[0:09]
Good evening. I'd like to welcome
everyone to the Village of Riverside
[0:13]
Board of Trustees regular meeting of
Thursday, March 19th, 2026.
[0:20]
Uh please stand as you're able and join
me in the pledge of allegiance.
[0:26]
I pledge algiance to the flag of the
United States of America and to the
[0:32]
republic for which it stands. One nation
under God, indivisible, with liberty and
[0:39]
justice for all.
[0:44]
» Clerk Stenzel, please call the role.
>> Trusty Marsha,
[0:47]
» here.
>> Trusty Gallagher here.
[0:48]
» Trusty CS
>> here.
[0:50]
» Trusty Evans here.
>> Trusty Mateo here.
[0:52]
» Trusty Fitzgerald here. Manager Francis
>> here. President Pollock
[0:55]
» here.
>> Also, President Clerk Stenzel.
[0:59]
» Uh we have a brief president's report.
Uh upcoming village meetings include the
[1:04]
following. Uh March 23rd, Parks and
Recreation Board regular meeting.
[1:10]
Riverside Public Library at 6:30 p.m.
March 25th, Planning and Zoning
[1:17]
Commission regular meeting at uh here at
the Village Hall Town Hall. uh room 4
[1:23]
6:30 p.m. And our next regular scheduled
meeting is April 2nd. Uh same time, same
[1:31]
place, 6:30 p.m. Town Hall.
Uh that concludes my president's report.
[1:38]
Do we have any trustee reports this
evening?
[1:43]
There are none. Uh Manager Francis,
manager's report.
[1:47]
» Thank you. I have two items to update
the board and the public on. One being
[1:52]
um the board might have seen that Joel
Kennedy is starting to work on parkway
[1:58]
restorations from lead service lines
that were installed last year. Um so
[2:04]
this will be firsttime restorations in
the parkway and also any areas that have
[2:08]
subsided over the winter will be
restored as well. Another item that will
[2:13]
begin soon is Nyor's restoration over on
Cowi. They'll be restoring the roadway,
[2:19]
curbs, sidewalk, and um the parkway.
There will be a detour when that work
[2:26]
begins. Uh public works staff is working
on obtaining the details and
[2:30]
coordinating through Nyore and their
contractors. Once the village has
[2:34]
received that information regarding the
detour and the timing, we will share it
[2:38]
with the public. As of this evening, we
don't have confirmed dates, but as soon
[2:43]
as we do, we will send those out. That
is all I have this evening.
[2:47]
Thank you. Uh public comments for
non-aggenda items. Is there anyone in
[2:52]
attendance who would like to address the
board uh on a matter that is not on our
[2:56]
agenda tonight? Uh knowing that uh as we
go through the agenda, there'll be
[3:01]
public comments on those specific items.
There are none. Uh consent agenda. Clerk
[3:07]
Stenzel, please read the consent agenda.
>> Approve voucher list of bills March
[3:12]
19th, 2026. Approve village board of
trustees regular meeting minutes March
[3:16]
19th, 2026. Approve village village
board of trustees executive meeting
[3:21]
minutes March 5th, 2026. The previous
one was also March 5th. Review and file
[3:26]
board and commission minutes economic
development commission regular meeting
[3:29]
minutes January 14th, 2026. Landscape
Advisory Commission regular meeting
[3:34]
minutes February 10th, 2026. Historical
commission regular meeting minutes
[3:38]
February 16th, 2026. Review and file
department reports. Public works
[3:43]
February 2026 finance February 2026
2025 community development annual report
[3:51]
and 2025 public safety annual report.
A resolution authorizing the village
[3:56]
manager to create a purchase order in
the amount of $174,900
[4:02]
for Christopher B. Burke Engineering to
provide professional design and
[4:06]
constructive engineering services as
part of the South Coat Road res.
[4:12]
An ordinance amending the village code
relative to beekeeping and henkeeping
[4:15]
and amending a fee schedule for the
village riverside. An approval of facade
[4:19]
grant application for Salme 35 East
Burlington.
[4:23]
» Do any of these items uh need to be
removed from the consent agenda?
[4:28]
Uh there are none. I'd ask for a motion
and a second to approve the consent
[4:32]
agenda.
>> So moved.
[4:34]
» Second.
>> Motion and second. Clerk Stenzel, please
[4:36]
call the role.
>> Trusty Marsha.
[4:38]
» I.
>> Trusty Galgas.
[4:39]
» Hi.
>> Trusty Cos.
[4:40]
» I.
>> Trusty Evans.
[4:42]
» I.
>> Trusty Matteo.
[4:43]
» I.
>> Trusty Fitzgerald.
[4:44]
» Hi.
>> Motion carries. Uh, department board and
[4:47]
commission reports. We have an update
this evening from for from the parks and
[4:52]
recreation department. Assistant
director Megan Cisa will provide that
[4:56]
report.
Good evening, President Pollock, village
[5:01]
trustees, manager Francis. I just wanted
to provide you all with a quick update
[5:05]
on some events and programs that we have
coming up as we move into the spring
[5:09]
season. Our variety of egg hunt events
will take place later this month. We
[5:13]
will kick off the egg hunt festivities
with our teen flashlight egg hunt that
[5:18]
will take place next Thursday, March
26th, over at Indian Gardens. The hunt
[5:23]
will begin at 7:45 p.m. and we invite
those that are 11 to 15 to join us for
[5:28]
that. Just be sure to bring a basket and
a flashlight with you. We will follow
[5:33]
that up with our annual egg hunt which
will take place on Saturday, March 28th
[5:36]
over at Big Ballpark. We will begin our
age groups promptly at 10:00 a.m. and we
[5:41]
invite those that are 10 and under to
join us for that. The bunny will also be
[5:45]
available at that event for photos. And
then we will conclude our egg hunt
[5:49]
events with our golden egg hunt which
will take place from March 31st to April
[5:53]
2nd. Each day in that time frame, new
golden eggs will be hidden in the parks.
[5:58]
Each golden egg that's found is going to
be eligible for a $10 parks and recck
[6:01]
certificate to use toward any future
program or event. Moving on to
[6:06]
programming that we have, we've got a
variety of programs that are beginning
[6:09]
in the next few weeks. Some upcoming
adult programs that we have are cardio
[6:13]
kickboxing, weight training, Zumba,
yoga. We have a Mother's Day paint and
[6:18]
sip, and dodgeball and pickle ball
tournaments. And then some upcoming
[6:22]
youth programs include a spring break
art camp, flag football, and spring
[6:26]
soccer, as well as our ongoing nature
programs such as Saturdays in the Woods,
[6:30]
and Earth Day nature hike. And speaking
of programming, our summer program
[6:35]
brochure will release in May with all of
our summer programs, classes, and
[6:38]
events. Be sure to keep an eye out in
your mail for our seasonal brochure
[6:42]
mailer that will come out to announce
when that is released. And lastly, we're
[6:46]
very excited to announce our brand new
weekly newsletter for Riverside Parks
[6:50]
and Recreation. Every Tuesday, we will
release a newsletter to your email
[6:54]
that's going to include some exciting
upcoming programs and events. This is
[6:57]
going to be the best way to keep up to
date with all things Riverside Parks and
[7:01]
Wreck. We did send out an initial signup
email as well as our first newsletter.
[7:05]
And if you did not receive that, you are
able to sign up um with the QR code
[7:09]
that's been posted both to the Riverside
Parks and Recck Facebook page as well as
[7:12]
the village p Facebook page. Thanks.
>> Thank you. Any questions for assistant
[7:19]
director Cisco? I would just make one
comment. Um
[7:24]
» since we adopted Well, first of all,
thank you for the update on the
[7:28]
programs. Uh, spring is here, so it's
time to get out, get outside and sign up
[7:34]
for a program. But I also want to take
this opportunity to thank the parks and
[7:39]
recreation department and parks and
recreation board on the tremendous
[7:44]
success, in my opinion, you've had
already in implementing your master plan
[7:48]
for 2025. We've already got funding for
for uh uh Turtle Park uh and um and Ble
[7:59]
Park, right? Yeah. Ble uh funding and
that's in the pipeline. And we're hoping
[8:05]
to follow that up with Harrington next
summer. And uh also the parks and
[8:10]
recreation board will be considering
another goal from the master plan of
[8:14]
creating zoning for the uh parks and
open space in the village. So, thank you
[8:20]
to the department and the board.
>> Thank you very much.
[8:25]
» Uh, pending business, um, presentation
and discussion of new public safety
[8:31]
facility visualization concepts. Manager
Francis,
[8:35]
» thank you. Um we do have the team from
Williams Architects that will walk the
[8:40]
village board through um the different
schemes and designs for the board to
[8:46]
take a look at and provide some feedback
on. Additionally, I just wanted to
[8:51]
provide the board a brief update after
this evening. Um the next step based on
[8:56]
the feedback that's received, Williams
will then attend a preservation
[9:00]
commission meeting and get additional
feedback based on the narrow down down
[9:05]
designs that the village board wants
preservation to react to and give
[9:10]
additional feedback. So with I will turn
it over to the Williams team.
[9:18]
» Good. Good evening, President Pollock,
village trustees manager Francis. um
[9:23]
happy to be here again tonight and um
we'll have all four of our team members
[9:28]
presenting um this evening a lot of
information about the concept. So um
[9:32]
let's just get right into it and next
please. So we want to just bring you up
[9:38]
to speed um as to where we've been um
what we've been working on for the last
[9:43]
few months and ultimately the four
different ideas we have um for the
[9:48]
exterior of the project. Um, we also
have partnered with harbor contractors
[9:54]
and Chris Kak is here tonight to tell
you a little bit about where costs are
[9:58]
projected at the moment as well as some
ideas to um perhaps um bring costs down.
[10:04]
At this point, we are um simply looking
for feedback from you as the village
[10:10]
board um what you like, what you don't
like um in terms of the exterior concept
[10:14]
so we can continue to move forward and
and refine. But most of all, we want to
[10:19]
make sure we're answering your questions
and keeping you as informed as possible
[10:22]
about the proposal.
So, um I sort of just gave away the the
[10:28]
updates. Um we've worked um had several
meetings with staff. Um we've um put
[10:35]
together um four very um distinct
concepts um for the exterior. We've also
[10:42]
really validated the work that you've
seen so far by engaging a civil engineer
[10:47]
and a structural engineer to make sure
that we really understand the site to
[10:51]
confirm that we do not need to do
anything further in terms of storm water
[10:56]
um detention which we have confirmed and
to understand um how we would be
[11:02]
actually structuring this in
consultation with a structural engineer.
[11:05]
So um there is a measure of um
architectural and engineering
[11:11]
feasibility that are baked into these
concepts that we're um going to show you
[11:15]
tonight and talked a little bit about
next steps as manager Francis mentioned
[11:20]
um we're ready to move um upon your
direction into design adjustments and
[11:25]
review um by the preservation commission
and to begin the community engagement
[11:30]
process around this project.
Um, so with that, um, I will turn it
[11:35]
over to our project manager, Kim Nigro,
to recap the site plan and the floor
[11:40]
plans and then we'll move to the
exterior concepts. Thank you.
[11:47]
» Thank you everyone. Glad to be back with
you. Um, I'll just start by recapping
[11:51]
the um, site plan and floor plans. um
some of which most of which you saw at
[11:56]
our last presentation but it has been
refined based on your feedback and um
[12:01]
some consensus um about the various
schemes that we presented at our last
[12:04]
meeting. So um
oh good this works. Oh thank you sorry
[12:10]
just getting back off. Thank you chief.
