street as it is right now, so you have that you're
[1:01:02] paving, you have some places, you have a ditch, some places that have been filled, but
[1:01:07] there's little pipes underneath on both sides, you have the water main in the middle, the
[1:01:12] sanitary at the bottom here, where you have the property lines on each side.
[1:01:17] So basically this is the existing, we're planning a presentation to the residents that are
[1:01:23] directly involved in this project.
[1:01:26] So at this point, it's something that we can share just this,
[1:01:30] but it's something that we're definitely,
[1:01:33] we really want to maximize the retention
[1:01:35] of the audio gestion in a little project like that.
[1:01:39] Each project can make the audio gestion
[1:01:44] of the audio gestion on the right side of the story again.
[1:01:55] So just a quick recap.
[1:01:57] I hope that the information was that, uh, interesting and useful, uh, some points to retain
[1:02:03] essentially in 2026 upcoming developments.
[1:02:07] We have over $3.1 million dollars as those are the projects that Benoit had just outlined
[1:02:11] with respect to stormwater management on a public domain that we'll take place throughout the next
[1:02:17] year.
[1:02:18] We also have the update of our bylaws at a new bylaw that will essentially allow us to launch
[1:02:26] There's a subsidy program for interventions on the private domain, and we have new communication
[1:02:31] tools also that are coming out with respect to heavy rainfall and the stormwater management.
[1:02:37] And once again, we want to deploy those in early of 2026.
[1:02:42] So just a quick recap for you, some elements are retained, and on that note, we're open for
[1:02:48] questions, and we thank you for your attention this evening.
[1:03:02] Those of you that want to ask questions, you can come up to the mic and
[1:03:11] Good evening.
[1:03:12] You mentioned Brebroke and also Maywood.
[1:03:16] We have already the sewer pipe that changes in the 90 to huge, but we get the same flood
[1:03:24] at sewer back up.
[1:03:26] Usually we have the drain on the ground on the, and we have the hole for the sub pump.
[1:03:32] In the past, when we have no electricity, when the sub-hams stop, and the water flow, it drained
[1:03:40] in the hole in the middle of the basement, but in 2020-2024 it happened, the water came from
[1:03:50] that drain, and thanks God, I was downstairs, I've marked it, but we're still too much
[1:03:56] pressure, it filled up the business, but not like about six inch. So that is exactly
[1:04:04] maybe we would return the pipe in the 90, I think about six feet, before we was a small one.
[1:04:11] And even when the small one we used to have a rain, have a rain, it's having a 96, we never
[1:04:16] have a flood or any surback up, but this is what's happened in the 2024 August 9th.
[1:04:25] Like we had mentioned, also the various myths that are saying, okay, just increase the pipe will be able to
[1:04:32] solve all the problems if we just increase the size of the pipes
[1:04:35] It's one option, but it still won't solve everything
[1:04:39] We have to work with plan B or where we could guess we know sometimes even the big big pipes will
[1:04:46] We'll be full and we'll backflow because the pressure is so strong and I understand it seems like because we did got it bigger
[1:04:55] Then we're going to be okay for all the various occasions.
[1:04:59] So we did improve the situation, but it's not a one in a hundred year rainfall that will address
[1:05:07] every single time.
[1:05:09] First of all, we'll be tripling that pipe if that's the case.
[1:05:13] And even then, if it's going to serve once every 30 years, and the investment is just a,
[1:05:20] at one point it's money as well and that's something that's very sensitive that we want to
[1:05:25] address as many situations as possible but we just at one point cannot design for these type
[1:05:33] of events on a yearly basis. Because I live in the 1990s since the 1990s and maybe with the same
[1:05:39] house. In the 1990s we don't have all this high rise building built for the last 10 years,
[1:05:44] more than 20 high-rise building, more than 5,000 units,
[1:05:48] we don't have all that in the 90.
[1:05:50] That's why all the, even the pipe was small for the sorted,
[1:05:55] they cleared the, we don't have any problem.
[1:05:59] The, all this high-rise building or 5,000,
[1:06:01] and increase all the population more than 10,000 people,
[1:06:04] of I'm sure that is also effect, the, the, the floor is in the,
[1:06:08] and the, because all this waste waterway goes, goes, the sewer.
[1:06:12] So if it's full, it's going to back up.
[1:06:16] The climate change is one thing for sure, but back then also the retention, the bylaws for retention on their own properties were not the same.
[1:06:26] We reduced it's only 10 liters per second, as we speak right now.
[1:06:34] So it's something that we really reduced compared to what it used to be in the past.
[1:06:37] So it's not because of the new development that there is more water actually when they
[1:06:43] redevelop and change the zoning or the properties at this time as soon as they change
[1:06:49] whatever on their parking lot or on the roof of their buildings, they have to have a
[1:06:55] retention which they didn't have in the past so we improved the situation basically.
[1:07:00] Yes, I understand but the wastewater from all this unit where it goes to the sewer.
[1:07:04] if the sewer can't value
[1:07:06] nobody is less water that's coming in even if there is a new building and new development
[1:07:11] there is less water going in the network than it was in the past because now we have restrictions
[1:07:17] before there was none okay do you have any solution now for us because that is exactly what's happened
[1:07:22] and if the dream when it's going to the water is coming even I block it but it was so
[1:07:30] So strong, the depression, it came up. Well, you mentioned Braybrook and Maywood. Yeah, that's an area that's part of the zones that we're looking for.
[1:07:39] Too many in Maywood, also happening, because you mentioned only Braybrook, but Maywood is too many, too many health issues.
[1:07:45] Well, that's it. I said, sector.
[1:07:47] Okay. Yeah.
[1:07:48] I hope we work together all that clearly. Like if you want any information, you can give all the information and we show you all that.
[1:07:56] if you have the sample from the water, if you want to know exactly, I kept it.
[1:08:01] If you know that it's sort of a cup or a rain, I kept it already in a jar.
[1:08:05] But it's confirming what we have in our simulation.
[1:08:08] Yes, thank you.
[1:08:09] Thank you.
[1:08:13] Yeah.
[1:08:13] Yeah.
[1:08:14] I'm Hans Fulstad.
[1:08:15] I live at 210 Delmont, facing Terracotta Park right in front of the...
[1:08:21] Oh, sorry.
[1:08:23] Right.
[1:08:23] or I'd 200 Belmont facing the park and the...
[1:08:31] Not at all, eh?
[1:08:32] No, okay.
[1:08:33] Damn, let's bring it up there.
[1:08:34] Okay.
[1:08:36] Is that better?
[1:08:37] All right.
[1:08:38] Yes, I've lived there since 2003.
[1:08:42] I noticed you've been mentioning dates here 2022, 23, 24, 25.
[1:08:48] I was flooded in 2013.
[1:08:50] I mean, when the city came to look at the house in 2013, the inspector had never heard of
[1:08:57] that street flooding before, I had seen it flood twice before then.
