[0:07] CALL TO ORDER
[0:14] ROLL CALL
[0:29] INVOCATION:
[0:49] PLEDGE OF ALLEGIANCE
[1:07] PRESENTATIONS:
[1:09] CITIZEN’S COMMENTS: Comments are limited to 3 minutes in length.
[1:22] AGENDA:
[1:22] Approval of Agenda
[1:37] CONSENT AGENDA: All items listed on the Consent Agenda are items, which are considered routine by the City Council and will be approved by one motion. There will be no separate discussion of these items unless a Council member or citizens requests, in which case the item will be removed from the consent agenda and considered at the end of the Consent Agenda.
[3:33] PUBLIC HEARINGS:
[3:36] Certifying Unpaid Charges to the County Auditor
[6:54] Assessment Hearing – Concord Exchange Improvement Project No. 2024-01
[19:51] Assessment Hearing – 7th Avenue South Reconstruction and I-494 Watermain Improvements Project No. 2023-12
[52:54] GENERAL BUSINESS:
[52:56] Preliminary Development Agreement - ZAS LLC (Hardman Triangle - Phase 1)
[1:02:04] MAYOR AND COUNCIL COMMUNICATIONS:
[1:12:51] ADJOURNMENT:

Transcript

Download: Text · SRT
SOURCE TRANSCRIPT

This transcript is downloaded from the source you provided but we haven't reviewed it for accuracy. Treat it as a starting point, not a verbatim record. You can also request an AI-transcription of the audio file with the button to the left.

[0:07] We adjourn.
[0:10] To the city of South Saint Paul.
[0:11] I call this meeting to order
[0:14] for Monday, NOVEMBER 4th. MISS
[0:17] Werner, will you please call
[0:19] the roll? Toen here. Council
[0:21] member Hanson, Council member
[0:23] Kaleski. Council member Pod
[0:25] Gorski, Council member Sberg
[0:27] Council member Thompson, Mayor
[0:28] Francis all present. Thank you
[0:29] very much. Please stand and
[0:31] join us in our Invocation and
[0:34] our pledge of allegiance.
[0:36] Heavenly Father, we come to you
[0:38] today asking for your guidance,
[0:39] wisdom and support as we begin
[0:42] this meeting. Help us to engage
[0:43] in meaningful discussion allow
[0:45] us to grow closer as a group
[0:46] and nurture the bonds of
[0:50] community. Amen. Amen. I pledge
[0:53] allegiance to the plan of the
[0:55] United States of America and to
[1:00] the Republic nation under GOD
[1:02] individual with liberty and
[1:07] justice for all. Good evening.
[1:09] We have no presentations today,
[1:10] so citizens
[1:11] comments is next.
[1:12] Anybody here with anything that
[1:13] is not on the agenda. They wish
[1:15] to speak about. This is the
[1:16] time to do that. Please step
[1:22] forward. Seeing none. Look for
[1:23] a motion to approve our agenda.
[1:26] So moved, Your Honor, that
[1:27] there was moved by Seabrook,
[1:30] second by Bakke? Is that
[1:32] correct? All right, just making
[1:34] sure. All in favor? I any
[1:37] oppose? Our agenda passes. Our
[1:38] consent agenda, all the items
[1:40] listed on our consent agenda
[1:42] are considered routine and will
[1:43] be approved in one motion.
[1:44] There will be no separate
[1:45] discussion of these items
[1:47] unless a council member or a
[1:48] citizen so requests. In that
[1:50] event, it will be removed from
[1:51] the consent agenda and
[1:53] considered at the end of our
[1:54] consent any items to be removed,
[1:58] council. Public, any items to
[1:59] be removed from our consent
[2:01] agenda. Can we slow down a
[2:03] little bit here? Sure, we can,
[2:07] Michael. Thank you. The consent
[2:09] agenda, no other items to be
[2:12] removed from the public or the
[2:14] council with that I look for a
[2:16] motion to approve, so moved.
[2:16] It
[2:18] s like a moved by Kalzeki,
[2:21] second by Thompson. MS. Warner,
[2:21] will you please read those
[2:24] items and then call the roll
[2:26] resolve the city of Sault Saint
[2:27] Paul does hereby approve the
[2:30] following. City council meeting
[2:32] minutes of OCTOBER 21st, 2024.
[2:35] Accounts payable. Declare costs
[2:37] to be assessed for the concrete
[2:38] exchange improvement project
[2:41] number 202401. Approved master
[2:43] control agreement. Turf
[2:48] maintenance services. Award
[2:49] streetscape services to
[2:50] curbside landscape and
[2:52] irrigation. To declare costs to
[2:55] be assessed for the 7th annual
[2:58] Avenue South Reconstruction and
[3:01] I-9494 water main improvement
[3:04] project number 2023-12. Retain
[3:05] Kraus Andersson Construction
[3:06] Company as the construction
[3:11] management advisor. Approved
[3:12] resolution 2024 131
[3:13] acknowledgment of lawful
[3:14] gambling exempt permit for Holy
[3:16] Trinity Catholic Church.
[3:20] Council member back in. Yes.
[3:21] Mayor Francis Councilmember
[3:23] Hanson, yes council member
[3:25] Kalaski, Council member Pod
[3:28] Gorski, Council member s Seberg
[3:29] Council member Thompson. 70.
[3:32] Thank you very much. Consent
[3:33] passes. Next is our public
[3:37] hearing. This first one is
[3:38] certifying unpaid charges to
[3:40] the county auditor. Hello,
[3:44] Clara. Welcome. Good evening.
[3:46] Um, the items that we are
[3:48] certifying or asking you to
[3:50] certify this evening. Our
[3:52] abatements, re-inspection fees,
[3:54] code enforcement citations, and
[3:54] rental license citations, all
[3:56] of the property owners received
[3:57] a letter indicating that these
[4:00] items would be on this
[4:00] evening
[4:01] s agenda, including the
[4:02] public hearing notice, in
[4:03] addition, public hearing notice
[4:05] was published in this, uh,
[4:08] Pioneer Press. Um, each of the
[4:10] properties was notified of the
[4:12] code enforcement or, um, rental
[4:16] license. Uh, infraction by the
[4:18] department invoices were issued
[4:20] by finance, uh, statements were
[4:21] sent out for the bills as they
[4:24] were not paid. Uh, these
[4:26] invoices were issued between
[4:28] OCTOBER of 23 and SEPTEMBER of
[4:31] 24. All charges are past due as
[4:32] of NOVEMBER 1st in accordance
[4:35] with city code. All the
[4:36] property owners have until
[4:38] DECEMBER 4th to pay the
[4:38] original invoice amounts
[4:42] without interest. Um, as
[4:45] allowed by statute. At that
[4:48] time, any charges not paid will
[4:50] be certified to the county to
[4:52] be collected with the 2025
[4:54] property taxes. These are one
[4:57] year assessments. Um, one
[4:58] correction I would like to make
[5:00] is that we do have a pin number
[5:00] that
[5:01] s incorrect on the
[5:03] resolution, we will make that
[5:04] correction before we submit it
[5:08] to the county. I myself and
[5:09] other staff are available if
[5:13] anyone has any questions. Uh MS.
[5:16] Elders, you, uh, you said you a
[5:18] property id number was missed.
[5:22] Ok. One of the property IDs is
[5:23] incorrect and the 113 3rd
[5:27] Avenue South. Very good. Uh,
[5:28] and the total assessments being
[5:32] levied to the auditor is 34,776.
[5:33] Is that correct? And we will
[5:35] again, like I said, we
[5:36] ll
[5:36] deduct anything that
[5:37] s paid
[5:38] between now and DECEMBER 4th.
[5:42] Very good. This is a public
[5:43] hearing, I guess I will open
[5:46] that up. Anybody here wish to
[5:49] speak on the items for the
[5:50] certifying unpaid charges to
[5:51] the county auditor. Anybody
[5:53] here whose address is on there
[5:57] that wants to discuss or
[6:00] Anything further? Asking again
[6:02] if anybody here from the public
[6:03] wishes to speak on the
[6:05] certifying the unpaid charges
[6:09] to the county auditor. Seeing
[6:10] and hearing none, we
[6:10] ll close
[6:12] the public hearing, look to
[6:15] counsel for questions. Comments
[6:19] Emotions Your Honor,
[6:20] Councilmember Sberg move to
[6:21] approve with the correction to
[6:23] 113 3rd Avenue South. We have a
[6:26] motion to approve by Councilor
[6:27] Sieberg, seconded by Podgorski
[6:29] for approval. Further
[6:35] discussion. Seeing none. MS.
[6:37] Werner, please call the roll.
[6:39] Mayor Francis, yes,
[6:41] Councilmember Hanson, Council
[6:43] member Kauski, Council member
[6:45] Pat Gorski, council member Serg
[6:47] Council member Thompson,
[6:48] Council member Bakke. Yes, 70.
[6:50] Thank you very much. Motion
[6:54] passes. Thank you. Clara. Next
[6:56] up is an assessment hearing for
[6:59] concrete exchange improvements
[7:01] project number 2024-01. MR.
[7:03] Williams, welcome. Good evening,
[7:04] Mayor and members of the
[7:06] council. Uh, one second as I
[7:24] load the presentation. At least
[7:24] something
[7:29] s happening. Sorry
[7:31] about that. There it is. At
[7:31] least it
[7:33] s on my screen. I get
[7:35] it. Ok, there we go. All right.
[7:37] Good evening mayor and members
[7:38] of the council. Uh, tonight is
[7:41] the assessment hearing for the
[7:42] Concord exchange Improvement
[7:43] Project, uh, brief presentation
[7:43] I
[7:44] ll go through this evening,
[7:46] then we can open up the public
[7:47] hearing and answer any
[7:51] questions the council MAY have.
[7:53] So the agenda will go through a
[7:55] summary of the project costs
[7:56] and funding sources talk about
[7:57] the special assessments, and
[8:00] lastly, the councilor action.
[8:02] So location we have Concord
[8:03] Exchange, uh, kind of broken up
[8:06] into two projects. We have the
[8:07] streetscape improvements north
[8:09] of Grand and the medians, uh,
[8:12] that was uh funded through the
[8:13] developer through the yards
[8:15] development, and then we have
[8:17] the reconstructions and
[8:19] streetscape improvements, south
[8:20] of Concord Exchange between
[8:22] Grand and the southern access
[8:24] that did include a full upgrade
[8:26] of storm sewer system as well
[8:29] as water main improvements. So
[8:30] before the project, you can see
[8:32] some photos here, uh, in the
[8:34] streetscape area. We had some
[8:36] deteriorated sidewalk
[8:37] conditions, various uplifts, um,
[8:40] you know, kind of some outdated
[8:41] streetscape amenities, which
[8:42] were all improved with this
[8:45] project. Uh, you can see, uh,
[8:46] in the reconstruction area,
[8:47] some pavement that
[8:49] s in poor
[8:50] condition, potholes and things
[8:53] of that nature, um, you know, a
[8:57] sidewalk again varied and, and
[8:57] various locations inconsistent
[8:59] wits, um, and then some kind of
[9:00] outdated, uh, street lights
[9:01] that we replaced with this
[9:06] project. So a summary in the
[9:08] streetscape area, we, uh,
[9:09] updated the landscaping and the
[9:11] medians, uh, replaced all the
[9:14] sidewalk through that, um, that
[9:14] Northern peace streetscape
[9:17] features, new benches, uh,
[9:18] trash cans, things of that
[9:20] nature, all the street lights
[9:22] got upgraded. Uh, we also did
[9:24] put an irrigation system in for
[9:26] the medians, so public works
[9:26] doesn
[9:27] t have to water that, so
[9:28] it
[9:29] s all self-sustaining.
