[0:06]
Call to order
[0:07]
meeting of the ASRB from Monday, June
[0:11]
15th at 4:30 p.m.
[0:14]
May I have a roll call, please?
[0:16]
>> Chair Lindsey.
[0:17]
>> Yes.
[0:17]
>> Member Del Gavio. Member Sullivan.
[0:20]
>> Here.
[0:20]
>> And vice chair Cameron member Middleman
[0:22]
are noted absent.
[0:26]
» Have any changes to the agenda tonight?
[0:29]
>> There are no changes to the agenda and
[0:31]
no disk items.
[0:32]
>> Okay.
[0:33]
Um at this point we call for any member
[0:36]
of the public either in the room or
[0:38]
online who wishes to make a comment or
[0:40]
statement on any item not on tonight's
[0:43]
agenda.
[0:44]
>> There's nobody in the Zoom room.
[0:46]
>> Okay, and I see no one
[0:49]
here in the hall, so we'll close that
[0:51]
item and move to the
[0:53]
consent agenda. I don't believe there's
[0:55]
any items on the consent agenda.
[0:57]
>> Um
[0:59]
there are some three minutes. Um yeah,
[1:01]
there's the minutes of June 3rd, 2020.
[1:03]
>> Oh, okay.
[1:06]
>> I'm sorry, I'm looking at a a wrong
[1:08]
agenda.
[1:08]
>> Uh-oh.
[1:09]
>> Um that was the consent agenda.
[1:14]
» [clears throat]
[1:14]
>> Yeah, there's minutes of May 4th and May
[1:17]
18th.
[1:21]
» I can make a motion to approve that.
[1:25]
» So moved.
[1:27]
>> Chair Lindsey.
[1:28]
>> Yes.
[1:28]
>> Member Del Gavio. Member Sullivan.
[1:30]
>> Yes.
[1:35]
» Okay.
[1:36]
Um
[1:39]
Just checking. So, next
[1:41]
item on the agenda is the nomination of
[1:43]
chair and vice chair roles. You Can you
[1:46]
give a summary of what was approved?
[1:48]
>> Oh, sure. Yes. So, um
[1:50]
as we discussed at a previous meeting
[1:53]
that the
[1:55]
handbook um indicates that a chair and
[1:58]
vice chair shall serve for 2 years, but
[2:01]
no more than 2 years in a 4-year period.
[2:04]
Um, and
[2:06]
at our previous discussion the AS RB
[2:09]
all the members unanimously, all five
[2:11]
members, um, indicated that they'd like
[2:14]
to see Chair Lindsey continue as chair.
[2:16]
And so, given that the handbook is
[2:18]
something just just adopted by the town
[2:19]
council by resolution, uh, staff brought
[2:22]
this question to the town council for
[2:25]
this particular instance, not ongoing.
[2:27]
And so, in this particular instance, the
[2:29]
town council uh, did allow for the
[2:32]
current chair and the current vice
[2:33]
chair, if they want to, um, to continue
[2:36]
to serve for another 2-year term. Um,
[2:39]
so,
[2:40]
uh, if it is the case in which the board
[2:42]
would like to nominate Chair Lindsey,
[2:44]
um, they can do that and if there's an
[2:46]
affirmative vote, he would serve for
[2:48]
another 2-year term.
[2:49]
And that could be the same for the vice
[2:50]
chair, but my understanding is Vice
[2:52]
Chair Comer does not want to continue as
[2:55]
um, vice chair, so that would just open
[2:57]
up nominations for that position.
[3:00]
>> Um,
[3:02]
>> He did and I think she's online today.
[3:03]
>> Um, if she yeah, if she if she's
[3:05]
interested and she's and
[3:07]
she can definitely, uh, comment, I
[3:09]
think.
[3:10]
>> Uh, would I make the nomination then for
[3:12]
Chair Lindsey?
[3:13]
>> Yes, you can do that.
[3:15]
>> I would like to make a nomination that
[3:16]
Chair Lindsey continues to serve for the
[3:17]
next 2-year term.
[3:19]
>> I will second.
[3:20]
>> Here.
[3:22]
>> Uh, Chair Lindsey?
[3:24]
>> Yes.
[3:25]
>> [laughter]
[3:26]
>> Member Del Gaudio?
[3:27]
Member Sullivan?
[3:28]
>> Yes.
[3:31]
Okay, thank you.
[3:32]
>> Um,
[3:33]
>> I think.
[3:34]
>> Do we have, is Vice Chair Comer online?
[3:37]
Do you see her?
[3:37]
>> Somebody named YD laptop is on.
[3:45]
» We don't know.
[3:46]
>> Yeah.
[3:46]
>> It's not her name.
[3:48]
>> I think she is going to be, I don't
[3:49]
know, her family laptop.
[3:54]
» Um in her absence, Sage, can we continue
[3:56]
this item to the next meeting?
[3:59]
>> Um you can.