[1:09:01] So this is not, when my point is this is not necessarily a, only a very recent event, it's
[1:09:08] been flooding for a long time.
[1:09:11] I've tried to speak to, I've got some neighbors who have lived there since the very beginning
[1:09:15] 1986.
[1:09:16] I haven't been able to get hold of them to get their own project.
[1:09:19] that let me know just how long has this been going on.
[1:09:21] I suspect it's been going on since 1986.
[1:09:25] That a Belmont now is a low point.
[1:09:29] It's lower than Don Againny.
[1:09:31] The corner of Settlewood and Belmont is lower
[1:09:34] than Don Againny's Street is.
[1:09:36] It was designed that way.
[1:09:39] Okay, so I'm very interested in what you're planning to do
[1:09:43] in front of my house.
[1:09:45] Like I said, we have to present the final project
[1:09:47] council first and then. So is it because you don't know more than what we've seen today?
[1:09:54] We know it's just something that we're not going to share today. We won before council sees the
[1:09:59] final product. I'm very curious how you're going to fill those basins.
[1:10:09] That soccer field is probably
[1:10:11] I don't know, two meters higher than the streets, so I'm very curious to know how the water is going
[1:10:14] up to that, uh, to that, uh, we'll be, uh, obviously, we'll be in the low point, uh, that.
[1:10:21] Well, okay, you're going to dig down below the, the street surface. Okay. There's going to be a
[1:10:26] lot of trucks going in front of my house for the next few years. And that case for sure. Um,
[1:10:31] um, uh, right, um, another issue just to come, uh, at a, uh, extra information, uh, that
[1:10:37] Glenlin, uh, ditched coming from Terracada. It's also something that we have discussions with the
[1:10:42] Because it's there, they're supposed to a certain diameter, it's their responsibility, we are working public works with them as well.
[1:10:53] We maintain it, but it's very hard to have access. There's no rows or no paths for equipment as well.
[1:11:01] So we had a meeting with them a few weeks ago and I'll try to make them more involved in this issue.
[1:11:07] All right, because already we know that that creek is a huge retention based and already, right?
[1:11:15] The creek is surely two or three meters deep full of water when before it starts over flowing onto Glenland.
[1:11:21] Have you considered to actually build a berm along the top of Glenland Street so that we're holding more water back into the park?
[1:11:30] There, you could do thousands of cubic meters of water, additional water retention in the
[1:11:38] park itself by building a berm there of maybe a one or two hundred feet.
[1:11:44] Again, we sent the blinds and specs that was, because the project, the last year was in
[1:11:49] 2000, there was a project that was done for the entire creek, and it was under Montreal as
[1:11:55] Also, we sent them the specs to make sure that they address the situation, but any options would be considered on one point.
[1:12:02] So are you saying it has been considered should have been considered on one point?
[1:12:05] Not the burn itself, but someone from the meeting had mentioned why don't we do have a retention base in somewhere in the park.
[1:12:13] But it's not even somewhere in the park. It's at the top of Glenwood Street.
[1:12:17] Yes, but that's the ground level.
[1:12:19] So that a lot more water gets held back.
[1:12:21] Help back there, but then what's the consequences of our stream none of the I think you've got a you've got a good drop
[1:12:28] Through the park itself from St. Louis Street down to a Glandland. There's got to be four or five meter drop there at least
[1:12:37] It's going to be looked at but
[1:12:39] I have many questions, but I'll leave it to the to those lining up anyhow
[1:12:50] Good evening
[1:12:51] Catherine Baxter, one, one, two, Saddlewood, so in the same neighborhood, but around the corner from my
[1:12:57] neighbor who's just speaking. Miss you all I'll mention that there was a blocked pipe from CNN and C.P.
[1:13:06] Our theory in our specific neighborhood on Saddlewood has been that that was a significant contributor to
[1:13:12] the water on terracotta Avenue, just wondering if you can provide us with an update of what's going on
[1:13:19] with that blockage that was found in CNN and CP's pipe.
[1:13:24] Yeah, we've been working with them to get that partial blockage resolved.
[1:13:30] So on our end, we recently actually pumped out all the water in front of their pipes so
[1:13:34] we can go down and get proper pictures so that we can give them all the information necessary
[1:13:38] for them to carry out the work and we actually have a meeting with them coming up this week
[1:13:43] on site in order to show them exactly where the issue is.
[1:13:46] They came, they did some work, there's still more work to be done.
[1:13:49] So by pumping on our end we were able to clear out all the water to get a clear portrait of what the
[1:13:54] what the issue is on their side and at the same time we went on the other side the CN is on the self side
[1:13:59] we were able to go on the CN side and get a clear picture also of the issue on their pipe because there are a few
[1:14:05] different pipes and it becomes an open ditch at some point between the tracks so there's a lot of debris that can
[1:14:10] end up in that pipe because of that and those sections of pipes belong to them so we need to follow up with that
[1:14:15] make sure they do their work and so it's a continuous thing, there's two entities involved
[1:14:21] and we can't intervene directly on the tracks, can't even go on the tracks, but we're
[1:14:26] working closely with them to get it done as quickly as possible.
[1:14:29] Appreciate the update, so my follow-up question that is from Isubinoa is if that has been determined
[1:14:35] to be the reason for the flooding that took place on Terecata Avenue, if the tracks being
[1:14:42] locked if that is specifically the reason why the coroner flooded.
[1:14:46] It's certainly one of the factors for sure, it's one of the factors, there are in that area
[1:14:50] though there are a multitude of different factors, there's the the Glenland area and stuff
[1:14:55] that's why we're collecting all the information to figure out exactly where the problem
[1:15:00] We came from and how to best address it, because we don't want to address what we think the problem is and then it just happens again.
[1:15:06] There are a multitude of different areas and for different parts, it's still a relatively large area.
[1:15:12] But if there's anything that's partially blocked, we'll let for sure need to get resolved. So that's an easy, that's an easy win.
[1:15:18] And then on the engineering side, they continue with their projects to do a full analysis of the area.
[1:15:22] Okay, final question for this one goes to Monsieur Rodant again and to Monsieur Tongue in terms of the response both by public works and public securities in the event of future emergencies.
[1:15:36] How has the city's new support plan? How will that change in terms of emergencies compared to what we've seen in the past?
[1:15:44] Well the objective here is to make it so that there isn't a current blockage.
[1:15:48] Because in that area, once the water is existing, it's on the surface, we can't pump from one end to the other.
[1:15:54] It's pumping the water from one side of a pool to another.
[1:15:57] It doesn't help.
[1:15:58] We can't pump over the tracks either.
[1:16:00] We need to get the water across the tracks.
[1:16:03] That's why for us, the immediate intervention is to resolve that issue.
[1:16:09] That's the urgency for us.
[1:16:11] Once that's resolved, at least water is going to go through.
[1:16:14] If the network is saturated, it's saturated.
[1:16:16] There's nothing we can do, it's that we're in the same body of water.
