[0:09]
Leading the order
[0:12]
for the Queen Annes County Planning Commission
[0:14]
on July 9th, 2026.
[0:17]
We'll start with the Pledge of Allegiance.
[0:19]
I pledge allegiance to the flag
[0:22]
in the United States of America and to the republic.
[0:25]
She stands one nation under God, indivisible, liberty
[0:30]
and justice for all
[0:36]
public comments.
[0:40]
We had no one signed up.
[0:41]
Okay. Updates legislative and legal matters.
[0:51]
Oh, you're right there. Sorry. Yeah, good morning.
[0:55]
Move one over. Hmm. You wanna move one over?
[0:58]
I'll just Scoot. That's it. Yeah.
[1:03]
Good morning, Amy Mordoff, planning director.
[1:05]
I have a few updates.
[1:08]
As you know, we had a a long list
[1:10]
of citizen sponsor text amendments.
[1:12]
Three of them were approved on the 9th of June
[1:15]
and will become effective on the 25th of July.
[1:19]
Those were amendments to the airport,
[1:23]
Kent Island Gateway District
[1:25]
and the WVC had two text amendments.
[1:29]
Those will become effective in July.
[1:32]
As I said, two of them,
[1:37]
26 0 6, 26 0 5, 26 0 6 is the
[1:41]
suburban commercial proposal
[1:44]
to change the impervious surface limit from 45 to 80%.
[1:49]
And then the proposal to alter the supplemental gas
[1:54]
standards relative to the setback from an intersection
[1:57]
and how you measure that setback.
[1:59]
Those two text amendments
[2:02]
had their public hearing on the 30th of June
[2:05]
and are potentially up
[2:08]
for a vote at the commissioner's next meeting,
[2:11]
which is on the 14th of July.
[2:15]
The other two text amendments
[2:17]
that are still hanging out there are relative
[2:20]
to the open space provisions, both in the TDR
[2:24]
and NCD districts.
[2:28]
Those projects have had a, they,
[2:33]
those two text amendments had their public hearings on May,
[2:36]
May 26th, and then on the 9th of June when they may have
[2:40]
been voted upon, the commissioners were considerate
[2:44]
of comments that were received relative
[2:47]
to maybe narrowing down non-agricultural uses
[2:52]
that are permissible in open space specific to
[2:57]
projects that have been subject to the,
[3:00]
the lot line adjustment as proposed.
[3:03]
So the commissioners requested that staff
[3:08]
put forward an amendment for their consideration.
[3:11]
So they are going to introduce an amendment
[3:15]
that is substantive enough
[3:17]
because we are looking to change what is permissible
[3:22]
in the open space.
[3:25]
So at their next meeting, which is the 14th of July meeting,
[3:29]
that amendment to the two amendments,
[3:32]
which is really one amendment which will apply to both
[3:35]
because the open space provisions are in one table.
[3:40]
So the TTDR
[3:41]
and NCD provisions are sit in the same place in terms of
[3:45]
what is permissible in open space.
[3:47]
So that amendment will be presented
[3:50]
and introduced at the 14th of July meeting,
[3:52]
and we'll come back to you for recommendation.
[3:55]
So that one's taking a little
[3:57]
longer to go through the process.
[3:59]
In terms of general updates, just to let you know,
[4:04]
I had mentioned to you the Turning Point Energy case,
[4:08]
which is three co-located community solar projects
[4:14]
that total almost 10 megawatts
[4:17]
and is cited in the town of Centerville's growth area.
[4:22]
I had mentioned that we were going to intervene in that case
[4:25]
and Lindsey on our behalf filed that petition
[4:29]
to Intervene, which was entered into the
[4:32]
record on the 8th of June.
[4:34]
And we are just continuing to participate
[4:37]
in the public utility law judge
[4:40]
and the Public Service Commission's
[4:42]
consideration of that case.
[4:44]
There are several dates that are relative
[4:47]
to submitting testament testimony and briefs
[4:51]
and Lindsay's just been keeping up with that.
[4:54]
And we will be making comments
[4:56]
and going on the record as appropriate to represent
[5:00]
what we feel is the correct interpretation of our code
[5:03]
and the state's renewable energy provisions.
[5:08]
Additionally, we had
[5:13]
canceled our August meeting for the Mako Conference.
[5:16]
There was a thought
[5:17]
that we might hold a special meeting in August if we had any
[5:21]
items for the agenda, but we do not.
[5:23]
So our next meeting will be on the,
[5:27]
on the seventh in s September.
[5:30]
I was trying to get the date, but, so no August, okay.
[5:32]
Hmm, no August, no August.
[5:34]
But at the Mako Conference, which is the 12th
[5:36]
through the 15th of August, just to let you know that
[5:41]
I'll be representing the county on a panel
[5:44]
that is discussing building the bigger picture,
[5:48]
and that is the county's,
[5:50]
I'll be the county voice on a panel discussing a lot
[5:53]
of the state provisions that impact development
[5:57]
and how the county can leverage some of its resources
[6:01]
and its own zoning to maximize some
[6:05]
of the positive aspects of that partnership.
[6:09]
As we've seen a lot of legislation
[6:11]
that impacts our local zoning codes.
[6:14]
Additionally, the Maker,
[6:16]
the Mako Planners affiliate will hold a work session
[6:19]
and I'll be chairing that session as the president
[6:22]
of the Planners affiliate for Mako.
[6:25]
That it, That's everything.
[6:27]
Miscellaneous staff items,
[6:28]
Those were my miscellaneous items.
[6:30]
Okay.
[6:31]
Alright. Major project. Thank you.
[6:37]
Thank you. Reliable Development Company.
[6:43]
Steve? Yes,
[7:01]
Good morning.
[7:02]
I'm Steve Johnson, senior Planner with planning and zoning.
[7:04]
It's good to see everybody again.
[7:06]
I want to thank Rob for filling in for me last month.
[7:08]
I hope he didn't give you too much of trouble
[7:13]
as stated by the the chair.
[7:14]
We are here to discuss SP 26 dash oh two dash 0 1 72
[7:20]
for Reliable Development Company LLC, who is proposing
[7:23]
to construct a 40,040 square foot building for the design
[7:26]
and fabrication of specialty vehicles
[7:28]
and is requesting major site plan approval.
[7:32]
This project did receive concept plan approval
[7:34]
in December of last year.
[7:37]
What you're about to see is essentially the same as
[7:39]
what was presented then.
[7:42]
Project's located in Stevensville south of Route 50
[7:44]
and East Pier One Road behind the target.
[7:48]
More specifically tax map 56 parcel 20 lot 1 0 9 totals
[7:52]
4.411 acres
[7:54]
and is located off of Ellendale Farm Lane in Stevensville.
[7:57]
The target is the large white building you see
[8:00]
at the center of your screen there.
[8:02]
And as you can see by the area,
[8:03]
the property is currently utilized for agricultural use
[8:08]
Property zoned urban commercial
[8:09]
and is located within the Chester Stevensville growth area.
