Transcript
SOURCE TRANSCRIPT
This transcript is downloaded from the source you provided but we haven't reviewed it for accuracy. Treat it as a starting point, not a verbatim record. You can also request an AI-transcription of the audio file with the button to the left.
These are YouTube's auto-generated captions, not a human transcript — expect occasional errors, especially with names and technical terms.
[0:00]
stand in for the
[0:03]
invocation I to of the United States of
[0:08]
America and to the for stands one nation
[0:14]
God indivisible liy and justice for
[0:20]
all our heavenly father we are very
[0:23]
grateful to be able to be here this
[0:25]
evening and to meet with the Town
[0:27]
Council we pray for thy Spirit to bless us and guide us as we discuss uh
[0:33]
various matters before us we're also
[0:35]
thankful to be able to recognize uh
[0:38]
recipients of awards throughout our
[0:40]
community we're thankful for our
[0:41]
emergency responders for all that they
[0:43]
do to protect us and to serve the needs
[0:46]
of our community we appreciate their
[0:48]
sacrifice and pray for a blessing of
[0:51]
peace and protection upon them and upon
[0:53]
their families we're thankful for the
[0:55]
moisture that we have received and we
[0:57]
pray that thou continue to bless our
[0:59]
region with with the snow that we need
[1:01]
to help to protect our forests and our
[1:03]
lakes and our rivers and streams and we
[1:06]
acknowledge thy hand in all things and
[1:08]
say this in the name of Jesus Christ
[1:10]
amen thank you Keith Item B on our
[1:18]
agenda tonight is call to the public
[1:20]
this is a business meeting of the Town
[1:22]
Council the town values and welcomes
[1:23]
public input please address the council
[1:26]
as a whole and not individual council
[1:27]
members do not address staff or members
[1:29]
of the audience Council action on items
[1:32]
brought up and call to the public is
[1:34]
limited by the open meeting law Council
[1:36]
may direct staff to study the matter and
[1:38]
reschedule for further consideration at
[1:40]
a later date items on the agenda are not
[1:42]
heard and individuals are limited to 3
[1:44]
minutes I don't have any requests so if
[1:47]
this is the time if you would like to
[1:48]
speak tonight okay we'll move on then to
[1:52]
item C which is our consent agenda all
[1:55]
items listed are considered routine
[1:57]
matters and will be enacted by one
[1:59]
motion the Council there will be no
[2:01]
separate discussion unless a member of
[2:03]
council requests that an item or items
[2:05]
be removed council members may ask
[2:07]
questions without removal of the item
[2:10]
from the consent agenda and items are
[2:12]
considered in their normal sequence as
[2:14]
listed unless called out of order are
[2:15]
there any questions from the council
[2:18]
councelor Craig bomb any questions for
[2:21]
you no I'm fine thank you okay councelor
[2:24]
smiter um I ask to be excused to abstain
[2:28]
myself because one of the items on the
[2:30]
consent agenda is something I'm involved
[2:32]
with so I'll
[2:33]
abstain okay should we just pull that
[2:35]
one item just for that one item okay
[2:39]
chrisy we need a motion for that correct
[2:41]
okay do I have a motion to remove item
[2:44]
C2 from the consent agenda please vice
[2:47]
mayor uh I move to remove item C2 from
[2:51]
uh the consent agenda at this time I
[2:53]
second that thank you all in favor
[2:55]
please signify by raising your right
[2:58]
hand councelor cbom
[3:01]
I thank you then um I will entertain a
[3:03]
motion for item
[3:05]
C1 vice mayor I move to approve uh C1
[3:10]
the the minutes of the Town council
[3:11]
meeting held on February 1st 2024 I
[3:14]
second that thank you all those in favor
[3:16]
please signify by raising your right
[3:18]
hand councelor cig bomb I thank you
[3:22]
we'll go back then to item C2 which is a
[3:25]
special event liquor license for the
[3:26]
balloon
[3:27]
festival vice mayor I move to uh approve
[3:31]
C2 the approval of a special event
[3:33]
liquor license for the balloon festival
[3:35]
at Mountain meow park for June 21st and
[3:37]
22nd 2024 I second that thank you we
[3:41]
have a motion to Second all in favor
[3:43]
please signify by raising your right
[3:45]
hand thank you councelor CRI bomb I
[3:50]
thank you we'll note that um councelor
[3:51]
snitzer abstained from that vote moving
[3:54]
on then to item D which is business
[3:57]
before our Council public comment will
[4:00]
be taken at the beginning of each agenda
[4:01]
item after the subject has been
[4:03]
announced by the mayor and explained by
[4:05]
staff any citizen who wishes may speak
[4:07]
one time for five minutes on each agenda
[4:09]
item before or after Council discussion
[4:12]
questions from Council Members however
[4:13]
may be directed to staff or a member of
[4:15]
the public through the mayor at any time
[4:18]
item D1 is a presentation of awards for
[4:21]
the voice of democracy audio
[4:24]
essays Christie is this you no it's
[4:27]
that's what I thought George come on up
[4:31]
make sure you stay close to the little
[4:33]
red lights so everybody can hear you
[4:34]
very good uh mayor council um on behalf
[4:38]
of BFW post 2364 I want to thank you
[4:42]
again for having us here every year
[4:44]
doing this um it's it's a good thing for
[4:47]
the I think for some of the kids and of
[4:50]
course law enforcement enironment EMTs
[4:53]
they don't get enough credit and you
[4:55]
know they can't take this one to the
[4:57]
bank but it might lighten their heart a
[5:00]
little bit I don't know uh at the first
[5:02]
meeting this month John Bey gave out uh
[5:05]
one of the voice of democracy Awards and
[5:08]
the other two uh winners we had I
[5:11]
believe were over at the high school
[5:13]
participating in a stage play so we'd
[5:16]
like to catch up on that tonight
[5:17]
starting out with the voice of democracy
[5:20]
Awards and I know that John explained it
[5:22]
all to you last meeting so off for go
[5:25]
that tonight so we'll start off with our
[5:27]
third place award voice of De Ry and
[5:30]
that is Brook
[5:33]
horn I don't see them tonight both and
[5:37]
Grace were going to come tonight I don't
[5:39]
know if something happened unless
[5:40]
they're out in the hallway I don't see
[5:42]
them yeah I don't either okay we'll just
[5:45]
move them along then the other one's not
[5:46]
here either no neither one of those
[5:48]
could announce it go ahead and announce
[5:50]
their names though anyhow uh anyhow go
[5:53]
back uh Brooke would have gotten a check
[5:55]
for
[5:56]
$50 and then Grace Smithson
[6:00]
uh who was second place would have got a
[6:02]
check for
[6:03]
$75 and at the last uh council meeting
[6:06]
Jackson Woods who our first place got a
[6:10]
$100 and then with the district uh he
[6:13]
took third place so he would have got
[6:14]
another $75 there so we got that well
[6:17]
congratulations to all of those students
[6:19]
they did a good job they really do they
[6:21]
do um then we'll go ahead to your next
[6:23]
item D2 which is presentation of Public
[6:26]
Service Awards from efw post 23 la
[6:29]
firefighter and EMT emergency medical
[6:33]
technician um we'll start off with uh
[6:37]
the co a code enforcement it's a Police
[6:39]
Service Officer Chelsea H for the town
[6:43]
of Pinetop
[6:47]
[Applause]
[6:58]
Lakeside
[7:04]
next we have our deputy sheriff Haley
[7:07]
farus from the neevo county sheriff's
[7:09]
[Applause]
[7:18]
office
[7:25]
no
[7:28]
thanks and the next award I think I said
[7:31]
the same thing last year is kind of
[7:33]
close to my heart as both my wife and I
[7:35]
were Detention officers down in Puma
[7:38]
County for uh Clarence stupnick back in
[7:41]
that's a long time ago if you guys knew
[7:43]
what but anyhow we have Deputy A
[7:44]
detention deputy sheriff Brian
[7:48]
mcelrath in the Navajo County
[7:50]
[Applause]
[7:58]
shff
[8:00]
fire fire Lewis marabelli from Pinetop
[8:04]
fire
[8:16]
district and last we have paramedic paramedic Zack
[8:21]
vanik I said that
[8:24]
[Applause]
[8:28]
right
[8:30]
again mayor council thank you for having
[8:35]
us okay yeah sh and Dan if we could get
[8:40]
Dan up here and
[8:42]
Jim and Dave is Dave here he's spting
[8:46]
around oh there he is Sheriff clouse we
[8:51]
can get them all up here and get a
[8:53]
[Music]
[8:58]
picture okay you guys got to get way
[9:00]
closer
[9:09]
together
[9:14]
two thanks
[9:17]
[Applause]
[9:26]
again thank you for being here George
[9:28]
and congratulations to all of you we do
[9:30]
appreciate all of your service thank
[9:38]
you okay we'll move on then to item D4
[9:41]
which is excuse me item
[9:44]
D3 presentation from Navajo County
[9:47]
Sheriff's Office including a recap of
[9:49]
2023 and plans for
[9:51]
2024 sheriff klous and Lieutenant
[9:58]
Williams
[10:02]
well good
[10:03]
evening nice to see you yeah thank you
[10:06]
for having us mayor and City uh members
[10:08]
of the council it's good to be here and
[10:10]
thank you to the BFW and for the town of
[10:13]
Pinetop Lakeside for always doing this
[10:14]
annually and recognizing uh the men and
[10:17]
women that serve as First Responders
[10:19]
throughout the community as we were
[10:21]
coming here tonight I was thinking about
[10:22]
all the different deputies and police
[10:24]
officers and firefighters we've honored
[10:26]
over the years coming here and it's
[10:27]
remarkable there truly is
[10:29]
a huge amount of of true heroes that serve us each and every day and uh
[10:37]
couldn't be happier to be here and to
[10:38]
celebrate them today so two or three
[10:41]
years ago we started uh as the Sheriff's
[10:43]
Office coming to City Council meetings
[10:45]
to give a brief presentation of an
[10:47]
update of kind of some of the um joint
[10:50]
operations or um task forces that we
[10:54]
work together with the cities we know
[10:56]
that Public Safety is one of the more
[10:58]
expensive expensive items on each of
[11:00]
your budgets it's one of your more uh
[11:02]
critical items that I know the public SP
[11:05]
special attention to to include roads as
[11:08]
one of them as well but Public Safety is
[11:10]
something that's always on the Forefront
[11:11]
of each of our minds and it it does come
[11:14]
at a high cost and we as Public Safety
[11:17]
officials and leaders always come to uh
[11:20]
Boards of Supervisors City councils
[11:22]
asking for more and more and more and
[11:23]
sometimes you have to have a little
[11:25]
justification as to why we need that
[11:27]
expensive equipment or what we're doing
[11:29]
and I know that the sheriff's off office
[11:31]
operates in and around and throughout
[11:34]
each of our communities within this
[11:35]
County and so I feel an obligation and a
[11:37]
duty to report back to you as well means
[11:40]
that we're operating within your city
[11:42]
and we're also operating on the
[11:44]
especially in Pint toop Lakeside where
[11:46]
it's so checkerboard but we're also
[11:48]
working with your Police Department each
[11:49]
and every day trying to find ways not to
[11:52]
duplicate services but to try to uh
[11:54]
share resources and I see one of the big
[11:57]
successes of that has been the the
[11:59]
regional communication that is something
[12:01]
that dates back 10 years ago that we
[12:03]
tried to get accomplished and you saw
[12:05]
sholo really worked there and we're kind
[12:08]
of on the northern part but in part of
[12:11]
our presentation I wanted to share
[12:13]
tonight is how we've made a lot of
[12:15]
stride in the last two years um so last
[12:19]
year I came here and we talked about our
[12:21]
SRT team or our joint team how we're
[12:24]
working together on that we talked about
[12:25]
Communications we talked about criminal
[12:27]
investigations we talked about mcap
[12:29]
which we're going to give an update here
[12:31]
tonight and we talked about uh kind of
[12:33]
joint operations with traffic
[12:35]
enforcement those are kind of five areas
[12:36]
that we work with your Chief um trying
[12:42]
to do these things in in in
[12:44]
collaboration as as a uh as law
[12:47]
enforcement this year kind of some of
[12:49]
our Focus that I wanted to report on
[12:52]
some some uh successes where we've made
[12:56]
some Headway um
[12:59]
we we have looked for ways to fund a lot
[13:03]
of these operations through the state or
[13:05]
through different federal grants I know