[4:01]
Um
[4:02]
and that would just keep her as vice
[4:03]
chair for the time being.
[4:05]
>> Okay.
[4:06]
I move that we do that.
[4:09]
>> Second.
[4:10]
>> Just to Just so we're all
[4:12]
clear on expectations.
[4:14]
>> Would you like a vote? Okay. Chair
[4:16]
Lindsey.
[4:17]
>> Yes.
[4:17]
>> Member Del Gavio.
[4:19]
Member Sullivan.
[4:20]
>> Yes.
[4:22]
>> Okay.
[4:23]
Thank you.
[4:24]
Um with that, we move to um the first
[4:28]
item of the public hearing, 275 Jocelyn
[4:31]
Lane.
[4:34]
Look to Sarah for presentation.
[4:36]
>> Um yes, thank you.
[4:39]
>> [clears throat]
[4:40]
>> Let load for a second.
[4:44]
Okay.
[4:46]
Um yes, thank you. I will be
[4:48]
introducing the project at 275 Jocelyn
[4:51]
Lane.
[4:52]
The project includes the demolition of
[4:55]
an existing single-family residence as
[4:58]
well as accessory structures and
[4:59]
swimming pool.
[5:01]
And includes the construction of a new
[5:04]
single-family main residence with a
[5:06]
detached garage,
[5:08]
a detached ADU,
[5:10]
um a guest pavilion ADU, swimming pool,
[5:14]
and other site improvements.
[5:17]
The property is approximately 8 and 1/2
[5:19]
acres and it's in the SCP-5
[5:23]
zoning district.
[5:25]
It's located off of Jocelyn Lane, which
[5:27]
is a private road that extends off of
[5:30]
Kings Mountain Road.
[5:32]
Um as you can see, the site has several
[5:36]
areas with 35% slope, so it's a um lots
[5:40]
of um topography,
[5:43]
um steep slopes on site.
[5:45]
It is currently developed, as I
[5:48]
mentioned with the single family
[5:49]
residence and accessory structures,
[5:52]
um all of which are proposed to be
[5:53]
demolished.
[5:55]
Um the
[5:57]
proposed new main residence is kind of
[6:01]
located in the same general location as
[6:03]
the existing development, so it's this
[6:05]
sort of
[6:07]
um
[6:08]
structure here that's the proposed main
[6:09]
residence.
[6:11]
So, kind of in the approximate center of
[6:14]
the property.
[6:15]
And then
[6:17]
over [clears throat] here in this um
[6:18]
area is the proposed ADU
[6:21]
and a proposed garage
[6:24]
/ gym structure.
[6:27]
And then kind of
[6:29]
uh south of the main residence is a new
[6:33]
guest house pavilion um ADU, so it is an
[6:36]
ADU.
[6:37]
As well as a new swimming pool.
[6:41]
The existing driveway location onto the
[6:44]
property will remain in the same
[6:46]
location. It'll be modified slightly to
[6:49]
um include new circulation as well as
[6:52]
parking and a fire truck turnaround.
[6:54]
That's that um piece right here.
[6:58]
There are
[7:03]
Um there are six significant trees
[7:06]
proposed for removal
[7:08]
in the project vicinity.
[7:13]
And then let me just pull up some
[7:15]
elevations.
[7:19]
So, the main residence is a two-story
[7:23]
structure
[7:24]
uh with the height being about 26.9
[7:28]
ft tall at the highest point.
[7:32]
Uh the de- detached structures will all
[7:34]
be less than the 17-ft maximum.
[7:37]
And the materials for all of the
[7:39]
structures include a mixed material
[7:41]
palette.
[7:42]
Um consisting of metal roofing, plaster
[7:46]
siding,
[7:48]
um with wood decks and wood panel
[7:50]
siding, as well as terracotta tile
[7:52]
siding.
[7:54]
Um and the colors will be muted
[7:58]
in shades of brown and beige.
[8:02]
Um the applicant did not install story
[8:05]
poles yet.
[8:07]
Um but that kind of includes my
[8:09]
introduction to the project and I'm
[8:10]
happy to answer any questions.
[8:14]
» Okay.
[8:15]
Thank you, Sarah. Um does any member of
[8:17]
the board have questions of staff
[8:19]
regarding this
[8:21]
proposal?
[8:25]
Okay.
[8:28]
Not until we heard the presentation.
[8:29]
>> Okay.
[8:30]
>> Yeah. All right. Thank you, Sarah.
[8:31]
>> [clears throat]
[8:32]
>> Um so with that we'll move to the
[8:33]
applicant. If the applicant wishes to
[8:35]
make a presentation, um
[8:37]
please do so.
[8:39]
>> Yes, we do. Uh my name is Peter Mason.
[8:41]
I'm with Mason Architects. I'm serving
[8:43]
as the local
[8:45]
uh architect to assist the uh
[8:47]
international architect of
[8:49]
King Kengo Kuma, uh who's from Tokyo.
