[1:05]
Yeah, just all right.
[1:11]
I uh more stomach
[5:06]
Would
[5:13]
you say
[5:24]
I have
[5:50]
Not going to get much.
[6:04]
All right, if everybody could make sure.
[6:11]
» Mine turned green. Hello. There you go.
[6:47]
technical difficulties. We're getting
[6:49]
there.
[6:51]
We're all here though, so that's
[6:52]
exciting.
[6:58]
Hey, any
[7:00]
good
[7:27]
ready. Okay. All right. We're going to
[7:30]
go ahead and open today um the September
[7:33]
3rd design review board.
[7:37]
Um first item is the approval of the
[7:40]
June 4th DRB minutes. Did everyone have
[7:42]
a chance to look at those? Emiled them
[7:44]
out separate. Anyone care to make a
[7:46]
motion there? I move the approval as
[7:49]
presented.
[7:50]
» A second. Hey, motion and a second. All
[7:51]
in favor?
[7:52]
» I.
[7:54]
» All right, Tim. Any announcements today?
[7:56]
» No announcements.
[7:58]
» Okay,
[8:00]
want to roll on to item two?
[8:02]
» Yes. Good afternoon. You've got me for
[8:04]
three more meetings.
[8:07]
[laughter]
[8:08]
» Retirement countdown.
[8:12]
At least I can't tell you the number of
[8:13]
days like Bob can, but yeah, I guess
[8:16]
it's the retirement countdown.
[8:17]
» All right.
[8:18]
» So
[8:24]
So this is a less than minor development
[8:27]
application submitted by by McNeel
[8:29]
Carroll Engineering requesting approval
[8:31]
to reduce the originally approved square
[8:33]
footage of a commercial building on
[8:36]
56.07
[8:37]
7 acres with the future land use of and
[8:40]
zoning of Bay Walton Sector Plan Town
[8:43]
Center properties located in district 5
[8:45]
on the north side of Highway 98. So this
[8:49]
was previously approved by this board on
[8:51]
January 5th, 2023.
[8:55]
So they're wanting to downsize this
[8:57]
building from 19,734
[9:00]
square ft to 11,279
[9:04]
square ft.
[9:06]
So, with that, I'd please like to enter
[9:08]
the staff report into the record.
[9:11]
» All right. So, noted
[9:12]
» And I'll answer any questions or I'll
[9:15]
turn it over to the
[9:17]
It's pretty straightforward. It's
[9:19]
basically the same
[9:22]
building
[9:24]
but smaller.
[9:26]
» Any questions of Tim?
[9:30]
Mr. Carol, do you
[9:38]
Good afternoon. Robert Carroll, McNeel,
[9:40]
Carol Engineering, 17800 Panel City
[9:42]
Beach Parkway. We are the engineer of
[9:43]
record. As Tim stated, we were here
[9:46]
several years ago. It was a two-story
[9:47]
building uh and a completely different
[9:49]
architect. So, we have completely
[9:51]
changed the project. They're still
[9:52]
allowing us to be part of the team, so
[9:54]
we're grateful. But, uh the roadways,
[9:56]
the parking, all of those are part of
[9:58]
the master plan. Those were previously
[9:59]
installed. We came here before. Uh so,
[10:03]
Basically, all the infrastructure around
[10:04]
it is installed. This is just for the
[10:06]
building itself. The architect is here
[10:08]
and she's brought a nice board and some
[10:11]
colors and uh I think she's gonna
[10:13]
control the show, but I was just here in
[10:15]
case there were any site related or any
[10:16]
questions that I could answer.
[10:19]
» I have one um site related question on
[10:22]
the first um
[10:26]
site plan that's actually includes the
[10:28]
frontage on Highway 98. There is a
[10:31]
sidewalk shown and I can't recall if
[10:33]
that sidewalk actually exists. And the
[10:35]
reason part of the reason I'm asking is
[10:36]
last month we had the uh large water
[10:39]
sign come before us.
[10:42]
» There's not one along 98. There the
[10:43]
sidewalks are internal with the roadways
[10:45]
but not along 98. We do not have a
[10:47]
walkway out there.
[10:48]
» Yeah. In other words, the packet that
[10:49]
you all submitted shows a sidewalk on
[10:52]
Highway 98.
[10:55]
» New sixoot sidewalk. Yes.
[10:58]
So, I was just curious. I mean, my
[11:00]
question might be direct better directed
[11:02]
to Tim. Um, but I know that that
[11:07]
requirement to provide a sidewalk on the
[11:10]
public rideway is frequently a
[11:11]
requirement of the project. Is this is
[11:13]
there supposed to be a sidewalk on
[11:14]
Highway 98? Well, not with this
[11:17]
particular project because it has no 98
[11:19]
frontage, but yeah, I mean, the code
[11:21]
does require
[11:24]
» I don't go by there really, so I don't
[11:28]
think it's currently there.
[11:30]
» Okay.
[11:30]
» I'm not sure, but when DOT widens the
[11:34]
road, they will put in the sidewalk.
[11:36]
» DOT's widening.
[11:39]
» Yeah, 98 is going to be widened all the
[11:41]
way to the Bay County line.
[11:44]
I mean, pushed it back. I mean
[11:46]
» Oh, I I see what you're saying. Yeah,
[11:47]
but not as part of this project.
[11:49]
» Not as part of this project. But in
[11:50]
Okay. with the 98 widening DOT will
[11:54]
install either a sidewalk or a mixed uh
[11:58]
a multi-use path like this last segment
[12:01]
they did from Mac Bayou Road to 3A. They
[12:04]
put in a 10- foot multi-use path.
[12:07]
» Okay.
[12:09]
All right. I guess I'll uh maybe I'll
[12:10]
bring it up as new business or something
[12:11]
at the end of the meeting. Um
[12:13]
» But this this particular project has no
[12:16]
98 frontage.
[12:17]
» Okay. Yep. I pose the question because
[12:19]
it was included in the packet. So
[12:22]
» The internal sidewalks there are so we
[12:24]
have the on the far east side. We have
[12:27]
sidewalks from there all internal all
[12:28]
the way through Publix all the way to
[12:30]
the bank.
[12:31]
» Yep.
[12:31]
» So okay.
[12:33]
» Pedestrians have free will to walk but
[12:34]
just not along 98. Yep. [clears throat]
[12:37]
» Thank you.
[12:38]
» Thank you. Thank you.
[12:46]
Hi, good afternoon. My name is Paula
[12:48]
Neil and I'm with the architect of
[12:50]
record
[12:52]
Neil in
[12:56]
uh I did bring a finish board um for
[12:59]
y'all to look at. Um do you mind if I
[13:02]
come up?
[13:13]
So, we do have it's a planned um retail
[13:17]
mixed use. Um I think St. Joe is
[13:20]
planning on putting a restaurant in one
[13:22]
and just a couple retail spaces in the
[13:25]
rest. And um it does front both Merchant
[13:28]
Lane and Port Plaza Way. and it's just a
[13:34]
small 11,000 square foot building. Um
[13:39]
the the character of the facade matches
[13:42]
the rest of the town center with just a
[13:44]
couple little tweaks um meeting the
[13:47]
scenic corridor requirements and the
[13:49]
mental color palette um which we're
[13:51]
showing there. So, um but the plan is to
[13:57]
have a little patio in the front and
[14:00]
then a little patio behind um for the
[14:03]
restaurant tours and uh and otherwise
[14:07]
it's uh really in line with the rest of
[14:09]
the town center development.
[14:12]
Let me know if you have any questions.
[14:15]
Be more than happy to answer.
[14:20]
Any questions of our architect?
[14:25]
» Uh, just to kind of confirm for the
[14:27]
record, all of the mechanical units are
[14:30]
located. Um, where and are they all
[14:33]
screened?
[14:34]
» So, actually, I did want to ask about
[14:36]
that. I know one of the scenic
[14:38]
requirements is a metal uh roof and we
[14:45]
have parapits around the entire roof.
[14:48]
So, you will actually
[14:50]
that roof assembly and we're doing a low
[14:53]
slope quarter inch per foot and so we
[14:56]
feel like a PVC roof makes more sense in
[15:00]
that case. Yes, the parapit is high
[15:02]
enough to completely conceal the
[15:04]
mechanical units which will be on the
[15:06]
roof as well. It'll also make flashing
[15:10]
to all the um curbs associated with
[15:13]
those mechanical units much easier. Uh
[15:16]
we do want
[15:19]
Sarnophil PVC product which is fire
[15:21]
resistant. Um it has you know the
[15:24]
Florida building code approval. It has
[15:26]
Miami Dade um approval. So I mean it's a
[15:31]
it's a good quality project that will
[15:33]
reduce you know that will resist any you
[15:36]
know wind uplift or anything like that.