So um just to give you the brief quick
[12:17]
overview of the site plan of the various
schemes that we presented last time. The
[12:21]
main difference was whether the
apparatus bay would be um flanked by the
[12:26]
apparatus support to the east or more or
whether that support bar would be more
[12:31]
in the center of the overall layout
based on again feedback from all of you
[12:36]
and more conversations with the manager
and chief. Um the decision was that
[12:41]
keeping the apparatus bays more um
toward the center and putting that
[12:46]
support on the outside edge um provided
a couple of different benefits within
[12:50]
the plan layout itself as well as on the
site. So this allows that apparatus
[12:55]
apron to be a little further away from
the drive down to the lower level. Um
[12:59]
provides that surface level parking here
for staff to come in quickly. Um and
[13:04]
then we've also again still focusing on
the community and public space here as a
[13:11]
light touched link to the existing
village hall. Um based on the feedback
[13:17]
again, we've focused the entryway right
here on axis with the colonade or view
[13:23]
connection out toward the river. Um and
and as you'll start to see in the
[13:27]
exterior schemes that we'll show you, um
all of the schemes have this layout on
[13:33]
site. All of the schemes have the same
kind of axis and exterior um colonade
[13:39]
and patio space um and you know are
basically all in the same massing and
[13:46]
form on the site.
[13:51]
So this um lower level plan really again
hasn't changed since you last saw it. um
[13:56]
parking available for um police here on
the lower level, entrance uh for staff
[14:02]
to a staff stair that takes them um or
through the elevator securely up to
[14:08]
secure administrative space on the
second floor. Um and then keeping kind
[14:13]
of the basic storage of the building
under the apparatus bay on this end and
[14:18]
the evidence processing and storage here
um near where they would enter and then
[14:23]
the utilities on the far end.
[14:29]
So, this again, as I kind of recapped on
the site plan, the main floor level has
[14:34]
um this community space around the lobby
here with the public conference room and
[14:40]
toilets and the you we're saying
ornamental stair that really just means
[14:43]
open, not an enclosed fire stair. um and
space for displaying of the historic
[14:49]
firet truck and um potential
repositioning of some um village hall
[14:55]
space in the in the existing village
hall. Uh and again that really nicely
[15:01]
consolidated shared administrative space
between police and fire. And then as we
[15:07]
move to the east, the um apparatus and
the support zones um for the apparatus
[15:14]
bay.
[15:18]
And on the upper level, again, all of
the community space is focused here on
[15:23]
the west end where they could come up
this public stair, access restrooms,
[15:28]
access the fitness space, um, come down
this public corridor all the way through
[15:33]
to the public terrace, um, and to the
community space, which is has access to
[15:39]
Riverside TV, the kitchen, and some
storage. So, the elevator is here
[15:46]
centrally located. this would have
public access at this level. Um, also if
[15:51]
police or fire needed to use that
elevator at this upper level, they can
[15:55]
do that and then come into a secure
corridor
[15:59]
where most of the police functions are
are focused right here with a men's
[16:04]
locker room and toilet and showers,
women's locker room, toilet and showers,
[16:08]
and then as you move on, um, this shared
kitchen, dining and day room space, and
[16:14]
then the more private bunk rooms and
lockers for fire and EMS personnel.
[16:20]
Well, that was one of the comments from
the last meeting was um liking them
[16:24]
having kind of their own quieter wing
over here um on the other side of the
[16:28]
apparatus bay. So, yeah, again, just
more public zone shared and and more
[16:35]
quiet private on the end.
So, with that, I'm going to move into um
[16:41]
exterior schemes unless anyone has any
thoughts or questions about the plan
[16:45]
recap.
So, I want to start by again kind of
[16:50]
talking about what's in common with the
four different schemes that we've looked
[16:53]
at. Um we've tried to take our cues um
based on listening to chief and uh um
[17:00]
manager and and all of the committee
about paying reverence to this historic
[17:06]
village hall but not trying to imitate
it. understanding the cues that we're
[17:10]
receiving from the proportions of the
building and um respecting that,
[17:16]
following that language, but creating a
new um design for this new um facility.
[17:23]
So, we've done things like looking at
the strong horizontal masonry banding of
[17:28]
this building and taking some cues from
that. We've looked at these the strong
[17:32]
corner vertical elements with the
turrets and taking some cues from that.
[17:37]
Um and then we've um because of the
large footprint of this plan as compared
[17:42]
to this building, we've tried to break
it down into clear those same kind of
[17:47]
clear functions of public administrative
fire and you know make sure that it's
[17:54]
not looking like a vast facade by
comparison to this building. and at the
[17:58]
same time wanting to um celebrate the
height of this building while keeping
[18:04]
this new facility lower. Again, because
it is um wider, a little larger in
[18:10]
footprint, we wanted to not have it also
be as tall and competing with this facil
[18:15]
this structure in that in that way as
well.
[18:20]
So, we've kind of named each of these
schemes so that you have a little
[18:23]
something to remember. It's it's going
to be a lot that we go through tonight.
[18:26]
So, I want um you to be able to refer
back to which was that scheme. So, we've
[18:31]
named this one dynamic response. And so,
scheme one uh really started around a
[18:37]
desire to um look at how closely we are
situated up against the village hall,
[18:44]
but give it a little bit of room to
breathe. So, um that footprint that in
[18:48]
plan was pretty square. In this version,
we're sort of um angling a few of the
[18:54]
walls, mostly this colonade that kind of
leads you through to the river and
[18:58]
bending right around this point where we
get tight at this turret. Um and so the
[19:05]
idea was that as you enter in the
facade, this the this column structure
[19:10]
feels wider, feels welcoming, kind of
funnels you into the space and then
[19:16]
widens again at the back, opens up again
at the terrace. So you feel that kind of
[19:20]
dynamic um movement as you as a you know
from someone from the community coming
[19:26]
to that space. And then again as I'd
mentioned um we've taken these these um
[19:33]
horizontal banding of the facility and
kind of mirrored that um in terms of the
[19:39]
proportions of overall and then breaking
this community space down separately in
[19:45]
mass from the apparatus bays and the
support zone on the end. And in talking
[19:51]
about some kind of tower anchoring
elements vertically in each scheme,
[19:55]
you'll see kind of this repeating um
vertical elements that um you know give
[20:01]
some repeat the rhythm of these
elements.
[20:07]
So this gives that view kind of right
through the entry and through um to the
[20:11]
green space along the river. And you can
kind of see those columns begin to
[20:16]
repeat leading you in. This would be
that historic um firetruck display could
[20:21]
could be on either side and and then uh
the public conference room and fitness
[20:26]
here. So it is glassier on this front
area. This is where those community
[20:29]
spaces would be.
[20:37]
And then as we each of these images will
kind of move you around to the south
[20:41]
toward the river as we And so this again
is that um oop sorry
[20:48]
the um bunk rooms here and some light
into the apparatus bay um support spaces
[20:56]
some lighting into stair towers
[21:01]
and on the back again um having kind of
expressing these
[21:07]
um ramps and and this dynamic um sort of
angular shapes again where you emerge
[21:14]
from the building with this colonade. Um
and then having that repeating that kind
[21:20]
of angled shading at the community
terrace as well.
[21:30]
And so then as you approach from the
river, walk from the west, you would
[21:35]
enter this public patio level. And then
again, there's the terrace um that's
[21:42]
supported by that colonade up at the
community room level.
[21:48]
I should have said in the beginning,
each of these schemes might have
[21:52]
elements or aspects that you like. They
they are all somewhat interchangeable.
[21:56]
if there's some aspect of scheme one
that you feel like would also work or be
[22:01]
celebrated in scheme three. Um just like
with the plans, you know, we want to
[22:06]
show you these four options as a way of
showing a lot of different ideas and
[22:10]
then taking that feedback and and
working them in together.
[22:16]
So there's kind of an aerial view where
you can see that bending um a little
[22:21]
more a little more clearly illustrated.
And then the apparatus bay roof would be
[22:28]
set a little lower to allow some
daylighting in along the um living
[22:32]
dining uh day room spaces.
[22:43]
Okay, move on to scheme number two.
Oh, I one more. Sorry. Elevations. So
[22:50]
the the flat elevations we thought were
kind of helpful to really look at the
[22:54]
scale of this building compared to those
historical datms and lines in the
[22:59]
masonry and how we're kind of pulling
those through and then how we're kind of
[23:03]
breaking down this eastern facade that's
facing more towards the residential
[23:08]
areas with more punched opening smaller
scale windows to keep that looking
[23:14]
appealing.
Okay.
[23:25]
Good evening. Uh again, uh president,
board, and uh and staff. Happy to be
[23:29]
back, uh here with you all. Uh so this
is I've got control here, right? Uh
[23:34]
forward and back. All right. Um as uh as
Kim shared, uh these images will take
[23:40]
you on a walk around uh each one of the
schemes. Uh, another thing I wanted to
[23:46]
mention with these, as you see, we're
showing this in a very light, um, just
[23:50]
kind of off-white collar with a little
hint of material. So, uh, to build on,
[23:54]
uh, a bit of what was said, we're
beginning to hint at materiality. So,
[23:58]
uh, keeping that in mind, too, like the
kind of interchangeability of ideas with
[24:02]
these schemes, some of these lend
themselves to, uh, inherently a little
[24:06]
bit more of a traditional look. Uh, but
even the more modern look uh, could use
[24:12]
more traditional materials. masonry or
or wood cladding and different things
[24:16]
that could uh kind of help bridge the
gap between the the new and the old. So,
[24:20]
just keeping that in mind, we we've
intentionally left these a little bit of
[24:23]
a blank slate with that um material uh
flexibility in mind. So, uh I'll take
[24:29]
you around this one that we're calling
um contextual presence. And uh as you
[24:34]
see immediately it feels a little more
traditional, a little more in uh uh in
[24:39]
tune maybe with the the traditional
architecture of the adjacent building.
[24:43]
Uh but yeah, very interested to have you
all review all these and and give us
[24:48]
your thoughts uh if we're finding that
balance. Um so the uh entry through the
[24:56]
middle there, you've got the view
through and hint of the the river
[25:00]
beyond. We've got the historic engine
number three. uh tucked into the the
[25:04]
space between the buildings on this one
and this one you see we've we've kept a
[25:08]
little further away than scheme one. So
you also see the view to the sky beyond
[25:14]
um and with the tight program there
there's uh moves that we make with these
[25:18]
like with this one you see the upper
level begins to pull forward a bit. So
[25:22]
by um kind of tight moving it further
away from the village hall we we flex
[25:27]
and scoot the spaces forward a little
bit. So, just a subtle difference that
[25:30]
you'll see with some of these. Um, so
here we're moving around um to the
[25:35]
northeast. Uh, this one uh also does the
the moves with the massing to step down
[25:41]
and then step back up uh at the corners.
Uh here's the view from the swinging
[25:46]
bridge of the um south facade. Those
views into the living spaces and then
[25:53]
the much larger glazed opening into the
community room on the upper level.
[25:59]
Uh this one uh still has as all of them
have the upper and lower um terrace on
[26:04]
the river side uh but with a more pulled
back overhang.