[9:31] Reconstruction area, full
[9:32] roadway reconstruction, new
[9:34] aggregate base, new pavement,
[9:36] new curb and gutter, uh, new
[9:39] sidewalk throughout, um. New
[9:40] skatescape features similar to
[9:42] the, the streetscape piece, uh,
[9:43] irrigation as well and all the
[9:46] plantar areas. Uh, sanitary
[9:48] sewer upgrades, um, so with all
[9:50] the developable properties that
[9:51] could be on Core exchange, we
[9:53] stubbed out sewer and water to
[9:54] those properties, so when they
[9:55] come in to develop, we don
[9:55] t
[9:56] have to tear into the new
[9:59] street. Uh, storm sewer, some
[10:00] pretty massive storm sewer
[10:01] upgrades, improved drainage,
[10:03] and again, the street lighting,
[10:05] we, uh, really added, um, a lot
[10:06] of improvements to the street
[10:07] light system out there to
[10:09] really make sure it was very
[10:13] lit during the evening hours.
[10:16] So this kind of uh a neat slide
[10:18] showing the pre-construction,
[10:19] um road conditions versus post,
[10:22] uh, you can kind of see what it
[10:24] looked like from Aeroview, uh,
[10:25] previously, um, just, you know,
[10:28] road was just kind of beat up,
[10:30] poor condition, had a really
[10:31] inconsistent kind of road with
[10:33] throughout, no real consistency
[10:34] through anywhere, through the
[10:36] corridor, uh, and then at the,
[10:37] and then the slide at the
[10:40] bottom shows kind of the post
[10:41] condition, um, you know, we got
[10:43] our, uh, 11 ft lanes, 9-foot
[10:45] parking, being a commercial
[10:46] area, um, the lines you see
[10:48] there are the striping yet, the
[10:48] striping is supposed to happen
[10:49] today, but it didn
[10:50] t happen
[10:51] with the rain, but that
[10:52] s just
[10:53] for illustration purposes, but
[10:56] kind of get the idea, um, of,
[10:59] of how it looks today. With
[11:02] that, um, that would show a
[11:04] quick drone video for all those
[11:06] who are interested, uh, about
[11:07] 30 seconds long and I can kind
[11:10] of describe. What we
[11:10] re seeing,
[11:12] so this is kind of going south.
[11:14] You can see the old Vendela
[11:16] glass, see the street lights,
[11:18] we got our new sidewalk, you
[11:21] can see the planter boxes, um,
[11:24] again those are all irrigated,
[11:26] uh, new curb and gutter, um,
[11:27] that car is not going that fast.
[11:28] It
[11:28] s the, it
[11:29] s the drone
[11:30] footage that actually makes it
[11:33] look that fast, so just so you
[11:34] know so it gives you a kind of
[11:35] idea of, of the improvements
[11:36] that we did. I
[11:37] m very proud of,
[11:40] of what, how it looks. Groups
[11:45] Yeah ok, sorry about that. Ok,
[11:47] on to project costs and funding,
[11:48] uh, looking at a total project
[11:50] costs of just under 4 million.
[11:53] That is under our as bid amount
[11:55] by about 320,000, um, pretty
[11:56] fortunate that we didn
[11:57] t run
[11:58] into any unforeseen conditions
[12:00] along that corridor, uh, given
[12:01] the history of Concert Exchange,
[12:03] we kind of anticipated we might
[12:07] run into some buried debris,
[12:07] building foundations,
[12:09] contaminated soil, things of
[12:11] that nature, um, but we were
[12:12] fortunate that we, we didn
[12:12] t,
[12:12] so we
[12:13] re able to deliver it
[12:15] under Budget, um, you know,
[12:16] also during construction, um,
[12:18] you know, Tom and Kelsey both
[12:20] looking at ways to save money
[12:20] during construction. We
[12:20] re
[12:22] always trying to find little
[12:23] tweaks here that we can save
[12:24] some money on this, then we do
[12:25] that? That
[12:26] s kind of a big part
[12:28] of our job. So you can see, uh,
[12:30] those costs did come in, uh,
[12:35] less than our as been amount.
[12:37] Funding sources so various
[12:37] funding sources for this. We
[12:38] got our municipal state aid is
[12:41] a state of road, about 1
[12:42] million uh tax increment
[12:44] financing of a million, uh, the
[12:45] developer fund I previously
[12:46] mentioned for the street skate
[12:48] piece, um, that was kind of on
[12:50] their plate to do, but we added
[12:52] it to our project. It was just
[12:53] easier that way. Uh, special
[12:54] assessments, which we
[12:54] re here
[12:58] to talk about tonight,
[12:59] approximately 40 545,000. Our
[13:01] water utility, sanitary sewer,
[13:02] and storm sewer make up the
[13:07] rest of that, um. Cost. So this
[13:10] is proposed to be specially
[13:12] assessed through the city
[13:15] assessment policy that rate is
[13:17] $90.40 per front foot, uh, all
[13:19] the properties on this corridor
[13:21] are commercial retail, high,
[13:22] high density residential, so
[13:24] there, there is no maximum for
[13:25] those commercial properties, um,
[13:27] they are kept at 5%, but the
[13:29] reason being is they have a
[13:32] more intense use more traffic,
[13:33] more heavier vehicles, kind of
[13:35] more wear and tear on the road,
[13:37] uh, as opposed to a residential
[13:37] property there. There
[13:40] s no max.
[13:43] So if adopted tonight, um,
[13:45] property owners have the option
[13:46] to prepay the assessment within
[13:48] 30 days of tonight, which would
[13:49] be DECEMBER 4th without
[13:51] interest. If not, it goes on,
[13:52] automatically goes on property
[13:54] taxes over a 10-year period, uh,
[13:56] with a 5% interest rate. And
[13:58] there are deferment options
[14:00] available, um, for those who
[14:02] qualify if, um, senior citizens,
[14:03] older fixed income, disabled
[14:05] veterans that usually applies
[14:07] to residential properties, but
[14:08] there are different options
[14:11] available. So the action is to
[14:15] hold a public hearing first and
[14:16] then consider resolution
[14:17] 2024-126, adopting the
[14:20] assessment role of the Cocker
[14:21] exchange improvement project.
[14:22] Uh, with that, I could stand
[14:23] for questions. If the council
[14:27] has any. Very good. Uh, this is
[14:28] a public meeting, your public
[14:30] hearing? Uh, so I will open it
[14:32] up for public. Anybody here
[14:34] wishes to speak about the
[14:36] assessment on concrete exchange
[14:36] improvement for the concret
[14:38] exchange improvement. This is
[14:39] the time. Please step forward.
[14:40] I know there
[14:41] s some business
[14:44] owners here present, not sure
[14:46] if they wanted to discuss or um
[14:48] talk. But this is the time, so
[14:50] if anybody here would like to
[14:53] speak from the public about the
[14:53] assessing for concrete exchange
[14:59] improvement. Uh, seeing none,
[14:59] hearing none, I
[15:00] ll close the
[15:02] public hearing. And turned to
[15:06] council for questions. Comments
[15:08] or motions. Your Honor,
[15:10] Councilmember Sberg. Nick, you
[15:12] pointed out that it was capped
[15:13] at 5% for commercial properties.
[15:15] Can you tell us why that is and
[15:18] how that complies with state
[15:19] statute on assessments for
[15:21] street improvement projects.
[15:23] Sure, that was adopted through
[15:24] the city
[15:24] s assessment policy as
[15:26] a way to, you know, kind of
[15:28] limit how big the assessment
[15:29] amount would be, um, kind of a
[15:30] council decision at the time
[15:32] through our policy is to have
[15:32] an amount that
[15:33] s not, doesn
[15:37] exceed that. And then we are
[15:39] obligated, so if somebody wants
[15:41] to contest their assessment,
[15:41] we
[15:43] re obligated to follow state
[15:45] statutes, so we have to prove
[15:48] that a property went up in
[15:51] value equal to or greater than
[15:52] the assessment that was the
[15:54] state statute part I was
[15:55] getting at, um, so we
[15:55] re
[15:57] complying with that. We make
[15:58] sure that that
[15:59] s the case in
[15:59] our opinion doesn
[16:00] t mean we
[16:00] re
[16:01] always right, but that
[16:02] s what
[16:04] we try to do, and then the
[16:05] different pots of money that
[16:08] made up The revenue that went
[16:10] into this, we had Minnesota
[16:12] state aid in addition to the
[16:13] developer
[16:13] s money that happened
[16:15] north of Gran we had the
[16:17] sanitary sewer fund and the
[16:18] storm sewer fund, sanitary and
[16:21] storm, we had some differences.
[16:22] You might say substantial
[16:24] differences in the pre-bed
[16:27] versus the post. Those are
[16:27] separate enterprise funds
[16:28] that
[16:29] s a city operates, correct?
[16:30] Yeah, Mayor remembers the
[16:31] council, that
[16:32] s correct. Um, so
[16:34] yeah, if, if somebody does
[16:35] appeal, there is a process on
[16:37] the, on the amount, but We do
[16:38] have the, those enterprise
[16:39] funds are kind of separate pots
[16:41] of money, if you will, for the
[16:42] individual pieces of the work
[16:47] that we do. Thank you. Others
[16:47] can
[16:49] t remember Kalzowski.
[16:52] you and the entire staff and
[16:54] all the contractors did a super
[16:55] bang up job on that looks just
[16:57] great. Kudos to all of you.
[17:00] Thank you. Thank you. Very good.
[17:05] Thank you, Councilor. Others? I
[17:06] would agree that it does look
[17:10] nice, um. I also know that We
[17:11] did everything underneath the
[17:17] ground. Sewer water New base so
[17:19] this this road should last us
[17:20] quite some time. I
[17:21] ve noticed
[17:22] now on your drone footage as
[17:23] well as driving on it that
[17:25] there are no cuts in that.
[17:25] That
[17:27] s a one straight. There
[17:31] no cuts inside the. Asphalt, um,
[17:31] that
[17:32] s nice as well. There
[17:33] s no,
[17:33] there
[17:34] s no noise. And is that a
[17:36] new thing or is that uh the
[17:38] standard of, of roads today
[17:41] that there are no cuts in those.