[15:39]
Um so we are asking for a variance on
[15:42]
that.
[15:45]
I'm not sure if there's a process that
[15:47]
we need to go through to get approval
[15:49]
[clears throat] on that. Our drawings
[15:50]
are currently showing the metal roofing
[15:53]
only because that was a requirement, but
[15:55]
we would like to change if possible to a
[15:58]
PVC roof product.
[16:01]
» Tim, can you answer a question?
[16:03]
» Yes.
[16:04]
» I mean, the metal roof requirement, in
[16:07]
my opinion, was always associated with
[16:09]
sloped roofs because we don't want
[16:11]
asphalt shingles on 98.
[16:15]
I never thought that that applied. I
[16:16]
wouldn't have even thought this was a
[16:17]
variance if they have a fully parapit a
[16:19]
full, you know, four-sided parapit on
[16:22]
this building that we would have to use
[16:25]
a variance to approve a like a TPO type
[16:28]
roof.
[16:35]
» We have approved membrane multiple
[16:38]
times. The code says barrel tile,
[16:42]
standing sea metal, concrete tile,
[16:44]
slate, copper, wood shingles, slshakes,
[16:47]
dimensional asphalt shingles, but
[16:49]
typically a parapit roof is is membrane,
[16:51]
and we've done that plenty plenty of
[16:53]
times.
[16:54]
» So, I mean, I think what you're
[16:56]
proposing is totally fine. I just
[16:58]
» I put standing seam metal because that's
[16:59]
what that's what you have on there.
[17:08]
notion.
[17:12]
» Well, and that's very typical. Like I
[17:14]
said, we we've improved that plenty of
[17:16]
times just because it is very typical.
[17:18]
» Do we have to approve that because it's
[17:21]
specifically not one of the items
[17:23]
listed. That's not something that can go
[17:24]
on a staff level.
[17:26]
» We
[17:28]
never have in the past.
[17:29]
» An incredible burden.
[17:30]
» We never have in the past. So from a
[17:33]
process standpoint, because it was not
[17:35]
advertised as a deviation, we cannot on
[17:38]
the floor approve a deviation.
[17:40]
» Right. All she really needs to do is
[17:42]
resubmit it with the membrane route,
[17:45]
» Right? And I don't think that you get
[17:48]
any push back about that. Um the the
[17:50]
deviation request process is is not um
[17:54]
we're not like a like the board of
[17:56]
zoning appeals, you know.
[17:57]
» So we had originally submitted it as a
[17:59]
PBC and that was a
[18:08]
Technically, it's not, but I mean, we've
[18:11]
» We've approved that plenty of times.
[18:13]
» That might be something we need to
[18:15]
adjust in the code then. I mean, if we
[18:16]
think about a Walmart or any of these
[18:19]
large buildings, they all have a
[18:20]
membrane style roof.
[18:22]
» Unfortunately, it doesn't look like
[18:23]
they're going to let us move forward
[18:24]
because of SP180. and you know we were
[18:27]
in the process of doing these changes
[18:30]
and I'm very much of a believer that
[18:32]
it's not putting an additional burden on
[18:35]
anyone. Um but yeah, I mean that would
[18:38]
be ideal if we're in the process of
[18:40]
changing it to add that.
[18:42]
I don't know exactly how that came about
[18:44]
because it's not specifically listed but
[18:47]
we've been approving those for years.
[18:50]
» Right.
[18:53]
So from a process standpoint,
[18:55]
unfortunately what we can do tonight is
[18:58]
um take action on the project as it's
[19:00]
presented.
[19:01]
» Um but with a separate project um
[19:05]
request that can come um probably next
[19:09]
month if you can get that.
[19:10]
» I think you can just make a condition
[19:12]
and she can resubmit the plan.
[19:15]
» I mean we've never made anyone else do a
[19:17]
deviation for membrane roof. So why
[19:20]
would why would
[19:22]
» It's not going to alter
[19:23]
» It this I mean clearly in the drawings
[19:26]
it's not an AR it's not a standing seam
[19:28]
roof. You couldn't do what what the
[19:30]
drawings show with a standing seam roof.
[19:32]
So I I think it's just the words on the
[19:34]
piece of paper.
[19:36]
» Um and so uh I'm very comfortable. Um
[19:40]
» Okay.
[19:42]
I just don't want there to be any any
[19:43]
issues with [clears throat] with process
[19:45]
on how we've done this. You just need to
[19:47]
make it not a condition per se, but just
[19:50]
put in your motion that they can change
[19:52]
it out and then they just submit new
[19:55]
plans.
[19:56]
» Yeah. With the membrane. Well, actually,
[19:58]
in this case, it's probably just a
[19:59]
labeling thing.
[20:01]
» I'm totally fine with that. I just want
[20:03]
to make sure that the process isn't
[20:04]
going to be
[20:04]
» Correct the notation. Basically, that's
[20:06]
it.
[20:07]
» Yeah. I think all she would have to do
[20:09]
if you guys approve it tonight is just,
[20:11]
you know, upload a new set of plans and
[20:14]
those will be the the final the final
[20:16]
plans.
[20:17]
» Okay, I'm good with that.
[20:19]
» And we could cloud all those notes so
[20:21]
that you can see that.
[20:23]
» And I do appreciate the sections you
[20:25]
provided with the view lines to the
[20:27]
rooftop equipment. That was very
[20:28]
helpful.
[20:30]
Yeah, we even did one all the way to to
[20:32]
98 so that we saw that
[20:34]
» You can see that there's just no
[20:36]
visibility whatsoever.
[20:38]
» Yeah, very helpful.
[20:41]
» So, I have another um question. This
[20:43]
this will probably confuse everybody for
[20:45]
a second, but just indulge me. Um is
[20:47]
there a a person who actually works with
[20:49]
the St. Joe Company present?
[20:52]
» Hi.
[20:53]
» So, um I just came from the South Walton
[20:55]
Fire District budget meeting. Um I'm a
[20:58]
commissioner on that board and um at the
[21:01]
last meeting we went through this board
[21:04]
went through a lot of effort to make
[21:06]
sure that uh the sign proposal that
[21:08]
y'all brought was approved and we we
[21:10]
kind of been over backwards to work
[21:11]
through all the little challenges that
[21:13]
came up and I think we're going to do
[21:14]
the same thing tonight on this. Um, but
[21:17]
uh, one of the things that I'm working
[21:18]
on with that hat on, this fire district
[21:20]
hat on, is is trying to get the fire
[21:22]
station going in Water Sound and clearly
[21:25]
you guys are moving forward with a lot
[21:26]
of development. And right now, uh, my
[21:29]
understanding after several
[21:30]
conversations is we're hung up on
[21:33]
getting an easement sorted out between
[21:34]
Florida Power and Light and St. Joe. And
[21:37]
I just want to encourage you to get
[21:39]
whatever it needs to get done done
[21:41]
because we're getting very frustrated
[21:43]
about the amount of time and money. We
[21:45]
have a fire we have a crew of guys and a
[21:47]
truck crammed into the Inlet Beach
[21:49]
Station that we need to have there that
[21:51]
are supposed to be at this new fire
[21:53]
station. So, um we really need to get
[21:55]
that going. So, uh if you want to share
[21:59]
with the other folks in your
[22:01]
organization that at least one person
[22:03]
who sits on multiple boards is getting
[22:05]
very frustrated about this. Thanks.
[22:08]
» I bet who's not here is Florida Power
[22:10]
and Light.
[22:11]
» They're Yes, I know. [laughter]
[22:13]
But uh I think it's Kathy Katherine um
[22:19]
you you have the background to know what
[22:20]
it is I'm talking about. So I just uh
[22:22]
again I'm uh going to show my um good
[22:26]
faith that at whatever point that we
[22:28]
finished our discussion I'm going to
[22:29]
make a motion to approve the project.
[22:31]
But if you bring another project back I
[22:34]
might not be so nice next time.
[22:41]
Is that an actual motion you want to?
[22:43]
» Oh, yeah. Everybody I I didn't want to
[22:44]
cut short the uh the discussion. I think
[22:46]
it's a wonderful wonderful
[22:47]
» No, I was just commenting for our light
[22:49]
takes forever to do everything. So,
[22:50]
» They do, but this has been this has been
[22:52]
many years and we are starting to have
[22:54]
um one of the things we discussed is how
[22:56]
many times we've rolled over the m the
[22:57]
budget.
[22:58]
» Sure.
