if everyone would join me please in
standing and say the Pledge of
[0:16]
Allegiance I plg to the of the United
States of America and to the Republic
[0:22]
for it stands one nation under God
indivisible ofice for all
[0:32]
may I get a roll
call Mr Ean yes here Mr castler yes here
[0:39]
miss Fields
here and can I get a motion for approval
[0:44]
of tonight's agenda I'll make a motion
to approve the agenda and I'll second
[0:49]
that Mr kastler yes Mr rikman yes M
Fields yes it's my understanding since
[0:57]
we don't have at least three people that
were at last month's meeting we will
[1:01]
continue the approval of the minutes is
that correct yeah yes all right we have
[1:07]
one item on this evening's agenda Sims
number
[1:11]
20231 silver Springhouse review a final
development plan to revise the approved
[1:17]
sidewalk size and location along the
Snider Road
[1:20]
Frontage
[1:25]
BR good evening Brian Snider inment you
should have a copy of the staff report
[1:30]
for this case this is a final
development plan modification um the
[1:36]
case is
20231 so it was just approved last year
[1:41]
um this zone change was approved by the
Sims Township
[1:44]
trustees um with conditions um and a
specific development plan since this is
[1:49]
a planned retail
District the plan that was approved by
[1:54]
the trustees um included U expansion of
a parking lot demolition of a house um
[2:01]
but the the point of tonight's meeting
they approved a 4-ft sidewalk um several
[2:06]
feet back from the um edge of pavement
of Snider Road basically at the back of
[2:10]
the rideway where our sidewalk would
typically typically be
[2:14]
constructed um that was how the plan was
approved by the trustees there was a
[2:19]
condition in the um trustees resolution
of approval that required the 4ft
[2:24]
sidewalk to be
constructed
[2:27]
um along Snider Road
um the final development plan that came
[2:32]
in after that um had moved the sidewalk
from its location at 4T and several feet
[2:38]
back from the road to right up against
the road and 6 feet in width um there
[2:44]
was some discussion at the time that's
what the township plans had showed um
[2:48]
that's what the township is planning to
construct north of the silver
[2:51]
Springhouse property on Sider Road um
and this would match that sidewalk
[2:56]
however um I believe the applicant can
explain it better but um they ran into
[2:59]
some situations with constructing that
sidewalk where it doesn't make sense to
[3:03]
build it there um and they are
requesting approval to move it back to
[3:06]
the location and the size sorry back to
the location where it was approved um as
[3:10]
part of the
trustees um plan and resolution and also
[3:15]
to make it 5T instead of
4T um that's the um subject of the
[3:22]
tonight's meeting um staff has no
findings other than we did contact the
[3:26]
Hamil County Engineer's Office um the
County engineer States that um the keny
[3:32]
engineer is satisfied with the 5ft
sidewalk that is shown on the attached
[3:35]
plan that was sent on March 25th 2024
which is the plan that we sent to them
[3:39]
um so they're okay with the plan as
submitted and as um in front of you for
[3:43]
tonight's
consideration uh that's all I have I'd
[3:46]
be happy to answer any
questions am I correct that the sidewalk
[3:50]
goes from keer to
patrilla um it goes from keer to the
[3:54]
edge of the silver Springhouse property
that's what they that's what tonight's
[3:59]
meeting is about there but then it will
continue on to Peto and further north
[4:04]
whatever the township builds it yes okay
and the sidewalk that's currently along
[4:09]
keer is that 4 feet I believe so thank
you so basically if I understand it
[4:17]
correctly you're going to take what was
what we approved what the township
[4:22]
approved which was a 5 and 1/2t sidewalk
directly adjacent to the street we're
[4:28]
going to put a tree line in there 5 1/2t
sidewalk you won't have to mess with the
[4:33]
utilities that are underground that
would be costly to have to deal with
[4:37]
with this uh sidewalk essentially yes it
was 6 and2 ft at the edge and they're
[4:42]
proposing 5 ft the staff report did say