[13:09]
that in my opening remarks we talk about
[13:12]
the cost the burden that this brings and
[13:14]
you guys have so many different uh
[13:16]
priorities that you're trying to weigh
[13:18]
and sometimes you're not able to to to fund these at the levels that we want
[13:23]
MCAT is one of those that is a it's a
[13:27]
multi- agency Joint Task force it is
[13:29]
proactive work and sometimes a lot of
[13:32]
our Chiefs and and the sheriff's office
[13:34]
we need to have deputies and officers
[13:36]
doing our calls for service our first
[13:39]
responder work and these these uh kind
[13:43]
of these proactive task forces sometimes
[13:45]
are the ones that that get staffed last
[13:48]
and one of the things is we would like
[13:50]
to join those task forces if there was
[13:52]
funding or if there's vehicles or if
[13:53]
there's things that that make it um
[13:56]
appealing for us financially to join
[13:58]
that that um this last year we as the
[14:03]
Arizona sheriff's Association lobbied at
[14:05]
the state legislature through the
[14:07]
governor's office to take the Bard what
[14:10]
governor Ducey started was a border
[14:11]
Strike Force well with the change in
[14:13]
leadership that that was kind of going
[14:15]
to go away and we kind of said hey don't
[14:18]
throw out the baby with the bath water
[14:20]
right and so Governor Hobbs had
[14:22]
reallocated those funds through the
[14:24]
legislative uh process it was
[14:26]
appropriation that was where all the
[14:28]
counties were able
[14:29]
to um essentially apply for that and so
[14:33]
we did a $1 million kind of Grant
[14:35]
application to receive those funds which
[14:38]
would now be sent to the county to work
[14:41]
and to fund mcap we used to do a lot of
[14:44]
these fundings through burn Jag and
[14:46]
through asset forfeiture those things
[14:48]
have really changed and you're relying
[14:50]
on the federal government now we're
[14:52]
relying on the state and this not
[14:54]
relying on the state but we're asking
[14:55]
the state to help fund it with the
[14:57]
opioid crisis with the f all crisis with
[14:59]
the poorest border and we're seeing a
[15:00]
lot of these things that have an effect
[15:02]
on us you're seeing a lot of great work
[15:05]
that MCAT has been doing over the years
[15:07]
with their productivity and their
[15:09]
production what we've been able to
[15:10]
manage here locally we were able to ask
[15:13]
for $1 million Grant we we expect to to
[15:16]
receive that in full which those funds
[15:19]
were going to be pushed each of our
[15:21]
municipalities as an opportunity where
[15:23]
they can put someone on the task force
[15:25]
up to 75% funded and so that's a
[15:28]
exciting opportunity that is essentially
[15:32]
two to three times more than what we've
[15:34]
done in the past and that's something
[15:36]
that we as are looking to um be United
[15:40]
within the county that there's there's a
[15:42]
great opportunity that's going to bring
[15:43]
additional services to your community um
[15:46]
the next thing on our Communications
[15:48]
with Pinetop Lakeside Joint Forces with
[15:50]
sholo we have been working with sholo to
[15:54]
make sure that we're not going in
[15:56]
different directions I'm not an expert
[15:58]
when it comes comes to VHF UHF LTE and
[16:00]
all these things but I'm learning it as
[16:02]
I'm going and we have people that speak
[16:05]
those languages and we got together with
[16:08]
your Chief and the City of scholo Chief
[16:10]
to say if you guys move this direction
[16:12]
we're going to move that direction vice
[16:14]
versa that way our two centers Don't Go
[16:17]
in different directions and that way
[16:19]
that you as community members and
[16:21]
councils don't see any um variances
[16:24]
between how these operate and that when
[16:27]
someone calls 91 one I don't think they
[16:29]
care if it goes to Holbrook or if it
[16:31]
goes to sholo or how it gets there they
[16:33]
just need resources sent quickly right
[16:37]
and so that's what our Focus has been in
[16:41]
November the Navajo last year the Navajo
[16:44]
County Sheriff's Office so part of that
[16:47]
conversation I'll just step back just
[16:49]
one part of that conversation was not
[16:51]
only do we have these centers but we
[16:52]
need to really up our infrastructure
[16:56]
sites we're operating on four tower
[16:58]
sites in our entire County we felt we
[17:00]
need to be looking at other models of
[17:02]
other counties we need to be around 15
[17:03]
or 16 18 20 sites Towers repeaters uh we
[17:07]
needed better uh Portables better mobils
[17:10]
in our vehicles Navajo County Sheriff's
[17:13]
Office applied for a Dema Grant through
[17:15]
it's it's federal funds that were sent
[17:18]
uh or no they're from the state that
[17:19]
were sent to DEA that law enforcement
[17:21]
was able to apply for we applied the
[17:23]
Sheriff's Office on behalf of all uh law
[17:26]
enforcement we received a $7 million
[17:28]
Grant and with that Grant we have P
[17:31]
we're purchasing radios for every police
[17:33]
officer in this County and we're
[17:36]
purchasing radio sites and and all that
[17:39]
so that we are taking uh the steps
[17:42]
forward with the city of sholo to ensure
[17:45]
that everybody's Communication in
[17:47]
everybody's vehicle fire and police and
[17:49]
Sheriff's is all talking on the same
[17:52]
language and uh that that is in the
[17:55]
works now the grant has been awarded and
[17:57]
it's this $5 million or it's a 5year $7
[18:00]
million
[18:01]
Grant and2 or3 million of those was
[18:04]
carved out for this for uh radio
[18:08]
infrastructure um next thing three or
[18:11]
four years ago we talked about a gel
[18:14]
District uh being implemented within
[18:16]
Navajo County that has been about 5
[18:20]
years that has been very
[18:24]
um what' you say it's put good
[18:29]
foundation and good structure to the
[18:31]
future of jail operations within this
[18:33]
County with that we in the last couple
[18:36]
years have gone outside of just looking
[18:38]
at detention costs medical costs and
[18:41]
feeding inmates and just doing those
[18:43]
routine mandatory obligations that we
[18:45]
have we're now looking at programs that
[18:48]
we're starting within the Jael to do
[18:51]
actual Rehabilitation or what we're
[18:53]
calling re-entry when we say re-entry
[18:55]
when people leave the facility and
[18:57]
re-enter Society
[18:59]
these are my neighbors these are your
[19:00]
neighbors they are being held
[19:02]
accountable and they're being booked in
[19:03]
for for crimes that they've committed
[19:05]
but while they're there we're finding
[19:06]
that a vast majority of these around 50%
[19:10]
it's a substance mental mental illness
[19:13]
or substance abuse type thing the other
[19:15]
half are serious crimes that they'll
[19:17]
probably end up spending DLC time but on
[19:19]
those ones that are shortterm going to
[19:21]
be re-entered we're looking to start two
[19:23]
where we are starting two programs one
[19:26]
for the this re-entry where they working
[19:29]
with the prosecutor's office where they
[19:31]
are going to be given um kind of
[19:34]
diversion for for treatment and where
[19:38]
their accountability is not dismissed
[19:41]
but it's in condition with receiving
[19:44]
treatment and then we're going to also
[19:46]
have in inhouse or in custody uh
[19:50]
substance abuse treatment that way when
[19:52]
your cities and the cities within here
[19:54]
book them in within ril you're going to
[19:56]
get back hopefully a better better
[19:58]
citizen that's going to come back and um
[20:02]
with successes of not having as many
[20:04]
addicted to these drugs and hopefully
[20:06]
become a property owner taxpayer and
[20:09]
start contributing to society so that is
[20:11]
something that we're really excited
[20:13]
about because of that jail district and
[20:15]
that we now have that stability in there
[20:17]
we now are applying for these grants
[20:19]
we're seeing great strides in what we
[20:21]
are uh in our jail
[20:24]
operations um touched on the regional
[20:27]
dispat and how that's moving along
[20:29]
coming in the same direction CI criminal
[20:32]
investigations you guys have had one of
[20:34]
the best or not the best one of the
[20:38]
most prolific um Cold Case Sol solved
[20:43]
cases uh in recent history in this
[20:45]
County it was remarkable work that your Police Department did you you
[20:50]
should be extremely proud of that case
[20:52]
that they
[20:53]
did um criminal investigations is one of
[20:56]
the most critical aspects I look at each
[20:59]
of our our um our departments that is
[21:03]
where we're handling some of the more
[21:04]
serious crimes we're looking at
[21:06]
30-year-old homicides like like we that
[21:09]
was dealing with here we're looking at
[21:10]
crimes against children we're looking at
[21:13]
um large dollar frauds we're looking at
[21:15]
um suicides and all and essentially all
[21:19]
death investigations that we we need to
[21:22]
make sure we do it right and we don't
[21:24]
make any type of mistakes um and that's
[21:27]
where we as as a county have really
[21:29]
worked together we have what we call the
[21:31]
Navajo County homicide Task Force if we
[21:33]
have a critical incident we rely on each
[21:35]
of the communities or each of the cities
[21:37]
to to come together to support one
[21:39]
another but it gets burdensome on a lot
[21:41]
of these smaller departments where
[21:43]
they're like I don't have the overtime
[21:44]
funds to send them there I don't have
[21:45]
the training for these types of things
[21:47]
and then vice versa when someone has to
[21:49]
come to our community and send ler
[21:52]
detective for a day or two it it's one
[21:54]
of those things it's it's hard to wait
[21:56]
but we always do what's what's best for
[21:57]
the
[21:58]
community so we had an appropriation
[22:01]
that now we've just received it for the
[22:03]
second year in a row we're receiving
[22:05]
$120,000 each uh budget Year from the
[22:07]
state to go to these region there was
[22:10]
five Regional task force identified and
[22:12]
Navajo County was one of them because we
[22:14]
applied through it through the Sheriff's
[22:15]
Office that way when we ask for your
[22:18]
detectives to go to these type of
[22:20]
trainings or to to work with us that we
[22:21]
can help with not only the cost of the
[22:24]
overtime but with the training and the
[22:26]
supplies and so those are ways that
[22:29]
we're looking for Solutions we're
[22:30]
finding these funds in these three
[22:32]
different areas that are really
[22:34]
hopefully going to to make a difference
[22:37]
in our in our Public Safety and our
[22:39]
criminal justice going forward so with
[22:41]
that I just want to give quick update on
[22:43]
those five things and then we had um
[22:45]
kind of our MCAT update we always do we
[22:48]
try to talk about specifically of the
[22:51]
type of crimes that we were working in
[22:53]
and around the Pint toop Lakeside area
[22:55]
and some of those statistical data is
[22:59]
okay he was going to give this part of
[23:01]
it but he's running late so I think you
[23:03]
just may hold him in uh hold him in
[23:05]
contemp for something right but I'll go
[23:07]
ahead and do
[23:08]
it um did it go where do I point it at
[23:13]
this just try to point it at this
[23:15]
computer there you go yeah okay so these
[23:18]
are their 2022 annual uh statistics for
[23:22]
um
[23:24]
nav as you can see methamphetamine
[23:27]
heroin and uh cocaine was one of the
[23:30]
more surprising things but these are in either in pounds or grams of of what
[23:35]
we sees you can see that fentanyl at 2.1
[23:40]
million pills is the drug of choice
[23:43]
throughout America in Arizona and in
[23:46]
Navajo County it is it is overtaken what we're seeing being traffic what
[23:52]
we're seeing on the streets um it has
[23:54]
the highest level potency you've seen
[23:56]
all the reports it's still
[23:58]
I think it was two years ago it Arizona does a uh threat assessment
[24:04]
on on the drug trafficing and and what heida um sees as as the biggest
[24:10]
threats to our communities and it was
[24:13]
methamphetamine held the top drug for at
[24:17]
least a decade it was two years ago that
[24:18]
fentanyl overcame that and it and it's
[24:21]
done it with quite the force and it's
[24:22]
