Transcript
SOURCE TRANSCRIPT
This transcript is downloaded from the source you provided but we haven't reviewed it for accuracy. Treat it as a starting point, not a verbatim record. You can also request an AI-transcription of the audio file with the button to the left.
These are YouTube's auto-generated captions, not a human transcript — expect occasional errors, especially with names and technical terms.
[0:08]
call this meeting to order on Monday
August 5th for the St Jo city council to
[0:13]
start we stand for the Pledge of
[0:21]
Allegiance
[0:28]
States Li and justice for
[0:35]
all item number two public comment
anybody that's wanting to address the
[0:40]
council for any issues not on tonight's
agenda you can step forward again that'd
[0:45]
be for anything that is not on tonight's
agenda seeing nobody step forward we'll
[0:51]
close public comment item number three
approval of the agenda second we have a
[0:58]
motion as a second all those in favor
signify by I I all those opposed motion
[1:06]
carries item number four consent
[1:11]
agenda second I would like to pull item
four I just for further explanation from
[1:19]
Randy if he could do that for us uh all
those in favor of approving the consent
[1:27]
agenda except for 4 I I say I
I all those
[1:35]
opposed so carried Randy could you
expand upon for I the approval
[1:40]
resolution and amending resolution for
the El Street East extension I think
[1:45]
we're at least in conert between Lori
and I uh I believe this is in response
[1:49]
to feedback from the city's Bond Council
uh typically when we're conducting
[1:54]
improvements under the 429
process um there are Provisions with
[1:59]
that are somewhat that are time
sensitive with respect to certain
[2:03]
actions from the council um after the
public Improvement hearing after
[2:08]
presentation of the feasibility report
and so considering that the Elm Street
[2:12]
improvements were delayed uh in this
case due to to write ofo acquisition
[2:16]
concerns I think the Bond Council had
recommended to to the council that or to
[2:21]
the city that they amend the resolution
reflecting that it's taking longer than
[2:26]
a year uh from our original action and
and so that's uh the purpose for that
[2:32]
that language modification or I
summarize that accurately that's exactly
[2:37]
the recommendation from Bond council is
just to extend it that the bids will be
[2:42]
let no later than such a period of time
and
[2:47]
we based on the information that we have
best estimate would be June 30th of
[2:52]
2025 for that project
okay so the the statute does provide for
[2:59]
instance like this when it does take
longer uh longer than a year but we want
[3:04]
it memorialized in in the resolution so
that's why it's being brought
[3:09]
back okay well thank you for the
clarity Adam can I make a comment yeah
[3:16]
just for the audience and people
watching on Zoom so what we're talking
[3:20]
about is that we thought earlier in the
year that
[3:24]
roundabout by Cashwise in the
McDonald's we thought that would be
[3:29]
happening the construction and it's not
going to happen because of right of way
[3:34]
issues so that won't be constructed
until 2025 correct is that accurate
[3:42]
that's accurate yeah because I don't
think that's been reported in the news
[3:45]
leaders or anything it's just been in
our own minutes and stuff it's my
[3:49]
understanding Stern County may have
published it on their website right but
[3:53]
but I don't know that it's been in print
per se sh on our Facebook
[3:57]
page okay I just reporting in progress
clarify that
[4:03]
okay well with that I move to approve
item 4 I from the consent agenda second
[4:10]
all those in favor signify by I I all
those
[4:15]
opposed motion carries item number five
from engineer reports public hearing the
[4:21]
special assessment hearing for the 2024
Street improvements in 2024 Elm Street
[4:25]
East
improvements believe you got that cover
[4:30]
Randy I I'll start and U my colleague
Bryce will will will follow up so good
[4:34]
evening uh my name is Randy sabart I'm
the city engineer with me this evening
[4:39]
is Bryce Johnson also on the engineering
team uh as the uh as Adam had indicated
[4:46]
uh tonight we're starting the what we
call the special assessment hearing uh
[4:50]
when the city proposes public
improvements under the chapter 429 uh
[4:55]
statute we're required to conduct two
public Improvement hearings the first
[5:00]
and or public hearings I should say the
first hearing was conducted mid January
[5:04]
January 16th which is what's referred to
as the public Improvement hearing at
[5:09]
that hearing the city presents uh the
nature of its proposed public
[5:13]
improvements provides an opportunity for
the residents to um provide input or
[5:19]
questions on the nature of the project
at that point we provide a preliminary
[5:23]
estimate of the costs uh the preliminary
estimate of the impacts from a special
[5:27]
assessment perspective uh the second
hearing which is tonight is what we
[5:32]
refer to as the special assessment
hearing so at this at this hearing the
[5:36]
city presents uh what are anticipated to
be the final costs associated with that
[5:42]
particular public Improvement and so we
have a a brief slideshow this evening
[5:47]
that that Bryce will will get into and
then there'll be a period for uh uh for
[5:51]
questions so with that I'll turn it over
to my colleague here Bryce Johnson
[5:55]
that'll work through the uh the slides
if you didn't notice uh uh at the table
[6:00]
outside the door there's a CO a hard
copy of these slides so that you could
[6:04]
follow
along all right thank you Randy again
[6:09]
I'm Bryce Johnson with SE I will be
presenting the slides here for the 2024
[6:15]
Street
improvements so the project locations we
[6:20]
have are Kiwi Court kale Court 295th
Street from Kiwi Court to 91st Avenue
[6:28]
Pearl Drive and 30 Fourth Street from
botser drive to Coler Court uh the
[6:34]
kleinfelter Park Trail and the Liberty
Point Trail this is a map showing those
[6:44]
locations within the
city these are the projected final total
[6:51]
project costs so
um the second column from the left is
[6:57]
the estimated cost at the public
hearing now there after the public
[7:04]
hearing there was a change an amendment
to the scope of the project so again the
[7:11]
that First Column with numbers is the
the estimated cost at the public hearing
[7:15]
after that scope changed that middle
column shows our estimated cost at the
[7:20]
public hearing just of that amended
scope which is smaller which will be uh
[7:25]
detailed later and then on the on the
right we have
[7:30]
the projected final cost of the project
as we sit tonight after the project has
[7:36]
been bid so our con as we sit tonight
our construction total is
[7:42]
$786,500 we then have $3,000 for the
feasibility report
[7:48]
$181,000 of design and construction
engineering $115,000 of soil borings
[7:55]
$63,000 of legal fiscal and
administrative costs for a grand total
[8:00]
of 1,75 th000 $75,900
[8:08]
so again this this is the project area
based on the original scope so you can
[8:14]
see
the project
[8:17]
costs get my laser pointer here you can
see the estimated costs here in this
[8:23]
column and then again our our proposed
final cost here so this morning Side
[8:29]
neighborhood leaf road and polar Circle
are no longer part of the project
[8:34]
area for this year's project for this
year's project yep they've simply been
[8:40]
delayed um so here this is the the same
column just with these these uh delayed
[8:47]
areas deleted out so you can see the
kind of the the Apples to Apples
[8:51]
comparison so um originally we had an
estimated cost of roughly $1.3
[8:57]
million and here we sit at 1 Point
[9:03]
1.75 so Project funding again the
original the original scope here we see
[9:09]
the preliminary special assessment
Revenue um we were projected to be at
[9:15]
$1.46
million with a city subsidy of 1.29
[9:20]
million again for a total of
[9:27]
2.75 with these areas deleted those
numbers drop to 530 roughly
[9:32]
$535,000 of special assessment Revenue
that's the estimate at the public
[9:37]
Hearing in January a preliminary City
subsidy of
[9:42]
$782,000 for that same total of roughly
1.3 million and on the bottom we have
[9:50]
the the
projected numbers as we sit tonight so
[9:56]
in the Forest Manor subdivision we we
have roughly
[10:00]
$120,000 of special assessment revenue
and in the industrial park east which
[10:05]
would be um um Pearl Drive sorry Pearl
Drive we have 200 roughly
[10:13]
$210,000 so here you can see the city
subsidies and the proposed totals uh the
[10:18]
Klein felter Park Trail and the Liberty
Point Trail none of those costs are
[10:23]
assessed so those that's a 100% City
subsidy so we end up with roughly 31 %
[10:29]
of the cost being borne by the
assessments and uh the balance being
[10:34]
borne by the
[10:37]
city some some information on the
special assessments um so we are
[10:41]
following the city's special assessment
policy it has been and continues to be
[10:45]
the policy of the city of St Joseph that
when infrastructure improvements are
[10:49]
constructed provided benefit to a
particular area those costs shall be
[10:54]
levied against benefiting properties
selected assessment basis or methodology
[10:59]
is meant to balance equity and
distribution of special
[11:03]
assessment the city commissioned a
special assessment benefit report by a
[11:07]
third party to identify a range of
Market benefit by the project so that's
[11:12]
what gives as we'll see later that gives
a a maximum assessment value a cap to
[11:17]
each to each area or each lot um that's
determined differently based on the type
[11:22]
of the type of
property uh that we are looking at so
[11:27]
here we have those numbers uh Again by
the third
[11:31]
party third party uh special assessment
benefit report so for Kiwi Court kale
[11:38]
court and 295th Street for all of these
areas a single family residential home
[11:44]
the maximum Market benefit the cap as it
were for the assessments is $10,000 per
[11:51]
lot uh for areas AB budding those
project areas with raw land that maximum
[11:58]
Market benefit was found to be $500 per
acre in the industrial park Pearl Drive
[12:05]
304th Street Industrial Lots greater
than five acres in lot size the maximum
[12:12]
Market benefit is 5 cents per square
foot for industrial Lots under five
[12:19]
acres in lot size that that maximum
Market benefit is 25 cents per square
[12:24]
foot and for vacant industrial
properties the maximum Market Ben
[12:29]
benefit was found to be 15 cents per
square
[12:34]
foot more information
[12:38]
here these specially assessed benefits
are derived from
[12:44]
surface
improvements the city's policy is that
[12:48]
up to 60% of Street overlay and
reconstruct costs can be assessed 100%
[12:54]
of the street costs are typically
assessed to Annex properties with no pre
[12:59]