5 and 1/2 ft somewhere but that was an
[4:45]
error it's 5T that's their proposal okay
all right thanks at the edge of their
[4:51]
property line if kind of along north of
their property if the sidewalks going to
[4:57]
be along the road are they kind of
taking into account you know if their
[5:02]
sidewalk is going to be back from the
road sort of you know tying that in
[5:06]
obviously um I I believe they'll have to
match the sidewalk that's constructed on
[5:13]
the silver Springhouse with whatever
sidewalk the township builds down to
[5:16]
that point it'll jog in some in some
fashion okay and as far as that jogging
[5:21]
my recollection is in one of the
drawings it was a straight line more
[5:24]
like a z is it possible to get more of
an S kind of a aesthetically pleasing
[5:29]
curve
I'm not a sidewalk
[5:32]
designer I'm not sure what Ada says
about that or anything else maybe we can
[5:36]
let the applicant yeah trust that just
curious yeah I agree
[5:43]
though thank you Brian okay thank
you someone here on behalf of the
[5:48]
applicant you could identify yourself
and give us an
[5:56]
address my name is Brian D with
Cincinnati United contractor is
[5:59]
representing the slver Spring House at
7143 East keer Road Cincinnati Ohio
[6:05]
45249 um so to answer some of the
questions um one being the the reasoning
[6:12]
behind the design so we have always
shown a 4T sidewalk um in the RightWay
[6:19]
but it's been up away from the street
and we do that for several reasons one
[6:25]
is to match the current sidewalk that's
along East keer Road which is set back
[6:29]
from the road
number two for the safety of pedestrians
[6:33]
and uh patrons of the business and then
number three it's most cost
[6:37]
effective
so um when we we originally proposed
[6:42]
that and then you know when it got
switched uh right after the trustees
[6:46]
meeting uh went to the face of the road
and then uh we want are now looking back
[6:52]
to go to our original plan which is
closer into the into the right of way
[6:57]
and if you could see
we
[7:02]
have the sidewalk connecting up to the
existing intersection to where it's
[7:07]
going to be right there so you can
people can walk across the intersection
[7:10]
and it goes all along the way goes
through this uh with the ramps through
[7:16]
this Drive Entrance and then it comes
all the way up here towards the northern
[7:20]
property line of the residence here and
then right now we've dedicated 50t right
[7:25]
away here and here this one currently
only has a 30t so what we did is yeah we
[7:30]
did kind of a z if you will and and
joged it back to that 30 foot RightWay
[7:37]
position so um if if an S works for you
guys to that's no big deal um we were
[7:43]
just trying to transition it back to
that 30 right away so were those all the
[7:48]
questions that I answer
everything I I guess the the only
[7:52]
question I have and I don't know whether
you know this or not is why did it
[7:57]
switch from the original plan to the now
current plan I mean was that a the
[8:02]
township requested that or the trustees
or what happened yeah the town the
[8:07]
administration requested that uh right
after the trustee meeting and before the
[8:12]
final um Planning Commission meeting
okay you don't know why though uh the
[8:18]
only only idea I have why is because
they were afraid of parking people
[8:22]
parking along the street and thought
that putting that sidewalk against the
[8:27]
street would prevent people from parking
that's the only thing that I've got on
[8:31]
so there's going to be between what
you're proposing between the sidewalk
[8:36]
and the street they'll be some kind of
grassy area is there going to be any uh
[8:42]
landscaping or anything no no trees
we're not allowed to put that in the
[8:46]
right of way okay grass yes grass okay
does that mean the existing no parking
[8:53]
signs will be done as well those no
parking signs uh are actually put up by
[8:58]
Hamilton County
um so we don't have jurisdiction in
[9:03]
those
okay go ahead oh I was just going to say
[9:07]
yeah that I think having that be more of
a gradual kind of yeah kind of s sort of
[9:14]
transition would be easier for you know