[17:42] We certainly do everything we
[17:43] can to not have a cut into the
[17:45] new pavement, um, sometimes
[17:45] when you
[17:46] re raising manholes,
[17:47] if you, you know, there
[17:48] s a
[17:48] process to doing that where you
[17:51] can have a cut into the road,
[17:52] um, but we, another reason why
[17:53] we stopped the utilities out so
[17:54] we don
[17:56] t have to cut it in the
[17:57] future, so our goal is always
[17:58] to not have cuts in the rope,
[17:59] but sometimes, you know, we
[17:59] can
[17:59] t. Can
[18:00] t always help it,
[18:00] but that
[18:02] s the goal. Very good,
[18:04] thank you. Your Honor,
[18:06] Councilor s Seberg, I would
[18:09] move to approve Resolution
[18:12] 2024-126. Second Moved by
[18:13] council member Surg, seconded
[18:17] by Bakken. Further discussion,
[18:19] Your Honor, just one more thing,
[18:20] please, please receiver and
[18:22] then Nick, thanks to the
[18:24] businesses down there too,
[18:25] street projects are never fun.
[18:29] Uh We were blessed a little bit
[18:32] with some some decent weather,
[18:33] uh, for the latter part of the
[18:35] summer anyways, but we
[18:36] understand the inconvenience
[18:37] and we appreciate everybody
[18:37] patience. It
[18:38] s not just the
[18:41] businesses, but on the next
[18:41] project. It
[18:42] s challenging.
[18:42] There
[18:43] s no good way to
[18:46] sugarcoat that. Um, but we
[18:49] appreciate The accessibility
[18:51] that not only the contractor,
[18:53] but Tom had in answering
[18:53] people
[18:53] s questions, so we
[18:56] appreciate that. Yeah, I would
[18:58] echo that Councilor s Seberg
[18:59] with the last year
[18:59] s Concord or
[19:00] the two years prior with
[19:03] Concord. Street and now with
[19:04] Concord Exchange those
[19:05] businesses have gone through a
[19:07] lot, so it is uh probably test
[19:09] of their patience, but now I, I
[19:10] just, I council member s Seri
[19:12] says, thank you for that and
[19:13] appreciate your investment in
[19:14] South Saint Paul. We
[19:14] re hoping
[19:17] Quality Auto will be there
[19:17] another 25 years. So you won
[19:21] have to see another street
[19:24] project, right? Ok, uh,
[19:25] anything further council, we
[19:29] have a motion a second. Seeing
[19:31] none, MISS. Werner, please call
[19:33] the roll. Council member
[19:34] Steberg Council member Pod
[19:36] Gorski. Council member back in
[19:39] council member Thomson, Council
[19:41] member Hanson, council member
[19:43] Kaluski, Mayor Francis, 70.
[19:45] Thank you very much. Motion
[19:46] approved. Thank you for
[19:48] investing in South Saint Paul.
[19:48] The businesses there on
[19:51] Concrete exchange. Now we move
[19:53] along to assessment hearing for
[19:54] 7th Avenue South reconstruction.
[19:57] MR. Williams, good evening
[19:59] again, Mayor and members of the
[20:01] council, uh, one second I load
[20:03] the presentation. Ok, here we
[20:05] go. This this is the assessment
[20:08] hearing for the 7th Avenue
[20:09] South reconstruction project
[20:10] similar to the last
[20:11] presentation, uh, brief
[20:12] presentation will go through
[20:14] and we can open up, uh,
[20:14] questions and the public
[20:18] hearing at the end. Talk about
[20:19] the summary of the project,
[20:21] cost and funding, uh,
[20:22] assessment policy again, as
[20:25] well as the council action. So
[20:26] this project was the
[20:27] reconstruction and JULY proved
[20:30] the 7 Avenue South from I-494
[20:32] to South Street, 5 blocks of
[20:34] 7th Avenue South and also
[20:36] consisted of the uh water main
[20:38] improvements along the under
[20:43] and along the I-494 corridor.
[20:44] Pre-construction conditions,
[20:46] you can see the the road was
[20:47] definitely past its useful life
[20:48] as well as the water main,
[20:50] being 84 years old, um, did
[20:52] have a history of water main
[20:54] breaks, sanitary sewer was also,
[20:57] uh, old and we were able to, to
[20:58] rehab that roadway drainage was,
[21:00] was kind of lacking. We were
[21:02] able to improve that, and then
[21:04] there was a, uh, sidewalk gap,
[21:06] uh, on the east side between
[21:07] Dale and South Street that
[21:08] been identified in in several
[21:10] city plans in the past and we
[21:11] were able to, uh, to put that
[21:15] new sidewalk in. And then the,
[21:16] the I-4994 Waterman crossings,
[21:17] this work isn
[21:19] t accessible work,
[21:21] but very important work as we
[21:22] had multiple crossings under
[21:25] that, uh, interstate, um, that
[21:26] were not encased old pipes in
[21:29] the Risk there is if those
[21:32] pipes were ever to burst, you
[21:33] could potentially have sinkhole
[21:34] develop on a major interstate,
[21:36] which nobody wants. So we were
[21:37] able to correct that with this
[21:41] project as well. So the
[21:42] existing conditions, 60 ft
[21:45] right of way, 44 ft wide, um,
[21:45] it
[21:47] s kind of oversized for our
[21:49] new standards, um, twelve-foot
[21:51] lanes, 10-foot shoulders, uh,
[21:54] and then the 7 7.5 ft sidewalk
[21:56] between 494 and Dale. Uh, again,
[21:57] the no sidewalk, there was a
[21:59] gap between Dale and South
[22:02] Street. So what do we consider
[22:03] during road design? Well, this
[22:04] is a state aid road, so that
[22:05] first and foremost, make sure
[22:09] we meet state aid standards for
[22:11] line width and parking. We did
[22:12] include a 5-foot boulevard for
[22:13] our city
[22:13] s new tree ordinance
[22:15] so we could plant trees in
[22:18] those boulevards. Uh, we
[22:20] addressed that sidewalk gap uh
[22:22] between uh Dale and South that
[22:24] was identified in our 2014 bike
[22:27] plan as well as our comp plan.
[22:29] And we want to make sure it
[22:30] meets our complete streets
[22:31] policies the council adopted in
[22:34] 2019, which, which it does, and
[22:35] then kind of standard is we
[22:37] always try to avoid property
[22:38] acquisition, expensive
[22:40] retaining walls and things of
[22:41] that nature on all projects we
[22:45] we do and reconstruct roads.
[22:46] Summer of the project, so a
[22:47] couple of photos you can see
[22:50] again, I, I think this really
[22:51] turned out amazing, you know,
[22:53] with brand new water main, new
[22:56] services to the curb stop, uh,
[22:57] reline the sanitary sewer
[22:58] manholes when you realign the
[22:59] sanitary sewer, it
[23:00] s basically
[23:02] a new pipe after you reign it,
[23:05] just cheaper to do that. Uh,
[23:06] all brand new storms were
[23:08] through there, uh, replacement
[23:09] and really upgraded the, the
[23:12] drainage of the road, uh, full
[23:13] roadway reconstruction,
[23:14] sidewalk installation, uh, the
[23:14] street lighting, kind of
[23:16] matching. Our new street light
[23:17] standard that we
[23:18] ve seen on
[23:19] Congre Exchange, Concord Street,
[23:21] uh, trying to have a consistent
[23:22] kind of light standard. So if
[23:23] we ever do replace streets,
[23:25] street lights, we have the
[23:28] parts handy. And then, uh,
[23:28] boulevard tree planning, we
[23:29] weren
[23:30] t able to do that this
[23:31] year with the, with the weather,
[23:32] the fall, um, but we are
[23:33] planning to do that in the
[23:34] spring. We
[23:36] ll be contacting, uh,
[23:37] residents about they want a
[23:39] tree, we can work with them to
[23:43] get one. And then 494 work
[23:44] really removing all those
[23:45] redundant crossings, putting
[23:47] one big crossing in, casing
[23:48] that pipe, if there
[23:49] s ever a
[23:49] problem, it
[23:49] s casing, it
[23:50] s not
[23:52] going to undermine the, the
[23:53] surface under the road under
[23:55] the interstate. And then we
[23:57] also upgraded the system with
[23:58] kind of looping it and, you
[23:59] know, kind of making sure it
[24:04] more resilient, more efficient.
[24:07] So similar photo, um, of the
[24:08] pre-construction versus post,
[24:09] uh, you can kind of see the
[24:10] center lines matching up. You
[24:11] can gives you a good idea of
[24:13] kind of how the road changed,
[24:15] right? From it, it did narrow a
[24:17] bit. Again, that
[24:18] s for our new
[24:19] standards trying to 11 ft lanes
[24:22] with 8 ft parking, uh, I will
[24:24] confirm the parking is 8 ft.
[24:25] From the face of the curve to
[24:27] the middle of the stripe, so
[24:28] that
[24:29] s been verified multiple
[24:32] times, so any concern? That
[24:33] been addressed, um, and then
[24:36] the 5 ft sidewalk we put in, uh,
[24:39] to have a, a complete sidewalk
[24:45] from 494 down to south. Similar
[24:46] to Congress a cool video to
[24:47] show again, about 30 seconds
[24:53] long. Play that now. So I was
[24:54] traveling southbound on 7th
[24:56] Avenue South. You can see we
[24:58] have street lighting, the
[24:59] 11-foot lanes, 8 ft parking,
[25:02] new curb and gutter. Matched in
[25:04] all the driveways, um, new
[25:06] carriage walks for people, um.
[25:09] Got the new so. Pedestrian
[25:13] improvements with new curb
[25:13] ramps, um, so that pretty much
[25:14] just continues along the hill 5
[25:15] blocks of the road. So thank
[25:19] you to, um, Jacob Steiner, our
[25:20] communications coordinator for
[25:20] for filming this. It
[25:20] s nice to
[25:29] have. Sorry about that. Oops
[25:35] Sorry, ok. Oops, sorry about
[25:41] that. Try this again. Ok, sorry,
[25:42] a little glitchy. All right, on
[25:44] the project cost funding, so,
[25:46] uh, Project To came in about
[25:47] 3.7 million that happy to say
[25:48] that did come in under budget
[25:51] as well. Similar to Conquer
[25:52] Change, we pretty fortunately
[25:53] we didn
[25:54] t run into any
[25:56] unforeseen conditions. We had
[25:57] good soils, no real, you know,
[25:59] issues. A lot of times they
[25:59] ll
[26:00] run into sub-grade issues. You
[26:00] just, you never know what
[26:01] you
[26:01] re gonna get into when
[26:01] you
[26:02] re, when you
[26:02] re
[26:04] constructing a road, so we got
[26:06] pretty fortunate with that. Uh,
[26:07] everything went very smooth. Um,
[26:10] as you can see by the pricing,
[26:11] uh, everything was, uh, you
[26:12] know, uh, came in, came in
[26:14] really good, so really happy to
[26:20] see that. As far as uh
[26:21] Assessments are concerned,
[26:22] again, this is specially
[26:24] assessed for the city
[26:26] assessment policy, that rate,
[26:29] uh, is $90.40 per front foot.