[26:10]
Um here's the view from the potential
riverwalk uh coming up from the
[26:17]
southwest.
[26:20]
And uh note again note the the large
windows into and out of the um the
[26:26]
community room. Here's the aerial
[26:32]
from the northeast and then the other
aerial from the southwest. And also
[26:36]
wanted to point out from the southwest
views, you'll see a little hint of what
[26:40]
we were thinking of as a potential um
art wall on the what's currently a a
[26:45]
literal blank slate on the back side of
the uh the village hall where we just
[26:49]
have the lap siding there. Uh our
thought was this could with um the
[26:53]
adjacency of the new public space could
be an opportunity for a mural or or art
[26:57]
wall of some kind. So you'll see that in
in all of the schemes. Um the other um
[27:04]
unique difference on this one uh a much
more um like curve linear approach to
[27:09]
the riverw walk. And with all of these
schemes, uh you'll you'll also see how
[27:13]
in collaboration with our um uh civil
engineers, we're we're retaining that or
[27:18]
we're keeping the existing retaining
wall and any proposed new work is being
[27:22]
held back from that retaining wall from
the river. So, uh subtle detail on those
[27:27]
riverwalk schemes. There's um the
elevations.
[27:34]
Uh and um we're only we were only
showing the like the primary public
[27:38]
elevations. Um but we've kind of studied
as you saw in the 3Ds the the the
[27:42]
alignment um on all sides.
[27:49]
And moving on um to the um next one. I'm
going to take the middle two and then
[27:53]
I'll hand it uh hand it off to another
member so you don't have to hear from
[27:56]
one of us for too long. Uh so this one
we're calling um spatial framing. And uh
[28:02]
what you'll start to see with this one
is this theme of kind of linear bands
[28:06]
that uh that encircle and frame certain
spaces or views uh around the building.
[28:11]
So um there at the entry, this piece
that rises up and frames that entry and
[28:17]
the view through. And you see a hint of
another framing element on the far side,
[28:20]
which you'll see as we move around.
[28:25]
Uh here we've got the the stair towers,
very similar massing to the others
[28:29]
responding to that program, but rather
than the kind of capped tower, it's got
[28:33]
this uh framing element that that um uh
frames the tower with some glazing in
[28:38]
there to provide light into the stair
tower.
[28:42]
Here's the view from the swinging bridge
with the articulation of the south
[28:46]
facade. uh more of those um boxed
elements around there which as you start
[28:51]
to see in this view and you'll see in
the other ones as well the articulation
[28:54]
on the south we begin to push and pull a
little bit to provide solar control on
[28:58]
the south uh the lighting here is based
on accurate um sun uh light that would
[29:03]
hit the building at different times in
the year uh so you can see how in like
[29:07]
morning light in I forget what day we
based this on but the those elements
[29:12]
that come out are providing important um
feature to help prevent glare and direct
[29:16]
uh heat gain coming into those spaces
while still uh allowing views out.
[29:22]
This one uh has that framing around that
upper piece. So uh still open to the
[29:27]
river but a little more enclosed.
[29:31]
Here's the view uh approaching down the
possible riverwalk extension
[29:39]
uh and the aerial views.
[29:47]
Yeah. So, more of a angular kind of
river walk uh scheme shown on this one.
[29:52]
And you'll notice with all of these, we
we were providing some like stepping
[29:56]
terracing or like potential little
planter areas that would provide uh
[29:59]
engagement on the the riverwalk and
terrace as well.
[30:04]
Here's those elevations.
[30:12]
All right, I'll hand it back to Kim.
>> Thank you.
[30:16]
So, um, this final scheme, we wanted to,
um, certainly show a version that did
[30:22]
have, um, pitched roofs and take a
little bit of a cue from this building
[30:27]
in that way, while at the same time not
going quite for the steepness that this
[30:31]
building has. This is not a building of
that era, and we don't want to again
[30:35]
compete with with this building in that
way. So, um, but we did want to do a
[30:40]
version to show you where we use those
different roof shapes again to anchor
[30:45]
these, um, sort of towers at the corner
and and give presence to the entryway.
[30:50]
Um so um the other thing about this
scheme and why we're calling it
[30:54]
traditional anchoring is we're also
exploring some other ideas of smaller
[31:00]
punched openings um that might lend
itself more to an overall masonry
[31:04]
construction again a little more like
the village hall. And like Joe said, um
[31:09]
the materiality is going to be another
opportunity to relate back to this
[31:13]
building in terms of color and materials
and those kinds of selections regardless
[31:18]
of what uh form the the new building
takes. Um so in terms of the uh some of
[31:24]
the elements in the scheme are very
similar to scheme number two in terms of
[31:29]
um these vertical kind of engaged
columns and some of the um these sort of
[31:34]
outriggers that are something a little
bit prairie style or craftsman uh in
[31:41]
nature.
[31:46]
So again the similar view towards the
river
[31:52]
and in each scheme we are trying to
think about providing you know some
[31:55]
space where you would want privacy on
the inside anyway. It creates a signage
[31:59]
opportunity on the exterior.
[32:06]
So, as we move to the south, again, just
looking at breaking up some of these
[32:11]
areas of glazing, slightly smaller
glazing areas, um, balancing some what
[32:17]
might be some additional roofing uh,
costs with maybe less glazing costs.
[32:23]
Um and in this scheme, one other
difference um on the rear here is that
[32:27]
because of the roof um massing, we've
extended the roof out and made this a
[32:33]
fully covered uh terrace where the
columns go all the way up to support
[32:37]
that roof structure.
Uh again, in this scheme, we're showing
[32:43]
a the same kind of riverwalk element
with the curve linear
[32:49]
design as in scheme two.
[32:54]
you know, knowing that we aren't the
landscape architects, we're the
[32:58]
architects, but this building has so
much integral relationship with what we
[33:03]
know will be an important river um
feature river future riverwalk. And so,
[33:09]
regardless of, you know, even the early
stages right now, we want to make sure
[33:12]
that the architecture of this new
facility is addressing that outdoor
[33:15]
space even at a conceptual level and
being informed by it.
[33:22]
So again, as Joe mentioned, all of the
schemes have that public art opportunity
[33:27]
that you know, if you're enjoying this
terrace, you've got a nice view of
[33:32]
that public art opportunity.
[33:36]
And there you can see a little better in
elevation how those kind of roof
[33:40]
elements
um relate but don't compete with the
[33:45]
village hall.
So just to kind of recap so you can see
[33:50]
them all in one place we thought would
be helpful. Um again I hopefully seeing
[33:54]
them all at once um reiterates the point
that we've made about the overall
[33:59]
massing the breaking up into public fire
support elements and using those towers
[34:08]
to anchor the corners and and mimic the
existing village hall in that way.
[34:17]
Sorry.
[34:20]
» And again, just this slightly different
riverwalk schemes as placeholders of
[34:25]
that future idea and how this terrace
space might start to relate to a future
[34:28]
riverwalk.
Okay. Any you want to stop and take some
[34:34]
questions on the overall schemes or go
all the way through?
[34:37]
» Uh, I'd say go all the way.
>> All the way through. Great.
[34:43]
» We'll turn it over to Yes.
[34:50]
» All right. Well, thank you everybody and
it's a pleasure to be here and glad to
[34:54]
meet you and I know I've worked with a
couple of you in the past on different
[34:56]
projects, but as a little introduction
again, Chris Kak with Harbor
[35:00]
Contractors. We're a 67y old
construction management contracting
[35:04]
company and public safety facilities is
probably one of our primary market
[35:08]
segments. I've been with the company for
23 years and I don't recall a time we
[35:12]
hadn't had an active public safety
project on at any one of those times. So
[35:17]
with our experience on building projects
and current projects and our historical
[35:22]
costs, we kind of work with the Williams
team to help pro provide some validation
[35:26]
of the costs and obviously are being
presented with some options and
[35:30]
decisions to show kind of the order of
magnitude impacts of those types of
[35:33]
decisions. So we'll kind of get right
into it. go backwards.
[35:39]
So to get right into it, again, we based
everything kind of off of the the scheme
[35:43]
one project with initial price and we've
got some details in the background of
[35:46]
that, but try to give some validation of
the different schemes and kind of their
[35:51]
impacts of how things move along and
change. Obviously, if you look at the
[35:55]
concepts, there are some different
things, more roof lines, more glass, and
[35:58]
more windows, and those kind of lead to
the
[36:00]
» Sure.
>> I'm sorry if I could interrupt.
[36:02]
Absolutely. Could you tell us what when
you say scheme one use the terminology
[36:07]
as also that so scheme one is the
dynamic?
[36:11]
» Yes.
>> Yes.
[36:12]
» Thank you.
>> Yep. The scheme one is the dynamic. And
[36:14]
let me see if I go back a couple here.
Where's your recap?
[36:19]
» Yeah. The scheme one is a dynamic.
>> Yeah.
[36:22]
» And the next one, scheme two, the
contextual presence. that would be or um
[36:28]
you know the a lower cost of
approximately $300,000 than the scheme
[36:32]
one
>> you know you get to go back to scheme
[36:36]
three the spatial uh context that one
you know it's basically the same cost as
[36:43]
scheme one you know I mean it shows a
small different thing and then scheme
[36:45]
four is the highest cost if you go again
you get additional roof lines the extra
[36:51]
canopies and all that So,
[36:58]
so that's the the total project budget
we came up with and and we'll get to the
[37:01]
next slide. It shows it is total project
budget escalation, contingencies, owner
[37:06]
costs and all that. You know, that's one
thing that uh you'll you'll see as we go
[37:10]
through. And then, you know, on top of
that, we did the riverw walk allowance
[37:14]
of uh additional budget of $3.5 million.
you know, the main patio function of all
[37:20]
of the options is in the base number,
but the extension of the river walks
[37:24]
going east and west, and that's kind of
an area that's kind of up for design a
[37:27]
little bit. And then, you know, we did
have another item of renovations to the
[37:31]
existing building. You know, there's
some functions that are leaving this
[37:34]
building. You know, kind of the basement
moving area. You know, we kind of that
[37:37]
as a placeholder of if you're going to
do something with those spaces now or
[37:41]
moving on.
So what I want to talk about again this
[37:46]
is probably a really important item of
the total project budget. Um we do this
[37:52]
a lot. We go through a lot of
municipalities who are you know
[37:55]
obviously you're looking what other
people have done and you hear people
[37:58]
talk about project costs of different
projects they've done. It's those
[38:02]
numbers are often all over the place.
Some of them include land, some of them
[38:06]
include owner costs, some of them are
just the building costs. So this
[38:09]
represents the total project budget. you
know, going through there. I mean, the
[38:13]
biggest item is the construction costs
of the 223, which is about 75% of the
[38:18]
total budget. Um, next biggest one is
the soft cost, the owner's cost. You
[38:24]
know, it's going to be design fees,
furniture, a lot of costs that you guys
[38:28]
have to deal with whenever you're doing
a project. You know, it's kind of
[38:30]
all-encompassing of the complete cost.
Um, you know, we have included a
[38:35]
contingency at this point. You know, the
way we put these estimates together,
[38:39]
like I said, we got a lot of experience
doing this. We've worked with Williams
[38:42]
quite a bit. We know even though these
drawings are early stages, we kind of
[38:46]
can envision what they're going to be
when they get done completing them. You
[38:49]
know, we know all the details that have
to get added. We've had conversations
[38:52]
with their structural engineers and work
with their civil side. So, we can kind
[38:56]
of anticipate what those things are
going to be, but you know, it's be
[39:00]
foolish at this point not to have a
contingency in there because, you know,
[39:02]
there's going to be things that move
around. And we also included an
[39:05]
escalation factor in there. You know,
anticipating this would be a 2028 start.