something that we're we're certainly
[24:24]
concerned about and we're continued
[24:26]
because the numbers just keep Rising um everything else kind of seemed
[24:30]
to have plateaued but uh cocaine had
[24:33]
made a rise in the last year uh we
[24:37]
conducted 68 search warrants throughout
[24:39]
this is mcap which is the regional task
[24:41]
force that everybody uh participates
[24:43]
with and we they conducted 68 search
[24:45]
warrants countywide uh during that last
[24:49]
year um that was in 22 here in 23 you
[24:53]
can see that the fentanyl pills went
[24:55]
down by a million um lot of those lot of
[24:59]
those seizures are coming on the
[25:01]
interstate and
[25:04]
um we we would
[25:06]
attribute throughout Arizona the numbers
[25:09]
were still higher but our local seizures
[25:11]
just went down it's not that we're
[25:13]
seeing less coming through the state we
[25:15]
just uh interdicted Less on on the
[25:17]
interstate and part of that would be
[25:20]
that our deputies and our DET Texas
[25:22]
working in this TR task force were uh
[25:25]
instead of doing a lot of interdiction
[25:27]
work we're doing a lot of those search
[25:28]
warrants working uh working what we call
[25:31]
drug trafficking organizations and
[25:32]
trying to to intercept those and
[25:35]
dismantle those um some of the
[25:38]
comparisons have kind of kind of the
[25:40]
trends stayed consistent throughout the
[25:42]
years but certainly methamphetamine or
[25:46]
Methamphetamine and Fentanyl is is uh
[25:49]
the two highest uh
[25:52]
producers um M catar compared from 2022
[25:56]
to 2023 we we had
[25:58]
24 uh3 this year and or last year and
[26:02]
then 20 228 the year before so you
[26:05]
seeing our our arrests with this task
[26:07]
force have gone
[26:09]
up uh here's our agency assist broken
[26:12]
down uh between each agency and as you
[26:15]
can see in the pie chart uh they're
[26:17]
assisting every agency uh in to include
[26:20]
Apache County um as they've become truly
[26:24]
one of the uh hardest hitting fastest re
[26:27]
acting groups within the the White
[26:30]
Mountains we're really proud of the work
[26:32]
that they've done and that that each of
[26:34]
these agencies rely or not rely on them
[26:37]
but they depend on them and they really
[26:38]
use utilize their
[26:41]
services
[26:44]
um why are you familiar with this this
[26:53]
one
[26:56]
yeah so back in April we uh had some
[27:00]
information that received from some of
[27:01]
our local agency
[27:03]
officers
[27:05]
with different subjects coming in and
[27:07]
have a hotel room in the sholo area
[27:10]
within that we started looking into it
[27:12]
with our detectives with the assistance
[27:14]
of like DPS Arizona gang task force as
[27:18]
well through this mult multiple traffic
[27:21]
stops were made throughout sholo into
[27:24]
snowflake Heber even up into pint top
[27:26]
that were all related to come in from
[27:28]
this room by the time we were done with
[27:30]
it uh we made the 19 arrest five search
[27:33]
warrants were actually served one of
[27:35]
them was actually served by Phoenix Drug
[27:37]
Enforcement Bureau with us on a Target
[27:40]
down in the valley that all tied into
[27:41]
this
[27:42]
area this is also part of a couple
[27:45]
people that we have actually arrested
[27:47]
two to three times not just only our
[27:50]
task force but shd Pine Top Lakeside
[27:52]
police officers so it's one of one of
[27:54]
them and we've actually just got a
[27:55]
sentence in both two of the suspects
[27:58]
Reed 5 years prison time out of it so
[28:00]
that's been really
[28:03]
good thank
[28:05]
you
[28:07]
um here we have a
[28:10]
couple those yeah remember these so we
[28:14]
have one detective that's actually a
[28:16]
full-time Task Force officer assigned to
[28:18]
Homeland Security out of Flag Staff um
[28:20]
they received a lot of multiple tips
[28:22]
regarding sex offenses throughout the
[28:25]
state um our officers that's assigned to
[28:28]
that he actually this tip came in
[28:31]
and received information of a bunch of
[28:34]
sexually explicit material involving a
[28:37]
CH child um he called me directly we
[28:40]
started working it with Homeland
[28:41]
Security same day that we had the tip we
[28:44]
had suspect in custody did three search
[28:47]
warrants on the house two houses one on
[28:50]
a vehicle was able to get the suspect in
[28:53]
custody who was working at a local
[28:55]
business um speaking with County
[28:58]
attorneys I mean there're so far at up
[29:00]
11 counts of the exploitation uh sexual
[29:04]
exploitation of a minor photographs um
[29:07]
there is still information going on
[29:08]
Investigation to further into this which
[29:11]
could lead to more charges so basically
[29:13]
our mkat team is not only just looking
[29:15]
at our dope stuff if it's a major crime
[29:19]
we get information on we kind of run
[29:21]
with it also in August uh wisell police
[29:25]
department called us and said hey we've
[29:27]
got a bunch of string of burglaries in
[29:28]
there air where one of them is actually
[29:30]
a robbery guy walks into a Circle K just
[29:33]
walks in there with a knife starts just
[29:35]
loading alcohol cigarettes and walks out
[29:37]
with about $4,000 worth of product um we
[29:41]
was able to identify who the guy was
[29:43]
which was also one of our targets we are
[29:44]
looking at for some drug sales So within
[29:47]
24 hours we did a search warrant on the
[29:49]
residence and recovered probably 50 to
[29:52]
60% of the property and located uh
[29:56]
stolen firearm along with some some
[29:59]
drugs out of it so it was a really good
[30:01]
partnership with all all the agencies on
[30:03]
any of these cases because part with
[30:05]
just our little task force there's
[30:07]
usually three s or three detectives one
[30:09]
Sergeant working most of it we can't do
[30:12]
it without the help of our local agency
[30:14]
even the patrol officers just because of
[30:16]
Manpower and the time it's been really
[30:19]
beneficial thank
[30:26]
you yeah this one we speaking of Jael
[30:29]
operations we had an overdose you know
[30:31]
fentanyl is is smuggled into everywhere
[30:34]
we had a we had an individual who was
[30:37]
remanded in court and was sent or was
[30:39]
sent you know uh to jail and he had
[30:42]
smuggled in couple pills in his shoes
[30:45]
that was missed during the search he had
[30:48]
transferred one to his uh cmate who
[30:52]
started overdose that's why these
[30:54]
deputies are recognized for their life-
[30:56]
saving measures they performed CPR
[30:58]
revive them but MCAT was called in to do
[31:01]
an investigation to find out who he was
[31:03]
who brought him in and where they did
[31:05]
that with that information they were
[31:06]
able to go back to the residents
[31:08]
intercept a lot of gun stolen guns uh
[31:11]
fent andol that was still in the home
[31:13]
that led to several arrests from that so
[31:16]
uh even though we took one tragic
[31:18]
scenario that occurred in the jail these uh this great team was able to uh
[31:23]
further that and uh bring uh several
[31:25]
others that were contributing this to
[31:29]
Justice um with that those are just a
[31:32]
couple of the snapshots of of of the
[31:34]
operations that we're doing here in
[31:36]
Navajo County but of course uh open up
[31:38]
to any questions if you have any if not
[31:40]
I just want to thank you again for your
[31:41]
time thank you for the the uh
[31:44]
partnership and the work that we work in
[31:47]
working with your city and uh the great
[31:49]
uh Chief and and command sta that you
[31:51]
have at the city of pintop that uh work
[31:54]
diligently uh to ensure that Public
[31:56]
Safety is is it uh is a priority within
[31:59]
this community and we couldn't uh we
[32:01]
enjoy working with them and and being
[32:03]
Partners in that in that mission each
[32:04]
and every day so thank you sheriff and
[32:07]
Wy appreciate those updates um it's just
[32:10]
amazing kind of scary in our little
[32:12]
small towns we would think that we were
[32:14]
to this but I think you have your head
[32:15]
in a sand if you continue to think that
[32:18]
um any other questions or comments that
[32:21]
was a great report councelor Craig bomb
[32:23]
do you have anything you'd like to
[32:25]
add no thank you and we appreciate all
[32:29]
the work that you're doing to obtain
[32:31]
those grants um we all know how precious
[32:33]
the dollar is and we need to to keep
[32:35]
working on so thank you sheriff wely for
[32:38]
coming tonight yes yes thank you yes
[32:40]
appreciate you very
[32:42]
much we'll then go ahead and move on to
[32:45]
item D4 which is consider approval of
[32:48]
resolution Number 24- 1700 authorizing a
[32:51]
call of election for the town of pintop
[32:54]
Lakeside 2024 primary and general
[32:56]
election
[32:57]
Christie this one is you yes good
[33:00]
evening mayor and Council I am going to
[33:02]
get back over to the correct screen here
[33:05]
um so this resolution is for the call of
[33:07]
election for the primary election and if
[33:10]
needed the general election I just want
[33:12]
to give a little bit of background
[33:13]
because um as of Friday February
[33:17]
9th um the governor signed House Bill
[33:21]
2785 which changed the primary election
[33:25]
by one week it moved it one week earlier
[33:28]
the reason for the change in that um
[33:30]
date is in 2022 a bill was signed that
[33:36]
changed the the percentage of ballots
[33:39]
that could be challenged for a recount
[33:42]
from 0.1 to5 so with the increase they
[33:44]
say it could take longer there's going
[33:46]
to be it could possibly cause more
[33:49]
recounts so in order to give them enough
[33:52]
time to get the ballots counted so that
[33:55]
they do count in the election they had
[33:56]
to ch change it by a week this could be
[33:58]
a permanent thing is what they're saying
[34:00]
it's not just for the primary election
[34:02]
this year it could be for the ones
[34:04]
oncoming um this doesn't affect the
[34:06]
general election but um there was a
[34:10]
possibility that if that didn't get
[34:12]
changed none of Arizona's votes would
[34:14]
have counted at all so they moved that
[34:17]
to July 30th um for those candidates
[34:21]
that picked up petitions and had
[34:23]
signatures before the change which it
[34:25]
was effective on the 9th I think I said
[34:27]
that but um if the petition said that
[34:30]
they were signing for an August 6th
[34:32]
election they're letting us go ahead and
[34:34]
take those petitions because it was
[34:37]
changed after that was signed by
[34:39]
legislator after and then um as of the
[34:42]
9th every petition needs to state that
[34:44]
the election is July 30th and they'll
[34:46]
all be accepted um we have three four
[34:50]
year seats um and one twoyear seat on
[34:54]
this election um council member Craig
[34:57]
bomb council member snitzer council
[34:59]
member Smith their their seats are up so
[35:01]
those will be for fouryear seats and
[35:03]
then Jeff Phillips who was recently
[35:05]
appointed it was finishing out a term
[35:07]
when council member Brimhall left and
[35:10]
that will be a two there will be two
[35:11]
years left on that term after this
[35:12]
election so we'll have four seats in the
[35:15]
primary election um if all four seats
[35:19]
get
[35:20]
um uh majority votes then we won't have
[35:23]
to take it to the general but the we're
[35:25]
going to go ahead and just add the
[35:27]
general and the and the primary
[35:29]
elections together into this call of
[35:32]
election is there any questions on that
[35:34]
any questions for
[35:36]
Christie thank you for explaining all
[35:38]
that that was a little bit confusing
[35:39]
when the state did that to us I think
[35:41]
yes yeah so do I have a motion vice
[35:45]
mayor I move to approve resolution
[35:47]
number
[35:49]
24-17 authorizing the call of election
[35:51]
for the town's
[35:53]
2024 primary election to be held on July
[35:56]
30th 20 24 and the general election if
[35:59]
needed being held on November 5th
[36:03]
2024 I'll second that thank you we have
[36:05]
a motion a second is there any further
[36:08]
discussion all in favor please signify
[36:10]
by raising your right
[36:11]
hand councelor Craig
[36:14]
bomb I thank you that carries
[36:17]
unanimously um there being no further
[36:20]
business um I will adjourn our regular
