RTM Special Meeting 2026/08/31

Waterford, CT · · More Waterford, CT meetings · More Connecticut meetings

Transcript

Download: Text · SRT
SOURCE TRANSCRIPT

This transcript is downloaded from the source you provided but we haven't reviewed it for accuracy. Treat it as a starting point, not a verbatim record. You can also request an AI-transcription of the audio file with the button to the left.

These are YouTube's auto-generated captions, not a human transcript — expect occasional errors, especially with names and technical terms.
[5:28] Are we all set? I just got settled. Now I got to get up
[5:32] again. >> Are you ready? Tell me when you're
[5:35] ready. >> All right. I'm calling the special
[5:41] August 31st meeting of the RTM to order. If you all stand up and follow the town
[5:46] clerk in the pledge. I pledge allegiance to the flag of the United States of
[5:51] America and to the republic for which it stands, one nation under God,
[5:57] indivisible, with liberty and justice for all.
[6:03] » Thank you. Clerk will call the role.
[6:07] » Miss Agman Bosa >> here.
[6:09] » Mr. Bartelli >> here.
[6:11] » Miss Bennett >> here.
[6:12] » Mr. Bade >> here.
[6:14] » Mr. Caukins >> here. Miss Casper,
[6:18] Miss Childs >> here,
[6:21] » Mr. Condan >> here,
[6:23] » Miss Driscoll >> here,
[6:25] » Miss Elbomb >> here,
[6:26] » Mr. Fiorante >> here,
[6:28] » Miss Franklin >> here,
[6:30] » Mr. Goldstein >> here,
[6:32] » Mr. Go >> here,
[6:33] » Miss Gonzalez >> here,
[6:35] » Miss Green >> here.
[6:37] » Miss Hogerty >> here.
[6:38] » Miss Khan, Miss McKenzie,
[6:43] » I'm here. >> Thank you. Miss Morris Head
[6:46] » here. >> Miss Mullen,
[6:51] » Miss Mullen Cole >> here.
[6:53] » Mr. Olinsu >> here.
[6:55] » Miss Pellet >> here.
[6:57] » Miss Stewart Gelinus >> here.
[6:59] » Mr. Sigru. >> Mr. Sullivan
[7:02] » here. >> Miss Watson Jones
[7:04] » here. >> We have a quorum.
[7:08] » All right. Thank you. Moving on. Uh correspondence.
[7:13] Uh you all got everything emailed and I believe the clerk was putting out hard
[7:17] copies tonight. So the only correspondence we have for this special
[7:20] meeting is uh the two requests from Director Allen and Director Haley asking
[7:27] us to have the special meeting and a copy of the letters sent by
[7:33] Representative Condan to the finance director, the Oswagawagi
[7:38] Fire Station building committee chair and attorney Keell and me regarding his
[7:43] concerns about a proposal in the sub building committee. Um, that's it.
[7:55] » No, we're not. Um, and
[8:00] moving on to public comment. Is there any public comment? Is Yes, Helen.
[8:11] I don't need to recite the rules of public comment to you, do I?
[8:17] » [laughter]
[8:38] » Hi, my name is Helen Quisnooki. Uh,
[8:45] we're here about another town building that needs a roof replacement. Again, my
[8:51] questions as well as should be yours. One, we also need to replace the town
[8:57] library roof that's leaking since December 2025,
[9:02] which went through two major snowstorm. One that dumped about 24 ines of snow,
[9:09] as well as numerous rainstorms. Some of them were heavy and tomorrow is going to
[9:13] be another heavy day. This roof is scheduled projected to be
[9:18] done in 2030, four years from now. Oh my gosh.
[9:24] Two, the town expects the library to cough up some money. How much is Goan
[9:29] Firehouse putting in? Remember they just had Fisman fireman's day which made
[9:35] money? Three, we have public works that is supposed to be checking town
[9:41] buildings so that we can nip these issues in the bud. Sounds like to me
[9:48] that his her they did not do their job seriously.