[39:10]
You know, we kind of do that on a, you
know, average continual escalation over
[39:14]
the years. You know, we don't really
factor any current little minor price
[39:17]
impacts. They usually all kind of smooth
out and just kind of go over the
[39:20]
historical, you know, 3 4% goes kind of
per year. So, anybody have any questions
[39:26]
on the total project budget?
Okay.
[39:32]
If we go to the next one, you know, um,
one of the things we do on many of the
[39:36]
projects, you know, yes, we're a
builder, but we get involved very early
[39:40]
on in these conceptual stages. You know,
not only to help guide those or provide
[39:44]
some cost validation behind those design
decisions, but as with every project,
[39:50]
everybody's trying to find the most
economical way to build the project. So
[39:53]
we start looking at options with uh the
Williams team as they're going through
[39:58]
design for you know are there ways for
cost reductions. You know there's kind
[40:03]
of two major categories A and B. There's
permanent changes. You know decisions
[40:08]
that you'll make that you can't really
go back on you know of cutting the
[40:11]
building in half or taking off a floor
or something like that. You know major
[40:14]
decisions or major program changes of
reducing square footages. Those are
[40:18]
difficult to come back with. The next
one is bid alternates or future phases.
[40:23]
It's portions of a project that we can
establish when it gets to the point of
[40:28]
this thing goes out for trade contractor
bidding alternate pricing. They can be
[40:32]
either ads or deducts of hey at uh the
build out of this room. You know, they
[40:37]
will provide the actual pricing. That
decision can be made when you get the
[40:40]
real final numbers at bid time. So
that's a good strategy to, you know,
[40:45]
kind of maximize your budget and also
not, you know, get in a situation where
[40:50]
you eliminate something and go, "Oh man,
we got really good numbers. The bids
[40:53]
came in really well." You know, in 2008
the economy was a perfect timing for
[40:57]
bidding. And we wish we wouldn't have
made that change. It gives you those
[41:00]
options to have those things in there
and choose as you go. So, you know,
[41:04]
initial options, just talking, you know,
and work with the Williams teams, we
[41:08]
came up about $ three and a half million
dollars of just initial options. That's
[41:11]
kind of a first round of that. And it's
kind of a continued effort during the
[41:15]
design and pre-construction. You know,
the way we work with the Williams teams
[41:19]
is as they're coming up with an option
or something, they won't completely
[41:23]
spend the time and effort fully to
design it out. They'll they'll consult
[41:26]
with us. We'll work with them and guide
them along the way of, hey, this is a
[41:30]
more economical way to do it or, you
know, here's a couple options you can
[41:33]
consider as you're going through the
design. But you know some of the options
[41:37]
we've investigated are you know
reduction in program spaces you know
[41:41]
those are things obviously you spent a
lot of time working on a program but you
[41:44]
know sometimes choices have to be made
and that's something to look at and you
[41:47]
know evaluate it and look at those as
you go through. You know the other thing
[41:52]
is build the shell and core with future
buildouts. You know, it's quite common
[41:55]
thing we do with a lot of clients where,
you know, hey, you design a portion of
[42:00]
the building, you build the entire shell
and cord, everything's there. You just
[42:03]
don't put the finishes in and it's
either funded as a separate project or
[42:06]
bid as an alternate or something that
could be a future phase of the project.
[42:10]
You know, the west parking lot, you
know, kind of the same thing we had in
[42:13]
the budget, reconstructing the west
parking lot, you know, and new paving
[42:17]
and getting that, you know, uh, cleaned
up and a little bit, you know, that
[42:20]
could be a separate project later down
the road. Um, you know, West Garage
[42:24]
Drive, you know, we've got the
drive-thru of the garage, you know,
[42:26]
running through, you know, from east to
west with the two garage doors. Same
[42:30]
thing. That's something it could be a
bid alternate or, you know, done as a
[42:33]
future phase on the project. Um, you
know, reduction amount of windows, you
[42:38]
know, that's something, you know, as you
look at the different concepts, you
[42:41]
know, that's something that could be
applied to any one of these concepts.
[42:43]
You know, obviously that's one of the
more expensive items in any project is
[42:46]
the glass is more expensive than the
masonry. So, it's something to look at.
[42:50]
um alternative exterior materials. You
know, we've already worked with the
[42:54]
Williams team on the actual structural
design of the building to kind of uh
[42:58]
bring some costs a little bit more in
line with that. But alternate materials,
[43:01]
you know, that's something, you know,
not necessarily could be a wholesale
[43:06]
change in materials or it could be
selective materials. And Whim's very
[43:09]
good at mixing different materials and
making it flow very well with their
[43:12]
designs, but that's something we look at
as options as we go through the project.
[43:17]
Um, you know, there's other things of
elimination of the ornamental stair, you
[43:20]
know, going to something more
traditional with than the kind of
[43:23]
grander lobby that's in there. And then,
you know, some open office space
[43:27]
layouts, you know, I mean, that's
something to look at a little more of a
[43:30]
different concept where you have more of
a cubicle type arrangement than offices.
[43:34]
Obviously, given the nature of this
facility, some of those things are need
[43:37]
to be separate, you know, separate
private offices, but it's an option to
[43:41]
look at. So pretty much it's it's to
provide kind of a guideline, a path of
[43:47]
moving forward and continually looking
at options throughout the process of
[43:52]
what's the most economical way to meet
your guys' vision. So that's kind of
[43:56]
where we provide that support and help
with that along the way. So any
[44:01]
questions on that cost reduction process
or thoughts?
[44:07]
» We'll go through uh this. Yeah, once you
guys are done, we'll we'll go through
[44:12]
this in more detail.
>> Absolutely. I think that's the last
[44:15]
slide.
[44:19]
» We got one.
[44:23]
» Thank you, Chris. So, um just to wrap up
and then um open everything up for
[44:27]
questions and for feedback. um next
steps. We certainly want to hear from
[44:31]
all of you um what you um what you're
thinking, what questions you have, what
[44:35]
preferences you have. Anything that you
want to say, don't ever show us again.
[44:39]
It's all um it's all on the table and
the goal is to show you a number of
[44:44]
options um so that we can work together
to get um to the solution that's in the
[44:49]
best interest of the community. So um as
we mentioned, we we'll have this
[44:53]
discussion tonight, answer questions you
have. We want to um if we are not if you
[45:00]
all coales around a particular exterior
idea that's wonderful. That is not our
[45:05]
expectation or our goal for this
evening. It's merely to receive
[45:09]
feedback. If you wish as a um village
board to sort of narrow the funnel um
[45:14]
for preservation
certainly um is is something you can
[45:19]
choose to do. Um but um our next steps
are to present this um to that group and
[45:24]
then to start the engagement process to
um inform the community um not only
[45:30]
about the design for this project and
the options for this project um but to
[45:34]
work with staff and work with all of you
around the underlying need. Why are we
[45:39]
doing this? Why is this necessary? Why
are we doing it now? So, um that is all
[45:44]
coming up in um in the coming weeks and
months, but um it's a lot of
[45:49]
information. Um we're doing a public
safety facility with fire and a lot of
[45:54]
information sort of through a proverbial
fire hose. So, at this point, love to
[45:58]
turn it over to you for questions and
comments.
[46:00]
» Thank you. Um in order for us to you
know, there's a lot to digest here
[46:06]
obviously. uh and in order I want to
organize how we proceed with our
[46:11]
discussion. I have a suggestion but I
I'm open to to uh other other
[46:17]
considerations. I would suggest we go
through the visuals first one at a time.
[46:25]
Maybe we say what we like and don't like
about each one and uh then we get into
[46:30]
the cost reduction um
uh discussion because the cost reduction
[46:36]
applies equally more or less to all the
different options. Right. Yeah. Does
[46:41]
that work for the trustees?
>> So I'd like to start with the site plan
[46:46]
because I have one comment on the site
plan.
[46:51]
» Thank you.
I'll just stay right here.
[46:55]
» And and this relates to the cost savings
stuff, too. My
[47:00]
comment when I f saw this over the
weekend was, do we really need that west
[47:05]
drive at all? Uh, and so I asked manager
Francis that and I believe the answer
[47:10]
was not really.
>> No. Um, initially when we were talking
[47:14]
about that drive, it was when we were
conceptually thinking about having the
[47:19]
the fire apparatus kind of swinging
around, but that changed and evolved
[47:24]
over time. So that additional access
point is is not needed and actually that
[47:29]
will probably help free up space for a
trash enclosure
[47:34]
» and it could be repurp or could be used
in the future as more public space as
[47:39]
well.
>> Sure. It's valuable riverfront space to
[47:42]
have unnecessary drive
doesn't seem necessary.
[47:48]
» But sort of the site plan question leads
into another one of my
[47:53]
questions about all the schemes and that
is um for the mechanicals for the
[47:58]
buildings. Um you know a lot of places
put their air conditioner condensers on
[48:03]
the roof. I just wasn't clear on where
the intended place for that was and
[48:11]
whether they would be visible or somehow
enclosed.
[48:16]
» Sure. I I can I can answer that
question. And um we're we haven't
[48:19]
determined the um the exact mechanical
systems for the project, but um it's
[48:25]
very likely that we'd have something for
cooling and ventilation on the roof um
[48:30]
which would be fully screened. um that
lower roof over the apparatus bays is an
[48:35]
ideal place for that. Um I have not
studied your zoning ordinance in great
[48:39]
detail, but I'm relatively certain that
it would require screening of those
[48:43]
units. So um that would handle a lot of
the ventilation and cooling heating. Um
[48:48]
we can we can look at options indoors.
Um we do like to do these facilities um
[48:54]
with hot water heat um and then air
handling units which could be in the
[48:58]
basement mechanical rooms. But um we do
anticipate some degree of equipment on
[49:02]
the roof and for that equipment to be
screened.
[49:06]
» Are there um any of the particular
designs that would be um more amendable
[49:12]
to that? I mean it seems like some of
them are pretty
[49:17]
um flat and low.
>> Yeah, I think it's something we have to
[49:22]
study to be very honest. In my mind, um
the the more contemporary or the the low
[49:28]
slope or flat roof concepts um that have
more horizontal elements lend themselves
[49:34]
to um those mechanical enclosures a
little better because we could use more
[49:39]
horizontal elements to help with that
screening. But um if the desire of um
[49:46]
the village is to explore something that
has those more traditional forms, we can
[49:50]
find ways to to screen in in ways that
that make sense. We we work on projects
[49:55]
all the time where it looks like a
sloped roof building from the street and
[50:01]
um somewhere in the center invisible to
anybody except someone who has a drone
[50:05]
or somebody flying over. Um you've got
some accounts and stuff there.
[50:09]
» Wonderful. Thank you.
>> So I think we can work that up no matter
[50:11]
what. Okay. Any other questions or
comments on the site plan?
[50:17]
Is there a general agreement to
eliminate the West Drive?
[50:21]
» Yes.