[8:12]
It's also located in the priority funding area,
[8:14]
which is not shown on the screen.
[8:19]
Property's partially located within the RCA
[8:21]
designation of the critical area.
[8:22]
This is the dark green sliver property
[8:24]
on the east side there.
[8:26]
That area is subject to an easement that limits use
[8:28]
to passive recreation planting
[8:30]
and landscape landscaping associated,
[8:32]
not associated with the proposal.
[8:35]
No part of this proposal encroaches upon
[8:37]
that area as required.
[8:40]
All chapter 18 landscape requirements are met
[8:42]
with this proposal that includes on onsite parking lot,
[8:45]
street buffer and screening plantings.
[8:48]
There are 0.189 acres of non-Title wetlands
[8:51]
and 0.52 acres of the associated buffer buffer on site.
[8:55]
These are the bright green areas
[8:56]
at the center of your screen.
[8:58]
The applicant is proposing to disturb 0.188 acres
[9:02]
of wetlands and 0.435 acres of buffer.
[9:05]
This disturbance has been authorized by MDE
[9:07]
and a copy of that authorization
[9:09]
was included in your packets.
[9:11]
There are 0.40 acres of woodlands on site
[9:14]
of which the applicant is proposing to clear 0.15 acres
[9:17]
that is delineated on your screen
[9:19]
as the hatch brown and white area.
[9:22]
Forest conservation has been addressed
[9:24]
with the original subdivision
[9:25]
and there are no steep slope streams, erosion hazard areas,
[9:28]
endangered species or areas
[9:29]
of a hundred year floodplain on site light.
[9:34]
Here's a look at the site plan.
[9:36]
Access is taken off
[9:37]
of Thompson Creek Road shown
[9:38]
circled in yellow on your screen.
[9:41]
All uc, district non-residential development standards are
[9:44]
met with this proposal including floor area
[9:46]
and imper area, which are both well
[9:47]
below the maximum permitted all chapter 18 parking
[9:52]
requirements met with this proposal and stormwater will be
[9:56]
provided on site and has been reviewed and approved by DPW.
[9:59]
Should you have any questions
[10:00]
regarding the stormwater on site there
[10:02]
as a representative from DPW here
[10:04]
to answer any questions you may have.
[10:09]
Property will be served by public water and sewer
[10:11]
and the project meets the requirements
[10:13]
of the adequate public facilities ordinance.
[10:15]
A copy of the A PFO approval letter was included
[10:18]
in your packets as well.
[10:20]
There is a overhead flight easement that runs
[10:22]
through this property, which restricts structures
[10:24]
and plantings to a maximum height of 35 feet.
[10:27]
This proposed development will comply with that restriction
[10:30]
as the building is proposed to be 34.8 feet in height
[10:33]
and all plantings will be kept below 35 feet.
[10:37]
It should be noted that the airport manager does support
[10:40]
conditional approval of the project subject
[10:42]
to the conditions that were included.
[10:43]
It's in the staff report.
[10:47]
There are road improvements
[10:49]
proposed as part of this development.
[10:50]
They include milling, resurfacing, res striping,
[10:53]
and minor widening along the south
[10:55]
side of Thompson Creek Road.
[10:56]
There in the dark dark ray that you see on your screen,
[10:58]
that is to supply a full width shoulder and curb.
[11:05]
During concept plan review,
[11:06]
the planning commission had concerns with truck turning
[11:11]
movements in and out of this site.
[11:13]
To address that, the applicant has developed a truck turning
[11:15]
exhibit that was included in your packets.
[11:17]
This is a snippet from that.
[11:19]
This is the inbound traffic coming into the site.
[11:22]
The trucks are shown as light blue
[11:24]
and the paths they take are shown as purple on your screens.
[11:30]
And this is what outbound turning movements may look like.
[11:33]
It's my understanding that the applicant has brought
[11:35]
their traffic engineer here.
[11:36]
So if you have any questions,
[11:37]
they should be able to address those.
[11:41]
Here's a look at the renderings of the building.
[11:43]
This is looking towards the south.
[11:45]
This is the entrance of the front of the building.
[11:48]
This is looking towards the northeast shows, the west side
[11:52]
and the rear of the building.
[11:55]
This is looking towards the northwest,
[11:57]
which is the east side of the building in the rear again,
[12:01]
and this is looking towards the southwest.
[12:04]
With that, before I turn it over to the applicant,
[12:07]
I do want to thank them.
[12:08]
They were a very good partner in this review,
[12:12]
the app, both the applicant
[12:14]
and the engineer worked really well with us and,
[12:17]
and I, I wanted to give him a compliment for that.
[12:28]
Good morning. Good morning.
[12:30]
My name is Tim Glass Land Engineering
[12:33]
and to my far right is John Brians with Tech Ops.
[12:36]
Remember seeing him before and
[12:38]
to my immediate right is Dorsey Schultz
[12:40]
with reliable real estate Development.
[12:43]
Mark Keeley, as Steve mentioned, is also behind me
[12:45]
with traffic concepts
[12:47]
and Genevieve McFarlane is also here as well.
[12:51]
Thank you Steve. That was pretty comprehensive on
[12:54]
what we could or discuss any further.
[12:58]
I will just simply mention to you that with regards to
[13:03]
the SHA approval
[13:04]
and access we have, we've checked all the boxes there.
[13:07]
Essentially where we're at right now is submitting
[13:09]
for final bond estimates for surety
[13:11]
and submitting the app, actual application.
[13:14]
I mean, we're through that, that process with them.
[13:16]
And also I think Steve just mentioned that we have the
[13:20]
MDE letter of authorization for the little bit
[13:23]
of non-Title wetland buffer
[13:24]
permits that we'll need for this.
[13:25]
That's ha that has been issued.
[13:29]
Quick note on drainage
[13:30]
and stormwater management, just the site's been designed to,
[13:35]
you know, meet the needs of really the site layout,
[13:37]
what the, what the owner needs to have accomplished on
[13:39]
that site that conduct his business effectively as well
[13:44]
as circulation and stormwater drainage features.
[13:47]
So we on site we have one microbio retention area,
[13:50]
which is an ESD practice as required,
[13:52]
and two submerge gravel wetlands to not only capture
[13:55]
that runoff directly from all the impervious areas,
[13:58]
but to store it, treat it, attenuate it,
[14:00]
and reduce flows ultimately
[14:02]
and total off of the site per requirements.
[14:04]
So that in a nutshell is as a stormwater,
[14:07]
it does provide more than required
[14:09]
of the environmental site design volume, which is a volume
[14:13]
of water that you have to capture, hold, treat, filter,
[14:15]
and then treat before it's released.
[14:17]
So we, we do comply with, with those requirements as well.
[14:22]
And Steve mentioned also, I mean, we're prepared
[14:24]
to essentially, you know, take care of any minor technical,
[14:28]
there's a couple of minor comments we got from sanitary
[14:31]
district about some notes and specs and pipe material
[14:33]
and some things like that that's already listed in there
[14:36]
in their standard details and, and construction criteria.