[8:53]
And [snorts]
[8:54]
um
[8:55]
they I have here are uh Will
[8:59]
Pritzker Pritzner
[9:01]
>> That's right.
[9:03]
>> Uh and Kyle Edwards Edwards Uh that are
[9:07]
and Will Will, do you want to say
[9:08]
something?
[9:09]
>> I would love to.
[9:13]
Hello, everybody.
[9:19]
Hello, everyone. Uh once again, my name
[9:21]
is Will Panzner.
[9:23]
Um I am an ownership representative.
[9:26]
And I was the one that was lucky enough
[9:29]
to actually find this beautiful piece of
[9:31]
land not too long ago. Um so with that
[9:34]
said, I'm um
[9:36]
super excited about this project. It
[9:38]
really is an incredible
[9:40]
lot.
[9:42]
The natural beauty is is it was um
[9:45]
It was incredible to see for the first
[9:47]
time. And with that said, I'm very
[9:49]
excited. We have a wonderful team here
[9:50]
as well. And I would invite Kyle as well
[9:53]
to come say hi to everybody.
[9:58]
» Hi, I'm Kyle Edward. I've been retained
[10:00]
by the owner as the construction
[10:02]
manager. Um again, we're we're really
[10:05]
excited about the project. If if you're
[10:06]
familiar with architecture at all, Kengo
[10:08]
Kuma is one of the best in the world.
[10:10]
So, we all feel very fortunate to be a
[10:12]
part of the project. And again, we're
[10:15]
really excited to be a part of the
[10:16]
community and make sure that we're
[10:18]
conducting the construction operations
[10:20]
as as smoothly as and
[10:23]
um
[10:24]
as less impactful as possible. So, um
[10:27]
yeah, it's a it's a beautiful town.
[10:28]
We're we're very familiar with side and
[10:31]
yeah, excited to be here. And thank you
[10:33]
for your time.
[10:34]
>> Thanks.
[10:38]
» Okay. Okay, I'm going to go through a
[10:40]
little bit of the design a little bit
[10:42]
for you.
[10:43]
And there was some stuff in here that
[10:44]
wasn't in the package that and I'm going
[10:47]
to try and see if all that works right.
[10:49]
Okay.
[10:51]
Next, Shangri. Shangri from my office is
[10:54]
running the thing. Okay, so this is the
[10:57]
um
[10:58]
This is the site itself. It sits
[11:00]
um
[11:03]
It sits at the very end of Jasmine Road.
[11:05]
And as a result, it's it got a very
[11:08]
private
[11:10]
environment. But it's also a very
[11:12]
constrained site. There's
[11:14]
San Andreas fault here. There's another
[11:17]
portion of the San Andreas down here.
[11:19]
And there's a zone in here that's
[11:21]
debatable.
[11:22]
Um next.
[11:27]
This
[11:30]
Oh, sorry. You want to go back?
[11:34]
Uh so, this is a vicinity map that shows
[11:36]
kind of where the all the adjacent
[11:38]
houses are.
[11:39]
Um the road Jocelyn Road comes up here
[11:42]
and goes up that way. This is a flag off
[11:44]
of it. It has this house and this house
[11:46]
over here.
[11:47]
Uh this is a very steep area and I'll
[11:49]
show you on the next slide what that's
[11:51]
doing.
[11:52]
Uh this is the San Andreas.
[11:54]
Uh there's another piece of it down here
[11:57]
and there's another piece of it
[11:57]
potentially here.
[11:59]
Uh so, it's a very constrained site. So,
[12:02]
there's
[12:02]
next slide, Shingri.
[12:05]
This is the existing uh property, you
[12:07]
know, in terms of what's there now.
[12:10]
Uh the buildable area is really this
[12:13]
zone and a little bit of stuff over
[12:14]
here, but that's it on this entire 8 and
[12:17]
1/2 acre site.
[12:18]
So, it's very constrained. There's a lot
[12:20]
of 35% slope. Some of this is is
[12:23]
man-made.
[12:24]
Uh some of the This is where the current
[12:27]
septic field is that we're going to be
[12:29]
expanding a little bit and
[12:30]
reconditioning.
[12:32]
Next.
[12:34]
The idea here is to really take
[12:36]
advantage of the entire environment.
[12:38]
This is kind of give you I idea of a
[12:40]
glimpse of what's happening with the
[12:41]
western hills. Uh the this the hills it
[12:45]
I mean, the trees
[12:47]
and this is the view that we're trying
[12:48]
to capture as part of this of the house.
[12:52]
While maintaining as much of the natural
[12:54]
site in this kind of state as possible
[12:56]
where and then forest.
[12:58]
Next.
[13:00]
These are some other
[13:02]
um photos. I don't know what how many of
[13:04]
you would actually gone up there, but
[13:06]
this is the driveway that comes off of
[13:07]
Jocelyn.