>> Great. Um, so let's move on to the uh
[50:28]
dynamic
response. Was that was Yeah. So, and
[50:33]
before we get into that detail, I just
want to answer one question that I know
[50:37]
we we all have had or I've heard is uh
we're not at the stage where we could
[50:43]
say what we're doing to make this an
environmentally friendly building, but
[50:47]
we will be and it will be an
environmentally friendly building to the
[50:52]
extent possible. uh meaning bird
friendly windows uh meaning uh efficient
[50:58]
uh utilities all the stuff that goes
into making a building sustainable. So
[51:04]
that will be a priority. It's just we're
not there yet.
[51:09]
So dynamic response,
what do you like or dislike about it?
[51:16]
» Anybody?
Aine?
[51:19]
» I actually like this one a lot. Um, I
really like the fact that it has, um,
[51:27]
some angularity to it. Um, it's
contemporary. I see, you know, in the
[51:33]
section that's behind the, um, Riverside
logo that there's some, uh, you know,
[51:39]
horizontal banding, which suggests to me
that warm wood that you sometimes see in
[51:44]
in contemporary glass like you were
talking about. um kind of softening or
[51:50]
harmonizing with materials
um you know something that is of a
[51:56]
different time period with its
surrounding architecture. So, um, you
[52:01]
know, this, uh, is very intriguing to me
and, um, you know, I'm always I always
[52:08]
kind of wonder a little bit about like
the pitch of the roof or is it flat?
[52:12]
Like, I can't exactly tell what's going
on with it, um, and how that works with
[52:17]
drainage and things like that, but I
really think it's a um, very energetic
[52:24]
and dynamic building. So, congrats on
the initial concept. Um, I'm not sure
[52:30]
about the Riverwalk. Um, you know,
having that be straight
[52:37]
as straight as it is. I mean, that's
very very angular. Um, but in general, I
[52:43]
think uh there's a lot of positive
things to be said about this one.
[52:49]
» I completely agree with you.
>> All right. So, there you go. Um, when I
[52:56]
look at all four of them,
the this first one is the one that I
[53:00]
actually had an emotional response to. I
actually felt like architecture is such
[53:06]
a big deal in Riverside and we have so
many different architectural styles
[53:11]
incorporated
and
[53:15]
this to me is a visually interesting
building that doesn't try and blend in.
[53:20]
It doesn't it's in it in itself
It is interesting.
[53:26]
I also feel like um I worked on a
college campus for over a decade and
[53:32]
obviously there were always we were
always building and every time we tried
[53:36]
to build something that looked a lot
like something else, it was never
[53:40]
received well because it never looked
enough like it and it never it was
[53:46]
trying to be something else. And one of
the things I really like about this is
[53:52]
it's not trying to be like the building
that's directly next to it, which is
[53:57]
something that is awesome in Riverside
that you can have two houses. You can
[54:00]
have a Victorian right next to a
Franklidd Wright, right next to a
[54:04]
bungalow. And so I really liked
the way that the lines kind of called to
[54:12]
the building next to it and were
cohesive with it, but it was its own
[54:17]
building. it was its own design. Um,
that was really, like I said, this is
[54:23]
the only one I actually had a response
to. The rest of them I was like, well,
[54:26]
these are fine. Um, the other thing I
love about this one is I love all the
[54:31]
glass and I feel like if you are inside
this building, you're going to get a ton
[54:36]
of natural light and feel much more like
you're in nature. Um, way more so than,
[54:42]
you know, it was we were talking with
the last scheme where the openings were
[54:47]
smaller and stuff. I really felt like
this would feel much more connected to
[54:51]
the river and the forest that's around
it more so than some of the other
[54:56]
designs.
[55:00]
» Any other comments on this?
>> I have a question. So, it looks like the
[55:05]
the the roof on scheme one it's pitched.
Is it does it go like this or is it
[55:12]
straight across the top?
>> I mean it it will have a pitch to drink
[55:15]
water.
>> There are number of way that we handle
[55:18]
that. Um and and even with the p pitched
roof beyond that fascia element that is
[55:24]
the large horizontal band, you know,
would stay flat.
[55:28]
» So um it may be a little bit of optical
illusion with the way that it bends
[55:32]
around the turret. It does kind of look
as though it's peeking up, but the
[55:37]
intent is that it be a really strong
horizontal band of facial all the way
[55:41]
around the building. And that movement
is more in plan view.
[55:50]
Uh, I'm happy to provide my my thoughts.
Um, initially this wasn't my favorite,
[55:57]
although I liked it. I still like it.
Uh, Trusty Marsha and Trusty Cost may
[56:03]
convince me that it's the favorite. But
what I do like about it a lot is all the
[56:10]
glass on the front side. Mhm.
>> I mean, I think that is
[56:15]
it's symbolic of transparency. Uh, it
connects it to the exterior.
[56:22]
Um, I I really like that part of it. I
like the horizontal lines. I like the uh
[56:30]
small thing, but I really like the sign
freeze above the garage doors, the
[56:35]
opportunity to have that branding there,
that Riverside Public Safety Center. Um,
[56:41]
I realize you could do that in other
ways on other elevations, but on this
[56:45]
one it's got a nice perfect It's like
it's designed to have that. It would
[56:49]
look empty without the sign on it.
Um what I am hesitant about with it is
[56:57]
the blank wall that we're looking at
right now where the uh uh you know on
[57:02]
the left side of the the the bays and
then on the back side.
[57:10]
Um yes I like that. Okay. Initially I
thought there was too much blank walls
[57:16]
but maybe maybe not. Maybe not.
>> Sorry.
[57:20]
um or that from that perspective it made
me feel like there were too many blank
[57:24]
walls.
Um but
[57:30]
those were my thoughts. Does anyone else
want to weigh in?
[57:35]
We'll go on to the Go ahead.
>> Um I like all of them. I think we all do
[57:42]
great work on it and I like how the
facade is broken up. For me, this design
[57:47]
doesn't break it up enough. And I know
that's intentional to take that straight
[57:51]
line all the way across the main part of
the building.
[57:55]
Just my personal preference. I don't
care for that.
[58:02]
» Uh I would just like to say your
emphasis on the windows in the back just
[58:06]
because that's the that's overlooking
the river which is our most important.
[58:13]
say that one of the comments on this
scheme in particular that
[58:16]
» Can you go to the podium please?
>> Sorry just one of the comments on this
[58:21]
scheme from the group about the glass
from the riverside was a concern for
[58:25]
vandalism. They do get a there are as we
were having this discussion walking
[58:29]
through broken windows facing the river.
And so from a practical standpoint, we
[58:35]
wanted to again show a variety of
options um if more glazing for views and
[58:40]
and that's why in this scheme we did
really try to focus in on where are
[58:43]
people um occupying the space for long
periods of time and having views from
[58:48]
the living spaces, the apparatus bay at
the lower level that's more prone to
[58:52]
damage from both inside and out. Um and
then focusing the glass more on the
[58:58]
community space where it will have the
views. But um as mentioned uh any of
[59:04]
these comments about where you do or
don't want more glass, you know, we can
[59:08]
translate those comments easily to any
of the schemes.
[59:12]
» Are they designed as all windows or is
it just a sort of a strip of windows?
[59:17]
» I mean typically when we have a large
expansive glass like this, it will
[59:21]
either be a curtain wall system or a
storefront system. So it's not all
[59:25]
operable if that's what So we would
design certain amount of actual
[59:29]
ventilation open windows that can open
within that system, but it would not all
[59:34]
be operable if that's
>> You mean open and close?
[59:38]
» Yes. Sorry.
>> No, I wasn't really thinking about that.
[59:40]
I just wanted to know how big the
windows are. It looks like there's only
[59:44]
a strip of windows, not the whole space,
the whole area of the squares.
[59:48]
» I see. I think you're seeing the ceiling
going through and so that looks solid.
[59:53]
Yes. Yeah, I see what you're saying now.
>> So, uh that is ceiling beyond.
[59:59]
» I see it. And then actually in this
space, if you're in the this is the
[1:00:04]
dining room, um there are glass there
are windows um looking over the
[1:00:10]
apparatus bay on the other side. So, and
there's also windows lower looking from
[1:00:14]
that space into the apparatus bay. So, I
think you're actually seeing I'm going
[1:00:19]
to go the other way.
Nope, wrong way.
[1:00:25]
These windows showing through
>> from the back view is what is kind of
[1:00:30]
throwing off that view of the glass.
Thank you for
[1:00:35]
pointing that out.
[1:00:39]
» Also, I just want to mention where you
see the most windows are the public
[1:00:44]
spaces because that was staff's focus as
we met with Williams.
[1:00:49]
Yeah, it doesn't make any sense to have
windows. I don't I mean, it'd be cool to
[1:00:55]
have textual design, textual
architecture design in the bottom part
[1:01:00]
where the bay is, but it doesn't make
sense to have windows there because
[1:01:04]
that's where all the trucks are and
stuff like that. You know, like you
[1:01:08]
said, they can get damaged that that's
not a great spot for I mean, as much as
[1:01:13]
I would love it, there's not a lot to
see and there's not a lot of people
[1:01:16]
looking even from inside. There aren't
people looking outside.
[1:01:21]
» Yeah, it it may be that the selection of
exterior materials will
[1:01:26]
» impact this view a lot.
>> Yeah.
[1:01:31]
» As well as the landscape and ramp
design, you know, other things that we
[1:01:35]
use to fill it to fill in that lower
space. Um there's opportunities both for
[1:01:40]
landscaping and material change to make
sure that's not a large blank facade.
[1:01:46]
Any
other comments on this one?
[1:01:52]
» So, let's uh talk about number two,
contextual.
[1:01:59]
» Sorry,
they're really small on my screen.
[1:02:04]
So, I'm seeing a lot of the same shapes
roughly.
[1:02:07]
» There you go.
>> That's where we go.
[1:02:19]
There we go. Contextual
[1:02:24]
» justice.
[1:02:27]
» This is my favorite one. Again, I like
how it's broken up. I like this there's
[1:02:32]
a lot of vertical lines to it. And of
course, the windows.
[1:02:42]
I like this one less because I liked the
horizontality of the other one and I
[1:02:47]
feel like the columns here are
distracting in a way um that they're
[1:02:53]
just
>> they're kind of like
[1:02:57]
added
just so we could have columns and I
[1:03:01]
don't it doesn't speak to the it doesn't
really speak to function for me. So,
[1:03:10]
» I have a question about the the entry,
the main entry. Is it a triangle in
[1:03:17]
between the two buildings?
Is it smaller?
[1:03:21]
What is the shape of the lobby?
>> Where the truck is. Are you talking
[1:03:26]
about? Yeah.
>> Oh, okay.
[1:03:29]
» So, just as a reminder, I'll opine and
then Williams can fill in the gaps. So,
[1:03:34]
we're going to be taking down where
basically the fire trucks are, right?
[1:03:40]
Because that was an old addition. Um,
all the fire equipment and then you have
[1:03:45]
offices currently on the outside of
that. So, all of that would be removed.
[1:03:50]
So, what you're seeing in creating that
connection are is the connection to the
[1:03:56]
historic building which occupies where
uh our front desk is. Um it also has uh
[1:04:05]
different areas as it relates to police
uh other like copier equipment, those
[1:04:10]
types of things. And so it's kind of
mirroring the existing building,
[1:04:14]
creating that lobby connection to then
the the new building. So it would be
[1:04:20]
somewhat triangular, but it it'll be
open as it's kind of illustrated there.