[14:41]
But they wanted us to kind of dot the,
[14:44]
i's cross the T's on the plans.
[14:46]
There's a couple of minor technical
[14:47]
notes we've gotta deal with there.
[14:49]
And then we've got sureties
[14:50]
and cost estimates that are, that are produced
[14:52]
and prepared, ready to submit back to DPW
[14:54]
so we can get the maintenance and inspection
[14:56]
agreements recorded for stormwater.
[14:57]
These are all kind of the finish line items that have
[14:59]
to be done on all these commercial jobs Anyway, so we're,
[15:03]
we're prepared to wrap all this up, close this out
[15:08]
and help John get moving forward with
[15:10]
what he intends to do with this site.
[15:13]
And with that, I think, John,
[15:14]
if you might wanna say a few words about, about the project,
[15:17]
who you are and so forth, that'd be helpful.
[15:19]
John Brianna, I'm the president at Tech Ops Specialty
[15:22]
vehicles that have been there for nine and a half years.
[15:24]
I'll let go. What, what Steve said.
[15:27]
You know, I think working on a project like this in any
[15:30]
county is, is difficult.
[15:31]
And I think the amount of teamwork that's needed over time
[15:34]
and, and it does take time, is important.
[15:38]
And the county, both Steve
[15:40]
and Rob have been great in coordinating with us.
[15:42]
Numerous site visits, a lot of engagement about
[15:45]
how we comply, but also, you know, kind
[15:48]
of meet the needs of the business.
[15:49]
And, and as we evolve,
[15:51]
I'll mention just a couple things about the business itself,
[15:54]
the physical location, the actual, you know, can, can island
[16:00]
location itself and, and some
[16:01]
of the people involved in the business.
[16:03]
The best way to describe what we do,
[16:04]
and I think most people know,
[16:05]
but it's to just kind of like talk about some examples
[16:09]
of projects that we do.
[16:10]
We do a lot of work for the US government and a lot of state
[16:13]
and local, a lot of Maryland centric work.
[16:17]
Everybody kind of knows about FIFA World Cup
[16:19]
and that the fact that that's going on the most
[16:23]
of the first half of this year,
[16:24]
our business was involved in designing
[16:26]
and building three quarters of the vehicles
[16:29]
that are being used at FIFA World Cup for a lot of the,
[16:31]
the drone defense, nature
[16:33]
and security aspects of what they're doing.
[16:36]
That's, that's an example of it, right?
[16:38]
It's trucks and trailers
[16:39]
and they're being used to kind of track
[16:41]
and mitigate threats from a security standpoint to,
[16:45]
you know, high profile events,
[16:48]
national level security events around the country.
[16:50]
That's some of the work we do.
[16:52]
Our biggest customers tend to fall within the US government.
[16:55]
Homeland Security is a principal customer of ours.
[16:58]
And, and the agencies, the,
[17:00]
the departments within Secret Service,
[17:02]
Homeland Security Investigations,
[17:04]
federal Protective Service groups like that.
[17:08]
The, so that's kind of a little bit of what we do.
[17:10]
We have engineers, we have technicians,
[17:12]
a lot of trades in the building.
[17:14]
And then typical kind of front
[17:15]
office administrative support.
[17:17]
The physical location ends up being
[17:19]
very important for the business.
[17:21]
And I'll give it just a couple examples of it.
[17:23]
One, in dealing with our customers, you know,
[17:25]
the US government and kind of a lot of the, the management
[17:28]
of projects like this tend
[17:29]
to be headquartered outta the DC area.
[17:32]
The ability for those customers to come to us physically
[17:35]
think about building a house, right?
[17:37]
You wanna sit down with an architect
[17:39]
and look at the review, put your hands around it
[17:41]
as the house is getting built, you want to visit it, see
[17:44]
how it's going with the overall intent to,
[17:46]
to serve the US government
[17:47]
and give them what they need to do their job.
[17:51]
The physical location facilitates a lot of that progress.
[17:56]
So being close to the DC you know, metro area.
[17:58]
In addition to that, we serve a lot of military groups.
[18:01]
Aberdeen Proven Ground is a customer of ours,
[18:03]
PAX River area, Webster outlying
[18:05]
Field as a customer of ours.
[18:06]
So some of the military installations
[18:08]
around the Maryland area also facilitate
[18:11]
just good business practice
[18:12]
and the ability to host customers when needed and,
[18:17]
and have them be a part of the project
[18:19]
and get what they need ultimately to support their mission.
[18:24]
The businesses has been growing.
[18:26]
I've been there nine and a half years
[18:28]
and we've, we've nearly grown every year I've been there.
[18:31]
KRM has been an am an amazing host. They're great.
[18:35]
The business park is in high demand
[18:38]
and the facility itself wasn't necessarily set up for
[18:41]
what we do as a business.
[18:43]
You know, larger doors
[18:45]
to bring vehicles in and out of the building.
[18:48]
Efficient work that's associated with that.
[18:50]
The, the height of the building, you know, inside in order
[18:52]
to do some of the testing we do on some of the vehicles.
[18:56]
It it, and it just wasn't set up for that.
[18:58]
So they have a backlog of, of requirements.
[19:00]
We've been able to scale and grow there recently,
[19:02]
but the reality is, is we need to find a new home.
[19:05]
And this headquarters, you know, is, is,
[19:09]
is in support of that.
[19:11]
In addition, there's sensitive nature in some of what we do.
[19:14]
So the ability to secure vehicles on our lot,
[19:16]
not have it be such an open area, things like
[19:18]
that end up facilitating what we do.
[19:20]
And also allow us to consider more confidential work
[19:23]
with the, for the, for the government.
[19:26]
The people in the building are, are critical to what we do.
[19:29]
It's a, it's a Maryland business.
[19:31]
It's a Maryland LLC, it's owned by Marylanders,
[19:35]
numerous Naval Academy graduates in that group.
[19:37]
We are a veteran-owned small business.
[19:40]
And then we pull from both the western
[19:41]
and eastern shore of Maryland to support what we do.
[19:45]
Head of engineering is the United States is a Maryland
[19:48]
University of Maryland grad.
[19:50]
Our front office, you know,
[19:53]
somewhat comes from the western shore,
[19:54]
some from the eastern shore, but a lot
[19:56]
of our technicians in trades do come from Queen Anne County.
[19:59]
And that's critical to what we do.
[20:02]
The maritime industry is a nice
[20:04]
sister industry to what we do.
[20:05]
If, if you understand boats and working in engines and,
[20:09]
and tinkering with tractors
[20:10]
and et cetera, you tend to to be able to pick up what we do.
[20:14]
And that's important for us to be able to continue to grow,
[20:17]
to continue to find labor that we need to support
[20:20]
what we do right here in the county.