[26:33] Uh, there is a 7 75 ft maximum
[26:34] accessible for residential
[26:35] properties. Yeah, if you have a
[26:37] corner lot, you only get
[26:38] assessed on the narrow side,
[26:40] not the long side, and those
[26:42] are also capped at 5%. Uh, you
[26:44] can see the table to the right,
[26:45] kind of what the amounts are,
[26:47] uh, most of the lots on 79
[26:49] South or in the 50 to 40 ft
[26:54] frontage. Payment options have
[26:56] adopted tonight again they have
[26:57] 30, 30 days from tonight, uh,
[27:00] which would be DECEMBER 4th, if
[27:01] adopted to prepay without
[27:03] interest. If not, that does go
[27:05] on property taxes over a
[27:06] 10-year period, 5% interest
[27:09] rate, and, uh, there are
[27:10] different options available if
[27:13] anyone does qualify, uh, senior
[27:14] citizens, fixed incomes,
[27:15] disabled veterans are, are the
[27:17] kind of the categories if, uh,
[27:20] for deferrals. Actually seeing
[27:22] is to hold public hearing and
[27:26] then to consider resolution
[27:27] 2024-127, adopting the
[27:29] assessment role for the 7th
[27:30] himself and I 494 Water main
[27:32] Improvements Project. Uh, that
[27:33] concludes staff
[27:33] s report. I
[27:34] be happy to answer any
[27:36] questions you MAY have. Thank
[27:38] you, MR. Williams. This is a
[27:39] public hearing, so we will open
[27:42] it up for the public. Anybody
[27:44] here wish to speak about the
[27:45] assessment on 7th Avenue South
[27:47] for the reconstruction. Uh,
[27:48] this is the opportunities.
[27:52] Please step forward. We have
[27:52] questions, comments, or
[28:07] concerned. Welcome. Hello, um,
[28:08] I really don
[28:09] t know anything
[28:13] about this process, but why?
[28:16] Thank you. Why isn
[28:18] t um Why are
[28:21] you holding a hearing now?
[28:22] Rather than before the
[28:25] construction happened. We held
[28:27] a hearing. I, I think you, I
[28:28] remember you being here and
[28:30] speaking at that, right, but
[28:30] now you
[28:34] re Voting on the or
[28:35] Going to determine the
[28:36] assessment if it
[28:38] s Going to
[28:39] follow through or not follow
[28:43] through or Yes, that
[28:45] s, that
[28:47] the process we, we, we hold it
[28:48] before we let people know we
[28:50] have the call for the bids, we
[28:52] bid it. It gets constructed,
[28:55] and then we assess afterwards.
[28:56] Isn
[28:57] t that like putting the
[28:59] cart before the horse. Well, I
[29:01] think MR. Williams could
[29:04] explain that the The formula is
[29:05] already set, and we talked
[29:07] about that in the beginning as
[29:09] I, I think, again, you had some
[29:12] concerns with that being um. On
[29:14] a fixed income and homeowner,
[29:16] correct, all those things, yeah
[29:18] exactly because it, it almost
[29:18] feels like we never had a voice.
[29:23] We had a voice, uh, for the
[29:25] levy for the proposed increase
[29:27] in our taxes for the schooling
[29:31] uh 1.5% raise in our property
[29:32] taxes to uh additional funding
[29:33] for schools, you know, when
[29:35] they got brand new computers
[29:36] and everything, we voted on
[29:39] that. No problem, but this one
[29:40] I, I feel like we never got a
[29:45] say in the whole matter. And
[29:45] Now the work
[29:48] s been done. But
[29:48] now you
[29:53] re Trying to basically
[29:55] say now should we charge Each
[29:57] and every person that lives on
[30:01] 7th Avenue, an assessment. What
[30:01] if it doesn
[30:04] t pass or I guess,
[30:05] is there a chance of it not
[30:10] passing. I, I, I don
[30:12] understand the reasoning or the
[30:14] why for here because It feels
[30:15] like we never had a vote in the
[30:18] whole matter. Or we weren
[30:22] hurt. You, Your Honor,
[30:23] COUNCILMAN Sberg, you bring up
[30:27] good points. I understand where
[30:28] you
[30:28] re coming from, but
[30:28] individual street projects do
[30:32] not go towards a citywide vote.
[30:32] That
[30:32] s not good government.
[30:33] That
[30:36] s Pushing off our
[30:39] responsibility to fix up our
[30:41] infrastructure to a popular
[30:42] opinion at the time. Nobody
[30:44] wants to pay for anything. The
[30:47] first option is free. As you
[30:49] looked at the breakdown, the
[30:51] community as a whole is paying
[30:53] for the overwhelming part of
[30:54] this project. It
[30:54] s important
[30:58] for us to provide good, safe
[30:59] city streets. In addition to
[31:00] that, it
[31:02] s important for you to
[31:04] have adequate water and
[31:07] sanitary service to your curb
[31:07] light. That
[31:08] s not a votable
[31:09] thing. That
[31:10] s not like a levy
[31:12] where you get to say, yeah, you
[31:12] know, we
[31:13] re going to put that
[31:15] in front of everybody in the
[31:15] city. We
[31:18] re going to redo. 5
[31:21] blocks of 7th Avenue South from
[31:24] 494 to South Street. So your
[31:26] vote in this matter and the
[31:26] reason we
[31:27] re certifying this is
[31:27] because it
[31:29] s got to go on the
[31:31] tax rolls to either be
[31:33] collected over the next 10
[31:35] years at a 5% interest rate,
[31:38] which is a good interest rate,
[31:40] or if you qualify for a senior
[31:44] deferral or a fixed income
[31:45] deferral or disability deferral
[31:47] that ball starts. Rolling this
[31:50] evening, so There, you MAY have
[31:51] a difference of opinion on
[31:52] whether we should do a street
[31:56] or not, and we do care. We
[31:56] ve
[31:58] delayed street projects. Which
[31:59] hasn
[31:59] t been the smartest thing
[32:00] to do because we get a room
[32:02] full of folks. Well, this
[32:02] street doesn
[32:03] t need to be done.
[32:04] Well, the price doesn
[32:07] generally go down. It goes up.
[32:11] And we try to set a fair amount
[32:13] on the front footage that
[32:15] covers a portion of the cost
[32:17] that is set in the state
[32:20] statutes. You can, you have
[32:22] every right to contest that
[32:22] what we
[32:23] re charging is not what
[32:25] you got. In other words, if you
[32:26] don
[32:28] t think the value of your
[32:30] home went up by the amount
[32:30] you
[32:31] re being assessed, you can
[32:33] challenge that. You have every
[32:34] right to do that. It
[32:34] s up to us.
[32:39] To only assess what we believe
[32:42] the value of the homes went up.
[32:42] That
[32:43] s our responsibility, so
[32:43] we
[32:44] re not, we
[32:46] re not trying to
[32:48] do anything sneaky, but if we
[32:50] literally voted on every street
[32:51] project in the community.
[32:52] Hardly any of them would get
[32:57] accomplished. Because again, or
[33:00] If the city paid the entire
[33:02] cost of every street project.
[33:04] The amount of assessments on
[33:06] this project that get assessed
[33:09] back to the homeowner is what,
[33:17] 4 462. What was it???????
[33:18] 4,621,462,000. If we added
[33:21] 462,000 to the general levy.
[33:26] Either in this year or in 2025
[33:27] to pay this, everybody
[33:28] s taxes
[33:30] would go up in the finance
[33:31] director just left. My best
[33:33] guess. And don
[33:35] t quote me on
[33:36] Facebook on this because that
[33:39] what the finance persons for
[33:43] would be over 5%. So we don
[33:47] have the luxury of paying for
[33:47] all street assessments or
[33:49] paying for the entire cost of
[33:53] every street project. The the
[33:55] water services in the street.
[33:58] Is paid by you and me. The
[33:58] city
[34:00] s portion of the street is
[34:01] paid by you and me and
[34:03] everybody that lives in the
[34:04] community that
[34:06] s not assessed,
[34:07] so street assessment hearings
[34:09] are always the hardest hearings
[34:10] for us because we
[34:11] re asking
[34:14] people to pay money. What we
[34:14] ve
[34:16] consistently tried to do
[34:17] through the time I
[34:18] ve been here
[34:21] is treat them all the same so
[34:21] nobody gets preferential
[34:23] treatment. We
[34:24] re all paying a
[34:25] portion of everybody
[34:27] s street.
[34:29] The the project before yours
[34:30] was concrete exchange. You paid
[34:32] for a part of that. You
[34:33] re not
[34:34] getting assessed on that
[34:35] yourself where you
[34:36] re writing a
[34:37] check every month. But through
[34:39] your property taxes, you paid a
[34:41] portion of that. You paid a
[34:43] portion of 5th Avenue. The
[34:44] people on 5th Avenue are paying
[34:46] a portion of the 7th Avenue
[34:47] Street. It
[34:48] s always been our
[34:51] thinking that all of the public
[34:53] streets are truly public and we
[34:54] all have an investment that we
[34:57] need to make. In that
[35:00] infrastructure to keep our
[35:01] streets workable and travelable
[35:03] to keep our sidewalks in good
[35:05] condition, but more importantly
[35:07] for us to make sure that when
[35:10] it rains, The water drains and
[35:12] it goes someplace. And when you
[35:14] turn on your tap, You
[35:14] re
[35:16] getting water that comes out of
[35:19] your tap, and believe me, we
[35:19] ve
[35:21] run the numbers countless times
[35:22] over the years. If we can
[35:25] afford to pay for everybody
[35:27] street projects entirely. We
[35:29] would love to do that, but it
[35:31] not necessarily the fairest and
[35:34] most equitable way to do it. So
[35:34] I hear what you
[35:35] re saying. I
[35:38] appreciate you coming here. The
[35:39] only thing that uh leftover
[35:43] thing that I have is When I
[35:44] turned the faucet on, water
[35:46] came out. When I flush the
[35:52] toilet. It went down, um. To my
[35:53] knowledge, there wasn
[35:53] t a
[35:58] problem. I know that the street
[36:01] itself looked. Hideous. To say
[36:11] the least. Basically He gave
[36:13] the street a facelift. We read
[36:14] no, that
[36:15] s not true though. If
[36:16] I might point that out, we
[36:17] didn
[36:19] t give the street a
[36:22] facelift. We gave him an
[36:23] extensive rebuild that
[36:23] s going
[36:25] to last another 25 years, that
[36:28] water main that was under there
[36:30] was 84 years old. It
[36:30] s like
[36:32] your house. How long does your
[36:35] roof last? I
[36:37] m asking you about
[36:39] Can you put it off another 2
[36:40] years of times are tough. Sure
[36:42] you can, but then what happens?
[36:42] It
[36:43] s got to be done at some
[36:47] point, right? And it generally
[36:47] Doesn
[36:49] t get any less expensive.
[36:51] Understandably so but there
[36:51] wasn
[36:53] t a problem. There was a
[36:54] huge problem with that street.