[13:08]
There's a meadow off to this off to the
[13:10]
right-hand side,
[13:12]
which is where the um garage goes.
[13:14]
And then there's another meadow over
[13:16]
here on the left-hand side. And as you
[13:18]
come out, then that's the that's the
[13:20]
view out towards the western hills that
[13:23]
we're trying to capture as part of the
[13:24]
house.
[13:25]
Next.
[13:28]
The idea here is is really to create a
[13:30]
very serene environment. Um this is a
[13:33]
couple of this is one of um
[13:35]
Kendra Kumos uh houses other houses. So
[13:40]
this isn't what we're doing but it's
[13:41]
something like something similar.
[13:43]
Next.
[13:47]
As Sarah was saying this is the proposed
[13:49]
site. The main residence is here which
[13:51]
is about where the pool is and the some
[13:53]
of the accessory existing accessory
[13:55]
structures are.
[13:57]
The new pool is going here. There's a
[13:59]
office slash guest room over here. And
[14:03]
then the uh
[14:05]
the garage. So we've we've added in a uh
[14:08]
fire fire truck turnaround there.
[14:10]
And then there's a wide courtyard like
[14:12]
you saw in that previous uh photo where
[14:15]
there's a uh
[14:17]
low pool with natural environment. And
[14:19]
there's a seven seven turn path that
[14:22]
goes down to the pool. Which is a
[14:25]
Japanese
[14:27]
um
[14:28]
concept. Landscape concept. Next.
[14:34]
Coming up the driveway
[14:36]
and be a turnoff going down here to the
[14:38]
garage.
[14:39]
And then this is where the guest house
[14:41]
is the main residence.
[14:44]
The main great room with the living area
[14:47]
spaces. And the dining room and then the
[14:49]
family portions here and the kids bed
[14:52]
bedrooms above.
[14:53]
Uh
[14:54]
all are oriented out here towards the
[14:55]
view. Same thing with the pool itself.
[14:59]
Next.
[15:02]
Just give you an idea of kind of what
[15:03]
the roof how it fits in with the site.
[15:06]
These existing trees are remaining.
[15:09]
And
[15:11]
will be enhanced to it create a real
[15:14]
uh separation between the house and the
[15:16]
road.
[15:19]
Next.
[15:22]
These are just some three-dimensional
[15:23]
models of it.
[15:26]
Next.
[15:30]
So, there's a The idea here is there's
[15:32]
the deep overhangs.
[15:33]
Um this is a a view as you're coming up
[15:36]
into the driving circle that looks out
[15:37]
towards the western hills. And this is
[15:40]
where the um porcelain
[15:45]
not porcelain, but
[15:47]
um
[15:50]
Anyway, so there's outdoor areas all the way around
[15:52]
it.
[15:53]
Next.
[15:58]
So, these are some of the natural
[15:59]
materials we're looking at that are that
[16:01]
are being looked at in terms of how it
[16:03]
works. Um there's a ceramics
[16:05]
uh
[16:06]
screen is in various wings that are all
[16:09]
being studied now. So, this is kind of
[16:11]
an early
[16:13]
uh study of it. Next.
[16:18]
Again, that gives you an idea of how the um
[16:22]
the vertical fins are protecting the
[16:25]
house from
[16:26]
view as well as out towards and the view
[16:29]
out towards the hills.
[16:34]
Yeah.
[16:38]
Next.
[16:41]
And then this is the small um
[16:43]
small
[16:46]
guest guest house over on the side.
[16:50]
And the pool off to the This is actually
[16:52]
been we're moving that's getting moved
[16:53]
down about a couple two or three feet to
[16:55]
open up the view even more.
[16:58]
Next.
[17:02]
That's from the pool looking back
[17:03]
towards the house.
[17:06]
And then you've seen the elevations.
[17:13]
Everything's within All the buildings
[17:15]
are within the within the code required
[17:17]
heights.
[17:18]
And
[17:19]
uh
[17:20]
TFAs.
[17:27]
Two-story, but there's a There's a
[17:28]
portion of the basement.
[17:30]
Includes mechanical spaces and
[17:33]
uh uh
[17:37]
theater type space. Next.
[17:44]
Landscape-wise, the whole idea here is
[17:46]
to maintain as much of the existing
[17:48]
Unfortunately, there's a couple trees
[17:49]
we're having problems with in terms of
[17:51]
how we fit within the within it. There's
[17:54]
a tree out here that we're
[17:56]
there's not much we can do about.
[17:58]
There's a tree here that we're talking
[17:59]
about how to whether move this back or
[18:03]
uh adjust it so that there's a tree here
[18:05]
and a tree here that we're trying to
[18:07]
save.
[18:08]
Uh but it's, you know, we're working
[18:10]
with a with the arborist.