[20:24]
So I say all that just to say that it, it's, you know,
[20:26]
we're, we're a business that's on the move and successful
[20:28]
and it's, it's in many respects
[20:30]
because of where we're located and it's as much a,
[20:33]
a Maryland and Queen Anne County story as anything else.
[20:36]
And I think our ability to continue to be here,
[20:38]
to grow here is important.
[20:40]
And I think, I think that's a, a large amount of pride
[20:43]
that everybody can take in, in the success of this business,
[20:45]
but a collective success of a
[20:46]
Maryland and Queenland County business.
[20:51]
Thank you, John. I guess at this point, you know,
[20:54]
we would, we would entertain any questions you guys have,
[20:57]
we'll be happy to answer those.
[20:58]
Otherwise, you know, we would respectfully request your
[21:01]
approval of the final site plan so that we can
[21:04]
button this project up
[21:05]
and like I said,
[21:07]
get John moving in the right direction here.
[21:10]
Questions Madam Chair?
[21:12]
Go ahead, Ben. Steve, can, can you give us some sort
[21:16]
of graphic of where the runway is
[21:18]
for Bay Bridge Airport in relation to the building?
[21:22]
Yeah, I, I might have
[21:23]
to pop outta my presentation real quick.
[21:26]
I'm curious as to whether the building's directly in the
[21:29]
approach path to use a pilot term or whether it's offset.
[22:08]
Okay, so the, the property in questions here
[22:10]
that's highlighted in blue and here
[22:13]
You're, here's your, that tells me
[22:14]
what I, what I'm asking. Okay. Yep.
[22:17]
Slightly offset. Yep. Thank you. Sure. Oh, I need,
[22:22]
I have a question regarding your traffic patterns.
[22:25]
I don't know if you wanna bring up your traffic person
[22:27]
or if you can address that.
[22:28]
And primarily it is,
[22:31]
and I'll give the county department heads up
[22:34]
that they'll be asked probably to weigh in on their opinion
[22:35]
as well, looking at the, What we're calling this,
[22:40]
your traffic post sign for outbound trucks leaving
[22:44]
the proposed project going westbound or eastbound on on 50
[22:50]
and recalling the conversation we had about ingress
[22:52]
and egress out of this particular property at
[22:54]
that intersection with Route 18 or eight south.
[23:00]
And so why are the westbound
[23:06]
traffic exiting your property crossing
[23:12]
a a thoroughfare that's in a car sometimes challenging.
[23:17]
And why are we sending, we you suggesting they
[23:22]
go left outta there speaking specifically about larger
[23:24]
trucks, tractor trailer scale
[23:26]
and not going eastbound on that access road to the turnabout
[23:30]
and coming back to get in the queue.
[23:34]
So we have 45% of our traffic trucks
[23:39]
and passenger car vehicles
[23:43]
traveling westbound over the bridge so
[23:46]
that traffic would exit the site making a left
[23:50]
and then a right onto to Maryland eight
[23:53]
and using the interchanged access 50.
[23:56]
Right. But why not?
[23:57]
Because that's a tricky exit coming off the property
[24:00]
and onto that access road, whatever that name is,
[24:05]
versus turning right, going down
[24:06]
to the circle and coming back.
[24:09]
So if you go to the circle,
[24:11]
then you're turning right onto us 50
[24:14]
and you've gotta go down and no,
[24:15]
No, no, you go around the circle
[24:16]
and come back to get in the queue. I'm just curious.
[24:20]
Yeah, I mean that that,
[24:21]
That's an, it's, it's a, it's an alternate route.
[24:24]
So turning, turning right, going
[24:27]
around the circle and then coming back.
[24:29]
Correct. Because the, the design
[24:33]
of the access as shown with the auto turn exhibit shows
[24:38]
that you can, I, I
[24:41]
wb 67 I think was the truck that we used,
[24:46]
which is the largest tractor trailer can negotiate that. I,
[24:50]
I have no question about the engineering involved in a,
[24:52]
a truck being certified to make a particular turn.
[24:55]
Yeah. Fantastic. Thank you for all that information
[24:58]
and data I'm just talking about logistically speaking,
[25:01]
I come at a target and I often wait several minutes in a car
[25:06]
to turn left to go to that same intersection.
[25:08]
And I'm just wondering as a tractor trailer driver in a
[25:11]
circum under a similar circumstance that that would be
[25:14]
that much more challenging.
[25:16]
I'm just curious to why we're directing traffic
[25:18]
to the left coming out of your this
[25:20]
facility versus going right.
[25:21]
Yeah, I just, I think that's, you know,
[25:23]
a professional truck driver is gonna take the easiest route,
[25:26]
I don't think going down to the roundabout
[25:28]
and trying to Well,
[25:30]
Well there's easy and they're safe and practical.
[25:33]
So I'm just, we we talk about this a lot about yeah. Right.
[25:36]
Specifically case in point are mining
[25:39]
extraction facilities here in the county.
[25:41]
Yeah. We require them to go way out
[25:44]
of their way roundabout over the hill through the woods
[25:46]
to avoid certain intersections
[25:48]
or certain parts of town that are school bus heavy
[25:51]
or business heavy or you know,
[25:52]
soft shoulder, whatever the reason is.
[25:55]
I understand what you're saying. We
[25:56]
Can direct traffic where we choose to direct traffic
[25:58]
and I'm just wondering if that, if we're currently under
[26:01]
that yellow arrow that's proposed, if that's the safest
[26:04]
egress from your property.
[26:05]
I get what you're saying, it's a left, we're trying
[26:08]
to eliminate left turn to where Well
[26:09]
It's, it's a short, it's a short run there too, but
[26:12]
I don't think,
[26:13]
and maybe John can answer this is not really
[26:20]
a, a large truck generator.
[26:22]
I mean the trucks come in, deliver parts. There's
[26:25]
One a day or something was per Joe's I
[26:26]
Think.
[26:27]
Yeah. And I'm not sure. So we, an I analyze
[26:30]
traffic engineers analyze peak hour.
[26:33]
I don't know exactly when your truck's coming in,
[26:36]
but I probably not during peak hours.
[26:41]
I know deliveries try not to come to facilities
[26:46]
during peak time period.
[26:47]
So I would suspect your truck traffic is not gonna arrive
[26:52]
during that seven to 9 46 mid morning
[26:55]
Later in the morning, sometimes afternoon.
[26:57]
And I think that probably the, the small number
[27:00]
of trucks accessing this site
[27:03]
and then not being peak hour trips, I would think mitigates
[27:09]
any, any conflicts with the commuting public.
[27:14]
Okay. I see engineers representing the department,
[27:17]
public works and roads.
[27:18]
Do you have any, can you reaffirm these comments
[27:21]
or alleviate my concerns Mr.
[27:25]
Ger or Mr. Moore about egress of truck traffic on
[27:28]
that stretch of road there?
[27:30]
That's pretty congested at most times.
[27:33]
Also Henry here, the state highway.