[22:58]
» For this fire station and
[23:00]
» The fire station is going to be there
[23:01]
for a reason. Yeah. It need it needs to
[23:03]
happen.
[23:05]
So anyway, with that, if uh if we have
[23:07]
finished discussing the building, um I'm
[23:10]
gonna I'll make a motion to approve the
[23:12]
project as presented with the
[23:14]
understanding that the um roofing
[23:17]
material inside the parapit is
[23:19]
anticipated to be a PVC I believe.
[23:22]
» Correct.
[23:23]
» Um in lie of the standing seam metal.
[23:26]
» Second motion and a second. All in
[23:28]
favor?
[23:29]
» I.
[23:30]
» Motion passes. Thank you.
[23:31]
» Thank you.
[23:34]
All right, Tim. Item three, panhandle
[23:37]
patio.
[23:38]
» Well, it's actually honest, but I I I
[23:40]
did misspeak. I guess there is a an
[23:42]
announcement. We normally do
[23:45]
continuances and whatnot under that
[23:47]
heading. And item number four is being
[23:50]
requested to be removed from the agenda
[23:53]
because it was already previously
[23:55]
approved by this board. So, it did not
[23:58]
need to come back. So, we're just asking
[24:01]
you to remove it from the agenda.
[24:06]
» The monument sign for Santa Rosa Plaza.
[24:11]
» Yes. It It's a little tricky because you
[24:14]
guys approved it with their MSP. The MSP
[24:16]
doesn't normally approve monument signs,
[24:21]
but you didn't want to have them to come
[24:23]
back, have to come back. It was right in
[24:26]
front of you. So, you approved it at
[24:29]
that time and I guess it just didn't get
[24:32]
taken off the agenda and we don't see a
[24:34]
reason to approve it a second time.
[24:40]
» Tim, could you clarify which project
[24:42]
that is?
[24:43]
» Number four, Santa Rosa Plaza monument
[24:46]
sign.
[24:48]
Santa Rosa Plaza is at the corner of Don
[24:50]
Bishop Road and Highway 98.
[24:52]
» Okay. So, in the minutes of the last
[24:54]
meeting, Santa Rosa Plaza MSP
[24:57]
It says there was a discussion regarding
[24:58]
building colors depicted in the packet
[25:00]
and it was noted that the monument sign
[25:01]
was not part of this approval.
[25:03]
» Oh,
[25:10]
» Well, we just approved. So, we need to
[25:12]
open the minutes back up and fix that.
[25:16]
So, I did add a note in the uh final
[25:19]
decision of the workflow of Energ
[25:21]
stating that and I rewatched the video
[25:24]
that we did or that this board did
[25:28]
make the approval a separate approval
[25:30]
for the master sign plan and then a
[25:32]
separate approval for the monument sign.
[25:35]
Um since as what Tim said,
[25:39]
» No
[25:48]
Okay,
[25:49]
» Got it. So then
[25:51]
» Staff approved the monument sign. That's
[25:53]
how the motion read, but that was my
[25:56]
understanding of the motion.
[25:58]
» So,
[26:00]
» Okay. But I think we need to clarify the
[26:02]
minutes because this sure reads like we
[26:04]
specifically pulled the monument sign
[26:05]
out. I I think we should we should amend
[26:08]
these minutes to read that the monument
[26:10]
sign was approved was considered
[26:12]
administratively or something to that
[26:14]
effect.
[26:15]
» Okay.
[26:16]
» Is that
[26:17]
» I think that's fine.
[26:19]
» I think proceed procedurally I think any
[26:22]
we can reopen items.
[26:24]
» We can. Yeah. So I guess is that does
[26:26]
that need to be a vote to reopen the
[26:28]
item?
[26:30]
» The official
[26:30]
» The minutes.
[26:32]
» Yeah. The minutes. Yeah.
[26:33]
» Okay.
[26:34]
» Okay. So
[26:38]
Y
[26:43]
» Oh, yeah. We can do that, too.
[26:44]
» So, I guess I'm going to move I think I
[26:46]
think the correct uh parliamentary
[26:48]
procedure is to reconsider.
[26:50]
» Okay.
[26:50]
» So, I make a motion to reconsider
[26:53]
» The meeting minutes of
[26:56]
» June
[26:57]
» June 4th.
[26:59]
» Right. We have a motion to reconsider.
[27:01]
» Second.
[27:01]
» All right.
[27:03]
» All in favor?
[27:04]
» I. All right.
[27:06]
» May I May I ask what that means for the
[27:08]
monument sign? Are we still going to
[27:10]
hear that?
[27:11]
» No.
[27:11]
» Even though my intent is just to get the
[27:13]
minutes look like we
[27:15]
» Okay.
[27:15]
» It sort of looks like we we didn't want
[27:17]
to approve it the way the minutes are
[27:19]
written and
[27:20]
» But I remember we did say it could be
[27:22]
approved
[27:22]
» Administratively. Yes.
[27:23]
» Right.
[27:24]
» Okay. So I get I guess now the minutes
[27:26]
are on the table.
[27:27]
» The minutes are on the table. So if we'd
[27:28]
like to have a motion to continue the
[27:30]
minutes to the
[27:32]
um October
[27:36]
October 1st.
[27:43]
[laughter]
[27:45]
» October.
[27:47]
» We're gonna miss you, Tim.
[27:49]
» Can you just come back for fun? Um,
[27:52]
October 1st, uh, DRB meeting.
[27:55]
» So moved.
[27:58]
» All right.
[28:00]
I second. Okay. All in favor?
[28:03]
» I. There we go.
[28:04]
» Um, okay. Now, heading back to uh the
[28:07]
removal of item four. Um, if we can
[28:13]
» Don't know what motion,
[28:14]
» No actions needed. We can just go. Okay.
[28:17]
So, the next item on our agenda was item
[28:20]
number three. So, let's head up to
[28:23]
panhandle patio building sign.
[28:25]
» Okay. Okay. So, the panhandle patio
[28:27]
building sign item number three,
[28:29]
SGN260099.
[28:33]
This is a scenic corridor sign
[28:35]
application submitted by submitted by
[28:37]
Duncan Signs and Lighting on behalf of
[28:39]
Northline Investments LLC requesting
[28:42]
approval of a building sign measuring 35
[28:44]
in by 221 in for a total of 53.71 square
[28:49]
feet on 1.63 63 plus or minus acres with
[28:52]
a future land use of mixed use in a
[28:54]
zoning category of coastal center.
[28:56]
Properties in district 4 at 1255 US
[29:00]
highway 98 West and can be identified by
[29:03]
the parcel number in your staff report.
[29:05]
May I enter the staff report into the
[29:07]
record?
[29:07]
» All right. Noted.
[29:08]
» Um may I also note that the applicant
[29:11]
was not able to attend today? Um so if
[29:14]
you do have any questions that need to
[29:16]
be answered, I'll do my best to answer
[29:18]
them and if I cannot then I'll have to
[29:20]
pass those questions on to the applicant
[29:22]
um if you all decide to continue based
[29:25]
on those questions. With that said, um
[29:30]
their proposal meets the minimum
[29:31]
technical requirements and I don't have
[29:33]
any comments further comments on that.
[29:36]
So, do you have any questions for me?
[29:39]
» Um is there any building lighting or
[29:41]
anything that's going to illuminate the
[29:42]
sign?
[29:45]
» No, they're not proposing
[29:48]
any lighting. It's a non-illuminated
[29:50]
sign.
[29:52]
So,
[29:52]
» And there's nothing existing on the
[29:53]
building that
[29:56]
» I think the question is, is there
[29:57]
anything on the building that's going to
[29:58]
light up the sign in place of the sign
[30:00]
being proposed is not illuminated?
[30:03]
» No. From what I'm seeing in their
[30:05]
renderings there, there's lighting on
[30:07]
the building. Uh, but it's not directed
[30:10]
upward toward the sign.
[30:12]
» Just sconce lighting on the
[30:13]
» Correct. Correct.
[30:14]
» Nothing that they're going to be able to
[30:15]
adjust to shine down or move around or
[30:17]
anything like that. No.
[30:25]
» Any other questions of um staff?
[30:28]
» Um I
[30:34]
» So I understand the letters based on the
[30:37]
exhibit to be
[30:39]
20 and 12 in tall
[30:43]
and they are described as being a half
[30:45]
inch thick PVC.