[9:54] Maybe it is time to start looking into this department. People should stop
[9:58] being responsible. four. Once again, the taxpayers is
[10:03] getting the shaft. It's about time to get away from flat
[10:08] roofs. I hope that you all look into this
[10:12] request before you all start saying yes. Thank you.
[10:20] » Thank you. Helen, did you want to give us a written copy
[10:24] or
[10:32] Sorry.
[11:07] What's that? Any other public comment?
[11:11] Any other public comment? Any other public comment? All right.
[11:16] Hearing none, we'll move on to the call. Uh first up
[11:22] to consider and act upon a recommendation from the board of finance
[11:25] to move $178,000 from designated line number 20523-57888
[11:35] uh CNR go roof replacement to appropriated line 20523-57888
[11:42] CNR go roof replacement to begin work on a capital project approved May in May
[11:49] 24. Do we have a motion? >> Second. Motion and a second. Um,
[11:54] presentation.
[11:58] » There was a question mark after that word. Sorry.
[12:01] Yeah.
[12:05] » Well, it it it seemed >> Good evening, everyone. Thank you for uh
[12:08] thank you for responding to our request to hold the special meeting. I know it's
[12:11] uh not always the most convenient thing to get everyone in, so I I appreciate
[12:15] that very much. Um, as the uh moderator stated, it was this is the continuation
[12:20] of a uh CNR capital project that was brought up uh I believe in 2024 prior to
[12:26] my arrival. Um, this uh a quick summary of it initially that was taken on the uh
[12:33] replacement of one of the three flat roof sections of the Goan firehouse. Um
[12:37] at that time uh I believe from the uh large amount of documentation that I I
[12:43] went through um provided courtesy of the the members of goan and and Tom Denbeck
[12:48] had assembled quite a uh dossier on the roof project. He had submitted a letter
[12:52] to the RTM and to I believe the board of selectman in March of 2025 requesting
[12:58] that the project be all three flat roofs in one to avoid uh tripling the setup
[13:03] and transportation fees. So that's what this is. Um the bidsp spec before you uh
[13:08] was prepared through um the town's purchasing office in partnership with
[13:13] Trimco Roofing. Uh they're the uh the town's roofing I guess subject matter
[13:18] expert uh that you would call them on call and uh this is to replace and uh
[13:24] replace the all three flat roofs in one fell shot. Um there's a number of
[13:30] specifications attached to it that was submitted as part of the backup. I am no
[13:34] roofer, but I have learned a lot about roofs through some of our expert help.
[13:38] So, I may be able to provide some backup uh and uh context, but bear with me if I
[13:46] don't know the most technical aspects of the materials and whatnot, but I uh I
[13:50] can give you a surface level uh layman's summary of it. It's a good quality
[13:54] product. It's not the It's certainly not the cheapest possible roof out there. I
[13:58] think um what what we're replacing may have been um and this isn't a uh it's a
[14:04] modified bumen roof, not the traditional builtup roof as they once were known as.
[14:09] Uh it's a uh very high quality high quality material. One of the most
[14:14] interesting things in throughout the course of this is that we haven't been
[14:17] able to find too much information about said roofs. Um, but this one will have a
[14:21] microchip buried in it that um, any of us that may or may not be here in the
[14:27] future when this roof needs to be replaced. Whoever gets the job can come
[14:30] over, scan said hidden microchip in it, and know when it was installed, what
[14:34] it's made of, how it was constructed, uh, when it got put down, and have all
[14:37] that information buried into the bedding of the roof, so we don't have to, uh,
[14:41] try and piece together the information again. So that's my
[14:47] » wow >> rant, not presentation. Just a rant.
[14:50] Presentations come with slides, but I'm open to any questions. Thank you again
[14:53] all for convening tonight. >> There you go. Thank you. Uh and I only
[14:56] use the phrase presentation because it's any less threatening than would you care
[15:00] to take a seat so we can ask you questions.