[1:16:19] Can public work sandbag against our houses instead of driving through the flooding water?
[1:16:25] Like I'm talking emergency matters.
[1:16:27] I know preventively you guys are doing what you can.
[1:16:30] You're up against it with CN and C.P., but is there anything in the short term that we can do to see a difference in not having a raging river come between our houses and flood, you know, a dozen houses?
[1:16:42] Like I said, we're trying to fix the issue in the short term.
[1:16:45] but also engineering has already done surveys of the area to see
[1:16:49] the sandbagging has to be done in the right area
[1:16:51] and has to have to provide a surface
[1:16:53] because the water is just going around well,
[1:16:55] it's just a waste of time.
[1:16:57] So until we have the actual elevations and everything
[1:16:59] and we can see that it's actually going to resolve something.
[1:17:02] It's hard to tell, but for sure, if there's something we can do,
[1:17:04] we will do it.
[1:17:06] That's the point.
[1:17:08] One of the things that we did,
[1:17:11] Mr. Joe, I met with Montreal, he's on Montreal Rocksboro,
[1:17:13] And the reason for that was because they're used to flooding from the river and they've gone and they've bought all kinds of latest technology
[1:17:22] inflatable dikes, all kinds of stuff. So the idea was to go over and see if there's anything that we could learn from them.
[1:17:28] They're actually going to come on a site in that area because we think we have to do something temporarily, quickly, in case of a short term flood.
[1:17:37] And maybe these practice would really, really work instead of I'm in the sandbag.
[1:17:41] They might be other options.
[1:17:42] So yes, they're taking it very serious.
[1:17:45] And they've got some great options coming up.
[1:17:47] And it's a great initiative that the two municipalities work together.
[1:17:51] Because they had experience in this before.
[1:17:53] So it's going to help with the area.
[1:17:56] Appreciate the updates. Thank you.
[1:17:57] There's also the fact that now it's more identified.
[1:18:00] You know, like each storm it changes.
[1:18:02] Like we said on the map before there's sections all over the city.
[1:18:05] It's not to say, well, it's all concentrated in one area.
[1:18:09] So we try and keep an eye on our vulnerable points.
[1:18:11] So obviously, this will become one of our vulnerable points.
[1:18:13] And we noticed that last time, water was going towards the houses.
[1:18:17] People were driving up and down the streets.
[1:18:18] Our response will be billed.
[1:18:20] We'll block it off as soon as we can.
[1:18:21] So at least we don't have that.
[1:18:22] Public works does have a second gate.
[1:18:24] They can get out through the back end.
[1:18:26] And we can continue to make sure that the least water goes towards the houses.
[1:18:30] And if the sewers are cleared, like we're hoping to,
[1:18:34] and the water passes on the tracks, it's a non-issue, because we won't even have to go there,
[1:18:38] but there are things that we can do in response. I can't bucket the water out of there,
[1:18:43] or pump it over to the next manhole, because it's just going to go right back to the
[1:18:46] same place and come up the manhole on terracotta avenue. But at least if we can maintain
[1:18:51] that people don't drive through it and send ways through your houses, it's already a good start.
[1:18:55] Sounds like an improvement. Thank you. Thank you all.
[1:19:01] Hello, my name is Rob Tippney. I live at five King. Unfortunately, our flooded area did make your top five lists for this year. Maybe next year.
[1:19:13] We live in a very concrete area, right beside two gas stations, and the building across from us also was deemed commercial after the residential house was torn down.
[1:19:30] So all that water can collect and doesn't get absorbed at all by the grass.
[1:19:36] My question is really about subsidies.
[1:19:39] We've already put to proposal and our neighbors.
[1:19:42] We both have descending driveways, and so we have to fill them in.
[1:19:48] And I noticed that you did mention just briefly mentioned subsidies.
[1:19:51] I know Montreal has a, I believe it's called rental plaques, city of Montreal is offering
[1:19:59] subsidies to get the work done.
[1:20:01] We have to get this done.
[1:20:02] We can't wait because we stay up in night waiting to see how much water is coming down.
[1:20:08] So to get sandbags out to try to keep the water from our basement.
[1:20:13] So,
[1:20:17] yeah, which is, which is, so my questions about subsidies,
[1:20:24] are they coming, do you know
[1:20:26] anything more about it and is it retroactive because we need to get our work done this spring?
[1:20:31] We can't wait for two years, is there any more information about subsidies?
[1:20:37] The subsidies are coming, they'll be coming throughout 2026, but did the exact intervention
[1:20:45] that will be subsidized is still under evaluation.
[1:20:52] So can I assume that it would be retroactive for someone that's not gone ahead and done
[1:20:57] that work?
[1:20:57] Those are elements that we're looking to as well.
[1:21:00] I can't guarantee you that they will or will not, but those are some of the elements that
[1:21:04] we're reflecting with respect to the subsidy program.
[1:21:09] Okay.
[1:21:09] Thank you.
[1:21:10] Well,
[1:21:14] King is an area that's been ended identified in the past.
[1:21:19] He, Mr. Finyal mentioned, and all the mapping was small, but essentially there were various
[1:21:24] areas throughout the territory that had been identified as high risk areas.
[1:21:30] Hello. Hello. My name is Daniel, where I live at, when I went Prince Rupert, Prince Rupert,
[1:21:37] Prince Prince Rupert is next to not far from the Lakeshore Hospital close to Singery Park.
[1:21:47] Our street in the last 20 years have gotten flooded about five times.
[1:21:55] First, at the beginning of the 2000, when all of Heimus was being built and everything,
[1:22:01] all the water comes down all-stin, then down Singery, then down Prince Rupert. Now as it goes
[1:22:08] down Prince Rupert towards Singery Park, the pipe doesn't connect. Like our pipe stops halfway
[1:22:18] in the middle of the street and a new pipe underground, of course, starts for Whitley at
[1:22:25] singly parks. So all the water would come from hymns and come.
[1:22:30] And hit there and flood all over houses. This has happened like five times now. Could we have a look at unblocking that pipe and making an open basin in Singery Park? That's right there. It's not even used as a soccer park. There's small areas that are used, but large areas in Singery Park that are not used at all and could be dug and used in case of when we have these things.
[1:23:00] Mr. Finale, just confirmed that it is an area that they were looking into the type of intervention that I can't speak to that, but it is an area that they've looked into are looking into to
[1:23:11] Did you know that the pipe doesn't connect?
[1:23:15] Well, this is new information.
[1:23:16] This is why I wanted to share this with you.
[1:23:18] That's why I wrote it down as well, but it was a sector that we identified earlier.
[1:23:23] Perfect.
[1:23:24] Thank you. Thank you very much.
[1:23:30] Hi.
[1:23:31] Can you hear me?