I think like Wheelchairs and people with
[9:18]
strollers and things like that um but is
the continuation of the sidewalk from
[9:25]
where your portion ends to patrilla is
that going to be the same
[9:30]
wther is that for some reason I me he
probably doesn't know but uh I could
[9:34]
probably find out I have I do have
drawings of the engineer if you really
[9:38]
that car suck it open on the no I mean I
know that the trustees had approved
[9:44]
putting sidewalk in all the way North
keer all the way I think to Fields erles
[9:49]
but I don't know exactly how they're
going to do that I mean just based on
[9:54]
what they did on Union Cemetery I think
some you know they they take the most
[9:58]
effective route you don't have to worry
about it yeah what's that they'll match
[10:02]
it up I just thought if you knew for
some reason I thought it was going to be
[10:05]
larger but it just makes sense to take
the existing and blend it in yeah yeah
[10:11]
um
[10:30]
it looks
[10:34]
like that's passive right I think that's
the next street down after petrill
[10:40]
they're showing it all against the road
which against the road they have it as 6
[10:43]
and 1/2 ft wide against the road so
there's limited there's limited existing
[10:48]
right away north of here and when you
get it that close to the road you have
[10:52]
to build the square curve and you have
to build it wider so people can walk
[10:54]
further away from the Cars makes
sense yeah so if Springhouse puts theirs
[11:01]
in and then a year from now or 6 months
or two years from now whatever the time
[11:05]
period
is I have 5 ft and then a larger is does
[11:10]
it is it a gradual or is it just it
stops at five and then it suddenly
[11:14]
becomes six it'll widen out in whatever
way they can figure out how to make it
[11:18]
widen out I've seen it where one p one
square is five and one square is six and
[11:24]
it just looks
horrible like if you look on Union
[11:28]
Cemetery where they curve is and it's
right against I mean you can't it's you
[11:33]
can't really tell I
mean uh any questions for
[11:39]
Brian all right thank all right thank
you is there anyone else here that would
[11:44]
like to speak in favor or against the
curent design
[11:50]
proposal had to go through the formality
uh with that I'd like to close tonight's
[11:55]
public hearing and open it up to
discussion among the board I think our
[12:01]
thoughts are pretty
straightforward yeah I mean in the
[12:06]
motion do we want to specifically kind
of state about a curvature or can that
[12:10]
just sort of do we want it in the motion
or is it just sort of a recommendation
[12:14]
can we is there any reason we can't
recommend
[12:19]
it um I I don't I don't know exactly
what you would say or how enforceable
[12:24]
that is like you you want the the
transition to be curved in nature no the
[12:30]
sidewalk yeah the transition between the
sidewalks to be curved in nature instead
[12:33]
of
square I'm not sure I I don't know I
[12:39]
mean yeah we don't want to create any
more problems like because they realize
[12:44]
that there's some electric Junction or
whatever that is now impacted you
[12:49]
know you know what we'd like if you can
do it fantastic if you run the
[12:54]
complications we don't want to make it
any more challenging right no problem
[12:59]
all right I'll make a motion to approve
the uh Sims
[13:05]
20231 uh as requested I'll
second roll Mr castler yes M Fields yes
[13:17]
Mr re yes excellent uh any old business
thanks for your time thank thank you
[13:24]
guys sorry we couldn't give you more of
a
[13:27]
challenge I've
you're not used to this no I'm not I
[13:31]
think this is the history of s c have
attended a sprous
[13:36]
meeting thank you uh any new business
we'll have a meeting in May it's mle 7
[13:43]
Brew coming back to make some
modifications for their final was that
[13:48]
approved last month or was it tabled yes
it was okay and they're just changing
[13:52]
well that was one of the issue with the
eement and the parking and yeah any
[13:57]
administrative matters no
motion to adjourn I'll make that motion
[14:02]
I'll second here's alone Mr castler I M
Fields yes that's
[14:08]
right
yes no