[30:48]
But the application
[30:51]
says
[30:53]
raised individual routed letters that
[30:55]
are between six and 12 in in height
[30:57]
shall have a minimum height of 3/4 in
[31:00]
and raised individual routed letters
[31:01]
between 12 and 24 in shall have a
[31:03]
minimum rise of 1 in and the applicant
[31:06]
had written NA
[31:09]
all that but it seems like they are not
[31:11]
thick enough
[31:14]
I don't know if they can laminate two
[31:16]
pieces inch thick PVC together. But I I
[31:21]
think for a 20 inch tall letter, it has
[31:23]
to be one inch thick.
[31:24]
» Okay.
[31:26]
» I would agree with you. The
[31:28]
dimensionality that we've talked about
[31:31]
um
[31:43]
and the 9 in letters need to be at least
[31:46]
3 in.
[31:51]
» I can pass that feedback on to the
[31:53]
applicant. Um,
[31:59]
yeah, I did not
[32:03]
Yeah, they did not propose that level of
[32:06]
thickness for those letters.
[32:09]
So, that's definitely something that can
[32:12]
be corrected.
[32:16]
Typically, if the applicant was here, we
[32:18]
would ask them if that they would be
[32:20]
acceptable of that as a condition of
[32:22]
approval.
[32:23]
» Um,
[32:25]
» From the conversations that I've had
[32:26]
with the applicant, I believe that they
[32:28]
would be they would be willing to
[32:30]
» To make those.
[32:31]
» Yeah. To make those changes. I don't
[32:32]
think that they would have any push back
[32:35]
because they really wanted to be able to
[32:37]
make it today, but I told them that I
[32:39]
would speak on their behalf.
[32:41]
» Okay.
[32:44]
I think in terms of the colors, the all
[32:46]
that stuff, it looks great.
[32:49]
» I guess do we uh would everybody be
[32:52]
comfortable if we approved it contingent
[32:54]
on the thicknesses meeting?
[32:56]
» I would.
[32:56]
» Minimum.
[32:58]
» Absolutely.
[32:58]
» Yes.
[33:00]
» Okay.
[33:00]
» Well, I will make a motion to Oh, I'm
[33:02]
sorry. We got more to go.
[33:03]
» Yep. I got um
[33:05]
» We'll finish with staff and then we have
[33:07]
a Yep.
[33:09]
And we may have actually missed that one
[33:11]
on origins because I don't have a check
[33:13]
mark next to that. Um,
[33:17]
if we opened and closed a public comment
[33:20]
session, we did not.
[33:21]
» Sorry, I scared them off with my
[33:23]
[laughter]
[33:24]
They moved pretty quick when
[33:27]
» Um, apologies then. Um,
[33:30]
let's finish up here and then we'll sort
[33:32]
my
[33:34]
hair.
[33:35]
» Any other questions? Any other questions
[33:37]
for item three? All right, seeing none,
[33:40]
anyone from the audience want to speak
[33:41]
on item three? And seeing no one, um
[33:46]
would you care to make a motion?
[33:47]
» I will.
[33:47]
» Okay.
[33:48]
» I move that we approve uh the panhandle
[33:51]
patio furniture building sign as
[33:54]
presented contingent on the
[33:58]
uh larger letters being at least one
[34:01]
inch thick and the lower uh patio
[34:05]
furniture
[34:06]
Word be 3/4 of an inch thick.
[34:11]
» Second. Have a motion, a second. All in
[34:13]
favor?
[34:14]
» I
[34:16]
» All right. The item passes.
[34:18]
» Um
[34:20]
» I did.
[34:21]
» Do we need to go back and take any
[34:23]
action for origins with the public
[34:25]
comment or
[34:27]
» Yeah.
[34:29]
» Is anyone from the audience here to
[34:31]
speak on item two, the origins building
[34:34]
less than minor? and seeing no one.
[34:37]
Sorry about that.
[34:40]
Got ahead of my check marks.
[34:42]
All right. Um so we have removed item
[34:45]
four. Um going on to item um five and
[34:50]
six, the Euro market signs. If you
[34:52]
wouldn't mind to present them together,
[34:54]
please.
[34:56]
So this is the item number five and six
[34:59]
zero market 3A building sign and
[35:01]
monument sign uh SGN260000101
[35:07]
and 000000102.
[35:10]
These are both scenic corridor uh sign
[35:12]
applications submitted by Euro market 38
[35:15]
LLC on behalf of ING Arc LLC.
[35:20]
Um requesting approval of the building
[35:22]
sign measuring 144 in x 24 in for a
[35:27]
total of 24 square ft and the monument
[35:31]
sign measuring 48 in x 72 in for a total
[35:35]
of 24 square ft on 649 plus or minus
[35:40]
acres with the future land use of mixed
[35:42]
use and a zoning category of village
[35:44]
mixed use. Uh both properties are
[35:46]
located or both signs are located in
[35:49]
district 5 at 4770
[35:52]
US highway 98 west and can be identified
[35:55]
by the parcel number in your staff
[35:57]
reports. May enter both staff reports
[35:59]
into the record.
[36:00]
» So noted.
[36:02]
» So would this board like to start with
[36:04]
the building sign
[36:06]
discussion and then monument sign?
[36:09]
» Yep, we can do that.
[36:10]
» Okay. So, for the building sign, um,
[36:14]
what the applicant proposed appears to
[36:17]
meet our requirements.
[36:19]
Um, I did not have any further comment.
[36:23]
Um,
[36:26]
well, I did have a discussion with the
[36:29]
applicant about their rendering. Um,
[36:32]
under exhibit C. I know that we measure
[36:35]
our sign area based on the smallest
[36:38]
rectangle around that copy area as
[36:41]
possible. Um
[36:45]
I know that they were trying to do their
[36:46]
best there. Um so I'll leave that final
[36:50]
decision with the board um on whether
[36:52]
that will suffice. Uh but based on how
[36:56]
they measured their sign area
[37:00]
with the smallest rectangle around that
[37:02]
copy area, it does meet the requirement.
[37:06]
So do you have any questions regarding
[37:08]
the building sign?
[37:09]
» Do we have any additional information
[37:11]
about how the sign is constructed or
[37:13]
mounted
[37:15]
» Material
[37:17]
in there? And it appears like they
[37:19]
furred this out over the doors. It
[37:22]
appears like the
[37:23]
» In the rendering,
[37:25]
which looks fantastic, but it's it's
[37:27]
just hard to tell how
[37:31]
» It's like the applicant's here.
[37:43]
eight months ago, but I translate if you
[37:46]
don't mind.
[37:47]
» Okay, sure. Um, we'll finish our
[37:49]
presentation here and then we'll have
[37:50]
you come up. Okay.
[37:56]
» I can put how this lights go to the wall
[38:01]
and
[38:03]
lights inside.
[38:07]
» So, it looks like we have aluminum and
[38:09]
» LED.
[38:11]
We're gonna have you go down to the
[38:12]
microphone as soon as we're done with
[38:14]
our planner discussion and we'll invite
[38:16]
you up.
[38:18]
» You're gonna handle staff questions
[38:21]
first and then they're going to give you
[38:23]
an opportunity to
[38:27]
» Yeah, of course.
[38:54]
Do you have any other questions for
[38:55]
staff before I hand it over to the
[38:58]
applicant?
[38:59]
just if there's anything else missing
[39:00]
from the packet that might notate um how
[39:03]
this thing is actually connected or
[39:07]
where the wiring is going to to provide
[39:08]
the power or anything like that any sort
[39:10]
of
[39:10]
» No.
[39:11]
» Okay.
[39:11]
» No.
[39:12]
» And also I noticed there were three
[39:13]
other down lights proposed on this
[39:15]
besides just this sign that are not
[39:18]
currently on the building or are they
[39:19]
and just not shown but they're shown in
[39:21]
the rendering.
[39:23]
» It is hard to tell and that was not
[39:25]
provided in the packet. Um but based on
[39:31]
one of the images on exhibit C, uh the
[39:34]
first image, it appears that those
[39:37]
additional lights are not placed on the
[39:39]
building as of yet.
[39:41]
» Right.
[39:41]
» Um
[39:42]
» So that would not be something that we
[39:44]
would be approving today.
[39:45]
» No, it would just be for the facade
[39:49]
building sign and the monument sign.
[39:51]
» Okay.
[39:59]
Thank you.
[40:00]
» Okay. And I believe the applicants um
[40:02]
are definitely going to be willing to
[40:05]
make whatever changes are necessary to
[40:07]
help them reach compliance.
[40:17]
Um there in the photograph of the
[40:19]
existing condition, there is an object
[40:22]
of some sort that is sort of just a few
[40:26]
feet off the front of the building. I
[40:28]
don't know if that is that a for sale
[40:29]
sign. That object right there.
[40:34]
But I want to make sure if it's an if
[40:35]
it's another sign then it would have to
[40:38]
come out of course for sale sign. Of
[40:40]
course I'm not.