[1:23:32] Okay, my name is Jennifer. I live at 136 saddlewood. I'm actually asking in general if the flood management system also is taking into consideration the spring saw
[1:23:45] The issues there's lots of people that are not on that map
[1:23:49] My mom is on Valwa Bay
[1:23:51] She has flooding in the spring every year
[1:23:54] And that has to do with the creek systems that have been filled in
[1:23:59] behind the Valois Bay that ran,
[1:24:03] say where the Jehovah temple is down in front of St. John Fisher Church.
[1:24:08] I'm wondering if that stuff has also been looked at and is being incorporated into the flood management system.
[1:24:15] Well, the storm management plan that's undergoing, as we speak,
[1:24:19] will specify and this is something that will pop out as well.
[1:24:22] Because we have, yes, the pipes in the street.
[1:24:24] There's also ditches that are existing or have been filled with time as well.
[1:24:29] So this is something that will go through everything again because in the past it was drainage towards the back and then people were maintaining it and then it was a good flow in the front or end or in the back.
[1:24:41] This is something that will be addressed in the storm water management plan.
[1:24:46] Is it something that we want to go back to? Is it something that we could have a plan B if there is a certain area with problems?
[1:24:53] it's yes it's heavy rainfall but also snow melt as well where we know there's
[1:25:00] low spots a little bit everywhere in the city. Okay and then another question
[1:25:05] would be you have your map of where the troubled issues are will all the
[1:25:12] residents have a chance to look at that so that they can also add their areas
[1:25:16] because I know there was a big focus on the people that flooded during the
[1:25:21] But maybe something more general, just so you can get a better idea because there's people that are, you know, here even tonight that are maybe there's issues that you don't know of because maybe it wasn't
[1:25:35] wasn't on the red flag that popped up in August 2024 or June or July 2026.
[1:25:42] Well, just to reassure you, basically, when they did the first presentation of their report that's underway with, again, the storm water management plan,
[1:25:52] they put the two data on top of each other, all the maps that we had, the data, where there was issues with the flooding in 2024, 2025,
[1:26:03] And their data, what they had simulated in the hydraulic network tools that we have, and it was matching, whatever we had at a complete complaints, or those data were matching.
[1:26:18] It was pretty impressive. Also, this will address the other issues that maybe people didn't call.
[1:26:24] Maybe they didn't have flooded basement, but there are still issues in the street.
[1:26:28] If it goes too high in the street, obviously it's more at risk for the properties around there.
[1:26:34] But it was very impressive.
[1:26:36] The way was matching the data was very good.
[1:26:39] And these are also areas that will be looked into.
[1:26:43] Okay. Last question. Will there be some kind of public consultation before any of these big programs go forward?
[1:26:51] and just my concern might be the butterfly park that's next to the planned retention area.
[1:26:59] If there's going to be any changes there or if there's going to be protection for that area,
[1:27:05] or just curious.
[1:27:08] Usually the presentation for this type of project will be done to the residents that are
[1:27:13] close by. Once the contract is awarded and will be presenting the project, the contractor,
[1:27:20] the amount and what is going to be the impact on the close residents to it.
[1:27:24] Perfect. Thank you very much.
[1:27:26] Welcome.
[1:27:30] Thank you.
[1:27:31] Alistair Dunning. I live on a couple of quick fire questions first and then
[1:27:35] too long ago and for public works and for public security,
[1:27:40] what are the contact methods when people have issues? Firstly, if we see an issue ever,
[1:27:44] we see an incident where we think something's blocked. We talked about blockages earlier
[1:27:49] and reporting.
[1:27:53] You can contact the city, the city.
[1:27:55] There's a number, a 6301234.
[1:27:57] That's our communication center.
[1:28:01] Obviously, if you're calling during the event,
[1:28:03] you might have trouble getting through.
[1:28:05] You also have a different, if you go on our website,
[1:28:08] you also have different email addresses
[1:28:10] for the contact public security, the contact public works.
[1:28:14] You can send us a message,
[1:28:16] say, by the way, did you realize yesterday,
[1:28:18] that we had six inches of water on our street?
[1:28:20] It didn't flood our homes, but I'm just letting you know
[1:28:22] we take that into consideration, you know, if there's an active problem in your basement
[1:28:27] is flooding, well, obviously it's not necessarily to call us as to call directly 9-1-1
[1:28:31] and we'll probably be sure even if you do get through, we'll probably be through your bright
[1:28:35] back to 9-1-1-1 and we'll get all that information the day, the next few days after a major event
[1:28:40] and we put it all together and that's where we get our maps and all the different people
[1:28:45] who call them. So your information is important if you don't get through the first time
[1:28:49] send us an email, it doesn't mean you're going to response right away, but at least we'll get
[1:28:52] the information.
[1:28:54] Thank you.
[1:28:56] And then with drainage and, so forth as well, same deal.
[1:29:00] Yeah.
[1:29:00] The counter.
[1:29:05] You can contact directly the main number of the city, as Mark mentioned, or via email, as well,
[1:29:12] it goes through to the main communications counter, who dispatches it to us, and any
[1:29:16] we just carry out a verification, and there's a response as carried out as well, directly
[1:29:21] to the resident. So the next question was, which I think we've answered actually, is there a database
[1:29:26] that tracks all of these issues that we know that we've got 100 issues on that street, 200 over there?
[1:29:32] Yeah, every time a call comes in or a request comes in by email, it's tracked by the communications
[1:29:38] department, and a lot of the times these these elements are transferred directly out to the
[1:29:45] detectable teams who will do carry out a verification. They respond within the built-in system,
[1:29:50] The information goes back to the communications counter, who then will contact the resident to inform them what was done and then the stuff stays and so it's used by the injury.
[1:30:00] Part of the Department to give us statistics and seeing and add to the information we already have regarding the knowledge of the network.
[1:30:08] Can you surface that information in these sessions as well, because I think it would help a lot of people understand that, hey, I know everybody, everybody's got their own problems.
[1:30:18] Like I see, I live on Bray Brook, we have water coming up as a big issue, but if there's an area there's got much more issues, it helps us put it all in perspective.
[1:30:25] I think that was part of the objective of the small plans that were put up,
[1:30:30] but just they're small, so it's hard to see, but a lot of it is we put the information on plans so that visually you can appreciate what sectors are had been impacted.
[1:30:41] But also it's also the, as Ben was mentioned, it's the simulations and then it worked to that confirm where there are issues and we want to make sure that our simulations are valid and that represent what is actually happening on sites.
[1:30:54] so that allows us to confirm.
[1:30:55] But yeah, the operations available and it can show up another way again.
[1:31:01] One thing for sure, they've been working really
[1:31:03] aren't getting the information and trying to put it into a presentation.
[1:31:08] They showed everybody.
[1:31:09] We rushed this meeting to get it done before the holidays.
[1:31:12] They give you peace of mind that there is stuff going on.
[1:31:15] So they wanted to hold off to January and February.
[1:31:17] There would be more information,
[1:31:18] they would say there would be many more consultations.
[1:31:21] You'll see more data.