[27:35]
That, that the state highway road, you might
[27:38]
Chime in.
[27:39]
That's fine. I, I defer to you as to
[27:41]
who con addresses the concern and it's not a major one.
[27:45]
It just seems like there's an alternate route
[27:47]
that might be safer and better
[27:48]
and why that's not being pro proposed as option A.
[27:52]
I don't know, is my question.
[27:56]
I mean, I can take it back to our
[27:57]
Traffic.
[27:58]
I think you're gonna need to be on a mic,
[27:59]
sir, if you don't mind.
[28:03]
I would add just quickly in support of Mr.
[28:06]
Lay's reservations, I'd hate to be the sheriff that has
[28:10]
to enforce unless enough space is there to clear the turn.
[28:16]
I don't think that road sign
[28:18]
that you proposed is particularly effective
[28:20]
and in support of Commissioner Lay's position, I'd like
[28:23]
to see something that says no right
[28:24]
or no left turn right for trucks.
[28:28]
Well again, we, we ran the auto turn
[28:30]
and there's, it's, there's adequate space
[28:33]
for the largest truck to, to turn left
[28:37]
If there's no other traffic.
[28:39]
Right? Well it's, it's, you wait for a gap.
[28:41]
It's just, I mean these are professional truck drivers,
[28:43]
they're gonna wait for a gap.
[28:44]
Yeah, no, I understand that. And they're gonna proceed.
[28:48]
I mean, you're also gonna have conflicts with traffic
[28:51]
with a truck trying to negotiate the, the roundabout.
[28:55]
Yes. So I, I think the safest way is to make,
[28:59]
wait for a gap in traffic.
[29:01]
It's gonna be off peak hour, make a left
[29:03]
and then use, use the state road
[29:07]
to access us 50.
[29:09]
I think that's the safest, most efficient route for
[29:14]
Trucks.
[29:15]
Is that the state's position as well, sir?
[29:17]
To the best of my knowledge, yes.
[29:18]
And like I said, I can take it back to our traffic engineers
[29:21]
and tractor division in the office
[29:24]
and if what their thoughts are on trying to send tractor
[29:28]
to trailers up to that roundabout,
[29:30]
that is a very small roundabout to try
[29:32]
to make a u-turn within it basically.
[29:35]
Well if you're coming eastbound, you're take,
[29:36]
you're cutting a u-turn on that,
[29:38]
that's the proposed entrance route for eastbound traffic.
[29:41]
Right? Sure. You're not coming off again.
[29:46]
It, it, it also suggests it's a little weird that
[29:49]
you're not, you're you're going out one way
[29:53]
but you're not coming in that same way.
[29:55]
Right? So if you turn the page, you're suggesting
[29:57]
that eastbound traffic go all the way down to that circle,
[30:00]
do that hairpin u-turn that we just mentioned
[30:02]
and coming back into the facility.
[30:04]
Why are you not getting off the exit ramp right off the
[30:07]
bridge and turning right and then merging over?
[30:11]
Well it's, I mean you're talking about going down
[30:13]
and turning a truck, turning around
[30:18]
the entire roundabout.
[30:19]
If you're coming from westbound 50, you don't need
[30:23]
to traverse through the entire roundabout. It's you're,
[30:26]
But it's arguably a, a similar if not tighter turn,
[30:30]
at least on the map we're looking at. I mean,
[30:32]
If you're, if you're going all the way
[30:33]
around the round the roundabout,
[30:34]
the truck's gonna be dragging its wheels through the center
[30:37]
of the roundabout if you're trying to,
[30:40]
Which I believe is built for that.
[30:42]
Yeah, it's, it's built for that.
[30:43]
But again, you know, the analysis shows that
[30:47]
and State Highway reviewed the study.
[30:49]
They reviewed the trip distribution and the number of trips
[30:52]
and they approved it and then they, they asked
[30:56]
for the truck turning radius, which we provided them.
[30:59]
And then we're, we're designing the access specifically
[31:04]
for trucks to exit and enter.
[31:06]
Again, I understand all the
[31:07]
design, engineering, and forethought.
[31:09]
Fantastic. Thank you. Appreciate that.
[31:10]
No problems, no issues. It's the simple logistics of why
[31:14]
you still haven't answer my question
[31:16]
to why are we bringing trucks in one way
[31:18]
but not the same way out.
[31:20]
It seems to me that would be, if if your argument is
[31:23]
where you want to position yourself, that's fine,
[31:26]
but it seems contradictory to me this
[31:29]
Way.
[31:30]
So I think what he's talking about is this here.
[31:34]
Right. So I yeah, we,
[31:38]
we have distributed the traffic.
[31:40]
There are 25 inbound
[31:45]
AM trips from, from northbound.
[31:50]
I'm on page 17.
[31:52]
I'm looking at this, this exhibit here,
[31:54]
this color coded wrap mount.
[31:56]
Yeah,
[31:59]
Yeah, that's, that exhibit's not my study.
[32:01]
And one page has you
[32:03]
leaving one way and the other way it's,
[32:05]
If I may add, this was an exhibit
[32:07]
that we put together internally
[32:08]
and coordination with, with tech ops to coordinate with
[32:12]
that study the count study that's in your packet as well.
[32:16]
This is not meant for everyday traffic like we're talking
[32:18]
about the larger trucks.
[32:20]
That's what this is, is meant for.
[32:22]
This will be an internal kind of logistics plan just
[32:25]
for the trucking.
[32:26]
It sounds like, you know, based on the time of arrival,
[32:30]
what we've done from the study, it's gonna be off peak hours
[32:32]
as Mark mentioned that left turnout of the site isn't
[32:36]
as much of a conflict
[32:37]
because there won't be as much,
[32:39]
much cuing at that time of day. Yeah.
[32:41]
But then why Okay then well, okay, fine, fine. Thank you.
[32:44]
Addressed and answered. Still have,
[32:47]
I'm waiting clarity on why inbound trucks coming from the
[32:51]
Bay Bridge are going under the underpass to go to
[32:54]
that roundabout to come back
[32:55]
and instead of getting off at the exit,
[32:57]
That's not happening.
[32:58]
And I didn't do that in my study.
[33:00]
All the traffic that's entering this site, if,
[33:05]
if you, I don't know if you have the study, it's on page 17,
[33:08]
they're arriving, they use the interchange
[33:13]
to access eight
[33:14]
and then they turn left onto Thompson Creek Road.
[33:21]
So this, you're talking about the long rundown and
[33:23]
Then I'm talking about this exhibit right there
[33:25]
that has him going past your facility, coming back to it
[33:29]
through the roundabout that we've been talking about.
[33:31]
Why is that the preferred means of entering
[33:35]
for eastbound traffic instead of getting off the exit,
[33:38]
immediately coming off the Bay Bridge
[33:40]
To reduce one left turn in that,
[33:42]
that lane at the intersection of Route eight
[33:45]
and Pine Creek route.