[15:03] » Thank you. So, uh any questions and comments?
[15:09] » Representative Franklin. >> I have a question.
[15:12] » Oh, Kate, you'll be second. Hi. Um, thank you for your your
[15:17] presentation. Um, I was I was curious if you know and [snorts] maybe somebody
[15:22] else here could answer when the last time the roof was replaced.
[15:29] » A resounding no. Uh, yeah, the uh information uh we that we were provided,
[15:34] we can't put an actual date on it. Um, but like I said, that's what we're
[15:39] hoping to avoid having to do by burying that RF microchip in there and making
[15:44] sure that uh hopefully our future descendants don't have to try and piece
[15:49] it together in the background. >> Yeah. And can I ask a followup?
[15:53] » Yes. >> Um, has has there been a history of a
[15:56] lot of like patchwork and repair on the roof over the last few years if if you
[16:01] know. >> Uh, yeah. I believe that that's why it
[16:03] was that's why it was brought forward uh two years ago to begin the process of re
[16:07] of replacing it. Um there's uh there's been a number of of repairs and leak
[16:13] leak repairs throughout the past couple years. Um TMCO uh from the past year
[16:18] that I've been here, TMCO has has been out there for that roof specifically and
[16:22] they and they've uh done some some repair work on it throughout. Um but
[16:27] apparently prior to me there was a you know a long string of history associated
[16:31] with the roof based on the large amount of material that um uh member Dembeck
[16:36] had um had compiled over the years. >> Right. Thank you very much.
[16:40] » Y Representative McKenzie,
[16:44] » you're up. Kate >> through you, Madam Moderator. Um, Chief,
[16:50] I see a what I might think of as a duplicative fee on each of the roofs.
[16:56] There's a $9,300 fee for setup, safety, and equipment.
[17:03] They're billing us $9,300 for setting up safety and equipment for
[17:10] each roof. If we're trying to package it all, can we get that down to one fee or
[17:16] why are we paying that each time if they're already there? Thank you.
[17:22] » Uh, if you can hear me over the phone, do you happen to have a page number that
[17:26] I can flip and refer to? >> Actually, I know the answer.
[17:30] » Looks like 14. Uh, sorry, it's going to be
[17:35] starting at 13, I believe. 14 and 15. It's the Imperial Company letterhead. It
[17:42] has the three roof breakouts. >> Yeah.
[17:45] » On individual pages. Looks like it starts
[17:50] page 12. >> Director Haley, I can explain that.
[17:55] » 12, 13, and 14. Roughly, it's roof one breakout, roof two breakout, and roof
[18:01] three breakout. And on the bottom of each one of those quotes for the three
[18:07] roofs, it says, "Add $9,300 for site setup, safety, and equipment."
[18:15] And that's on each roof. So, I'm just curious,
[18:19] » represent trying to consolidate and do it all at once. Thank you.
[18:23] » Thank you, Representative McKenzie. I'm taking pity on Director Haley because
[18:27] that is a document from before his time. Um but I do know what you are
[18:32] referencing that that was in the backup uh from the budget we were presented
[18:37] last spring which was prepared the winter before that the year before that.
[18:44] That is a much earlier quote from Imperial. There are actually buried in
[18:49] there three quotes from 2024 and 2025 and then 2026. the one you're looking
[18:55] at, the 2025 with the 9300. Um,
[19:00] that is not the quote that was approved. And actually, I I did the math on that
[19:05] and they were only in the end on that quote going to charge us one single
[19:09] $9,300 fee back then, >> but it's very good.
[19:15] » It's somewhat moot at this point because now we have a different bid.
[19:20] » All right. I appreciate that, madam moderator, and thank you for the
[19:23] clarification. >> Thank you for reading all the backup to
[19:26] the end. >> You're welcome.