assessment unless Council determines
otherwise and up to 100% of New Street
[13:04]
curb and gutter costs could be assessed
as well as 100% of new sanitary storm
[13:10]
sewer water main
costs so that leaves roughly 40% or more
[13:15]
of the cost to be subsidized by the city
um as we saw in that previous slide that
[13:20]
number is typic typically higher than
40% special assessments for the
[13:25]
subsurface improvements are calculated
on a per per unit basis
[13:29]
we do not have any of those
here special assessments for the surface
[13:36]
improvements are calculated on the basis
of Frontage per lineal per lineal foot
[13:40]
so that is the the Frontage that your
property AB buts to the
[13:45]
street so for regular interior Lots 100%
of your budding footage for the
[13:51]
Improvement is assessed uh on a
rectangular corner lot the sum of 100%
[13:58]
of the short side footage and 50% of the
longside footage is assessed we'll see a
[14:04]
we'll see an example of that later and
for irregular sized Lots 100% of the
[14:09]
average width of the lot AB buding the
Improvement is
[14:16]
assessed these are the assessment rates
again we have the estimated preliminary
[14:22]
assessment rates from our public Hearing
in
[14:25]
January and then our proposed final
special assessment rate here on the
[14:30]
right so you see the Forest Manor
subdivision the original estimate was
[14:36]
$497 cents per linear linear
foot we came to
[14:42]
4385 tonight for the industrial park the
original estimate was
[14:49]
$852 per linear foot of Frontage and
here tonight we sit at $863
[14:59]
these special assessments may be paid in
annual installments over time the that
[15:05]
typically is a market rate uh for this
for this year the term is 10 years and
[15:11]
the interest rate is
5% no interest will be charged if that
[15:15]
special assessment is paid in full
within 30 days of the adoption of the
[15:19]
assessment role so assuming that the
assessment role be adopted tonight if
[15:24]
you pay that full amount within 30 days
you won't be charged interest for this
[15:28]
first year so that date that deadline
would be September 4th of 2024 of this
[15:34]
year the first installment is payable
honor before the first Monday in January
[15:40]
of the following year so January 2025
would be when that first payment is
[15:50]
due you must pay the pay city the entire
remaining amount with acred interest or
[15:55]
sorry you may pay you may pay off your
assessment full at any time that in that
[16:02]
assessment that interest acrs up to
December
[16:06]
31st so that needs to be paid before
November 15th or the interest will be
[16:12]
charged through December 31st of the
succeeding Year and that is based on the
[16:17]
Minnesota 429
statute you may also partially prepay
[16:22]
the assessment with any balance being
certified to the county auditor for the
[16:26]
collection under the terms previously
described in the other
[16:32]
slides there there is an opportunity for
deferrals if uh certain criteria are met
[16:37]
if you are a senior disabled or on
active duty military and the assessment
[16:43]
is over $3,000 you can request a
deferral um this is this doesn't this
[16:49]
doesn't um wi get rid of any of the
assessment it's it simply defers it for
[16:55]
a set amount of time
[17:01]
uh this is just the process for those
for that deferral one would need to
[17:06]
apply apply with the city fill out
Financial disclosure form within 30 days
[17:12]
of the
assessment at which time the city
[17:16]
council would Grant or deny that
[17:20]
deferral all right assessment
appeals no appeal may be taken as to the
[17:27]
amount of an assessment unless a written
OB rection by the affected property
[17:30]
owner is filed with the municipal clerk
prior to the hearing or presented to the
[17:36]
presiding officer at the hearing so if
if you do want to appeal your assessment
[17:42]
you need to do so in writing either at
tonight's
[17:46]
hearing or to the municipal
clerk Council may consider the objection
[17:52]
at an adjourned meeting uh the owner May
appeal an assessment to The District
[17:57]
Court
and they must serve notice upon the
[18:01]
mayor or city clerk within 30 days after
the adoption of the assessment and file
[18:06]
such notice with the district court
within 10 days after service upon the
[18:11]
mayor or the city
clerk okay so here we have the special
[18:17]
assessment example if you remember the
the example of the corner lot 100% of
[18:21]
the short side and 50% of the long side
so say we on Kiwi Court if you have an
[18:28]
80 foot spot so our assessment rate of
4385 * 80 ft gets us to an assessment of
[18:38]
358 and here we have an example from the
industrial park 863 times a 100t
[18:46]
lot gets us to an assessment of
$863 now we don't have this situation
[18:52]
here
but if if we had a corner lot that was
[18:57]
that was on an intersecting street that
had these two different assessment rates
[19:02]
on them we would assess 100% of the
short side which is the 80 foot side and
[19:09]
then we would take half of the footage
of the long side and multiply that out
[19:15]
so that total assessment would be
$753
[19:23]
50 finally we have a schedule again we
had our we
[19:30]
wrote our feasibility report in
December and that was approved by
[19:34]
Council December 18th we conducted our
public Improvement hearing on January
[19:38]
16th where Council ordered preparation
of plans and
[19:42]
specifications the original the original
bid the original scope of the project
[19:47]
bids were opened on May 13th after which
bids were uh the project scope was
[19:52]
amended so Count Council authorized the
advertisement for bids for this scope
[19:58]
scope the amended scope on June
17th Council declared the cost to be
[20:04]
assessed on July 15th the public bid
opening for this this project was on
[20:11]
July 11th here tonight we are conducting
the special assessment
[20:16]
hearing uh Council May award the
Construction contract and adopt the
[20:20]
assessment role tonight if that happens
construction will start September of
[20:25]
this year and be complete substantially
complete and October of this year and
[20:31]
final construction will be complete in
by May of
[20:36]
2025 with that I can take any questions
uh from from anybody at this
[20:49]
time you live within the city and uh
respect to anybody else that might be
[20:54]
speaking tonight we want to try and keep
it to around three minutes or less so
[20:58]
any anybody would like to speak or have
questions for them you're welcome to
[21:02]
step
up a separate issue question just step
[21:08]
up to the podium to State your
[21:13]
question my name is Dan rat here and I
represent our Family Trust uh which
[21:20]
involves eight children and we own the
farm uh with land along 295
[21:29]
and I guess just I I wanted to keep this
really short so I just had one question
[21:34]
we going through the uh how you figure
the assessment
[21:40]
so 49 Acres along a
road times 500 that's what it how it
[21:48]
comes to what it is then or yeah yes sir
so if the field was going the other way
[21:54]
and it was 100 acres it would
be done the same way well I should back
[22:00]
up the the the $500 per acre is the
maximum Market benefit so what we do
[22:09]
initially is we'll take the Frontage the
Frontage that you have that abuts the
[22:13]
road and multiply that by by that rate
that 40 40
[22:20]
49485
4385 so then from there if I remember
[22:25]
correctly your lot in
particular did did breach that maximum
[22:30]
Market benefit it was over you know 49
Acres multiplied by $500 so you you pay
[22:38]
that max amount that's that's the
assessment value the rest of it
[22:42]
is covered by the city subsidy okay so
yes if you had if if what you're asking
[22:48]
is if you had a a a longer skinnier lot
where you had more front edge your your
[22:53]
original assessment rate would be
higher if the field
[22:58]
I don't want I my question is more like
if the field went away from the road
[23:04]
didn't butt up to the road anymore would
it' be a bigger
[23:08]
assessment if you had less footage along
295 then then potentially your
[23:13]
assessment would be less right so we're
we're comparing two things the
[23:17]
assessment rate is looking at the the
abing footage along
[23:22]
295 and then the subsidy or the the the
maximum cap to the assessment is based
[23:27]
on the
times uh the $500 per
[23:32]
acre okay uh so anyway
um The Family Trust would like to
[23:41]
politely ask for um what you would call
a
[23:47]
deferment um they did this for us when
they put the water man along our land
[23:52]
for the apartment building and we had it
was 15 years or if we sell any land we'd
[23:59]
have to pay the assessment and it was
interest
[24:03]
free um and we'd like to be considered
for that I it sounds like what you were
[24:10]
we'd have to put that all in writing the
request or you'd need to have Chang
[24:14]
since last time we did this you need to
have that in writing written out and
[24:20]
signed this evening and either deliver
to the mayor the mayor is not here I'm
[24:24]
the acting mayor so either deliver to
myself or David the city administrator
[24:29]
so tonight you need something in writing
that asking for the
[24:34]
deferral what and
okay and then I have another
[24:40]
question do the microphones in here only
record or they supposed to amplify
[24:48]
voices they're supposed to do both okay
thank you but I guess um as far as um my
[24:56]
experience in with with taking appeals
um it can be something that you can you
[25:01]
can handr write it's just you need to
appear uh ask for the ask for what you
[25:05]
want and then um you can just put it in
a piece of paper you know it doesn't
[25:10]
have to be overly complete or formal it
can be fairly informal last time we did
[25:15]
this we just did it at a meeting like
this may SCH took a okay it's possible
[25:22]
the 429 rules might have changed I
because the process we're following is
[25:26]
through the 429 process but well I'm
understanding there's maybe two
[25:29]
questions here uh the deferral versus
appeal two different things so the
[25:34]
deferral would be we not we know over
the bar yeah so then the deferral can
[25:40]
occur after Council action tonight so
the there isn't a Time sensitivity if
[25:46]
you're not appealing if you're seeking a
deferral there's a separate form that
[25:50]
that staff can provide you after after
the close of business here for you to
[25:55]
submit your deferral request okay So
yeah thank you if I may sure So Randy
[26:01]
thanks for that clarification so on the
deferral um Bryce you had that slide up
[26:06]
on deferral
parameters and it said a senior a senior
[26:11]
citizen or person that's considered a
senior can request a deferral what's
[26:17]
senior is that age 65 I think it's age
655 it's that's defined in statute as
[26:22]
well but yeah and then Bryce you said
deferral is you said something like time
[26:29]