[36:22]
council meeting thank
[36:25]
you can you give me one second mayor I
[36:28]
went to switch my recorders okay thank
[36:40]
you I need to get to my agenda too
[36:47]
so okay whenever you're ready okay hang
[36:50]
on a minute I need to get to my okay we
[36:52]
don't have to figure all this out
[36:55]
anymore
[36:57]
okay I will call the board of adjustment
[36:59]
meeting to order this evening um we do
[37:02]
have a quorum again counselor board
[37:04]
member um cck bomb is on the phone with
[37:07]
us
[37:08]
today um this is a business meeting of
[37:11]
the board of
[37:14]
adjustment the board welcomes values and
[37:16]
welcomes public input pleas please
[37:18]
address us as a whole and not individual
[37:20]
board members do not address staff or
[37:23]
members of the audience action on
[37:26]
Council excuse me board action on items
[37:29]
brought up in call to the public is
[37:30]
limited by the open meeting law the
[37:32]
board may direct staff to study the
[37:34]
matter and reschedule for further
[37:35]
consideration later date items on the
[37:38]
agenda will not be heard or discussed
[37:40]
and call to the public and individuals
[37:41]
are limited to three minutes of the
[37:42]
board of adjustments special meeting
[37:44]
held on November 2nd
[37:46]
202 thank you we have a motion of second
[37:48]
further discussion all in favor please
[37:51]
raise your right hand announced by the
[37:53]
mayor and explained by staff any citizen
[37:56]
who additional use permit
[38:01]
Cup this item is the second time you've
[38:03]
seen this item it was previously for
[38:06]
your consideration in November Alpha
[38:10]
this location is a neutral
[38:12]
site
[38:16]
106.2 and it's Light commercial zoning
[38:18]
District the applicant
[38:20]
must 17106
[38:23]
020b the commission unanimously voted
[38:27]
to deny the issuance of a cup the board
[38:30]
of adjustment convened November 2nd 2023
[38:32]
consider an appeal to the denial of cup
[38:35]
133 the applicant requested a 90-day
[38:37]
extension to allow for the the
[38:39]
exploration of an alternative location
[38:43]
for the applicant uh failed to appeal
[38:46]
within a lot of
[38:48]
time a tower with a maximum height of 75
[38:52]
ft or the height of the tree line ft but
[38:55]
in no case greater than 95 ft per
[38:59]
171
[39:01]
is permitted under the existing zoning
[39:04]
with a conditional use permit however
[39:06]
the
[39:08]
height 1T with 5ot lightning rod hence
[39:12]
the requested tower height of 180 ft
[39:16]
Maxum the applicant proposes four Tech
[39:19]
lights on the
[39:23]
on for
[39:25]
17163 0 D the lighting is only
[39:27]
permissible for by the FAA FCC or
[39:31]
another governmental agency all lighting
[39:33]
must be in conformance with
[39:35]
17 vertical Bridge proposes to remove an
[39:38]
existing 8ft fence around the Western
[39:40]
perimeter of parcel fences over 6 ft are
[39:43]
only permitted as a conditional use
[39:44]
permit condition per 17108
[39:48]
06082 the board of adjustment could
[39:50]
require an 8ft tall fence as a condition
[39:52]
of approval is recommended that an 8ft
[39:54]
CMU block wall be utilized for screening
[39:57]
the Landscaping plan has yet to be
[39:59]
submitted as part of the application for
[40:01]
17106 030 F4F Landscaping shall mitigate
[40:06]
the visual impact of a wireless
[40:08]
communication facility and ancillary
[40:09]
structures Evergreen plant material of a
[40:12]
minimum height of 5 ft shall be planted
[40:14]
adjacent to the exteria of any wall or a
[40:16]
fence at least every 10 ft from Center
[40:18]
to Center the community development
[40:19]
director or the Planning and Zoning
[40:21]
commission or in this case the board of
[40:22]
adjustment May W or reduce these
[40:24]
Landscaping requirements if it is deemed
[40:26]
unnecessary or impracticable to provide
[40:28]
necessary screen for 17106 030 f4c
[40:33]
simulated branches must taper toward the
[40:35]
top of the tower to give the appearance
[40:37]
of a natural conically shaped evergreen
[40:39]
tree the submitted Tower elevation does
[40:41]
not demonstrate conformance to this
[40:42]
requirement as it does not taper to give
[40:44]
the appearance of a natural conically
[40:46]
shaped evergreen tree but instead is a
[40:48]
cylindrical shape some other things to
[40:51]
consider um include General requirements
[40:54]
outlined in 17106 030 F which requires
[40:57]
wireless communication facilities to be
[40:59]
cited and constructed preserve the
[41:01]
pre-existing character surrounding
[41:02]
buildings of vegetation while this site
[41:04]
is neutral is immediately adjacent to
[41:06]
the RV part most jurisdictions require a
[41:09]
minimum of one to one setback in the
[41:11]
event of catastrophic failure of a tower
[41:13]
until recently we only required a fall
[41:16]
zone letter the fall zone letter stated
[41:18]
multiple times that it cannot guarantee
[41:20]
the tower would fall within the 20ft
[41:21]
fall zone radius which states which
[41:24]
statements such as it will like
[41:26]
do and so uh and a best attempt to meet
[41:29]
the requirements given that current
[41:32]
codes do not address failure mechanics
[41:34]
is impossible to predict the behavior of
[41:36]
a failing structure the fall zone
[41:38]
require the applicant to submit
[41:40]
additional information to provide
[41:41]
further justification if they believe it
[41:43]
is necessary or appropriate any existing
[41:46]
Tower could accommodate the tower um
[41:48]
excuse me an existing Tower could
[41:50]
accommodate the tower within 6 t0 of a
[41:52]
mile if the proposal progresses with
[41:54]
approval there will be likely there is a
[41:56]
likelihood that there could be three
[41:58]
towers within this area including the
[41:59]
existing and the proposed from Tower
[42:01]
from Pine Top fire P 17
[42:04]
10608 D coordination with federal law a
[42:08]
conditional use permit may be granted
[42:09]
despite non-compliance with the
[42:11]
provisions of this section whenever
[42:12]
denial of a conditional use permit would
[42:14]
unreasonably discriminate among
[42:16]
providers of a functionally equivalent
[42:17]
personal wireless service or prohibit or
[42:20]
have the effect of prohibiting provision
[42:21]
of personal Wireless services within the
[42:24]
meaning of 47 United States code section
[42:27]
332
[42:29]
c7b I in evaluating an application for a
[42:32]
conditional use permit no consideration
[42:34]
shall be given to the environmental
[42:36]
effects of radio frequency emissions to
[42:38]
the extent that such emissions follow
[42:40]
the regulations of the Federal
[42:41]
Communications commissions as provided
[42:43]
in 47 United States code section 332 C7
[42:48]
B4 for an annalysis have provided for
[42:51]
the board of adjustment the following
[42:52]
the applicant vertical Bridge request to
[42:54]
have a conditional use permit issued for
[42:56]
a cell tower on August 24th 2023 the
[42:59]
Planning and Zoning commission
[43:00]
unanimously six to nothing denied the
[43:03]
issuance of the conditional use permit
[43:04]
the reasons for the denial are as
[43:06]
follows the applicant failed to provide
[43:08]
engineering report sealed by a licensed
[43:10]
structural engineer for
[43:14]
17167 1cd the applicant failed to show
[43:18]
all preferred sites where the tower
[43:19]
could be cited P 17106
[43:22]
7b1 the applicant failed to provide
[43:25]
written explanation of why they did not
[43:26]
select a preferred site including their
[43:28]
best efforts made to secure each of the
[43:30]
preferred sites why such efforts were
[43:32]
unsuccessful and why each of the
[43:34]
preferred sites is not technically or
[43:35]
legally feasible for 17106 70b do3 the
[43:40]
applicant proposed Tech lights on the
[43:41]
tower for installing new apperances
[43:43]
however no artificial lighting of
[43:45]
wireless communication facilities is
[43:46]
permitted unless such artificial
[43:48]
lighting is required by the FAA or the
[43:51]
FCC or another state or federal agency
[43:53]
of competent jurisdiction or NE or
[43:55]
necessary for security such lighting
[43:57]
shall comply with the lighting
[43:58]
regulations found in section 17141 100
[44:02]
the applicant failed to locate the
[44:04]
wireless communication facility away
[44:05]
from residential neighborhoods whenever
[44:07]
feasible per 17106 do10
[44:10]
B while the applicant proposes to
[44:13]
camouflage the site the camouflage must
[44:14]
taper toward the top and the tower shall
[44:16]
be painted to emulate a natural tree
[44:19]
trunk per
[44:20]
17163 F4 CND D and finally uh under the
[44:25]
effective or orance
[44:27]
24468 the tower would require 225 ft
[44:31]
setback per
[44:33]
17164 two for my recommendations I
[44:36]
provide the following staff recommends
[44:38]
denying the cup for the following
[44:40]
reasons proposed Tower's height is 180
[44:43]
ft a maximum height of 75 ft is
[44:45]
allowable and in no case greater than 95
[44:47]
ft in the site designated as
[44:49]
neutral applicant must submit evidence
[44:51]
of meeting the requirements established
[44:53]
was within 17106 70 B3 regarding contact
[44:57]
with all other Tower providers and
[44:59]
Property Owners within preferred sites
[45:01]
the applicant failed to submit a fall
[45:03]
zone letter that exemplifies confidence
[45:05]
that the tower would not harm residents
[45:07]
in the RV Park in the event of a
[45:09]
catastrophic failure the applicant
[45:11]
failed to locate the side away from the
[45:13]
residential neighborhood for 17106 10B
[45:16]
the applicant should have considered the
[45:17]
requirements outlined in 17106 30f
[45:20]
requiring Wireless communication
[45:22]
facilities to be cited and constructed
[45:24]
to preserve the pre-existing character
[45:25]
of the surrounding buildings and
[45:26]
vegetation while this is a neutral uh
[45:29]
site it is immediately adjacent to an RV
[45:31]
park a landscaping plan conforming with
[45:34]
17130 F4 still needs to be submitted
[45:37]
Tech lighting does not me meet the
[45:39]
requirements established within 17141
[45:41]
100 and 17106 030 D the effective
[45:45]
setbacks cannot be met at the site per
[45:47]
17106
[45:49]
42 if the board of adjustment chooses to
[45:51]
uphold denial the motion must contain
[45:53]
the reasons for the denial which shall
[45:55]
be supported by substantial evidence in
[45:57]
the written
[46:02]
record that's all for for now for my
[46:05]
staff report thank you Jeremiah
[46:07]
put need a towel or
[46:10]
something need to drink water yeah
[46:13]
anyway okay thank you Jeremiah are there
[46:15]
any questions currently for
[46:17]
Jeremiah um councilor Craig bomb do you
[46:20]
have any
[46:22]
questions no May when thank you
[46:26]
um I would like to hear from the
[46:27]
applicant at this time if you'd come up
[46:28]
and and remind us your name and
[46:30]
everything
[46:32]
please thank you for having us here
[46:35]
today myself Shannon McCrae State 48
[46:38]
development Consulting on behalf of
[46:39]
vertical bridge and Stephen Kennedy the
[46:42]
RF engineer will be presenting um on
[46:45]
behalf of vertical bridge for this
[46:46]
Wireless
[46:50]
facility um so
[46:52]
whenever there thank you um so today
[46:55]
we're we going to be going over the new
[46:57]
proposed Wireless facility on behalf of
[46:59]
vertical Bridge the site name is usaz
[47:02]
5121 this is cup
[47:06]
133 so the proposed Wireless facility
[47:09]
will be located on parcel
[47:11]
41143
[47:13]
008a um and as mentioned by staff it's
[47:17]
on a parcel Zone
[47:19]
C1 it will be designed as a monopine to
[47:21]
blend in with the surrounding pine trees
[47:23]
in the area and will be located within a
[47:26]
43x 37 ft enclosure surrounded by an 8T
[47:30]
High chain link fence compound the
[47:32]
overall height of the tower will be 180
[47:35]
ft which will allow for collocation and
[47:37]
may include multiple antennas as shown
[47:40]
on a later slide with the elevations and
[47:42]
we did design the Tower with a 20ft fall
[47:45]
radius to contain debris on
[47:47]
site so here is just a an aerial view of
[47:51]
the overall site plan as you can see
[47:54]
that square that's on the screen there
[47:56]
that just shows where the tower is in
[47:58]
proximity to the parcel
[48:01]
lines here is an enlarged site plan this
[48:05]
shows the 10x15 concrete pad for
[48:07]