[19:31] » I app I applaud that greatly. Thank you, Sue, because moderator Driscoll because
[19:36] I uh I quickly became very confused and then if you look it for everyone's
[19:40] context, the the section that they're talking about was from then the CNR was
[19:44] initially brought up dated at the very top uh 116 2025. So I believe that's
[19:49] what they were referring to. Avoid the three setup fees. Um the one you should
[19:53] be or the one that is in question tonight before you is uh my
[19:58] correspondence 72326. Thank you.
[20:01] » Yeah, that was it. That is the problem. But it
[20:05] does show the history of just >> Yeah.
[20:07] » how many times this has been bumped around. All right,
[20:13] Representative Childs. through you madam moderator. Um so I
[20:19] found hi I found um in the 2425 fiscal year request um for a capital project um
[20:26] it was from um the director before you he had mentioned in his description that
[20:33] um not only the twothirds of the flat roofing but onethird of the pitched roof
[20:38] needed to be replaced. Did you when you were looking through kind of the records
[20:42] to see what might have been done, did you see anything about the pitched roof
[20:46] being addressed? >> Uh, no. The I also spoke to TMCO as well
[20:51] uh when they rebid this and and when they were out to create uh that package
[20:56] initially. Yeah. >> Um no, there was never anything included
[20:59] in any of the initial scopes about the pitched roof.
[21:02] » Okay. Um, I spoke to I spoke to the luckily the the the person who wrote
[21:07] this one that was just quoted referred to from 2024 still still there, still
[21:11] employed, still our um uh representative. Uh, I spoke to him uh
[21:17] over the weekend again just to confirm that and and so far no one has been able
[21:21] to uh identify a solid answer on how old the uh the roof the pitched roof portion
[21:26] is. Okay. But um he's been out to the site twice uh to write this initially
[21:31] and then to update it um with a little bit better materials and things the
[21:35] second time around. Um and he's he strongly believes that that because
[21:40] there's a sloped uh portion on the the pitched roof, it's a it's a hip and
[21:44] sloped roof that there there's some life still left in the shingle roof right
[21:48] now. Um I to quote the technical assessment that he gave me over the
[21:53] phone. uh it has not experienced blowoff or tear out or cracking at this point um
[21:58] and uh feels that there's there's um life left in the shingled portion, but
[22:03] no, so far no one has been able to >> find any paperwork that says how old
[22:07] that is. >> Excellent. Thank you.
[22:13] » Any other questions for Representative Bennett?
[22:17] » Through you, Madam Moderator. Um I have a quick question. Um thanks for sharing
[22:20] the info first on the tracking chip. I feel like that is something that's uh
[22:24] pretty interesting to know that that can happen. It reminds me of like when you
[22:27] put it in your dog and they scan the dog to find out where it goes. It's it's
[22:30] amazing how much technology can really impact and make our lives easier.
[22:34] Hopefully it works by [laughter] the time the room is done. Um when it comes
[22:37] to this new material that they're um that they're per that they're get
[22:41] telling us to use instead of the like you said the cheapest material. Do you
[22:44] have any idea on the longet like how many years it is supposed to last? Uh
[22:49] yeah, the it comes with your, you know, your standard commercial 20-year. I
[22:54] shouldn't say standard because some of the other work roof work that may have
[22:56] gotten done in the past may not have come with the standard warranty. Uh but
[23:00] it would come with what's considered a uh indust industry industry standard
[23:03] 20-year warranty. Um uh the installer themselves, bumperto bumper, two years.