to be determined or I mean how long can
a deferral
[26:34]
last so the the statute would Define the
maximum deferral of 30 years okay and so
[26:40]
there are conditions for which then the
deferral would have to be paid often
[26:44]
times it's sale of the property so that
that'll be something that the council
[26:48]
considers but the statute by itself
defines certain conditions for how long
[26:53]
uh the deferral would last a person
requesting a deferral would go to City
[26:57]
administ minator or city clerk correct
but then the council has to approve it
[27:02]
correct so they'll make
application uh you know build their case
[27:06]
as to why there's a hardship and why a
deferral is being requested and then the
[27:11]
council makes the determination of
whether a hardship exists or or not but
[27:17]
under 429 it sounds like the state says
if you're a senior why wouldn't you be
[27:22]
granted a deferral you well there's
still and even and on Bryce's slide for
[27:28]
example the principle has to be rise to
a certain level uh in terms of how much
[27:34]
of the assessment is owed so for example
it has to be over $3,000 I believe is
[27:38]
what the ordinance describes is is is a
hardship so depending on the conditions
[27:46]
um for some that that there may not be
an actual
[27:50]
hardship well if it's only the 3,000 but
if if the person's a senior are other
[27:56]
factors enter in like net worth or
income exactly so I mean just because
[28:01]
they're a senior doesn't necessarily
mean that the assessment represents a
[28:05]
hardship some some seniors may have the
resources to to to pay the assessment
[28:10]
what if they're a
veteran Sim similarly though the the
[28:14]
veterans case or or active duty case if
they a way on active duty uh that's
[28:20]
typically where the hardship might might
come into play I think there's some
[28:24]
discretion on the council's part for for
this and I believe and I believe this
[28:28]
statute references active duty versus
veteran okay all right that's all I
[28:33]
had my name is Jacob frame I'm at 29436
scale
[28:38]
courtt you plan on repaving our
road uh we we have no Services we were
[28:44]
annexed in 18 at some point services
will be brought out will the road be
[28:52]
substantially destroyed through that
process will we have to go through
[28:56]
another system like this and P more
money for a road that is perfectly fine
[29:01]
as it sits today so that that is one of
the challenges that the city has to to
[29:07]
to reconcile or you know with respect to
a road that has deteriorated to the
[29:12]
degree that we we're seeing in in kale
court or
[29:16]
295th um so the answer to your first
question is potentially and potentially
[29:22]
I say because it depends on the timing
ideally um the city wouldn't have to
[29:28]
entertain extending Municipal Utilities
for for some time into the future and
[29:32]
and the road is aged uh if we're
presented with petitions to install
[29:38]
sewer and water because well and septics
have have failed or or some
[29:43]
environmental issue like that we'll have
to cross that bridge when we get to it
[29:47]
but that is certainly one of the
challenges that the council had to
[29:50]
consider with the nature of this
Improvement is how do we continue to
[29:55]
maintain a street in in the condition
that we're seeing in kale court or 295
[30:01]
you keep I'm sorry to interrupt but you
keep saying kale and Q as they're the
[30:05]
same condition there's they're in
similar conditions but I beg to
[30:10]
differ it's not even
close so but that that's the the nature
[30:17]
of it is is we have to consider whether
or not the road in its present condition
[30:22]
is still
serviceable and the council's we've made
[30:26]
the conclusion that that it was time to
make that Improvement at the same time
[30:30]
as
295th so to be clear City Council
[30:35]
Members you agree and approve that qwi
and kale are at the same deterioration
[30:42]
level we weren't in agreement that
they're at the same deterioration level
[30:46]
but in previous meetings we've looked at
the Integrity of them the quality of
[30:50]
them and we agreed that they both need
replacing we we didn't agree that like
[30:56]
they were equal and Det
[31:00]
do you take into account the fact that
we're at a dead end street we have very
[31:04]
little
[31:08]
traffic was that taken into account I
can't hear you was it taken into account
[31:14]
that we're on a dead end
street we have no
[31:19]
traffic no that wasn't considered was a
good uh I believe I'm going off to the
[31:25]
engineer's recommendation
on the conditions of the
[31:31]
court I I think we'd accept that if if
if your point is there's not through
[31:35]
traffic or other traffic from other
parts of the community coming through
[31:38]
yes we we we recognize that kale and
kiwi in the end of 16th Avenue serves
[31:45]
your neighborhood P predominantly that
we don't have other traffic coming
[31:48]
through your neighborhood solely we
would AC predominantly solely pardon me
[31:53]
solely so solely yes unless someone's
lost or you've got deliveries
[31:58]
uh yes the traffic in your neighborhood
is limited to the people that live back
[32:06]
there thank
[32:15]
you my name is Sher langth I live at
29457 kale Court
[32:22]
uh my neighbors and I most of us um we
have brand new neighbors three homes in
[32:27]
tale Court have just sold since January
1st we have someone who just put over
[32:33]
$30,000 into a brand new septic system
our septic system is very new majority
[32:38]
of the septic systems there are very new
uh the neighbors that I have spoken with
[32:43]
we're all very against this project
because we feel that our court uh the
[32:49]
pavement there is fine especially for
the small amount of traffic that we get
[32:54]
uh against what we're being levied and
assessed uh there's there's also here my
[33:00]
question uh is as far as kale Court uh
for a maximum Market benefit what is
[33:05]
that based on for $10,000 per lot
because that's saying I believe if I'm
[33:10]
not mistaken having been in real estate
for quite some time that that's the the
[33:17]
benefit that each lot could see but what
is that based on and what is I mean
[33:22]
that's the very maximum and yet many of
us are seeing well Corner Lo are going
[33:28]
to be considerably more ours is almost
$7,000 in assessments uh we do not have
[33:34]
we've gotten bills recently they've been
talking about we don't we don't have
[33:38]
street lights we don't have city sewer
or water people have spent a lot of
[33:44]
money to keep themselves on septic to
keep themselves uh I think and the
[33:51]
majority of people who have now recently
bought in uh were unaware that lot of
[33:58]
these things were even in the works are
coming we bought our house just a few
[34:01]
years ago and you know we had a newer
septic system we weren't even aware that
[34:08]
there had been some sort of annexation
uh that we would
[34:12]
be uh
possibly uh facing uh we don't have city
[34:18]
garbage service um these are the things
that they want to try talk to us about
[34:22]
we don't have city garbage we don't have
sewer we don't have water we don't have
[34:26]
street lights
uh I believe the majority of the people
[34:30]
that live there find it very unfair that
we should have to bear any of that
[34:34]
burden when we don't have any of those
services and to come in and do a Paving
[34:40]
project and then talk about if you're if
it's not being down that time then again
[34:44]
later on coming in to do these things
will rip things up again um this just
[34:49]
puts kind of an unfair burden on us uh
for I mean if we were to show I mean if
[34:56]
we were to bring in pictures
um and take a look at our road is in
[35:01]
relatively good condition in kale Court
I don't spend a lot of time in Kiwi
[35:05]
Court uh but I know as far as kale court
and even most of the road on
[35:11]
295th there's one corner that
looks uh somewhat worn but the rest of
[35:18]
it is in relatively good condition
especially when we don't have any of
[35:22]
these services and but I guess back to
my question is what is this Mar maximum
[35:28]
Market benefit um because some of the
people that are having Corner lots are
[35:33]
going to be well over their assessment
is going to be well over what the
[35:37]
maximum Market benefit that they're
looking at could be so to address that
[35:42]
question so the the third party that the
city engages that that provides the
[35:46]
opinion takes a look at similar types of
property as as yours in Ko and kiwi
[35:53]
court so rural rural properties with
similar condition stream Street and they
[35:58]
look at before and after and so they
offer an opinion as what is the increase
[36:02]
in market value that a parcel like yours
would see before or after such an
[36:09]
improvement and so the $10,000 is their
opinion of what that increase in market
[36:13]
value if you were to sell your property
tomorrow after the Improvement by
[36:18]
comparison to what it was worth prior to
the Improvement but that's a maximum
[36:22]
what is the actual I mean is there an
like more of an actual Market value
[36:27]
versus um like what it would be versus
what the maximum is because most of us
[36:33]
are going to be looking at being close
to the very maximum when that's the
[36:38]
maximum so so the maximum is saying the
city or what the city would be able to
[36:42]
Levy would be an assess a special
assessment up to $110,000 in your case I
[36:47]
think in your example you said the
assessment was close to 7,000 7,000 so
[36:50]
there in their opinion that parcel could
bear an assessment even higher based on
[36:56]
the Improvement that's proposed by the
city so that's why in the case of when
[37:01]
we talk about a a city subsidy or the
difference if your assessment was
[37:07]
$113,000 for example for a corner lot
then it would have been capped at
[37:12]
10,000 in this case you're you're under
the $10,000 cap so but for somebody who
[37:17]
is on a on a corner lot then their cap
is
[37:20]
$10,000 yes corre so correct and there
there are three um there are three
[37:27]
thoughts out there that the proposed
assessment was higher than the than the
[37:31]
cap and so then they were limited at the
[37:35]
$10,000 okay yeah I just I don't the
other aspect that you asked that that
[37:41]
doesn't come into the appraisers
analysis is whether or not uh there was
[37:46]
a street light or city refuge service or
those types of things those are
[37:50]
independent of of the Assessor's
evaluation of the property so they're
[37:54]
looking at before and after conditions
yeah we don't I mean we can't even get
[37:59]
decent internet out there because nobody
will come out there so we
[38:04]
are I mean that's it's
[38:10]
it's it's difficult because the amount
that you're asking from everybody you
[38:17]
know is is you know for most of them are
going to be fairly close to that cap and
[38:23]
I don't know that everyone's just going