Associated ground equipment the 4x9
[48:09]
concrete pad for the Emergency backup
[48:11]
generator and um it we would like to
[48:14]
note for the record that emergency
[48:16]
backup generators will cycle once per
[48:17]
week for a total of 15 minutes and omit
[48:21]
a noise of around 70 to 90 DB which is
[48:24]
about the equivalent of a car are
[48:25]
passing
[48:27]
by so on the screen here you can see the
[48:30]
elevations of the tower um the initial
[48:34]
anchor tenant would be installed at that
[48:36]
top there you can see that um and that
[48:39]
is just the rad is basically the center
[48:42]
of antennas where it will be installed
[48:45]
on the tower let me go ahead and pull
[48:47]
those up here so T-Mobile is the initial
[48:50]
inchor tenant uh they will be installed
[48:52]
at a rout of 171 ft the second Co cator
[48:56]
would be installed at a rout of 159 ft
[48:59]
and the third collator would be
[49:01]
installed at a rout of 147
[49:04]
ft there's additional views of the
[49:06]
elevation of the
[49:09]
Tower so stealth designs um per the Pine
[49:12]
Top code it encourages stealth designs
[49:16]
to blend in with the surrounding area um
[49:18]
as such vertical Bridge decided that a
[49:21]
monopine would best suit this area a
[49:24]
monopine is is a tower that's designed
[49:26]
to look like a pine tree um this photo
[49:29]
on the right is not a photo from this
[49:31]
specific area but from a different Tower
[49:33]
as you can see in the back um the
[49:35]
monopine kind of Blends in with the
[49:37]
surrounding pine trees
[49:42]
um uh so the fall zone uh the Pinetop
[49:45]
Lakeside town code under chap chapter
[49:49]
17106 stated that the applicant must
[49:53]
provide a certified letter from a
[49:55]
structural engineer showing that the
[49:57]
structural fa failure characteristics of
[49:59]
the wireless communication facility and
[50:01]
demonstration that site and setbacks are
[50:03]
adequate to contain debris on site um at
[50:06]
the time of submitt this was the code it
[50:10]
is vertical Bridges position that as
[50:13]
such since it was submitted under this
[50:15]
code and because the application was
[50:17]
active that the old code applies to our
[50:21]
site um we did provide a 20 foot fall
[50:24]
zone letter to the jurisdiction um and
[50:27]
on the next SL this is just a photo of
[50:30]
that fall
[50:32]
letter so to review preferred sites
[50:35]
neutral sites and disfavored sites I
[50:37]
won't go through all of the details but
[50:39]
preferred sites would include the fire
[50:41]
station uh across the street and then
[50:44]
neutral sites is any site Zone C1 PUD or
[50:47]
r
[50:48]
l disfavored sites would be residential
[50:54]
neighborhoods so
[50:56]
I'll go ahead and Skip just to this one
[50:58]
but as you can see on the zoning map
[51:00]
here the star the green star on the
[51:02]
slide indicates where our proposed site
[51:05]
is located it's located on a parcel Zone
[51:08]
C1 which is listed as a neutral site um
[51:10]
our low is also listed as a neutral site
[51:14]
per the code and that RV park is just
[51:17]
North of our site there located on R so
[51:21]
it's that's just an aerial view
[51:24]
there
[51:29]
back um okay so I will go ahead and let
[51:31]
the RF engineer who is here speak to the
[51:33]
significant Gap in service um but the
[51:37]
site is uh the only preferred option
[51:40]
would be the fire station that was
[51:41]
approximately 500 ft away I know we had
[51:44]
at our last hearing requested an
[51:46]
extension to look into the fire
[51:47]
department but ultimately um it did not
[51:50]
work for T-Mobile which is is why we're
[51:52]
back here
[51:54]
today
[51:59]
and then this is just an aerial view of
[52:00]
the proposed
[52:03]
site uh the 5year facilities plan it was
[52:07]
stated that that was not included with
[52:09]
our application and we just would like
[52:11]
to state that we did include that um
[52:13]
which had a site inventory and the
[52:16]
technologies that would be included on
[52:18]
the tower um and then we did have a note
[52:22]
that stated that there were no existing
[52:24]
Tower T-Mobile Towers or vertical Bridge
[52:26]
Wireless facilities within the
[52:29]
jurisdiction that that's just a photo of
[52:32]
the 5year facilities
[52:37]
plan and then the Pinetop Lakeside code
[52:39]
does encourage collocation we did
[52:42]
explore the option of collocating on
[52:44]
nearby structures um and he'll go ahead
[52:47]
and deep dive into that a little further
[52:49]
but we did determine that this area had
[52:52]
the highest need for improved coverage
[52:53]
in the area and the additional height of
[52:55]
the tower beyond the prescribed limit in
[52:58]
the code was necessary to achieve the
[53:01]
coverage objective that the initial
[53:02]
inchor tenant was looking to achieve um
[53:05]
I'll go ahead and hand the presentation
[53:07]
over to our RF engineer stepen Kennedy
[53:09]
to go over those coverage maps and then
[53:11]
if you have any questions feel free to
[53:13]
let us thank
[53:15]
you uh Stephen Kennedy I'm the owner of
[53:18]
B wab coast Consultants out of Arizona
[53:22]
I've got 34 years design experience in
[53:25]
the Wireless Communications industry um
[53:27]
can you bring up the RF
[53:29]
justification
[53:39]
deck that's the alternate side analysis
[53:42]
try the other
[53:46]
deck
[53:50]
okay thank you
[53:52]
ma'am okay once again um talking about
[53:55]
the RF design analysis for the T-Mobile
[53:58]
site for vertical Bridge so I'm an
[54:00]
independent Consulting RF engineer I do
[54:02]
not work for T-Mobile I represent
[54:04]
vertical bridge and consult with the
[54:06]
T-Mobile
[54:11]
Engineers okay so two reasons why
[54:13]
carriers design sites as your Sheriff
[54:15]
stood up in front of you a little while
[54:17]
ago and said that their four sites need
[54:18]
to be about 20 it's infrastructure but
[54:22]
the need is there so just like the
[54:25]
sheriff's department wants to expand the
[54:26]
radio network for First Responders the
[54:29]
carriers want to expand their networks
[54:30]
to provide service for their customers
[54:32]
two types of things that create a need
[54:34]
for a site one is coverage and that is
[54:37]
the ability for a transceiver on a sell
[54:39]
site to talk to the transceiver in the
[54:41]
phone and have a connection and be able
[54:43]
to follow through that connection
[54:45]
without a drop call or without a loss of
[54:47]
signal that's coverage capacity is the
[54:50]
ability to process the traffic for the
[54:53]
wireless phones now when I started this
[54:55]
business 34 years ago all you could do
[54:56]
on a phone was talk now we do a lot more
[54:59]
with them we stream videos we do web
[55:01]
searches there's apps like crazy on
[55:03]
these things that cost capacity that
[55:06]
cost throughput capacity and throughput
[55:08]
or capacity can be explained um use an
[55:12]
analogy of a water hose so if you have a
[55:14]
water hose in your front yard you're out
[55:15]
work in front yard one day you're the
[55:18]
only person drinking from the water hose
[55:19]
you're getting 100% of the capacity all
[55:21]
the bandwidth is available to you if
[55:23]
your neighbor walks up and says hey I
[55:25]
want to grab water off the water hose
[55:27]
too now the capacity is
[55:29]
50% you add two more neighbors drops to
[55:33]
25% four more neighbors it drops to 12
[55:36]
half% down down down so the more users
[55:38]
the less water or capacity per user
[55:41]
there is these sites can work three to
[55:44]
400 users at a time because these phones
[55:46]
while you may not be active on the phone
[55:48]
it's active talking to servers and
[55:50]
networks because of all the apps you're
[55:52]
running on your phone so that's the
[55:54]
capacity the
[56:00]
impact all right so the objective new
[56:02]
site is provide bandwidth for customers
[56:03]
in the area provide coverage for
[56:05]
T-Mobile users in this area because
[56:07]
there's no T-Mobile coverage at this
[56:09]
time so this site would provide coverage
[56:10]
along 260 in the feder roads in the area
[56:12]
where we have a significant Gap in
[56:14]
service or no service 96% of Americans
[56:17]
own a cell phone 57% of American homes
[56:20]
rely exclusively on cell phones and 84%
[56:23]
or more of 911 emergency calls are made
[56:25]
from cell
[56:32]
phones uh site 175t monopine with 5ft
[56:36]
apperances all that's all the technical
[56:38]
data latitude longitude ground elevation
[56:40]
and the antenna center line for
[56:41]
T-Mobile's
[56:43]
171 why here lack of coverage in Pine
[56:46]
Top lack of services in surrounding R
[56:48]
suburban and rural areas there's a
[56:50]
significant Gap in service IE T-Mobile
[56:52]
has no service in the area uh there's a
[56:55]
been a significant amount of increased
[56:56]
Network use for all the networks across
[56:58]
rural Arizona just because of Co and a
[57:00]
lot of people working from home and
[57:02]
that's really put Demand on a lot of
[57:04]
these networks and as you guys probably
[57:06]
are proving new homes being built and
[57:08]
all sorts of fun stuff it's it's
[57:10]
expanding in the rural areas here's
[57:12]
Zumer proposed
[57:14]
site uh there's the nearest neighbor
[57:16]
T-Mobile sites they're 53.5 miles away
[57:19]
and 63.7 miles away so uh T-Mobile's
[57:23]
working to expand that but this is one
[57:25]
of the the key sites for that this is
[57:28]
T-Mobile cell mapper this is coverage
[57:30]
that's provided by drive test units or
[57:33]
uh vans that drive around and they take
[57:34]
readings across the United States and
[57:36]
they they have a bunch of antennas on
[57:38]
the top of Van bunch of phones and
[57:39]
they'll go take readings and report this
[57:41]
back to servers this is showing that
[57:44]
there is nothing for T-Mobile in the
[57:46]
area basically not even enough to to
[57:49]
cause a receiver to go into full
[57:51]
quieting this is open signal this is uh
[57:54]
um so if you ever load an app on your
[57:56]
phone like Facebook or something you're
[57:57]
giving all these permissions for
[57:59]
Facebook to load this stuff on your
[58:00]
phone you're going to load a thin client
[58:03]
and that's open signals Thin Client what
[58:04]
that Thin Client does is it sends to
[58:07]
open signal servers hey the telephone
[58:11]
connected to the network that did some
[58:12]
business and the coverage was good or
[58:14]
the coverage was bad and we can see from
[58:17]
this that it's significantly
[58:21]
Laing this is uh
[58:26]
reference signal receive power this is a
[58:28]
way that we show coverage in a digital
[58:31]
Network or a Broadband Network so green
[58:34]
means to a 95% probability that there's
[58:37]
going to be service inside a building so
[58:40]
you've got all the walls you've got all
[58:41]
the things that that can pass through uh
[58:44]
and and slow down the the signal and not
[58:46]
allowed entry so green when it runs a
[58:49]
propagation modeling it's showing that
[58:51]
you you're going to have to a 95%
[58:53]
probability coverage indoors if you see
[58:55]
yellow that's in vehicle and if you see
[58:58]
red that's open field you're out the
[59:00]
golf course you're out in your front
[59:01]
porch you're you're you're not not
[59:04]
inside or not in a vehicle this is for
[59:07]
low band and to make note 85% of
[59:10]
T-Mobile Spectrum as allocated by the
[59:12]
Federal Communications Commission is
[59:14]
midband so this is low band uh so there
[59:18]
it it provides a greater service the the
[59:20]
RF the radio energy propagates
[59:23]
farther we go to the midband we see A
[59:25]
Change midband Is significantly smaller
[59:28]
so 85% of the spectrum this is what the
[59:31]
coverage it's going to provide where 15%
[59:34]
of the
[59:36]
spectrum I put a blue circle in to give
[59:38]
kind of a reference of what the low band
[59:42]
versus the midband is doing okay that's
[59:44]
the last of that one the next thing that
[59:47]
I was requested to do was an alternate
[59:48]
side
[59:53]
analysis
[1:00:07]
that's
[1:00:13]
it okay so uh I was requested to review
[1:00:16]
other sites within the area at the
[1:00:17]
heights that were available on those
[1:00:19]
sites uh compared to the proposed by
[1:00:21]
T-Mobile vertical Bridge so the local
[1:00:24]
Juris required this two towers exist
[1:00:26]