[33:47]
Okay, we can, I'm, I'm hearing con contradicting,
[33:50]
contradicting to ions on, on
[33:54]
from an expert, traffic expert
[33:58]
who says trucks are gonna take the path
[33:59]
of release resistance and then
[34:01]
the next comment is they're gonna go down underneath this,
[34:04]
go around, skip through Maloo and come back.
[34:06]
Okay. I, I just, I'm, I'm, I need, I still,
[34:09]
I'm still not super clear on why we're not doing
[34:12]
So can I.
[34:13]
Same entrance and egress pathways.
[34:15]
I, I, when I do a study, I try to take the
[34:19]
worst case traffic scenario
[34:21]
'cause it's the easiest path for me to get
[34:24]
Approved.
[34:25]
Sure. Human nature. Yeah.
[34:25]
So I had all my trips from coming across the Bay Bridge
[34:31]
using the interchange
[34:32]
and then as I said, coming down south,
[34:36]
The shorter run.
[34:37]
Yeah, right. The more logical Right.
[34:39]
Direct route. And we, so then we did the auto turn just
[34:42]
to make sure that truck traffic could do
[34:45]
what I'm showing in the study and they can,
[34:48]
and then I guess Dorsey had an alternative.
[34:53]
I I don't think it's a good idea to say no left turns.
[34:56]
I mean I think the best access is to, to keep
[35:02]
the full access movement.
[35:04]
'cause again, this is a very limited
[35:09]
generator in terms of tractor trailers.
[35:12]
And again those tractor, the tractor trailer
[35:15]
that will visit the site is most likely not gonna
[35:19]
happen during the peak hour
[35:21]
To the next page.
[35:23]
I I hear you and I, I don't necessarily agree with you,
[35:26]
but it's just from a presentation.
[35:29]
But when I'm reading this, it sounds like you're
[35:33]
proposing two different scenarios
[35:35]
and then saying they're both the best, but I'm,
[35:37]
I'm not. I'm I'm
[35:38]
Saying okay, your team is Yes,
[35:40]
Yes. And that,
[35:41]
That's, and that's confusing
[35:42]
to the people sitting over here that that's who are trying
[35:44]
to interpret your intentions. If I,
[35:45]
If I can just kind of summarize
[35:46]
and bring back, we've got four want, two inbound,
[35:49]
two outbound, I Sure, sure.
[35:55]
Two inbound, two outbound.
[35:56]
And the only route that differs from
[35:58]
what was in the traffic report was this one
[36:01]
where I show further down right at
[36:03]
The circle and coming back through through Yep. Yes. That
[36:05]
Was tip only to reduce any left turn at the
[36:08]
End.
[36:09]
That's not necessarily a preferred recommended route.
[36:11]
That's just simply the alternative route.
[36:13]
Simply like turning right turn only
[36:15]
would be an alternate route. Yes sir. Understood.
[36:17]
For the one tractor trailer that,
[36:19]
that comes each once a day during off peak hours.
[36:23]
Okay, now that, now that's clear. Okay.
[36:25]
Thank Sorry for the confusion.
[36:26]
No, no, it's, you leave a little, when you leave room
[36:29]
for interpretation, you get different interpretations.
[36:34]
But I appreciate you that, that Thank you. But
[36:36]
I completely addressed Questions.
[36:38]
Un unless the county department has anything to add
[36:40]
or subtract from that testimony on behalf
[36:43]
of Department of Public Works.
[36:45]
'cause you've been involved in this, I'm sure.
[36:49]
Good morning. Lee Edgar, chief engineer
[36:52]
with the Department of Public Works.
[36:54]
I'm not quite as intimately knowledgeable with regard
[36:57]
to the exhibit and how that all came together and such.
[37:00]
So the applicant is really best to speak to that.
[37:03]
But I am hearing the discussion and understand your question
[37:06]
and concern and want to provide some insight
[37:08]
with regard to that.
[37:10]
Commissioner, you're always good to add, ask the question.
[37:12]
As always, we're concerned about the safety
[37:16]
and, you know, movement for our motoring public and such.
[37:19]
In this case, as you brought up the, the matter of
[37:23]
extractions and mines
[37:25]
and such in the review of this project, the
[37:30]
trucks coming in
[37:31]
and out serving this are very, very few in number.
[37:35]
Whereas with a mine that that product is,
[37:38]
you have a vast quantity of vehicles coming in and out.
[37:42]
I would tend to agree with the applicant that
[37:46]
not restricting this
[37:48]
and leaving, leaving the access to
[37:52]
and from the site to the discretion
[37:54]
of the truck driver would be the best scenario in this,
[37:59]
in this case, for example, a tractor trailer and,
[38:04]
and I don't know how many tractor trailers they would really
[38:06]
have indicate that was kind of the worst case scenario.
[38:11]
Making that right turn outta the site, going back
[38:15]
to the traffic circle
[38:16]
and coming back, the vehicles entering that circle,
[38:20]
even though it is marked with a deceleration speed
[38:23]
and such would coming off
[38:25]
of the state highway would be presumably coming at a much
[38:28]
higher rate of speed than, for example, vehicles coming
[38:33]
off of Route eight, making that turn
[38:36]
onto the road from that light.
[38:39]
They have very little time to bring up speed.
[38:41]
So I think if I were driving the truck leaving
[38:46]
that site, I would likely opt to wait for a clear movement
[38:51]
to make a left turn out of the site.
[38:53]
To your point, it may take a little while depending on the
[38:57]
queuing of vehicles and such,
[38:59]
but I think it is very situational.
[39:02]
And in this particular instance, the proposal as it is,
[39:06]
which does not have signage
[39:07]
or restrictions on how those
[39:11]
vehicles which are delivering materials to
[39:14]
or from the site would utilize their discretion.
[39:18]
It would probably very be a very challenging thing
[39:20]
to implement, unlike a mine for example, where
[39:24]
that is the business
[39:25]
and the drivers are very much trained to adhere
[39:28]
to a haul route when you have a manufacturing facility
[39:31]
and a occasional deliveries which may be coming in
[39:34]
and out, different, different drivers
[39:37]
and every, it would be very, very difficult if not,
[39:41]
you know, really logistically impossible to
[39:44]
enforce a haul route
[39:46]
and could enter some confusion into that
[39:49]
for the drivers who are doing it.
[39:50]
So you're, you're very good to ask the question.
[39:53]
I think there are valid questions in the terms
[39:55]
of the motorist that's going to be pulling out,
[39:58]
but I would agree that it's best to be left to the driver
[40:02]
for that particular delivery.
[40:03]
And so Mr. Edgar, thank you, appreciate that greatly.
[40:05]
Good points all, would you, just to clarify your comments,
[40:10]
you would not be in favor of a sign suggesting that in,
[40:14]
in the application package, quote, attention all trucks,
[40:16]
no left turns unless there's enough space
[40:18]
to clear the eastbound drive lane.
[40:19]
That seems as Mr.