[18:12]
The idea here is to add more trees
[18:16]
upper and lower so that the landscape
[18:18]
concept is based upon a a layered
[18:21]
approach where there's low ground cover
[18:24]
and grasses and that kind of stuff to
[18:26]
medium-sized bushes to taller trees that
[18:29]
fill in so that when you're coming up
[18:30]
here, you're not going to you're not
[18:32]
going to be seeing the house until you
[18:35]
get clear up into here, which is the
[18:37]
intent, which is to keep and maintain
[18:39]
the privacy
[18:40]
and, you know,
[18:43]
create some create a unique retreat.
[18:45]
Next.
[18:49]
So, there's this is sort of the the idea
[18:52]
of the layered approach where you're
[18:53]
having low level
[18:54]
and this is being refined. We have We're
[18:56]
working with a the architect landscape
[18:58]
architect to develop it further.
[19:00]
And then the medium high
[19:03]
shrubbery
[19:04]
and then bigger stuff so that it's it's
[19:07]
a layered it's a has creates a layering
[19:10]
as you know, to create the buffer and to
[19:12]
create privacy.
[19:15]
Next.
[19:17]
And then the trees itself.
[19:20]
And do I have any questions?
[19:22]
>> Thank you, Peter.
[19:24]
Um
[19:25]
a couple of questions. Uh Eric, could
[19:27]
you go to sheet
[19:29]
A1.1?
[19:34]
This um trench
[19:37]
that's going to be dug.
[19:39]
If that reveals any sort of issues
[19:42]
underlying [snorts] that area, as you
[19:43]
said,
[19:44]
potentially.
[19:46]
>> [laughter]
[19:46]
>> Uh it has been dug.
[19:48]
>> that have?
[19:49]
>> It has been dug.
[19:50]
>> Okay.
[19:51]
>> Uh they are working with the town
[19:53]
engineer to define the um
[19:57]
parameters of this of the uh zone,
[20:01]
seismic zone.
[20:02]
And um
[20:04]
and then it'll be plotted by Leon Braze
[20:06]
onto the site plan and we'll have that
[20:08]
as part of the next discussion. And if
[20:10]
we need to adjust something, we'll move
[20:11]
it around.
[20:13]
We we we think at this time that it
[20:15]
doesn't affect doesn't affect the main
[20:17]
residence at all. It may affect a little
[20:19]
bit of some of this.
[20:21]
But we don't think. And and if it does,
[20:23]
we're we'll just do a garage over there.
[20:26]
>> Are are we discussing the
[20:30]
» We may we may do a like a four-car,
[20:31]
five-car garage here and and work work
[20:35]
around the other pro- programmatic
[20:38]
items.
[20:40]
>> Okay.
[20:41]
>> Are the piles or the trees that are in
[20:43]
question?
[20:45]
>> Um yes.
[20:47]
So this one's kind of this there's a
[20:48]
redwood tree here that there's a whole
[20:50]
bunch of redwood trees. They're all in
[20:52]
varying states of
[20:54]
uh
[20:55]
surviving.
[20:56]
They're surviving. How we don't know,
[20:58]
but they are. Uh so this one's in the
[21:00]
way to get the get the path get the entrance to work. There's one
[21:05]
here that's, you know, not really
[21:07]
significant and this one there's nothing
[21:09]
we can do about. We just don't have We
[21:10]
just don't have any room to do it move
[21:12]
it. To do it and it's not movable.
[21:14]
>> One of the cabinets is a possible
[21:16]
>> So the Yeah, so there's this one here.
[21:18]
So we're looking at what we can do to
[21:20]
save that one. There's another one right
[21:21]
here that we're working on. We're trying
[21:23]
to keep both of those trees.
[21:25]
But we don't know yet.
[21:27]
We may or may not be successful.
[21:30]
But we're planning enough trees to more
[21:31]
than cover the
[21:35]
» The wood fins and they are in front of
[21:37]
the terracotta on the walls. Is that not
[21:39]
a
[21:39]
>> The what is?
[21:40]
>> The wood fins
[21:41]
>> No, the the There's the fins are going
[21:44]
to be terracotta.
[21:50]
Yeah, so it's it's kind of a
[21:53]
very
[21:55]
A little bit of old A little bit old
[21:56]
coming into the new.
[21:59]
» And is there standing water in some of
[22:01]
those locations like
[22:02]
>> Yeah, so the ponds The ponds in here are
[22:05]
going to be They're going to all going
[22:06]
to be, you know, 4 or 5 inches deep.
[22:09]
>> Circulation or there's not
[22:11]
>> Yeah, right. Right. Yeah.
[22:22]
» Okay.
[22:23]
>> Anything else?
[22:24]
>> Um
[22:26]
» If you can think of anything, let me
[22:28]
know.
[22:28]
>> Yeah, we So we I mean
[22:31]
This direction This sort of style is not
[22:34]
something we see a lot of.
[22:36]
So my question to you is actually, you
[22:38]
know,
[22:39]
this warehouse were built in a similar
[22:42]
rural community
[22:44]
in Japan, would it be completely in
[22:46]
place?