[1:04:25]
Does that make sense? Okay.
[1:04:37]
What I liked about this one was the the
roof line, the cornice line.
[1:04:44]
Um,
[1:04:48]
you know,
puts a definitive
[1:04:52]
end on the height of the building. Um,
which probably, you know, gives it a
[1:04:58]
little bit better relationship to the to
the town hall building.
[1:05:04]
Um,
the uh turrets or the columns, if you'll
[1:05:10]
go back to that,
[1:05:14]
that corner piece on the left has
windows. It has it has a cap. It's like
[1:05:19]
a traditional Roman column or whatever.
I think it'd be an ionic column.
[1:05:26]
Um,
or Doric.
[1:05:29]
» Doric is the one with the swirls at the
top.
[1:05:31]
» Ionic. Ionic has the it has the curls.
Corinthian has the
[1:05:36]
» leaves. Right.
>> So, it's Doric. Ionic.
[1:05:40]
» Corinthian.
>> Doric. The simplest.
[1:05:44]
» Please tell me you got that on tape.
Please tell me some of you that was all
[1:05:53]
» my work is done.
>> Um
[1:05:59]
I I like the backside of this one.
Um but quite honestly equally I I like
[1:06:05]
that it's cost less.
Um,
[1:06:11]
I mean that's not a deal. That's, you
know, it's doesn't cost enough less
[1:06:16]
to where if I, you know, didn't like it,
I'd do it. But, um, but that's a plus in
[1:06:23]
its column.
[1:06:28]
» I I mean, I I I like this one. I feel
like it's But I feel like it's fine.
[1:06:34]
» It's not as exciting.
>> That's how I feel. It's fine.
[1:06:38]
» It's not as risky, not as exciting.
>> Yeah. And I feel like we're such an
[1:06:44]
architectural village, right? It's
architecture is so important to so many
[1:06:48]
people in this village that having
something that's just kind of
[1:06:52]
» fine or like, you know,
I'm I'm not I don't want to offend
[1:06:58]
anybody. I'm really sorry, but like it
looks like a lovely strip mall or like a
[1:07:03]
I mean like a really lovely one. Not
like your gross corn, you know, but like
[1:07:07]
it looks it's like a lovely strip mall
kind of thing and I don't feel like it
[1:07:12]
has the like wow.
>> Yeah.
[1:07:17]
Okay.
>> Any other comments on this one?
[1:07:22]
» I agree with Trustee Cos.
We are never like this. This is awesome.
[1:07:30]
Well, let's uh move on to number three.
Spatial framing
[1:07:38]
» to me. This one's similar to the first
one. Not the same, but has a lot of
[1:07:42]
similarities.
[1:07:46]
» The lines are a little bit more broken
up.
[1:07:54]
» Any other comments on this one or
You said that it was um a craftsman
[1:08:02]
style.
>> That was the windows
[1:08:05]
» two
more.
[1:08:09]
» I'm sorry. Two and four.
>> Oh, okay.
[1:08:11]
» Two and four.
>> This is a little more modern in the
[1:08:16]
same.
>> Can you go to the microphone, please?
[1:08:18]
» I can't pick it up for our audio if it's
not on the mic. I apologize. I
[1:08:22]
apologize.
Um, anyone can answer these questions
[1:08:25]
for our team, but um, yeah, this one has
a little bit more of a modern references
[1:08:30]
in the framing lines, whereas op scheme
um, two and four did have some what we
[1:08:36]
would consider more traditional
Craftsman detailing with um, the deep
[1:08:41]
overhangs and the um, the detailing of
kind of the outriggers supporting that
[1:08:46]
roof line.
But, you know, that can be accentuated
[1:08:51]
or or not in terms of the detailing of
the building. So,
[1:08:57]
this one seems just too modern.
I don't know if it would look
[1:09:04]
as nice next to the township building.
Looks very modern to me.
[1:09:15]
» A little too busy and distracting.
>> Yeah.
[1:09:21]
I wasn't too I wasn't didn't didn't
really like the uh if you'll go to that
[1:09:27]
the backside perspective.
>> Yeah. Well, no, not that one. What the
[1:09:33]
the swinging bridge side?
[1:09:38]
» This one.
>> That's good. That's good.
[1:09:42]
the the framing of the columns on the
edges at the corners and the framing of
[1:09:47]
the window bays
seemed to me to be not natural.
[1:09:54]
Something like that. Not organic.
[1:09:58]
» Interesting.
>> Um,
[1:10:01]
so
speak for myself, either one or two I'd
[1:10:08]
prefer over this one.
Does anybody feel any differently from
[1:10:12]
that?
[1:10:16]
» Good. We can move on to number four.
[1:10:26]
» Traditional anchoring. This is the most
expensive one, right?
[1:10:32]
» And that's I'm guessing because of the
roof almost entirely, if not entirely,
[1:10:38]
» which I did like the roof. this one.
[1:10:45]
» Others comments.
>> Uh, this is my least favorite one. Uh,
[1:10:52]
again, I'm sorry, Alex, but I don't love
the roof. Um, I also don't love that the
[1:10:57]
windows are are smaller and choppier. I
like seeing the expanse of windows.
[1:11:03]
I think it's
Yeah, I I I just think it's more
[1:11:08]
interesting.
with the expansive windows. And I I
[1:11:13]
don't know.
Yeah. Again, I worry what I worry about
[1:11:16]
with this one is that it's gonna look
like that. We tried really hard to make
[1:11:22]
it sort of look like the building that's
next to it, but it doesn't really look
[1:11:26]
like the building that's next to it. And
that people are going to be like, "We
[1:11:29]
tried, but we didn't." And it's going to
look not right.
[1:11:35]
Not that you wouldn't do a fantastic job
on it, but
[1:11:40]
» but you're you're absolutely correct,
trusty cause, and you've commented
[1:11:44]
before. I think historic preservation
preservationists would say the same
[1:11:50]
thing. Don't try to look just like the
other building.
[1:11:55]
Be respectful of the other building, but
don't try to copy it.
[1:12:01]
» Exactly.
That's a fine line. I know. But
[1:12:05]
» no, no, no. You're right. Because I can
understand if if you did have the same
[1:12:08]
shingles on both buildings, then you are
trying to mimic it. After two different
[1:12:12]
ones, it still wouldn't compliment it
quite well. At number one, it does have
[1:12:17]
a very nice complimentary horizontal
line.
[1:12:21]
It does pay some homage to it as well.
So, um, while I was impressed with this
[1:12:26]
one, it's not my favorite. I would think
number one, probably the best one.
[1:12:33]
So, given what I'm hearing, does this
rise above one or two for anybody?
[1:12:40]
» Good. But we're down to two.
Um, and I would suggest
[1:12:47]
that uh we send those two to to our
preservation commission
[1:12:53]
saying here's what
we like and ask for their feedback.
[1:13:00]
Emily, can you put the four up again?
>> Yeah.
[1:13:03]
» Thank you.
>> Yeah, this is four.
[1:13:06]
» No, four.
>> All four. Sorry.
[1:13:10]
» Page 175.
[1:13:22]
» I think that's a good suggestion.
So that's the plan based on the board's
[1:13:27]
discussion is the next step is the April
9th preservation meeting that we would
[1:13:33]
solicit additional feedback
[1:13:39]
» and want to send one and two to them. Is
that what we're doing?
[1:13:42]
» Mhm.
>> What's that?
[1:13:43]
» We're going to send schemes one and two.
>> Yes.
[1:13:45]
» Okay.
Well, I mean they can look at all four
[1:13:48]
of them because this is on our website,
but
[1:13:51]
» yeah,
>> the direction would be the village board
[1:13:54]
is asking for their response to one or
two. If
[1:13:59]
they like if they have comments about
three or four, I wouldn't stop them from
[1:14:03]
commenting, but
>> you know,
[1:14:06]
» free speech and all.
>> Yeah.
[1:14:10]
So, let's uh let's next go to the cost
reduction page.
[1:14:16]
Wait, could we just say one more thing
about scheme one?
[1:14:20]
» Yeah.
>> So, I think your feedback was that the
[1:14:23]
the side the east facing side was too
plain.
[1:14:29]
» Well, it's more that
that blank column that faces the street.
[1:14:36]
» Yeah.
>> Yeah. So, it's the doors just that one
[1:14:39]
column.
And maybe it maybe it makes sense and
[1:14:42]
maybe again it's with the right
materials it's fine.
[1:14:47]
» Um
>> or open to suggestions on that one.
[1:14:51]
» Yeah.
>> Or
[1:14:52]
» could you just maybe do something to it?
[1:14:57]
» It's a stair.
>> So
[1:14:59]
» stairway. Yeah.
>> Which you I mean like Kristen said you
[1:15:02]
could do architectural elements. You you
know there's you could do I was kind of
[1:15:07]
thinking in the blank spaces they
wouldn't necess In all of these games,
[1:15:11]
they wouldn't necessarily be blank. They
would they're just blank slates. I don't
[1:15:16]
know. Maybe I'm
>> be a contrasting panel of some kind.
[1:15:20]
Right.
>> Well, and I also just wanted to remind
[1:15:22]
everybody as well like some of the
elements could be interchange. So, one
[1:15:26]
thing that came to my mind there was
signage potentially like we showed
[1:15:29]
there's that area adjacent to the entry
which kind of makes sense for a good
[1:15:33]
signage location, but there's all like
that could be an opportunity for for
[1:15:37]
signage. Um, but absolutely like there's
still opportunity to articulate it with
[1:15:41]
windows. I recall in this scheme, I
think the way that that stair gets its
[1:15:45]
light is that we had like a narrow slit
window on the side that's not really
[1:15:50]
visible, but as some of the other
examples showed, that's a great
[1:15:53]
opportunity to do like a linear slit
window that would let light into the
[1:15:57]
stairs. So, yeah, there's definitely
ways that that could be further
[1:16:00]
developed.
>> Cool.
[1:16:05]
Okay.
>> Anything else on the elevations?
[1:16:09]
» Let's uh go to that cost reduction page.
[1:16:21]
» Go Emily. Go. Go Emily. Go. You can do
it.
[1:16:28]
» I'm glad she was doing that. I would be
panicking.
[1:16:32]
would be like I can't find.
>> We also have broken out slides for the
[1:16:36]
cost estimates too that kind of depict
more if you need more visual.
[1:16:41]
» So there there was another page though
that had the list
[1:16:45]
of that.
>> Yeah.
[1:16:47]
» Yeah.
>> So let's go through that. Uh reduction
[1:16:53]
in program spaces that just means making
the building smaller, right?
[1:17:00]
I don't think we want to do that.
>> No.
[1:17:02]
» No.
>> I mean, yeah.
[1:17:05]
Uh, build shell and core for future.
Uh,
[1:17:10]
» no.
>> That just means spending money later
[1:17:13]
than rather than
>> more expensive.
[1:17:15]
» And if we're going to referendum,
you know, I feel like we should be
[1:17:21]
honest and say this is what it costs and
>> yeah,
[1:17:23]
» just how much money we need.
Um, we talked about the west driveway
[1:17:31]
and I think we agreed that we would
eliminate that.