[23:10] Uh, and TMCO being that that we work with them, uh, TMCO is a national
[23:14] roofing supplier, uh, and they have a number of contractors that are
[23:17] installers for them. But they, um, they would come out prior to that two-year
[23:21] bumper-to-bumper, if you will, expiring, and do an assessment on our behalf to
[23:25] make sure that that the installation was done properly, uh, was all done up to
[23:28] spec, and then they TMCO would provide a number of ongoing, um, ongoing
[23:34] assessments throughout. uh you know, kind of like if you want the warranty on
[23:37] your Honda to keep up, you got to do the oil changes and air filters when Honda
[23:40] tells you. Um they would come out and do those ongoing inspections for us. And um
[23:45] all all things all things kosher would go through um at 20 years, we'd be able
[23:50] to refresh the roof instead instead of replace it. They'd be able to strip the
[23:54] top layer off, reskin it. This is a two- layer roof. You have a heavy duty base
[23:58] layer uh and then a product that's called Endura 100. Um it's not the
[24:02] Cadillac top end, but it's not It's not the stuff that you have to tear off and
[24:06] throw away. So, you'd be able to redeck the roof for another another 20 years of
[24:10] service at the end of the initial 20 years
[24:13] » for much less than what we have to do to put it together.
[24:15] » Correct. It becomes what they refer to as a roof restoration at that point. Um,
[24:19] by by putting in the the two-layer system, you're able to protect. They're
[24:22] going to replace any of the wet insulation that's under there right now.
[24:25] Tear that off, replace all the anything that's compromised right now. Um, but
[24:31] uh, you know, nothing is obviously bulletproof. uh you know, hurricane
[24:34] damage, things like that that may or may not be end up being, you know, taking
[24:37] the road of an insurance type thing. But, uh,
[24:41] all things included and all things by design would be able to get a 20-year
[24:44] service life out of it and then be restored for another 20 year service
[24:48] life after this. And then at that point, you re remove, you know, down to the
[24:52] deck and replace the roof system as a whole.
[24:56] » To the best of my knowledge, based off of
[24:59] » Yeah. And who knows what products are going to be available in 20 years. It
[25:02] could be a 40-year roof at that point. Um, when it comes to those maintenance
[25:05] items that you just discussed, is that something that's included in the price
[25:07] that's here or is that something that we would have to come up with?
[25:10] » It's included as part of the package. >> Oh, okay.
[25:12] » That makes me feel better. All right. Thank you so much.
[25:14] » Thank you. >> Okay. Any other questions?
[25:19] » Oh, Representative Elbow. >> Hello. I did have a quick question. I
[25:25] work in a building that has flat roofs as well. Birds are a big concern because
[25:31] love to drop things and then peck. Causes a lot of leaks and
[25:38] birds like to peck at the roots and cause of course going through and
[25:43] penetrates through and cause a lot of leaks. Um is there going to be anything
[25:47] put up to deter birds perhaps? So that can help deter
[25:54] early issues maybe. >> Hasn't come up. Uh,
[25:59] » just a little POA, you know, that might be something interesting. So,
[26:05] » I would uh I I I would look into one of those plastic owls.
[26:09] » I'd even provide it myself if it if it keeps the roof to get intact. I would
[26:13] look into it. But yeah, I mean >> I I'll I honestly I will I I'll call
[26:18] TMCO and ask, you know, is bird deterrent, you know, something in the
[26:22] roofing industry. >> It sounds funny, but
[26:24] » No, I listen especially being near the shore. I mean, I can only imagine that
[26:27] the occasional clam gets dropped >> uh dropped and it misses the parking lot
[26:31] and hits the roof. So, I totally understand it.
[26:34] » Thank you. >> Yep.
[26:37] » All right. Any other questions? Any other
[26:43] uh and Representative Valencu? Sorry,
[26:46] Steve. I saw him first. You're next. uh through you madam or under uh Chris I
[26:51] just want to thank you for your work so far as a director of fire services uh
[26:57] for many years the the issues of the needs of the various other four
[27:02] firehouses of ostaging have [clears throat] needed attention and I
[27:07] think you promised to me when you first got hired that you would address these
[27:11] issues of the other firehouses and you have done so adimately so far. I just
[27:16] want to thank you for uh really doing a great job uh taking care of our other
[27:23] firehouses. Uh and that's it. Thank you.
[27:28] » I appreciate that. Thank you. >> Thank you, Representative Bizade.
[27:32] » Who owns the firehouse?