[1:31:22] They're doing still testing and they're doing all kinds of work to do simulations.
[1:31:27] So as it's going on, it will be transmitted to you publicly and on a website, I presume, right?
[1:31:35] You have to remember, it's climate change is here to stay.
[1:31:38] Yeah, and it's a long term issue.
[1:31:40] So eventually we're committed to making it better.
[1:31:43] We got to take one project at a time and the capacity to do one project.
[1:31:47] So we're going to try and identify those ones that we can reach in a reasonable time limit
[1:31:53] within our capacity to do so, and then we'll keep moving on to the next ones.
[1:31:56] And as we do more and more of these projects, we'll get better at them.
[1:31:59] We'll learn from them, and even the other ones that come down the line will be even more efficient.
[1:32:04] So eventually, yes, we got an entire city to do, but we'll start one or two projects at a time.
[1:32:09] Thank you.
[1:32:10] Thank you.
[1:32:11] Just answer your question.
[1:32:13] More precisely with respect to that nothing.
[1:32:15] Essentially, the storm water management plan,
[1:32:18] once it's presented to the elected officials, can be presented here.
[1:32:22] And you'll see, essentially, the areas that I hope sports.
[1:32:25] Exactly, okay, thank you.
[1:32:30] Hi, I'm Mary Jane Dukus.
[1:32:32] I live on Mount Pleasant in Belaua.
[1:32:36] I just like to thank the city for all her efforts
[1:32:40] to recognize the climate change is real and dangerous.
[1:32:44] And to thank the city for all her efforts
[1:32:46] to mitigate and help and study, you've done a great job.
[1:33:11] Hi, Sandy.
[1:33:13] 100, 75.
[1:33:14] And I'm just hoping that you will look into the ditches that run down sunny side.
[1:33:24] And the rest of the streets along there.
[1:33:27] And I'm wondering, is there any way I know a lot of them are blocked?
[1:33:31] but is there a way that maybe you could dig deeper behind the two properties on
[1:33:40] sunny side and culprits and existing streets that have those ditches? Is that
[1:33:46] possible because they used to be a lot deeper? And the city, the city used to
[1:33:53] come and clean them out. The city used to go up in the in the spring and they
[1:34:00] go in the fall and they would clean that all out.
[1:34:05] Is it possible not every portion of that ditch
[1:34:09] is city property? That's some of the issues over time a lot of it has become private property.
[1:34:16] So the portions that belong to us, yeah, they can go with a reprofiling can be done in certain
[1:34:20] areas but there's some portions that run along the back of the property that we no longer have,
[1:34:25] that's triple land that we used to have. So that's something that needs to be looked at before we
[1:34:29] we go, but most of the properties in point
[1:34:31] Claire originally had been designed with that,
[1:34:34] that was that ditch along the back of the properties.
[1:34:37] And over time, people raised their lawns or planted trees
[1:34:41] or planted cabans and filled it up.
[1:34:43] It's led to a lot of issues of a lot of drainage issues
[1:34:46] on a lot of properties.
[1:34:47] So it's a common issue.
[1:34:49] That's one of the few areas, though,
[1:34:50] where we do have some land still that gives us a little bit
[1:34:54] of leeway to intervene and help the situation.
[1:34:57] But it's sort of a common issue that we have
[1:34:58] And it's part of the challenges we have to address and look at and that we'll be able to
[1:35:04] get a better appreciation of in the the pleasure of the city and the basins that are
[1:35:08] at the end of those ditches.
[1:35:10] Those are the cities.
[1:35:11] At the end of the ditches, they connect to the city, right?
[1:35:14] That's the same thing on the other streets.
[1:35:16] Those catch basins, they connect to the city system.
[1:35:21] But the ditches themselves or in some cases the piped in ditches don't necessarily fall
[1:35:27] on city land. They were just the way they were they were done. So as additional challenges,
[1:35:32] but it doesn't mean it's not something they were taking a look at.
[1:35:35] So is possible to have somebody come and have a look at it?
[1:35:39] Yeah, for sure, for sure. We can always look at everything. Yeah, yeah.
[1:35:41] Because I'm sure coming down from Belmont, yes, they are blocked.
[1:35:47] Yeah. But from my end, two Donnie Gany is all open up.
[1:35:51] Well, we'll take a look at it and see where our property lands, but I think I know in that area,
[1:35:55] there is a strip that belongs to the city and for sure the maintenance can be done yet.
[1:35:59] Oh, that would be great. That would be great because that was the issue last time. That
[1:36:04] all blocked up. They basin all filled up and there was nowhere for the water to run it except
[1:36:10] come in the backyard. We'll note it and we'll take a look. Super. Thank you very much.
[1:36:19] Good evening.
[1:36:19] What I noticed for both storms, 2024 and 2025, we had the big power outage.
[1:36:28] So when the power went off, the pump stopped working.
[1:36:32] That's when the house flooded.
[1:36:35] So can we make sure that hydrocobec is on top of like to provide us adequate electricity
[1:36:44] I don't know if it's a question that branches were falling on electricity lines, maybe it should be better maintained,
[1:36:52] because I went even for a walk in the evening and I could hear homes where the generator was working, and that's the area that got flooded,
[1:37:00] so that's something else to consider.
[1:37:07] So first of all, I have a meeting with Hydro, I think it's January 14.
[1:37:11] And the New Year, to understand one vessel made power failures, I know like for instance a couple of weeks ago, or a month ago, it was complain, but somebody took a hydro, took a hydro pole, and that's why they're in a power failure.
[1:37:23] And if the gas leak in their value, they shut off the power.
[1:37:26] Sometimes it's not always high-drills fault, there's other research.
[1:37:30] But I want to get the list. And as far as you're right, there's a lot of times it is, trees at the top, hydro, last time we talked to them, they maintained tree canopy along hydro lines on the average of every four years, but they need to do it more because they were branched.
[1:37:47] They came back so they did do an intervention after only two years, made a big difference. You've seen them working nearly a lot lately, but the trees are definitely a big problem. There are a lot of mature trees, especially in point-lair.
[1:37:59] We're trying to save as many chooses as we can, but in the meantime there's a negative side to it.
[1:38:03] So, but that will be all stuff that will come over and meet there with Hydro in January,
[1:38:07] which I will let everybody know exactly what's happening.
[1:38:09] Yes, I was wondering when you take your statistics,
[1:38:11] were you asking people, did you have a power outage, which also contributed to your flood?
[1:38:17] Well, they know we know where the power outage is.
[1:38:19] We're in no states where you know where the area was out.
[1:38:21] And yes, that's part of the, and maybe that'll be part of your subsidy program.
[1:38:25] that may be people who have to buy a sample for the back for something, that's all stuff we're looking at, you know, what they are, maybe buy a generator, but that'll be all part of where we're coming over with the subsidy.
[1:38:34] That would be cool, a subsidy for a generator.