[40:21]
Till Commissioner Tillman stated silly to enforce
[40:26]
and, and a and a professional trucker should know that,
[40:29]
that they shouldn't turn if, if it's not safe, right?
[40:32]
I mean what was that a, whose recommendation was that?
[40:35]
The, a recommendation of the traffic expert
[40:37]
for safety purposes or that
[40:39]
That was our internal clarity.
[40:41]
Just notify all truck drivers if we supposed
[40:43]
to sign on our gate, on the gate
[40:45]
of the site as they're leaving.
[40:46]
Okay. This wouldn't be an an out
[40:48]
On the road.
[40:49]
See it's not a legal enforceable traffic
[40:51]
sign, it's just a Correct.
[40:52]
Hey guys, you're gals,
[40:53]
you're coming into a congested area, right? Be
[40:56]
Mindful practices. Yes. Okay.
[40:58]
That work for you? Yeah. Yeah. Gotcha. Thank you Mr. Greg.
[41:00]
Appreciate it. You're very welcome. Thank you.
[41:03]
I would like to note that art's been among us for a while
[41:09]
And if he doesn't connect he may do his vote
[41:11]
through me, if that's okay.
[41:13]
Okay, sure. Been emailing back
[41:15]
and forth as long as you're okay, Lindsay.
[41:16]
Yeah, as long as you announce it. Okay. Yep.
[41:20]
Okay. Any other questions?
[41:25]
Other comment? Sure.
[41:34]
I arrived a little late and wasn't able to sign up.
[41:37]
If I can, can I submit this for all of the commissioners,
[41:43]
commissioners, Jay Aleg, queen Ann Conservation Association.
[41:46]
I'm not here to oppose this project,
[41:48]
but I did wanna raise just a couple of things for you all
[41:51]
to consider and also hope to make an appeal
[41:53]
to the applicant himself
[41:55]
because there might be a couple of things here
[41:56]
that could both be a soft cost savings
[42:00]
and also beneficial for the environment.
[42:03]
So I did, I reviewed their storm water management plan
[42:10]
when it comes to the Chesapeake Bay
[42:11]
and Maryland's rivers and creeks.
[42:14]
We're making a lot of progress in a lot of areas,
[42:16]
but the one area where we continue to fail is storm water.
[42:21]
And the applicant is doing what's required right now,
[42:25]
but there might be a better way to do this
[42:28]
and this would be with a pervious surface
[42:32]
within the parking lot.
[42:34]
And the document that I've just
[42:36]
provided to you was generated off an AI search.
[42:40]
What it shows that a pervious parking lot can actually be
[42:43]
cheaper than some of the storm water management plans
[42:46]
that we currently have in place.
[42:49]
And so one of the things that I would really like to appeal
[42:51]
to the applicant for is to consider that and look into it
[42:55]
because it may be a cost savings
[42:57]
and it would certainly be more
[42:59]
beneficial to the environment.
[43:01]
The other two things that I just wanna mention also,
[43:04]
which again appeal an appeal to the applicant when it comes
[43:08]
to the landscaping of the property.
[43:11]
If you all could make a specific note
[43:13]
of planting only native species trees and shrubbery.
[43:19]
Planting native is important for a lot of reasons,
[43:21]
but especially in the trees.
[43:25]
An oak tree, for example, harbors up to 400 different
[43:31]
organisms locally and that can be beneficial
[43:34]
to the, to our environment.
[43:35]
And then very last on your lighting fixtures
[43:39]
for your buildings, there's a website called the dark sky
[43:44]
Dark Sky effort
[43:46]
and it's meant to reduce light pollution
[43:50]
in this area of Ken Island.
[43:51]
Light pollution is a problem.
[43:53]
There are fixtures online that are dark sky compliant,
[43:57]
which still provide businesses with the necessary light,
[44:00]
but they angle it downward
[44:02]
and it's not like the big floodlights
[44:04]
that you see all over the place.
[44:06]
So three environmental things that
[44:08]
I hope the app applicant will consider
[44:11]
and it could be something that we could all celebrate.
[44:13]
I'd love to see more businesses do these types of things
[44:16]
and it's a bragging, it's a bragging right
[44:18]
for Queen Anne's County and for the business.
[44:20]
And a lot of times many
[44:22]
of these things are less costly than some
[44:24]
of the other things that are out there.
[44:26]
So thank you for your time. Thank you.
[44:29]
Any other public comment?
[44:34]
Don't have it. Nothing. One line. Okay. Can I get a
[44:39]
Just one follow up on that Madam chair?
[44:41]
If I may, based on Mr.
[44:42]
F Said's comment, I'm looking over at staff.
[44:44]
Is this, are the landscaping plans not required
[44:47]
or at least in large part to be
[44:49]
required to be native plants?
[44:51]
I think the majority of these are native on site, right?
[44:53]
Their landscape architect is here.
[44:55]
Nate Ter Nate, he may be able
[44:56]
to answer your question about he on site.
[44:59]
No, from my review of the list, they appear largely native,
[45:02]
but I, I'm looking to you guys
[45:03]
that I think there's actually language in our code
[45:06]
that requires, we remember going
[45:08]
through this with previous directors.
[45:09]
Some, but not all. It's when readily available,
[45:12]
some loop in there that allows people to substitute if
[45:16]
we can't get stock or something.
[45:17]
But that's the intent is to be, if not all,
[45:20]
largely in part native plantings. Yes, correct.
[45:25]
I did have someone that wanted to make common alive.
[45:27]
Okay. Hello?
[45:54]
I am allowing her to make comment, but no one
[45:57]
Hello?
[46:02]
Did they hang up?
[46:03]
No, they're still there.
[46:08]
Let me,
[46:18]
Hi Lauren, if you're there, you're, you can unmute now.
[46:21]
I made you a, gave you the ability to at least
[46:29]
Just
[46:33]
Lauren, are you there?
[46:44]
I don't know.
[46:45]
Muted. She's saying it won't
[46:50]
let her on mute, but
[46:52]
Didn she Type her
[46:53]
Comment.
[46:54]
Yeah. Lauren, if you can type your comment.
[46:56]
I could read it for you. I'm not sure why it's
[46:58]
not letting you unmute.
[47:47]
Need some Elevator music. It's not allowing Yeah.
[47:50]
Tell
[48:05]
this is your only sole facility, correct?
[48:10]
This one that we're, yes. Yeah,
[48:11]
it's Yep. No other locations
[48:14]
Fully Relocating
[48:15]
From.
[48:16]
And you, how long you been in the business park?
[48:18]
Oh, six six as tech years since 17?
[48:21]
Yeah. Are you bringing more jobs with this building?
[48:25]
Maybe split. How many do you have
[48:26]
now and how many are you bringing?
[48:28]
It's, well, I mean maybe I'll just
[48:29]
Let, It depends on contracts, basically. But's.
[48:33]
Try that one. We don't Have to be
[48:34]
exact. It's not pass out.
[48:35]
Yeah. I mean it'll allow Us to get, all right.