[36:56] It was laid out in the
[36:57] presentation and in the public
[36:58] hearings six months ago about
[37:00] the sewer system and the water
[37:02] system. There was no, it was
[37:03] televised. There was a
[37:04] challenge with the water and
[37:06] sewer system. It was being
[37:07] degraded and it was going to
[37:09] start to leak. We
[37:10] ve had
[37:12] multiple water main breaks
[37:13] coming under 494 and in the
[37:15] south end of town that had to
[37:16] be addressed. We just couldn
[37:18] put it off any longer because
[37:21] your taxes and my taxes, pay
[37:23] for the water department to fix
[37:24] those water main breaks every
[37:24] time there
[37:26] s a water main
[37:29] breaks at a certain point it
[37:30] becomes more economically
[37:31] feasible for everybody that
[37:34] lives in this community. To
[37:36] redo a street where you have
[37:38] multiple challenges instead of
[37:39] patching it with asphalt,
[37:41] digging up the street to fix a
[37:43] water main break, digging up
[37:45] the street to fix a sanitary
[37:48] sewer break. If I had my way, I
[37:49] wish that everything would last
[37:52] 100 years. It would make our
[37:54] Our obligation up here much,
[37:55] much simpler and we wouldn
[37:58] have to send you a bill, but
[37:58] that
[38:00] s not reality. To my
[38:03] knowledge, the, I think the
[38:04] company
[38:06] s name was Inogenesis
[38:09] or the, the, the sewer guys.
[38:14] They lined The sewers From 494
[38:17] all the way to South. They were
[38:20] just lined. There were no
[38:25] actual pipes. Removed From my
[38:27] understanding. Now I was out
[38:28] there seeing them dig every day.
[38:32] Spoke to one of the foremen,
[38:35] they said, well, This is almost
[38:36] better than replacing the pipes,
[38:38] that type of thing. It
[38:38] ll last
[38:43] another 20 years. And I just
[38:47] found it. Pretty interesting
[38:48] because the reason why all the
[38:50] digging up and everything else,
[38:52] I believe. Was because we were
[38:55] gonna get New sewer pipes, or
[38:58] at least You know, upgraded
[39:01] ones, but You know, I saw them
[39:05] do the lining and everything.
[39:05] So they
[39:07] re good for another 20
[39:10] more years or so. So if a
[39:13] problem happens, Are we looking
[39:18] at this all over again? And not
[39:18] being cosmetic in front, you
[39:20] know, make it look nice because
[39:22] it does look great. It looks
[39:23] fantastic, you know, 7th Avenue,
[39:24] but that
[39:25] s not gonna last if
[39:27] they continue having semi
[39:28] tractor trailer trucks drive
[39:29] down the road. Let
[39:30] s, let
[39:31] s let
[39:33] that Nick uh answer the lining
[39:35] question? Sure, yeah, Mayorman
[39:37] is the council. So sanitary
[39:38] sewer lining as opposed to
[39:40] water main, you, you can line,
[39:41] a sewer. It
[39:42] s a, it
[39:42] s a process
[39:45] called, um, cast in place or
[39:47] cured in place, uh, piping, so
[39:49] it basically ends up being a
[39:50] brand new pipe when you
[39:50] re done.
[39:52] So the, the beauty is if it
[39:54] in good enough condition is you
[39:55] can just line it, which ends up
[39:56] being a brand new pipe in the
[40:01] end. Basically it gets the same
[40:02] useful life you just you get
[40:03] more than 20 years out of it,
[40:03] we
[40:05] ll probably get 50 years out
[40:06] of it, um, you know, so there
[40:06] s,
[40:06] there
[40:07] s no need to replace the
[40:09] pipe at that point when you can
[40:10] light it. Now Waterman, you
[40:10] can
[40:11] t do that, and the water
[40:13] main, has to be fully replaced
[40:14] and removed, and that
[40:15] s what we
[40:15] did in this situation. And
[40:17] there was a history of water
[40:19] main breaks through that
[40:20] corridor and that
[40:20] s the reason
[40:22] why we, we needed to replace
[40:23] the water main, um, to answer a
[40:25] couple more questions, she
[40:28] mentioned, um. Is we during the
[40:30] assessment process, we have a
[40:31] feasibility study that that
[40:32] done and a public improvement
[40:34] hearing at that hearing,
[40:35] everyone
[40:36] s kind of told what
[40:38] the preliminary assessment role
[40:40] will be. So that was presented
[40:41] at that public hearing, and
[40:44] everyone got a notice of what
[40:45] the proposed assessment would
[40:47] be, so this is really not new
[40:47] information we
[40:48] re providing
[40:48] tonight. It
[40:49] s just kind of the
[40:51] formality of the assessment,
[40:52] adopting it, um, and then we
[40:54] also presented that at at the
[40:55] uh neighborhood meeting, which
[40:55] I, I know you
[40:55] re at, we present.
[40:58] That kind of assessment
[40:59] discussion at that as well. So
[41:00] i just wanted to let the
[41:02] council know about that. Your
[41:05] Honor, just just I could ask.
[41:09] Council Please, by officially
[41:10] adopting the assessment, it
[41:13] gives Residents who are being
[41:15] assessed, it starts the time
[41:16] clock on contesting the
[41:19] assessment, does it not? So
[41:20] that
[41:22] s part of the formal
[41:24] process too, and Again, there
[41:25] no hard feelings if you don
[41:26] believe that you
[41:27] re getting
[41:27] your money
[41:28] s worth out of this
[41:33] project, you can pursue that.
[41:34] The only difference I see was
[41:36] that what was said at the
[41:37] preliminary meetings like you
[41:38] were stating and everything as
[41:40] far as uh And what we were
[41:46] presented with. The main reason
[41:50] Was to replace 85 year old
[41:53] pipes. That was the crux of the
[41:56] meeting to replace 85 year old
[41:57] pipes after Inogenesis did
[41:59] their evaluation and they put
[42:01] the, the, the camera, the
[42:01] microscopic camera through the
[42:05] tube and everything. One of the
[42:06] foremans kind of stood up and
[42:08] said, why do we want to create
[42:09] a problem when we can take care
[42:13] of it this way. And that
[42:13] s when
[42:15] the lining came into play and
[42:16] everything else and I don
[42:20] know Much about uh, you know,
[42:22] lining or this or that or. I
[42:22] don
[42:25] t know, but What I was
[42:28] expecting and what I was.
[42:30] Believing what would happen was
[42:31] 85 year old pipes would be dug
[42:33] out of the ground, which is why
[42:35] they were going to The massive
[42:38] area in front of my house. And
[42:43] Replace The sewer pipes,
[42:43] because they
[42:46] re 85 years old.
[42:46] That didn
[42:47] t happen. They lined
[42:51] the sewer. I don
[42:52] t know about
[42:53] the newer technology. I don
[42:56] know about anything else and it
[42:58] probably is going to be ok, but
[43:01] what was said at this other
[43:04] meeting was not what happened.
[43:04] That
[43:04] s what I
[43:07] m getting at. And
[43:09] for residents like myself that
[43:11] saw every single day. The
[43:12] construction and everything
[43:15] moving along with it. I felt
[43:17] kind of helpless. Because I
[43:18] didn
[43:18] t know exactly what was
[43:24] going on. Sure. And um MR.
[43:25] Williams, uh, you had mentioned
[43:27] that there was a reduction in
[43:29] cost would that anything to do
[43:31] with uh the The lining of the
[43:33] pipes. I know we were under
[43:35] budget by the foreman told me
[43:37] that too at at right after they
[43:41] put the micro uh or the Scope,
[43:43] the scope down and basically
[43:46] said, If we started cracking
[43:48] into the sewer pipes and
[43:48] everything. We
[43:51] re gonna put
[43:53] Newer technology with older
[43:54] receiving pipes and everything,
[43:54] we
[43:58] re gonna cause a problem.
[43:58] And that
[43:59] s why I understood
[44:00] what he was saying, but what
[44:02] was said at the meeting and
[44:03] then said, and then what
[44:08] happened? To me, there are two
[44:09] different things, and
[44:09] somebody
[44:11] s got to be aware of
[44:12] this. MR. Williams answer that,
[44:13] and then, uh, can
[44:15] t remember.
[44:16] Yeah, mayor and members of the
[44:18] council, the plan was to always
[44:20] line those sewers, if you look
[44:21] back at our feasibility stage.
[44:23] The plan was to always line the
[44:24] sanitary sewer again, there
[44:26] no need to replace the pipe
[44:26] when it
[44:27] s in good enough
[44:27] condition where you can line it
[44:29] because you end up with a new
[44:31] pipe at the end. Um, as far as
[44:33] the costs are concerned, um, it
[44:35] was always a plan to line it,
[44:37] um, the cost reduction you see
[44:38] is we have less services that
[44:41] we run into. So sometimes we,
[44:42] if the services are where the
[44:44] water main is, we have to
[44:45] replace their service and so
[44:47] sometimes that can get costly,
[44:48] so we have to assume we
[44:48] re
[44:49] going to replace so many in
[44:50] this case we
[44:51] re able to do that
[44:52] work without replacing those,
[44:54] but the plan was always line it,
[44:55] we shared that at the
[44:56] neighborhood meeting, we shared
[44:57] that in a feasibility study
[45:00] that was always the plan. I
[45:00] can
[45:02] t Hanson and I also think
[45:03] that um it
[45:06] s a good example. To
[45:07] the residents of how we hire
[45:09] people to go in and do a
[45:10] project, and if they see
[45:12] something or some way it can be
[45:13] done better. I think that
[45:13] s a
[45:16] good thing. So even they
[45:17] expected something different
[45:18] what you got was probably
[45:21] better so. I appreciate the
[45:23] fact that that our employees
[45:25] and the people we hire take the
[45:26] time to check that. I
[45:27] m, I
[45:29] impressed that you were able to
[45:30] talk with them and they
[45:30] explained it all so I think
[45:31] that that
[45:35] s great. And if I, if
[45:37] I MAY add, um, during
[45:39] construction, we, we go above
[45:40] and beyond to communicate the
[45:41] the items of work that were
[45:42] happening. I, I don
[45:42] t know if
[45:44] you were on the email list that
[45:48] Kelsey had sent out weekly, but,
[45:49] um, we did communicate um very
[45:50] frequently with, with the
[45:51] neighborhood to let people know
[45:53] what was happening, what to
[45:54] expect, all of our contact info
[45:55] was there. I think you
[45:55] ve
[45:57] talked to Tom a few times in
[45:59] the field during construction,
[45:59] so you
[46:00] re kind of aware of what
[46:01] was happening. I just wanted to
[46:02] make sure you were, you were
[46:08] aware of that. Ok. But um Maybe
[46:12] just uh And update or advise us,
[46:15] you know. The difference
[46:18] because uh The yard got torn up.
[46:22] My tree roots, the big tree on
[46:25] 7th Avenue takes up lot of
[46:28] space, um, were exposed. They
[46:29] put side on it, but uh I don
[46:30] know if that
[46:30] s going to catch
[46:34] in. There
[46:35] s a possibility of
[46:37] that huge tree which was there
[46:39] since before I was Even moved
[46:40] into the place and everything.