[22:48]
>> Yes.
[22:49]
>> Okay.
[22:49]
>> Yeah, and I think it fits here, too. I
[22:51]
think with the materials and the way
[22:53]
it's cited, I think it fits very well in
[22:55]
Woodside.
[22:57]
>> And the challenge for us is not having
[22:58]
full down materials that we need.
[23:00]
>> Yeah. Well, that's what you're going to
[23:02]
see next. That's what formal's for.
[23:04]
>> Yep.
[23:05]
>> So, we'll we'll give you a little bit
[23:06]
more information on how we're doing that
[23:08]
and
[23:09]
we're working through how the structure
[23:10]
works and how the all that all that
[23:12]
works and
[23:13]
what the glazing system does and
[23:15]
what the seismic needs to do.
[23:19]
>> Okay.
[23:20]
>> Any other questions?
[23:21]
>> No.
[23:27]
» See the light.
[23:31]
» It's a It's a placeholder for now.
[23:35]
We know the rules.
[23:37]
>> We like see the
[23:40]
» So, so we'll have that we'll get we'll
[23:42]
have detailed lighting plans. It's part
[23:44]
of the
[23:46]
>> Yeah, there wasn't um
[23:48]
much lighting included. It's not
[23:50]
required at this stage. Yeah.
[23:56]
» Maybe.
[23:57]
>> Doing better good.
[23:59]
>> So,
[24:01]
see it I'll try to sum it
[24:03]
page.
[24:04]
Um
[24:07]
uh it is sort of a difference just in case there's anyone
[24:10]
online so we just make sure if there's
[24:13]
any public comment.
[24:17]
Um
[24:19]
it is somewhat a typical style for for
[24:21]
us to review here in the town. I don't
[24:24]
recall having
[24:26]
um reviewed a similar
[24:29]
design in the last few years. Um I think
[24:31]
what
[24:32]
it is extremely private site. So, that's
[24:35]
working in your favor is that
[24:37]
um no one can
[24:39]
see it
[24:40]
unless you're right upon it.
[24:42]
Um what I like in particular is actually
[24:45]
the choice of materials that we are
[24:46]
seeing in the renderings. I think that's
[24:49]
one of the things that
[24:50]
brings it very much back in line with
[24:52]
expectations of the town of Woodside to
[24:55]
um be sensitive about choice of
[24:57]
materials, natural materials, natural
[24:59]
colorings.
[25:01]
Um,
[25:03]
privacy I think is
[25:06]
pretty unique aspect of this property.
[25:09]
Um, which I think in turn gives more
[25:11]
flexibility in terms of the design
[25:14]
direction and style choices. Um, I think
[25:17]
it's particularly well done,
[25:18]
particularly elegant. Um,
[25:21]
and I like
[25:23]
how all the aspects are
[25:26]
organized.
[25:28]
Um,
[25:29]
obviously saving trees is something we
[25:31]
always promote.
[25:32]
Um,
[25:34]
I did get a chance to visit the site and
[25:36]
I think that that grove indicated by
[25:38]
that bunch of red dots and
[25:40]
cutting across the center, I think that
[25:42]
preserving that is critical to this
[25:44]
project.
[25:46]
Um, I think there's I don't know exactly
[25:49]
today where the existing drive goes
[25:51]
relative to what's being drawn as new,
[25:54]
especially that large
[25:55]
tree marked for removal in the center
[25:57]
just to the right of the
[26:01]
trench.
[26:02]
Um, I don't know where the existing
[26:03]
drive goes relative to
[26:04]
>> Existing drive comes up a little bit
[26:06]
further. Our turnarounds are right about
[26:08]
there. And the existing house is right
[26:11]
about there.
[26:12]
And the pool's over here. Yeah.
[26:16]
» Yeah, so again, and the guidance would
[26:18]
be anything that could be further
[26:20]
refined in order to preserve more trees.
[26:22]
We always encourage that.
[26:24]
Um, I think for me that pretty much
[26:27]
summarizes my feedback.
[26:31]
Like to add to that?
[26:33]
>> No, I think it's beautiful, it's
[26:34]
interesting, unique. Um,
[26:36]
certainly love the whole organic
[26:38]
environment that you're trying to create
[26:39]
there. I think, uh,
[26:41]
again, as repeating, the trees are
[26:43]
really important to us and I'm sure they
[26:45]
will be to you and your client as well.
[26:47]
So, anything that you could do to save,
[26:49]
I'm also we're We're concerned about,
[26:51]
uh, any kind of lighting, but I'm sure
[26:53]
once again with this style of property
[26:55]
most likely they're not going to want
[26:57]
light it up very much either. So,
[27:00]
I don't have any strong objections. I
[27:02]
mean, it'd be great if we could see the
[27:04]
materials, but if that comes next time
[27:06]
round,
[27:07]
out of our hands, we're cool.