within 1.25 miles the proposed primary
[1:00:29]
coverage objective is Highway 260
[1:00:31]
towards pentop Lakeside and south and
[1:00:33]
east of the proposed towards the country
[1:00:34]
club the following propagation is for
[1:00:37]
low band as well as midband just like we
[1:00:39]
did before so here's the area so there's
[1:00:42]
the distance from the proposed to the
[1:00:44]
other SES one other site's 8 Miles Away
[1:00:47]
the other one is 1.23 miles
[1:00:50]
away so alternate site one owned by
[1:00:53]
White Mountain Communications 50ft self
[1:00:55]
support Tower highest height available
[1:00:57]
was 110 ft so it's not you're not be
[1:01:00]
able to put the antennas at the top
[1:01:01]
Tower because somebody's already there
[1:01:03]
ground elevation
[1:01:05]
6,961 ft alternate site to owned by
[1:01:09]
navapache Electric Company 196t self
[1:01:12]
support Tower highest height available
[1:01:14]
is 130 ft that's at 7178
[1:01:19]
amsl uh the jurisdiction also requests
[1:01:21]
the proposed intentas be lower to 71 fet
[1:01:23]
above ground ground level and compare to
[1:01:25]
the
[1:01:26]
proposed so this is the first low this
[1:01:29]
is low band so if we look at the blue
[1:01:31]
circle this is what the proposed site's
[1:01:33]
going to be able to provide within 171
[1:01:36]
ft in tenis Center Line for low
[1:01:38]
band this is 10t on the site to the West
[1:01:43]
so we can see a slight difference in
[1:01:45]
what's what's being covered on the
[1:01:48]
frequencies and then we get alternate
[1:01:50]
two that's low band on for that site so
[1:01:53]
we can see that it's going to be you
[1:01:55]
know coverage in the Southeast but not
[1:01:58]
coverage towards the center or the West
[1:02:01]
within the when the primary coverage
[1:02:07]
objective all right uh then we looked at
[1:02:10]
proposed 71 ft so we lowered the antenna
[1:02:13]
height from 171 down to 71 and that
[1:02:16]
shows the difference in propagation
[1:02:17]
analysis if you remember on the 171
[1:02:20]
significantly more green and yellow
[1:02:21]
within the blue circle so a significant
[1:02:25]
drop in what the site would do at 71
[1:02:29]
ft this is midband so 171 we saw that
[1:02:33]
it's it's midband it's not going to
[1:02:36]
propagate into the buildings quite as
[1:02:38]
well uh just because the wavelength
[1:02:40]
that's working out here's the RC RP
[1:02:43]
coverage for the 110t
[1:02:46]
alternate there's the RC RP coverage for
[1:02:49]
the alternate number
[1:02:51]
two and there's the rsrp coverage for 71
[1:02:58]
ft so alternate sites do not provide the
[1:03:01]
same level of service as the proposed
[1:03:03]
Heights available in the alternates are
[1:03:04]
not as high as the proposed uh
[1:03:07]
alternates impact the coverage of low
[1:03:08]
Band frequencies and significantly
[1:03:10]
impact coverage of high band or midband
[1:03:12]
frequencies and you get into 3,800 to
[1:03:14]
4200 megahertz and it it really makes an
[1:03:16]
impact and then the reduction in height
[1:03:18]
to 71 significantly reduces what the
[1:03:20]
site can do so recommended uh please
[1:03:24]
approve the proposed site at the hype in
[1:03:26]
order for team
[1:03:27]
M area I stand for questions thank you
[1:03:31]
Steve any
[1:03:33]
questions councelor snitzer uh yeah the
[1:03:36]
backend um I don't begin to understand
[1:03:39]
all the technical stuff but back in uh
[1:03:41]
in
[1:03:42]
October uh I made a request and they
[1:03:45]
said they would comply and it's not here
[1:03:50]
U my request was uh everything that was
[1:03:52]
presented showed
[1:03:54]
what happens if you have one Tower and
[1:03:58]
my request was that if we have the
[1:04:01]
existing towers and we use both of those
[1:04:05]
towers and mount uh their equipment on
[1:04:07]
both of those Towers what would the
[1:04:09]
coverage look like then uh the coverage
[1:04:13]
would be a probably 80% of what the
[1:04:17]
proposed site would do the 80% of what
[1:04:20]
the one single tall tower yes sir okay
[1:04:22]
so they could basically get it at least
[1:04:24]
80% there uh if they added a third short
[1:04:28]
Tower if they built the Tower in the
[1:04:30]
middle uh and it was a short Tower which
[1:04:34]
is whatever is permitted I forget 79 80
[1:04:37]
whatever it is feet but if you had those
[1:04:39]
three towers what would the coverage
[1:04:41]
look like any idea coverage would be
[1:04:43]
comparable but once again team Hubble's
[1:04:45]
trying to do it with one one asset
[1:04:47]
versus three asset well it's yeah it's much uh from a financial standpoint
[1:04:51]
I understand it's easier to have a few
[1:04:54]
big tower yes sir but it sounds to me
[1:04:57]
like they could get where they want to
[1:04:59]
get if they built a small Tower and then
[1:05:03]
rented space on the other two towers is
[1:05:05]
that right yes sir okay thank you yes
[1:05:07]
sir any other questions any other
[1:05:09]
questions for
[1:05:12]
Steve thank you for your presentation um
[1:05:14]
I would like to invite Jeremiah to come
[1:05:16]
back up please go over what you've got
[1:05:19]
for
[1:05:21]
us so we had a third party RF engineer
[1:05:25]
um basically run the numbers on the same
[1:05:28]
site and interestingly enough the um RF
[1:05:32]
engineer that we selected to do this was
[1:05:34]
a had worked for T-Mobile for 20 plus
[1:05:38]
years uh and I don't proport to
[1:05:40]
understand all of this information
[1:05:42]
that's in here either uh councelor
[1:05:43]
snitzer but I'll do my best to convey it
[1:05:45]
to the uh members of the board um so
[1:05:49]
they basically ran the same numbers and
[1:05:52]
some of the comments that they made were
[1:05:54]
the values provided by the applicant
[1:05:55]
were listed as rsrp th though the
[1:05:58]
provided values were much higher
[1:06:00]
strength than the applicant's typical
[1:06:01]
design
[1:06:02]
thresholds um and they go and they they
[1:06:06]
as the maps that you sh that the the
[1:06:08]
applicant showed they have some similar
[1:06:10]
but they're slightly different and
[1:06:12]
hopefully the board had time to review
[1:06:14]
those they're also available in the
[1:06:17]
packet for anybody interested at home or
[1:06:19]
in the audience you can view them
[1:06:21]
digitally um but some of the through the
[1:06:24]
general discussion and the concerns that
[1:06:26]
they had they said that the proposed
[1:06:29]
location provides indoor coverage of the
[1:06:30]
areas in Pinetop along Highway 260 from
[1:06:33]
Sweetwater Ranch to the west to just
[1:06:34]
past Buck Springs road entrance into the
[1:06:36]
White Mountain summer homes and pine
[1:06:38]
toop Lakes Country Club Pine toop Lakes
[1:06:40]
has some indoor service but mostly in
[1:06:41]
vehicle coverage along Buck Springs to
[1:06:43]
Branding Iron Loop White Mountain
[1:06:44]
Country Club is Not serviced well
[1:06:47]
coverage is mostly local to the
[1:06:48]
businesses along the Highway 260 the
[1:06:50]
majority of which are to the west of the
[1:06:52]
proposed Tower location tower Tower the
[1:06:55]
wiscom tower area that's actually been
[1:06:57]
purchased by Tower co uh the
[1:06:59]
improvements in coverage to the east and
[1:07:01]
south over the wiscom tower results from
[1:07:04]
increased ground elevation of 7170 at
[1:07:07]
the proposed location vers 6960 at the
[1:07:10]
wiscom tower plus the increased rad
[1:07:13]
Center of 171 versus
[1:07:15]
117 available at wisecom a total of 165
[1:07:18]
ft increase in antenna height however
[1:07:20]
the wise the wisecom tower as shown
[1:07:23]
later provides better Target coverage
[1:07:25]
around the business areas of pint
[1:07:26]
toop uh some of the concerns the rsrp
[1:07:30]
design points are little on the high
[1:07:32]
side the 85 uh dbel mowatt rsrp for
[1:07:36]
indoor service is more typical of
[1:07:38]
commercial areas rather than rural areas
[1:07:40]
in pintop residential indoor services
[1:07:42]
for five megahertz carriers at 700 MHz
[1:07:46]
is more along the lines of um 100 to 105
[1:07:50]
D mows with many models showing to dbm
[1:07:54]
and the link budget the covered areas
[1:07:57]
have good population densities however
[1:07:58]
the areas include very highly attended
[1:08:00]
areas during the summer activities uh in
[1:08:03]
this area and they're speaking
[1:08:05]
specifically of the wiscom tower one
[1:08:07]
sector of the proposed site will cover
[1:08:10]
the general Pinetop area including
[1:08:11]
businesses and residential areas one
[1:08:13]
sector of the proposed site covers the
[1:08:15]
Pinetop lakes and Pinetop Country Club
[1:08:17]
areas one sector of the proposed site
[1:08:19]
covers the residential areas of Woodland
[1:08:20]
Hills and White Mountain Country Club
[1:08:23]
the same services areas are provided by
[1:08:25]
multiple sites by all the cellular
[1:08:26]
providers in the area and such as
[1:08:29]
Verizon at and cellular 1 use the other
[1:08:31]
three sites they're functionable a
[1:08:34]
single Tower location so hopefully that
[1:08:37]
speaks to your question a little bit um
[1:08:39]
a single Tower location may not provide
[1:08:41]
sufficient capacity for the area and
[1:08:43]
additional Tower locations will
[1:08:44]
eventually be investigated by the
[1:08:46]
applicant tier one carriers Verizon AT&T
[1:08:49]
mobile Point their annual Capital spend
[1:08:51]
to populated metropolitan areas Ro areas
[1:08:54]
are typically the last areas to Beed
[1:08:56]
which typically increases the time
[1:08:57]
required to fix service problems
[1:08:59]
congestion issues and lead to block
[1:09:01]
calls and slow data through put speeds
[1:09:03]
drop calls due to the areas of impaired
[1:09:05]
services and and other concerns um then
[1:09:08]
they go on to show some of the maps run with the numbers that they used and
[1:09:13]
they're similar but they vary a little
[1:09:15]
bit they show um the RSI RSSI approach
[1:09:20]
and um using typical design values
[1:09:24]
and then uh part of their analysis they
[1:09:26]
state that the specifications provided
[1:09:28]
by the applicant included only Spectrum
[1:09:30]
owners by another entity the SL s
[1:09:34]
Spectrum through this spectrum may have
[1:09:36]
been so though the Spectrum may have
[1:09:38]
been sold or leased to T-Mobile Sal
[1:09:40]
Spectrum also owns or owned the B Block
[1:09:42]
meaning the prediction should be run for
[1:09:44]
10 mahz LTE carrier rather than 5 MHz
[1:09:47]
bandwidth and that concludes the third
[1:09:50]
party
[1:09:51]
analysis thank you Jeremiah does anybody
[1:09:54]
have any questions for
[1:09:55]
Jeremiah just more of an observation um
[1:10:00]
if I'm looking at these Maps right and I
[1:10:02]
don't I don't report to understand them
[1:10:05]
but um understanding what was said the
[1:10:08]
green area is where we're getting our
[1:10:09]
coverage and this is on the low Band
[1:10:11]
frequencies and I'm I'm looking at this
[1:10:13]
and just comparing in my head where my
[1:10:16]
house is versus where this Tower is
[1:10:18]
going to go we're talking like a three
[1:10:20]
mile stretch of highway and a whole
[1:10:23]
bunch of land where nobody lives and a
[1:10:27]
huge isore right off the the side of the
[1:10:30]
highway in the middle of town for and I
[1:10:32]
don't I don't understand the purpose
[1:10:34]
there's barely any residential area that
[1:10:36]
gets good coverage from this
[1:10:38]
site that was kind of my observation as
[1:10:41]
well councelor Heiser moving the site
[1:10:44]
over there gives more elevation but then
[1:10:46]
a big part of the area have the uh
[1:10:50]
greatest effect on is basically forest
[1:10:52]
service and uh not develop land so it's
[1:10:56]
curious as to exactly why this site was
[1:10:58]
selected as opposed to somewhere
[1:11:01]
else thank you for your observations
[1:11:03]
anybody else just I I I think there
[1:11:06]
there's an obvious economic benefit to a
[1:11:09]
single big tower it it's less costly
[1:11:12]
than multiple Towers plus it gives you
[1:11:14]
the opportunity down the road to sell
[1:11:17]
space like what we're talking about
[1:11:19]
lower down on the same Tower to other
[1:11:21]
entities so but from the stand point of
[1:11:24]
providing service as opposed to
[1:11:27]
maximizing profitability you can provide
[1:11:30]
roughly equivalent service with multiple
[1:11:33]
Towers so if we if we um deny this we
[1:11:38]