[46:40] I don
[46:41] t know if that
[46:42] s gonna
[46:43] survive because they really did
[46:45] cut in. To the property line
[46:48] and the root. So I
[46:48] m hoping
[46:51] that it comes back. But I
[46:53] pretty sure that when they were
[46:54] cutting and everything, they
[46:55] were cutting to replace the
[46:57] sewer line. And not just Line
[47:02] it. So What
[47:05] s your address?
[47:06] 1120 7th Avenue. So, the
[47:09] massive tree in the front yard,
[47:09] that
[47:14] s my big baby. Ok Thank
[47:16] you. Thank you. Thank you for
[47:18] coming down. This is a public
[47:20] hearing. Anybody here else wish
[47:22] to speak on the assessment
[47:23] hearing for 7th Avenue South
[47:24] Reconstruction. This is the
[47:28] time, please step forward. This
[47:29] is a public meeting and it is
[47:32] open. For public consideration,
[47:36] comment. I
[47:37] ll ask one more time
[47:39] if anybody is here that wishes
[47:40] to speak again on the
[47:41] assessment hearing for 7th
[47:45] Avenue South Reconstruction.
[47:47] Seeing none a closed public
[47:51] hearing. Turn to council for
[47:53] questions, Councilor Hansen. Um,
[47:55] first of all, I would like to,
[47:58] uh, make a motion to approve
[48:00] the project number 2023-12.
[48:01] Then after that I have
[48:03] something else to say. Motion
[48:07] by Hansen for approval. 2 by.
[48:11] Kalzewski. Further discussion,
[48:14] Councillorhansson. I was so
[48:16] impressed by how that project
[48:17] turned out. If you haven
[48:18] t had
[48:21] time yet to take a drive down
[48:22] 7th Avenue South. It
[48:23] beautiful. I hope all of our
[48:25] streets end up looking like
[48:27] that in town because it, they
[48:30] did a great job. I heard
[48:32] nothing but compliments about
[48:33] McNamara, the construction
[48:34] company that worked on that,
[48:35] and obviously, it, you know,
[48:37] just the way they talk to the
[48:39] the people that live there,
[48:41] they were all more several
[48:42] people actually came up and
[48:44] told me what. A great job they
[48:44] did, and they
[48:45] d be out there
[48:45] working and they
[48:46] d be cleaning
[48:49] up, and he said, um, they were
[48:50] just very impressed by the
[48:51] company that did the work and
[48:53] so that makes me feel good that
[48:56] we made a good choice and we
[48:57] did have some discussion about
[48:59] the width of the street, and
[49:00] m pleased that it turned out
[49:03] very well. That
[49:04] s it. Thank you,
[49:09] Councilor. Others. I would echo
[49:09] Council member Hanson
[49:12] s um,
[49:14] Comments about the project, um,
[49:16] I was not for the sidewalk, um,
[49:18] I think I was the only
[49:19] dissenting vote for for the
[49:24] sidewalk, um. But Like most
[49:26] projects, when there
[49:27] s a
[49:28] dissension and approval. We
[49:30] continue to support that and
[49:32] having walked that whole strip
[49:34] with uh Tom Madigan, who is our
[49:36] project superintendent. I, I
[49:39] too was impressed at at how it
[49:41] turned out and um. Also we
[49:41] re
[49:43] very fortunate in the city of
[49:43] South Saint Paul, ma
[49:44] am, you,
[49:45] you met with Tom and others
[49:48] have met with Tom as, as well.
[49:51] Uh, he spent An absorbitant
[49:52] amount of time making sure
[49:53] people were aware of what was
[49:55] going on and making sure that
[49:57] it was the project came out the
[49:59] way it does from designing um
[50:02] to Execution to working with
[50:05] the contractors and folks I can
[50:07] tell you that we are so lucky
[50:09] to have Tom on our team for
[50:10] your sake, he
[50:11] s there to make
[50:13] sure that the project gets done
[50:14] to the specifications and that
[50:16] nothing gets missed and there
[50:20] no no things cut corners cut
[50:20] and so again we
[50:21] re, I
[50:22] m very
[50:23] impressed at seeing that, um,
[50:27] m. More of a fan of sidewalks
[50:29] than I was before. I think that
[50:32] it turned out. Better than I
[50:33] anticipated with a sidewalk,
[50:36] and I think it really does help
[50:37] our connect our community from
[50:38] north to south, and so I
[50:39] m, I
[50:40] impressed with that. So thank
[50:41] you, Councilmember Hanson for
[50:43] bringing that forward.
[50:45] Councilor Bakken, I actually
[50:47] have a question and a comment.
[50:50] I love the sidewalk, actually,
[50:51] um, the track team and the
[50:55] cross country team use it a lot
[50:58] to run and as we redo a lot of
[50:59] the projects in South Saint
[51:00] Paul. We
[51:03] re an old city. And
[51:04] accessibility wasn
[51:05] necessarily a thing when we
[51:07] were created back in the day.
[51:09] So the fact that we have 3 ft
[51:12] sidewalks, kids. Anybody
[51:14] wheelchairs, they all can get
[51:16] down, um, to upper fifty-fifth
[51:18] safely. Um, that was a pretty
[51:19] wide road to just have
[51:20] pedestrians pretty much on the
[51:22] street or in people
[51:23] s yards. So
[51:27] I, I think that um, is, um, I
[51:27] think that
[51:28] s the prize of it
[51:30] all, other than the, the road
[51:32] being redone. I do have a
[51:34] question, a follow up about the
[51:37] trees, um, will people get an
[51:37] option to have a tree? You said
[51:40] you were going to be contacting
[51:41] residents or um, are they, are
[51:43] they just going to be planted
[51:47] in a certain Sure, uh, Mayor
[51:47] mayor and members of the
[51:49] council, we will be asking
[51:51] people if they want a tree. Now
[51:51] they
[51:54] re certain. Criteria
[51:56] involved if we have private
[51:58] utilities or our our water main
[52:00] or sewer in the way, then they
[52:00] can
[52:02] t put a tree there on their
[52:03] property. We don
[52:03] t want that
[52:05] growing into our new pipes, but
[52:06] we are giving people the option
[52:08] if they do want a tree, um,
[52:08] we
[52:09] ll be reaching out this
[52:11] spring and, uh, offering those
[52:12] up to people. So they do have
[52:14] an option, yes. Perfect. Thank
[52:21] you. Others Xinan motion the
[52:23] 2nd. MS. Werner, please call
[52:26] the roll. Council member Pad
[52:28] Gorski. Yes, council member
[52:31] Thompson. Yes. Council member
[52:34] Keleski, council member back in
[52:36] Mayor Francis, council member
[52:37] Hanson, Council member Curg.
[52:42] Yes. 70. Thank you very much.
[52:44] Motion is approved. Thank you
[52:45] all residents for investing in
[52:47] South Saint Paul and uh those
[52:49] that worked on that project,
[52:50] getting that buttoned up before
[52:53] the end of the year. Moving on
[52:54] from our public hearings to
[52:58] general business. First is a
[52:58] preliminary development
[52:59] agreement llc at the Hardman
[53:05] Triangle Phase one. Doctor
[53:08] Garcia, welcome. Thank you. MR.
[53:10] Mayor, members of the council,
[53:11] uh, item 10a. Tonight we are
[53:13] seeking approval of a
[53:14] preliminary development
[53:17] agreement with That llc or eda
[53:20] owned property. At the corner
[53:21] of Grand Avenue and Concord
[53:24] Street. Um, just a quick
[53:26] summary, the agreement is
[53:28] enclosed in the in tonight
[53:29] packet, uh, but just a quick
[53:32] summary of that agreement. This
[53:34] establishes an exclusive
[53:35] relationship between this
[53:36] developer and the eda and the
[53:39] city. Uh, to explore a
[53:40] development opportunity at the
[53:41] southwest corner of what we
[53:45] call the Hardman Triangle. Um
[53:46] Key provisions of the agreement,
[53:49] the eda in the city for this
[53:51] agreement agreed to provide the
[53:53] developer with various studies
[53:55] and data and reports about the
[53:58] conditions impacting the site
[53:59] and impacting the development.
[54:01] The eda and City agreed to
[54:02] identify and evaluate potential
[54:04] public costs that might be
[54:06] associated with pursuing the
[54:08] developments such as new
[54:10] streets or utility extensions
[54:11] to serve the development and
[54:13] the eda and the city agreed to
[54:16] negotiate in good faith. Uh,
[54:18] the execution of a purchase and
[54:19] development agreement or, uh,
[54:22] agreements plural. The
[54:24] agreement also obligates the
[54:26] developer to develop and submit
[54:27] development plans for city
[54:30] approvals in a timely fashion,
[54:31] uh, to conduct their own due
[54:33] diligence on the feasibility of
[54:36] the development. Uh, to obtain
[54:37] financing to complete the
[54:39] project, and similarly to
[54:41] negotiate in good faith with
[54:43] the eda and cities towards the
[54:43] purchase and development
[54:49] agreement or agreements. A
[54:51] couple of other key provisions,
[54:54] the agreement itself is
[54:55] effective through AUGUST 30th
[54:58] of 2025, the developer has
[55:00] indicated a desire to uh
[55:02] hopefully break ground in the
[55:05] late 2nd quarter to early 3rd
[55:10] quarter of 2025. The agreement
[55:11] proposes option payments
[55:12] $15,000 due at execution. This
[55:15] would, uh, be, uh, not only to
[55:17] secure that exclusive right to
[55:18] pursue the development of this
[55:20] property, but also, uh, to
[55:22] cover any of the EDAs or the
[55:23] city
[55:24] s administrative costs
[55:25] that might be associated with
[55:28] reviewing this development such
[55:29] as financial consultants.
[55:29] There
[55:30] s a master plan that
[55:30] we
[55:32] re looking at as well on the
[55:34] eda agenda tonight, uh, some of
[55:34] those other administrative
[55:39] costs. In addition to that
[55:41] $15,000 if the agreement is not
[55:43] terminated before these
[55:45] milestone dates additional
[55:47] $5000 progress payments to keep
[55:50] the site under option are due
[55:53] on JANUARY 1st of 25, APRIL 1st
[55:58] of 25, and JULY 1st of 25.