[27:36] » Who holds title to the firehouse? Is it goant like a private company like Algaji
[27:42] was or does the town of Waterford own it? uh private association.
[27:47] » Okay. The town is obligated to put a roof on this private property.
[27:54] » Uh the the building the building maintenance services are are
[27:58] historically u part of a ongoing uh agreement that was agreements that were
[28:04] signed with each individual association. Uh I believe in the 70s.
[28:08] have to defer to someone that 1974 um and you that were signed in
[28:16] partnership um to protect both both parties in in uh both parties interests
[28:21] in the properties I believe to avoid them uh becoming subject to mortgage for
[28:26] improvement that it was if um that the town would would support building
[28:31] building upkeep and building repairs uh to avoid the associations having I guess
[28:35] put them under mortgage and at that time the uh to the best of my understanding
[28:39] then at that time the town would lose its its interest in a um you know a
[28:44] public safety infrastructure asset. So I believe that's how those agreements were
[28:48] initially reached but I would I'm I'm waiting into waters that are long before
[28:52] my time here uh just taking off the surface level.
[28:57] » Will the town buy that property like they did Owagi you think down the road?
[29:06] I >> or it will it always be private? And if
[29:09] it is private, do they make any kind of contribution to this expense of putting
[29:14] a roof on it or any other expensive HVAC, doors, whatever?
[29:20] » Uh it's it's it's nothing that I've explored. Um but historically, I believe
[29:27] the agreements were, you know, everything was through funded through
[29:30] the town to the best of my knowledge that I've put together. Um,
[29:34] [clears throat] uh, so I I I wouldn't I wouldn't know. I'd be I wouldn't want to
[29:38] speak out of turn on something that I don't know about what had gone on in the
[29:41] past, but I believe that >> understand
[29:43] » everything has gone through uh through town funds.
[29:46] » I'm totally in favor of putting a roof on a firehouse to protect the apparatus
[29:51] and and the investment, but I'm not a big fan of putting a roof on my
[29:55] neighbor's house, if you follow me. So, someday we're going to own it. as
[30:01] part of the investment of buying the property. Um,
[30:05] just curious. I mean, the alagotchi was private for my whole life and now the
[30:11] town owns it and big things are happening there. I didn't know if there
[30:14] was plans for that down the road as well. Um, I I would say, you know, in
[30:18] the in the uh in the broader context, I if if that was a case of, you know, we
[30:23] would definitely want to be approving the roof either way, like you said, to
[30:26] protect your investment. Um, if if that's something that the town wishes to
[30:30] pursue, uh, far beyond my purview right now is today. Um, but I
[30:38] agree with you that that putting the roof on would be a sound investment for
[30:41] the future. The [clears throat] other concern I have, and it was addressed a
[30:43] little bit earlier, was um the the shingled part of the roof,
[30:49] if it only has x amount of years, and you said nobody can really come up with,
[30:54] should it be all done at one time? Because if they're going to replace that
[30:58] down the road, the flat roof's going to take a beating with the debris that they
[31:02] pull off. I would assume they're going to strip it and replace plywood or
[31:05] whatever needs to be done. Um,
[31:08] » how much more, if this company even does that type of
[31:12] roofing, how much more would it cost just to do it all and let it be done for
[31:16] a number of years? >> One of the uh one of the challenges is
[31:20] that the project was already established. So, I just followed the the
[31:23] existing scope so we didn't have to expand the scope out again and bring
[31:27] this back um you know further years down the road. And and with that uh one of
[31:32] the reasons that the next item is the bid wa is the uh not the bid waiver the
[31:35] uh the waiting period the 15-day waiting
[31:39] period to waiver it is to try to get moving before the winter so we're not
[31:42] we're not subject to another winter of >> it's all good all good what everything
[31:46] you're doing is good it's just u you know I'm in that field where do you just
[31:52] put a band-aid on whatever is there or should it be top down selling just
[31:57] replace it all and be done with it? How much more would it cost? It's not going
[32:02] to get any cheaper down the road. And if we're spending all
[32:07] this money on a flat roof with this fancy
[32:10] migraine chip thing, we certainly don't want to damage it without having to
[32:15] replace 5 10 years down the road. You know, it I'm just thinking out loud.