[1:38:38] But there are some, there are some pumps now that come with marine batteries and that way it, it won't last you for 12 or 14 hours, but you might get through four hours out of it, and generally speaking when there's power editors, they don't necessarily last all day all the time.
[1:38:52] So that's something's this options that are available to you on the private side or like the
[1:38:57] Mayor set a generator which will run your front pump. So at least again you'll avoid the
[1:39:03] water backing up in that house. Okay and my other point I was thinking of during the presentation
[1:39:09] was you're gathering information you're having people full of surveys and all that. I just want to know
[1:39:15] are you sharing that information with the insurance companies because this year when I shop around
[1:39:19] for insurance quote was told that I'm in a flood zone.
[1:39:24] I mean, I'm far from my river or a lake.
[1:39:26] Why would I be considered in a flood zone?
[1:39:28] And where did they get that information?
[1:39:30] Well, insurance companies will get their own bad
[1:39:32] in order not to have to pay it, right?
[1:39:34] So they'll create their own bad abation, but that's not paying for it.
[1:39:36] There was a new flood map that just came up like a back.
[1:39:39] Not only because of the flood that we had the other day,
[1:39:42] but from going back to 2018, we got flooded.
[1:39:44] So Quebec is creating a whole new flood map,
[1:39:46] which I believe it just came online.
[1:39:48] And that's the information that they come out with themselves. They do the flood not
[1:39:52] and we don't do that. But insurance companies definitely create data from all their claims
[1:39:57] and they end up creating a, because you see that's around the bodies of water lakes and
[1:40:03] no, not necessarily. Now they're going to have the floods for the middle of the street.
[1:40:07] Uh, but after what we just lived there, there are areas that will be identified as a high risk area now, for sure.
[1:40:14] And there's a new flood map coming out.
[1:40:16] It's come out.
[1:40:17] It's I believe it's online a couple days ago.
[1:40:20] I'm freaking back.
[1:40:21] Oh, I saw
[1:40:30] it first.
[1:40:31] So they have that information.
[1:40:32] They have it all.
[1:40:34] It doesn't go in the city.
[1:40:35] It exists and you can even find it on the internet.
[1:40:37] But it's not something to do with the sea level or something to do more with like the
[1:40:40] sea pipes not working.
[1:40:43] It's with the elevations.
[1:40:44] And point that I actually got taken out of the flood map in 2018.
[1:40:48] We went to Quebec City and we were ourselves from Beacons,
[1:40:51] I've been up over the two first days to get out of the flood map, because of our other
[1:40:56] old village, we were with, there's no danger, the only place where there was any chance
[1:41:01] of flames at the boat ramp at the bottom of the car, so we were the first from this
[1:41:05] valley to get out of it because we did our research, we sent it back all the data, so we were
[1:41:08] not part of the flood map.
[1:41:10] I want to verify it in the next couple of days that we weren't put back in it, but we were
[1:41:13] completely out of it.
[1:41:14] Okay, and most of our streets also, well that was 2018, I was because of the leg, not
[1:41:18] because of the streets.
[1:41:25] has false dead again.
[1:41:28] You mentioned the elevations, I guess, you know, we have floods on the Hymus, and that's 10 meters higher than the lake at the worst of times.
[1:41:38] So, the flooding isn't only related to elevation above the lake.
[1:41:45] Yeah.
[1:41:48] Okay, guys, they could have listened on the webcast.
[1:41:50] Can't hear you guys talking about the lakes, unfortunately.
[1:41:52] Okay, I asked earlier, I've been to one council meeting here previously and asked what kind of studies were being done on the whole fled situation.
[1:42:04] The only thing I could get out of that was the ETS Masters thesis that was being done at ETS.
[1:42:13] But I'm encouraged to see, you mentioned that there was a hydrologist here that's been hired, I guess since then, since the flood of last year.
[1:42:22] Our engineers were doing, we've been doing our own simulation on the hydraulic tools that we have for all various simulations.
[1:42:30] We've been doing it for the longest time together.
[1:42:33] Okay, the council was not aware of that, I guess.
[1:42:35] We had sort of raises one of these.
[1:42:37] Our engineering team does it all from those simulations all the way up to the job inspections,
[1:42:43] but yes, that was part of our design when we were proposing a design or a new street.
[1:42:49] we were looking into the capacity of the drainage pipe
[1:42:53] as well as the sanitary pipes.
[1:42:55] These were calculations we were doing downstairs.
[1:42:59] But this one was major, because it's the entire city.
[1:43:02] It's something way more, it's way bigger
[1:43:05] than what engineering department could do downstairs.
[1:43:08] Oh, OK.
[1:43:09] So this specific, and that's recent.
[1:43:12] OK, so I know I'm curious to hear that you are updating
[1:43:15] your hydraulic model.
[1:43:16] and so I asked a question at the council as well as where and I'm thinking selfishly now about
[1:43:24] the pipe from the from the park from Tercotta Park down to the lake because it's that pipe that's
[1:43:31] flooding us. So I asked a little bit about my opening statement and I was telling you how
[1:43:37] impressed I was with all the work that they had done and they hadn't made a public yet and that's
[1:43:41] why we called this meeting because they had done all these tests and all these scenarios and yes
[1:43:46] we didn't know, but they're doing this since
[1:43:48] especially flooding in 2024, they've been working really
[1:43:51] hard on it.
[1:43:52] You've got to show this, this isn't.
[1:43:53] So that's what the purpose of this meeting was tonight.
[1:43:56] And it'll be more stuff coming out.
[1:43:58] So there, yeah, they know a lot of great work.
[1:44:00] And now you all know, and I hope we'll be more coming.
[1:44:03] OK, because the question I had at that council meeting
[1:44:05] is where is the bottleneck on that pipe?
[1:44:07] Where there's a restriction somewhere.
[1:44:10] We already know that the entrance to the pipe is a restriction.
[1:44:13] That's why it's overflowing onto Glamlin.
[1:44:15] But once the water is in the pipe, there's a restriction.
[1:44:19] There's something keeping from restricting as flow into the lake.
[1:44:22] Do we know from the model what section of that pipe is the actual restriction?
[1:44:27] Because the city has sent some of my neighbors, different drawings,
[1:44:32] I've requested some myself.
[1:44:34] And I see that that pipe actually has a restriction at the lake itself.
[1:44:37] It goes up to seven feet, and then it restricts to six and a half feet
[1:44:41] and the last hundred feet going into the lake.
[1:44:44] that's what causing the uh well the drainage system is very complex and in this scenario
[1:44:49] basically you have one of the largest drainage basin in the city. It starts from the way up north
[1:44:56] and goes all the way down through terracotta where you have three-
[1:45:00] Big pipes going into the ditch interracotta. Then it goes back to that grill at the end of Glennlin. And then it goes all the way up to the lake. So obviously, when you look at it, basically, just like this, you said, well, okay, there's three big pipes. There's a big ditch and it goes into a little pipe at the end of Glennlin. But it's everything else that has to be considered as well. And we know there are sensitive spots. It's just a question of addressing it properly. And again, the agglows involved in this project.