[40:49]
» This is like a 4x4
[40:55]
like 4x4 and
[40:58]
» Oh it's just a post
[40:59]
» Like I put like a chain to the row we
[41:03]
cut after that.
[41:07]
» Okay.
[41:08]
» Only four by four.
[41:09]
» Okay. So, it does not appear to be
[41:11]
assigned.
[41:11]
» It's not a sign. That's great. I just
[41:12]
wanted to make sure. Yeah, it looked
[41:14]
permanent. Whatever it was, I wanted to
[41:15]
make sure it wasn't signed. Okay.
[41:20]
» Any other questions of staff on the
[41:22]
monument sign
[41:24]
» Or the building sign?
[41:28]
» And it's very similar renderings to the
[41:30]
monument sign
[41:32]
» Portion of this application, too. So I'm
[41:34]
I'm I'm guessing the rendering shows
[41:37]
that the monument side and the building
[41:38]
are very close in color.
[41:40]
» Yes.
[41:41]
» Whereas in existence right now they're
[41:43]
not part of that. So are they going to
[41:46]
be painting that monument sign to match
[41:49]
the building or are they making the
[41:50]
building darker to match the monument
[41:52]
sign
[41:54]
» Or are they are you going to fac
[41:56]
» So from the renderings my
[41:58]
» Different facade. My assumption is that
[42:00]
the monument sign would be painted to
[42:03]
match the color of the building sign.
[42:06]
» I think we'll have to ask that
[42:08]
» Necessarily the architecture of the
[42:09]
building, but maybe the applicant can
[42:11]
speak to that a little bit better than
[42:13]
what was provided in the renderings.
[42:15]
» Okay.
[42:19]
» Any other questions of staff?
[42:23]
» Okay. our applicant would come up and
[42:25]
we'll um to the microphone and state
[42:28]
your name for the record please.
[42:32]
» Hello. Uh my name is Vasili. Uh this is
[42:35]
Anna. Uh she open I help you uh here
[42:39]
from translated and opening this store
[42:41]
grocery store. And uh we don't want to
[42:44]
pay paint for this Stella. He's just put
[42:48]
like a letter that's it. We don't want
[42:51]
to paint
[42:54]
» And I don't know what I need.
[42:59]
Give you
[43:01]
» Um
[43:03]
» If you need something, you tell me.
[43:07]
» Guess one thing. We're on the building
[43:10]
sign right now. So, the building sign
[43:11]
letters are back lit, channel letters.
[43:15]
Can you confirm that the letters on the
[43:17]
monument sign are not backlit?
[43:25]
Uh we right now he's not to the lights
[43:29]
because I bring this one. We need like
[43:32]
uh put everything and then he's lighting
[43:36]
» On the the monument sign. The letters do
[43:39]
not have light or do have light
[43:41]
» Have light same but a little bit
[43:43]
smaller.
[43:48]
Same same leather, same material.
[43:52]
» We do.
[43:52]
» Okay, that's right.
[43:55]
» That's just not what the
[43:57]
» Yeah, the rendering shows that it's
[43:58]
looks like it's lit from above casting
[44:00]
down, but that the letters are not lit
[44:02]
themselves.
[44:03]
» But the letters will be lit just like
[44:06]
the building.
[44:12]
Uh you like looking like a photo
[44:16]
right now.
[44:27]
» So I I think I might be able to answer
[44:29]
that. So, it appears from the from the
[44:32]
renderings that the building sign
[44:35]
letters will be back lit, but the
[44:37]
letters on the monument sign will be lit
[44:41]
from that lighting that is Yeah, the
[44:44]
down lit.
[44:44]
» Okay.
[44:45]
» Down lighting onto those letters. So,
[44:48]
» And I'm wondering if that's just an
[44:50]
issue with the rendering.
[44:51]
» Yeah, I'm
[44:52]
» Because there's not a light there in
[44:54]
actuality.
[44:55]
» I'm I'm guessing that the rendering has
[44:57]
liberties. Yeah, we can do from uh if
[45:00]
you want to we can put like this lights
[45:03]
to the up and we can do uh put leather
[45:07]
with uh lights like this. How you
[45:10]
approve us? We put like this because
[45:13]
right now this photo uh GPT
[45:17]
» Yeah. [laughter]
[45:19]
» Yeah. Is the the monument sign the
[45:22]
monument sign out in front of the
[45:23]
building. Is it double-sided?
[45:25]
Yeah, he's double side but
[45:33]
yeah both side is uh we can put because
[45:37]
people when going you need see this
[45:40]
market
[45:44]
» Is then still compliant both side the
[45:46]
sign face
[45:47]
» Who side this side and behind side same
[45:51]
» So
[45:55]
From what I've been provided, um,
[45:57]
there's no way of knowing for sure that
[45:59]
it's double-sided, but they would
[46:02]
definitely need to add that to the
[46:04]
renderings
[46:05]
um, for clarity.
[46:15]
Yeah, as long as it's in the
[46:17]
» Yeah, we do allow doublesided monument
[46:19]
signs, but it would need to be defined
[46:22]
in um more detailed renderings.
[46:28]
I mean, I think if if this um math is
[46:32]
correct, then we we do have enough room
[46:37]
for the the two sign faces.
[46:40]
» Yeah.
[46:41]
» So,
[46:42]
um
[46:45]
» Based on the square footage of the copy
[46:46]
area, I think that they can make that
[46:48]
work.
[46:50]
» We would just need to, I think, address
[46:53]
that and conditions so that they don't
[46:55]
have to come back.
[47:04]
Um,
[47:07]
any other questions of our applicant?
[47:11]
All right. Thank you. Um, anyone from
[47:13]
the audience want to speak on either
[47:15]
item five or six?
[47:18]
And not seeing anyone there. Um,
[47:23]
does anyone have problem with the
[47:26]
monument sign being either
[47:29]
uplit or or sorry, down lit or
[47:33]
halo lit?
[47:36]
» As long as the maximum letter size is 24
[47:39]
in, I'm
[47:41]
» Okay.
[47:41]
» They don't really have the structure
[47:44]
above for the overhead lighting right
[47:45]
now, right? you know that that crown is
[47:48]
applied like straight onto the face.
[47:51]
» So if it wasn't back lit, I think it
[47:53]
would actually need to be lit from a
[47:55]
ground light. So
[47:57]
» If they were preferring to do back lit,
[47:59]
I would just assume
[48:00]
» I think it would look better, too,
[48:01]
honestly.
[48:01]
» Yeah, I like that one. I like the back
[48:03]
lit because it really gives a nice
[48:04]
streamline look.
[48:07]
Um, I think that it probably makes sense
[48:10]
to include,
[48:11]
» But the address won't be back or it
[48:14]
will.
[48:19]
» How much glow are those?
[48:22]
[clears throat]
[48:27]
» It should be visible.
[48:28]
» They're allowed to halo light all of
[48:30]
these letters on the monument sign as
[48:31]
well as the address, right?
[48:33]
» Yes.
[48:33]
» Yeah.
[48:33]
» Okay. then that would probably be the
[48:36]
recommendation that they keep it
[48:37]
consistent.
[48:38]
» Right. Right. I would think that if
[48:40]
you're going to um have backlit letters
[48:44]
on the monument sign, it would make
[48:46]
sense to include the the address numbers
[48:49]
in that
[48:52]
just for consistency.
[48:54]
» And what does the board think about
[48:55]
keeping the existing sign a different
[48:58]
color from the building itself?
[49:00]
Um
[49:02]
» You know in the rendering they show very
[49:03]
similar
[49:04]
» And clean and streamlined. However, in
[49:06]
the existing
[49:07]
» It's not Yeah,
[49:08]
» Not at all. Yeah.
[49:10]
» Um
[49:14]
I mean we always ask that they do match.
[49:17]
Um
[49:18]
» Maybe whiteashing that.
[49:20]
» Yeah, I think I mean I feel like that's
[49:22]
probably
[49:24]
» It would make those reasonable
[49:27]
» Um for the monument sign to have
[49:30]
a finished treatment to match the
[49:32]
building.
[49:40]
» Um so for the applicant what we are
[49:44]
asking is the code states that the
[49:47]
materials of a monument should reflect
[49:50]
the materials on the building as well.
[49:53]
So, since the building has whitewashed
[49:56]
or white painted brick, we're asking if
[49:59]
you would be willing to paint the
[50:01]
monument prior to um your application of
[50:04]
these sign letters so that the monument
[50:07]
does indeed match the materials of the
[50:10]
building.