[32:22] » Um [clears throat] I I I had to advance the uh the scope of the project that
[32:27] existed. Um, like I said, we we did touch base and they said that that they
[32:31] see life left in that. Um, and uh, at this time he said he he couldn't give an
[32:38] accurate recommendation on replacing it other than that that he believes that
[32:41] there's life left in the aphalt shingles. Um, no one, like I said, no
[32:45] one has been able to identify the current age of it, but um, I think it is
[32:51] it is advisable to try and get at least all three of the flats done uh, prior to
[32:55] another winter. and um and then explore that uh in the next coming five-year
[33:02] capital requests. Normally, I believe we're putting out a five-year window for
[33:06] capital requests. So, to be able to find room in there to continue that that
[33:10] portion of it if so uh if so possible so we don't wait until something is failed
[33:16] and leaking. We can try and get ahead of it and get it on the radar at least now
[33:19] and start looking at it while we have some time to plan out and things. and
[33:22] hopefully this is um one of the last ones that we're chasing uh late. So I I
[33:27] I totally hear and understand your sentiments on on everything you stated.
[33:31] Um and I think that we're we're attempting to become, you know, to take
[33:34] a more responsible approach and a little bit more forward-looking approach to all
[33:38] these things. Um so I I totally agree with with every one of your sentiments
[33:42] on it. So >> thank you for your time.
[33:45] » Thank you. >> Appreciate you.
[33:46] » Thank you. Thank you. Was that any other questions?
[33:52] Representative Condan. >> Uh through you, Madam Modiator.
[33:57] Uh Chris had did you talk to uh I'm just
[34:01] looking at the pictures is the first time I'm seeing the plans. Did you talk
[34:04] to uh HVAC Tech to get a price to move those uh units on the roof?
[34:11] Is that included? I see in their their uh construction notes that it's up to us
[34:16] to uh disconnect and reconnect. Um which obviously we would want to approve this,
[34:22] but I don't want your budget to take a ding. I know this project predates you,
[34:25] so if you had to come back for more money at a later date, I just didn't
[34:29] know if this was uh I don't see any evidence that it was included. Well, one
[34:33] of the nice things is that that another um
[34:37] another step forward we took on the buildings this year was to um work to
[34:42] get preventative maintenance contracts uh on various different services that
[34:46] didn't exist before. Uh one of those is that we were able to partner with MCOR
[34:50] who already has uh you know a bulk of or is working towards a bulk of the
[34:54] projects um and the HVAC systems in town. Uh so we signed on an agreement um
[35:00] with them to provide dual services uh spring and fall turns and turnoffs and
[35:05] pre or post uh heating and cooling seasons. So in the event we had to
[35:09] relocate or or disconnect something or or you know if we had to drain a system
[35:13] to move something around based on what TMCO needs to do for penetrations. Um
[35:17] you know right now we don't know is there failed insulation around some of
[35:20] those things that might have to we have to redeck a section or whatnot. Luckily,
[35:24] we we now have MCORE at our disposal on call uh signed on a on a service
[35:28] agreement um for all the stations uh for everywhere now. So, every every station
[35:34] will be getting not only that preventative maintenance, but it it
[35:36] gives us a little bit more of um it's kind of like if you have a service
[35:40] agreement with your oil guy, right? >> You get kind of a little bit more
[35:43] preferential treatment when you need them. So luckily we have them at our
[35:46] disposal in the event that we have to significantly relocate something or or
[35:50] maybe drain the you know the refrigerant out of a system or something to move it.