to see
[38:28]
in real estate we can just tack on
$10,000 because that road that's like
[38:33]
everyone's going to have an expectation
when you go in and you buy a house that
[38:38]
there's going to be toilets there it's
not that versus a working one versus a
[38:42]
non-working one the the pavement is in
as not a bad a shape
[38:48]
that the amount that we're getting back
out of it I just it it doesn't make
[38:53]
sense uh especially seeing as how it's
not
[38:58]
it's it's really you know it's in pretty
decent shape and there's no way we're
[39:03]
going to realize a
$10,000 um Market benefit on having um
[39:09]
new Pavement in
[39:18]
there can't we need you to come to the
podium so it can be recorded
[39:27]
three three of our neighbors sold in the
last year and they ended up giving the
[39:32]
new buyers money so this is not a
positive improvement from a from
[39:41]
a property value it's a
reduction so it's difficult for us to
[39:48]
address that we have no idea where they
listed their property whether it was
[39:51]
above or below market conditions and
admittedly they're selling with the
[39:55]
street in the condition that it's that
it's in so the market was it sounds like
[40:00]
in those instances determined that they
were asking for too
[40:03]
much no there was discussion within the
agreement knowing that there was going
[40:10]
to be a special assessment and the buyer
said that's nice but you're going to
[40:15]
take a certain amount of money off of
the cost of the house because of the
[40:19]
assessment and that's typical in in real
estate or transactions that the the real
[40:25]
estate agent for the buyers will usually
approach the city to find out if there
[40:30]
are what's called pending special
assessments so there's a process to
[40:33]
understand if there's a public
Improvement that's pending and so I
[40:37]
think the question that you asked or
someone had asked new buyers how do they
[40:41]
become aware of a project if they
weren't weren't there there's a process
[40:45]
built in for which they can find out
whether or not pending special
[40:50]
assessments would apply then how can it
be considered a positive
[40:55]
Improvement I'm maybe not following your
the the nature so they've they've
[40:59]
accounted in the they would pay more
money for the property so what it sounds
[41:03]
like they did the property would have
increased they have accounted for the
[41:08]
Assessments in the transaction is what
it what it sounded
[41:13]
like
[41:25]
okay my name is Kevin afin and I also
live on Kel Court I have a corner
[41:31]
lot and uh when the area got an i or
when we got into the city they were
[41:41]
mentioning you guys were mentioning that
there was not going to be any
[41:46]
Improvement in that area for seven years
well it hasn't been seven years
[41:53]
yet so I'm under trying to understand if
Mr M Mr ass here sold those lands and
[42:01]
he's going to develop it all if it's or
you going to wait until this development
[42:07]
comes in first
before before they would start to uh s
[42:14]
uh sell land or whatever and build h
Homes out there that's what I can't
[42:19]
figure out why you would want all
this uh maintenance done now when down
[42:27]
the road that's going to
happen and it could be 10 years down the
[42:33]
road could be 15 by that then we'll have
to redo everything again and I don't
[42:40]
understand your your ideas of uh why you
want to get everything done now that's
[42:48]
totally insane it's going to take cost
us like all these people that are on
[42:54]
this that are on this for our um paying
for this we Improvement it's over almost
[43:02]
a half a million dollars you think we
got half a million dollars just to throw
[43:08]
and do this for our roads
no we have other things that we need to
[43:14]
use for kids
families this is too hard to do that
[43:21]
thank you for listening
[43:32]
good evening I'm Kyle R I'm at 29410
kale Court uh I am one of the the new
[43:37]
folks to the neighborhood and um I guess
I'm kind of getting up to speed on this
[43:42]
when you say uh these improvements can
you just explain is this just repaving
[43:46]
are you tearing up the road are you
resurfacing can you just explain what
[43:49]
you are doing yes we they they'll it's a
reclaim and repave so what they'll do is
[43:54]
bring in a machine and grind the
existing bis bituminous surfacing with
[43:58]
the underlying aggregate base so they'll
blend those materials and then they'll
[44:02]
grade that and and PVE pave new pinus on
top of that so it's not a widening
[44:09]
project it's not uh we're not improving
kale or kiwi or 295th to City standards
[44:15]
which would typically be an urban
section uh so we're we're attempting to
[44:21]
rebuild what what is essentially there
and and the nature or the width of those
[44:25]
streets do not meet standards uh they're
they're much more narrow but we're
[44:30]
looking to put back as close as we can
the conditions that that are in kale and
[44:34]
Kiwi Court in 295th today so the
approach was to be mindful of the fact
[44:40]
that Municipal Utilities are are are not
present uh city is quite honestly Trying
[44:46]
to minimize its investment in in Rec
reconstructing the street those that are
[44:51]
in the neighborhood you know we've
likely observed we've had a patch uh a
[44:55]
couple of areas already on on the street
we have concerns about the longevity of
[45:00]
being able to continue winter
maintenance and plowing without peeling
[45:03]
up much more of the road so that's the
Genesis behind what the council was
[45:08]
considering in terms of improving it now
uh because of we've already had to
[45:12]
invest in patching uh to try to hold it
together so you said it's deteriorated
[45:18]
to the point you can't provide the
city's
[45:21]
Services those city services as we said
are not storm water management
[45:27]
they're not garbage pickup it's snow
removal is that the only city service
[45:32]
that you're considering that needs to
improv that's been maintained or that's
[45:35]
been provided so the neighborhood hasn't
petitioned the city to the best of my
[45:39]
knowledge for Municipal Utilities uh
certainly their Municipal Utilities are
[45:44]
nearby but but not what we would
consider at the doorstep of of the
[45:49]
subdivision so I think the question was
asked about other property that that may
[45:54]
or may not develop that that wasn't uh
the council's consideration in terms of
[45:59]
whether to proceed with um the street
improvements um I ideally those two
[46:05]
things can time together that the
availability of sewer and water and the
[46:09]
deterioration of the street or the
Improvement in the street could time
[46:12]
together um oftentimes we're faced with
just this very condition that the road
[46:17]
is something needs to be done with the
road before we're ready it sounds like
[46:21]
the Improvement needs to happen for City
Services not necessarily for the
[46:25]
residents living there uh as as I'm
hearing some of my neighbors say and I
[46:32]
in the two short months I've been there
would agree it's fine for the low amount
[46:36]
of traffic so if it's deteriorated to a
point uh is that the are you comparing
[46:41]
that is the is it just a
Citywide standard you're trying to meet
[46:46]
there and if so you know the traffic is
so much lower out there should we be
[46:51]
holding that at the same standard as
city streets that may much higher
[46:55]
traffic right the standard has been can
can we maintain can we can the city
[47:00]
conduct winter maintenance activities
without causing further damage and and
[47:04]
so we've already seen where uh winter
maintenance activities are picking up uh
[47:10]
pieces of of of the street because it's
it's deteriorated to a point and so when
[47:15]
the city now has to invest additional
funds to patch or or pay P or pay for
[47:21]
binus patching multiple times and we're
Beyond just pothole patching there's
[47:27]
cost Effectiveness question that the
cities have to address is is it
[47:30]
continuous is it continuing to be cost
effective for them to patch areas of
[47:35]
Street as it gets peeled up by by winter
maintenance
[47:39]
activities okay uh thinking more long
term is it sounds like we may have to re
[47:46]
think about this again or or come to
this um this idea again down the road if
[47:51]
other services is there long-term
planning for the Forest Manor what what
[47:56]
things are we thinking about there is
this so there there certainly has been
[48:00]
long-term planning since well even 2008
uh when we look at our our Municipal
[48:05]
utility service areas the the the
annexation that occurred in
[48:10]
2018 all those things are are are
considered but typically when we're
[48:14]
looking at extending utilities it can be
for as I mentioned earlier failing of
[48:19]
well and septics so there's a health and
safety issue that that has to be
[48:23]
addressed that could be one development
activity nearby where utilities are even
[48:28]
closer to the subdivision that that's
another consideration um but certainly
[48:33]
that area has been planned for the
eventual uh extension of utilities but
[48:38]
uh just because it's been planned
doesn't mean that it that the extension
[48:43]
of those utilities are imminent so
there's a lot of factors that would go
[48:45]
into play as to whether or not the city
makes the decision to to invest in
[48:51]
extending the utilities sure so it seems
that the only really imminent thing is
[48:56]
the potential damage to a snow plow
that's not even so much the snow plow
[49:00]
it's the damage to the
road okay it seems yeah I guess just
[49:06]
hearing all this it seems that there's
longer term planning that needs to occur
[49:10]
before a short-term project like this
that may be uh may be moot or obsolete
[49:17]
in in a not very distant
[49:23]
future may I so in my thank you for your
comments thanks for your comments and to
[49:32]
the other
[49:34]
residents in my four years on the
council as I've wrapped my brain around
[49:39]
these hearings and Street
improvements the city has a standard
[49:44]
Street Improvement
program
[49:48]
which I embrace it it's it's not a short
term it's building a road
[49:56]
that is planned to last or or improving
a street that's planned to last for is
[50:03]
it up to 20 years P you know with
maintenance we get past 20 so we our
[50:08]
goal is to get to at least 30 so we've
had in my experience
[50:15]
other hearings where residents and I
totally understand it they're looking at
[50:20]
the road saying my Road's fine why in
the heck are you GNA redo it charge me
[50:27]
an
assessment it's because 5 years down the
[50:31]
road pun
intended that street if it wasn't
[50:35]
improved then could get worse and then
you have to do do it then and it's going
[50:43]
to cost more money so we just have a
standard in St Joseph to keep our
[50:50]
roads um up to
date and I know for people on Kale you
[50:58]
compare it to 295th or