might be imposing a financial hurdle but
[1:11:41]
we're not making it impossible to serve
[1:11:44]
people in a certain area and um and then
[1:11:47]
you know so I think um I think the
[1:11:51]
things that we've asked for generally
[1:11:53]
speaking but the thing I asked for in
[1:11:56]
particular um they have not been very
[1:11:58]
responsive to uh to our request for
[1:12:02]
information or to the requirements from
[1:12:03]
our codes um and and I don't think we
[1:12:07]
are imposing anything more than uh you
[1:12:10]
know lowered profitability if we say
[1:12:14]
yeah you've got to have a small Tower in
[1:12:16]
the middle that meets our requirements
[1:12:17]
and use the existing Towers I think that would make a feasible solution for
[1:12:23]
every body just not the highest
[1:12:28]
profitability thank you go ahead and to
[1:12:30]
that point part of the point I was
[1:12:33]
trying to make was it seems as though
[1:12:34]
they're going to have to have multiple
[1:12:36]
Towers in the area anyways to meet the
[1:12:38]
coverage need if the really the end goal
[1:12:40]
is to provide coverage to the community
[1:12:42]
because this does not do that right and
[1:12:45]
that was one of the observations of our
[1:12:47]
third party RF analysis uh RF engineer
[1:12:49]
as well that uh this this Tower alone
[1:12:52]
wouldn't uh
[1:12:53]
provide coverage for the for the area so
[1:12:57]
they eventually would seek more
[1:13:00]
towers do do we have I know the
[1:13:03]
progression the technology progression
[1:13:06]
you know 5G and all this has been to uh
[1:13:09]
more smaller
[1:13:11]
Towers um does that is that only for
[1:13:15]
urban areas or something like that
[1:13:17]
looking I'm asking you to look down to
[1:13:19]
the future I can't even imagine but the
[1:13:21]
does the progression of Technology
[1:13:23]
indicate that these big tall towers
[1:13:25]
won't be required as much in the future
[1:13:28]
um I may defer that question to an
[1:13:30]
actual RF engineer being a civil
[1:13:31]
engineer but I can tell you what I've
[1:13:33]
seen um from the standpoint of
[1:13:36]
engineering from civil engineering in in
[1:13:38]
um Metropolis or greater Phoenix area I
[1:13:41]
have uh another civil engineer on my
[1:13:44]
commission and he's we had the
[1:13:46]
conversation he said what they're doing
[1:13:47]
down in the valley for instance is
[1:13:49]
putting a bunch of towers on a light so
[1:13:51]
you don't it's why when you go down
[1:13:52]
there you don't see one every half mile
[1:13:54]
of these 180t towers number one they
[1:13:57]
don't have the same elevation obstacles
[1:13:58]
or trees that we have but they're they
[1:14:01]
have the ability to put these on lights
[1:14:02]
anywhere and I think that at one point
[1:14:04]
in our code the intent was looking
[1:14:06]
forward that that was the direction that
[1:14:08]
the industry was going and and correct
[1:14:09]
me if I'm wrong but it appears that um
[1:14:12]
our code was looking towards that
[1:14:14]
direction but um I think that the
[1:14:16]
service up here um May May preclude that
[1:14:20]
number one based on we don't have the
[1:14:22]
light capacity that cities do and we
[1:14:24]
have all the elevation Deltas but you
[1:14:26]
can explain more if you'd like so you're
[1:14:28]
referring to small cells they're
[1:14:30]
typically sites that are anywhere from
[1:14:33]
20 feet tall to 32 to 35 ft tall
[1:14:37]
depending on the depending on the height
[1:14:39]
of the light pole or the street uh
[1:14:41]
traffic signal light so we see a lot of
[1:14:43]
the small cells in areas where there's a
[1:14:45]
lot of capacity so for example last
[1:14:48]
year's Super Bowl at State Farm Stadium
[1:14:51]
um I was hired to design about 50 small
[1:14:54]
cells covering in and around that
[1:14:56]
stadium so why so many small cells when
[1:14:59]
there was already macro coverage that
[1:15:01]
was because the amount of users within
[1:15:02]
that area were very tight condensed
[1:15:05]
packed small areas so you got a site
[1:15:08]
that covers maybe two blocks so in a
[1:15:11]
area like a college or downtown Phoenix
[1:15:14]
or downtown Chandler or larger
[1:15:18]
metropolitan areas you're going to see
[1:15:20]
small sales and basically their capacity
[1:15:22]
fixes so they're all ing mobiles to not
[1:15:24]
talk to the macro but switch down to the
[1:15:26]
small cell even though the coverage area
[1:15:27]
is smaller so it does really good where
[1:15:29]
there's slow traffic or a lot of walking
[1:15:31]
colleges a lot of college kids love
[1:15:33]
these phones so that's where you see
[1:15:35]
small cells uh in order to have small
[1:15:38]
cells you have to have existing macro
[1:15:40]
coverage or large sight coverage to be
[1:15:42]
able to do that yeah I wasn't exactly
[1:15:44]
thinking of I was more thinking in a in
[1:15:46]
a general sense the the years ago um I
[1:15:51]
was working on a designing an
[1:15:53]
agricultural tractor and all the gauges
[1:15:56]
were analog gauges at that time uh but
[1:16:00]
my program wasn't going to happen for 5
[1:16:02]
years and we could see that five years
[1:16:04]
down the road uh digital Technologies
[1:16:08]
cost you know the cost curve would come
[1:16:10]
down and uh so so the time that I was
[1:16:14]
putting this together was prohibitive to
[1:16:16]
do what I wanted to do but by the time
[1:16:18]
we got there 5 years later it was
[1:16:21]
cheaper and better and all that so so
[1:16:23]
Mike it's sort of a general question do
[1:16:25]
we see technology changing we're um not
[1:16:30]
necessarily a little Tower every you
[1:16:32]
know couple hundred yards but but uh
[1:16:35]
something like uh you know using Towers
[1:16:37]
but just not needing not even needing
[1:16:40]
180 foot Tower so there's two things
[1:16:42]
that come into play one is the laws of
[1:16:44]
physics and how radio frequencies
[1:16:46]
propagate um it's kind of like you guys
[1:16:50]
at being on the council you're setting
[1:16:52]
up above everyone else right than
[1:16:54]
everybody sitting in the chairs behind
[1:16:55]
me so you have the ability to see
[1:16:57]
everything better than what we have we
[1:16:59]
have the ability to see you because
[1:17:01]
you're elevated higher than what we are
[1:17:03]
in the crowd same concept for antennas
[1:17:05]
if you take your pair of eyes and you
[1:17:07]
say I'm going to turn them into antennas
[1:17:09]
all right are they going to work better
[1:17:11]
up here near the top of my head where
[1:17:13]
God put them or are they going to work
[1:17:15]
better at my
[1:17:16]
ankles so the laws of phys physics come
[1:17:18]
into play with radio frequency
[1:17:19]
properties but there's you know there's
[1:17:21]
still it's like that that what used to
[1:17:23]
be true in radio communications but they
[1:17:26]
just found a way to to bring a ground up
[1:17:30]
uh so that the basically the signal the
[1:17:33]
signal was propagating from a higher
[1:17:36]
level and covered more distance I it's
[1:17:38]
just I mean I again I don't begin to
[1:17:40]
understand the technology but do you see
[1:17:43]
any uh any shift toward guys being able
[1:17:48]
to solve the problem of getting cover I
[1:17:49]
mean whoever does it will make a lot of
[1:17:52]
money um you get of getting better
[1:17:56]
coverage without having a tall tower
[1:17:58]
don't see that once again it comes into
[1:18:00]
play with laws of physics and terrain
[1:18:02]
and morphologies and clutter data and
[1:18:05]
trees and all those wonderful things
[1:18:07]
that stop RF it's a physics
[1:18:10]
thing any other
[1:18:13]
questions okay thank you um this is a
[1:18:18]
public hearing we do have some
[1:18:20]
individuals that would like to come
[1:18:21]
speak to us um if you guys would come up
[1:18:24]
please Warren
[1:18:26]
Avery thank you you know I was here in
[1:18:30]
October when the room was was totally
[1:18:32]
packed and you voted against it and now
[1:18:34]
they're back again uh and I can see the
[1:18:36]
difference it's a great marketing playy
[1:18:38]
but I have three observations number one
[1:18:41]
uh I saw a picture of this tower that
[1:18:43]
looks like a tree and it was great but
[1:18:46]
did you see any picture of the tower
[1:18:48]
compared to the pine trees around it I
[1:18:51]
don't think we have any 180t pine trees
[1:18:53]
around here so this thing's going to
[1:18:54]
stick out like a a sore thumb next thing
[1:18:57]
I saw was a they have a 20ft fall zone
[1:19:01]
well if you have 180 ft Tower and it
[1:19:03]
falls over and it falls over white mine
[1:19:06]
Boulevard what good is a little 20x 20
[1:19:08]
fall zone going to do and the thing I
[1:19:11]
never saw they talk about T-Mobile
[1:19:14]
expanding their their marketing in this
[1:19:16]
area did anybody see any any input as to
[1:19:19]
what T-Mobile currently has in the
[1:19:22]
October fire remember somebody asked who
[1:19:24]
had T-Mobile nobody raised their hands
[1:19:27]
so here we're supposed to put a tower in the hopes that T-Mobile is going to
[1:19:31]
expand their business so I for me I
[1:19:34]
still don't think it's a great idea
[1:19:36]
thank you okay thank you Warren um David
[1:19:48]
adcox mayor Commissioners thanks for
[1:19:52]
having me come over for a third
[1:19:56]
time personally I don't think that
[1:20:00]
uh he's he's going to tell
[1:20:03]
us his job here today is to get this
[1:20:07]
Tower uh
[1:20:09]
approved um I agree with you Mr snitzer
[1:20:13]
the the technology is going there it's not going to have I mean why why
[1:20:18]
not a 500t tower you know 180 ft Tower
[1:20:22]
let's put a 500 foot 1,000 foot uh we
[1:20:25]
can get coverage all the way down to
[1:20:27]
Phoenix
[1:20:29]
um I don't think that the due diligence
[1:20:31]
has been done by this company they had
[1:20:34]
90
[1:20:35]
days couldn't F could not uh respond
[1:20:41]
back within the 90 days they missed
[1:20:43]
their
[1:20:44]
deadline and really in my opinion has
[1:20:47]
not explored other options we've got uh
[1:20:50]
Chief Morgan I was talking to him and
[1:20:52]
he's been talked to there there was an
[1:20:54]
option of T-Mobile joining with them and
[1:20:58]
they had a deadline of today to either
[1:21:01]
agree or
[1:21:03]
disagree and from what I understand they
[1:21:06]
either did not uh get back with them at
[1:21:10]
all or um they they uh turned it down so
[1:21:15]
it was an option that was right across
[1:21:19]
the street that was given to them and
[1:21:22]
they're still turning it down they're keep pounding this one
[1:21:26]
location and I'm I'm representing the mobile home park and this
[1:21:31]
Tower the base of this Tower
[1:21:34]
unfortunately for
[1:21:36]
me is 38 ft from the corner of my
[1:21:41]
personal mobile home and like I was can
[1:21:45]
you put your paper down so we can pick
[1:21:47]
you up on our thank you okay that red
[1:21:49]
microphone right in front of you thank
[1:21:51]
you so it's 38t from the base of of of
[1:21:55]
where I live and uh i' I've showed you
[1:21:57]
guys pictures I I put out uh different
[1:22:00]
presentations with pictures a lot of
[1:22:02]
different information and for me I'm not
[1:22:06]
going to be going out and
[1:22:08]
looking out at a tower I'm going to have
[1:22:12]
to actually see this Tower I'm going to
[1:22:14]
actually have to go outside and look
[1:22:15]
straight up at 180t Tower and and the
[1:22:19]
fall
[1:22:20]
zone is just you yeah
[1:22:25]
it's Jeremiah has talked about uh if and and hope and in perfect world
[1:22:32]
situations that's just that's just
[1:22:35]
BS
[1:22:36]
um I've got uh I'm I'm supposed to be
[1:22:39]
reading this off I I like somebody else
[1:22:42]
I I get off um I'll let it go it's down
[1:22:47]
uh we had over a hundred uh signatures
[1:22:50]
of of people before that are are against
[1:22:54]
this um this was back when the mobile
[1:22:57]
home park was actually open it's it's
[1:23:00]
normally the majority of my people are
[1:23:02]
only there for six
[1:23:03]
months
[1:23:05]
uh and so the other six months of which
[1:23:08]
we are in right now they're not here and
[1:23:11]
not representing uh but we had 100 100
[1:23:14]
over a hundred uh residents that signed
[1:23:17]
that uh a lot of this
[1:23:19]
stuff he's covered we've covered
[1:23:23]
Jeremiah's covered talking about the
[1:23:26]
uh applicant doesn't provide the entire
[1:23:29]