[35:53] » Yeah, that was my question because this just says that they have to lift these
[35:56] at a minimum 8 inches of clearance to a roof underneath it. But the the cost is
[36:02] to us not not to but as long as we have somebody
[36:06] » Yeah. I mean there there' obviously be you know a cost but it wouldn't have to
[36:10] be a uh you know a furtherance of a capital project.
[36:15] I say that quickly. I knock as quickly as I can, but hopefully it would just be
[36:19] uh there's enough slack in the line sets to be able to lift it. But if they had
[36:21] to redeck a portion of it under something like that, I'm sure MCOR would
[36:25] uh would have the tools and people to do it.
[36:28] » Perfect. Thank you. >> Thank you.
[36:32] » Okay. Any other questions? Any other questions?
[36:39] Any other questions? All right, hearing them. I think we're ready for a vote.
[36:46] Roll call.
[36:49] Roll call. [snorts]
[36:55] » You want to repeat the motion?
[37:03] » Sure. The last meeting couldn't remember if I had to repeat the motion.
[37:08] The motioning for all of us who have forgotten is to move $178,000
[37:13] from designated line number 2052357888 CNR Goian roof replacement to
[37:20] appropriated line 20523-57888
[37:25] CNR go roof replacement to begin work on the capital project approved May 2024.
[37:32] So call the role
[37:39] A yes is to approve. Miss Agman Bosa. >> Yes.
[37:44] » Mr. [clears throat] Bartelli. >> Yes.
[37:47] » Miss Bennett. >> Yes.
[37:49] » Mr. Bade. >> Yes.
[37:51] » Mr. Caukins. >> Yes.
[37:53] » Miss Childs. >> Yes.
[37:56] » Mr. [clears throat] Condan. >> Yes.
[37:58] » Miss Driscoll. >> Yes.
[38:00] » Miss Elbomb. >> Yes.
[38:01] » Mr. Fioranti. >> Yes.
[38:04] » Miss Franklin. >> Yes.
[38:06] Mr. Goldstein, >> yes.
[38:08] » Mr. Go, >> yes.
[38:10] » Miss Gonzalez, >> yes.
[38:12] » Miss Green, >> yes.
[38:15] » Miss Hogerty, >> yes.
[38:19] » Miss McKenzie, >> yes.
[38:22] » Miss Morris Head, >> yes.
[38:25] » Miss Mullen Cole, >> yes.
[38:27] » Mr. Olinsu, >> Miss Pellet,
[38:31] » yes. >> Miss Stewart Galinus,
[38:33] » yes. Mr. Sullivan,
[38:38] » Miss Watson Jones, >> yes.
[38:41] » Motion passes. Thank you all very much.
[38:44] » Thank you. >> Much appreciated.
[38:46] » And despite your disclaimer, you sounded like you were an expert on roofing by
[38:50] the time you got into it. Gary, don't say that too loud. Gary will
[38:56] come find me. >> Well, we're all going to call Gary and
[38:59] ask him why we can't get microchips in every building.
[39:03] Uh, next on the agenda to consider an act upon the previous motion as
[39:07] emergency legislation waving the 15-day waiting period in order to have the
[39:12] project completed before harsh weather conditions delay work until next year.
[39:17] Do we have a motion? >> Second
[39:23] steward. I'm very proud I don't usually catch them both.
[39:28] All right. Uh, any questions? Any discussion? Any
[39:36] questions? Any discussion? Any
[39:42] questions? Uh, hearing none. Are we okay with a
[39:46] with a voice vote on this one? All right.
[39:53] So, we're going to do a voice vote on declaring this emergency legislation to
[39:58] wave the 15-day waiting period. Huh? I means you agree.
[40:05] How's that?
[40:10] » You want to call for the vote? All in favor?
[40:13] » I >> opposed.
[40:16] » Abstain
[40:20] hearing. None. Eyes have it. Motion passes. All right. Thank you all very
[40:24] much. Uh I'll enter a motion to adjurnn. Second.
[40:29] Thank you all again. >> Thank you.
[40:31] » Thank you, Chris
[40:36] of a German. I opposed.