kiwi uh no one here I don't think
[51:04]
there's anyone here from kiwi if for
good reason because their road is turned
[51:08]
into a asphalt Beach um so
it's it's not
[51:15]
easy it's hard to look at these
assessments but it it's not a short-term
[51:21]
fix this is for the longterm and we
don't know when develop m is going to
[51:27]
occur out there uh that's an unknown is
it 5 years 10 years 20 years that that
[51:34]
area where Field Street
terminates and going Beyond is just you
[51:39]
know it's it's not nothing's happening
in that area as far as we know so that's
[51:44]
my comment Street Improvement
program am I right yes so the city is
[51:53]
we're actually on our third third update
to uh a street maintenance program uh
[51:59]
which is intended to improve the
longevity of of St Joseph streets and so
[52:04]
what what council member cluser is
referring to particularly when we're
[52:07]
dealing with
overs I mentioned the original design of
[52:12]
binous streets typically accounts for a
20-year life cycle and we stretch that
[52:18]
to 30 years or more with maintenance
that is involving crack sealing what we
[52:24]
call aggregate ship seals and overlays
and so what councelor cluser is
[52:28]
referring to is when we have an
assessment for an overlay that overlay
[52:32]
may occur at year 15 of that street age
uh and people look at their street and
[52:38]
they say gez I don't see potholes I
don't see it all cracked up the reason
[52:42]
for the overlay at that point is that we
have to time these so that we stretch
[52:47]
the life of that street to get to 30
years if we try to do it at year 25 once
[52:52]
the potholes and the cracking show up
it's too late and so the city has its
[52:57]
third generation of Street Maintenance
improvements with the intention that we
[53:02]
stretch the life out of our streets
hopefully to 30 35 years with properly
[53:07]
timed
improvements and D kiwi uh um did kale
[53:13]
and K Court just have it resurfaced
about five seven years ago I've been
[53:20]
working with the city since 2007 in in
kiwi and K Court in 295th certainly
[53:25]
weren't part of the
city as that early but there hasn't been
[53:29]
an investment from an overlay
perspective unless the township did
[53:34]
something prior to the annexation I'm
almost positive I've been there 42 years
[53:39]
and it has been done I'm almost positive
has been done a couple times and then it
[53:46]
was also where the cracks were filled in
with that tape and that yep I've seen
[53:51]
that so that's that's to prevent the
moisture from getting in but with the
[53:55]
degree of cracking and Det deterioration
that we see out there now if if if
[53:59]
anybody told you that that could be
overlaid and you'd see the life out of
[54:03]
an overlay uh you were misled uh the
conditions have deteriorated to the
[54:08]
point that we can no longer do a
inexpensive overlay and what we're
[54:12]
proposing with the reclaim and pave is
the next next most economical thing that
[54:18]
could be done to improve that road okay
so then we improve this road now and
[54:25]
then you're saying
we pay everybody pays whatever their
[54:29]
amount of money it is and then nothing
gets done out there no building gets
[54:35]
done out there no sewer lines or
anything getting done out there either
[54:41]
just the road in terms of what's
proposed this evening correct it's it's
[54:47]
just the pavement and similar with
$10,000 just for my little stretch Road
[54:54]
there so now you now you're also
appreciating the point if if we were
[54:58]
talking sewer water storm sewers carbon
gutter Street reconstruction we'd be
[55:03]
talking cost much more significant than
what we're talking about this evening
[55:08]
it's all the more reason why it's a
challenge for the city that's that's
[55:12]
totally insane to do it that way put the
road down and then come back and do
[55:17]
sewer and water later and all that and
you got to tear up the road again no
[55:23]
come on we're not say but we're not
saying that sir even if the property
[55:27]
adjacent develops that isn't a precursor
to extending sewer and water into 295th
[55:33]
or kiwi or kale they're mutually
exclusive so the rasier property could
[55:37]
develop if if that happens in the next
10 years that doesn't doesn't it isn't a
[55:43]
precursor to utilities having to come
into kiwi or kale Court
[55:57]
too far
[56:01]
out I'm not sure I'm I'm following could
you please go to the podium again I'm
[56:06]
sorry we need to have it
[56:18]
recorded if the question is what what's
the minimum amount of time before the
[56:22]
city would reconsider uh sewer and water
I I
[56:28]
I'm sorry Kevin we need to have you at
the podium so it can be
[56:32]
recorded I apologize
Kevin I'm
[56:36]
sorry no I'm not talk I'm not talking
about the sore and water I'm talking
[56:41]
about just the actual Road that's going
in for us that's going to go in
[56:50]
there and say five years from the sewer
and water comes in all that money that
[56:57]
we put into that
road that's all going to get destroyed
[57:02]
on uh because of sewer and water coming
in there so in your example if the
[57:08]
determination that sewer and water would
be extended into your neighborhood and
[57:12]
the streets needed to be reconstructed
at only five years old the city would
[57:16]
not be able to likely Levy assessments
for Street improvements again because it
[57:21]
is so such a short period of time they
wouldn't do it
[57:26]
they they wouldn't be able to Levy
special assessments for the street
[57:30]
improvements again if it occurred with
years correct we wouldn't be able to
[57:34]
prove the benefit we wouldn't be able to
yeah you'd still have a a newlook street
[57:39]
we wouldn't be able to do the same kind
of analysis and demonstrate that there
[57:43]
was an increase in benefit in in your
example now I hope I'm not around to
[57:48]
have to entertain extending sewer and
water in in five years if that question
[57:53]
came up but right but that's legal
[58:03]
would that number would drop say it's
$10,000 now if the road was in better
[58:08]
condition that Max benefit would be
maybe it would be$ 1,000 or or you
[58:14]
wouldn't even be able to assign a Max
benefit to it but that number would be
[58:18]
lower if if at all right yes yes if if
at all
[58:30]
hi I'm Ryan Parsons I have a parcel on
Elm Street and um I don't know if Elm
[58:35]
Street was struck from the agenda at the
beginning of the meeting or or what the
[58:38]
future of that looks like for um for
hearings and assessment and all that but
[58:42]
the numbers are starting to roll in and
thank you so much you know you guys for
[58:45]
meeting me out there um I really
appreciate your responsiveness on all
[58:48]
these questions that I have um am I able
to ask them tonight now that that's been
[58:53]
struck or yeah I would say you did
received the notice um the for that uh
[58:59]
the yeah your portion of that project
was we talked about earlier was to is
[59:03]
being delayed until next year due to the
because we don't have the the access for
[59:08]
the right away there yet so um it is
still the public hearing you did receive
[59:12]
a notice for it so I would think we
would be able to um hear your questions
[59:17]
and and answer what we can so I I don't
think that that would be
[59:20]
inappropriate um yeah I will uh I just
want to reserve my right to appeal the
[59:25]
assessment I just know that that was due
tonight and so I have it written on the
[59:29]
back of the uh the letter for this
meeting give us to
[59:38]
meet question would be just on um just
in general you know do Property Owners
[59:44]
get to see the breakdown of the special
assessment benefit report um for their
[59:50]
property it's got to be some algebraic
equation with a bunch of different
[59:54]
factors do we get to know what those
factors are are and then who is the
[59:57]
third party that does that um and can we
contact them um I'm just wondering
[1:00:03]
because I have an agricultural parcel
and I want to know how the different
[1:00:07]
zoning applies to my parcel which is
pie-shaped
[1:00:11]
crazy as we talked about before um but
I'd love to know exactly why I'm
[1:00:16]
assessed exactly what I'm
[1:00:20]
assessed we we contract with a third
party appraiser uh certif residential
[1:00:26]
appraiser that that does this and takes
a look at what the proposed benefit is
[1:00:31]
the name of of thatan Nel Nel appraisals
Nel was escaping me at the moment um and
[1:00:37]
they do issue a report that report is
public um public
[1:00:42]
data actually it's presented to the
attorney so I I believe it's it is
[1:00:46]
privileged what is okay sorry this is I
apologize this is a new process here for
[1:00:51]
me where we we do the appraisals
beforehand in the all the cities have
[1:00:54]
worked at before we if there was an
objection we did it afterwards so so my
[1:00:59]
mistake but um but yes we do and we get
that report and then we from there we we
[1:01:05]
determine what that overall benefit
is okay and do I ever get a copy of that
[1:01:12]
report I I don't know if I don't know
the I I I was making assumption it was I
[1:01:18]
I guess if this goes to a district a
district proceeding uh I I anticipate
[1:01:23]
that that will be available right now
the City attorney commissions that
[1:01:28]
report so that it in the event that
there are appeals it's treated as
[1:01:32]
privileged privileged information okay
so just for
[1:01:37]
my everybody else here uh so am I wrong
when I say that we don't get unless we
[1:01:43]
hand a letter to you like I just did we
never get a chance to see the breakdown
[1:01:48]
of how we're assessed on our special
assessments for these projects is that
[1:01:52]
correct that that's correct okay you
well no that that's not entirely correct
[1:01:57]
you're not the breakdown of the
assessments is available the assessment
[1:02:01]
role is available at in in David's
office so that breakdown of how the
[1:02:04]
assessments are computed is is a public
document and that's available but not
[1:02:08]
how they're computed just the fact that
even how we compute it is available the
[1:02:12]
the thirdparty Appraiser's opinion is
the part that's
[1:02:19]
privileged can you give me an example
what that might so I can what do you
[1:02:24]
mean like we can show you exact how we
calculate your assessment okay that's
[1:02:28]
based on the cost of the the cost of
construction but not the factors that go
[1:02:33]
into that and the and the factors that
go into the into the cost so all of that
[1:02:38]
information the cost information is is
publicly available the Appraiser's
[1:02:42]
opinion of how he determined the maximum
benefit is the part that is privileged
[1:02:48]
or the document is is obtained by the
attorney in the event that there are
[1:02:54]
appeals that that can be treated as
privileged
[1:02:58]
information okay can I get the okay the
screen
[1:03:03]
again that answer your question it it