[1:45:30] We want to do our part, point-clear ones to do their part, we're talking with the aglow,
[1:45:36] but we need not only their money, but their engineering staff as well.
[1:45:44] They have those simulations as well, where they can come and improve the system,
[1:45:48] yes, on their network, but that touches ours as well locally.
[1:45:52] What point does the responsibility shift from the city to the
[1:45:56] agglomeration?
[1:45:58] What diameter do we know?
[1:46:01] It depends on the pipe.
[1:46:02] It's more the role of the pipe.
[1:46:04] So you have collector pipes and you have transport pipes.
[1:46:06] Once we're talking about transportation of the water, then it's
[1:46:11] agglomeration.
[1:46:12] So there's a plan that exists, specifically indicated.
[1:46:15] It's the same thing for aqueduct, for sanitary and for drainage.
[1:46:21] different sizes. In general, once we get to the larger dimensions and we're no longer,
[1:46:28] there's no catch basins that are directly attached to these conduits. So the ones that
[1:46:32] all empty into Terracotta, Terracotta ditch itself and everything that goes from Glamlin out to
[1:46:40] the lake, it's all 100% aglomeration. We have certain responsibilities. There's shared responsibilities
[1:46:46] that they give us in order to, because we're here, we need to upkeep it, but they're responsible for the conception and making sure that it's the right, it's size properly.
[1:46:57] But it doesn't also mean that the engineering department doesn't look at it and look at it in part of their simulations so that we can point much all in the right direction.
[1:47:06] All right, so at this stage, would you be able to, do you have the data to determine what part of that pipe would need to be rebuilt?
[1:47:16] If it were to be rebuilt,
[1:47:21] you have a model, you said that's very well calibrated.
[1:47:25] Again, that's been addressed with the City of Montreal, and it's something that will be
[1:47:29] keep pushing, because yes, point-clay will be due there at part, it's going to address part of the
[1:47:34] situation, but we know from there all the way to the lake, there's diameters that have to be
[1:47:41] re-addressed by the City of Montreal, and there are where the situation, we sent them the study as well,
[1:47:45] So, where it's a partnership with them, we want to make sure we push them enough to
[1:47:51] it faster than later.
[1:47:54] Thank you very much, and can I ask, is there anybody in this room who lives on Glenn
[1:47:58] and Street?
[1:48:01] Nope.
[1:48:05] Oh, yeah.
[1:48:06] We'll ask you.
[1:48:08] I'll take it off.
[1:48:08] Okay.
[1:48:09] Thank you.
[1:48:13] Roger Palfrey, I live on Emboldt in Crescent, and I thoroughly enjoyed this information session.
[1:48:21] you're doing a lot of work and it's good to see that you are.
[1:48:30] And before I go I just want to get back to something that was mentioned and that is making
[1:48:38] sure that individuals with their looking after their own property can be part of the team
[1:48:46] that's trying to deal with this problem of occasional and not so occasional heavy rains.
[1:48:57] And I'm wondering if I mean we can all have our stories, I'm not going to go into mine.
[1:49:04] But I would like to, and it's always nice if there's someone from the city who's able to come to talk individually
[1:49:14] or we can go and meet them and talk individually, but often it's a case of someone looking
[1:49:20] at your property, looking at where you are, how it's situated. What knowing what you've already
[1:49:26] done, what isn't working and how you might actually improve it within the bylaws and the needs
[1:49:35] of not overloading the bigger system that you seem to be mostly looking at at the moment,
[1:49:44] quite rightly. I don't know about great answer, but essentially got an answer for that.
[1:49:51] In essence, we're working with Equi. I bet that's okay, Quebec. To they would be an entity
[1:49:57] that would come and essentially evaluate your dwelling, your land to see what would be the best
[1:50:04] possible solution for your particular context, okay? So one would have to report one's problem first
[1:50:10] to get the attention, what would have to somehow let the city know, correct, that we have a
[1:50:21] problem, some sort of outline of the problem, and then maybe we would be on a waiting list
[1:50:31] to be seen by some.
[1:50:32] Well, the process itself, if you go on a city of much rather, they use the Gulevitais
[1:50:37] back as well. The process they use with the city of Montreal essentially is that you fill out a form
[1:50:42] detailing your problematic equi-vitational context, you get more information, should they need more
[1:50:48] information, and then the dialogue is established between the two to visit your dwelling and that
[1:50:55] to find possible solutions. So, this goes with the city of Montreal. No, no, currently that's an example
[1:51:04] with the city of Montreal, and we're trying to replicate that type of service for the
[1:51:10] city of Portland. That's what we're working on moving forward.
[1:51:13] And we will hear about it. Thank you very much.
[1:51:17] You're welcome.
[1:51:26] I live on Portland, and I've been flooded twice. Call engineering department. They showed up.
[1:51:33] guys, Sean, fantastic man, patient, didn't tell me to evolve with all my questions, try to
[1:51:40] answer, like a little camera stuff, but the thing is, I never got a resume of what's happening,
[1:51:46] how do I get that?
[1:51:49] Yeah, I wrote it down, I'll talk with you on tomorrow, all right, but yeah, it is 49 part
[1:51:57] And the second question is, is there a car that ditch useful for the flooding in
[1:52:03] particular?
[1:52:05] Is it controlled enough to slow down the water flow from where it comes from before it gets
[1:52:10] to the bottom of the hill?
[1:52:13] It's a drainage ditch, it's not there to control the flooding as there to transport water.
[1:52:18] That's the way it was originally designed, Montreal designed it and built it in,
[1:52:26] it was
[1:52:26] within the ditch, the putty.
[1:52:30] If you sort of hydraulic dams that are meant to slow down the water, these dams need maintenance, and there's no way to maintain these, these sort of hydraulic dams, because there's no access within the park. And this is one of the issues that we're working with with the city of Montreal to try to get them to fix the issue so that this can improve the situation. It doesn't, it won't fix everything, but it's one of the measures to slow down the water. So it doesn't arrive as quickly as this fills up with debris over time. The water just flies over it.
[1:53:00] And if ever you, you're at the edge of Glenland during one of these storms, we have four,
[1:53:05] four, four meters of water, and we need to get that water inside the conduit as quickly as possible, so it doesn't go over.
[1:53:12] So, uh, yeah.
[1:53:13] That's what I'm asking, because I also mentioned that to Sean.
[1:53:16] On Parkland, we got a wood, a little wood, a ditch that's really deep, and there's water drizzled in there.
[1:53:25] Where couldn't it be used for basin, for maybe the gang up,
[1:53:29] say, Louis, to control the water flow that comes down,
[1:53:32] and maybe we wouldn't get flow like flooded down below?
[1:53:36] The way we see it now, every green space is an opportunity.
[1:53:40] So that's part of what we'll be looked at.
[1:53:42] And the engineering department, they're looking at all these green spaces.