[50:10]
» Yeah, no problem. You want to uh I need
[50:14]
painting like a stellar. Is this
[50:16]
monument same color to the building?
[50:19]
» Yes. Yes. No problem.
[50:31]
» Yep.
[50:32]
» Could I see the sample better again?
[50:35]
[clears throat]
[50:36]
» I'm a little confused how this thing
[50:37]
where it gets wired into.
[50:40]
» I just making sure that the I guess you
[50:43]
call it serif.
[50:43]
» It's very light.
[50:44]
» Yeah, it's all all in there. So
[50:56]
Are is your building sign
[51:00]
every letter attached to the building?
[51:03]
Every letter is attached to the building
[51:04]
or is it on a bar behind it that they're
[51:06]
attached on?
[51:09]
» Uh every
[51:12]
letter like this.
[51:13]
» Okay. So you will use those connections.
[51:17]
Okay.
[51:37]
» Okay. So, we'll need two separate
[51:39]
motions, one for the building and one
[51:41]
for the monument. Um
[51:43]
» I have I do have one one more uh comment
[51:46]
to make. Um
[51:48]
the lighting
[51:51]
not not the not this lighting but the
[51:55]
lighting on the building and the sign
[51:56]
lighting. Um we want to make sure that's
[51:59]
not overdone, not excessively bright. Um
[52:05]
» No
[52:06]
» I mean it's not on the
[52:08]
» We're not approving that light.
[52:09]
» Oh okay. We're not approving it. Okay.
[52:10]
We've already Okay. Sorry, we're not
[52:12]
focused on something else. Okay, great.
[52:13]
Awesome. Thank you. That takes care of
[52:14]
me.
[52:15]
» Okay.
[52:16]
» I was curious about that. I mean, it
[52:17]
doesn't look bad, but there's no specs
[52:19]
on it that there's no drawings on it.
[52:20]
» No, that's I was I was just getting
[52:21]
nervous that if we approved a light that
[52:22]
we have,
[52:24]
» It could be the wrong color. And the
[52:26]
advertised as building and monument sign
[52:29]
me.
[52:30]
» And I'll make it clear to the applicants
[52:32]
to not
[52:33]
» Yeah. No. Yeah. No lighting.
[52:35]
» If they want lighting, they just have to
[52:36]
bring it back.
[52:37]
» Correct. Correct. detail about the color
[52:40]
and the intensity and all that stuff.
[52:42]
» Definitely.
[52:42]
» Cool.
[52:43]
» We may.
[52:44]
» All right. So, would someone care to try
[52:47]
their hand at item five, the building
[52:49]
sign?
[52:51]
» I make a motion to approve item five,
[52:53]
the building sign based on the example
[52:57]
brought for the signage only, not the
[53:00]
lighting.
[53:05]
» Sorry.
[53:08]
Right.
[53:10]
» I motion to approve the signage for our
[53:13]
item for Euro Market 30A for the signage
[53:17]
only, not the lighting.
[53:21]
» Building sign and monument sign.
[53:23]
Correct.
[53:24]
» Just building. Sorry, my bad.
[53:26]
» Since there's no detail, maybe explain
[53:28]
it as the black um aluminum
[53:32]
» Black LED lit letters individually.
[53:36]
I motion to approve that.
[53:41]
» We have a motion and a second. All in
[53:44]
favor?
[53:44]
» I.
[53:46]
» Okay.
[53:46]
» Item six, the monument sign.
[53:51]
» I'll make a motion to approve item
[53:53]
number six, your market 38 monument
[53:55]
sign.
[53:57]
with the caveat that we whitewash or
[54:01]
make the brick white to match the
[54:03]
building in in color in some form to
[54:06]
bring the design together there. The
[54:09]
letters may be lit in halo dome lit and
[54:13]
the address may be also lit.
[54:17]
No other additional lighting to be added
[54:19]
to that monument sign.
[54:23]
» Okay, we have a motion.
[54:25]
» Second.
[54:25]
» Second. All in favor? I
[54:27]
» I
[54:28]
» All right. And we are approved on both
[54:31]
five and six.
[54:33]
» Thank you.
[54:33]
» Thank you.
[54:34]
» And um additional business.
[54:38]
» I know you wanted to bring something up
[54:43]
the sidewalk in
[54:46]
» Yeah, that was a happy thing to see on
[54:47]
the plan, wasn't it? It was
[54:49]
» I feel like it goes back to the original
[54:51]
master plan is where that's coming from.
[54:53]
I think it just keeps getting copied
[54:54]
over. Well, no, I understand. Thank you.
[54:59]
[laughter]
[55:00]
» Yeah, welcome.
[55:00]
» We look forward to it.
[55:02]
» Um, yeah, I just, you know, I'd like to
[55:04]
see the codes of applied um and I do see
[55:08]
people I saw some people on the way to
[55:10]
this meeting uh riding bicycles um on
[55:13]
the there is a little section of bike
[55:15]
lane on on uh 98 right there,
[55:18]
» But uh they would be a lot more
[55:19]
comfortable. Well, there's a lot of
[55:20]
pedestrians in that area going from the
[55:22]
apartments coming from south of 98 and
[55:25]
they're moving on that roadway. I think
[55:27]
we require sidewalks of other
[55:30]
developments. I think we should require
[55:32]
it of this one.
[55:33]
» Do do we have any idea of where FDOT is
[55:35]
at with this and that's probably more of
[55:37]
a question for Tim.
[55:38]
» They're years away from the actual
[55:39]
installation. They're still in in the
[55:41]
they're at the end of the PD&E study and
[55:43]
they've just selected the engineers to
[55:45]
begin designing. I heard the next
[55:47]
segment would be from 38 to 3:31,
[55:51]
» Right?
[55:51]
» So, it's going to be some time before
[55:53]
they eventually it'll get widened, but
[55:56]
no time soon.
[55:57]
» Yeah.
[55:57]
» So, David, you would like to see St. Joe
[56:00]
go ahead and front the bell to put a
[56:01]
sidewalk in and not wait on FDOT to
[56:04]
finish.
[56:04]
» Yeah. Now, is it possible that they did
[56:06]
a payment in L or something for that?
[56:08]
Uh,
[56:10]
» I mean they showed it in their drawing.
[56:12]
So,
[56:12]
» But doubtful. Um,
[56:15]
typically we don't allow that on 98
[56:18]
because we want a continuous sidewalk.
[56:21]
» I haven't really been involved with
[56:23]
origins. So, I don't know. I mean, the
[56:26]
code absolutely says a sidewalk is
[56:29]
required. Why it hasn't been built yet.
[56:32]
They may have some arrangement that they
[56:34]
don't have to do it until a certain
[56:36]
amount of development. Well, they
[56:37]
haven't other people other people don't.
[56:40]
Yeah, that's where I'm going is and as
[56:41]
you heard, I'm getting increasingly
[56:44]
frustrated
[56:45]
» With St. Joe. They're very They're very
[56:48]
They press us very hard. You got to
[56:49]
approve this. You we got to do this now.
[56:51]
And then when we ask for something
[56:54]
» Yes, they they definitely pressed hard.
[56:57]
» It's like they'll say, "Well, this
[56:58]
isn't, you know, it's not real road
[57:00]
frontage. The building's set back."
[57:02]
» Yeah. Yeah. Yeah. We can't We can't We
[57:03]
got to ask road frontage there.
[57:05]
» Yeah. We're not sure if FDOT will let us
[57:07]
move this piece of driveway, but we got
[57:09]
them to move an entire highway one time,
[57:11]
right? So, uh I don't I don't buy it.
[57:14]
And you know, we represent the community
[57:16]
and I'm here to say I'm getting
[57:17]
frustrated with St. Joe's attitude and
[57:20]
they're on the way to build a whole lot
[57:21]
of stuff. And as I pointed out, I could
[57:24]
have very easily said, I don't see the
[57:25]
sidewalk. Your packet shows a sidewalk.
[57:27]
You said it's not going to be in the
[57:28]
project. Motion to deny.
[57:30]
» And I would been perfectly justified in
[57:32]
doing that.
[57:33]
What's the hold up on the fire station?
[57:36]
» They
[57:38]
Yeah, this so we have to cross flour and
[57:42]
lights
[57:44]
» Easement
[57:44]
» Easement
[57:45]
» And
[57:47]
um St. Joe is concerned that the
[57:52]
easement that will be a temporary
[57:54]
construction road easement is going to
[57:56]
somehow
[57:58]
cause them a problem because we have to
[58:00]
get an easement across their property to
[58:02]
get to the site that we negotiated and
[58:06]
and have in good faith purchased from
[58:08]
them.