not well I'm just trying to
[1:03:07]
differentiate between what is the public
and what is the private so what does
[1:03:11]
what do so is privileged on the slide
where they say maximum
[1:03:16]
benefit that's the
appraiser so this number this
[1:03:20]
4385 and 8063 we can show you exactly
where that that's that's the
[1:03:25]
construction cost we can show you
exactly where that comes from each each
[1:03:29]
bid item you know black top gravel all
the
[1:03:33]
things this that's what it costs to do
the project yes yep the the
[1:03:40]
maximum benefit number this you know
yours is different right yours is I
[1:03:47]
believe is on a square footage basis but
this $10,000 per lot that maximum
[1:03:51]
benefit number that's what Randy is is
talking about when he says that's
[1:03:56]
contracted through the lawyer yeah and
that's we don't get to see how they
[1:03:59]
calculated that yes yes sir okay right
[1:04:10]
thanks
[1:04:14]
yes yes yes you will it's correct yeah
[1:04:29]
Scott Bine live at 29457 kale Court um
couple issues um first of all can you
[1:04:37]
tell me how old this road is 2 95th out
to kale we cannot uh who knows
[1:04:43]
this hopefully well maybe at best
someone from the township so when there
[1:04:48]
is no record drawing so any improvements
that the city builds or constructs over
[1:04:53]
time there's a record of the plan if
it's even 20 years old yet we we don't
[1:04:58]
we suspect it's it's older than that but
we don't know if it's more than 20 years
[1:05:03]
old or under 20 years old we know what
it looks like so do we yep and being on
[1:05:09]
Kale Court you know we got a lot of kids
in the neighborhood ride bike skateboard
[1:05:16]
roller blade out there there ain't
nothing wrong with that
[1:05:19]
road June 95th does have some
issues biggest one being on the corner
[1:05:25]
which a big chunk was torn out and that
was because of one of the city snow
[1:05:29]
plows and I watched them he just kicked
it off into the ditch did the city come
[1:05:34]
back out to fix that nope so now you're
going to assess us for the
[1:05:40]
damage but I don't need to know how old
this road
[1:05:44]
is if if someone can produce a record of
of the original construction uh
[1:05:50]
unfortunately there isn't one available
U I'd love to know that too I'd love to
[1:05:55]
know what what's underlying it um what
the original construction was but there
[1:06:00]
was no documentation that the city had
available to
[1:06:04]
it so when you do this
Overland say three five years down the
[1:06:10]
road then you want want to run out the
utilities and stuff are they going to
[1:06:14]
widen the road out then and put curbs
and gutters in that's a decision that
[1:06:19]
the city will make it that time I I
guess I can't answer that question for
[1:06:22]
you sir so we're just going to go ahead
and repave this without any future
[1:06:27]
plans we don't know what's going to
happen yet
[1:06:30]
right I mean it could be next year two
years 10 years nobody knows right the
[1:06:35]
council could commission or or order an
improvement if if it deemed necessary uh
[1:06:41]
so improvements can be conducted two
ways one by petion of the neighborhood
[1:06:45]
or two by the council's own action so
certainly a c a seated council could
[1:06:50]
make the decision to improve or widen um
none of us seing here can
[1:06:57]
can say with certainty whether that
would happen five years from now or two
[1:07:01]
years from now so nobody really knows
them so you're telling me that that's
[1:07:06]
fair I I don't know how I I could answer
that question for
[1:07:10]
you so down the road are we going to
have a chance to vote on if we want
[1:07:15]
these water out there because we've had
the water tested compared to the city
[1:07:19]
and our water out there is much better
with the whales well I guess I
[1:07:24]
me and it it we you can't bind a future
Council to what they can or can't do but
[1:07:30]
typ with the the council at least in the
short time I've been here with the city
[1:07:34]
has taken the the approach or the
opinion that um as far as the the sewer
[1:07:38]
and water out there that that would be a
by a petition purpose is because it's
[1:07:43]
not right up to it right now so you'd
have to extend it to go out there so um
[1:07:48]
at this point then there's been no um
there's been no push to to I guess for
[1:07:54]
to extend it out there and force the
residents to do that um you know what a
[1:07:59]
future Council might do um it's it's
hard you can't predict that um but all I
[1:08:05]
say is in my experience with working
City C with City councils on a situation
[1:08:09]
like that it would be either a comparing
a compelling reason meaning something's
[1:08:13]
out there's really failing like it's
contaminating a water system or
[1:08:17]
something along those lines or the
residents out there have had um issues
[1:08:21]
with it and they petition to have sewer
and water extended to them
[1:08:26]
on a personal
note I know I'm sitting as a council
[1:08:30]
member but I live on 17th Aven of
Southeast and I was Township when we
[1:08:36]
moved in and now we are City and
actually what's happening to you guys it
[1:08:42]
happened with my husband and I um all I
can say in concur with is you have to go
[1:08:49]
with every situation as it's coming and
take care of how you want to approach it
[1:08:54]
as it's happening happening because we
can't we can't my husband and I didn't
[1:08:59]
know I mean compared to what we were
dealing with with the council at the
[1:09:02]
time and then we had a situation you
know approximately 15 years after that
[1:09:09]
completely different Council completely
different mayor um and so I I would just
[1:09:14]
say you know make sure you have all your
information and if you need to move
[1:09:20]
forward then take the appropriate steps
that the city and following letters and
[1:09:26]
making sure that the communication is
between uh the residents and the city
[1:09:31]
and hopefully following the ordinances
and that we have that we can support we
[1:09:36]
don't want to have this happen to you
but we have to be able to look at both
[1:09:40]
sides of the fence and be able to make
sure that we are watching out for
[1:09:45]
everyone concerned and I I hear you I
understand
[1:09:51]
exactly what you're going through um and
so moving forward we're trying to the
[1:09:56]
best of our ability to be able to
support you as we
[1:10:02]
can all right thank
[1:10:14]
you is there anybody else that like to
address the council this
[1:10:20]
evening with that we'll close the P
sorry go ahead goe Kevin I
[1:10:26]
just I just want to know how do we find
out if this passes or not passes or or
[1:10:32]
is it in the works or it's what you are
you going to
[1:10:38]
just let us
know or what so the council has two
[1:10:44]
actions uh this evening after the public
hearing closes uh first action would be
[1:10:49]
whether to adopt the assessment role as
has been presented or proposed this
[1:10:53]
evening the second decision that they
would make is whether or not to award
[1:10:57]
the Construction contract and proceed
with the work so that is the next step
[1:11:01]
that they could take okay soon as this
evening you would have another meeting
[1:11:05]
after that there there wouldn't be
another meeting after after
[1:11:19]
this okay
[1:11:29]
I'll just ask one last time is there
anybody else who would like to address
[1:11:32]
the council before we close the public
[1:11:36]
hearing if not then we will close the
public
[1:11:40]
hearing mror mayor if I may and just um
so now that the public hearing is closed
[1:11:45]
um we Al Just for information we did
receive a written petition uh appeal in
[1:11:51]
the uh objection in the mail um it is
for the Elm Street portion that was so I
[1:11:58]
mean it's not really applicable at this
point but we do need to make aware that
[1:12:01]
we did receive it and we will keep it
for when that comes forward
[1:12:09]
okay Randy can you reiterate the two
actions that we have before the council
[1:12:13]
this evening now that the public hearing
is closed so first action would be to
[1:12:17]
consider adopting the assessment role
that that has been presented so that
[1:12:21]
would in essence um um
adopt the costs that you're anticipating
[1:12:28]
uh the revenue that you're anticipating
to be generated through the
[1:12:32]
assessments um and then parallel to that
you have the ability if if you wanted to
[1:12:38]
to proceed with awarding the
Construction contract that would in
[1:12:41]
essence start uh the construction
activity or initiate the construction
[1:12:46]
activity but there wouldn't be a a
another or third public Improvement
[1:12:51]
hearing or public hearing um after
tonight's proceeding
[1:12:56]
and that' be two separate votes they
would be two separate votes uh and yes
[1:13:02]
two separate
votes and And to clarify on the
[1:13:06]
resolution for the adopting the final
assessment that to clarify that does
[1:13:11]
exclude the Elm Street Extension because
that was
[1:13:16]
postponed pending you know those
RightWay Acquisitions and being able to
[1:13:20]
move forward on that project so because
the um
[1:13:25]
notification in the publication included
the Elm
[1:13:29]
Street um assessment I just wanted to
clarify that the resolution does exclude
[1:13:34]
that so when we get into bonding that's
critical that we understand that the
[1:13:39]
cost is less because of that piece of it
okay with that being heard I'll make a
[1:13:46]
motion to move to approve uh resolution
[1:13:55]
excluding the Elm Street Extension
properties
[1:14:00]
second any other discussion if not we
have a motion in a second all those in
[1:14:05]
favor signify by I I I all those
opposed motion carries I will make
[1:14:13]
another motion to approve resolution 20
24-4 n awarding bid to Knife River Corp
[1:14:21]
for the 2024 Street improvements
second any other
[1:14:29]
discussion with a motion a second all
those in favor signify by I I I all
[1:14:35]
those
opposed then motion does carry as
[1:14:40]
well on to item number six we got
there's one more Motion in here that
[1:14:46]
okay I'll move to approve the
supplemental letter agreement with SE to
[1:14:50]
provide engineering Construction
Services for the 2024 stre Improvement
[1:14:57]
second with a motion in second to
approve the supplemental letter
[1:15:01]
agreement with SE to provide engineering
constructions services for the 2024
[1:15:05]
Street improve Improvement project is
there any other
[1:15:11]
discussion all those in favor signify by
I I all those
[1:15:16]
opposed the third and final motion
carries now on to item number six the
[1:15:23]
special event Rock for
altimers yes good evening um so staff
[1:15:30]
had received an application from Bad
Habit Brewing Company um for their
[1:15:33]
annual Rock for Alzheimer's event the
event is scheduled to be held on
[1:15:37]
September 8th um from 1: to 8:30 p.m.