[48:36]
Lauren, could you try unmuting
[48:37]
for us one more time? If you can hear me?
[48:40]
A fuller one shift of of
[48:41]
Employees.
[48:42]
Okay, but how many do, would you, do you,
[48:44]
if you don't wanna say how many
[48:45]
employees you have, that's fine, I guess.
[48:47]
No, we're pr it's on site on a given day
[48:50]
is probably around 40.
[48:53]
But you have people offsite too. The businesses supporting
[48:55]
The salespeople.
[48:56]
The, the vi my mic's going through. Yeah,
[48:59]
But maybe she's not Hearing it on.
[49:02]
Oh, it, it is possible if she had it muted on her end.
[49:05]
I'm not, I'm not getting any text response.
[49:08]
And I've made the meeting available so anyone could unmute
[49:11]
and no one's unmuting. So
[49:13]
Mr. Lee, in res response
[49:15]
to your question about landscaping.
[49:16]
Yes. Onsite encourages the use of native species,
[49:21]
the encourages the use for the on onsite landscaping guests.
[49:26]
Okay. She did send in a message. Thank you. Yep.
[49:28]
Our messages, this is from Lauren
[49:31]
Smuts, she said, sorry about that.
[49:33]
I would like to know what the applicant is doing to adhere
[49:36]
to the design standards in the uc zone guide,
[49:39]
especially in regard to compatibility
[49:41]
with surrounding development such as residential.
[49:44]
Apologies that it won't. Let me unmute.
[49:49]
So we've, we've submitted the UCTC design guideline notes
[49:53]
and memo along with the package, you know,
[49:56]
through the concept plan review the colored elevations
[49:59]
that are included and extensive with review with staff.
[50:03]
We were confident that we meet the standards within the
[50:07]
design guidelines.
[50:09]
It was a, a major topic of conversation during the PLA
[50:13]
concept plan phase.
[50:15]
And from that approval, we've had no substantial changes
[50:19]
to the design of the building
[50:21]
and the associated memo and code.
[50:24]
Okay. As you Have further comment,
[50:32]
She says, if they could please share some
[50:34]
of the elements integrated into that design
[50:37]
Piece.
[50:38]
More water.
[50:40]
Steve, if you want to pull up the colored
[50:42]
elevation or is that something Yeah.
[50:44]
Pull up with public comment.
[50:45]
Do we typically do a back and forth or is it more No.
[50:48]
Yeah, that's, if, if you guys would
[50:53]
prefer to ask, and I
[50:54]
I will go on record to say this does meet the
[50:56]
TCUC design standards.
[50:58]
We worked very hard with these, the applicant to, to get
[51:01]
to this design initially.
[51:03]
It, it needed some work
[51:05]
and they, they've come a long way with it.
[51:06]
So I just wanna put that out there.
[51:09]
There was a memo in your packets that explains all this.
[51:14]
Okay. Any other questions?
[51:19]
Any other comments?
[51:22]
I'm good. Can we get a
[51:24]
proposal recommendation?
[51:29]
Madam Chair? Having considered the testimony presented
[51:32]
and having reviewed the findings outlined in the staff
[51:35]
report, be it hereby resolve that the planning commission
[51:38]
regarding the request by a reliable development company, LLC
[51:43]
for major site plan approval
[51:44]
to construct a 40,040 square foot building for the design
[51:49]
and fabrication of specialty vehicles
[51:52]
between a 4.411 acre parcel in the urban commercial zoning
[51:56]
district, and is more particularly described in Department
[51:59]
of Planning and zoning file.
[52:01]
SP number 26 dash oh two dash oh 1 72
[52:06]
hereby finds the site plan does meet all requirements of
[52:11]
chapter 18.
[52:13]
Will not substantially increase traffic hazards
[52:16]
or safety concerns due to traffic generated, generated
[52:19]
by the proposed use.
[52:21]
The location or orientation of curb cuts
[52:23]
or the layout of internal circulation
[52:27]
does contain a layout of buildings, parking,
[52:30]
roads, and utilities.
[52:31]
That does not substantially increase fire, health
[52:34]
or other public safety standards.
[52:36]
Is a adequately buffered
[52:38]
and screened to minimize potential adverse impacts
[52:41]
to neighboring properties
[52:43]
and public rights of way
[52:45]
will not substantially increase stormwater drainage.
[52:47]
Drainage, or pollution will not have an unreasonably adverse
[52:52]
effect upon property values in the vicinity of the site,
[52:55]
will not adversely affect the public welfare
[52:58]
and will provide for public safety through compliance
[53:01]
with the state Fire code and with any applicable county
[53:04]
or municipal fire codes is compatible
[53:07]
with the general character of the surrounding neighborhood
[53:10]
and is consistent with the purpose, goals
[53:12]
and objectives of the 2022 comprehensive plan
[53:16]
and hereby grants minor site plan approval subject
[53:20]
to the following conditions.
[53:22]
All remaining edits and
[53:24]
or documents required by the Department
[53:26]
of Public Works planning and zoning
[53:27]
or any other reviewing agency be reviewed and approved.
[53:31]
All remaining comments, edits, and
[53:33]
or documents required by the Maryland Department
[53:35]
of Transportation State Highway
[53:37]
Administration must be addressed.
[53:40]
All required legal documents must be approved, signed
[53:43]
and recorded prior to obtaining final site plan signatures
[53:47]
All required bonds sureties review
[53:50]
and inspection fees must be submitted to the Department
[53:53]
of Public Works and the Department of Planning
[53:54]
and zoning is appropriate.
[53:56]
The conditions specified in the attached airport manager
[53:59]
review number three, email dated
[54:02]
June 18th, 2026 must be met.
[54:05]
And the architecture
[54:06]
and overall site design must substantially reflect the
[54:10]
documents provided.
[54:12]
Can I make one point of clarification?
[54:14]
The staff report notes minor site plan approval
[54:16]
instead of major site plan
[54:18]
Approval. I
[54:18]
Okay.
[54:19]
Apologize. I I read that.
[54:21]
I thought you in my mind I was okay.
[54:23]
Just making sure. Yes. Okay.
[54:25]
So may I amend my motion to, to make
[54:29]
that major site plan approval. Thank you, Lindsay.
[54:31]
It's supposed to be major. Yep. Apologize for that. Yep.
[54:35]
I Okay.
[54:39]
All those in favor? There's a like a second
[54:43]
for public comment.
[54:44]
I'm sorry. Second. Second. All in favor? Opposed?
[54:50]
So did we get art's vote art?
[54:54]
He hasn't emailed me. Right.
[55:15]
And board member Eberts Berger votes in favor of the motion.
[55:18]
Okay, so moved. Thank you. Thank you very much. Thank you.
[55:23]
Thank you. Public comment
[55:30]
there being none.
[55:32]
Can I get my favorite resolution? Ajour?
[55:37]
Second. Second? Second. All in favor? Aye. Aye.