[1:17:37]
» Uh, we talked a lot about windows and if
anything we wanted more windows
[1:17:43]
so that one's out. And then yeah,
exterior materials that's for a future
[1:17:48]
discussion. Correct. We can decide what
you at some point we'll see what the
[1:17:53]
different materials cost and what the
savings are
[1:17:56]
» uh in that
>> the elimination of ornamental stair I'm
[1:18:01]
guessing trustees don't have an opinion
until you see the difference between
[1:18:06]
» the ornamental and non-orthnamental
right
[1:18:09]
» and how much we save or don't save
>> so that is that the difference more or
[1:18:13]
less
>> this more of an open stair I can let
[1:18:17]
» Yeah. So, um, ornamental and open stairs
we kind of use interchangeably. So,
[1:18:23]
these are some more contemporary
examples, especially if you're, um,
[1:18:27]
tending in the direction of our schemes
one or two. Um, this kind of expression
[1:18:32]
where the stairs and railings are a
little little bit more contemporary,
[1:18:37]
open to the rest of the space. Um
whereas if you um um if we're looking at
[1:18:42]
a clo an enclosed stair or what we would
normally consider an egress stair, yes,
[1:18:48]
we can do some glass. Um so there there
is um a measure of transparency, but um
[1:18:54]
just not as nice, you know, um more of
what we would think of um as an enclosed
[1:18:59]
exit stair like you have right at the
front um of the building here. So there
[1:19:04]
is obviously a cost difference um
between those two. Um but um it it's one
[1:19:11]
way among many to um save a few dollars
if you're so inclined.
[1:19:17]
» I can only speak for myself. I'm not so
inclined.
[1:19:20]
» Yeah, I'm not either.
>> Yeah, those that first two pictures is
[1:19:26]
beautiful. That's you know that's our
public space,
[1:19:29]
» right? If
>> you'll go back to the previous one.
[1:19:32]
Yeah.
>> Yeah.
[1:19:41]
» No, the other stair one.
>> Oh,
[1:19:45]
» that's the enclosed.
>> The other stair.
[1:19:48]
» Pretty one.
>> Pretty one.
[1:19:51]
» Yeah. No, that's
>> that's nice.
[1:19:53]
» That one on the left. That's what I want
our
[1:19:56]
primary village space to look like.
>> Yeah.
[1:20:00]
Gate uh the Gateley Park Fieldhouse in
um on the far south side of Chicago if
[1:20:05]
anybody's interested one of our
projects.
[1:20:09]
» Well done.
>> Yes.
[1:20:11]
» What is in the space underneath the uh
staircase?
[1:20:15]
» Great great question. Um so um whenever
we have a stair um where you have open
[1:20:22]
space underneath um we can't essentially
we can't let somebody underneath it
[1:20:27]
until the head room is at least 6'8. So
we need a way to block off those lower
[1:20:33]
areas
>> um so we're not bumping our heads up
[1:20:36]
against something. And in this
particular project, they just decided to
[1:20:40]
enclose that with a little bit of a um a
low wall that people could sit on as
[1:20:44]
they're in the lobby.
Depending on how we would articulate the
[1:20:48]
stair, um we may not end up having that
condition at all where we'd have to
[1:20:52]
close close that off.
>> We just had a moment. I just saw a um an
[1:20:59]
open staircase with an enclosure like
that that had seating on the outside,
[1:21:03]
but it had a lyken garden. on the inside
of it which is like extremely
[1:21:09]
lowmaintenance and it was installed in
this really artistic pattern and I can
[1:21:14]
show you photos and it was cool and that
would be a really neat um
[1:21:20]
» absolutely
>> I feel like that doesn't fall into the
[1:21:22]
cost savings you know but you know you
and I yeah I think it's right there
[1:21:29]
» be an LC project
>> once in a while
[1:21:32]
» love it sustainability
>> there y So there was one more item on
[1:21:37]
that list of co potential cost
reductions I think.
[1:21:41]
» Yeah. Yeah. And I'm not interested in
open office space layouts
[1:21:47]
» and I you know that was a trend for a
long time and I'm sure you guys can can
[1:21:53]
can have have an opinion on that. From
everything I've read open office space
[1:21:59]
makes people less productive.
I I've read articles to that. I
[1:22:05]
Yeah, because of the distractions, I
guess. But
[1:22:08]
» well, and I think we're building this
for public safety and for I mean,
[1:22:13]
» primarily we want this to be
>> people make sure
[1:22:16]
» Yeah, we want to be nice. Yeah, that's
that's the those are the spaces that I
[1:22:21]
least want to
>> No one wants a cube
[1:22:23]
» cut, right?
>> We don't want cubes.
[1:22:26]
» Yeah, cubes are no fun for anyone.
Okay,
[1:22:32]
» I have intentionally been quiet for the
time being. I'm not pretending I am a
[1:22:38]
design expert on anything. Uh Chris can
attest to this though I've been through
[1:22:42]
this before um with with a project
similar actually bigger in size uh with
[1:22:49]
with the public safety thing. And uh I
just want to say first off from my
[1:22:54]
perspective uh the site design was the
most important thing operationally uh
[1:23:00]
administratively it was staff driven in
regards to the layouts of everything. So
[1:23:04]
I think that's the most important thing
as long as the designs whether it's one
[1:23:08]
through four at any point does not um
interfere with any of the operations or
[1:23:15]
with the public engagement. I think I'm
fine with that. If you had to ask me for
[1:23:20]
any type of um design element, I would
say make the walkways curvy.
[1:23:26]
» That's
>> meandering. We like to call it
[1:23:27]
meandering.
>> Meandering. Um
[1:23:29]
» please.
>> I think you guys you did a great job.
[1:23:32]
» Yeah.
>> With with with the layout um for the
[1:23:34]
site because I'm more operational on it.
Um and I would defer to the board and
[1:23:38]
preservation for for their direction as
well.
[1:23:43]
» Thank you. Anything else?
>> Very good. Thank you. Well,
[1:23:49]
» thank you all for such um thoughtful
commentary, honest commentary. Um it's
[1:23:55]
important for us to hear what you like
and what you don't like because that
[1:23:59]
helps us get to the best possible
solution. Um I also want to thank um our
[1:24:04]
entire team in addition to um our um
Riverside resident Joe and Kim. There's
[1:24:10]
another team of folks behind this effort
um at at our office that has really um
[1:24:15]
poured their heart and soul into this.
This is a really exciting project for us
[1:24:19]
to be a part of and we're really looking
forward to next steps. So, thank you
[1:24:23]
very much.
>> Thank you.
[1:24:24]
» Thank you.
>> Thank you.
[1:24:25]
» We're we're gonna talk about a potential
referendum now. So, you might want to
[1:24:29]
stick around and listen to this.
>> How we pay for it
[1:24:32]
» because that sounds super fun, right?
>> So, yes. Next on the agenda is
[1:24:38]
discussion of regarding public safety
facility referendum.
[1:24:46]
Manager Francis,
>> thank you. Um, so as we embarked on this
[1:24:50]
journey back in November of 2024, it was
discussed that to bring this facility to
[1:24:57]
fruition, we would have to do a
referendum. We just didn't have the
[1:25:01]
capacity to look at alternative ways, no
matter how creative we are as a team.
[1:25:06]
You know, that that's a heavy lift. And
so, um, as part of the discussion, we
[1:25:13]
did reach out to Spear Financial, who is
the village's financial advisor, who
[1:25:18]
we've worked with in the past to issue
debt. Um, and so they provided us some
[1:25:24]
scenarios
relative to how much debt the village
[1:25:29]
could issue. Now, debt is dictated on
the village's equalized assessed value,
[1:25:34]
and you'll see up there. So, um, tells
you what the formula is for our limited
[1:25:40]
for our tax our debt limitation. Um,
currently our general obligation bonds
[1:25:47]
is 1.9 million. That's our limited tax
debt that we issued a couple of years
[1:25:51]
ago. And so, you deduct that and say how
much is left for you to issue as debt.
[1:25:57]
Now, as our equalized assessed value
continues to grow, so example, once the
[1:26:02]
PUD is built, that will go up. Um
typically every year your equalized
[1:26:09]
assessed value as a village continues to
increase based on improvements and
[1:26:12]
reinvestment in the community. Um so
that number that 34.9 million won't
[1:26:19]
remain static presumably you know if
staff and the village is doing
[1:26:24]
everything right that number will
continue to go up in future years. So
[1:26:29]
with that being said, we asked Spear to
provide us some examples. Um, and this
[1:26:36]
was be obviously when we had some ranges
and Harbors provided a little bit more
[1:26:42]
concrete numbers. So we did a max of an
issuance amount of 28 million it over 20
[1:26:49]
years. That's the maximum time frame in
which we can do. And then it would show
[1:26:53]
the financial impact on typical ho
households based on the market value of
[1:26:59]
the home. And so it's broken out on
annual cost versus monthly costs. Um
[1:27:05]
obviously if we were to increase that we
would to 29 million you would see an
[1:27:11]
incremental increase. Um and we will
certainly get that for the board. We
[1:27:15]
weren't sure what was going to be cut or
how this discussion was going to where
[1:27:20]
it was going to go as it relates to size
and other eliminations, but we do have
[1:27:25]
the capacity to increase that issuance
amount. Um, now all of these are based
[1:27:32]
on certain percentages, 4% interest.
We're double A+ bond rated community, so
[1:27:39]
we're not quite at that triple
AAA bonding. Um but so we're receiving a
[1:27:46]
much lower rate than other communities
that don't have sound financial
[1:27:50]
practices, procedures, policies, etc. So
we benefit in that respect. And so there
[1:27:56]
are times even when you go for an
issuance amount. Let's say we went for
[1:27:59]
28 million, but then there's I don't
want to get too far in the weeds, but we
[1:28:04]
get a really good interest rate and it's
less and we get a good discount rate. It
[1:28:08]
could actually be more than 28 million
that's issued to us.
[1:28:13]
Um, and so that's where those numbers
look like for that. And so part of the
[1:28:21]
initial discussion is do you you don't
want to ex you don't want to come up
[1:28:27]
against the maximum amount of your debt
limit, right? Because there could be a
[1:28:32]
need to issue debt to do an additional
referendum in the future. And so you
[1:28:37]
always want to keep that that buffer,
right?
[1:28:40]
you are also paying off debt year after
year too as it relates to you know when
[1:28:47]
I like to manifest when the referendum
is approved by our residents um that
[1:28:52]
number would slowly go down and our debt
capacity would continue to to increase.
[1:28:57]
Um that isn't to say that we want to
utilize all that debt capacity.
[1:29:01]
Obviously we are very much below um even
the halfway point of our debt capacity.
[1:29:07]
We're actually less than 1% of our
maximum capacity. So, um I'm sorry, less
[1:29:14]
than 10%.
So, all those being equal, you'll see
[1:29:20]
kind of the different breakdown of that.
Are there any questions relative to
[1:29:25]
that?
>> If somebody is at home watching this and
[1:29:30]
can't really read that type, do you want
to give some examples?
[1:29:33]
» Sure. No potential examples. So for the
$28 million issuance, I would say on
[1:29:39]
average a typical household in Riverside
is valued at $500,000.
[1:29:45]
And so you would look at an annual cost
increase of $720.32
[1:29:51]
and what that looks like monthly is
$60.3
[1:29:55]
per month.
>> Thank you.
[1:29:57]
» You're welcome. Thank you.
And once again, that's subject to
[1:30:03]
somewhat change. Another example is if
our EAV continues to increase, then that
[1:30:11]
impact per household then gets
redistributed too. Similar with with
[1:30:15]
property tax. Um, if we have new
developments,
[1:30:20]
the spread of that property tax burden
gets redistributed.