area the proposed
[1:23:31]
facility uh justification as to why they
[1:23:35]
don't have a preferred site uh of which
[1:23:38]
the site on uh 2666 East White Mountain
[1:23:43]
Boulevard it does not have enough space
[1:23:48]
to do everything that they want if if it
[1:23:51]
was the the the land itself with nothing
[1:23:54]
else on that land it still wouldn't be
[1:23:57]
enough for the tower they had a nice
[1:23:59]
little Tower picture up there with the
[1:24:01]
uh uh the little gazebo in
[1:24:05]
there I did not see any properties that
[1:24:07]
were 38 ft from the base of that Tower
[1:24:10]
in that little picture picture you
[1:24:13]
had
[1:24:15]
uh say we've covered a lot of this um
[1:24:19]
talked about Chief Morgan just talked to
[1:24:22]
him tonight they never got back with
[1:24:23]
them on a different
[1:24:26]
option uh applicants said that they
[1:24:29]
talked with the fishing game fishing
[1:24:31]
game had no knowledge whatsoever of them
[1:24:34]
contacting them at
[1:24:36]
all doesn't qualify for a neutral site
[1:24:40]
uh points that have already been made
[1:24:42]
that I'm just going to touch on they
[1:24:43]
missed the deadline the new setback is
[1:24:47]
in effect now even though they they say
[1:24:49]
that it wasn't in effect at the time it
[1:24:52]
was uh it was denied at the time and
[1:24:57]
they were supposed to show why it uh why
[1:24:59]
it was supposed to be a good
[1:25:01]
idea uh David can you kind of wrap up a
[1:25:04]
little bit please okay that's about
[1:25:06]
that's it's just not enough room in the
[1:25:07]
tower and it's too close the fall zone
[1:25:10]
is just it's
[1:25:12]
not and so I definitely request that you
[1:25:16]
uh turn it down thank you very much for
[1:25:18]
your comments um Jackie
[1:25:21]
Wilson
[1:25:26]
thank you for hearing me I live at at I
[1:25:29]
live in the mobile home park I liveed
[1:25:31]
there year round and we did have a lot
[1:25:35]
of people here representing us when in
[1:25:38]
October when it when it first was said
[1:25:41]
but I do live there year around
[1:25:44]
and I have sell coverage but I don't
[1:25:47]
have
[1:25:48]
T-Mobile but I just don't think that that Tower belongs in our
[1:25:56]
backyard and I'm like David it's setting
[1:25:58]
right against the mobile homes that are
[1:26:00]
on that side of the park and a lot of
[1:26:03]
our friends are elderly and it's going
[1:26:05]
to cause them health problems and I just
[1:26:09]
think that you made the right decision
[1:26:11]
in October and I hope that you find us
[1:26:17]
in favor thank you thank you Jackie
[1:26:19]
appreciate your comments is there any
[1:26:21]
other member of the public would like to
[1:26:22]
speak to us tonight as this is a public
[1:26:25]
hearing okay seeing none we'll go ahead
[1:26:28]
and close the public hearing and have
[1:26:29]
open it up for Council discussion if
[1:26:31]
there is any um councelor cig bomb are
[1:26:33]
you still with
[1:26:35]
us I am here okay just want to make sure
[1:26:38]
if you have any comments let us know
[1:26:41]
well um I would have a much improved
[1:26:46]
self coverage at my house if a tower
[1:26:49]
went in someplace up in this area but
[1:26:53]
180 ft just seem so high and exposed
[1:26:57]
right there um at Hill Street and I
[1:27:01]
appre I appreciate the people who live
[1:27:04]
in all of those mobile homes um and I
[1:27:09]
can certainly see their
[1:27:12]
concerns thank you councelor Heisler um
[1:27:16]
Jeremiah could you touch briefly on uh
[1:27:19]
the FCC rules regarding health and
[1:27:21]
Towers just real quick cuz I I mean want
[1:27:24]
people understand that we're listening
[1:27:25]
to what they say but we're also
[1:27:27]
precluded from right and I mentioned
[1:27:29]
that uh in my staff report that
[1:27:33]
basically U you can't take into
[1:27:35]
consideration health effects if it uh um
[1:27:40]
Falls within the guidelines provided by
[1:27:43]
the federal government um so basically
[1:27:46]
that rules out that component as part of
[1:27:49]
um the decision making process thank you make a
[1:27:56]
motion board member oh councelor
[1:27:59]
Phillips board member Phillips I guess I
[1:28:01]
appreciate the fact that they uh
[1:28:03]
provided the maps and all that and I I
[1:28:05]
reviewed all that stuff and uh but me
[1:28:08]
I'm a visual guy I actually took a drive
[1:28:11]
out there this last week myself in my
[1:28:13]
truck and where the proposed Tower uh
[1:28:17]
would
[1:28:18]
be I understand where you're saying 38
[1:28:21]
ft is right on top of the the real close
[1:28:24]
to those mobile homes and uh the 20ft
[1:28:27]
Falls them seems to be a
[1:28:31]
little
[1:28:33]
underestimated and I would agree with
[1:28:35]
that statement and that's why we brought
[1:28:36]
forward after I after this came to my
[1:28:38]
attention um having worked at a
[1:28:40]
municipality that had at least a one: U recommendation that was what the
[1:28:45]
commission um brought forward I
[1:28:48]
initially proposed a 2:1 uh ratio the
[1:28:51]
commission went with a 1 to one and then
[1:28:53]
ultimately the council decided that uh a
[1:28:56]
1 and a quarter would be more signific
[1:28:58]
or more uh substantial be able to cover
[1:29:01]
things like maintenance and uh safety
[1:29:05]
for uh residents around the area and uh
[1:29:08]
did have this conversation with the town
[1:29:09]
attorney and he's of the opinion that
[1:29:11]
this is an effective ordinance and it
[1:29:13]
was effective as of uh February 5th
[1:29:15]
which was three days after they were
[1:29:17]
supposed to be here for their 90-day
[1:29:19]
appeal that was granted uh from the
[1:29:22]
board in
[1:29:23]
November thank you any other comments I
[1:29:26]
guess I would ahead I'm a kind of a
[1:29:29]
practical guy and we have a reason for
[1:29:33]
the height that we have in our
[1:29:35]
ordinances and this is way above that um
[1:29:40]
I I understand why because the higher
[1:29:43]
you get the farther you can transmit you
[1:29:45]
know it's but you know technology is
[1:29:47]
line of sight so I understand that uh um
[1:29:52]
but from a really practical standpoint
[1:29:55]
how can you expect a tower to fall
[1:29:57]
that's 180 ft tall if it's strong enough
[1:30:00]
to stand up it's probably strong enough
[1:30:02]
to fall that
[1:30:04]
way it's 180 ft you know fall radius to
[1:30:08]
me right I I don't I don't see how they
[1:30:11]
could do it in 20 ft unless it's a
[1:30:13]
collapsible thing so they they in a
[1:30:15]
nutshell they design a weak spot into
[1:30:17]
the tower so the top 20 ft there's a
[1:30:22]
they do a finite element analysis and
[1:30:25]
they design it so there's essentially a
[1:30:27]
weak spot there and in a perfect world
[1:30:29]
the top would just fall off but we don't
[1:30:30]
live in a perfect world there's
[1:30:31]
potential and even as identified in
[1:30:33]
their own fall zone letter for it to
[1:30:35]
fall outside exactly that that's my
[1:30:37]
point you
[1:30:39]
know theoretically it might but probably
[1:30:42]
won't fall within that 20 foot if there
[1:30:44]
was a catastrophic failure it would fall
[1:30:47]
the entire Tower would fall uh and
[1:30:49]
probably roll even further than 180 ft
[1:30:52]
yeah and I used to live in the little in
[1:30:54]
that park by the
[1:30:56]
way in the
[1:30:59]
summertime yes go ahead councelor for me the main point just as as it has
[1:31:05]
been since October is uh the and and you
[1:31:11]
know and i' asked for him to bring this
[1:31:13]
out they brought it out but only when I
[1:31:15]
ask again they didn't volunteer the
[1:31:18]
information and that is that they can
[1:31:20]
provide uh
[1:31:22]
essentially 100% of the same coverage by
[1:31:25]
using two of the existing towers and
[1:31:27]
renting space on them and building a
[1:31:30]
conforming Tower at this location so so
[1:31:33]
I don't see a need other than a
[1:31:35]
financial need but there's no physical
[1:31:38]
need the technolog is in place and uh
[1:31:41]
you know a short Tower here and the
[1:31:43]
other two towers would meet the needs so
[1:31:46]
um you know for you know in addition to
[1:31:49]
these other reasons I would say that
[1:31:51]
because there's another way to meet the
[1:31:54]
need thank you anything else um as did
[1:31:59]
board member Phillips I have taken a
[1:32:01]
tour of that um mobile home park and I
[1:32:06]
know exactly where that Tower would be
[1:32:07]
in relation to these folks homes and I
[1:32:09]
just think that's way too close I mean
[1:32:11]
we we thought about this when we
[1:32:13]
implemented the
[1:32:14]
1.25 fall zone 1.25 to one so I think we
[1:32:19]
are we are well aware of that and um
[1:32:22]
also I want to address the 5G topic that
[1:32:25]
came up on the shorter Towers I believe
[1:32:27]
when we put that in our code it was an
[1:32:28]
FCC regulation that we address that
[1:32:31]
somehow in our code and so we were
[1:32:33]
proactive in doing that even though that
[1:32:35]
technology I don't believe is up here
[1:32:36]
yet so that's why you know just for the
[1:32:39]
Public's knowledge that's why that is in
[1:32:40]
our code so I I too do not believe this
[1:32:44]
is a great place for this proposed tower
[1:32:47]
now the the technology I mean it's uh
[1:32:51]
you know we went went away from from
[1:32:52]
microwave as an example we went away
[1:32:54]
from microwaves old technology were
[1:32:57]
going to go to a new technology and then
[1:32:59]
people figured a way to what they call
[1:33:02]
multiplexing microwav so you have you
[1:33:05]
know instead of it being able to carry
[1:33:07]
one communication it can carry multiple
[1:33:09]
Communications and all of a sudden
[1:33:11]
microwaves have come back into the mix
[1:33:14]
especially because there are places that
[1:33:16]
suffer from low low uh internet service
[1:33:20]
through the normal me so that like the
[1:33:22]
hospital has a microwave link now in
[1:33:25]
case everything goes wrong they still
[1:33:27]
have a way to get in and out um so you
[1:33:30]
know the Technologies keep
[1:33:32]
changing thank you is there any further
[1:33:35]
discussion if not I'm ready for a motion
[1:33:38]
go right ahead I move to uphold the
[1:33:41]
denial of the conditional use permit cup
[1:33:43]
133 for the construction of vertical
[1:33:45]
Bridge cell tower on APN
[1:33:47]
41143
[1:33:48]
008a for the following reasons the
[1:33:51]
proposed Tower's height is 180 ft a
[1:33:53]
maximum height of 75 ft is allowable in
[1:33:56]
no case greater than 95 ft and site
[1:33:58]
design is neutral per 17106
[1:34:03]
5082 the applicant must submit evidence
[1:34:05]
of meeting the requirements established
[1:34:07]
within 17106 070 B3 regarding contact
[1:34:12]
with all other Tower providers Property
[1:34:13]
Owners within the preferred sites the
[1:34:16]
applicant failed to submit a fall zone
[1:34:17]
letter that exemplifies confidence that
[1:34:19]
the tower would not harm residents at
[1:34:21]
the RV Park in the event of catastrophic
[1:34:24]
failure the applicant failed to locate
[1:34:26]
the site away from residential
[1:34:27]
neighborhoods per 17106
[1:34:30]
010b the applicant should have
[1:34:32]
considered the requirements outlined in
[1:34:34]
17106 030 F requiring wireless
[1:34:37]
communication facilities to be site
[1:34:39]
cited and constructed to preserve the
[1:34:42]
pre-existing character of the
[1:34:43]
surrounding buildings and vegetation
[1:34:45]
while the site is neutral it is
[1:34:46]
immediately adjacent to an RV park the
[1:34:49]
request is deficient as a land scaping
[1:34:51]
plan in conformance with
[1:34:54]
17130
[1:34:57]
F4F was not submitted Tech lighting does
[1:35:00]
not meet the requirements established
[1:35:02]
within
[1:35:03]
1704100 and 17106 030 D the proposed
[1:35:08]
site does not meet the effective
[1:35:09]
setbacks for wireless communication
[1:35:11]
facilities established within 17106
[1:35:16]
0402 thank you I'll second that thank
[1:35:19]
you we have a motion of second is there
[1:35:21]
any further discussion all those in
[1:35:23]
favor please signify raising your right
[1:35:25]
hand thank you councelor
[1:35:28]
cbom I thank you um the motion passes
[1:35:32]
unanimously to uphold the denial of the
[1:35:35]
cup um there being no further business
[1:35:38]
before the board tonight this meeting is
[1:35:40]
adjourned thank
[1:35:42]
you