[56:01] Final point, um, The agreement
[56:02] itself does contemplate and
[56:04] acknowledge that there MAY be a
[56:06] request in the future for
[56:08] potential financial assistance,
[56:09] whether that
[56:10] s through various
[56:12] grant and loan programs that
[56:15] the eda is aware of or through
[56:17] the establishment of tax
[56:18] increment finance district for
[56:19] the project. The project, as
[56:21] you can see, does propose
[56:23] multiple phases of mixed-use
[56:25] development, uh, the site is,
[56:29] as everybody knows, um. A
[56:30] former former industrial campus
[56:33] location for Swift and Company,
[56:35] uh, meat meat processing, uh,
[56:37] and we have encountered some
[56:38] underground conditions in our
[56:40] due diligence of the site in
[56:42] our demolition of the buildings
[56:43] that were there previously. Uh,
[56:45] so there MAY be a need for some
[56:46] of those financial assistance
[56:48] programs to To make the
[56:52] development a reality. If that
[56:53] financial assistance is
[56:54] ultimately pursued in the
[56:56] future. It would require the
[57:01] eda to review and approve, uh,
[57:02] development plan confirmation
[57:04] again independently through our
[57:06] financial consultant of any
[57:07] financial cost estimates for
[57:08] all phases and components of
[57:10] the project. And it would
[57:11] require its own public hearing
[57:13] and review again at a future
[57:15] date once some of those terms
[57:16] and conditions are, are
[57:19] understood. But at this stage
[57:21] we are looking for approval, a
[57:24] motion to approve a preliminary
[57:25] development agreement between
[57:29] sas. The city and the eda. Uh,
[57:30] which would thereby authorize
[57:32] the mayor and the city clerk to
[57:34] execute the agreement, subject
[57:35] to minor revisions meeting the
[57:35] city attorney
[57:36] s approval. Happy
[57:38] to answer your questions. Thank
[57:40] you, MR. Garcia. Very exciting.
[57:42] This is, um, can you go back to
[57:45] the, the picture and and
[57:46] perhaps maybe just go a little
[57:47] bit into detail on, on the
[57:51] house, yes, and uh what each of
[57:53] those would entail just for the,
[57:54] for the general public. Thank
[57:59] you, yeah, um, the developer is
[58:00] 11 NOVEMBER 2024 schematic
[58:03] concept for the site, uh,
[58:05] proposes a building along
[58:07] Concord Street. This would be a
[58:08] residential building. Market
[58:11] rates. Apartment development,
[58:14] about 140 to 150 units total.
[58:15] With underground parking under
[58:18] building parking. Uh The other
[58:20] component of that first phase
[58:21] of the development as they
[58:21] re
[58:24] proposing it is about a 30,000
[58:26] square foot, what they call
[58:27] destination retail, uh, right
[58:27] now they
[58:30] re working with. A
[58:30] group that
[58:32] s interested in um
[58:33] establishing recreational
[58:36] indoor sort of commercial
[58:37] recreational indoor pickleball
[58:39] facilities so folks could go.
[58:42] You know, rent a court and
[58:44] joined friends for a friendly
[58:47] spirited game of pickleball.
[58:50] That concept is also tied to an
[58:53] independent um full service
[58:54] restaurant which has the number
[58:58] 4 on the map. On the screen
[59:01] should be again about a 300 to
[59:02] 5000 square foot full service
[59:04] restaurant with um with, you
[59:06] know, indoor and outdoor
[59:08] seating, uh, full kitchen, uh
[59:11] bar that would be Really not
[59:12] not directly affiliated with
[59:13] the destination retail but
[59:14] would have some shared service
[59:17] opportunities there. Um And
[59:19] then uh with number 2, there
[59:20] are housing b, that
[59:21] s a
[59:23] potential future phase of
[59:24] additional residential
[59:25] development. This schematic is
[59:28] still pretty early. We are
[59:29] looking at other concepts for
[59:31] the site in terms of how it
[59:32] would lay out and uh whether
[59:35] all of those buildings would
[59:37] actually uh work and fit on the
[59:39] site, so this is subject to
[59:40] some revision again as we get
[59:43] into that due diligence process,
[59:46] but um this is again the
[59:47] preliminary schematic concept
[59:48] really anchored by that that
[59:50] housing, that first building
[59:52] along Concord Street and the
[59:52] destination retail and
[59:54] restaurant development. Very
[59:58] good, thank you. That, that
[59:58] shouldn
[59:59] t get people excited.
[1:00:03] Um, it should be noted that um.
[1:00:04] Economic development has been
[1:00:06] working on the Hardmann
[1:00:09] Triangle for 7 to 8 years and
[1:00:13] this. Agreement is helping us
[1:00:14] move that forward, that vision
[1:00:17] forward and really is going to,
[1:00:21] I believe, um. Catapult that uh
[1:00:23] piece of property into more
[1:00:24] development New Concord Street,
[1:00:25] New Concord Exchange, great
[1:00:26] opportunities down there. Thank
[1:00:28] you for the presentation.
[1:00:29] Questions, comments from
[1:00:34] council. Motions Your Honor,
[1:00:36] Councilor Sberg, I would so
[1:00:39] move approval. Second, moved to
[1:00:40] approve by Council s Seber,
[1:00:43] seconded by Thompson. Further
[1:00:44] discussion, Councilor Murray
[1:00:44] Thompson, I
[1:00:46] d also like to
[1:00:47] basically echo your statements
[1:00:49] that I think, you know, for the
[1:00:50] public to understand that this
[1:00:51] is a really exciting
[1:00:52] opportunity, I think, to get
[1:00:55] the Harbin Triangle to start
[1:00:56] the development that we
[1:00:57] ve been
[1:00:57] talking about for years, you
[1:01:00] know, we have, we have people
[1:01:01] living down there now, and now
[1:01:02] this is another development
[1:01:02] where we
[1:01:04] re, we are looking at
[1:01:04] potentially getting a
[1:01:06] restaurant, uh, retail
[1:01:08] destination, a place for people
[1:01:10] to go. People somewhere where
[1:01:11] people want to go, come into
[1:01:13] South Saint Paul and enjoy
[1:01:16] something and so this is, I
[1:01:17] think, I hope the springboard
[1:01:18] to continue to develop in
[1:01:20] Harbin Triangle, so, um, I
[1:01:21] really looking forward to the
[1:01:22] development of this project.
[1:01:29] Thank you. As am I. Others
[1:01:32] Hearing none We have a motion
[1:01:33] to second, MS. Werner, please
[1:01:35] call the roll. Council member
[1:01:37] Thompson. Yes. Council member
[1:01:39] Kal Zeski, Mayor Francis,
[1:01:41] council member Bakke. Council
[1:01:43] member Hanson, Council member
[1:01:45] Curg, Council member Pat Gorski.
[1:01:48] 70. Thank you very much. Motion
[1:01:51] passes. Uh, thank you to, uh,
[1:01:54] Zavvi and te Miller Development
[1:01:55] for um looking to invest in
[1:02:00] South Saint Paul. That does it
[1:02:02] for our Business here tonight,
[1:02:04] our general business. Uh
[1:02:08] council Communications would
[1:02:09] like to start. Can
[1:02:09] t remember
[1:02:11] Kalzewski. Thank you, Your
[1:02:13] Honor. Uh, last Thursday,
[1:02:14] Halloween over on Marie Avenue
[1:02:16] was just fantastic. Did anybody
[1:02:17] get a count of how many people
[1:02:19] were there. I guess I made it
[1:02:22] out about 3000 people. There is
[1:02:23] a tremendous crowd there,
[1:02:25] tremendous, uh, great night, a
[1:02:27] little cold but but great night
[1:02:28] and uh everybody had a great
[1:02:30] time. Some great costumes there
[1:02:36] too. And also my lawn service
[1:02:37] note for the communications
[1:02:38] keep those leaves out of the
[1:02:39] street, please use the compost
[1:02:40] site. I
[1:02:41] ve been down there a
[1:02:43] couple of times. That place is
[1:02:45] fantastic. Buck a bag. By big
[1:02:46] banks, it
[1:02:47] s only $1 so it
[1:02:48] s uh.
[1:02:49] Well worth it for everybody
[1:02:50] down there to dump all the
[1:02:52] leaves off. Very good. They can
[1:02:54] find that information on our
[1:02:56] city website and good luck to
[1:02:57] the candidates that are up for
[1:03:00] election, so. Thank you,
[1:03:02] council member. Others?
[1:03:05] Councilor Hanson. Um, first,
[1:03:09] d like to, um, tell everyone
[1:03:11] about Thursday, NOVEMBER 14th,
[1:03:12] which is coming up soon. It
[1:03:15] the South Saint Paul senior
[1:03:16] citizens Thanksgiving dinner,
[1:03:17] so it
[1:03:18] s free for the over 55
[1:03:20] year old group. Sorry, I
[1:03:20] m not
[1:03:23] going to be here to go, but um
[1:03:25] s being sponsored by
[1:03:26] Protouch Wakota Federal Credit
[1:03:28] Union, Lyons, and the partners
[1:03:30] of South Saint Paul School
[1:03:33] District, Boy Scout to 9095 and
[1:03:33] Mayor
[1:03:35] s Youth Task Force. You
[1:03:36] can find more information on
[1:03:37] the website and Facebook if you
[1:03:38] need it, but that
[1:03:38] s coming up
[1:03:39] quick. It
[1:03:41] s hard to believe
[1:03:42] that it
[1:03:42] s practically
[1:03:43] Thanksgiving. Um, the other
[1:03:43] thing I
[1:03:45] d like to mention too
[1:03:48] is um council member Kalzowski
[1:03:49] talked about Halloween, so I
[1:03:52] was at the, the event and Marie
[1:03:54] and after was all I went home
[1:03:55] and I decided, well I
[1:03:56] m gonna
[1:03:58] hand out some candy. So I did
[1:04:00] and I have to tell you I was so
[1:04:02] impressed by all the kids who
[1:04:04] came to my door. They were all
[1:04:05] always happy, smiling, and from
[1:04:07] the littlest to the the older
[1:04:10] ones, they were very polite and
[1:04:12] m just impressed by the, the
[1:04:13] kids that came around on
[1:04:13] Halloween, and I
[1:04:14] ve heard that
[1:04:17] from a few other people too, so
[1:04:19] kudos to the kids and
[1:04:20] appreciate them for how great
[1:04:21] they were. Don
[1:04:22] t forget to vote
[1:04:22] tomorrow. That
[1:04:23] s all I can say
[1:04:28] about voting. Thank you Council
[1:04:29] Councilor Podorski, thank you,
[1:04:30] Your Honor. Yeah, I too would
[1:04:33] just like to say um thanks for
[1:04:34] the Halloween event on Marie
[1:04:35] that the city helped sponsor. I
[1:04:37] just want to thank our staff
[1:04:39] and, uh, the volunteer
[1:04:41] businesses, uh, because without
[1:04:42] those businesses and and others
[1:04:43] helping put it together it
[1:04:44] really wouldn
[1:04:44] t be the great
[1:04:46] success, um, that it is so
[1:04:48] great to see, uh, kids and
[1:04:49] family out on a, a little
[1:04:52] chilly night as, uh, council
[1:04:53] member Kalzewski said that we
[1:04:53] were handing out candy together
[1:04:56] for a little while and um It
[1:04:58] was a little chilly at times
[1:04:59] when the wind would pick up,
[1:05:01] but great to see the, the kids
[1:05:02] out there, just want to say
[1:05:04] thanks again to all those that
[1:05:05] helped participate in that. And
[1:05:07] yes, um, I also would like to
[1:05:10] say get out and vote and let
[1:05:12] stay friends after tomorrow, uh,
[1:05:15] NOVEMBER 5th, um, I think
[1:05:16] people are staying pretty
[1:05:18] respectful, but please try and
[1:05:19] be respectful to your neighbors,
[1:05:21] family, friends, and voting
[1:05:23] staff, uh, as well. I know, um,
[1:05:25] a number of people are feeling
[1:05:26] like this is some challenging.