[27:10]
>> Would you want to see the project come
[27:12]
back in formal?
[27:14]
>> So, story poles have not been installed.
[27:16]
Um so, uh in this in these instances,
[27:21]
um there's two options the way you could
[27:22]
look at it is one that they'll just come
[27:24]
back for formal. They'll also they'll
[27:26]
install story poles at that time. Also,
[27:28]
give you the opportunity to look at the
[27:29]
materials and lighting.
[27:31]
Um if you prefer that staff completes a
[27:33]
formal design review, uh then what's
[27:36]
happened in the past is we've kind of
[27:37]
continued the conceptual review, and it
[27:40]
allows the and it allows the applicant
[27:42]
to install story poles. We put the item
[27:44]
on consent. If there's no further
[27:46]
concerns based on the story poles at the
[27:48]
conceptual level, then it could be
[27:51]
passed to staff for formal design
[27:53]
review. Um if you want to see more
[27:55]
aspects of the project, it's probably
[27:57]
just best to bring it back to the ASBR.
[28:01]
» Yeah. So, that's that's what I would
[28:03]
move that we
[28:05]
uh approve conceptual,
[28:07]
>> Mhm.
[28:08]
>> and but have the project returned to the
[28:10]
ASBR as part of formal.
[28:12]
>> Sure. And so, what I've heard is that
[28:15]
the commended the applicant
[28:17]
for the design of the structure is
[28:19]
unique, but is uh a good choice of
[28:21]
materials and colors to blend in with
[28:24]
the surrounding area. And that um in
[28:27]
terms of recommendations,
[28:30]
uh the ASBR is encouraging the applicant
[28:31]
to try to save um some of the trees that
[28:34]
are proposed for removal if possible,
[28:36]
and also encouraging the applicant to
[28:39]
provide minimal lighting that's around
[28:41]
the
[28:42]
uh development, and obviously would be
[28:44]
downward facing and shielded.
[28:48]
Anything else?
[28:49]
>> Good. That's great.
[28:51]
All right.
[28:53]
>> So, the motion is to bring it back with
[28:55]
those items
[28:57]
to the ASBRB for formal design review.
[28:59]
Is there a second?
[29:00]
>> Second the motion.
[29:02]
>> Chair Lindsey.
[29:02]
>> Yes.
[29:03]
>> Member Delgavi.
[29:04]
Member Sullivan.
[29:05]
>> Yes.
[29:08]
» Okay.
[29:10]
>> Great.
[29:10]
>> You'll receive a letter in the next
[29:11]
couple days.
[29:12]
>> Great.
[29:13]
Thank you very much.
[29:14]
>> Thank you.
[29:15]
It's going to be fun.
[29:17]
>> Thanks, everyone.
[29:17]
>> Thank you.
[29:18]
>> Good to see you soon.
[29:21]
That's the impression.
[29:21]
>> Yes.
[29:22]
>> Thank you.
[29:28]
» All right. In terms of um director's
[29:29]
reports, I mean you you have a
[29:31]
director's report for May.
[29:33]
Um and as we kind of always highlight
[29:34]
with these things is looking at our
[29:36]
housing numbers.
[29:37]
We've also included a new pie chart um
[29:40]
that actually uh identifies all of the
[29:44]
residential housing permits that have
[29:46]
been issued
[29:47]
um
[29:48]
for this arena cycle six for this
[29:50]
housing element. Uh so, you'll see a
[29:52]
total of 87 ADUs so far and 36
[29:55]
single-family dwellings.
[29:57]
Um so, that's all the way up to date
[29:59]
through May.
[30:00]
And then uh for the month of May, we
[30:03]
didn't have any single-family dwelling
[30:05]
permits issued and only two ADU permits.
[30:09]
Um but, on the positive side,
[30:11]
um when you add up the numbers at least
[30:13]
for the ADUs, we are at 15 ADUs so far
[30:17]
this year.
[30:18]
Um so, you know, roughly halfway through
[30:20]
the year, not even quite halfway. And if
[30:22]
we were able to keep up this pace and
[30:24]
hit 30 ADUs
[30:26]
um this year, that would be great. That
[30:27]
would be the highest we've ever had in
[30:29]
several years, if not ever. Um so, we
[30:32]
are seeing um
[30:33]
more interest in ADUs as well as
[30:36]
uh we're continuing to modify municipal
[30:40]
code to make things more flexible.
[30:42]
Um we just brought another ordinance to
[30:44]
the planning commission last month and
[30:47]
they have recommended approval. So, we
[30:48]
will be bringing it to the next council
[30:50]
meeting another ordinance updating ADU
[30:53]
standards to provide more flexibility.
[30:55]
Um
[30:55]
>> [snorts]
[30:56]
>> So, so the some of the highlights are,
[30:58]
you know, for a second driveway
[30:59]
exception that needs to serve an ADU, we
[31:01]
can just deal with that at the staff
[31:03]
level without having to go to the
[31:04]
planning commission.