[1:30:24]
» And so that in impact could be slightly
different. I don't want to say it would
[1:30:28]
be substantially different but uh just
to provide a little bit of context.
[1:30:35]
» Very good. And
>> so we will uh we don't have to uh file
[1:30:41]
the referendum question till late in the
year. Right.
[1:30:44]
» Correct. So we we'll start the process
later this year and interally.
[1:30:50]
» And from my understanding the referendum
question can be a little bit more direct
[1:30:54]
than the last one. Oh yes, 100%.
>> I could basically just say, you know, do
[1:31:01]
you approve of the village borrowing
this amount of money for a public safety
[1:31:05]
facility more or less
>> and to equip the public safety
[1:31:09]
» to equip Yeah. Yeah. So
>> So which election? The presidential
[1:31:13]
election?
>> No, it would be
[1:31:15]
» uh April of 2027.
>> Consolidated.
[1:31:19]
» Yeah.
>> Yeah.
[1:31:20]
» Yeah.
So, I know the trustees know this, but
[1:31:25]
I'm and I've said this to you before,
but I'm going to say it again and again
[1:31:30]
and again and again. Um,
this is the most important thing any of
[1:31:35]
us will do as an elected official in
this village.
[1:31:39]
Um,
our number one obligation is public
[1:31:44]
safety
and to maintain that the the great level
[1:31:50]
of public safety this village has always
had, our first responders need
[1:31:56]
facilities that are appropriate and
support a top-notch
[1:32:03]
police and fire public safety uh
department. So, uh, it is incumbent upon
[1:32:09]
all of us to do everything we can to
educate the public about this.
[1:32:15]
Um, and we'll be working on educational
information and strategies.
[1:32:22]
Um, and that will come soon. Uh, but I
would say it's not too early to start
[1:32:28]
talking to your neighbors, make people
aware of this.
[1:32:32]
Um because I
strongly believe that if people
[1:32:37]
understand the need for this, it will be
approved. Uh
[1:32:41]
» I agree.
>> Riverside residents
[1:32:44]
value our police and fire departments
uh and they know that uh they have to
[1:32:52]
they have to support them financially.
[1:32:58]
» With that, any other questions,
comments? M manager Francis, did you
[1:33:02]
have some additional comments?
>> Um, so with regard to community
[1:33:06]
engagement, Williams Architects also has
built in um some future community
[1:33:12]
engagements. Um, one being creating an
open house to solicit feedback on the
[1:33:18]
different design, see what additional
feedback residents have, bring that back
[1:33:23]
to the village board. Um, and then they
would also do a second round of
[1:33:27]
community engagement. Right now, we have
tentatively in our schedule July of
[1:33:32]
2026, but that could be subject to
change because obviously going from that
[1:33:37]
second engagement period to April of the
following year for the election, I don't
[1:33:42]
know that if we want that long of a time
span to occur with not that the board
[1:33:49]
and staff wouldn't push out additional
education and answer questions and do
[1:33:53]
open houses, but that may be something
that we would look to the board to have
[1:33:57]
further discussion. and and work with
Williams to maybe change that timeline
[1:34:01]
for that second engagement piece. Um,
additionally, um, there there would be
[1:34:07]
subsequent presentations to the village
board. Once we have the community, the
[1:34:11]
initial community engagement and the
openhouse, feedback from preservation,
[1:34:15]
modifications to the design, then
Williams will be firming up their
[1:34:20]
designs further to get closer to what
some what this building will look like.
[1:34:26]
Um so in the past I also wanted to make
a note how we handled community
[1:34:32]
engagement when we were having
referendums right we've always had the
[1:34:35]
discussion that we can educate we cannot
advocate um as staff village resources
[1:34:41]
cannot be put towards advocating a
resident calls us and asks questions we
[1:34:45]
can ask answer those questions if a
resident calls and asks us how should I
[1:34:49]
vote we can't answer that question um in
the past what we have done is we've
[1:34:55]
created postcards and redirected uh
residents to a main landing page on the
[1:35:02]
website. We've done engagement. Both
village board members and staff have
[1:35:07]
been present present at different
community events, whether it's the
[1:35:11]
farmers market or other events. We've
created videos from Riverside TV to to
[1:35:18]
outline the different items and issues,
answer questions. Additionally, what um
[1:35:23]
staff has put together and flagged as
additional opportunities, uh Director
[1:35:29]
Buckley and I have already spoken about
doing public safety tours. Um
[1:35:34]
Absolutely.
>> So, Director Buckley would it would be
[1:35:38]
sign up because we we would want him to
be able to answer questions. So, it
[1:35:42]
would be smaller groups, more uh tours,
but being able to have that engagement,
[1:35:49]
answer those questions. Um we would also
um in speaking with other communities
[1:35:56]
what they've done um when they have a
large referendum is presenting to other
[1:36:00]
taxing bodies. So staff or the a board
member presenting just FAQs and
[1:36:09]
information at a school district. So,
district 96 at one of their meetings or
[1:36:14]
district 208 or even going to the
library at one of their meetings and
[1:36:19]
presenting or township, right? Township
covers a little bit more than Riverside,
[1:36:24]
but it offers that additional
opportunity for engagement. Um, and then
[1:36:31]
finally, I think there have been some
questions of whether or not to hire a
[1:36:35]
consultant for um, further engagement.
And um, I'm doing some additional
[1:36:41]
research. Williams is going to provide
us um, some consultants that they've
[1:36:45]
worked with in the past. Um and then we
would get some different proposals
[1:36:50]
costing of those different services and
what the village would be receiving and
[1:36:55]
then making that evaluation of whether
or not these services can be done
[1:37:00]
in-house effectively or if we would need
some support from an outside party.
[1:37:05]
» I have a question.
I'm pretty sure I know the answer to
[1:37:09]
this, but I just want you to say it
again out loud. So as village trustees I
[1:37:15]
know that you cannot say anything about
um not how to but like you can't give
[1:37:20]
opinion
what are the rules regarding what we can
[1:37:24]
say and how we can interact with this
referendum.
[1:37:28]
» So you can certainly provide information
and you are a private citizen so you can
[1:37:33]
also
say what your thoughts are relative to
[1:37:38]
that. Staff cannot do that. Um and so I
I will make sure that attorney pickrol
[1:37:44]
provides additional guidelines for the
board as we begin on this journey.
[1:37:50]
» Okay, great.
>> And just put it another way, we as
[1:37:55]
trustees on our own time
>> can advocate all we want
[1:37:59]
» as private citizens, not as trustees.
Yep.
[1:38:01]
» Right.
>> Because we're not spending village res
[1:38:04]
the key is you can't spend village
resources to advocate.
[1:38:08]
» Yep.
staff time or money for flyers that say
[1:38:13]
vote no or vote yes.
>> Sure,
[1:38:15]
» those kinds of things. So,
>> yeah,
[1:38:17]
» I know it is a little outdated, but 12
years ago, wasn't there a video that was
[1:38:21]
made of our facilities that were
crumbling and deteriorating?
[1:38:24]
» We do have those as well.
>> Put that out for public education as
[1:38:27]
well. I know it's a little outdated, but
it's
[1:38:30]
» we would and we would create new videos.
So, in speaking to a couple of village
[1:38:34]
managers that recently did referendums,
um they did much shorter videos um that
[1:38:40]
were less than like the target was 30
seconds or less essentially um and
[1:38:46]
sharing that information. And I think
also the engagement within the police
[1:38:51]
department and the fire department and
providing those tours um because a lot
[1:38:56]
of these areas are they're they're not
accessed by residents and so residents
[1:39:03]
don't know what are behind these
different doors. And so I think that can
[1:39:07]
be also very eye opening.
>> Okay. And I think we all know that Chief
[1:39:10]
Buckley is not shy in front of a camera.
So, I think we can get him to do some
[1:39:16]
great videos for us.
[1:39:22]
» You're welcome.
>> Very good.
[1:39:24]
» Anything else?
>> The final item um within the packet, it
[1:39:29]
talks about the business district. So,
Ryan LLC
[1:39:34]
um acquired Kain McKenna, who was the
previous firm that created the business
[1:39:39]
districts, the three business districts
along Harlem Avenue. And so we did have
[1:39:43]
the discussion previously about creating
a business district overlay over the new
[1:39:49]
facility
um simply for the assessing the 1%
[1:39:55]
business district tax and that money can
then be used to be reinvested within the
[1:40:00]
facility or anything within the
boundaries of the facility or actually
[1:40:04]
helping to pay off some of the debt that
is issued. Um, in speaking with them,
[1:40:09]
they had recommended that the first step
would be to actually do an evaluation of
[1:40:15]
the revenue that could be derived from a
space of that size um to make sure that
[1:40:22]
it it makes sense to make the larger
investment. So, the cost of just doing
[1:40:27]
that evaluation is 2500. And then if if
it did make sense then creating the
[1:40:34]
business district plan and doing the
evaluation and conducting the process
[1:40:39]
that would be 20,000.
So
[1:40:43]
» but right now do you want direction from
the village to proceed with the $2,500
[1:40:48]
to do the analysis?
>> Yes.
[1:40:51]
» I know that's in your spending authority
but we should have direction from the
[1:40:54]
board.
I was just wondering if you could
[1:40:57]
provide residents with some examples of
sales tax generating opportunities and
[1:41:01]
this is precisely going to do that. So
I'm all for it.
[1:41:05]
» Yes, please.
>> So right now how the site plan is laid
[1:41:11]
out there is the main space with the
kitchen. So presumably any so we could
[1:41:17]
contract with individuals to then assess
the 1% business district tax on any
[1:41:23]
catering services that are done out of
that room. And then there's the other
[1:41:27]
smaller space that I'll refer to as the
cafe that was left open. um that then
[1:41:35]
whatever
pro services are provided out of there
[1:41:39]
or products rather um so smoothies,
coffee, whatever it may be then that 1%
[1:41:45]
tax would be also assist there. Also, in
addition, the business district tax, it
[1:41:50]
would not just be that, but you'd also
have the opportunity to, you know, any
[1:41:55]
sales that are generated would be the 1%
regular sales tax and then the 1% uh
[1:42:03]
non-home roll sales tax.
>> Yep.
[1:42:05]
» So, non-home rule sales tax would go
directly to streets, the 1%, and I take
[1:42:10]
that back. Also, places for eating tax,
which would be 1%.
[1:42:14]
» Nice. Thank you. Anything
else?
[1:42:19]
» No, I just need direction on the
>> Oh, yes. Please proceed.
[1:42:24]
» Yes.
>> Okay.
[1:42:26]
» Trustees, any other comments, questions
on referendum or public safety
[1:42:31]
facilities.
>> Just want to thank staff for all the
[1:42:35]
work
>> it's this is really big and very
[1:42:39]
exciting, but it's done a lot of work
and heavy lifting and appreciate it.
[1:42:44]
» Thank you.
>> Thank you. Awesome.
[1:42:47]
» And thanks to previous boards too and
presidents who have championed this
[1:42:54]
endeavor as well.
Uh so we do not have need for an
[1:42:59]
executive session. I'd like to ask for a
motion and a second to adjurnn.
[1:43:04]
» So moved.
>> Second.
[1:43:05]
» All in favor say I. I. Any opposed?
I know you there tonight.