[1:05:28] Times and people are maybe
[1:05:29] getting a little tired of uh
[1:05:32] some of the the rhetoric that
[1:05:33] goes along with elections, but,
[1:05:35] um, I
[1:05:36] m looking forward to it
[1:05:38] being done, and I know a lot of
[1:05:38] other people are as well, and
[1:05:41] re gonna get through this
[1:05:41] all together, so thank you,
[1:05:44] Your Honor. Very good. Thank
[1:05:47] you. Councilor Bakken. Sure,
[1:05:49] ll go. Um, I think a good
[1:05:52] number of us were at the great
[1:05:53] Halloween get-together and uh
[1:05:55] My plus one was with me, and I
[1:05:57] think we might have beat you
[1:05:59] all with how much candy we
[1:06:00] handed out, but you know,
[1:06:01] that
[1:06:02] s just, um, but the, you
[1:06:04] know, the costume, I love, I
[1:06:07] love seeing the Old school
[1:06:08] costumes maybe, and then the
[1:06:10] fancier ones and I think I
[1:06:11] counted like 8 bananas. I mean,
[1:06:12] who doesn
[1:06:13] t want to be a banana
[1:06:17] for Halloween. So, um, that, uh,
[1:06:20] it just as always a fun event.
[1:06:23] It was the 23rd annual, uh, get
[1:06:25] together, and I remember the
[1:06:26] first annual get-together when
[1:06:29] all of our kids were small, and
[1:06:30] so I think it
[1:06:32] s very cool that
[1:06:34] kids that have attended that
[1:06:35] when it was a um a beginning
[1:06:37] tradition. Um, brought their
[1:06:38] own kids, um, that evening as
[1:06:39] well, and that
[1:06:39] s kind of what
[1:06:41] South Saint Paul is all about,
[1:06:42] you know, um, growing up here
[1:06:45] and. Raising your family here,
[1:06:47] um. Speaking of voting, yes,
[1:06:50] please go out and vote. However,
[1:06:52] I would like to just take a hot
[1:06:53] minute to say thank you to
[1:06:58] Deanna. And your staff. And the
[1:07:00] election judges, I mean, we
[1:07:03] had a banner turnout here at
[1:07:05] City Hall and you were open
[1:07:06] Saturday and Sunday. I heard
[1:07:08] you were here all day yesterday,
[1:07:11] so I just want to commend, um,
[1:07:14] your, uh, role in all of this.
[1:07:16] I actually attended the
[1:07:18] election integrity, uh, Deal
[1:07:21] you put on to watch how our, um,
[1:07:23] you know, our machines work.
[1:07:24] And there
[1:07:25] s just a lot of
[1:07:28] behind the scenes that happens
[1:07:30] and I just appreciate you and
[1:07:30] everything you
[1:07:31] ve done, and
[1:07:32] just your knowledge about the
[1:07:34] whole thing, how you did that
[1:07:35] whole meeting. I was just like,
[1:07:38] look at her ghost. So perhaps,
[1:07:40] props to you and thank you and
[1:07:44] I hope you survive tomorrow. Me
[1:07:44] too. That
[1:07:45] s all. Thank you very
[1:07:46] much. That
[1:07:48] s my receiver.
[1:07:49] Thanks, Your Honor. There
[1:07:51] been almost 1.4 million people
[1:07:54] that took advantage of early
[1:07:55] voting according to the latest
[1:07:56] statistics from the state. I
[1:07:59] saw earlier today, I think it
[1:08:02] was 1,372,000, which is about
[1:08:05] 35% of the electorate. So it
[1:08:07] an awesome thing. We
[1:08:08] re looking
[1:08:09] forward to tomorrow. Keep in
[1:08:10] mind that it
[1:08:12] s your friends and
[1:08:15] neighbors that are working the
[1:08:16] polling locations in South
[1:08:17] Saint Paul. They don
[1:08:17] t have a
[1:08:18] preconceived agenda. There
[1:08:21] people from every party there
[1:08:22] working on behalf of doing this.
[1:08:24] A number of them have
[1:08:26] volunteered for years. So get
[1:08:29] out, do your job. Your civic
[1:08:32] duty and vote, um, and to, to
[1:08:33] my friends here that are
[1:08:36] running, best of luck to
[1:08:38] everybody that has put their
[1:08:40] name in to be considered for
[1:08:42] counsel or mayor or school
[1:08:44] board, it takes courage to do
[1:08:47] that. Thank you for doing that.
[1:08:50] s not easy in 2024 with all
[1:08:53] of the digital means to
[1:08:54] question things. A lot of the
[1:08:56] discussion is good. It
[1:08:57] constructive. Some of it you
[1:09:00] kind of wonder what planet it
[1:09:02] coming from, but Um, at the end
[1:09:03] of the day, it
[1:09:04] s a democratic
[1:09:06] process that we have, and it
[1:09:09] extremely important for us to
[1:09:10] continue that democratic
[1:09:11] process, not only in South
[1:09:13] Saint Paul and Dakota County in
[1:09:15] Minnesota, but in the United
[1:09:15] States, it
[1:09:16] s a fair and free
[1:09:21] election. Make sure that we
[1:09:22] exercise our constitutional
[1:09:23] right to vote, and we
[1:09:23] ll see
[1:09:25] where the chips fall, but we
[1:09:26] looking forward to the future
[1:09:28] here in South Saint Paul. And
[1:09:30] again, thank you to the
[1:09:31] election officials and to our
[1:09:31] team that
[1:09:32] s put in so much work.
[1:09:35] It truly is in our community
[1:09:37] and with the number of team
[1:09:38] members. I always call them
[1:09:40] team members, and not just
[1:09:41] staff, they
[1:09:42] re team members
[1:09:43] that we have. It
[1:09:44] s an all hands
[1:09:47] on deck process. We don
[1:09:48] t have
[1:09:50] a department of 100 people
[1:09:51] working on elections. We
[1:09:51] ve got
[1:09:54] a team at City Hall under the
[1:09:56] direction of the city clerk
[1:09:58] that works on elections, and we
[1:10:00] appreciate you and we want to
[1:10:01] thank the buildings that allow
[1:10:04] us To go in and conduct
[1:10:05] elections on election day in
[1:10:08] the primary, so. Thank you,
[1:10:10] Your Honor. Very well, thank
[1:10:12] you, Councilor Thompson. Uh,
[1:10:14] slow day in the news for me
[1:10:15] today, I guess. Um, I guess the
[1:10:17] one thing I do want to say is,
[1:10:20] I want to say again, thank you
[1:10:23] to MS. Warner and her excellent
[1:10:25] staff for their hard work, um,
[1:10:25] they
[1:10:26] ve, they
[1:10:26] ve gone through
[1:10:27] some tremendous numbers in just
[1:10:28] one building, you know, so we
[1:10:29] have, how many, how many
[1:10:32] precincts again? 5 precincts,
[1:10:34] but over 2000 early votes,
[1:10:35] right? 2000 early votes. I mean,
[1:10:36] so that
[1:10:37] s, that
[1:10:37] s tremendous
[1:10:39] all coming in here to get the
[1:10:42] job done, um, so I just want to
[1:10:43] thank staff and, uh, the
[1:10:44] election judges for putting
[1:10:45] their time and effort and
[1:10:46] energy into this and making
[1:10:48] sure that there is a good
[1:10:50] honest selection here, um,
[1:10:50] that
[1:10:52] s all I have. Thanks. Very
[1:10:53] good. Thank you. I would like
[1:10:56] to thank the team, uh, all
[1:10:58] departments actually the
[1:10:59] engineering department at this
[1:11:00] time of year, year after year,
[1:11:01] we button up all these big
[1:11:03] projects that we started and
[1:11:05] your team has a lot to do with.
[1:11:06] Orchestrating those and trying
[1:11:08] to keep everybody on time and
[1:11:12] keeping Keeping the issues low
[1:11:14] and the progress high and
[1:11:14] sometimes those don
[1:11:15] correspond, but I, I, you,
[1:11:15] you
[1:11:17] ve all done a really good
[1:11:19] job, uh, not only your
[1:11:20] department but the water
[1:11:22] department and all the public
[1:11:23] works department who are doing
[1:11:25] all of those things on the
[1:11:26] backside that we don
[1:11:27] t see, um,
[1:11:29] many times in the middle of the
[1:11:31] night, many times early in the
[1:11:32] morning when contractors need
[1:11:33] to get things started. So thank
[1:11:34] you and please pass that along
[1:11:36] to your, to your team. Because
[1:11:39] it does take all of us to make
[1:11:41] this happen and it is um I
[1:11:44] quite proud of the work that
[1:11:44] You
[1:11:45] ve all done making sure all
[1:11:48] these things happen every year
[1:11:48] and now we
[1:11:49] re going to start
[1:11:51] preparing our public works
[1:11:52] department for snow and the
[1:11:53] winter and the cold and the ice
[1:11:56] and so all those things are
[1:11:58] coming together now in NOVEMBER
[1:11:59] and so I just want to recognize
[1:12:01] those staff members that are
[1:12:02] that are continually working
[1:12:03] hard for us and those that back
[1:12:05] them up, and of course, it
[1:12:08] been said about our, our city
[1:12:09] clerk and all the work that
[1:12:09] that she
[1:12:11] s been doing and her
[1:12:13] team have some grace. With
[1:12:15] people if things are a little
[1:12:16] long tomorrow if if things
[1:12:16] aren
[1:12:17] t, uh, you make a mistake,
[1:12:18] s ok, have some grace with
[1:12:20] yourself, go back and work out
[1:12:22] to get another ballot and and
[1:12:23] redo that. Don
[1:12:25] t be afraid to
[1:12:26] ask ask questions if you
[1:12:27] re, if
[1:12:27] you
[1:12:27] re concerned about
[1:12:30] something, they are all trained
[1:12:31] and are are there helping and
[1:12:32] as council member s Seberg said,
[1:12:35] they are. All of them are our
[1:12:36] neighbors. These aren
[1:12:36] t flown
[1:12:38] in people. These aren
[1:12:39] professionals. These are moms,
[1:12:41] dads, uncles, neighbors that
[1:12:43] are that are out there doing
[1:12:45] this on our behalf to make sure
[1:12:46] that everything goes well, so
[1:12:47] thank you to them and thank you
[1:12:49] to you all for getting out and
[1:12:51] exercising your vote. With that,
[1:12:56] uh, I look for a motion to
[1:12:56] adjourn our council meeting
[1:12:58] that was moved by council
[1:12:59] member Serg, seconded by
[1:13:02] Councilmember Kalzeki. All in
[1:13:04] favor of adjournment. Any
[1:13:07] oppose? Meeting is adjourned.
[1:13:10] We will Thank you very much. We