[58:10]
» It has been seven years since the
[58:12]
conversation about this started.
[58:13]
» That's the same thing over by Mac
[58:15]
Valley.
[58:15]
» Yeah.
[58:16]
» Easement issue over there. They they
[58:18]
keep falling back on, well, Florida
[58:20]
Power and Lights got to think about it.
[58:21]
If St. Joe would just say, "Look, we'll
[58:24]
figure this all out. We're getting ready
[58:26]
to try to build a at least 11.5 million
[58:29]
fire station." And again, we're
[58:31]
investing. We've bought millions of
[58:33]
dollars worth a ladder truck to give you
[58:35]
an idea cost $2.3 million. We've
[58:38]
purchased that thinking we were going to
[58:40]
have a fire station to put it in. And um
[58:44]
we without falling down a rabbit hole, I
[58:47]
just again the pattern I'm seeing with
[58:49]
St. Joe is when we make it when the
[58:51]
community makes an ask of them, they're
[58:53]
very very slow to respond. When they
[58:56]
want something, they expect us to wave
[58:59]
this irregularity, I mean, bringing a
[59:02]
set of drawings that have a PVC membrane
[59:04]
roof relabeled as standing seam, that's
[59:06]
ridiculous.
[59:08]
» Yeah. Uh, so I just I'm just going to
[59:11]
use this opportunity to put some
[59:13]
pressure on them.
[59:14]
» And again, I see a sidewalk drawn that
[59:16]
everybody else has had to build. Why
[59:18]
don't they have to build it?
[59:20]
» Yeah, I don't have the answer. All I can
[59:22]
tell you is the code absolutely requires
[59:24]
a sidewalk on Highway 98.
[59:25]
» And I'm sure it's on all of their
[59:27]
drawings, all of the civil drawings.
[59:28]
That's what I'm saying. It just gets
[59:29]
copied over.
[59:30]
» And I get internally, well, that's not
[59:32]
my problem. That's private property.
[59:33]
They they put that there if they want it
[59:34]
there. Um, uh, the sidewalk on 98 is a
[59:37]
community asset that they're supposed to
[59:39]
provide. And they told us, "We've got
[59:41]
all this frontage. You ought to let us
[59:43]
do this non-compliant sign. Give us a
[59:45]
variance." You know, and we were like,
[59:47]
"Oh, yeah, sure. No problem." U, I just,
[59:50]
you know, you got all that frontage, put
[59:52]
a sidewalk on it.
[59:54]
» So, there's a lot of frontage there.
[59:56]
» Yeah,
[59:59]
» That's the end of my rant, but um,
[1:00:01]
» Maybe if staff could respond back. Um,
[1:00:04]
well, that's that's on the south side.
[1:00:06]
» Yeah. Who put that in the county, state?
[1:00:09]
» That's a good question.
[1:00:10]
» Combination.
[1:00:11]
» Okay.
[1:00:11]
» Combination of funds.
[1:00:13]
» I do agree. I mean, there's so much more
[1:00:15]
pedestrian and bike traffic, bicycle
[1:00:17]
traffic, than there used to be. I mean,
[1:00:18]
just 10 years ago, you didn't used to
[1:00:20]
see tons of people on the side of the
[1:00:22]
road. But with all the hidden runs and
[1:00:24]
the accidents on 98,
[1:00:25]
» I think.
[1:00:27]
» Yeah. We first started talking about
[1:00:29]
this in 2021. And I still have meeting
[1:00:32]
minutes from a meeting with Chase about
[1:00:34]
these sidewalks and the 10-year plan. I
[1:00:36]
mean, he didn't call it a 10ear plan. I
[1:00:38]
did
[1:00:38]
» Because now we're five, six years into
[1:00:40]
it. It's still progressing, right?
[1:00:43]
» And yeah, St. Joe holds a lot of a lot
[1:00:45]
of sway in different areas down on down
[1:00:47]
in that way. So, I understand your
[1:00:48]
frustration. I'm on the other end of
[1:00:50]
town on the Mac Valley side, but it's
[1:00:51]
been just frustrating for us. It's a
[1:00:52]
very long process.
[1:00:54]
» Yeah. And and I made the joke about
[1:00:56]
Florida Power and Light because they are
[1:00:58]
always at the tip of the iceberg with
[1:00:59]
these easements and until you get
[1:01:01]
lawyers involved, nothing ever gets
[1:01:02]
done.
[1:01:03]
» Yeah.
[1:01:04]
» So,
[1:01:05]
» Anyway,
[1:01:05]
» Yeah, my understanding was is that uh
[1:01:08]
Florida Power was much more cooperative
[1:01:11]
than FPL.
[1:01:13]
» You mean Golf Power?
[1:01:14]
» Yeah. Oh, Golf Power.
[1:01:15]
» Golf Power was fantastic. When Florida
[1:01:17]
Power and Light came in, what did I say?
[1:01:18]
» You said Power Golf Power. They were
[1:01:21]
much more um
[1:01:22]
» Southern company. They're very very
[1:01:24]
engaged in their communities and uh
[1:01:27]
» Florida Power and Light is
[1:01:29]
» I had I have I had golf power till it
[1:01:31]
became FPL.
[1:01:32]
» We are
[1:01:33]
» The problem on this particular
[1:01:34]
» And they raised our rates 25%.
[1:01:35]
» It would be nice if staff could figure
[1:01:37]
it out. Um
[1:01:39]
» Give us a report at our next meeting.
[1:01:40]
» I don't know where it is. I'll try, but
[1:01:43]
you know, Renee did all of that and when
[1:01:47]
she left,
[1:01:48]
» Rosanna did all and you know, neither
[1:01:50]
one of them are here now. So,
[1:01:52]
» I guess again I was my attempt was to
[1:01:54]
try to give and that's why um
[1:01:57]
» Catherine
[1:01:58]
» Katherine I thought I recognized her.
[1:02:00]
» Um it I went to them to get the message.
[1:02:04]
I'm not kidding. The next item they
[1:02:06]
bring to this board, I will I will hold
[1:02:10]
it up over whatever deficiency I can
[1:02:12]
find in their drawings.
[1:02:14]
» Yeah, they wanted to come this to come
[1:02:15]
immediately to the meeting. I cut them
[1:02:17]
some slack.
[1:02:19]
» Really? It should have went next month.
[1:02:22]
» They should have corrected the drawings
[1:02:23]
and brought it next month. Yeah,
[1:02:24]
» But they were
[1:02:25]
» Anyway next time again
[1:02:27]
» Insistent on getting on this meeting. So
[1:02:29]
I'm like, okay, fine.
[1:02:32]
» Okay. Well, they got money tied up.
[1:02:35]
» That's why. [snorts]
[1:02:37]
» But it would it would be nice to know if
[1:02:40]
if fees were paid or if they have a
[1:02:43]
trigger somewhere in their plans of when
[1:02:45]
that will get constructed.
[1:02:46]
» Well, it's certainly possible, but I
[1:02:48]
kind of doubt we would let them buy it
[1:02:49]
out.
[1:02:50]
» Well, I mean, it it's obviously shown
[1:02:52]
somewhere in the civil package or it
[1:02:53]
would not have shown up on their
[1:02:56]
drawings.
[1:02:56]
» Yeah.
[1:02:57]
» Because a lot of that is from the master
[1:02:59]
plan, correct? I mean, most of what he
[1:03:02]
shows on his drawing is from the master
[1:03:04]
plan.
[1:03:05]
» No, absolutely. And and I mean, that's
[1:03:07]
where it lives, you know. It's not They
[1:03:09]
don't generate a new drawing set every
[1:03:11]
time. I mean, that's
[1:03:13]
» The You're just xing in.
[1:03:15]
» I'll see what I can find out. Um there's
[1:03:19]
a lot of dos there. So,
[1:03:21]
» I mean, at some point, the sidewalk
[1:03:22]
needs to be built, right? So who does it
[1:03:25]
like it's supposed to be a part of their
[1:03:27]
development and yet we keep approving
[1:03:29]
all the things for them to build without
[1:03:31]
» Sometimes
[1:03:32]
» The public amenity
[1:03:33]
» The developer will
[1:03:36]
» Get an agreement with the county like
[1:03:39]
Alice speech they had an agreement with
[1:03:40]
their proportionate fair share so they
[1:03:43]
didn't have to pay it all up front they
[1:03:45]
paid it over like seven years or
[1:03:47]
something till it was paid off now it's
[1:03:50]
paid off
[1:03:52]
» But Um, I don't know that that happened,
[1:03:54]
but I'm just saying sometimes the
[1:03:56]
developer will get an an agreement
[1:03:59]
between them and the county approved to
[1:04:04]
delay or what you know like typically
[1:04:07]
you pay the proportion of fair share all
[1:04:08]
upfront
[1:04:09]
» Or or there's a trigger written in when
[1:04:12]
a certain percentage of the development
[1:04:13]
» Of the devel right
[1:04:16]
we've worked on smaller developments
[1:04:17]
where the county we're required because
[1:04:19]
the sidewalks get destroyed during
[1:04:21]
construction. Y
[1:04:22]
» The developer has to put forth a bond.