[1:53:44] All of our parks, all of our natural environment,
[1:53:46] is an opportunity for us to do better, to better manage the water,
[1:53:51] slow down the water, so that it doesn't overload the system
[1:53:53] cause problems for the land of the road. So it's a possibility I can't tell if I look
[1:53:57] into details but I'm sure it's all these areas are up for grabs on the list of engineering
[1:54:03] for sure. Because that could be a nice push.
[1:54:09] Thank you.
[1:54:12] Hello, I'm going to go back to the 14th Berlin Green.
[1:54:15] At the point of that, I'm in the front of the corner,
[1:54:19] we have a FUSSER and a FUSSER.
[1:54:22] A big FUSSER, I'm going to make it.
[1:54:27] I'm going to put it in the second one.
[1:54:28] It's like the two of them, the second one, the second one, the second one.
[1:54:32] The second one, the second one.
[1:54:32] And it's now in the middle of the school.
[1:54:37] And I'm the most proud in the generation,
[1:54:39] In fact, it started from 2007, and we ended up in the middle of July, the problem was in 2020.
[1:54:46] We came with a cameo in operation, and they opened the cage at the level of the conduit.
[1:54:56] The question I think is, is that it is a suicide, and a conduit that the propriety of the ship or the ship is the ship that is the ship that is left.
[1:55:11] We say, being a world champion,
[1:55:13] that is not a kind of competition.
[1:55:14] At the time, I used to live in a community.
[1:55:17] I used to live in a community.
[1:55:21] But at that time,
[1:55:24] there was no one to be able to see it.
[1:55:28] There were no people who were able to see it.
[1:55:29] They were able to see it.
[1:55:31] For certainties,
[1:55:33] for certainties
[1:55:34] or for others,
[1:55:36] the property of the ship, but not several years ago, they did not.
[1:55:39] And yes, we were installed, we were installed, we were installed by the
[1:55:43] promoter, the poor, the very, very, very long time, or the rest of them,
[1:55:47] that we have a lot to offer. It is a part of the heritage of the
[1:55:51] point of view. In fact, we are already already in the middle of the
[1:55:54] world of the world, and then just because it is true, on the
[1:55:57] land, it is possible that we will absolutely ignore it, but for the
[1:56:00] solution we will vary, then we will change a function.
[1:56:13] Yeah, it's a process of doing it, but that's it.
[1:56:16] Yes, but the other question is to have a...
[1:56:19] Why do we have to have a plan to do that, to say good things?
[1:56:23] What is the plan? What is the plan to do?
[1:56:26] What is the plan to do?
[1:56:27] in two or three or four years.
[1:56:30] What is the options?
[1:56:31] What can we start in a business?
[1:56:33] And what can I do?
[1:56:35] What can I do to be able to understand,
[1:56:38] you say, you have already seen it,
[1:56:41] but it's possible to look at it
[1:56:43] in detail,
[1:56:44] or it's in the beginning of the private business.
[1:56:48] And that's all.
[1:56:49] It's the domain of private business.
[1:56:51] It's a change in nature.
[1:56:53] But it's supposed to understand,
[1:56:56] with the project in the engineering industry.
[1:56:59] We need to work on the sectors.
[1:57:01] In the course of the course of the course,
[1:57:02] we need to be able to generate certain problems.
[1:57:04] We need to be able to make resources for the materialism
[1:57:08] to create their own spaces.
[1:57:09] It's the same as in other states.
[1:57:12] But I think that when I look at the method of creating the environment,
[1:57:16] we need to look at the work.
[1:57:17] When you're done, I'm going to say that
[1:57:24] to shape.
[1:57:32] I live on St. Louis between Martian Delmar, and like the gentleman before, we did make the top
[1:57:42] five, either.
[1:57:44] So we just want to duly note that you guys are looking into a problem, on St. Louis, because
[1:57:52] On the last presentation, where the flood was,
[1:57:55] where the car was floating, that's our house,
[1:57:57] and with a finite area, but a hundred meters of mine.
[1:58:00] My neighbors and I just want to make sure
[1:58:02] that that was being taken look at on St. Louis.
[1:58:05] Could I add, I heard nothing, I had,
[1:58:08] and I talked to my counselor, Mr. Poffron, he's well aware,
[1:58:11] but we just want to make sure that there's some kind of action,
[1:58:14] or maybe even a temporary solution,
[1:58:16] because we've had to out of pocket,
[1:58:18] been there for over two decades.
[1:58:20] We've never flooded him.
[1:58:21] We fly in twice in a year. And of course, you know, the insurance is not covered. So we
[1:58:26] have to call it our own plumbing experts, our own engineering experts, to make sure just like
[1:58:30] the gentleman on King, when it rains, we can't sleep, because we don't know if it's going to
[1:58:35] fly again. And this is a finite area. So while we're asking more or less, it's just to looking
[1:58:40] to the problem. So we know that something's going on there. That's it. But thank you very much for
[1:58:44] the presentation. Thank you. This is roller.
[1:58:54] You just make me think something. All of Saddlewood before
[1:58:58] it was built. That was all the brickyards. And in there was an apartment building. So I wonder if
[1:59:07] there's any hidden pipes underground for sewer system or drainage? Anything is possible. Unlikely
[1:59:17] with it, when they rebuilt the streets, usually they dig all that up, but anything is possible and
[1:59:22] will normally the things that are connected to the city drainage system, where we're aware of them,
[1:59:25] and a lot of the issues were having a more on the surface, but that's a possibility.
[1:59:33] I just wanted to throw it out.
[1:59:36] Because that was late 50s, early 60s.
[1:59:40] Yeah.
[1:59:40] We're on that time.
[1:59:42] Before we develop, too.
[1:59:43] Before you guys were born.
[1:59:45] Okay.
[1:59:46] Thank you very much for all that you've done and for putting on this session tonight.
[1:59:52] I don't know everybody so I was going to end the evening again so the purpose of the night was to just let you guys all know everybody knows
[2:00:00] We've all lived through hard time, we've had that flooding, that the city really is working, how it had it. They're taking it serious. Council is on top of it. Everybody's been affected and we want you to know we're doing whatever we can. A lot of players, and as you heard about the agglomeration, you heard about a fearful rock, we heard about much of a lot of players and a lot of bureaucracters. We're trying to beat all that. We're trying to get done as fast as possible and they're doing a great job. They're a little bit mellow and they don't want to show off what they've done but they've done a heck of a lot of good work and a lot of good work and a lot of good work and a lot of good work and a lot of good work and a lot of good work and a lot of good work
[2:00:29] last year. So I'd like to congratulate them all. I wanted to thank them all for coming
[2:00:33] out here tonight and I asked them like I said, they'd expediate the process. They weren't
[2:00:39] happy but they got the job done. They'd great job. Thank you very much and I hope you
[2:00:43] guys all go home. Have a happy all day. You can sleep well. Thank you so much.