staff has reviewed the request and chief
[1:15:43]
onstein is requiring that two Off Duty
Officers um attend the event this year
[1:15:47]
um they did increase the number of
attendees or expected attendees which
[1:15:51]
resulted in the increase um from one to
two officers a map of the event is
[1:15:55]
included in the packet um and the
request um recommended action is to move
[1:16:01]
forward with the that special event
permit move to approve
[1:16:07]
second with a motion a second is there
any other
[1:16:11]
discussion
Kelly all those in favor signify by I I
[1:16:18]
all those
opposed motion does carry on to item
[1:16:23]
number seven and up update from
[1:16:29]
connectic good evening members of the St
Joseph
[1:16:33]
Council and interested bystanders thank
you I'm Scott jig with
[1:16:39]
Kinetic and there are some updates that
I want to make the council aware of um
[1:16:45]
per our agreement we had some very
specific things that we kinetic is your
[1:16:51]
uh partner in fundraising for the
community center
[1:16:55]
uh that we needed to do as part of our
agreement with you it's Our
[1:16:59]
obligation those some of those things
are in the last memorandum of
[1:17:05]
understanding that that we agreed to one
of the things that we had to do was was
[1:17:11]
conduct additional training for the
members of the Capitol Campaign
[1:17:16]
Committee those volunteers serving on
The Campaign Committee that would be
[1:17:21]
going out and participating in
solicitations and in explain in the um
[1:17:28]
the project to interested participants
and interested
[1:17:32]
donors on July
18th uh we did that session at Gan um we
[1:17:39]
had good attendance from the committee
had it over lunch and had about two and
[1:17:44]
a half hours worth of training um for
all the members and we also had it uh
[1:17:49]
available online via zoom and we did
have members attend via Zoom as well
[1:17:54]
well so that that obligation that we uh
took on for additional training we did
[1:18:01]
that on July
18th um one of the other things that we
[1:18:05]
said that we would do is is in our
agreement uh our agreement between
[1:18:13]
connetic and the city council is that we
would provide up to 80 hours worth of
[1:18:18]
consulting services on any given
month understanding that the holiday
[1:18:23]
seasons in around Thanksgiving and
Christmas New Year's inside our our
[1:18:30]
current contract that those holiday
seasons are not uh time periods excuse
[1:18:36]
me are
not are not prime fundraising time with
[1:18:41]
people gone in the holidays so what
we've done is rather than dividing
[1:18:47]
those 80 hours per month evenly over
each of the months we've taken hours
[1:18:55]
from December and hours from November
that are not going to be as productive
[1:19:01]
in November December because of the
holidays and we're moving those hours
[1:19:05]
into July August and September where we
do have an opportunity to be more
[1:19:11]
productive and provide more services um
but but we're maintaining the same
[1:19:18]
contract terms and billing spread evenly
so that way the city is not paying extra
[1:19:24]
for us to to do extra work in July
August September you're paying the same
[1:19:28]
period throughout the the terms of the
contract it's just this gives us an
[1:19:33]
opportunity to give you more value
without you spending more money for that
[1:19:38]
additional value and that's that's
already started and it's and it started
[1:19:43]
in uh in July August and September um I
personally am coming in um two days per
[1:19:53]
week typically as what it ends up
happening and then the rest of the team
[1:19:57]
is coming in in addition to the two days
on a weekly basis I'm coming in to meet
[1:20:02]
with donors and to meet with the
committee the committee itself um
[1:20:08]
decided that providing
leadership the volunteer leadership for
[1:20:13]
the
campaign was too much work to
[1:20:17]
expect a an individual in a volunteer
capacity to do so the committee creat
[1:20:24]
ated what they are calling the St Joseph
YMCA campaign
[1:20:31]
chair committee and it's a leadership
group made up of five individuals with
[1:20:39]
one additional um advisor and counselor
on this the five individuals are that
[1:20:45]
are taking this leadership role and
assuming this leadership
[1:20:49]
responsibilities Patty
wling um Amy
[1:20:53]
bonfig Carol breze Corey ellt and
reasner additionally uh mayor Rick
[1:21:01]
Schultz has has agreed to come on an ad
hoc episodic basis and provide advice
[1:21:07]
and councel to the leadership committee
as needed um we had the first meeting of
[1:21:15]
that Committee in in a formal Fashion on
August 1st and I attended as your
[1:21:22]
councel on uh that committee meeting and
we started making assignments for each
[1:21:27]
of the leadership committee members so
that we could actually start calling on
[1:21:31]
donors and fulfilling the the asks that
are necessary to move forward with
[1:21:37]
fundraising on the campaign so those
assignments have been made this today
[1:21:42]
tomorrow and Wednesday are my followups
to work on individual scheduling with
[1:21:49]
each of those each of those members so
that's happening the committee has
[1:21:53]
decided it's going going to meet the
leadership committee is going to meet
[1:21:57]
every other week on
Thursday um and they'll meet in the
[1:22:04]
morning at 10: here at the government
center and I'll be present for those
[1:22:09]
meetings um while the committee is
meeting and then the full Campaign
[1:22:15]
Committee will meet the third
Thursday um it's basically the same day
[1:22:21]
as the leadership group leadership group
will me in the morning the full
[1:22:25]
committee will meet in the afternoon at
3:30 in the afternoon the 3:30 time
[1:22:29]
period is so that the committee will
those committee members that have
[1:22:33]
obligations during the day that keep
them from meeting during the daytime
[1:22:38]
would have a better opportunity to meet
at 3:30 in the afternoon so so we're
[1:22:42]
moving forward with that um I will be
present at each of those meetings as
[1:22:47]
well to make sure that that we keep that
moving
[1:22:50]
forward the rest of my team that are
working alongside me
[1:22:55]
Janelle Johnson has been taking Point um
with doing our foundations requests
[1:23:03]
we've identified three
foundations that we believe that kinetic
[1:23:08]
believes uh would be good partners to
help fund this
[1:23:14]
request um we're not in a position right
now to to to share who those are but I
[1:23:21]
can assure you that we're going through
the application process we're starting
[1:23:25]
to to meet with the funders themselves
each of those three foundations will be
[1:23:31]
specific requests for the St Joe
Community Center
[1:23:36]
YMCA they are not requests to be shared
this from these particular three are not
[1:23:42]
shared between us and the St Cloud Y and
any other projects they're specific to
[1:23:47]
St Joseph and each of those three
funders have the potential
[1:23:54]
it it's not defined yet but has the
potential of being six figure
[1:23:58]
contributions to the campaign and one of
those three has a potential of being a
[1:24:03]
seven figure contribution to the
campaign so we're moving forward with
[1:24:07]
that paperwork right now um and we've
worked with the St Cloud y to make sure
[1:24:15]
that we have the proper EIN number uh
employee identification number tax ID
[1:24:21]
number so that that way those found s
can actually contribute to the St Joseph
[1:24:27]
Community Center project and have it be
designated for this project and solely
[1:24:31]
for this project so we're working
forward with that that was something
[1:24:35]
that the council specifically asked us
to do and we're moving forward with that
[1:24:41]
one of the other things that the council
asked for us to do is create a
[1:24:45]
systematic approach to
communicating where we are with the
[1:24:50]
status of the campaign and what's
happening uh both good bad and ugly in
[1:24:56]
terms of that and we've drafted our
first
[1:25:01]
internal copy the the the the words the
content of what a a monthly newsletter
[1:25:09]
might look like for the campaign and
we're going through the editing process
[1:25:14]
on that and then now the design process
to make sure that it looks good and
[1:25:20]
attractive and folks will want to be a
part and want to receive it and that's
[1:25:24]
happening we still anticipate that being
able to to start uh being disseminated
[1:25:30]
as soon as SE uh September so we feel
really good about that
[1:25:36]
um this next these next three days and
then uh a week later I'm going to be
[1:25:42]
spending most of my time my Consulting
days working with individual committee
[1:25:47]
members to make sure that we've
secured individual commitments from the
[1:25:53]
committee members are in a position to
make commitments and then
[1:25:58]
frankly um
to
[1:26:02]
revitalize those committee members that
that may have for one reason or another
[1:26:08]
stepped back from an active role in the
the committee we've had a few members
[1:26:14]
that have have said you know I'm really
busy I'm not certain that this is the
[1:26:19]
project for me right now and and we
interpret that
[1:26:24]
as as um I'm not particularly ready to
move forward with this campaign so we've
[1:26:32]
got to go back and meet with those
individual committee members and kind of
[1:26:35]
reactivate them as part of part of a
role in the committee and that's going
[1:26:39]
to have to be done on an individual
basis so we're we're moving forward with
[1:26:45]
that as well those are the action items
that we committed to to the council as
[1:26:50]
per the memorandum of understanding so
far we're following through with that
[1:26:55]
um Bob council member loo I will tell
you I'm feeling better about my
[1:27:02]
commitment to you that if it comes time
to come back with a proposal I'm feeling
[1:27:10]
that I can defend it to you at that
point I'm not there yet but I'm on the
[1:27:14]
pathway sir the jury's still out on you
yeah thank you sir any other
[1:27:20]
questions I I do I do have a question
yes um so you said you have three that
[1:27:27]
you're just particularly asking for St
Joel why isn't that across the board for
[1:27:32]
any asking is the is the St Cloud still
asking St Cloud is still going through
[1:27:39]
their Grant application process because
there are some
[1:27:43]
foundations that frankly will fund the
broader Regional scope more than they
[1:27:49]
will fund either a specific project for