[31:06]
Um there's uh
[31:08]
a couple other little tweaks we've done
[31:10]
really to clarify some of the stuff in
[31:12]
terms of like how far eaves and
[31:14]
overhangs for ADUs can go into the
[31:16]
setback since the ADU is already in the
[31:19]
setback. Um same with things like uh
[31:22]
um we've already in practice we've
[31:24]
already done this in terms of like uh
[31:26]
HVAC units
[31:27]
um you know, for ADUs, they have to be
[31:30]
adjacent to the building. So, we're just
[31:32]
clarifying and what we do in practice is
[31:34]
that uh they can be next to the ADUs,
[31:36]
they just can't be any closer than 4 ft
[31:38]
the side or rear property line such as
[31:40]
the ADU. So, um so, that's all I have to
[31:42]
report at this time.
[31:46]
» Graham, I'm going to be there.
[31:47]
>> Yeah.
[31:48]
>> Um question, as you see long-term trends
[31:52]
as you compile these
[31:54]
monthly.
[31:55]
Um
[31:57]
at what point do you
[32:00]
feel that we are
[32:02]
you know, over indexing on ADUs and at
[32:05]
the detriment of fewer new single-family
[32:07]
home permits?
[32:08]
>> Um well, I just think I don't know if
[32:11]
it's to the detriment of single-family
[32:13]
dwellings, it's just a matter of
[32:15]
you know,
[32:17]
most properties are developed. Um you
[32:20]
know, the the vacant properties have a
[32:22]
lot of challenges
[32:24]
uh and so, um so, really when we see new
[32:26]
single-family dwellings, it's usually
[32:28]
replacing an existing one. It's a kind
[32:30]
of a larger project that most people may
[32:32]
be not ready to undertake. Um whereas
[32:35]
uh now that there's more flexibility for
[32:37]
ADUs and we allow more ADUs and state
[32:39]
law requires more ADUs on properties.
[32:43]
Um, that's why we probably see a much
[32:45]
higher uptick in ADUs than single-family
[32:48]
dwellings. We do really hope to get more
[32:50]
single-family dwellings. We need to hit
[32:51]
those numbers.
[32:53]
Um, we still are moving forward with
[32:55]
looking at, you know, how to get the
[32:57]
multi-family housing accomplished. Um,
[32:59]
it's important that Woodside has varied
[33:01]
types of housing, even if we are getting
[33:03]
close to hitting our numbers. Um, so
[33:05]
there's a couple different things that
[33:06]
we have to look at.
[33:10]
Um, it's being processed. They they have
[33:14]
submitted for a uh, subdivision, so
[33:16]
that's what we are processing.
[33:18]
Uh, they don't have a specific proposal
[33:20]
to actually do construction, but they
[33:23]
propose one multi-family site and 10
[33:25]
single-family residential sites um, as
[33:27]
part of the roughly 9 acres
[33:30]
um, that they have out there.
[33:32]
And the multi-family the target in the
[33:34]
housing element is for 16,
[33:37]
um, although it is zoned for 20 units
[33:40]
per acre and it would do it 1 acre, so
[33:43]
they if they wanted to, they could make
[33:45]
it a little bit more dense than what the
[33:46]
target was for um, housing, but at this
[33:49]
time we're just processing the cutting
[33:51]
up of the land. And so if they chose to
[33:54]
whether they choose to or a future owner
[33:56]
chooses to do the kind of the
[33:58]
construction aspect, uh, we would review
[34:00]
those details at that time.
[34:04]
Uh, they they are they've received their
[34:06]
permit for their
[34:09]
driveway/roadway. The reason I say it
[34:11]
that way is the final map hasn't been
[34:13]
technically recorded yet, but they are
[34:15]
to
[34:16]
uh, complete the construction of the
[34:17]
roadway and um, so that is underway.
[34:20]
>> They said that they're going to sell
[34:22]
those lots, is that right?
[34:23]
>> Um, they there's seven lots and whether
[34:27]
they choose to develop them or sell them
[34:29]
individually or sell them all to one
[34:31]
person.
[34:33]
That remains to be seen.
[34:35]
My understanding at least from the
[34:36]
applicant this time is that they are
[34:39]
looking to sell them. They don't plan on
[34:40]
developing them themselves.
[34:43]
Yeah, yeah, yes. Yes.
[34:46]
Yeah, whether it's one owner or not.
[34:48]
Yes, they would come under separate
[34:50]
permits.
[34:52]
Good.
[34:53]
>> Those numbers are already calculated
[34:55]
basically seven
[34:56]
>> No, those are cuz that's just cutting up
[34:59]
the land. So, once they come in for
[35:02]
permits, that's when we can we issue the
[35:04]
permits, that's when we can count them.
[35:11]
Okay,
[35:12]
thank you, Sage.
[35:13]
All right, with that I'll close the
[35:14]
meeting at 5:05 p.m.