[1:04:24]
» Yeah.
[1:04:24]
» For that.
[1:04:25]
» Well, it's a letter of credit, but yeah,
[1:04:27]
because
[1:04:28]
» Yeah.
[1:04:28]
» That's one of the last basically
[1:04:30]
sidewalks and landscaping is the last
[1:04:32]
thing they want to do because it'll get
[1:04:34]
all torn up.
[1:04:36]
» Sidewalks. If you notice Camp Creek,
[1:04:38]
that whole master plan shows sidewalks
[1:04:41]
at the development. They told me they
[1:04:43]
put have no intention to put in the
[1:04:45]
sidewalks because I was, you know, when
[1:04:47]
I was designing the house in there, I
[1:04:49]
said I called them because I said it
[1:04:51]
shows that this owner, every owner has
[1:04:53]
to put in their
[1:04:55]
» Four foot sidewalk from property line to
[1:04:57]
property line. I said I just drove
[1:04:59]
through the development and there's none
[1:05:00]
of them. They said, "Oh yeah, we gave up
[1:05:01]
on this." [laughter]
[1:05:03]
» So So there are no development or there
[1:05:06]
are no sidewalks in Camp Creek. I'm
[1:05:08]
surprised that uh that wasn't picked up
[1:05:11]
by the BPR folks.
[1:05:13]
» I'm not
[1:05:14]
» Because they're looking at they should
[1:05:16]
be looking at the master plan.
[1:05:20]
» Is it possible to give developers
[1:05:22]
deadlines for completing certain
[1:05:24]
projects that if they're consistently
[1:05:26]
showing a sidewalk on every plan for
[1:05:28]
seven years that doesn't ever exist?
[1:05:30]
» I'm just going to I'm going to use the
[1:05:32]
same strategy.
[1:05:33]
» Original developer site plan has those
[1:05:35]
triggers built in. Like you said,
[1:05:36]
there's a letter of credit, there's a
[1:05:37]
bond, there's a note somewhere that says
[1:05:39]
this is going to be built with this
[1:05:41]
parcel development,
[1:05:42]
» Right?
[1:05:42]
» There's that data is required somewhere
[1:05:46]
» On a certain percentage of buildouts.
[1:05:47]
She's saying when you get to 60%
[1:05:49]
» That way the county if the developer
[1:05:51]
doesn't do it, the whole idea of we
[1:05:53]
don't take bonds anymore. It's a letter
[1:05:55]
of credit. The whole idea is if the
[1:05:59]
developer goes bankrupt or whatever, the
[1:06:02]
county will take that money and put in
[1:06:04]
the sidewalks or landscaping or
[1:06:06]
whatever.
[1:06:07]
» There should be um that should be part
[1:06:10]
of their their sign off
[1:06:11]
» And they have to provide that before we
[1:06:14]
allow them to plat it, right?
[1:06:17]
And typically we get those two things,
[1:06:20]
landscaping and sidewalks, because if
[1:06:23]
they put it in up front, they tend to
[1:06:25]
get torn up. So they'll give us a letter
[1:06:27]
of credit, and that's basically the last
[1:06:30]
thing they'll put in and and and
[1:06:34]
you know, they have to have the DO
[1:06:35]
inspector's final sign off that these
[1:06:38]
things are in before they can plat the
[1:06:42]
project. But to to the board's point,
[1:06:46]
like it could take them 20 years to
[1:06:48]
finalize all this project.
[1:06:49]
» Yeah.
[1:06:50]
» So David's saying, why do why does the
[1:06:52]
community have to wait 20 years?
[1:06:53]
» They're not driving they're not driving
[1:06:54]
trucks across this anymore. They've
[1:06:56]
landscaped everything around it. Um
[1:06:59]
» Again, it's um
[1:07:01]
» They just don't want to pay for,
[1:07:02]
» You know, next time they come to this
[1:07:04]
board. That's a possibility as well that
[1:07:06]
they have to
[1:07:07]
» I'm sure I can find something wrong with
[1:07:08]
their application and we'll
[1:07:11]
» I'm just letting you know what I'm going
[1:07:12]
to do.
[1:07:14]
» Well, I feel you. I mean, they certainly
[1:07:16]
they certainly pressure us to, you know,
[1:07:18]
get this stuff moved forward as quickly
[1:07:21]
as possible.
[1:07:21]
» Well, there's a there's a record.
[1:07:22]
There's a paper trail somewhere and I
[1:07:24]
think that it would be advantageous to
[1:07:28]
find it.
[1:07:28]
» Go back to 08. I would like to add to
[1:07:31]
the record
[1:07:34]
LDC section 5.04.03
[1:07:41]
pointH sidewalks. That might answer some
[1:07:45]
of the questions that you have about
[1:07:47]
sidewalks and buyouts.
[1:07:49]
» Okay.
[1:07:50]
» The county.
[1:07:51]
» Well, I mean basically that just says
[1:07:52]
you have to do it.
[1:07:54]
» Yeah. But this was this was approved
[1:07:56]
what 18 years ago? I think it goes a
[1:07:58]
little bit deeper than that.
[1:08:00]
» So,
[1:08:01]
» Okay.
[1:08:01]
» I don't know what the code was when they
[1:08:02]
when they
[1:08:03]
» Now, this is a rule section of Highway
[1:08:05]
98. And if DOT keeps it a rule section,
[1:08:09]
they typically won't put in a bike lane,
[1:08:13]
which of course if you're using DOT's
[1:08:15]
bike lane, you're taking your own life
[1:08:16]
in your life in your own hands.
[1:08:19]
» Can you rattle that section off again?
[1:08:21]
But um
[1:08:23]
typically they put in a sidewalk and
[1:08:25]
they put a bike lane, but it has to be
[1:08:26]
an urban section, not a rural section.
[1:08:31]
» It's in chapter 5 of the land
[1:08:33]
development code 5.04.03.H
[1:08:38]
and the subsection title is sidewalks.
[1:08:41]
» Sidewalks. Okay. But that would only be
[1:08:43]
applicable
[1:08:45]
for it wouldn't necessarily hold the
[1:08:47]
vesting from
[1:08:48]
» From that particular project master
[1:08:51]
plan.
[1:08:52]
» Yeah.
[1:08:52]
» No, but it talks about where they're
[1:08:54]
required,
[1:08:55]
» Buying them out, exempting them.
[1:08:58]
» Because it has to be in a rural area for
[1:09:00]
exemptions. So we
[1:09:02]
» At the end of the day, they're showing
[1:09:03]
it on a plan set, which means it's in a
[1:09:05]
plan set
[1:09:06]
» Somewhere. Yeah. somewhere
[1:09:07]
» Because they're using the same base
[1:09:10]
every time they print out something for
[1:09:12]
water. It's the exact same CAD base.
[1:09:15]
» Yeah.
[1:09:15]
» So, it's in their file, which means it's
[1:09:18]
on a drawing somewhere.
[1:09:21]
» I agree.
[1:09:22]
» Which means it was
[1:09:24]
» Somewhere. It's somewhere.
[1:09:25]
» But just so you know,
[1:09:27]
» You can only exempt a sidewalk in rural
[1:09:29]
areas. And we've made the planning has
[1:09:32]
made the determination that there's
[1:09:33]
nothing rural in South Walton. If it was
[1:09:36]
if it was exempted, it wouldn't be
[1:09:38]
showing up in his C.
[1:09:39]
» No, I'm just saying we're talking about
[1:09:41]
sidewalks. There's a provision in the
[1:09:44]
code for them to be exempted, but that's
[1:09:46]
in rural areas, and we we're the
[1:09:49]
planning department is saying there are
[1:09:51]
no rural areas in South Walton.
[1:09:53]
» Yeah.
[1:09:54]
» There hasn't been for a really long
[1:09:55]
time.
[1:09:56]
» No, I get it. All right. Um well, thank
[1:09:58]
you all
[1:09:59]
» And um Karen, next month we're here.
[1:10:02]
» Yes. All right. Thank you very much. And
[1:10:07]
we're darned calling it.
[1:10:29]
Chase.