St Cloud on its own or specific project
[1:27:55]
for St Joe on its own but if they look
at the project as a regional
[1:28:02]
impact um we both will get more money
than we would if we tried to get it on
[1:28:07]
our
[1:28:14]
own thank you and we're communicating
really closely on that to make sure that
[1:28:20]
that that those points are
clarify do you have a total figure you
[1:28:29]
can throw at us tonight I don't because
I've had two additional contributions
[1:28:34]
and I'm not certain that Lori has
received yet so um I'll have that for
[1:28:39]
the next meeting but uh we did get two
more commitments that have come in since
[1:28:46]
the last time that I've gotten a report
Okay Kevin anything thank you Scott
[1:28:52]
thank you
[1:28:56]
that was item seven we're on to item
eight we have a County Road 121
[1:29:02]
crosswalk Improvement update uh thank
you acting mayor um council members so
[1:29:08]
uh I was hoping to have something on
your agenda for tonight for Action uh
[1:29:11]
however um it is not quite ready yet um
as you remember uh staff Council
[1:29:17]
authorized staff to submit an
application for safe road Zone funds for
[1:29:21]
the crossing out there at uh
cter Road 121 and Lanigan um so that so
[1:29:29]
the city along with the county applied
for the safe road excuse me safe roads
[1:29:33]
Zone fund Grant earlier this year and we
have been notified that we were approved
[1:29:37]
for
$95,000 um so the state is currently
[1:29:41]
processing the award to generate the
grant agreement I was hoping to have
[1:29:44]
that ready for tonight for authorization
um but looks like it was not quite ready
[1:29:48]
so it will be um before you at the next
council meeting for official action so
[1:29:53]
this is more of a information on that so
that um the application anticipates
[1:29:58]
roughly 127,000 of construction and that
Grant is an 8020 split which leaves an
[1:30:03]
estimated City cost of roughly 32,000
plus any additional soft costs so no
[1:30:09]
action required at this time but we will
take any questions yeah the the cost is
[1:30:14]
127,000 out of 95 so there's 32,000 left
isn't the county participating in this
[1:30:21]
at all and it's all our cost
[1:30:26]
uh it is all of the city's costs what
the county had committed to would have
[1:30:30]
been uh any additional striping or or
improvements at the at the road but they
[1:30:36]
lended the support uh to to the uh to to
the city's application so there was a
[1:30:41]
letter of support from the county but uh
this was the city's pursuit in terms of
[1:30:46]
the
improvements um in terms of the safety
[1:30:50]
Improvement okay so the county just gave
us a go get him
[1:30:56]
guy
okay
[1:31:02]
correct so just to reiterate Dennis
because I know that's why you're here
[1:31:06]
tonight the state's currently processing
the $95,000 grant award and they need to
[1:31:11]
create a grant agreement once they
create that then that's something that
[1:31:16]
can be given to us and we can vote to
approve it so we're slowly working can I
[1:31:23]
question
it's up to the presiding officer it's
[1:31:27]
fine with
[1:31:30]
me just I I
appreciate I appreciate all it's been
[1:31:35]
done had a couple more people here one
of our gentlemen in our group just had
[1:31:40]
electrodes put in his brain and he had
to go home he was having some issues he
[1:31:45]
was so that's why they left early so I
apologize for Tom Scher uh he wanted to
[1:31:52]
be here um but I appreciate what you've
done I don't know who wrote the grant
[1:31:56]
that's obviously time was about 20 pages
I read it all very well done I we
[1:32:02]
appreciate that to me it seems like a
deal at an 820 so we appreciate I
[1:32:07]
appreciate that the only thing I ask can
added it very good very um keeping us
[1:32:12]
informed just keep us informed at the
Timeline I had a goal like before the
[1:32:16]
snow flies but I know you've got a
bidding process you know you've you know
[1:32:21]
I you have probably have to pour
concrete before it freezes too but just
[1:32:26]
keep us informed that's I don't know do
you answer how long the process
[1:32:33]
takes um we're hoping the procurement is
actually fairly quick um what what there
[1:32:39]
may be more of a delay uh is is actually
ordering the equipment so uh
[1:32:45]
availability for the council's
clarification the what's been considered
[1:32:50]
as part of the scope would have been two
speed zone feedback back displays so the
[1:32:54]
things that show how fast drivers uh are
are driving so so the budget included
[1:33:00]
two of those in each Direction uh LED
and crusted kind of push button signs
[1:33:05]
similar to what we see right across the
street here by by the College of St
[1:33:08]
Benedicts so there's often lead times
with getting getting those equipment so
[1:33:14]
that I'm is probably more of a variable
for us than ordering and getting it here
[1:33:19]
get getting it here
um since we have the county support in
[1:33:24]
terms of the permitting and working
within the right of way that that's
[1:33:27]
likely not going to be very time
consuming so the only the other thing
[1:33:31]
that's going to take some time is
actually putting together the the
[1:33:34]
construction documents uh to to be able
to solicit the quotes So the design uh
[1:33:40]
solicitation of the quotes and then the
actual execution of the work so um the
[1:33:45]
grant agreement uh we the time frame has
it has to be spent by the end of June uh
[1:33:51]
next year so yeah okay that's so we have
so we have time um but our goal would be
[1:33:57]
to start the process as soon as the
grant agreement uh is presented to the
[1:34:01]
city and the council we well we
appreciate all you've done thanks to I
[1:34:05]
guess it's acting
mayor just for tonight just or you hope
[1:34:10]
I guess so but we appreciate all you've
done especially I know it takes time the
[1:34:15]
people that actually write the grants go
through the process I know jod Tesh was
[1:34:20]
part of it too and we we appreciate it
uh it was was kind of an interesting
[1:34:25]
Summer with the with the extra traffic
it
[1:34:28]
was was quite interesting so I
appreciate it so thank
[1:34:35]
you my other people also appreciate
it said Tom surgery so thank you
[1:34:45]
Dennis on to where we at item number
nine Department reports anything to
[1:34:51]
report or then we've already covered
um I'll go first I just wanted to let
[1:34:56]
you know that early voting starts
tomorrow um so normal business hours
[1:35:02]
then we are open on Saturday from 9:00
to 3 Monday 8 to 5 and then next
[1:35:06]
Tuesday's election day for primary state
and
[1:35:10]
federal yeah y okay yep that's
up just from a Community Development
[1:35:17]
standpoint uh just so the council's
aware our Planning Commission meeting
[1:35:21]
next Monday we have a couple items that
will come forward to the council at your
[1:35:25]
next meeting in August here uh one of
them is a Knife River interm use permit
[1:35:30]
uh they're just proposing to do portable
crushing of asphalt and concrete and
[1:35:34]
then storage of that Associated material
this is for that site that is east of
[1:35:38]
the Tropic site um so their parcel that
they purchased maybe about a year ago um
[1:35:43]
we also have the American Legion um
who's redoing the western side of their
[1:35:48]
building uh because we have a allowance
on the um total percent of metal um and
[1:35:54]
they're proposing to exceeded that uh
that does require Planning Commission
[1:35:58]
recommendation and Council approval
similar to when bad habit Brewery
[1:36:02]
expanded their operation and expanded
some of that metal facade um they'll
[1:36:06]
follow that same process and then we'll
have our final draft readings of the
[1:36:11]
short-term rental ordinance and the
honeybee ordinance at the Planning
[1:36:14]
Commission level so anticipate that um
we'll have those drafts and finalized
[1:36:21]
and presented to Council in September
with the public public hearing at the
[1:36:24]
Planning Commission in September and
then lastly our Eda had been reviewing
[1:36:29]
and updating some business subsidy
policies uh those are required to go to
[1:36:34]
the council um so we anticipate that
will hold a public hearing um which is
[1:36:38]
also required for our subsidy policy at
your next meeting in August so with that
[1:36:44]
I'll take any questions if you have any
on any of
[1:36:49]
that I don't believe so you got anything
for us Ryan
[1:36:54]
awesome do
I thank you
[1:36:57]
guys um mayor and Council
reports I have a couple things to
[1:37:04]
mention uh we just had the Hansen
groundbreaking last week and like Kevin
[1:37:09]
myself others were there I thought that
was a really nicely presented
[1:37:13]
groundbreaking it's great to see
businesses such as Adam Hansen and his
[1:37:17]
company expanding and growing in the way
that they are we have the house
[1:37:22]
groundbreaking the
house food and tap Hall groundbreaking
[1:37:26]
coming up in a couple
weeks uh so that's open to the public
[1:37:31]
there's also um WR home company is
having like an extension brand or
[1:37:36]
extension company they're starting WR
Littles and Co so like pregnancy and
[1:37:41]
baby things probably something my wife
and I should go since she's
[1:37:46]
pregnant that's a store opening
groundbreaking happening in a couple
[1:37:50]
weeks and Rhonda left us but her along
with the CVB and I think uh mayor Rick
[1:38:01]
uh Mary Bruno they had all noticed the
pop- of Splash Pad occur in St Cloud and
[1:38:05]
they very quickly scrambled to get the
fire department involved and we had a
[1:38:10]
splash pad this weekend on Saturday and
I thought it was very well attended
[1:38:15]
probably a hundred kids and parents
together and everybody that came is held
[1:38:20]
from 1 to 3 just east of City Hall here
of everybody that came they stayed the
[1:38:26]
entire time it wasn't anybody popped in
for a couple minutes like it was very
[1:38:30]
well attended it was great to see and St
Joe's so Sandy that wasn't very muddy it
[1:38:35]
just all sank
in only thing I'll say about that is it
[1:38:39]
was interesting to see those kids didn't
really seem to be affected by the
[1:38:42]
temperature of the water coming out of
that hydrant at all I would call that a
[1:38:46]
cold plunge they thought that was a good
day but that's all I
[1:38:52]
got if that's all we have then item
number 11 move
[1:38:57]
to all those in favor signify by I I I
all those opposed thank you
[1:39:06]
everyone
[1:39:22]
Facebook for